KR20170106869A - Rope fixing device for building cleaning - Google Patents

Rope fixing device for building cleaning Download PDF

Info

Publication number
KR20170106869A
KR20170106869A KR1020160030570A KR20160030570A KR20170106869A KR 20170106869 A KR20170106869 A KR 20170106869A KR 1020160030570 A KR1020160030570 A KR 1020160030570A KR 20160030570 A KR20160030570 A KR 20160030570A KR 20170106869 A KR20170106869 A KR 20170106869A
Authority
KR
South Korea
Prior art keywords
rope
building
sleeve
reinforcing bar
box
Prior art date
Application number
KR1020160030570A
Other languages
Korean (ko)
Other versions
KR101857682B1 (en
Inventor
고의환
고재환
Original Assignee
고의환
고재환
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 고의환, 고재환 filed Critical 고의환
Priority to KR1020160030570A priority Critical patent/KR101857682B1/en
Publication of KR20170106869A publication Critical patent/KR20170106869A/en
Application granted granted Critical
Publication of KR101857682B1 publication Critical patent/KR101857682B1/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16GBELTS, CABLES, OR ROPES, PREDOMINANTLY USED FOR DRIVING PURPOSES; CHAINS; FITTINGS PREDOMINANTLY USED THEREFOR
    • F16G11/00Means for fastening cables or ropes to one another or to other objects; Caps or sleeves for fixing on cables or ropes
    • F16G11/12Connections or attachments, e.g. turnbuckles, adapted for straining of cables, ropes, or wire
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B35/00Screw-bolts; Stay-bolts; Screw-threaded studs; Screws; Set screws
    • F16B35/04Screw-bolts; Stay-bolts; Screw-threaded studs; Screws; Set screws with specially-shaped head or shaft in order to fix the bolt on or in an object
    • F16B35/041Specially-shaped shafts
    • F16B35/042Specially-shaped shafts for retention or rotation by a tool, e.g. of polygonal cross-section
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B45/00Hooks; Eyes

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The present invention relates to an apparatus for fixing a rope for cleaning a building, which is configured to fix a rope on which a worker hangs when cleaning an exterior wall such as windows, tiles, or the like of a building. The apparatus for fixing a rope for cleaning a building comprises: a box (20) having one side opened and embedded in concrete; a sleeve (50) inserted through a bolt through-hole (25) formed in both side walls (22) of the box (20); a rope loop (30) positioned in a concave groove (24) of the box (20) and having a through hole through which the sleeve (50) passes at both ends of an upper portion in a U shape so as to penetrate an outer diameter of the sleeve (50); an iron hanging member (60) positioned on the outside of the both side walls (22) of the box (20), coupled to both ends of the sleeve (50), and coupled to iron of an iron net in a building; and a bolt nut (40) coupled through the inside of a bolt coupling hole (63) of the iron hanging member (60), the bolt through-hole (25) of the box (20), and the sleeve (50). According to the present invention, the apparatus for fixing a rope is capable of rotating the iron hanging member to easily couple the same to iron, and improving safety by being firmly coupled to the iron without breakaway by a hooking piece formed on an iron hanging unit. Also, it is possible to easily manufacture an iron member in a large quantity by pressing the iron member with a member of a flat plate.

Description

Building cleaning rope fixture {.

In order to fix a rope hanging on a building to a building, the reinforcing bar fastening member is rotated to easily fasten the reinforcing bar to the reinforcing bar to clean the outer wall surface of a glass window or tile of a high-rise building. It is possible to securely secure the safety of the cleaning worker on the outer wall surface of the building using the rope. And more particularly to a rope fixing device for cleaning buildings.

Generally, when cleaning the outer wall of a high-rise building, an operator hangs on the rope and cleans the roof from the top of the building. At this time, the rope must be fixed to the top of the building to fix the rope, Respectively. Therefore, it is necessary to fix the rope on the top floor of the building. In recent buildings, the rope fixing ring is embedded in the concrete when the railing of the building is formed. On the other hand, the rope fixing device must be firmly mounted on the wall of the building, since it can safely support the person hanging on the rope. Therefore, the rope fixing device for building cleaning is usually constructed by fixing the rope fixing device to a steel frame or a reinforcing bar which is installed inside a wall of a building when building the building, and then a reinforcing bar for reinforcing the wall of the building when the concrete is laid, To be buried in the wall surface, thereby providing a safe and durable installation structure. That is, in order to install the high-rise building cleaning rope fixing device, when the concrete on the outer wall or the column of the building is poured, the portion where the rope is held is exposed to the outer wall surface of the building and the rest is tied to the reinforcing bar in the building wall It is being buried.

