KR20160149380A - Connection structure of steel column and steel beam - Google Patents

Connection structure of steel column and steel beam Download PDF

Info

Publication number
KR20160149380A
KR20160149380A KR1020150086141A KR20150086141A KR20160149380A KR 20160149380 A KR20160149380 A KR 20160149380A KR 1020150086141 A KR1020150086141 A KR 1020150086141A KR 20150086141 A KR20150086141 A KR 20150086141A KR 20160149380 A KR20160149380 A KR 20160149380A
Authority
KR
South Korea
Prior art keywords
bracket
steel beam
steel
column
plate
Prior art date
Application number
KR1020150086141A
Other languages
Korean (ko)
Other versions
KR101711614B1 (en
Inventor
박동순
유영기
노현섭
이정하
심규관
김병준
김용완
이은석
Original Assignee
삼성물산 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 삼성물산 주식회사 filed Critical 삼성물산 주식회사
Priority to KR1020150086141A priority Critical patent/KR101711614B1/en
Publication of KR20160149380A publication Critical patent/KR20160149380A/en
Application granted granted Critical
Publication of KR101711614B1 publication Critical patent/KR101711614B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/58Connections for building structures in general of bar-shaped building elements
    • E04B1/5806Connections for building structures in general of bar-shaped building elements with a cross-section having an open profile
    • E04B1/5812Connections for building structures in general of bar-shaped building elements with a cross-section having an open profile of substantially I - or H - form

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The present invention relates to a bonding structure of a steel column and a steel beam, rapidly and easily fixating a joint of a steel beam to a joint of a steel column. According to the bonding structure of a steel beam and a steel column enabling the steel beam to be bonded to a bracket horizontally fixated to a side surface of the steel column, the bracket and the steel beam comprise an upper flange, a lower flange, and a web connected to the upper and lower flanges. A web end part unit of the bracket and a web end part unit of the steel beam have stepped surfaces corresponding to each other.

Description

철골기둥과 철골 보의 접합구조{CONNECTION STRUCTURE OF STEEL COLUMN AND STEEL BEAM}BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a joining structure of a steel column and a steel beam,

본 발명은 철골기둥과 철골 보의 접합구조에 관한 것으로서, 더욱 상세하게는 철골기둥과 철골 보의 접합을 쉽고 빠르게 할 수 있는 철골기둥과 철골 보의 접합구조에 관한 것이다.The present invention relates to a joining structure between a steel column and a steel beam, and more particularly, to a joining structure between a steel column and a steel beam that can easily and quickly join the steel column and the steel beam.

일반적으로 철골구조는 철근콘크리트 구조에 비하여 인장과 압축에 대하여 우수한 구조성능을 갖기 때문에 장스팬(span) 형성이 쉽고 부재의 생산 면에서도 철근콘크리트 부재는 현장생산인데 비해 철골부재는 공장생산이므로 부재 구조성능의 신뢰도가 높고 현장공기를 단축할 수 있는 이점이 있다.Generally, the steel structure has excellent structural performance against tensile and compression compared with the reinforced concrete structure. Therefore, it is easy to form long span and the steel reinforced concrete member is produced on site in the production of members. There is an advantage of high reliability of performance and shortening of field air.

그리고 하이테크 공장과 같이 장스팬의 바닥구조를 필요로 하거나 초고층 빌딩과 같이 중량이 작은 부재를 적용해야 하는 건축물의 경우에는 철골 보 부재가 빈번히 적용되고 있다. 이때 기둥과 보의 접합구조는 전체 구조물의 강성확보에 있어 매우 중요한 부분을 차지하게 된다.In the case of a structure requiring a long span floor structure such as a high-tech factory or a structure requiring a small weight member such as a high-rise building, a steel beam member is frequently applied. At this time, the joining structure of the column and the beam is a very important part in securing the rigidity of the whole structure.

특히 철골기둥과 보가 만나는 면에서 현장 용접작업을 최소화하고 간편하게 접합부를 시공하기 위하여 공장으로부터 기둥에 브래킷(bracket)을 용접하고 현장으로 운반 한 후 기둥과 보의 접합부를 조립하는 경우가 많다.In particular, brackets are welded to the columns from the factory to minimize the welding work on the surface where the steel column and beam meet, and the joints of the column and the beam are assembled after the plate is transported to the site.

철골기둥과 철골 보의 접합은 철골기둥을 설치한 다음, 지상에서 타워크레인 등과 같은 양중장비로 철골 보를 양중한 후 보-기둥 접합부를 시공하게 되며, 이때 작업위치에서 현장 작업자가 보의 웨브를 가볼팅하여 임시로 브래킷에 고정시키는 작업이 필요하다. 이 과정이 끝나는 시점까지 양중장비가 보의 양중 상태를 유지하여야 한다.The joining of the steel column to the steel beam is carried out by installing the steel column and then attaching the steel beam with the heavy equipment such as the tower crane on the ground and installing the beam-column joint. At this time, It is necessary to temporarily fix it to the bracket. Until the end of this process, both heavy equipment must maintain the beam condition.

