KR20160033388A - stone panel construction methods using union device of concrete building exterior stone panels - Google Patents

stone panel construction methods using union device of concrete building exterior stone panels Download PDF

Info

Publication number
KR20160033388A
KR20160033388A KR1020140124077A KR20140124077A KR20160033388A KR 20160033388 A KR20160033388 A KR 20160033388A KR 1020140124077 A KR1020140124077 A KR 1020140124077A KR 20140124077 A KR20140124077 A KR 20140124077A KR 20160033388 A KR20160033388 A KR 20160033388A
Authority
KR
South Korea
Prior art keywords
stone panel
fixing
wall
bracket
anchor bolt
Prior art date
Application number
KR1020140124077A
Other languages
Korean (ko)
Other versions
KR101663372B1 (en
Inventor
배대권
Original Assignee
(주)세기경영기술연구원
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)세기경영기술연구원 filed Critical (주)세기경영기술연구원
Priority to KR1020140124077A priority Critical patent/KR101663372B1/en
Publication of KR20160033388A publication Critical patent/KR20160033388A/en
Application granted granted Critical
Publication of KR101663372B1 publication Critical patent/KR101663372B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0832Separate fastening elements without load-supporting elongated furring elements between wall and covering elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0832Separate fastening elements without load-supporting elongated furring elements between wall and covering elements
    • E04F13/0857Supporting consoles, e.g. adjustable only in a direction parallel to the wall
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/14Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements stone or stone-like materials, e.g. ceramics concrete; of glass or with an outer layer of stone or stone-like materials or glass
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/388Separate connecting elements
    • E04B2001/389Brackets
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F2201/00Joining sheets or plates or panels
    • E04F2201/05Separate connectors or inserts, e.g. pegs, pins, keys or strips
    • E04F2201/0511Strips or bars, e.g. nailing strips

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

The present invention relates to a construction method for a stone panel. The present invention is to provide the construction method for a stone panel, capable of integrating the combination of a stone panel, a wall, and a thermal insulation board when the thermal insulation board and the stone panel are combined with the concrete wall and of combining the stone panel and the wall by freely controlling a gap between the stone panel and the wall. The construction method for a stone panel is to construct the stone panel used for a finishing work of an exterior of a building. The construction method for a stone panel includes: a working drawing preparing step (S1) of preparing a working drawing to correspond to the wall and preparing the thermal insulation board and the stone panel; a thermal insulation board fixing step (S2) of fixing the thermal insulation board prepared in the wall to correspond to the working drawing prepared through the working drawing preparing step (S1); an installation position display step (S3) of displaying an installation position on the thermal insulation board fixed to the wall through the thermal insulation board fixing step (S2); an anchor bolt embedding step (S4) of boring a hole of a fixed depth at the installation position displayed on the thermal insulation board through the installation position display step (S3) and fixing one end of an anchor bolt; a tensioning device installing step (S5) installing a tensioning device which is through unification in the anchor bolt fixed to the wall through the anchor bolt embedding step (S4); a stone panel installing step (S6) of installing the stone panel in the tensioning device installed on the wall through the tensioning device installing step (S5); and an inspection step (S7) of inspecting whether an installation state of the stone panel installed in the wall is proper or whether even flatness is maintained.

Description

콘크리트 건축물 외장용 석재패널의 긴결장치를 이용한 석재패널 시공방법{stone panel construction methods using union device of concrete building exterior stone panels}Technical Field [0001] The present invention relates to a method of constructing a stone panel using a long-

본 발명은 콘크리트 건축물 외장용 석재패널의 긴결장치를 이용한 석재패널 시공방법에 관한 것으로서, 더욱 상세하게는 콘크리트 벽체에 단열보드와 석재패널 결합시 상기 석재패널과 벽체 및 단열보드의 결합을 일체화하는 작업이 가능하며, 상기 석재패널과 벽체 사이의 이격거리를 자유롭게 조절하면서 결합하도록 하는 콘크리트 건축물 외장용 석재패널의 긴결장치를 이용한 석재패널 시공방법에 관한 것이다.
The present invention relates to a method of constructing a stone panel using a long colon value of a stone panel for exterior use of a concrete structure, and more particularly, to a method of integrating the combination of the stone panel with a wall and a heat insulating board when a heat insulating board and a stone panel are joined to a concrete wall The present invention relates to a method of constructing a stone panel using a long colon of an exterior stone panel of a concrete building, which is capable of freely adjusting the distance between the stone panel and the wall.

일반적으로, 건축물의 외피 구조중 콘크리트 건축물의 외벽 면은 건축물의 단열성능과 아름다운 외관을 구현하기 위해 벽체의 외부면에 단열층을 형성하고, 그 외부면에 다양한 재료의 외장재료로 마감하여 이루어진 복합구조로 구성된다.Generally, the outer wall surface of a concrete structure of a building is formed of a composite structure formed by forming a heat insulating layer on the outer surface of the wall and covering the outer surface of the wall with a covering material of various materials in order to realize a heat- .

이러한 복합구조는 콘크리트 벽체가 형성되면 그 외벽면에 면하여 단열재료인 우레탄이나 스티로폼 등을 설치하고, 그 외부면에 최종적인 마감처리를 위해 마감재료인 타일이나 석재 또는 금속 예컨대, 알루미늄패널 등으로 마감한다.When the concrete wall is formed, urethane or styrofoam, which is a heat insulating material, is disposed on the outer wall surface of the concrete wall, and a tile or a stone or a metal such as an aluminum panel Close.

상기한 마감재료 중 석재패널로 시공하는 경우, 벽면에 먼저 단열보드를 설치하고 그 외부면에 벽체에 긴결되는 석재패널을 결합하여야 하는데, 이를 위해서는 먼저 콘크리트 벽체와 긴결되어야만 안전하게 마감될 수 있다.In the case of the above-mentioned finishing materials, when a stone panel is used, it is necessary to install a heat insulating board on the wall first and to connect the stone panel which is tightened to the wall on the outer surface thereof.

종래의 일례를 살펴보면, 대한민국 특허 제993538호(2010.11.04. 등록)의 건축물의 내외장용 석재패널 시공구조는, 도 1에 도시된 바와 같이, 한 장의 단위 석재패널 또는 다수의 단위 석재패널을 각각 인접하게 배치하고 프레임을 통해 하나의 석재패널 시공유닛으로 형성하고, 이를 건축물의 내,외측에 커튼 윌 형태로 시공하는 건축물의 내외장용 석재패널 시공구조에 있어서, 4 측면에 프레임 결합홈이 연이어 형성된 단위 석재패널과, 전면부로 수직하게 돌출되어 상기 단위 석재패널의 측면부를 감싸주는 날개의 내측에 상기 단위 석재패널의 프레임 결합홈에 끼워져 걸려지는 걸림편이 돌출 형성되고 상기 날개의 후방부로는 유닛 연결겸 고정바 결합홈과 연결구 삽입홈을 일체로 구비한 "ㄷ"자형 결합구가 구비된 구성을 갖고 상기 단위 석재패널의 4 측면에 결합되는 외곽프레임 및 서로 인접된 외곽 프레임의 연결구 삽입홈에 각각 양단부가 끼워진 형태에서 고정구를 통해 외곽 프레임의 결합구에 일체로 고정설치되어 외곽 프레임 자체가 단위 석재패널의 4 측면에 사각 틀체 형상으로 고정 설치되도록 하는 수개의 "ㄱ"자형 연결구를 구비하고 건물의 내외장재로 시공되는 석재패널 유닛과; 상기 석재패널 시공유닛의 외곽프레임에 형성된 유닛 연결겸 고정바 결합홈에 끼워져 결합되는 사각 결합봉과, 상기 결합봉의 어느 일면에서 후방부를 향해 연장 형성된 고정편을 구비하고 상기 석재패널 시공유닛의 상면과 저면 또는 양측면에 각각 대향되게 설치되어 석재패널 시공유닛을 건물의 벽체나 슬라브에 설치된 케스팅 채널에 패스너와 볼트 및 너트를 통해 고정설치해 주는 수개의 고정바와; 건물의 벽체나 슬라브에 매립 또는 앵커볼트를 통해 고정 설치되어 상기 석재패널 시공유닛에 결합된 고정바가 패스너와 볼트 및 너트를 통해 고정되도록 하는 방식을 통해 석재패널 시공유닛 자체가 건물의 외벽 또는 내벽에 고정된 상태를 유지하도록 하는 수개의 케스팅 채널과; 상기 케스팅 채널과 고정바 사이를 볼트와 너트를 통해 상호 결합시킬 수 있도록 하는 수개의 패스너;로 구성된다.As shown in FIG. 1, a stone panel construction for interior and exterior use of a building of Korean Patent No. 993538 (Registered on Nov. 4, 2010), which is one example of a conventional unit stone, comprises a single unit stone panel or a plurality of unit stone panels The present invention relates to a structure for constructing a stone panel for an interior and exterior of a building which is arranged adjacently and formed as a single stone panel installation unit through a frame and which is constructed in a curtain-like form on the inside and outside of the building, A unit stone panel; and a latching protrusion formed to protrude from an inner side of a blade protruding vertically to a front portion of the unit stone panel and enclosing a side surface of the unit stone panel, the unit engaging with a frame coupling groove of the unit stone panel, And a "C" -shaped fitting portion integrally provided with a fixing bar coupling groove and a coupling hole insertion groove, wherein the four side And the outer frame itself is integrally fixed to the coupling part of the outer frame through the fixing part in such a manner that both end parts are fitted into the connecting hole insertion groove of the outer frame adjacent to each other, Shaped panel having a plurality of "a" -shaped connectors adapted to be fixedly installed in a shape of a building; And a fixing piece extending from one side of the connecting rod toward the rear portion of the connecting rod, wherein the upper and lower surfaces of the stone panel installation unit Or a plurality of fixing bars which are opposed to each other on both sides to fix the stone panel construction unit to a casting channel provided on a wall or a slab of the building through a fastener, a bolt and a nut; The stone panel installation unit itself is fixed to the outer wall or the inner wall of the building through a method of fixing the installation bar to the wall panel or the slab of the building through an anchor bolt to fix the fixing bar coupled with the stone panel installation unit through the fastener, A plurality of casting channels to maintain a fixed state; And a plurality of fasteners for mutually joining the casting channel and the fixed bar through bolts and nuts.