In order to satisfy such a condition, the 'rope fixing device' of Japanese Laid-Open Patent Application No. 2008-0074500 includes a fixing piece 6, which is embedded in the concrete 19, And a rope loop 7 formed at one end of the fixing piece 6 and connected to the rope are integrally formed. In order to install the rope loop 7 on the concrete 19 of the railing, the rope loop 7 is provided on the mold 12 provided on the side where the rope loop 7 is exposed from the molds 12 on both sides, And the concrete is inserted between the molds 12 in a state where the fixing pieces 6 are inserted into the through holes 17 to form a railing . When the curing of the concrete placed between the dies 12 is completed, the dies 12 on both sides are removed. At this time, the dies 12 provided with the rope rings 7 can not be removed due to the rope loop 7, Another large hole 18 is formed in a portion where the rope loop 7 is located to remove the mold 12. The mold 12 having the holes 18 formed therein can not be reused, and therefore can not be disposed of. Especially in case of recently used molds of steel plate, the price is high and the economic loss is great. Since 5 to 20 rings are usually installed in a single building, about 5 or as many as 20 molds are disposed of, resulting in a large economic loss. Since the fixing pieces 6 of the rope loop 7 are inserted into the through holes 17 formed in the formwork 12, movement occurs in the rope loop 7 when the concrete is laid, There is a problem that the position is changed.

The 'building cleaning rope fixing device' of Registration Practical Utility Model No. 20-0459687 includes a main body 2 having a concave groove 1 as shown in FIG. 2A, A bracket 5 protruding from both sides of the mounting hole 4 and a fixing piece 6 fixedly attached to the bracket 5 in a state of being inserted through the mounting hole 4. A rope loop 7 is fastened to a rope at the front end of the fixing piece 6. An auxiliary reinforcing bar 8 disposed inside the wall of the building is inserted into the rear end of the fixing piece 6 to be fixed And a reinforcing bar insertion hole 9 is formed. 2B, the auxiliary reinforcing bars 8 are horizontally inserted into the reinforcing bar insertion holes 9 formed in the fixing pieces 6, And then the concrete is laid. However, it is necessary to cut the auxiliary reinforcing bar 8 at the time of construction and transfer it to a high place, and to insert the auxiliary reinforcing bar 8 into the reinforcing bar insertion hole 9 and then to bundle it with the wire 16 The reinforcing bar insertion hole 9 and the reinforcing bars 14 and 15 are often bundled with the wire 16 without using the auxiliary reinforcing bar 8 at the actual construction site in many cases. However, in reality, the fixing pieces 6 are not firmly fixed to the reinforcing bars in the building structure and are not fixed to the walls or pillars of the building. In this case, Which is not supported by the cement portion of the concrete, is insufficient in structural strength and thus can not guarantee safety. In addition, the above-described structure has a problem that it is relatively expensive because it takes a lot of time for assembling components and constructing them at a high construction site.

Published Patent No. 2008-00744500 Registration Utility Model No. 20-0459687 Application No. 10-2015-0169851 Published in Japan Utility Model Newspaper No. 06-051403 .

SUMMARY OF THE INVENTION In order to solve the above-mentioned problems, the present invention has been made to solve the above-mentioned problems and it is an object of the present invention to provide a structure in which a rope loop is combined with a reinforcing bar in a concrete, And to provide a building cleaning rope fixing device capable of reliably ensuring the safety of the building.

Other objects of the present invention will become readily apparent from the following description of the embodiments.

In order to accomplish the above object, the present invention relates to a building fixing rope fixing device for fixing a rope to which an operator hangs when cleaning an outer wall surface of a glass window or a tile of a building, A sleeve 50 inserted through a bolt through-hole 25 formed in both side walls 22 of the box 20; A rope loop 30 located in the concave groove 24 of the box 20 and having a through hole through which the sleeve 50 penetrates at both ends of the upper portion in a U shape so as to penetrate the outer diameter of the sleeve 50; A reinforcing bar member 60 located outside the opposite side walls 22 of the box 20 and coupled to both ends of the sleeve 50 and coupled to reinforcing bars of the reinforcing net in the building; A bolt coupling hole 63 of the reinforcing bar member 60, a bolt through hole 25 of the box 20, and a bolt nut 40 penetrating through the inside of the sleeve 50 A rope fixing device for building cleaning is provided.