기존의 철골 보-브래킷 접합부를 적용한 건축물 시공 중에는 위와 같은 과정의 반복으로 인하여 양중장비 작업의 지연이 발생하므로, 철골 공사의 공기를 단축시키기 어렵다. 이러한 문제는 비단 보-기둥 접합부뿐만 아니라 철골 거더-보 접합부 등에서도 동일하게 발생한다.It is difficult to shorten the air of the steel frame construction due to the delay of the operation of both heavy equipment due to the repetition of the above process during the construction of the building using the existing steel beam-bracket joint. This problem occurs not only in beam-column joint but also in steel girder-beam joint.

철골기둥과 철골 보의 접합에 관련된 선행기술 중 한국공개특허공보 10-2013-0088462호(특허문헌1), 한국등록특허공보 10-1349649호(특허문헌2)는 철골 보-기둥 접합부는 휨, 전단, 그리고 내진성능을 향상 시키는 데에 발명의 목적이 있으며, 접합부의 시공성 및 설치의 용이성을 고려하지 않고 있다.Among the prior arts related to joining steel column and steel beam, Korean Patent Laid-Open Publication No. 10-2013-0088462 (Patent Document 1) and Korean Patent Registration No. 10-1349649 (Patent Document 2) disclose a steel beam- Shear, and seismic performance, and does not consider the ease of installation and ease of installation of the joint.

또 다른 선행기술 중 한국등록특허공보 10-1384706호(특허문헌3)의 철골 보-기둥 접합부는 시공성을 고려하여 접합부 부재들을 간소화하였으나, 양중장비의 작업시간을 단축시키는 효과를 기대하기는 어렵다.Among other prior arts, the steel beam-column joint of Korean Patent Registration No. 10-1384706 (Patent Document 3) simplifies the joint members in view of workability, but it is difficult to expect the effect of shortening the working time of both heavy equipment.

이와 같이 종래의 철골기둥과 보의 접합에 있어 기둥 또는 기둥에 형성된 브래킷의 단부에 보의 단부 면을 접촉시키는 작업이나 접촉시킨 상태에서 체결부재를 체결하는 설치작업이 힘들 수밖에 없으므로 공사기간이 그만큼 많이 소요된다.As described above, in the conventional joining of the steel column and the beam, it is difficult to make the end face of the beam contact with the end of the bracket formed on the column or the column, or to install the fastening member in the contacted state. .

한국공개특허공보 10-2013-0088462호Korean Patent Publication No. 10-2013-0088462 한국등록특허공보 10-1349649호Korean Patent Registration No. 10-1349649 한국등록특허공보 10-1384706호Korean Patent Publication No. 10-1384706

본 발명은 상기한 바와 같은 종래의 문제점을 해결하기 위하여 제안된 것으로서, 본 발명의 목적은 철골기둥의 접합부에 철골 보의 접합부를 신속하고 용이하고 고정시킬 수 있는 철골기둥과 철골 보의 접합 구조를 제공하는데 있다.It is an object of the present invention to provide a joining structure of a steel column and a steel beam capable of quickly and easily fixing a joining portion of a steel beam to a joining portion of a steel column, .

본 발명이 제안하는 철골기둥과 철골 보의 접합구조는 철골기둥; 상기 철골기둥의 측면 수평방향으로 고정된 브래킷; 상기 브래킷에 접합되는 철골 보; 를 포함하고, 상기 브래킷과 철골 보는 상부플랜지 및 하부플랜지와 이들 상하부플랜지에 연결되는 웨브로 구성되고, 브래킷의 웨브 끝단부와 철골 보의 웨브 끝단부는 서로 대응되는 계단면으로 각각 이루어진 철골기둥과 철골 보의 접합구조를 제공한다.The joining structure between the steel column and the steel beam proposed by the present invention is a steel column; A bracket fixed to a lateral side of the steel column; A steel beam joined to said bracket; Wherein the bracket and the steel frame are constituted by an upper flange and a lower flange, and a web connected to the upper and lower flanges, wherein the web end of the bracket and the web end of the steel beam are formed of steel column and steel frame, And provides a bonding structure of the beam.

상기 브래킷의 계단면 측면으로는 거치부가 형성되고, 철골 보의 계단면 측면으로는 거치부에 안착되어 철골 보를 지지하는 지지부가 형성된다.A mounting portion is formed at the step side surface of the bracket, and a supporting portion for supporting the steel beam is formed at the side surface of the step portion of the steel beam so as to be seated on the mounting portion.

상기 거치부와 안착부는 각 웨브에 수평방향으로 고정되는 고정플레이트와 지지플레이트로 이루어지고, 고정플레이트와 지지플레이트는 웨브의 일측면 또는 양쪽 면에 각각 형성된다.The stationary portion and the stationary portion are composed of a stationary plate and a support plate which are horizontally fixed to the respective webs, and the stationary plate and the support plate are formed on one side or both sides of the web, respectively.