상기한 바와 같은 종래기술에서는, 콘크리트 벽체 면에 먼저 단열보드 예컨대, 스티로폼 등을 설치하고 그 위에 석재패널을 부착하기 위해 강제트러스(truss, 또는 커튼 윌)를 격자형으로 제작하여 벽체에 결합하거나 또는 벽체 외벽 면에 먼저 설치된 단열보드 중 앵커볼트를 매입할 부분의 단열보드를 절취한 다음 절취된 벽면 부위에 앵커볼트와 석재패널을 고정하는 방법이다.In the above-mentioned prior art, a truss (or curtain will) is formed in the form of a grid to attach an insulating board, for example, styrofoam, on the concrete wall surface and a stone panel thereon, The anchor bolt and the stone panel are fixed to the cut-away wall surface portion of the heat-insulating board installed on the wall outer wall surface first.

이 경우, 단열보드의 절취부분 틈새를 다시 우레탄이나 우레아폼 등을 재충진하여야 함으로, 작업공정의 추가로 인해 작업이 복잡해지는 문제점이 있다.In this case, there is a problem that the work is complicated due to the addition of the work process since the cut-out portion of the heat insulating board must be filled again with urethane or urea foam.

특히, 단열보드 절취시 칼로 도려내거나 화염으로 녹여야 함으로써, 작업공정이 복잡하고 유해 독성물질의 발생으로 작업환경을 저해하는 문제점이 있다.Particularly, when the heat insulating board is cut, it is necessary to cut off with a knife or melt with a flame, thereby complicating the work process and causing harmful toxic substances, thereby hindering the working environment.

또한, 절취된 단열보드에 의해 환경폐기물이 발생되고, 이렇게 환경폐기물을 처리해야 하는 처리비용이 추가되는 문제점이 있다.Further, there is a problem that environmental wastes are generated by the cut heat-insulating board, and the processing cost to process the environmental wastes is added.

또한, 건축물의 외벽면에서 작업이 이루어짐으로써, 고소작업과 화염작업 등으로 인한 작업자의 안전을 해칠 수 있는 문제점이 있다.Further, since the work is performed on the outer wall surface of the building, there is a problem that the safety of the operator due to the high-altitude operation and the flame operation can be impaired.

상기한 작업은 공정이 복잡하기 때문에 현장에서 시공하는 전체 작업량 증가와 공정이 길어지는 문제점 때문에 공사비가 증대되어 경제적이지 못하다. 또한, 절취된 단열보드 부위의 틈새를 재충진해야 하는 문제점과 함께 틈새가 제대로 충진되지 못하면 벽체틈새의 열손실이 이루어져 전체적으로 에너지손실을 초래하는 문제점이 있다.Since the above-mentioned operation is complicated, the construction cost is increased due to an increase in the total work amount applied in the field and a long process, which is not economical. In addition, there is a problem that the gap of the cut heat insulating board portion must be filled again, and if the gap can not be filled properly, the heat loss of the wall gap is generated, resulting in energy loss as a whole.

결국, 상기한 문제점들에 의해 건축물의 외벽에 석재패널을 시공하는 작업신뢰성이 저하됨에 따라 석재패널의 시공 경쟁력을 떨어뜨리게 된다.
As a result, the reliability of the operation of installing the stone panel on the outer wall of the building is lowered due to the above-mentioned problems, and the construction competitiveness of the stone panel is lowered.

대한민국 특허 제555320호(2006.02.20. 등록)Korean Patent No. 555320 (Registered on February 20, 2006) 대한민국 특허 제1147446호(2012.05.11. 등록)Korean Patent No. 1147446 (Registered May 11, 2012) 대한민국 특허 제1244981호(2013.03.12. 등록)Korean Patent No. 1244981 (Registered on March 13, 2013) 대한민국 특허 제1270436호(2013.05.28. 등록)Korean Patent No. 1270436 (Registered on May 28, 2013) 대한민국 특허 제1336667호(2013.11.28. 등록)Korean Patent No. 1336667 (Registered on November 28, 2013) 대한민국 특허 제1429057호(2014.08.05. 등록)Korean Patent No. 1429057 (Registered on August 4, 2014)

상기한 문제점을 해결하기 위하여 제안하는 것으로서, 본 발명의 목적은, 콘크리트 벽체에 단열보드와 석재패널 결합시 상기 석재패널과 벽체 및 단열보드의 결합을 일체화하는 작업이 가능하며, 상기 석재패널과 벽체 사이의 이격거리를 자유롭게 조절하면서 결합하도록 하는 콘크리트 건축물 외장용 석재패널의 긴결장치를 이용한 석재패널 시공방법을 제공하는 데 있다.
It is an object of the present invention to solve the problems described above and it is an object of the present invention to provide a method for integrating a stone panel with a wall and a heat insulating board when a heat insulating board and a stone panel are coupled to a concrete wall, The present invention also provides a method of constructing a stone panel using a long colon of an exterior stone panel of a concrete building.