The reinforcing bar member 60 is fastened to both side walls 22 of the box 20 by the bolt nuts 40 so as to be rotatable with respect to the box 20, It is easy to adjust the angle.

The reinforcing bar member 60 is formed of a flat plate member and has a circular sleeve insertion opening 61 at one end and a circular reinforcing opening 62 at the other end of the sleeve insertion opening 61 .

The reinforcing bar member 60 further includes a first reinforcing bar 63 at a lower side of the reinforcing bar insertion hole 62 and a second reinforcing bar 63 between the first reinforcing bar 63 and the sleeve insertion hole 61. [ The first and second reinforcing hooks 63 and 64 are provided with a first engaging member 63a and a second engaging member 63b for preventing the detachment of the reinforcing bars by covering the reinforcing bars inside the building concrete, (64a) is formed.

The first and second reinforcing bars 62 and 63 are formed with a first guide portion 63c and a second guide portion 64c, respectively, for guiding the coupling by rotation of the reinforcing bar The first and second reinforcing bars 62 and 63 are formed with first and second engaging jaws for preventing the reinforcing bars from being separated from the reinforcing bars after the coupling by rotation of the reinforcing bars when the reinforcing bars are pivotally coupled .

The rope fixing device according to the present invention has a simple structure and can easily be fastened to the reinforcing bars constituting the walls or pillars of the building before the form is pivoted so that the rope fastening members can be easily fastened. So that they can be firmly coupled to each other. Further, the sleeve 50 can be easily installed or separated on the outer wall of the building without damaging the form, and the sleeve 50 is made of stainless steel or the like to prevent corrosion to make the appearance of the building beautiful. The safety of the cleaning worker on the outer wall surface of the building can be surely guaranteed.

BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a schematic view showing a conventional coupling structure between a rope fixing ring and concrete
FIG. 2 is an example of a conventional structure for coupling a rope fixing ring and a reinforcing bar.
3 is a perspective view and a side view of an embodiment of a rope fixing device for building cleaning according to the present invention.
4 is a view of a reinforcing bar member as a component of the building cleaning rope fixing apparatus according to the present invention
5 is a front view and a side view of another embodiment of the building cleaning rope fixing device according to the present invention.
6 is a view showing various forms of a bolt nut which is a component of a building cleaning rope fixing apparatus according to the present invention

While the invention is susceptible to various modifications and alternative forms, specific embodiments thereof are shown by way of example in the drawings and will herein be described in detail. It is to be understood, however, that the invention is not to be limited to the specific embodiments, but is to be understood to cover all modifications, equivalents, and alternatives falling within the spirit and scope of the invention, And the scope of the present invention is not limited to the following examples.

Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings, wherein like or corresponding elements are denoted by the same reference numerals, and redundant explanations thereof will be omitted.

FIG. 1 is a view showing an example of a conventional coupling structure between a rope fixing ring and concrete, and FIG. 2 is an example of a conventional coupling structure between a rope fixing ring and a reinforcing bar. 3 is a side view of a rope fixing device for building cleaning according to the present invention, FIG. 4 is a side view of a rope fixing device for building cleaning according to the present invention, FIG. Fig. 3 is a side view of a reinforcing bar member as a component. Fig.

3A and 3B, the rope fixing device 100 includes a box 20 which is opened at one side thereof and is embedded in the inside of the concrete, A sleeve (50) inserted through a bolt through-hole (25) formed in the housing (22); A rope loop 30 located in the concave groove 24 of the box 20 and having a through hole through which the sleeve 50 penetrates at both ends of the upper portion in a U shape so as to penetrate the outer diameter of the sleeve 50; A reinforcing bar member 60 located outside the opposite side walls 22 of the box 20 and coupled to both ends of the sleeve 50 and coupled to reinforcing bars of the reinforcing net in the building; A bolt coupling hole 63 of the reinforcing bar member 60, a bolt through hole 25 of the box 20 and a bolt nut 40 penetrating through the inside of the sleeve 50.