상기 고정플레이트의 상부에는 고정봉이 형성되고, 지지플레이트에는 고정봉이 끼워지는 끼움홀이 형성된다. 상기 고정플레이트와 지지플레이트 중에서 어느 하나 이상의 플레이트는 보강재로 보강된다. 상기 브래킷과 철골 보의 접합부에는 접합플레이트가 고정된다.A fixing rod is formed on the upper portion of the fixing plate, and a fitting hole is formed in the supporting plate to hold the fixing rod. At least one of the fixing plate and the supporting plate is reinforced by a reinforcing member. A joining plate is fixed to the joining portion of the bracket and the steel beam.

본 발명에 의한 철골기둥과 철골 보의 접합구조는 철골기둥에 형성된 브래킷에 철골 보를 빠르고 용이하게 가조립할 수 있어 철골기둥과 철골 보의 접합 작업을 간단하고 빠르게 할 수 있다.The joining structure of the steel column and the steel beam according to the present invention can quickly and easily assemble the steel beam to the bracket formed on the steel column, so that the joining operation between the steel column and the steel beam can be performed easily and quickly.

또한 브래킷에 가조립된 철골 보는 브래킷에 고정된 상태로 안착되어 유동되지 않으므로 타워크레인 등의 양중장비를 현장 작업자의 보-브래킷 임시 접합 작업 완료 시까지 기다릴 필요 없이 바로 후속작업에 이용할 수 있으므로 철골 보의 양중 작업시간을 대폭적으로 단축시킬 수 있어 공사기간을 단축할 수 있다.In addition, since the steel frame assembled to the bracket is fixed to the bracket and does not flow, the heavy equipment such as the tower crane can be used for the subsequent work without waiting for completion of the temporary work of the beam operator of the field worker. It is possible to shorten the working time significantly and shorten the construction period.

도 1은 본 발명에 따른 철골기둥과 철골 보의 접합 구조를 설명하기 위한 사시도이다.
도 2는 도 1을 다른 방향에서 바라본 사시도이다.
도 3은 본 발명에 따른 철골기둥과 철골 보의 접합구조에 있어서 철골기둥의 브래킷에 철골 보가 안착된 상태를 나타내는 사시도이다.
도 4는 본 발명에 따른 철골기둥과 철골 보의 접합구조에 있어서 철골기둥의 브래킷에 안착된 철골 보를 접합플레이트를 이용하여 브래킷에 접합한 상태의 정면도이다.
도 5는 도 4를 측면에서 바라본 도면이다.
1 is a perspective view for explaining a joint structure between a steel column and a steel beam according to the present invention.
Fig. 2 is a perspective view of Fig. 1 viewed from the other direction. Fig.
3 is a perspective view showing a state in which a steel beam is mounted on a bracket of a steel column in a joining structure between a steel column and a steel beam according to the present invention.
FIG. 4 is a front view showing a state in which a steel beam mounted on a bracket of a steel column is joined to a bracket using a joining plate in the joining structure of the steel column and the steel beam according to the present invention.
Fig. 5 is a side view of Fig. 4. Fig.

이하, 본 발명의 바람직한 실시 예를 첨부한 도면을 참조하여 더욱 상세히 설명한다.Hereinafter, preferred embodiments of the present invention will be described in more detail with reference to the accompanying drawings.

도 1 및 도 2는 본 발명에 따른 철골기둥과 철골 보의 접합구조에 있어서 철골기둥과 철골 보의 접합부의 구조를 나타내는 사시도이다.1 and 2 are perspective views showing a structure of a joint between a steel column and a steel beam in a joining structure between a steel column and a steel beam according to the present invention.

도시된 바와 같이 발명에 따른 철골기둥과 철골 보의 접합구조는 철골기둥(100)의 측면 수평방향으로 고정된 브래킷(200)에 철골 보(300)를 접합하는 것으로서, 브래킷(200)은 상부플랜지(210) 및 하부플랜지(220)와, 이들 상, 하부플랜지(210)(220)에 연결되는 웨브(230)로 구성된다.As shown in the drawings, the joining structure of the steel column and the steel beam according to the present invention is such that the steel beam 300 is joined to the bracket 200 fixed to the lateral direction of the steel column 100, A lower flange 220 and a web 230 connected to the upper and lower flanges 210 and 220.

또한 철골 보(300)는 상부플랜지(310) 및 하부플랜지(320)와, 이들 상, 하부플랜지(310)(320)에 연결되는 웨브(330)로 구성된다.The steel beam 300 also includes an upper flange 310 and a lower flange 320 and a web 330 connected to the upper and lower flanges 310 and 320.

상기 철골기둥(100)과 브래킷(200) 및 철골 보(300)는 구조계산에 의하여 건물의 상부하중을 충분히 지탱할 수 있는 것이 사용된다.The steel column 100, the bracket 200, and the steel beam 300 can be used to sufficiently support the upper load of the building by structural calculation.

브래킷(200)은 일측단부가 철골기둥(100)에 용접 등으로 고정된다. 이 용접작업은 공장에서 진행될 수 있다.One end of the bracket 200 is fixed to the steel column 100 by welding or the like. This welding operation can be carried out at the factory.

또한 브래킷(200)과 철골 보(300)의 접합부위 주변에는 고정홀(240)(340)이 각각 형성되어 뒤에서 상세하게 설명되는 바와 같이 볼트와 너트로 이루어진 고정부재(400)를 이용하여 접합플레이트(500)를 접합할 수 있도록 되어있다.Fixing holes 240 and 340 are formed in the vicinity of the joint between the bracket 200 and the steel beam 300 so that the fixing plate 400 is fixed to the joint plate 400 using bolts and nuts, (500) can be joined.

이와 같은 브래킷(200)과 철골 보(300)는 기존에 사용되는 것과 동일 또한 유사한 것이 사용될 수 있으며, 본 발명에서는 브래킷(200)의 웨브(230) 끝단부와 철골 보(300)의 웨브(330) 끝단부는 서로 대응되는 계단면(250)(350)으로 각각 이루어진다.In the present invention, the end of the web 230 of the bracket 200 and the end of the web 330 of the steel beam 300 can be used as the bracket 200 and the steel beam 300, End portions are formed by stepped surfaces 250 and 350, respectively, which correspond to each other.

이러한 계단면(250)(350)을 형성하기 위하여 브래킷(200)과 철골 보(300)의 웨브(230)(330) 중간부분을 기준으로 상부 측의 웨브와 하부측 웨브가 층을 이룰 수 있도록 형성되어 각 웨브(230)(330)의 중간부분이 서로 대응되는 계단면(250)(350)을 이루도록 되어있다.In order to form such a stepped surface 250 and 350, the upper side web and the lower side web may form a layer with respect to the middle portion of the brackets 200 and the webs 230 and 330 of the steel beam 300 So that intermediate portions of the webs 230 and 330 form stepped surfaces 250 and 350, respectively, which correspond to each other.

브래킷(200)에 형성된 계단면(250)은 웨브(230)의 하부가 상부에 비하여 돌출되게 형성되어 상부로 향하는 계단면(250)으로 이루어지고, 반대로 이와 면접촉되는 철골 보(300)의 계단면(350)은 웨브(330)의 상부가 하부에 비하여 돌출되게 형성되어 하부로 향하는 계단면(350)으로 이루어진다. 즉, 브래킷(200)에 형성된 계단면(250)과 철골 보(300)에 형성된 계단면(350)은 서로 대응되는 구조로 이루어지고, 철골 보(300)를 브래킷(200) 접합하면 계단면(250)(350)은 서로 면접촉하여 위치할 수 있도록 되어있다.The stepped surface 250 formed on the bracket 200 includes a stepped surface 250 which is formed so that the lower portion of the web 230 protrudes from the upper portion and is directed upward, The surface 350 comprises a stepped surface 350 which is formed so that the upper portion of the web 330 protrudes from the lower portion and is directed downward. That is, the stepped surface 250 formed on the bracket 200 and the stepped surface 350 formed on the steel beam 300 correspond to each other. When the steel beam 300 is joined to the bracket 200, 250 and 350 may be positioned in face contact with each other.

이와 같은 계단면(250)(350)의 구조로 인하여 철골 보(300)를 브래킷(200)에 접합할 때 철골 보(300)의 끝단부를 브래킷(200)의 끝단부에 안착시키면 철골 보(300)를 브래킷(200)에 거치시킬 수 있으므로 그 후속 작업을 편리하고 빠르게 진행할 수 있다.When the end of the steel beam 300 is seated on the end of the bracket 200 when the steel beam 300 is connected to the bracket 200 due to the structure of the stepped surfaces 250 and 350, Can be mounted on the bracket 200, the subsequent operation can be carried out conveniently and quickly.

즉, 브래킷(200)에 형성된 계단면(250)에 철골 보(300)의 계단면(350)을 안착시키면 철골 보(300)의 끝단부가 브래킷(200)의 끝단부에 면접촉되며 거치될 수 있고, 이렇게 거치된 상태에서 크레인을 다른 후속작업에 사용하면 되고 거치된 철골 보(300)를 브래킷(200)에 접합하는 작업을 각각 진행하면 된다.That is, when the stepped surface 350 of the steel beam 300 is seated on the stepped surface 250 formed on the bracket 200, the end of the steel beam 300 is in surface contact with the end of the bracket 200, In this state, the crane can be used for another subsequent operation, and the work for joining the mounted steel beam 300 to the bracket 200 can be performed.

그리고 철골 보(300)를 브래킷(200)에 더욱 용이하게 거치시킬 수 있도록 브래킷(200)의 계단면(250) 측면으로는 거치부(260)가 형성되고, 철골 보(300)의 계단면(350) 측면으로는 거치부(260)에 안착되는 지지부(360)를 더욱 형성할 수 있다.A mounting portion 260 is formed on a side surface of the step face 250 of the bracket 200 so as to more easily mount the steel beam 300 on the bracket 200, 350 may be further provided with a support portion 360 which is seated on the mounting portion 260.

이렇게 각각의 계단면(250)(350) 측면에 거치부(260)와 지지부(360)를 각각 형성하면 브래킷(200)의 계단면(250)에 철골 보(300)의 계단면(350)을 더욱 쉽게 안착시킬 수 있어 접합 작업을 쉽고 더욱 빠르게 진행할 수 있다. 또 이와 같은 거치부(260)와 지지부(360)로 인하여 철골 보(300)는 브래킷(200)에 안착된 상태에서 유동되지 않고 안정적인 상태를 유지할 수 있다.When the mounting portion 260 and the supporting portion 360 are respectively formed on the side surfaces of the step surfaces 250 and 350, the step surface 350 of the steel beam 300 is formed on the step surface 250 of the bracket 200 So that the joining operation can be carried out easily and quickly. Also, due to the mounting portion 260 and the supporting portion 360, the steel beam 300 can be maintained in a stable state without being flowed in a state of being mounted on the bracket 200.

거치부(260)와 지지부(260)는 각 웨브(230)(330)에 형성된 계단면(250)(350)을 따라서 수평방향으로 고정되는 고정플레이트와 지지플레이트로 이루어질 수 있다.The mounting portion 260 and the supporting portion 260 may be composed of a fixing plate and a supporting plate which are fixed in the horizontal direction along the stepped surfaces 250 and 350 formed in the respective webs 230 and 330.

이들 고정플레이트와 지지플레이트는 소정의 두께를 갖는 강판을 사용할 수 있으며, 웨브(230)(330)에 용접 등의 방법으로 고정된다.The fixing plate and the supporting plate may be made of a steel plate having a predetermined thickness and fixed to the webs 230 and 330 by welding or the like.

고정플레이트와 지지플레이트로 이루어지진 거치부(260)와 지지부(260)는 웨브(250)(350)의 일측면 또는 양쪽 면에 각각 형성될 수 있는데, 바람직하게는 웨브(250)(250)의 양쪽 방향으로 각각 형성하는 것이 철골 보(300)를 브래킷(200)에 더욱 용이하게 거치시킬 수 있다.The mounting portion 260 and the supporting portion 260 formed of the fixing plate and the supporting plate may be formed on one or both sides of the webs 250 and 350, It is possible to more easily mount the steel beam 300 to the bracket 200. [0064]

또한 철골 보(300)를 브래킷(200)에 거치시킬 때 철골 보(300)가 브래킷(200)에 고정되면서 거치될 수 있도록 거치부(260)의 상부에는 고정봉(270)이 형성되고, 지지부(360)에는 고정봉(270)이 끼워지는 끼움홀(370)이 형성된다.A fixing rod 270 is formed on an upper portion of the mounting portion 260 so that the steel beam 300 can be fixed while being fixed to the bracket 200 when the steel beam 300 is mounted on the bracket 200, (360) is formed with a fitting hole (370) in which the fixing rod (270) is inserted.

이와 같은 구조로 인하여 브래킷(200) 위에 철골 보(300)를 안착시키면서 고정시킬 수 있으므로 타워크레인 등과 같은 양중장비로 철골 보(300)를 양중 하여 브래킷(200)에 빠르게 거치 및 고정시킨 후 현장 작업자의 보-브래킷 임시 접합 작업 완료 시까지 기다릴 필요가 없이 양중장비를 그 다음 후속작업에 사용할 수 있다. 이에 따라 전체적인 철골부재 양중 및 접합 작업 시간을 단축할 수 있다.Because of this structure, the steel beam 300 can be seated and fixed on the bracket 200, so that the steel beam 300 is fastened and fixed to the bracket 200 with the heavy equipment such as a tower crane or the like, Of beam-brackets can be used for subsequent work without having to wait until completion of the temporary joining operation. Accordingly, it is possible to shorten the total amount of steel members and the joining operation time.

즉, 종래에는 철골 보를 크레인 등으로 양중한 후 철골 보의 양쪽 끝단부를 브래킷에 맞물리고 브래킷에 가볼팅으로 고정할 때 까지 크레인이 철골 보를 계속 양중하고 있어야 됨으로 개별 철골 보 접합에 소요되는 크레인의 양중시간이 상당 하였지만, 본 발명에서는 철골 보(300)를 크레인으로 양중한 후 철골 보(300)의 양쪽 끝단부를 브래킷(200)에 거치시키는 작업이 완료되면 크레인을 그 다음 후속작업에 사용할 수 있으므로 작업시간을 대폭 단축할 수 있다.That is, conventionally, after the steel beam has been weighted by a crane or the like, the crane has to continuously keep the steel beam until the both ends of the steel beam are engaged with the bracket and fixed to the bracket with the gobbling, However, since the crane can be used for the next work after completion of the operation of mounting both ends of the steel beam 300 on the bracket 200 after the steel beam 300 is lifted by the crane, Time can be greatly shortened.

상기 거치부(260)는 더욱 큰 하중을 지지할 수 있도록 보강재(280)가 더욱 제공될 수 있다. 이 보강재(280)는 강판으로 이루어지고 웨브(230) 등에 용접으로 고정될 수 있다.The mounting portion 260 may further be provided with a stiffener 280 so as to support a larger load. The reinforcing member 280 is made of a steel plate and can be welded to the web 230 or the like.

보강재(280)는 본 실시 예에서는 거치부(260)에 제공되어 거치부가 더욱 큰 하중을 감당할 수 있도록 되어있지만 이에 한정되는 것은 아니고 필요한 경우 지지부(360)에도 함께 제공될 수도 있다.The stiffener 280 is provided to the mounting portion 260 in the present embodiment so that the mounting portion can support a larger load, but is not limited thereto and may also be provided with the supporting portion 360 as needed.

기본적인 작업 순서는 브래킷(200)이 고정된 철골기둥(100)을 정해진 간격을 유지하며 수직 방향으로 설치한 후 철골 보(300)를 설치할 수 있다. 철골 보(300)의 설치는 크레인 등과 같은 양중장비를 이용하여 설치할 수 있는데, 먼저 양중장비를 이용하여 철골 보(300)를 인상시킨다.The steel beam 300 can be installed after the steel column 100 with the bracket 200 is fixed at a predetermined interval and installed in a vertical direction. The steel beam 300 may be installed using a heavy equipment such as a crane. First, the steel beam 300 is lifted using both heavy equipment.

이때 도 1 및 도 2에서와 같이 철골 보(300)는 접합되는 브래킷(200)보다 약간 높게 인상시킨 다음, 서서히 하강시키면서 도 3과 같이 브래킷(200)의 거치부(260)에 형성된 고정봉(270)에 철골 보(300)의 지지부(360)에 형성된 끼움홀(370)을 끼운다.As shown in FIGS. 1 and 2, the steel beam 300 is pulled up slightly higher than the bracket 200 to be joined, and then is gradually lowered to be fixed to the fixing rod 260 formed on the mounting portion 260 of the bracket 200 270 are inserted into the fitting hole 370 formed in the supporting portion 360 of the steel beam 300.

이러한 작업은 철골 보(300) 양쪽단부에서 동시에 진행할 수 있으며, 고정봉(270)에 끼움홀(370)이 끼워지면 브래킷(200)의 계단면(250)에 철골 보(300)의 계단면(350)이 면접촉되면서 안착되면서 철골 보(300)의 양쪽 끝단부는 브래킷(200)의 양쪽 끝단면에 면접촉된 상태로 지지된다.This operation can proceed simultaneously at both ends of the steel beam 300. When the fitting hole 370 is fitted in the fixing bar 270, the stepped surface 250 of the bracket 200 is fixed to the stepped surface of the steel beam 300 350 are in face-to-face contact and both end portions of the steel beam 300 are supported in face-to-face contact with the opposite end surfaces of the bracket 200.

이와 같이 브래킷(200)에 안착된 철골 보(300)는 고정봉(270)에 끼움홀(370)이 끼워진 상태이고, 또 계단면(250)(250)은 서로 면접촉된 상태로 그 측면에 형성된 거치부(260)와 지지부(360)도 서로 면접촉된 상태이므로 철골 보(300)는 브래킷(200)에 안착된 상태에서 유동되지 않고 안정적인 상태를 유지할 수 있다.The steel beam 300 mounted on the bracket 200 has the fitting hole 370 in the fixing bar 270 and the stepped surfaces 250 and 250 are in contact with each other, Since the formed mounting portion 260 and the supporting portion 360 are in surface contact with each other, the steel beam 300 can be maintained in a stable state without being flowed in a state of being mounted on the bracket 200.

이렇게 철골 보(300)가 브래킷(200)에 거치되면 철골 보(300)를 양중하고 있던 양중장비에서 철골 보(300)를 분리시킨 후 양중장비를 그 다음 후속작업에 사용하면 된다.When the steel beam 300 is mounted on the bracket 200, the steel beam 300 may be separated from the heavy equipment used for the steel beam 300, and then the heavy equipment may be used for the next operation.

그리고 도 4 및 도 5와 같이 철골 보(300)와 브래킷(300))의 접합부위 주변에 형성된 고정홀(340)(240)에 접합플레이트(500)를 덧대고 볼트와 너트로 이루어진 고정부재(400)를 체결하여 접합 작업을 완료하면 된다.The fixing plate 340 is attached to the fixing holes 340 and 240 formed around the joining portions of the steel beam 300 and the bracket 300 as shown in FIGS. 4 and 5, 400 are tightened to complete the joining operation.

접합플레이트(500)는 브래킷(200)과 철골 보(300)의 상부플랜지(210)(310), 하부플랜지(220)(320) 및 웨브(230)(330)를 각각 연결할 수 있다.The joining plate 500 may connect the brackets 200 and the upper flanges 210, 310, the lower flanges 220, 320 and the webs 230, 330 of the steel beam 300, respectively.

상기에서는 본 발명의 바람직한 실시예가 예시를 목적으로 설명되어 있으나 이에 제한되지는 않으며, 특허청구범위와 발명의 상세한 설명 및 첨부한 도면의 범위 내에서 여러 가지로 변형하여 실시하는 것도 가능하다.While the preferred embodiments of the present invention have been described for illustrative purposes, those skilled in the art will appreciate that various modifications, additions and substitutions are possible, without departing from the scope and spirit of the invention as disclosed in the accompanying claims.

100: 철골기둥 200: 브래킷
210, 310: 상부플랜지 220, 320: 하부플랜지
230, 330: 웨브 240, 340: 고정홀
250, 350: 계단면 260: 거치부
270: 고정봉 280: 보강재
300: 철골 보 360: 지지부
370: 끼움홀
100: Steel column 200: Bracket
210, 310: upper flange 220, 320: lower flange
230, 330: web 240, 340: fixed hole
250, 350: stepped surface 260: mounting part
270: Fixing rod 280: Stiffener
300: Steel beam 360: Support
370: insertion hole

Claims (7)

철골기둥;
상기 철골기둥의 측면 수평방향으로 고정된 브래킷;
상기 브래킷에 접합되는 철골 보;
를 포함하고,
상기 브래킷과 철골 보는 상부플랜지 및 하부플랜지와 이들 상하부플랜지에 연결되는 웨브로 구성되고, 브래킷의 웨브 끝단부와 철골 보의 웨브 끝단부는 서로 대응되는 계단면으로 각각 이루어진 철골기둥과 철골 보의 접합구조.
Steel column;
A bracket fixed to a lateral side of the steel column;
A steel beam joined to said bracket;
Lt; / RTI >
Wherein the bracket and the steel frame are constituted by an upper flange and a lower flange, and a web connected to the upper and lower flanges, wherein a web end portion of the bracket and a web end portion of the steel beam have a stepped surface, .
청구항 1에 있어서,
상기 브래킷의 계단면 측면으로는 거치부가 형성되고, 철골 보의 계단면 측면으로는 거치부에 안착되어 철골 보를 지지하는 지지부가 형성된 것을 특징으로 하는 철골기둥과 철골 보의 접합구조.
The method according to claim 1,
Wherein a bracket is formed at a side surface of a step of the bracket, and a supporting portion for supporting the steel beam is formed at a side surface of a step of the steel beam so as to be seated on the mounting portion.
청구항 2에 있어서,
상기 거치부와 안착부는 각 웨브에 수평방향으로 고정되는 고정플레이트와 지지플레이트로 이루어진 것을 특징으로 하는 철골기둥과 철골 보의 접합구조.
The method of claim 2,
Wherein the stationary portion and the stationary portion are composed of a stationary plate and a support plate which are horizontally fixed to the respective webs.
청구항 3에 있어서,
상기 고정플레이트와 지지플레이트는 웨브의 일측면 또는 양쪽 면에 각각 형성된 것을 특징으로 하는 철골기둥과 철골 보의 접합구조
The method of claim 3,
Wherein the fixing plate and the support plate are formed on one side or both sides of the web, respectively.
청구항 3에 있어서,
상기 고정플레이트의 상부에는 고정봉이 형성되고, 지지플레이트에는 고정봉이 끼워지는 끼움홀이 형성된 것을 특징으로 하는 철골기둥과 철골 보의 접합구조.
The method of claim 3,
Wherein a fixing bar is formed on an upper portion of the fixing plate, and a fitting hole is formed in the supporting plate so that the fixing bar is inserted.
청구항 3에 있어서,
상기 고정플레이트와 지지플레이트 중에서 어느 하나 이상의 플레이트는 보강재로 보강된 것을 특징으로 하는 철골기둥과 철골 보의 접합구조.
The method of claim 3,
Wherein at least one of the fixing plate and the supporting plate is reinforced with a reinforcing material.
청구항 1에 있어서,
상기 브래킷과 철골 보의 접합부에는 접합플레이트가 고정된 것을 특징으로 하는 철골기둥과 철골 보의 접합구조.
The method according to claim 1,
And a joint plate is fixed to a joint between the bracket and the steel beam.
KR1020150086141A 2015-06-17 2015-06-17 Connection structure of steel column and steel beam KR101711614B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020150086141A KR101711614B1 (en) 2015-06-17 2015-06-17 Connection structure of steel column and steel beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020150086141A KR101711614B1 (en) 2015-06-17 2015-06-17 Connection structure of steel column and steel beam

Publications (2)

Publication Number Publication Date
KR20160149380A true KR20160149380A (en) 2016-12-28
KR101711614B1 KR101711614B1 (en) 2017-03-14

Family

ID=57724673

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020150086141A KR101711614B1 (en) 2015-06-17 2015-06-17 Connection structure of steel column and steel beam

Country Status (1)

Country Link
KR (1) KR101711614B1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110056088A (en) * 2019-05-15 2019-07-26 华侨大学 It is a kind of can the connection structure of Fast Installation girder steel and the installation method of girder steel
CN111779144A (en) * 2020-07-20 2020-10-16 中国建筑第八工程局有限公司 Connecting structure of elevation lowering cross beam and construction method thereof
CN112323972A (en) * 2020-11-12 2021-02-05 华侨大学 Connecting assembly of shear-resistant short corbel steel beam reinforced by stiffening ribs and connecting method thereof
KR102471965B1 (en) * 2022-01-11 2022-11-29 (주)에스엠구조안전진단 Steel Beam of Asymmetric Variable Section for the Optimum Design and method of installation of the same
CN116335278A (en) * 2023-04-10 2023-06-27 宁波市新铭建设工程测试有限公司 Green building steel construction
KR102552578B1 (en) * 2023-01-06 2023-07-06 주식회사 유니크종합건설 Steel structure construction method that can shorten the construction period

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102289254B1 (en) 2019-07-01 2021-08-12 삼성물산(주) Z-shaped connection structure of steel column and steel beam
KR102635664B1 (en) 2023-05-31 2024-02-13 박창도 Combined Structure of Long-term Steel Frame for Column Free Space

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06146406A (en) * 1992-11-04 1994-05-27 Kumagai Gumi Co Ltd Girder connection structure
JPH07216988A (en) * 1994-02-09 1995-08-15 Kajima Corp Joint structure of steel framed column-steel framed beam
KR20120003342A (en) * 2010-07-02 2012-01-10 한국기술교육대학교 산학협력단 Gable frame improved connection strength and constructability of beam
US20130088462A1 (en) 2010-07-27 2013-04-11 Chi W. So System and method for remote touch detection
KR101349649B1 (en) 2012-11-22 2014-01-09 주식회사 액트파트너 Composite structure of bulit-up steel-girder with reinforced end unit
KR101384706B1 (en) 2013-04-23 2014-04-14 채일수 Steel beam joint

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06146406A (en) * 1992-11-04 1994-05-27 Kumagai Gumi Co Ltd Girder connection structure
JPH07216988A (en) * 1994-02-09 1995-08-15 Kajima Corp Joint structure of steel framed column-steel framed beam
KR20120003342A (en) * 2010-07-02 2012-01-10 한국기술교육대학교 산학협력단 Gable frame improved connection strength and constructability of beam
US20130088462A1 (en) 2010-07-27 2013-04-11 Chi W. So System and method for remote touch detection
KR101349649B1 (en) 2012-11-22 2014-01-09 주식회사 액트파트너 Composite structure of bulit-up steel-girder with reinforced end unit
KR101384706B1 (en) 2013-04-23 2014-04-14 채일수 Steel beam joint

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110056088A (en) * 2019-05-15 2019-07-26 华侨大学 It is a kind of can the connection structure of Fast Installation girder steel and the installation method of girder steel
CN111779144A (en) * 2020-07-20 2020-10-16 中国建筑第八工程局有限公司 Connecting structure of elevation lowering cross beam and construction method thereof
CN112323972A (en) * 2020-11-12 2021-02-05 华侨大学 Connecting assembly of shear-resistant short corbel steel beam reinforced by stiffening ribs and connecting method thereof
KR102471965B1 (en) * 2022-01-11 2022-11-29 (주)에스엠구조안전진단 Steel Beam of Asymmetric Variable Section for the Optimum Design and method of installation of the same
KR102552578B1 (en) * 2023-01-06 2023-07-06 주식회사 유니크종합건설 Steel structure construction method that can shorten the construction period
CN116335278A (en) * 2023-04-10 2023-06-27 宁波市新铭建设工程测试有限公司 Green building steel construction
CN116335278B (en) * 2023-04-10 2024-04-09 宁波市新铭建设工程测试有限公司 Green building steel construction

Also Published As

Publication number Publication date
KR101711614B1 (en) 2017-03-14

Similar Documents

Publication Publication Date Title
KR101711614B1 (en) Connection structure of steel column and steel beam
WO2017026113A1 (en) Column and beam connection structure and method
JP2015092114A (en) Clamps, and member-fixing structure using the same
KR101766807B1 (en) the rigid connection structure between precast concrete column and precast concrete girder and the rigid connection structure between precast concrete girder and precast concrete beam using the plate, the modular system using the same
KR101868677B1 (en) Connection unit for coupling main steel girder and ancillary steel girder and, connection methods using the same
KR101462843B1 (en) Joint structure of steel column and steel beam, and joint structure of steel column and steel column and steel beam
KR101686045B1 (en) Connecting structure of prefabricated steel column frame and steel beam frame
KR101372300B1 (en) Unit Moduler Structure For extension
JP5362310B2 (en) Unit building
KR100626543B1 (en) Hybrid structure system of precast concrete beam and steel beam, precast concrete beam with bracket for connection with steel beam
JP2009057716A (en) Connecting structure of building unit, and fabricated building
JP7156885B2 (en) Fixing structure of waist wall panel
JP7032051B2 (en) Floor structure construction method and floor structure reuse method
JP3956297B2 (en) Joint structure of joist unit and beam, and connection structure of joist unit
JP2008031644A (en) Floor frame of steel frame building and construction method of this floor frame
JP7208028B2 (en) Construction method of earthquake-resistant ceiling structure
JP6474575B2 (en) Brace seismic reinforcement structure and seismic reinforcement method for existing buildings
KR200285281Y1 (en) Supporting structure for concrete wall
JP2018127825A (en) Joining method of column and beam
KR101273087B1 (en) Method for installing alc panel to concrete slab
JP6713144B1 (en) Connecting fittings for hoisting work scaffolds and installation method
JP7380042B2 (en) Building column and beam connection method
JP6875120B2 (en) Floor panels, floor structures, floor construction methods and building skeleton reuse methods
JP4871363B2 (en) Column / beam joint structure and unit building reconstruction method
JP6886788B2 (en) Seismic ceiling structure

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20200128

Year of fee payment: 4