상기한 목적을 달성하기 위한 본 발명은, 건축물의 외장 마감에 사용되는 석재패널을 시공하는 석재패널 시공방법에 있어서, 벽체에 맞춰 시공도를 작성하고, 이에 맞춰 단열보드 및 석재패널을 준비하는 시공도 작성단계; 상기 시공도 작성단계를 통해 작성된 시공도에 맞춰 벽체에 준비된 단열보드를 고정하는 단열보드 고정단계; 상기 단열보드 고정단계를 통해 벽체에 고정된 단열보드 상에 설치위치를 표시하는 설치위치 표시단계; 상기 설치위치 표시단계를 통해 단열보드에 표시된 설치위치에 일정깊이의 구멍을 뚫고, 앵커볼트의 일단을 고정하는 앵커볼트 매립단계; 상기 앵커볼트 매립단계를 통해 벽체에 고정된 앵커볼트에 유닛화된 긴결장치를 설치하는 긴결장치 설치단계; 상기 긴결장치 설치단계를 통해 벽체에 설치된 긴결장치에 석재패널을 설치하는 석재패널 설치단계; 및 상기 석재패널 설치단계를 통해 벽체에 설치된 석재패널의 설치상태가 적정한지 또는 균일한 평탄도를 유지하는지를 검사하는 검사단계를 포함하고; 상기 긴결장치 설치단계는, 상기 앵커볼트 매립단계를 통해 벽체에 앵커볼트의 고정이 완료되면, 몸체에서 연장된 압착다리가 단열보드에 박히도록 하고 상기 몸체에 형성된 X축 장공에 상기 앵커볼트의 볼트부를 삽입시키면서 X축 방향으로 설치위치를 보정하도록 하는 고정브라켓 설치단계; 상기 고정브라켓 설치단계를 통해 고정브라켓의 설치가 완료되면, 상기 고정브라켓에 일단이 밀착되고 상기 앵커볼트의 볼트부를 Y축 장공에 삽입시켜 Y축 방향으로 설치위치를 보정하도록 하고 Y축 방향의 보정이 완료되면 상기 앵커볼트에 앵커너트를 체결시켜 상기 고정브라켓 및 가변브라켓을 고정하는 가변브라켓 설치단계; 상기 가변브라켓 설치단계를 통해 가변브라켓의 설치가 완료되면, 상기 가변브라켓의 일단에 일부를 삽입시켜 Z축 방향으로 설치위치를 보정하고, 보정이 완료되면 체결수단을 통해 상기 가변브라켓에 간격조절브라켓을 고정시킴으로써 벽체에 대하여 석재패널을 X, Y, Z축의 3차원 방향으로 설치위치를 보정할 수 있도록 하는 간격조절브라켓 설치단계;를 포함하는 것을 특징으로 한다.In order to accomplish the above object, the present invention provides a method of constructing a stone panel for constructing a stone panel for use in exterior finishing of a building, the method comprising the steps of: Drawing step; Fixing the prepared heat insulating board to the wall in accordance with the degree of construction created through the construction drawing step; A step of displaying an installation position on the heat insulating board fixed to the wall through the step of fixing the heat insulating board; Anchor bolt burying step of drilling a hole having a predetermined depth in an installation position indicated on the heat insulating board through the installation position indicating step and fixing one end of the anchor bolt; A step of installing a long unit, which is unitized into anchor bolts fixed to the wall through the anchor bolt embedding step; A stone panel installation step of installing a stone panel in a tightening device installed on the wall through the installation of the tightening device; And inspecting whether the installed state of the stone panel installed on the wall through the stone panel installation step is proper or maintains a uniform flatness; The anchor bolts are inserted into the anchor bolts through the anchor bolts. When the anchor bolts are fixed to the wall through the anchor bolt embedding step, the pressing legs extended from the body are inserted into the X- A fixing bracket mounting step for correcting the mounting position in the X-axis direction while inserting the mounting portion; When the installation of the fixing bracket is completed through the fixing bracket installation step, one end is brought into close contact with the fixing bracket and the bolt portion of the anchor bolt is inserted into the Y-axis long hole to correct the installation position in the Y- A variable bracket mounting step of fastening the anchor bolts to the anchor bolts to fix the fixing brackets and the variable brackets; When the installation of the variable bracket is completed through the variable bracket installing step, a part of the variable bracket is inserted into one end of the variable bracket to correct the mounting position in the Z axis direction. When the correction is completed, And an interval adjusting bracket mounting step of fixing the installation position of the stone panel in the three-dimensional directions of the X, Y, and Z axes to the wall by fixing the installation space.

본 발명에 있어서, 앵커볼트 매립단계에는, 구멍에 앵커볼트를 매립하고, 단열보드 상에 돌출된 상기 앵커볼트의 볼트부에 제2앵커너트를 체결시켜 상기 단열보드에 대한 고정력이 증폭;되도록 하는 것이 바람직하다.According to the present invention, in the anchor bolt embedding step, an anchor bolt is buried in the hole and the second anchor nut is fastened to the bolt portion of the anchor bolt protruded on the heat insulating board to amplify the fixing force to the heat insulating board .

본 발명에 있어서, 가변브라켓 설치단계의 가변브라켓은, 상기 고정브라켓에 일단이 밀착되고 Y축 장공이 형성된 수직편; 및 상기 수직편의 끝단에서 일정길이 연장되고 내측에 간격조절브라켓이 삽입되어 길이를 조절할 수 있도록 일정깊이로 형성되는 삽입홈 및 체결수단이 삽입되어 체결력을 발휘하도록 하는 체결공이 형성된 수직편을 포함하고; 상기 삽입홈은 건축물에 거동이 작용하여 체결수단을 중심으로 회전모멘트가 작용할 경우 상기 간격조절브라켓이 회전되는 것을 방지하도록 함체 형상;으로 형성되는 것이 바람직하다.In the present invention, the variable bracket of the variable bracket mounting step may include: a vertical piece having one end thereof fitted to the fixing bracket and having a Y-axis elongated hole; And a vertical piece extending a predetermined length from the end of the vertical piece and having an insertion groove formed at an inner side thereof with a predetermined depth for adjusting the length thereof and having a fastening hole inserted therein for exerting a fastening force; Preferably, the insertion groove is formed in a shape that prevents the rotation of the gap adjusting bracket when a rotational moment acts on the building due to the movement of the building.

본 발명에 있어서, 간격조절브라켓 설치단계의 간격조절브라켓은, 상기 가변브라켓의 삽입홈이 삽입되어 유동되는 삽입편; 상기 삽입편의 끝단에 구성되고 상단 및 하단으로 일정길이 돌출되어 석재패널을 지지하도록 하는 걸림편; 상기 삽입편에 형성되어 Z축 방향에 대하여 설치위치를 보정하고 체결수단의 볼트가 삽입되는 Z축 장공; 및 상기 삽입편에 형성되어 상기 삽입홈으로 삽입되는 삽입깊이를 제한하도록 하는 단속편;을 포함하는 것이 바람직하다.In the present invention, the interval adjusting bracket in the interval adjusting bracket installing step may include an insertion piece into which the insertion groove of the variable bracket is inserted and flows; A locking piece formed at an end of the insertion piece and projecting a predetermined length to an upper end and a lower end to support the stone panel; A Z-axis elongated hole formed in the insertion piece for correcting an installation position with respect to the Z-axis direction and into which a bolt of the fastening means is inserted; And an intermittent piece formed on the insert piece to limit the depth of insertion into the insertion groove.

본 발명에 있어서, 고정브라켓 설치단계의 고정브라켓의 압착다리는, 상기 몸체의 상단 및 하단부 각각에 적어도 하나 이상이 구성되고; 상기 압착다리는 상기 몸체에서 일정각도만큼 기울어지도록; 형성되는 것이 바람직하다.
In the present invention, at least one compression bridge of the fixing bracket in the fixing bracket installing step is formed on each of the upper and lower ends of the body, Wherein the compression leg is inclined at an angle with respect to the body; .

본 발명에 의하면, 콘크리트 벽체에 단열보드와 석재패널 결합시 상기 석재패널과 벽체 및 단열보드의 결합을 일체화하는 작업이 가능하며, 상기 석재패널과 벽체 사이의 이격거리를 자유롭게 조절하면서 결합하도록 하는 효과가 있다.
According to the present invention, it is possible to integrate the joining of the stone panel with the wall and the heat insulating board when the heat insulating board and the stone panel are joined to the concrete wall, and it is possible to unite the stone panel and the wall while freely adjusting the separation distance .

도 1은 종래의 일례를 보인 개략적인 사시도.
도 2는 본 발명에 따른 콘크리트 벽체에 석재패널의 시공공정도.
도 3은 본 발명에 따른 단열보드 고정단계를 개략적으로 도시한 사시도.
도 4는 본 발명에 따른 앵커볼트 매립단계를 개략적으로 도시한 사시도.
도 5는 본 발명에 따른 벽체에 긴결장치가 설치된 개략적인 단면도.
도 6은 본 발명에 따른 긴결장치의 분해 사시도.
도 7은 본 발명에 따른 고정브라켓 설치단계를 개략적으로 도시한 사시도.
도 8은 본 발명에 따른 벽체에 고정브라켓이 고정된 상태의 개략적인 단면도.
도 9는 본 발명에 따른 가변브라켓 설치단계를 개략적으로 도시한 사시도.
도 10은 본 발명에 따른 간격조절브라켓 설치단계를 개략적으로 도시한 사시도.
도 11은 본 발명에 따른 석재패널 설치단계를 개략적으로 도시한 단면도.
1 is a schematic perspective view showing a conventional example.
2 is a view showing a construction process of a stone panel on a concrete wall according to the present invention.
3 is a perspective view schematically showing a step of fixing an insulating board according to the present invention.
4 is a perspective view schematically illustrating an anchor bolt embedding step according to the present invention.
5 is a schematic cross-sectional view of a wall according to the present invention in which a long collar is installed.
6 is an exploded perspective view of a tightening device according to the present invention.
7 is a perspective view schematically showing a fixing bracket mounting step according to the present invention.
8 is a schematic sectional view of a fixing bracket fixed to a wall according to the present invention.
9 is a perspective view schematically showing a step of installing a variable bracket according to the present invention.
10 is a perspective view schematically showing a step of installing a gap adjusting bracket according to the present invention.
11 is a sectional view schematically showing a step of installing a stone panel according to the present invention.

이하, 본 발명의 바람직한 실시 예를 첨부된 도면을 참조하여 설명한다(종래와 동일한 구성에 대해서는 동일한 참조부호를 사용하고 이에 대한 상세한 설명은 생략한다).DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings (the same reference numerals are used for the same components as the conventional ones, and a detailed description thereof will be omitted).

본 발명에 따른 콘크리트 건축물 외장용 석재패널의 긴결장치를 이용한 석재패널 시공방법은, 도 2에 도시된 바와 같이, 시공도 작성단계(S1)와, 단열보드 고정단계(S2)와, 설치위치 표시단계(S3)와, 앵커볼트 매립단계(S4)와, 긴결장치 설치단계(S5)와, 석재패널 설치단계(S6), 및 검사단계(S7)를 포함한다.As shown in FIG. 2, the method of constructing a stone panel using a long colon of a stone panel for exterior use of a concrete structure according to the present invention includes a construction drawing step S1, an insulation board fixing step S2, (S3), an anchor bolt embedding step (S4), a tightening device installation step (S5), a stone panel installation step (S6), and an inspection step (S7).

상기 시공도 작성단계(S1)는, 콘크리트 건축물의 벽체(1)에 맞춰 단열보드(2)와 석재패널(3)의 규격별 크기 및 형상에 따라 시공도를 작성한다.In the construction drawing step (S1), the degree of construction is made according to the sizes and shapes of the heat insulating board 2 and the stone panel 3 in conformity with the wall 1 of the concrete building.

또한, 상기 작성된 시공도에 맞춰 단열보드(2)와 석재패널(3)을 준비한다.In addition, the heat insulating board 2 and the stone panel 3 are prepared in accordance with the created construction diagram.

상기 단열보드 고정단계(S2)는, 시공도 작성단계(S1)를 통해 준비된 단열보드(2)를 벽체(1)에 시공도에 맞춰 고정한다. 이 경우, 상기 단열보드(2)의 고정은 종래와 같이 접착제 또는 고정철물을 이용하여, 상기 벽체(1)에 단열보드(2)를 고정한다.The heat insulating board fixing step (S2) fixes the heat insulating board (2) prepared through the construction drawing step (S1) to the wall (1) in accordance with the degree of construction. In this case, the heat-insulating board 2 is fixed to the wall 1 by using an adhesive or a fixed metal, as in the prior art.

상기 설치위치 표시단계(S3)는, 상기 단열보드 고정단계(S2)를 통해 벽체(1)에 단열보드(2)를 고정한 후, 도 3에 도시된 바와 같이, 상기 단열보드(2) 상에 앵커볼트(140)를 설치하고자 하는 위치를 표시한다. 이 경우, 일반적으로 먹줄을 이용하여 단열보드(2) 상에 앵커볼트(140)의 설치위치를 표시한다. 물론, 이에 한정하는 것은 아니며, 앵커볼트(140)의 설치위치를 표시할 수 있는 수단이면 어느 것이든 사용 가능하다.The installation position indicating step S3 is a step of fixing the heat insulating board 2 to the wall 1 through the heat insulating board fixing step S2 and then fixing the heat insulating board 2 on the heat insulating board 2 The position where the anchor bolt 140 is to be installed is indicated. In this case, the mounting position of the anchor bolt 140 is generally indicated on the heat insulating board 2 by using a diagonal line. Of course, the present invention is not limited thereto, and any means can be used as long as it can indicate the installation position of the anchor bolt 140.

상기 앵커볼트 매립단계(S4)는, 상기 설치위치 표시단계(S3)를 통해 단열보드(2) 상에 표시된 설치위치에, 도 4에 도시된 바와 같이, 앵커볼트(140)의 일단을 매립시켜 상기 앵커볼트(140)의 볼트부가 상기 단열보드(2)에서 외부로 돌출되도록 한다. 이는, 단열보드(2) 상에 표시된 설치위치에 앵커볼트(140)가 삽입될 수 있도록 일정깊이의 구멍을 뚫는다. 이후, 구멍에 앵커볼트(140)의 끝단을 박고, 견고한 고정력을 발휘하도록 망치와 같은 공구로 강제 삽입시켜 고정되도록 한다. 상기한 앵커볼트(140)의 고정은 일반적인 고정방식임으로 이에 따른 상세한 설명은 생략한다.The anchor bolt embedding step S4 embeds the one end of the anchor bolt 140 at the installation position indicated on the heat insulating board 2 through the installation position indicating step S3 as shown in FIG. So that the bolt portion of the anchor bolt 140 protrudes from the heat insulating board 2 to the outside. This drills a hole of a predetermined depth so that the anchor bolt 140 can be inserted into the installation position indicated on the heat insulating board 2. [ Thereafter, the end of the anchor bolt 140 is inserted into the hole, and is forcedly inserted and fixed by a tool such as a hammer to exhibit a firm fixing force. Since the fixing of the anchor bolts 140 is a general fixing method, a detailed description thereof will be omitted.

또한, 상기 단열보드(2) 상에 돌출된 앵커볼트(140)의 볼트부에 제2앵커너트(144)를 체결시켜 상기 제2앵커너트(144)에 의해 상기 단열보드(2)의 일단을 압박함으로써, 상기 단열보드(2)가 벽체(1)에 고정되는 고정력을 증폭시킨다.The second anchor nut 144 is fastened to the bolt portion of the anchor bolt 140 protruded on the heat insulating board 2 so that one end of the heat insulating board 2 is connected by the second anchor nut 144 So that the fixing board 2 is fixed to the wall 1, thereby amplifying the fixing force.

상기 긴결장치 설치단계(S5)는, 상기 앵커볼트 매립단계(S4)를 통해 단열보드(2) 상에 고정된 앵커볼트(140)에, 도 5에 도시된 바와 같이, 긴결장치(100)를 고정한다.5, the tightening device 100 is installed on the anchor bolts 140 fixed on the heat insulating board 2 through the anchor bolt embedding step S4. Fixed.

이를 좀 더 상세히 살펴보면, 상기 긴결장치 설치단계(S5)는, 고정브라켓 설치단계(S52)와, 가변브라켓 설치단계(S54), 및 간격조절브라켓 설치단계(S56)를 포함한다.In more detail, the fastener installation step S5 includes a fixing bracket mounting step S52, a variable bracket mounting step S54, and a gap adjusting bracket mounting step S56.

또한, 상기 긴결장치(100)는, 도 6에 도시된 바와 같이, 단열보드(2)에 고정되는 고정브라켓(110)과, 상기 고정브라켓(110)에 일단이 고정되는 가변브라켓(120), 및 상기 가변브라켓(120)에 일단이 고정되고 타단에 석재패널(3)을 고정하는 간격조절브라켓(130)를 포함한다.6, the tightening apparatus 100 includes a fixing bracket 110 fixed to the heat insulating board 2, a variable bracket 120 having one end fixed to the fixing bracket 110, And a gap adjusting bracket 130 having one end fixed to the variable bracket 120 and fixing the stone panel 3 to the other end.

또한, 상기 긴결장치(100)는 경량이면서 제조가 간편하고 일정강도를 유지할 수 있으며 습기에 의해 부식되지 않는 재질로 형성된다. 이 경우, 상기 긴결장치(100)는 알루미늄으로 형성됨이 바람직하다. 물론, 이에 한정하는 것은 아니며, 합성수지 또는 스테인리스로 형성될 수도 있다.Also, the tightening apparatus 100 is formed of a material that is lightweight, easy to manufacture, maintains a certain strength, and is not corroded by moisture. In this case, the tightening device 100 is preferably formed of aluminum. Of course, it is not limited thereto and may be formed of synthetic resin or stainless steel.

상기 긴결장치(100)를 경량의 알루미늄으로 형성하면, 종래와 같이 커튼 윌을 설치하지않고 석재패널의 시공이 가능하고, 특히 건축물에 긴결되는 구조물의 하중을 최소화하여 건축물의 경량화에 기여할 수 있다.When the tightening device 100 is made of lightweight aluminum, it is possible to construct a stone panel without installing a curtain will like in the prior art. In particular, it is possible to minimize the load of a structure that is tightened to a building, thereby contributing to weight reduction of the building.

상기 고정브라켓 설치단계(S52)는, 상기 앵커볼트 매립단계(S4)를 통해 단열보드(2) 상에 돌출된 앵커볼트(140)의 볼트부에, 도 7에 도시된 바와 같이, 고정브라켓(110)을 고정한다.7, the fixing bracket mounting step S52 may be performed by inserting a fixing bracket (not shown) into the bolt portion of the anchor bolt 140 protruded on the heat insulating board 2 through the anchor bolt embedding step S4 110).

상기 고정브라켓(110)은 몸체(112)와, 상기 몸체(112)의 일단에 돌출되어 단열보드(2)에 박히는 적어도 하나 이상의 압착다리(114), 및 상기 몸체(112)에 구성되고 앵커볼트(140)의 일단이 삽입되며 X축 방향으로 간격이 조절될 수 있도록 형성되는 X축 장공(116)을 포함한다.The fixing bracket 110 includes a body 112 and at least one compression leg 114 protruding from one end of the body 112 to be caught in the heat insulating board 2, And an X-axis slot 116 in which one end of the X-axis 140 is inserted and the gap is adjusted in the X-axis direction.

또한, 상기 압착다리(114)는 복수로 구성됨이 바람직하다. 상기 압착다리(114)는 상단부에 2개 및 하단부 중앙에 1개로 구성됨이 바람직하다. 이는, 석재패널(3)을 받침할 때 작용하는 하중을 분산시켜 상기 단열보드(2)에 미치는 응력이 최소화되도록 하기 위함이다.In addition, it is preferable that the pressing legs 114 are composed of a plurality of pressing legs 114. It is preferable that the pressing leg 114 is composed of two pieces at the upper end portion and one piece at the middle portion of the lower end portion. This is to minimize the stress on the heat insulating board 2 by dispersing the load acting upon supporting the stone panel 3.

또한, 상기 압착다리(114)는 도 8에 도시된 바와 같이, 몸체(112)에서 일정각도(α°) 기울어지게 형성됨이 바람직하다. 이 경우, 상기 몸체(112)의 상단 및 하단 각각에 형성된 압착다리(114)가 상호 오므려지는 형태를 이루도록 대칭되게 형성됨이 바람직하다.Also, it is preferable that the compression legs 114 are formed to be inclined at a predetermined angle (?) From the body 112 as shown in FIG. In this case, the compression legs 114 formed on the upper and lower ends of the body 112 are preferably formed symmetrically to each other.

이는 단열보드(2)에 고정브라켓(110)을 박으면, 상기 고정브라켓(110)의 압착다리(114)가 상호 오므려지는 형태로 상기 단열보드(2)에 박힌 상태를 유지하게 되고, 이를 통해 상기 압착다리(114)의 오므려지는 압박력에 의해 상기 단열보드(2)에 견고하고 확고한 고정력을 발휘하게 된다.This is because when the fixing bracket 110 is put on the heat insulating board 2, the pressing legs 114 of the fixing bracket 110 are kept in a state of being caught in the heat insulating board 2, So that the fixing board 114 is firmly and firmly fastened to the heat insulating board 2 by the pressing force of the pressing legs 114.

또한, 상기 압착다리(114)의 기울기 각도(α°)는 1° ~ 10°임이 바람직하다. 예컨대, 1°미만이면 단열보드(2)에 미치는 압박력이 저조하여 확고한 고정력을 발휘할 수 없고, 10°초과하면 단열보드(2)에 박힐 때 압착다리(114)에 의해 깎여지는 부분에 의한 공간이 확대되어 상기 단열보드(2)의 강도를 약화시키는 문제점이 있다.Further, it is preferable that the inclination angle alpha of the pressing leg 114 is 1 to 10 degrees. For example, if it is less than 1 DEG, the pressing force on the heat insulating board 2 is low and a firm fixing force can not be exerted. If it is more than 10 DEG, a space formed by the portion cut by the pressing leg 114 when stuck in the heat insulating board 2 There is a problem that the strength of the heat insulating board 2 is weakened.

상기 X축 장공(116)은 앵커볼트(140)의 볼트부가 삽입되고, X축 방향으로 장공 형상으로 형성되어, 상기 앵커볼트(140)를 중심으로 긴결장치(100)의 X축 방향에 대하여 설치위치를 보정하게 된다.The X axis elongated hole 116 is formed in the X axis direction with the bolt portion of the anchor bolt 140 inserted into the elongated hole 120. The X axis elongated hole 116 is formed around the anchor bolt 140 with respect to the X axis direction of the tightening device 100 The position is corrected.

가변브라켓 설치단계(S54)는, 고정브라켓 설치단계(S52)를 통해 고정브라켓(110)의 설치가 완료되면, 가변브라켓(120)을 설치한다.In the variable bracket setting step S54, when the fixing bracket 110 is installed through the fixing bracket installing step S52, the variable bracket 120 is installed.

상기 가변브라켓(120)은 일정높이 세워지는 수직편(122)과, 상기 수직편(122)의 끝단에서 일정길이 연장되는 수평편(124)으로 구성된다.The variable bracket 120 includes a vertical piece 122 and a horizontal piece 124 extending from the end of the vertical piece 122 by a predetermined length.

상기 수직편(122)은 상기 고정브라켓(110)의 몸체(112) 일단이 밀착된다.One end of the body 112 of the fixing bracket 110 is in close contact with the vertical piece 122.

또한, 상기 수직편(122)에는 앵커볼트(140)의 볼트부가 삽입되고, Y축 방향으로 장공 형상으로 형성되어, 상기 앵커볼트(140)를 중심으로 긴결장치(100)의 Y축 방향에 대하여 설치위치를 보정하는 Y축 장공(123)이 형성된다.The bolt portion of the anchor bolt 140 is inserted into the vertical piece 122 and formed into a long hole shape in the Y axis direction so that the anchor bolt 140 is inserted into the vertical piece 122 with respect to the Y axis direction of the tightening device 100 A Y-axis long hole 123 for correcting the installation position is formed.

상기 수평편(124)은 상기 수직편(122)의 하방 끝단부에서 연장된다.The horizontal piece 124 extends from the lower end of the vertical piece 122.

또한, 상기 수평편(124)에는 끝단에서 일정깊이를 가져 간격조절브라켓(130)의 일단이 삽입되도록 하는 삽입홈(126)이 형성된다.An insertion groove 126 is formed in the horizontal piece 124 so that one end of the interval adjusting bracket 130 is inserted at a predetermined depth from the end.

또한, 상기 수평편(124)에는 상기 삽입홈(126)이 삽입된 간격조절브라켓(130)을 체결력에 의해 고정력을 발휘하도록 체결수단(128)의 일종인 볼트의 일부가 삽입되는 체결공(125)이 형성된다.The horizontal piece 124 is provided with a fastening hole 125 for inserting a part of the bolt which is a kind of the fastening means 128 so as to exert a fixing force by the fastening force of the gap adjusting bracket 130 in which the insertion groove 126 is inserted, Is formed.

한편, 상기 삽입홈(126)은 일단이 개방되는 함체 형상으로 형성됨이 바람직하다. 예컨대, 상기 삽입홈(126)의 양단이 개방된 형상으로 형성될 경우, 간격조절브라켓(130)의 일부가 삽입되어 설치된 후 건축물에 작용하는 거동에 의해 상기 체결수단(128)을 중심으로 회전모텐트가 작용하게 되고, 이로 인해 상기 간격조절브라켓(130)이 개방된 양단을 통해 체결수단(128)을 중심으로 회전되어, 결국 석재패널(3)을 파손시키는 문제점이 발생할 수 있다. 그러나 상기와 같이 삽입홈(126)을 함체 형상으로 형성하면 체결수단(128)을 중심으로 회전모멘트가 작용하여도 간격조절브라켓(130)이 회전되는 것을 방지하여 상기한 문제점을 해결하게 된다.Meanwhile, it is preferable that the insertion groove 126 is formed as a hollow shape having one end opened. For example, when both ends of the insertion groove 126 are formed in an open shape, a portion of the gap adjusting bracket 130 is inserted and installed, The tent may be actuated to cause the gap adjusting bracket 130 to rotate about the fastening means 128 through both ends of the gap adjusting bracket 130, thereby damaging the stone panel 3. However, if the insertion groove 126 is formed in the shape of an armature as described above, the gap adjusting bracket 130 is prevented from rotating even if a rotational moment acts on the fastening means 128, thereby solving the above problem.

이에 따라, 도 9에 도시된 바와 같이, 상기 단열보드(2)에 박힌 고정브라켓(110)의 X축 장공(116)에는 일정길이 앵커볼트(140)의 볼트부가 돌출된 상태이므로, 상기 돌출된 앵커볼트(140)의 볼트부에 가변브라켓(120)의 Y축 장공(123)이 삽입되도록 한다.9, the bolt portion of the fixed length anchor bolt 140 is protruded from the X-axis elongated hole 116 of the fixing bracket 110, which is embedded in the heat insulating board 2, And the Y-axis slot 123 of the variable bracket 120 is inserted into the bolt portion of the anchor bolt 140.

아울러, 상기 Y축 장공(123)을 통해 가변브라켓(120)을 Y축 방향에 대하여 설치위치를 보정한다.In addition, the mounting position of the variable bracket 120 is corrected with respect to the Y-axis direction through the Y-axis slot 123.

상기한 가변브라켓(120)의 Y축 방향에 대한 설치 보정이 완료되면, 앵커너트(142)를 상기 앵커볼트(140)에 체결시킴으로써, 상기 앵커볼트(140)에 의해 고정브라켓(110) 및 가변브라켓(120)의 고정이 완료된다.When the anchor nut 142 is fastened to the anchor bolt 140 by the anchor bolt 140, the fixing bracket 110 and the adjustable bolt 140 are fixed by the anchor bolt 140, The fixing of the bracket 120 is completed.

상기 간격조절브라켓 설치단계(S56)는, 가변브라켓 설치단계(S54)를 통해 가변브라켓(120)의 설치가 완료되면, 도 10에 도시된 바와 같이, 간격조절브라켓(130)을 설치한다.In the step S56 of installing the gap adjusting bracket, when the variable bracket 120 is installed through the variable bracket mounting step S54, the gap adjusting bracket 130 is installed as shown in FIG.

상기 간격조절브라켓(130)은, 상기 가변브라켓(120)의 삽입홈(126)에 일단이 삽입되어, 벽체(1)와 석재패널(3)의 간격에 대한 설치위치를 보정하는 수단이다.The interval adjusting bracket 130 is a means for inserting one end into the insertion groove 126 of the variable bracket 120 to correct an installation position for the distance between the wall 1 and the stone panel 3. [

상기 간격조절브라켓(130)은 상기 가변브라켓(120)의 삽입홈(126)에 삽입되는 삽입편(132)과, 상기 삽입편(132)의 끝단에 형성되어 석재패널(3)에 형성된 고정홈(3a)에 끼워져 상기 석재패널(3)의 설치위치를 고정하는 걸림편(134), 및 상기 삽입편(132)에 형성되는 Z축 장공(136)을 포함한다.The interval adjusting bracket 130 includes an insertion piece 132 inserted into the insertion groove 126 of the variable bracket 120 and a fixing groove 132 formed at the end of the insertion piece 132, And a Z-axis elongated hole 136 formed in the insert piece 132. The engaging piece 134 is inserted into the insertion hole 132 of the insert panel 132 to fix the installation position of the stone panel 3,

또한, 상기 삽입편(132)에는 상기 삽입홈(126)에 삽입되는 길이를 단속하도록 상기 삽입편(132)의 양단에서 일정길이 돌출되는 단속편(138)을 포함한다.The insertion piece 132 includes an intermittent piece 138 protruding by a predetermined length from both ends of the insertion piece 132 so as to intermittently insert a length into the insertion groove 126.

상기 삽입편(132)은 상기 삽입홈(126)과 동일한 형상으로 형성됨이 바람직하다. 또한 상기 삽입편(132)은 삽입홈(126)에 대하여 기본 오차범위 예컨대, 0 ~ 0.1mm의 허용오차 범위를 가지도록 형성됨이 바람직하다.The insertion piece 132 may be formed in the same shape as the insertion groove 126. Further, it is preferable that the insertion piece 132 is formed to have a basic error range, for example, a tolerance range of 0 to 0.1 mm with respect to the insertion groove 126.

상기 걸림편(134)은 상기 삽입편(132)을 중심으로 상, 하단으로 일정높이 돌출되게 형성된다. 이 경우, 상기 걸림편(134)은 상단보다는 하단의 돌출높이가 길도록 형성됨이 바람직하다. 즉, 걸림편(134)의 상단은 석재패널(3)의 하단을 지지하기 때문에 걸림되었다는 정도로 길이를 가져도 상기 석재패널(3)의 자체하중에 의해 견고하게 설치위치가 고정된다. 이에 반하여, 상기 걸림편(134)의 하단은 석재패널(3)의 상단을 지지하기 때문에 건축물에 작용하는 거동에 의해 쉽게 이탈될 수 있으므로 이를 방지하기 위해 다소 길게 형성됨이 바람직하다.The latching piece 134 is formed to protrude upward and downward at a predetermined height around the insertion piece 132. In this case, it is preferable that the protruding height of the lower end of the retaining piece 134 is longer than that of the upper end. That is, the upper end of the retaining piece 134 supports the lower end of the stone panel 3, so that the installation position is firmly fixed by the self-load of the stone panel 3 even if the retaining piece 134 is long enough to hold it. On the other hand, since the lower end of the retaining piece 134 supports the upper end of the stone panel 3, it can be easily separated due to the action acting on the building.

상기 Z축 장공(136)은 상기 삽입홈(126)에 삽입된 후 체결수단(128)의 볼트가 삽입되어, 상기 체결수단(128)의 체결력에 의해 설치위치가 고정된다.The Z-axis elongated hole 136 is inserted into the insertion groove 126 and then the bolt of the fastening means 128 is inserted and the mounting position is fixed by the fastening force of the fastening means 128.

또한, 상기 Z축 장공(136)은 Z축 방향으로 장공 형상으로 형성되어, 벽체(1)와 석재패널(3) 사이의 간격이 조절되도록 긴결장치(100)의 Z축 방향에 대하여 설치위치를 보정하게 된다.The Z-axis elongated hole 136 is formed to have a long hole shape in the Z-axis direction so that the distance between the wall 1 and the stone panel 3 can be adjusted by adjusting the installation position with respect to the Z-axis direction of the tightening device 100 .

이에 따라, 상기 앵커볼트(140)에 의해 고정된 가변브라켓(120)의 삽입홈(126)에 간격조절브라켓(130)의 삽입편(132)을 삽입시킨다.The insertion piece 132 of the interval adjusting bracket 130 is inserted into the insertion groove 126 of the variable bracket 120 fixed by the anchor bolt 140. [

이때, 상기 삽입편(132)의 삽입길이는 벽체(1)와 석재패널(3) 사이의 간격에 맞춰 Z축 방향으로 조절하고, Z축 방향에 대한 보정이 완료되면 체결수단(128)을 통해 상기 가변브라켓(120)의 수평편(124)에 간격조절브라켓(130)을 체결, 고정시킨다.At this time, the insertion length of the insertion piece 132 is adjusted in the Z-axis direction in accordance with the interval between the wall 1 and the stone panel 3, and when the correction for the Z-axis direction is completed, The gap adjusting bracket 130 is fastened and fixed to the horizontal piece 124 of the variable bracket 120.

그러므로, 시공도에 맞춰 상기 콘크리트 벽체(1)에 고정된 단열보드(2) 상에 긴결장치(100)의 고정이 완료된다.Therefore, fixing of the precise apparatus 100 is completed on the heat insulating board 2 fixed to the concrete wall 1 in accordance with the construction diagram.

상기 석재패널 설치단계(S6)는, 상기 긴결장치 설치단계(S5)를 통해 벽체(1)에 긴결장치(100)의 설치가 완료되면, 도 11에 도시된 바와 같이, 상기 긴결장치(100)를 통해 석재패널(3)을 고정한다.The stone panel installation step S6 is a step in which when the installation of the precise apparatus 100 is completed in the wall 1 through the precondition installation step S5, Thereby fixing the stone panel 3.

이는, 상기 간격조절브라켓(130)의 끝단에 형성된 걸림편(134)에 석재페널(3)의 상단 및 하단 각각에 형성된 걸림홈(3a)이 걸림되도록 함으로서, 결국, 벽체(1)에 대한 석재패널(3)의 시공이 완료된다.This is because the retaining grooves 3a formed at the upper and lower ends of the stone panel 3 are engaged with the retaining pieces 134 formed at the ends of the gap adjusting brackets 130, The construction of the panel 3 is completed.

상기 검사단계(S7)는, 상기 석재패널 설치단계(S6)를 통해 벽체(1)에 석재패널(3)의 시공이 완료되면, 결합상태가 적정한지 또는 균일한 평탄도를 유지하는 지를 최종적으로 검사한다.The inspecting step S7 is a step of judging whether the stone panel 3 is finished to be installed on the wall 1 through the stone panel installation step S6, Inspect.

또한, 벽체(1)에 설치된 석재패널(3)의 검사가 완료되면, 상기 석재패널(3)들 사이에 실리콘과 같은 마감재를 주입시켜 마감처리 한다.
When the inspection of the stone panel 3 provided on the wall 1 is completed, a finishing material such as silicon is injected between the stone panels 3 to finish the same.

이상에서 설명한 것은 콘크리트 건축물 외장용 석재패널의 긴결장치를 이용한 석재패널 시공방법을 실시하기 위한 하나의 실시 예에 불과한 것으로서, 본 발명은 상기한 실시 예에 한정되지 아니한다. 본 발명에 속하는 분야에서 통상의 지식을 가진 자라면, 본 발명의 요지를 벗어남이 없이 다양한 변경실시가 가능하다는 것을 이해할 수 있을 것이다.
The above description is only one example for carrying out the method of constructing the stone panel using the long colon value of the stone panel for the exterior of the concrete structure, and the present invention is not limited to the above embodiment. It will be understood by those skilled in the art that various changes may be made without departing from the spirit of the invention.

1: 벽체 2: 단열보드
3: 석재패널 100: 긴결장치
110: 고정브라켓 112: 몸체
114: 압착다리 116: X축 장공
120: 가변브라켓 122: 수직편
123: Y축 장공 124: 수평편
125: 체결공 126: 삽입홈
128: 체결수단 130: 간격조절브라켓
132: 삽입편 134: 걸림편
136: Z축 장공 138: 단속편
140: 앵커볼트 142: 앵커너트
1: Wall 2: Insulation board
3: Stone panel 100:
110: fixing bracket 112: body
114: compression bridge 116: X axis slot
120: variable bracket 122:
123: Y-axis elongated hole 124:
125: fastening hole 126: insertion groove
128: fastening means 130: interval adjusting bracket
132: insertion piece 134:
136: Z-axis elongated hole 138:
140: anchor bolt 142: anchor nut

Claims (5)

건축물의 외장 마감에 사용되는 석재패널을 시공하는 석재패널 시공방법에 있어서,
벽체에 맞춰 시공도를 작성하고, 이에 맞춰 단열보드 및 석재패널을 준비하는 시공도 작성단계(S1);
상기 시공도 작성단계(S1)를 통해 작성된 시공도에 맞춰 벽체에 준비된 단열보드를 고정하는 단열보드 고정단계(S2);
상기 단열보드 고정단계(S2)를 통해 벽체에 고정된 단열보드 상에 설치위치를 표시하는 설치위치 표시단계(S3);
상기 설치위치 표시단계(S3)를 통해 단열보드에 표시된 설치위치에 일정깊이의 구멍을 뚫고, 앵커볼트의 일단을 고정하는 앵커볼트 매립단계(S4);
상기 앵커볼트 매립단계(S4)를 통해 벽체에 고정된 앵커볼트에 유닛화된 긴결장치를 설치하는 긴결장치 설치단계(S5);
상기 긴결장치 설치단계(S5)를 통해 벽체에 설치된 긴결장치에 석재패널을 설치하는 석재패널 설치단계(S6); 및
상기 석재패널 설치단계(S6)를 통해 벽체에 설치된 석재패널의 설치상태가 적정한지 또는 균일한 평탄도를 유지하는지를 검사하는 검사단계(S7)를 포함하고;
상기 긴결장치 설치단계(S5)는, 상기 앵커볼트 매립단계(S4)를 통해 벽체에 앵커볼트의 고정이 완료되면, 몸체에서 연장된 압착다리가 단열보드에 박히도록 하고 상기 몸체에 형성된 X축 장공에 상기 앵커볼트의 볼트부를 삽입시키면서 X축 방향으로 설치위치를 보정하도록 하는 고정브라켓 설치단계(S52);
상기 고정브라켓 설치단계(S52)를 통해 고정브라켓의 설치가 완료되면, 상기 고정브라켓에 일단이 밀착되고 상기 앵커볼트의 볼트부를 Y축 장공에 삽입시켜 Y축 방향으로 설치위치를 보정하도록 하고 Y축 방향의 보정이 완료되면 상기 앵커볼트에 앵커너트를 체결시켜 상기 고정브라켓 및 가변브라켓을 고정하는 가변브라켓 설치단계(S54);
상기 가변브라켓 설치단계(S54)를 통해 가변브라켓의 설치가 완료되면, 상기 가변브라켓의 일단에 일부를 삽입시켜 Z축 방향으로 설치위치를 보정하고, 보정이 완료되면 체결수단을 통해 상기 가변브라켓에 간격조절브라켓을 고정시킴으로써 벽체에 대하여 석재패널을 X, Y, Z축의 3차원 방향으로 설치위치를 보정할 수 있도록 하는 간격조절브라켓 설치단계(S56);
를 포함하는 것을 특징으로 하는 콘크리트 건축물 외장용 석재패널의 긴결장치를 이용한 석재패널 시공방법.
A method of constructing a stone panel for constructing a stone panel used for exterior finishing of a building,
A construction drawing step (S1) of preparing an installation drawing in conformity with a wall and preparing a heat insulation board and a stone panel accordingly;
An insulating board fixing step (S2) of fixing the heat insulating board prepared in the wall in accordance with the construction diagram created through the construction drawing step (S1);
(S3) for displaying an installation position on the heat insulating board fixed to the wall through the heat insulating board fixing step (S2);
An anchor bolt embedding step (S4) of drilling a hole having a predetermined depth in an installation position indicated on the heat insulating board through the installation position indicating step (S3) and fixing one end of the anchor bolt;
A step S5 of installing a long unit for unitizing the anchor bolts fixed to the wall through the anchor bolt embedding step S4;
A stone panel installation step (S6) of installing a stone panel on a tightening device installed on the wall through the installation step (S5) of the tightening device; And
And a checking step (S7) of inspecting whether the installation state of the stone panel installed on the wall is proper or maintains a uniform flatness through the stone panel installing step (S6);
When the fixing of the anchor bolts to the wall is completed through the anchor bolt embedding step S4, the presser foot extended from the body is inserted into the heat insulating board, and the X-axis slot formed in the body (S52) of inserting a bolt portion of the anchor bolt into the fixing bracket so as to correct the installation position in the X-axis direction;
When the installation of the fixing bracket is completed through the fixing bracket installing step S52, one end of the fixing bracket is brought into close contact with one end, and the bolt portion of the anchor bolt is inserted into the Y-axis long hole to correct the mounting position in the Y- (S54) of fixing the fixing bracket and the variable bracket by fastening the anchor bolt to the anchor bolt when the directional correction is completed;
When the installation of the variable bracket is completed through the variable bracket installing step (S54), a part of the variable bracket is inserted into one end of the variable bracket to correct the mounting position in the Z axis direction. When the correction is completed, An interval adjusting bracket installing step (S56) for fixing the installation position in the three-dimensional directions of the X, Y, and Z axes of the stone panel with respect to the wall by fixing the interval adjusting bracket;
The method for constructing a stone panel using a long colon value of a stone panel for exterior use of a concrete structure.
청구항 1에 있어서, 상기 앵커볼트 매립단계(S4)에는,
구멍에 앵커볼트를 매립하고, 단열보드 상에 돌출된 상기 앵커볼트의 볼트부에 제2앵커너트를 체결시켜 상기 단열보드에 대한 고정력이 증폭;
되도록 하는 것을 특징으로 하는 콘크리트 건축물 외장용 석재패널의 긴결장치를 이용한 석재패널 시공방법.
2. The method of claim 1, wherein in the anchor bolt embedding step (S4)
Anchoring bolts are buried in the holes and the second anchor nut is fastened to the bolts of the anchor bolts protruded on the heat insulating board to amplify the fixing force to the heat insulating board;
Wherein the method comprises the steps of: (a)
청구항 1에 있어서, 상기 가변브라켓 설치단계(S54)의 가변브라켓(120)은,
상기 고정브라켓(110)에 일단이 밀착되고 Y축 장공(123)이 형성된 수직편(122); 및
상기 수직편(122)의 끝단에서 일정길이 연장되고 내측에 간격조절브라켓(130)이 삽입되어 길이를 조절할 수 있도록 일정깊이로 형성되는 삽입홈(126) 및 체결수단(128)이 삽입되어 체결력을 발휘하도록 하는 체결공(125)이 형성된 수직편(124)을 포함하고;
상기 삽입홈(126)은 건축물에 거동이 작용하여 체결수단(128)을 중심으로 회전모멘트가 작용할 경우 상기 간격조절브라켓(130)이 회전되는 것을 방지하도록 함체 형상;
으로 형성되는 것을 특징으로 하는 콘크리트 건축물 외장용 석재패널의 긴결장치를 이용한 석재패널 시공방법.
The variable bracket according to claim 1, wherein the variable bracket (120) of the variable bracket mounting step (S54)
A vertical piece 122 having one end fixed to the fixing bracket 110 and having a Y axis slot 123 formed therein; And
An insertion groove 126 and a fastening means 128 which are formed to have a predetermined depth so as to be adjustable in length are inserted into the inner side of the vertical piece 122 by extending a predetermined length from the end of the vertical piece 122, And a vertical piece (124) formed with a fastening hole (125) for exerting an effect;
The insertion groove 126 prevents the rotation of the gap adjusting bracket 130 when a rotation moment acts on the fastening means 128 due to the movement of the building.
The method for constructing a stone panel using a long colon value of a stone panel for exterior use of a concrete structure.
청구항 1에 있어서, 상기 간격조절브라켓 설치단계(S56)의 간격조절브라켓(130)은,
상기 가변브라켓(120)의 삽입홈(126)이 삽입되어 유동되는 삽입편(132);
상기 삽입편(132)의 끝단에 구성되고 상단 및 하단으로 일정길이 돌출되어 석재패널(3)을 지지하도록 하는 걸림편(134);
상기 삽입편(132)에 형성되어 Z축 방향에 대하여 설치위치를 보정하고 체결수단(128)의 볼트가 삽입되는 Z축 장공(136); 및
상기 삽입편(132)에 형성되어 상기 삽입홈(126)으로 삽입되는 삽입깊이를 제한하도록 하는 단속편(138);
을 포함하는 것을 특징으로 하는 콘크리트 건축물 외장용 석재패널의 긴결장치를 이용한 석재패널 시공방법.
[7] The apparatus of claim 1, wherein the gap adjusting bracket (130) of the gap adjusting bracket mounting step (S56)
An insertion piece 132 through which the insertion groove 126 of the variable bracket 120 is inserted and flows;
A locking piece 134 formed at an end of the insertion piece 132 and protruding to a predetermined length at an upper end and a lower end to support the stone panel 3;
A Z-axis elongated hole 136 formed in the insert piece 132 to correct the mounting position in the Z-axis direction and into which the bolt of the fastening means 128 is inserted; And
An interlock piece 138 formed on the insert piece 132 to limit an insertion depth to be inserted into the insertion groove 126;
The method for constructing a stone panel using a long colon value of a stone panel for exterior use of a concrete building.
청구항 1 내지 청구항 4 중 어느 하나에 있어서, 상기 고정브라켓 설치단계(S52)의 고정브라켓(100)의 압착다리(114)는,
상기 몸체(112)의 상단 및 하단부 각각에 적어도 하나 이상이 구성되고;
상기 압착다리(114)는 상기 몸체(112)에서 일정각도(α°)만큼 기울어지도록;
형성되는 것을 특징으로 하는 콘크리트 건축물 외장용 석재패널의 긴결장치를 이용한 석재패널 시공방법.
The method according to any one of claims 1 to 4, wherein the pressing bracket (114) of the fixing bracket (100) of the fixing bracket mounting step (S52)
At least one or more of each of the upper and lower ends of the body 112 are formed;
So that the compression leg 114 is inclined at a predetermined angle [alpha] [deg.] In the body 112;
The method for constructing a stone panel using a long colon value of a stone panel for exterior use of a concrete structure.
KR1020140124077A 2014-09-18 2014-09-18 stone panel construction methods using union device of concrete building exterior stone panels KR101663372B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020140124077A KR101663372B1 (en) 2014-09-18 2014-09-18 stone panel construction methods using union device of concrete building exterior stone panels

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020140124077A KR101663372B1 (en) 2014-09-18 2014-09-18 stone panel construction methods using union device of concrete building exterior stone panels

Publications (2)

Publication Number Publication Date
KR20160033388A true KR20160033388A (en) 2016-03-28
KR101663372B1 KR101663372B1 (en) 2016-10-06

Family

ID=57007802

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020140124077A KR101663372B1 (en) 2014-09-18 2014-09-18 stone panel construction methods using union device of concrete building exterior stone panels

Country Status (1)

Country Link
KR (1) KR101663372B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101988725B1 (en) * 2017-08-18 2019-06-12 주식회사 포스코 Fixing apparatus for outer wall panel

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100555320B1 (en) 2003-04-30 2006-02-24 정용주 The open joint outer wall panel and wall construction method using the same
KR100880649B1 (en) * 2007-06-22 2009-02-02 (주)해주석재 Fixing apparatus for exterior stone plate of building
JP2010242500A (en) * 2010-06-29 2010-10-28 Tsuzuki Co Ltd Reinforcing construction method and reinforcing metal fitting for support bolt in construction method for outside heat insulation of building
KR101011520B1 (en) * 2010-01-20 2011-01-31 주식회사 명우산업 Charnel house with sliding support table
KR101147446B1 (en) 2012-01-30 2012-05-22 주식회사 일산금속 Angle assembly for insulator construction and construction method using the same
KR101244981B1 (en) 2012-09-18 2013-03-18 박재민 Angle unit for wall construction
KR101270436B1 (en) 2012-11-13 2013-06-04 박재민 Angle unit for insulator construction
KR101336667B1 (en) 2011-07-25 2013-12-04 주식회사 공도 A pannel in use interior and exterior finishing and working method therof
KR101429057B1 (en) 2013-12-16 2014-08-12 한국건설기술연구원 External insulation wall system for buildings and construction method using the same

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100555320B1 (en) 2003-04-30 2006-02-24 정용주 The open joint outer wall panel and wall construction method using the same
KR100880649B1 (en) * 2007-06-22 2009-02-02 (주)해주석재 Fixing apparatus for exterior stone plate of building
KR101011520B1 (en) * 2010-01-20 2011-01-31 주식회사 명우산업 Charnel house with sliding support table
JP2010242500A (en) * 2010-06-29 2010-10-28 Tsuzuki Co Ltd Reinforcing construction method and reinforcing metal fitting for support bolt in construction method for outside heat insulation of building
KR101336667B1 (en) 2011-07-25 2013-12-04 주식회사 공도 A pannel in use interior and exterior finishing and working method therof
KR101147446B1 (en) 2012-01-30 2012-05-22 주식회사 일산금속 Angle assembly for insulator construction and construction method using the same
KR101244981B1 (en) 2012-09-18 2013-03-18 박재민 Angle unit for wall construction
KR101270436B1 (en) 2012-11-13 2013-06-04 박재민 Angle unit for insulator construction
KR101429057B1 (en) 2013-12-16 2014-08-12 한국건설기술연구원 External insulation wall system for buildings and construction method using the same

Also Published As

Publication number Publication date
KR101663372B1 (en) 2016-10-06

Similar Documents

Publication Publication Date Title
KR101663373B1 (en) Union device of concrete building exterior stone panels
CA3054647C (en) Wall structure for building, attachment apparatus, and board material construction method
AU2018289851B2 (en) Wall structure for building, attachment apparatus, and board material construction method
KR102100751B1 (en) An exterior material fixing device for constructing the exterior material on the building
KR101663372B1 (en) stone panel construction methods using union device of concrete building exterior stone panels
KR20150019937A (en) An apparatus for fixing external ornaments to outer wall of building
WO2019004143A1 (en) Fixture and wall structure for buildings
KR102100754B1 (en) Wedge type of exterior material fixing device for constructing the exterior material on the outer wall surface of the building
AU2016256678A1 (en) Creation of Surface-Mounted Sills or Hobs on Cast-in-situ Concrete Building Slabs
JP2008095463A (en) Perpendicularity adjuster for building
KR20180130973A (en) Union device of concrete building exterior stone panels
JP3886032B2 (en) Curtain wall fixing device
KR101052830B1 (en) Stone Panel Fixture
JP2008063776A (en) Mounting structure of panel member
KR20190066191A (en) Non-welding type building exterior construction structure and construction method
KR101804943B1 (en) Exterior panel fixture for building
KR101472860B1 (en) Fixing apparatus for tile
KR102586055B1 (en) Multi Bracket Apparatus
JP4026180B2 (en) Support bracket for insulation and surface material in wooden buildings
JP4038086B2 (en) Bracing unit mounting structure
JPH11256739A (en) Fitting structure for wall panel, flat bar, cap, and wall panel
JP2007023708A (en) Bracket and method for installing furring strips
JPH02101251A (en) Wall material fitting method for alc construction
JPH07269066A (en) Connection device of stone-made structure or the like
KR101698383B1 (en) Finish material support apparatus and construction method of brick wall using the same

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right