Although the box 20 is shown in FIG. 3A as a quadrangle, it is not limited to a quadrangle, but a circular or other shape can be used to add decorative elements. 3, a flange 11 is provided on the periphery of the concave groove 10 formed in the box 20. The flange 11 is formed on the front surface of the box 20, The box 12 and the box 20 are in close contact with each other so that the concrete does not enter into the concave groove 10 when the door 12 is closely installed. A through hole through which the sleeve 50 passes is formed in a U-shape at both ends of the upper portion of the box 20 so that the rope loop 30 Is supported by a bolt nut 40 passing through the sleeve 50. The sleeve 50 is formed to be longer than the width of the box 20 so that both ends of the sleeve 50 are inserted into the sleeve insertion portion 62 of the reinforcing hook portion 60. The material is made of stainless steel, FRP, Thereby preventing foreign substances from penetrating into the concave groove 10 when the concrete is poured.

3A and 3B, the reinforcing bar member 60 is fastened to both side walls 22 of the box 20 on the outside of the sleeve 50 inserted in the bolt nut 40, So that it has a rotatable structure. This structure facilitates the angle adjustment so that the front surface of the main body can be closely attached to the mold.

4, a circular sleeve insertion opening 61 is formed at one end of the reinforcing bar member 60, and a circular reinforcing opening 62 is formed at the other end of the sleeve insertion opening 61 do. As shown in FIG. 2A, the reinforcing bar insertion port 62 can be coupled with the building fixing rope fixing device using the auxiliary reinforcing bar 8 according to the circumstances of the site.

The reinforcing bar 60 further includes a second reinforcing bar 64 between the first reinforcing bar 63 and the sleeve inserting hole 61. The reinforcing bars 63, So that the reinforcing bar member 60 is rotated in the upward and downward direction to be fastened to the reinforcing bar. The two reinforcing bars 63 and 64 can be selectively used depending on the distance between the box 20 and the reinforcing bars of the building.

The reinforcing bar member 60 is provided with a first engaging member 63a and a second engaging member 64a for preventing the detachment of the reinforcing bars and the first and second reinforcing bars 62 and 63 are provided with first The first and second reinforcing bars 62 and 63 are provided with a guide portion 63c and a second guide portion 64c. The first stopping jaw and the second stopping jaw are formed. The reinforcing bar member 60 of the present invention having such a shape rotates smoothly without being caught by the guide portions 63c and 64c due to the radius of rotation when the reinforcing bars are pivotally coupled to the reinforcing bars, 63 and 64. The completely inserted reinforcing bars are firmly fastened to the reinforcing bars 63 and 64 without being separated from the reinforcing bars 63 and 64 by the first or second fastening jaws. The reinforcing bars fastened in this way are combined with the reinforcing bars 15 formed in the inside of the wall and are fixed by concrete. This structure can prevent breakage of the form caused by the conventional technique shown in FIG. 1, and the fixing piece 6 is inserted into the auxiliary reinforcing bar 9 during the construction in FIG. 2 of the prior art, 14, since the reinforcing hook 63 can be hooked to the side reinforcing bars 15 without the hassle of tying it with a wire, the working time can be reduced at the time of constructing the building and it is advantageously combined firmly. Also, in manufacturing, there is an advantage that it can be easily manufactured at a low cost by a method such as shearing using a member of flat plate.

 The structure of the present invention has an advantage that the angle can be selectively and easily adjusted so that the box 20 can be brought into close contact with the work surface depending on the position of the reinforcing bar 15. [ The apparatus of the present invention having such a structure is installed together with reinforcing bars 15 and 14 arranged in the horizontal and vertical directions for reinforcement in the wall or column of the building, The reinforcing hook member 60 is tightened to adjust its position and then the reinforcing material 29 such as Styrofoam is filled in the concave groove 10 of the box 20 and the mold is covered and assembled to the outside. When the apparatus according to the present invention is filled with the concrete into the fastened mold, the mold 13 is covered and assembled with the concrete outside, and the concrete according to the present invention is filled into the fastened mold 12, Since the arm portion 62 and the reinforcing hook portion 63 of the fixed round bar 60 for fastening the apparatus of the present invention to the reinforcing bars 15 built in the wall of the building are fixed together in the concrete, The fixing device is firmly mounted on the wall of the building.

As described above, since the apparatus according to the present invention is rigidly fastened together with the concrete by the structure of the reinforcing bars 15 and the like embedded in the wall of the building, when the formwork 12 is assembled and installed, Even if the device according to the invention and the formwork 12 are not fastened to each other, the device according to the invention can accurately maintain its position, and even if the concrete is laid into the formwork, There is no problem such as moving to the place or changing the position.

After the concrete in the mold 12 is completely cured and the mold 12 is separated through this process, the flange portion 11 of the box 20 and the retaining ring 12 located in the recessed groove 10 15 are cleanly exposed to the outer surface of the building. Therefore, there is no need to separate the form 12 and the box 20 of the apparatus according to the present invention.

When the building of the present invention is installed, the rope is roped on the rope loop 70 exposed on the outer wall of the building so that the worker can safely clean the building.

At both ends of the sleeve (50), a packing may be provided so that foreign matter does not penetrate into the box (20) when the concrete is laid. The sleeve 50 is made of stainless steel or FRP which is resistant to corrosion. The flange 11 of the box 20 is provided with a front surface of the box 20, A plurality of nail holes 13 are formed which can be nailed and fixed after close contact.

FIG. 6 discloses the shape of a bolt nut and may be configured in various forms. A bolt thread 44 may be formed at the end of the bolt shaft 43 as shown in FIG. 5A and coupled with a nut 45 or a pin hole 48 may be provided in the bolt thread 44 as shown in FIG. And the bolt coupling ring 63 can be fastened with the halftone pin 47. 5C, the bolt coupling ring 63 may be fastened with the halftone pin 47 by providing a pin hole 48 to the bolt threaded portion 44 without the bolt threaded portion 44. Alternatively, as shown in FIG. 5D, And a method of forming an auxiliary bolt hole 48a having a threaded end at the end thereof and fastening the auxiliary bolt 49 from the outside.

Although the present invention has been described with reference to the accompanying drawings, it should be understood that various changes and modifications may be made without departing from the spirit of the invention. Therefore, the scope of the present invention should not be limited to the described embodiments, but should be determined by the equivalents of the claims, as well as the following claims.

1, 10: concave groove
2, 20: box
22: side wall
3, 30: rear wall
4: Mounting hole
5: Bracket
6:
7, 70: rope ring
8: Auxiliary reinforcement
9: Reinforcing hole
11: flange portion
12: Form
13: Nail hole
14, 15: Rebar
16: Wire
17: Through the hole
18: hole
19: Concrete
40: Bolt nut
41: Bolt
42: Bolt head
43: Bolt axis
44: Bolt thread
45: Nut
46: Washer
47: halpin
48: Hall pinhole
48a: auxiliary bolt hole
49: auxiliary bolt
50: Sleeve
60: reinforcing hook member
61: Sleeve insert
62: Reinforcing hole
63: first reinforcing bar portion
63a: first engaging member
63b: first stopping jaw
63c: first guide portion
64: second reinforcing hook portion
64a: second engaging member
64b: second stopping jaw
64c: second guide portion

Claims (8)

A building cleaning rope fixing device installed in a concrete in a building railing (200), comprising: a box (20) having one side opened and embedded in the interior of the concrete; A sleeve (50) inserted through the through hole (25); A rope loop 30 located in the concave groove 24 of the box 20 and having a through hole through which the sleeve 50 penetrates at both ends of the upper portion in a U shape so as to penetrate the outer diameter of the sleeve 50; A reinforcing bar member 60 located outside the opposite side walls 22 of the box 20 and coupled to both ends of the sleeve 50 and coupled to reinforcing bars of the reinforcing net in the building; A bolt coupling hole 63 of the reinforcing bar member 60, a bolt through hole 25 of the box 20, and a bolt nut 40 penetrating through the inside of the sleeve 50 A rope fixing device for building cleaning.
The method according to claim 1,
The reinforcing bar member 60 is fastened to both side walls 22 of the box 20 by the bolt nuts 40 so as to be pivotable with respect to the box 20, Characterized in that it is easily adjustable.
The method according to claim 1,
The reinforcing bar member 60 is formed of a flat plate member and has a circular sleeve insertion opening 61 at one end and a circular reinforcing opening 62 at the other end of the sleeve insertion opening 61. [ Building cleaning rope fasteners.
The building cleaning rope fixing device according to claim 3, wherein the reinforcing bar member (60) further comprises a first reinforcing bar (63) at a lower side of the reinforcing bar insertion hole (62).
The structure of claim 4, wherein the reinforcing bar member (60) further comprises a second reinforcing bar (64) between the first reinforcing bar (63) and the sleeve insertion hole (61) Rope fixture.
6. The method of claim 4 or 5, wherein the first and second reinforcing bars (63, 64) are provided with a first engaging member (63a) and a second engaging member 64a) are formed on the inner surface of the rope fixing rope.
[7] The apparatus of claim 6, wherein the first and second reinforcing bars (62, 63) are provided with a first guide portion (63c) and a second guide portion (64c) Wherein the rope fixing device comprises:
[8] The apparatus of claim 7, wherein the first and second reinforcing bars (62, 63) are formed with first and second engaging jaws for preventing separation from the reinforcing bar after coupling by rotation of the reinforcing bars Wherein the rope fixing device for building cleaning is characterized by:
KR1020160030570A 2016-03-14 2016-03-14 Rope fixing device for building cleaning KR101857682B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020160030570A KR101857682B1 (en) 2016-03-14 2016-03-14 Rope fixing device for building cleaning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020160030570A KR101857682B1 (en) 2016-03-14 2016-03-14 Rope fixing device for building cleaning

Publications (2)

Publication Number Publication Date
KR20170106869A true KR20170106869A (en) 2017-09-22
KR101857682B1 KR101857682B1 (en) 2018-06-25

Family

ID=60034973

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020160030570A KR101857682B1 (en) 2016-03-14 2016-03-14 Rope fixing device for building cleaning

Country Status (1)

Country Link
KR (1) KR101857682B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU201822U1 (en) * 2020-10-01 2021-01-14 Сергей Владимирович Свяслов Device for connecting rope to flat panel
KR102667805B1 (en) * 2023-11-13 2024-05-22 이상은 An apparatus for fixing a rope for hanging the dusterof building

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4491813B2 (en) * 2004-01-29 2010-06-30 日本カタン株式会社 Connected structure
KR200406601Y1 (en) 2005-11-02 2006-01-23 박봉래 An apparatus for fixing a rope for hanging the duster of building
KR200431081Y1 (en) * 2006-09-02 2006-11-14 오환기 Hook for clean

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU201822U1 (en) * 2020-10-01 2021-01-14 Сергей Владимирович Свяслов Device for connecting rope to flat panel
KR102667805B1 (en) * 2023-11-13 2024-05-22 이상은 An apparatus for fixing a rope for hanging the dusterof building

Also Published As

Publication number Publication date
KR101857682B1 (en) 2018-06-25

Similar Documents

Publication Publication Date Title
KR200470106Y1 (en) Fasten apparatus of angker bolt for prevent fall of gang form
KR101263002B1 (en) fall preventing safety net apparatus
KR101457114B1 (en) Pre-fabrication method for steel reinforcement
KR200425807Y1 (en) Lift type gangform
KR101857682B1 (en) Rope fixing device for building cleaning
KR102024302B1 (en) Structure of exterior insulation
KR200406601Y1 (en) An apparatus for fixing a rope for hanging the duster of building
CN108643405A (en) Assembled mould plate and its construction method for shear wall corner sleeper region
CN208733878U (en) Assembled mould plate for shear wall corner sleeper region
JP3149454U (en) Temporary column for handrail
KR20170000701U (en) Building vertical safety net
CN216476335U (en) Inclined frame concrete cylindrical formwork reinforcing system
KR200487493Y1 (en) Rope fixing device for building cleaning
KR200485889Y1 (en) A rope fixed device for cleanning a building
KR100978025B1 (en) Concrete form
KR200459687Y1 (en) An apparatus for engaging the rope for cleaning the surface of a building
CN113958120A (en) Inclined frame concrete cylindrical formwork reinforcing system
KR200410958Y1 (en) An apparatus for fixing a rope for hanging the duster of building
KR20170090052A (en) A rope fixed device for cleanning a building
KR20090002041U (en) Install bracket of dropping prevention net
KR100863003B1 (en) Handrail installing structure and construction method
KR20100020155A (en) Falling prevention device of mould for construction
KR20080074500A (en) Link fixed on the wall for rope
JP7444751B2 (en) Wall material unit and wall construction method
KR102667805B1 (en) An apparatus for fixing a rope for hanging the dusterof building

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant