KR20160001368A - Wire cylinder type retaining wall and operation thereof - Google Patents

Wire cylinder type retaining wall and operation thereof Download PDF

Info

Publication number
KR20160001368A
KR20160001368A KR1020140079763A KR20140079763A KR20160001368A KR 20160001368 A KR20160001368 A KR 20160001368A KR 1020140079763 A KR1020140079763 A KR 1020140079763A KR 20140079763 A KR20140079763 A KR 20140079763A KR 20160001368 A KR20160001368 A KR 20160001368A
Authority
KR
South Korea
Prior art keywords
panel
mesh
wall
retaining wall
stone
Prior art date
Application number
KR1020140079763A
Other languages
Korean (ko)
Inventor
허택인
Original Assignee
허택인
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 허택인 filed Critical 허택인
Priority to KR1020140079763A priority Critical patent/KR20160001368A/en
Publication of KR20160001368A publication Critical patent/KR20160001368A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Paleontology (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Revetment (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The present invention relates to a prefabricated gabion retaining wall structure using a mesh panel, and a construction method thereof. More specifically, the present invention forms a plurality of unit mesh panels discriminated into an L-shaped front side wall part having a front side or a front and a rear side wall body and forming floor reinforcement with a regular width and a lower side floor part playing a role of the floor reinforcement, and on the other hand installs an assistant mesh panel composed of dense meshes on the front side wall part of the unit mesh panel; simultaneously forms a gabion retaining wall using a longitudinal partition panel arranged to be spaced at regular intervals from the front side wall part of the unit mesh panel to form a gabion space; and constructing the gabion retaining wall in a cutting and embankment transition zone. The present invention stably couples the L-shaped panel while preventing tilting by making a longitudinal protruding steel wire of a lower layer panel penetrate the spaced gaps of a left and a right side traversed steel wire adjacent to a bent portion of an upper layer panel; accordingly promotes structural stability with stable slope while preventing slope deformation due to stones filled in the retaining wall; through this maximizing suppression a swelling phenomenon or the like due to bending, sliding and falling; and makes hooks of an end of a lower part easily couple the floor reinforcement to save construction period and costs while enhancing stability of the structure.

Description

매쉬패널을 이용한 조립형 돌채움 옹벽 구조물과 그 시공방법 {Wire cylinder type retaining wall and operation thereof}Technical Field [0001] The present invention relates to a wall-type retaining wall structure and a construction method thereof,

본 발명은 매쉬패널을 이용한 조립형 돌채움 옹벽 구조물에 관한 것으로, 보다 상세하게는 전면벽부와 하면바닥부로 구분되는 복수개의 단위 메쉬패널을 구성하는 한편, 단위 메쉬패널의 전면벽부에 포개지는 조밀한 망목으로 이루어지는 보조 메쉬패널, 그리고 돌채움 공간을 형성하도록 단위 메쉬패널의 전면벽부와 일정간격을 두고 배치되는 종방향의 제 1 칸막이패널 및, 상기 단위 메쉬패널의 전면벽부와 종방향의 제 1 칸막이패널 사이에 일정간격을 두고 수직 배치되는 횡방향의 제 2 칸막이패널로 돌망태 옹벽을 구성하는 한편, 이에 더하여 연반지반 절개지 또는 지반이 견고한 암반 절개지에 따라 후면벽부와 연장바닥부로 구분되는 조밀한 망목 형태의 후면가림용 메쉬패널을 선택적으로 결합 구성하여 돌채움에 의한 옹벽 시공의 공간을 확보하고, 채워지는 돌에 의한 기울기 변형을 방지하면서 안정된 경사 기울기를 가지는 옹벽의 구조적인 안정성을 도모하여 휨, 밀림 및 전도에 의한 배부름 현상 등을 최대한 억제하고, 특히 돌 채움 작업시 단위 메쉬패널의 전면벽부를 일부 개방하여 파충류 대피공간 또는 물고기 산란공간을 용이하게 형성할 수 있도록 하는 메쉬패널을 조립형 돌망태 옹벽과 그 시공방법에 관한 것이다.BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an assembled stone-walled retaining wall structure using a mesh panel, and more particularly to a multi-walled unit mesh panel divided into a front wall portion and a bottom wall portion, An auxiliary mesh panel made of mesh and a longitudinal first partition panel disposed at a certain distance from the front wall of the unit mesh panel so as to form a stone fill space; The second partition panel is formed by a transverse second partition panel vertically disposed at a predetermined interval between the panels. In addition, the gravel retaining wall constitutes the gravel retention wall or the dense mesh partitioned into the rear wall portion and the extending floor portion according to the rock- It is possible to select the space of the retaining wall construction by the stone filling by selectively combining the mesh panel for the rear closure of the form The structural stability of the retaining wall having a stable inclined slope is prevented while avoiding the inclination of the inclined stone caused by the filled stone, thereby suppressing the folding phenomenon caused by warping, The present invention relates to an assembled gabion retaining wall and a method of constructing such a mesh panel, in which a front wall portion is partially opened to easily form a reptile evacuation space or a fish scattering space.

일반적으로 도로변의 절개지나 하천의 제방벽은 하절기 장마철에 집중적으로 내리는 비로 인해 허물어지거나, 동절기에 얼어붙은 토사가 봄이 되면 녹아 응고력이 떨어지면서 흘러내려 도로가 망가지거나 제방의 무너짐으로 인해 인명 및 재산상의 피해가 많이 발생되는 문제점이 있었다.Generally, the incision of the roadside or the barrier of the river is broken down due to the rain that falls intensively in the rainy season during the winter season, or when the frozen tofu is frozen in the winter season, it melts and the coagulation power falls and the road is broken down. There is a problem that a lot of property damage occurs.

이러한 문제점을 해결하기 위해 상기한 도로변의 절개지나 하천의 제방벽에는 콘크리트 블록으로 옹벽을 시공하고 있으나, 최근에는 환경 친화적인 이유로 옹벽보다 돌망태 방식의 옹벽 설치가 늘어나고 있는 실정이다.In order to solve such a problem, a retaining wall is constructed of a concrete block on the incline of the road side or the barrier wall of the river. However, in recent years, the installation of the retaining wall of the gabard type has been increased more than the retaining wall because of environment friendliness.

돌망태 방식의 옹벽은 이 같은 도로법면의 절개지나 하천변의 축조, 강변도로의 유실방조 축조, 교각측면 축조시에 자연 친화적인 환경을 살리기 위해 설치하는 구조물로서, 보강망 내부에 암석이 수용된 상태로 다단 적층하여 시공되고, 이에 기존의 콘크리트 옹벽이나 블록 옹벽과는 달리 미관상으로도 보기 좋으며 토양이 숨을 쉴 수 있는 여건을 조성함으로써 시간이 흐를수록 미생물이 번식하여 잡목과 잡초가 어울려지는 환경 친화성의 견고한 옹벽을 형성하여 이에 시공면의 토사유출을 효과적으로 막아주고 빠른 시간 내에 유입수를 배출시켜 상기한 산사태나 도로 유실 등의 문제점을 막아주는 효과를 제공하는 구조물이다.The retaining wall of the gabion type is a structure that is installed in order to take advantage of the natural environment in the case of the incision of the road side, the construction of the riverside side, the aeration prevention of the river road, and the side construction of the pier side. Unlike existing concrete retaining wall or block retaining wall, it is well-viewable and it creates a condition that the soil can breathe. As a result, microbes reproduce with time, and the environment-friendly, It is a structure that effectively prevents the outflow of the gravel on the construction site and discharges the inflow water in a short period of time, thereby preventing the problems such as landslide and road loss.

그러나, 상기한 돌망태 방식의 옹벽은 단층으로 쌓는 경우에 있어선 특별한 문제점이 없으나, 절개면이 높아 다단으로 시공하게 되는 경우, 상층에서 눌러주는 압력 하중에 의해 하단부에 위치할수록 돌망태 내부에 채워진 암석들이 그 크기가 일정하지 않아 빈틈 부분이 채워지지 않으면서 조그만 틈새에 의해 채워진 돌이 유동되며 돌망태의 전면 노출되는 부분이 점점 앞으로 밀려나 볼록하게 튀어 나오는 배부름 현상이 발생하는 등 구조적으로 안정성이 저하되는 문제점이 있었다.However, in the case of the gabion-type retaining wall described above, there is no particular problem when it is stacked as a single layer. However, when the incision surface is high and the multi-stage construction is performed, There is a problem in that the stiffness is degraded because the gap is not filled and the stone filled by the small gap flows and the front exposed part of the gab will be pushed forward, .

이러한 배부름 현상을 개선하기 위해 통상 전면부의 보강망을 이중-3중의 추가망으로 칸막이 구성하는 구조의 돌망태가 개시되어 있으나, 이 경우 자재의 양이 크게 늘어나 공사비용이 가중됨은 물론 전면부의 구성이 복잡해져 미관상으로도 좋지 못하며, 벽면의 모양은 단순하고 일률적인 형태를 벗어나지 못하게 되어 시각적인 효과 또한 저하되는 단점이 있었다.In order to improve such a folding phenomenon, a gab of a structure in which the reinforcing net of the front part is constituted by a double-triple additional net is disclosed, but in this case, the amount of the material is greatly increased and the construction cost is increased. It is complicated and the appearance is not good, and the shape of the wall is simple and uniform, and the visual effect is also deteriorated.

또한, 종래 돌망태 방식의 옹벽은 상하 적층되는 돌망태를 별도의 이음부재나 결합부재를 이용하여 상호 결합시키는 구조로 구성되는데, 이 경우 중량이 무겁고 부피가 커지며 결합구조가 매우 복잡해지는 등 번거로운 작업공정으로 인해 시공기간이 늘어나고 생산성이 저하되는 원인이 되는 것이었다.In addition, the retaining wall of the conventional gabion type is constructed by a structure in which the gabbles which are stacked vertically are joined to each other by using separate joint members or joining members. In this case, heavy weight, large volume, Which caused the construction period to increase and the productivity to deteriorate.

본 발명은 이 같은 사항을 감안하여 안출된 것으로, 전면벽부와 하면바닥부로 구분되는 복수개의 단위 메쉬패널을 구성하는 한편, 단위 메쉬패널의 전면벽부에 포개지는 조밀한 망목으로 이루어지는 보조 메쉬패널, 그리고 돌채움 공간을 형성하도록 단위 메쉬패널의 전면벽부와 일정간격을 두고 배치되는 종방향의 제 1 격벽 메쉬패널 및, 상기 단위 메쉬패널의 전면벽부와 종방향의 제 1 칸막이패널 사이에 일정간격을 두고 수직 배치되는 횡방향의 제 2 칸막이패널로 돌망태 옹벽을 구성한 후 이를 절성토에 시공하도록 구성함으로써, 절성토에서 돌채움에 의한 옹벽 시공의 공간을 확보하고, 채워지는 돌에 의한 기울기 변형을 방지하면서 안정된 경사 기울기를 가지는 옹벽의 구조적인 안정성을 도모하여 휨, 밀림 및 전도에 의한 배부름 현상 등을 최대한 억제하고, 특히 돌 채움 작업시 단위 메쉬패널의 전면벽부를 일부 개방하여 파충류 대피공간 또는 물고기 산란공간을 용이하게 형성할 수 있도록 하는 메쉬패널을 조립형 돌망태 옹벽 및 그 시공방법을 제공한다.SUMMARY OF THE INVENTION The present invention has been made in view of the above circumstances, and it is an object of the present invention to provide an auxiliary mesh panel constituting a plurality of unit mesh panels divided into a front wall portion and a bottom floor portion, A first vertical partition wall mesh panel disposed at a predetermined distance from a front wall portion of the unit mesh panel so as to form a stone fill space and a second vertical partition wall panel disposed at a predetermined interval between the front wall portion of the unitary mesh panel and the first vertical partition panel The second partition panel in the vertical direction, which is vertically disposed, constitutes a gabion retaining wall, and then the gabion retaining wall is constructed so as to be installed in the cleaved soil, thereby securing a space for retaining wall construction by the stone filling in the cleavage so as to prevent the slope deformation by the filled stone Structural stability of the retaining wall with stable inclination is promoted to prevent buckling due to warping, To inhibit and provide, in particular a stone filling the mesh panels assembled gabion to the retaining wall when the unit, some parts of the open front wall of the mesh panels to be easily evacuated form the space reptile or fish spawning task space and a construction method.

상기의 목적을 효과적으로 달성하기 위한 본 발명의 매쉬패널을 이용한 조립형 돌채움 옹벽 구조물은, 내부에 돌을 채워 도로면의 절개지나 하천변의 구조물 축조시 무너짐을 막기 위해 사용되는 옹벽에 있어서, 돌채움의 충격에 저항하고 구조적으로 안정되도록 다수의 종방향철선과 횡방향철선을 격자 형태로 반복되게 결합되어 절곡된 "L"자 코너부를 중심으로 제 1 벽부와 제 1 바닥면부를 형성하면서 다단 적층되는 망상구조의 제 1 메쉬패널; 상기 제 1 벽부에 밀착된 상태로 포개어져 채움돌이 전방으로 이탈되는 것을 방지시키는 것으로, 다수의 종방향철선과 횡방향철선을 격자 형태로 반복되게 결합되는 망상구조의 벽부 보조매쉬패널; 상기 제 1 벽부와 일정간격을 유지하여 돌채움 공간을 형성하면서 상기 제 1 바닥면부에 시공되고, 전방측으로 토립자의 유출을 막기위한 가름막이 덮혀진 경사면을 형성하며, 후방측에 유공관이 시공되는 보강토다짐부; 를 포함하면서, 다단을 이루는 돌채움 공간에 돌채움이 이루어지도록 하면서 옹벽 최상단이 마감재로서 패널에 의해 덮혀지도록 구성하는 것이다.In order to effectively accomplish the above objects, the present invention provides a retaining wall structure for use in a mash panel, the retaining wall being used to prevent collapse when a structure of a road surface is filled with a stone by filling a stone with a stone therein, Quot; L "-shaped corner portion repeatedly joined in a lattice form so as to form a first wall portion and a first bottom surface portion in the form of a multi-layer stacked structure A first mesh panel of a network structure; A wall auxiliary mesh panel having a network structure in which a plurality of longitudinal wires and a plurality of transverse wires are repeatedly coupled to each other in a lattice form so as to prevent the filling stone from being separated from the front wall by being overlapped with the first wall portion. And a reinforcing layer formed on the first bottom surface portion to form a curved surface covered with a curtain to prevent the outflow of the ground particles to the front side, Compaction part; And the top end of the retaining wall is covered with the panel as a finishing material so that the stone filling space constituting the multi-stage is filled with stone.

다른 일면에 따라, 내부에 돌을 채워 도로면의 절개지나 하천변의 축조시 무너짐을 막기 위해 연약지반에 시공되는 옹벽에 있어서, 돌채움의 충격에 저항하고 구조적으로 안정되도록 다수의 종방향철선과 횡방향철선을 격자 형태로 반복되게 결합되어 절곡된 "L"자 코너부를 중심으로 제 1 벽부와 제 1 바닥면부를 형성하여 절개지 후방까지 연장되어 돌채움이 전방과 하방으로 이탈되는 것을 방지하고 배면토사와 같이 연동하여 벽부 보조매쉬패널 역할을 하며 다단 적층되는 망상구조의 제 1 메쉬패널; 상기 제 1 바닥면부의 일정위치에서 수직하게 세워져 돌채움 공간을 형성한 후 채워지는 돌이 후방으로 빠져나가지 않도록 다수의 종방향철선과 횡방향철선을 격자 형태로 반복되게 결합되어 절곡된 "L"자 코너부를 중심으로 제 2 벽부와 제 2 바닥면부를 형성하며 다단 적층이 이루어지는 망상구조의 제 2 메쉬패널; 상기 제 1 벽부에는 조밀한 망목으로 다수의 종방향철선과 횡방향철선을 격자 형태로 일정한 간격을 두며 반복되게 결합시킨 보조매쉬패널; 상기 제 1 벽부와 제 2 벽부의 사이에 일정한 간격을 두고 간격을 유지하면서 고정시키는 내부보강패널을 설치하고, 수직방향과 수평방향으로 다단 구성되는 옹벽층; 을 형성함을 특징으로 하는 것이다.According to another aspect of the present invention, there is provided a retaining wall which is installed on a soft ground to prevent collapse when a stone is filled in the inside of a road surface or in the construction of a river side in order to prevent collapse, And the first wall portion and the first bottom wall portion are formed around the bent "L" -shaped corner portion so as to extend to the rear of the incision site, thereby preventing the stone filling from being diverted forward and downward, A first mesh panel having a network structure and acting as a wall auxiliary mesh panel in a multi-layered structure; A plurality of longitudinal wires and a plurality of transverse wires are repeatedly coupled in a lattice form so as to prevent a stone to be filled after the stones are vertically erected at a predetermined position of the first bottom surface, A second mesh panel having a network structure in which a second wall portion and a second bottom surface portion are formed around a corner portion and multi-layered stacking is performed; An auxiliary mesh panel in which a plurality of longitudinal wires and a plurality of transverse wires are repeatedly coupled to each other at regular intervals in a lattice pattern; An inner reinforcing panel that fixes the first wall portion and the second wall portion while keeping a predetermined gap therebetween, and has a multi-stage structure in a vertical direction and a horizontal direction; Is formed.

또한, 상기 제 1 벽부는 전면벽부이고, 상기 제 1 바닥면부는 옹벽보강재 구간 끝까지 연장되는 하면바닥면부인 것이다.The first wall part is a front wall part, and the first bottom part is a bottom bottom part extending to the end of the retaining wall reinforcement part.

또한, 상기 제 1 벽부는 전면벽부이고, 상기 제 1 바닥면부는 돌채움 구간까지 연장되며 끝부분을 고리형태로 마감하여, 보강토다짐부의 끝까지 시공되는 바닥 보강재가 걸림 설치되도록 구성하는 것이다.The first wall part is a front wall part, and the first bottom part extends to a stone filling part, and the end part is closed in a ring shape so that a bottom reinforcement to be installed to the end of the reinforcing soil compaction part is hooked.

또한, 상기 제 1 메쉬패널과 보강토 다짐부에 의해 형성되는 돌채움 공간은 다단 구성하여 다단의 옹벽층을 형성하는 것이다.In addition, the stone filling spaces formed by the first mesh panel and the reinforcing soil compaction unit are multi-tiered to form a multi-stage retaining wall layer.

또한, 상기 보강토다짐부가 시공될 상기 제 1 메쉬패널의 제 1 바닥면부에는 상기 보강토다짐을 지지하는 적어도 하나의 수직메쉬패널을 형성하는 것이다.At least one vertical mesh panel supporting the reinforcing soil compaction is formed on a first bottom surface of the first mesh panel to which the reinforcing soil compaction is to be applied.

또한, 상기 보강토다짐부의 경사면을 덮는 토립자의 유출을 막기위한 가름막은 상기 제 1 매쉬패널의 제 1 벽부로 연장 설치되는 것이다.The crimping film for preventing the leakage of the ground particles covering the inclined surface of the reinforcing soil compaction portion is extended to the first wall portion of the first mesh panel.

또한, 상기 토립자의 유출을 막기위한 가름막은 토목섬유인 것이다.In addition, the membrane for preventing the outflow of the above-mentioned particles is a geosynthetic fiber.

또한, 상기 제 1 벽부는 전면벽부이고, 상기 제 2 벽부는 후면벽부인 것이다.The first wall portion is a front wall portion, and the second wall portion is a rear wall portion.

또한, 상기 제 1 벽부는 후면벽부이고, 상기 제 2 벽부는 전면벽부인 것이다.The first wall portion is a rear wall portion, and the second wall portion is a front wall portion.

또한, 상기 제 1 바닥면부는 옹벽보강재 구간 끝까지 연장되는 하면바닥면부이고, 상기 제 2 바닥면부는 상기 제 1 바닥면부에 포개어지는 연장바닥면부인 것이다.The first bottom surface portion is a bottom bottom surface portion extending to the end of the retaining wall reinforcement portion, and the second bottom surface portion is an extended bottom surface portion overlapping the first bottom surface portion.

또한, 상기 제 1 바닥면부는 상기 제 2 바닥면부에 포개어지는 연장바닥면부이고, 상기 제 2 바닥면부는 옹벽보강재 구간 끝까지 연장되는 하면바닥면부인 것이다.The first bottom surface portion is an extended bottom surface portion overlapping the second bottom surface portion, and the second bottom surface portion is a bottom bottom surface portion extending to the end of the retaining wall reinforcement portion.

또한, 상기 제 1 바닥면부는 일측끝단에 걸림고리를 형성하고, 상기 걸림고리에는 일단이 걸림되면서 보강토 다짐부의 끝까지 연장되는 바닥보강재를 결합 구성한 것이다.In addition, the first bottom surface portion is formed with a hooking ring at one end, and a bottom stiffener joined to one end of the hooking ring and extending to the end of the reinforcing-soil compaction portion.

또한, 상기 제 1,2 메쉬패널에 의해 형성되는 돌채움 공간은 절개지의 수직방향과 수평방향으로 다단 구성하여 다단의 옹벽층을 형성한 것이다.In addition, the stone filling spaces formed by the first and second mesh panels are multi-tiered in the vertical direction and the horizontal direction of the cutout to form a multi-stage retaining wall layer.

또한, 다단의 상기 옹벽층과 절개지의 경계부에는 부직포를 설치 구성한 것이다.In addition, a nonwoven fabric is provided at a boundary between the retaining wall layer and the cutout at a plurality of stages.

또한, 상기 제 1 벽부와 제 1 바닥면부에는 조밀한 망목으로 다수의 종방향철선과 횡방향철선을 격자 형태로 반복되게 결합시킨 벽부 보조매쉬패널을 일정간격을 두고 다단 구성한 것이다.The first wall portion and the first bottom portion have a plurality of wall auxiliary mesh panels formed by repeatedly joining a plurality of longitudinal and transverse wires in a lattice pattern with a dense mesh.

본 발명의 또 다른 일면에 따라, 제 1 옹벽층을 이루는 단위 메쉬패널의 전면벽부에는 돌채움과 함께 파충류 대피공간 또는 물고기 산란공간을 위한 개방부를 설치 구성하는 것도 좋다.According to another aspect of the present invention, it is also possible to provide an opening for a reptile evacuation space or a fish scattering space along with a stone fill in a front wall portion of the unit mesh panel constituting the first retaining wall layer.

한편, 본 발명의 매쉬패널을 이용한 조립형 돌채움 옹벽 구조물 시공방법에 따르면, 지반이 견고한 암반 절개지에 바닥기초부를 시공하는 단계; 상기 바닥기초부 위에 제 1 벽부와 제 1 바닥면부를 형성하도록 "L"자 코너부를 가진 제 1 메쉬패널을 설치하는 단계; 상기 제 1 메쉬패널의 제 1 벽부 내측에 조밀한 망목으로 제작되는 벽부 보조매쉬패널를 포개지도록 설치한 후 철선으로 묶음 결합시키는 단계; 상기 벽부 보조매쉬패널가 포개진 상기 제 1 메쉬패널의 내면으로 토목섬유(부직포)로 이루어진 토립자의 유출을 막기위한 가름막을 펼쳐지게 설치하되, 상기 토립자의 유출을 막기위한 가름막의 일면을 상기 제 1 메쉬패널의 제 1 벽부에 걸침된 상태로 상기 제 1 메쉬패널의 제 1 바닥면부에 설치하는 단계; 상기 제 1 메쉬패널의 제 1 벽부로부터 일정거리의 여유공간을 남기고 상기 토립자의 유출을 막기위한 가름막의 위에 일정높이로 흙을 성토하고 이를 흙다짐하여 보강토다짐부를 형성하는 단계; 상기 제 1 메쉬패널의 제 1 벽부에 걸침되었던 상기 토립자의 유출을 막기위한 가름막의 선단으로 보강토다짐부의 전방을 감싸 올려줌으로서, 상기 제 1 메쉬패널의 제 1 벽부로부터 일정거리에 돌채움 공간을 형성하는 단계; 상기 제 1 메쉬패널과 보강토다짐부의 사이에 확보된 돌채움 공간에 각각 돌채움을 충진하여 제 1 옹벽층을 형성하는 단계; 돌채움이 완료되면, 제 1 옹벽층을 이루는 상기 제 1 메쉬패널과 보강토다짐부의 위에 제 2 옹벽층을 이루게 될 또 다른 제 1 메쉬패널을 적층 조립하되, 제 1 옹벽층을 이루는 제 1 벽부의 상단을 제 2 옹벽층을 이루게 될 제 1 메쉬패널의 제 1 벽부에 포개어지도록 연장시키면서 벽부에 포개어지는 벽부 보조매쉬패널를 철선으로 묶음 결합시켜 1,2 옹벽층의 제 1 메쉬패널을 연결 고정하는 단계; 를 반복적으로 수행한 후, 상기 제 1 메쉬패널의 최상단 개구부에 패널를 결합시키는 단계; 를 포함하여 진행하는 것이다.According to another aspect of the present invention, there is provided a method of constructing an assembled stone-walled retaining wall structure using a mash panel, comprising the steps of: constructing a floor foundation on a rock- Providing a first mesh panel having an "L" -shaped corner portion to form a first wall portion and a first bottom portion on the bottom base; Providing a wall part auxiliary mesh panel made of a dense mesh inside the first wall part of the first mesh panel so as to be superimposed thereon, Wherein a first mesh panel is provided on the inner surface of the first mesh panel on which the wall auxiliary mesh panel is laid, and a separator for preventing leakage of the ground particles made of geosynthetic fibers (nonwoven fabric) is installed so as to spread out, The first mesh panel is mounted on the first bottom surface of the first mesh panel in a state of being stuck on the first wall of the first mesh panel. Forming a reinforcing soil compaction unit by filling the soil with a certain height on the top of the topsheet to prevent the outflow of the soil particles leaving a clearance of a certain distance from the first wall of the first mesh panel; A stone filling space is formed at a certain distance from the first wall portion of the first mesh panel by raising the front side of the reinforcing soil compaction portion with the tip end of the granule to prevent the outflow of the ground particles that have been stuck on the first wall portion of the first mesh panel ; Filling a stone filling space secured between the first mesh panel and the reinforcing soil compaction portion to form a first retaining wall layer; When the stone filling is completed, the first mesh panel constituting the first retaining wall layer and another first mesh panel constituting the second retaining wall layer are laminated and assembled on the reinforcing soil compaction portion, and the first wall panel constituting the first retaining wall layer A step of connecting and fixing the first mesh panel of the retaining wall layer by bundling the wall auxiliary mesh panel, which is superimposed on the wall portion, with the upper end to be superimposed on the first wall portion of the first mesh panel to be the second retaining wall layer, ; And then joining the panel to the uppermost opening of the first mesh panel; .

다른 일면에 따라, 본 발명의 매쉬패널을 이용한 조립형 돌채움 옹벽 구조물 시공방법에 따르면, 지반이 견고한 암반 절개지에 바닥기초부를 시공하는 단계; 상기 바닥기초부 위에 절개지로부터 일정거리 이격되게 "L"자 코너부를 가진 제 1,2 메쉬패널을 일정간격을 두고 연속적으로 설치하여 돌채움 공간을 형성하는 단계; 상기 제 1 메쉬패널의 일정위치에서 수직하게 세워져 돌채움 공간을 형성한 후 채워지는 돌이 후방으로 빠져나가지 않도록 다수의 종방향철선과 횡방향철선을 격자 형태로 반복되게 결합되어 절곡된 "L"자 코너부를 중심으로 제 2 벽부와 제 2 바닥면부를 형성하는 단계; 상기 제 1,2 메쉬패널에 의해 확보된 돌채움 공간에 각각 돌채움을 충진하여 제 1 옹벽층을 형성하는 단계; 돌채움이 완료되면, 제 1 옹벽층을 이루는 상기 제 1,2 메쉬패널 위에 제 2 옹벽층을 이루게 될 또 다른 제 1,2 메쉬패널을 적층 조립하되, 제 1 옹벽층을 이루는 제 1,2 벽부의 상단을 제 2 옹벽층을 이루게 될 제 1,2 메쉬패널의 제 1,2 벽부에 포개어지도록 연장시키면서 제 1 옹벽층의 제 1 메쉬패널 벽면부의 횡방향 철선과 제 2 옹벽의 제 1 매쉬패널의 바닥면부 횡방향 철선을 철선으로 묶음 결합시켜 1,2 옹벽층의 제 1,2 메쉬패널을 연결 고정하는 단계; 상기 제 1,2 메쉬패널의 제 1,2 벽부와 제 1,2 바닥면부에 일정간격을 두고 격자형을 이루는 벽부 보조매쉬패널을 설치하여 각각의 옹벽층에 돌채움 공간을 다단 형성하는 단계; 를 반복적으로 수행한 후, 상기 제 1,2 메쉬패널의 최상단 개구부에 패널을 결합시키는 단계; 를 더 포함하여 진행하는 것이다.According to another aspect of the present invention, there is provided a method of constructing an assembled stone-walled retaining wall structure using a mash panel according to the present invention, comprising the steps of: constructing a floor foundation on a rock- The first and second mesh panels having an "L" -shaped corner portion spaced a predetermined distance apart from the cutout on the bottom base portion are continuously provided at regular intervals to form a stone fill space; A plurality of longitudinal wires and a plurality of transverse wires are repeatedly coupled in a lattice form so as to prevent a stone to be filled up after being formed vertically at a predetermined position of the first mesh panel to form a stone filling space, Forming a second wall portion and a second bottom surface portion around the corner portion; Filling a stone filling space secured by the first and second mesh panels with a stone filler to form a first retaining wall layer; When the stone filling is completed, another first and second mesh panels, which will form a second retaining wall layer, are stacked on the first and second mesh panels constituting the first retaining wall layer, and the first and second mesh panels, The upper end of the wall portion is extended to be superimposed on the first and second wall portions of the first and second mesh panels to form the second retaining wall layer while the lateral wire of the first mesh panel wall portion of the first retaining wall layer and the first wire- Connecting and fixing the first and second mesh panels of the first and second retaining wall layers by bundling the transverse wire of the bottom surface of the panel with a wire; Forming a plurality of stone filling spaces in each of the retaining wall layers by providing wall auxiliary mesh panels in a lattice shape at predetermined intervals on the first and second wall portions of the first and second mesh panels; And then joining the panel to the uppermost opening of the first and second mesh panels; As shown in FIG.

다른 일면에 따라, 본 발명의 매쉬패널을 이용한 조립형 돌채움 옹벽 구조물 시공방법에 따르면, 지반이 견고한 암반 절개지에 바닥기초부를 시공하는 단계; 상기 바닥기초부의 위에 바닥패널을 설치하는 단계; 상기 바닥패널 위에 절개지로부터 일정거리 이격되게 "L"자 코너부를 가진 제 1,2 메쉬패널을 일정간격을 두고 연속적으로 설치하여 돌채움 공간을 형성하는 단계; 상기 바닥패널과 제 1,2 메쉬패널의 제 1,2 벽부 내측, 그리고 제 1,2 바닥면부의 위에 조밀한 망목으로 제작되는 벽부 보조매쉬패널를 포개지도록 설치한 후 바닥패널에 포개어진 벽부 보조매쉬패널와 제 1,2 바닥면부에 포개어진 벽부 보조매쉬패널를 철선으로 묶음 결합시키는 단계; 상기 제 1,2 메쉬패널에 의해 확보된 돌채움 공간에 각각 돌채움을 충진하여 제 1 옹벽층을 형성하는 단계; 돌채움이 완료되면, 제 1 옹벽층을 이루는 상기 제 1,2 메쉬패널 위에 제 2 옹벽층을 이루게 될 또 다른 제 1,2 메쉬패널을 적층 조립하되, 제 1 옹벽층을 이루는 제 1,2 벽부의 상단을 제 2 옹벽층을 이루게 될 제 1,2 메쉬패널의 제 1,2 벽부에 포개어지도록 연장시키면서 바닥패널에 포개어진 벽부 보조매쉬패널와 제 1,2 바닥면부에 포개어진 벽부 보조매쉬패널를 철선으로 묶음 결합시켜 1,2 옹벽층의 제 1,2 메쉬패널을 연결 고정하는 단계; 를 반복적으로 수행한 후, 상기 제 1,2 메쉬패널의 최상단 개구부에 패널를 결합시키는 단계; 를 포함하여 진행하는 것이다.According to another aspect of the present invention, there is provided a method of constructing an assembled stone-walled retaining wall structure using a mash panel according to the present invention, comprising the steps of: constructing a floor foundation on a rock- Installing a floor panel on top of the floor base; Forming a stone fill space by continuously providing first and second mesh panels having an "L" -shaped corner portion spaced apart from the cutout on the floor panel at regular intervals; A wall auxiliary mesh panel made of dense mesh on the inner side of the first and second wall portions of the floor panel, the first and second mesh panels, and the first and second bottom portions are installed to be superimposed on each other, Connecting the panel and the wall auxiliary mash panel superimposed on the first and second bottom surface portions with a wire; Filling a stone filling space secured by the first and second mesh panels with a stone filler to form a first retaining wall layer; When the stone filling is completed, another first and second mesh panels, which will form a second retaining wall layer, are stacked on the first and second mesh panels constituting the first retaining wall layer, and the first and second mesh panels, The upper part of the wall part is extended to be superimposed on the first and second wall parts of the first and second mesh panels to be the second retaining wall layer, and the wall part auxiliary mesh panel superimposed on the floor panel and the wall part auxiliary mesh panel superimposed on the first and second bottom surface parts And connecting and fixing the first and second mesh panels of the first and second retaining wall layers; And then joining the panel to the uppermost opening of the first and second mesh panels; .

또한, 상기 제 1 메쉬패널은 절개지까지 연장되는 제 1 바닥면부를 가지거나 또는 절개지까지 연장되지 않고 일측끝단에 고리부를 형성한 후 이에 바닥보강재를 연결하면서 상기 바닥보강재를 절개지까지 연장시킨 것이다.In addition, the first mesh panel has a first bottom surface extending to a cutout, or a ring is formed at one end of the first bottom panel without extending to the cutout, and the bottom reinforcement is extended to the cutout while connecting the bottom reinforcement.

또한, 상기 제 1,2 메쉬패널의 제 1,2 벽부와 제 1,2 바닥면부에 일정간격을 두고 격자형을 이루는 벽부 보조매쉬패널을 설치하여 각각의 옹벽층에 돌채움 공간을 다단 형성하는 단계; 를 더 포함하여 구성하는 것이다.The first and second wall portions and the first and second bottom portions of the first and second mesh panels are provided with a wall auxiliary mesh panel having a lattice shape at a predetermined interval to form a plurality of stone filling spaces in the retaining wall layers step; As shown in FIG.

또한, 상기 옹벽층과 절개지의 사이에는 부직포를 시공하는 단계; 를 더 포함하여 진행하는 것이다.The method may further include: applying a nonwoven fabric between the retaining wall layer and the incision; As shown in FIG.

본 발명에 의한 메수패널 조립형 돌망태 옹벽은 절성토 또는 지반이 견고한 암반 절개지에서 돌채움에 의한 옹벽 시공이 간편하고 신속하게 이루어지도록 하여 전체 공사기간 및 비용을 절감하고, 채워지는 돌에 의한 기울기 변형을 방지하면서 돌망태 옹벽이 안정된 경사 기울기를 유지하는 구조적인 안정성을 도모하여 휨, 밀림 및 전도에 의한 배부름 현상 등을 최대한 억제할 수 있으며, 특히 돌 채움 작업시 단위 메쉬패널의 전면벽부를 일부 개방하여 파충류 대피공간 또는 물고기 산란공간을 용이하게 형성하는 한편, 수해로 인한 돌망태 옹벽의 유실이 발생하더라도 이를 신속하게 복구시키는 효과를 기대할 수 있는 것이다.The gauze panel-assembled gauze retaining wall according to the present invention can easily and quickly construct the retaining wall due to the stone filling in the cut-away soil or the rocky cutter ground having a hard ground, thereby reducing the construction period and cost, It is possible to minimize the occurrence of folding phenomena caused by warping, swinging and conduction by providing a structural stability in which the gabion retaining wall maintains a stable inclined slope, and in particular, the front wall portion of the unit mesh panel is partially opened So that the reptile evacuation space or the fish scattering space can be easily formed, and even if the gabion retaining wall is lost due to the flood, the effect can be expected to be promptly restored.

도 1은 본 발명의 제 1 실시예로 제 1 메쉬패널의 구조를 보인 사시도.
도 2는 본 발명의 제 1 실시예로 벽부 보조매쉬패널의 구조도
도 3은 본 발명의 제 1 실시예로 제 1 메쉬패널과 보강토다짐부를 이용하여 절성토에 상하의 옹벽층을 시공한 상태의 단면 개략도.
도 4는 본 발명의 제 1 실시예로 보강토다짐부에 수직메쉬패널을 설치한 상태도.
도 5는 본 발명의 제 1 실시예로 제 1 메쉬패널과 보강토다짐부를 이용한 상하 옹벽층 시공 흐름도.
도 6은 본 발명의 제 2 실시예로 제 1 메쉬패널 또는 제 2 메쉬패널의 구조를 보인 사시도.
도 7은 본 발명의 제 2 실시예로 벽부 보조매쉬패널의 구조를 보인 사시도.
도 8은 본 발명의 제 2 실시예로 패널의 구조를 보인 사시도.
도 9는 본 발명의 제 2 실시예로 벽부 보조매쉬패널의 구조를 보인 사시도.
도 10은 본 발명의 제 3 실시예로 제 1,2 메쉬패널과 패널를 이용하여 절성토에 상하의 옹벽층을 시공한 상태의 단면 개략도.
도 11은 본 발명의 제 2 실시예로 전방에서 절개지로 바닥면부를 연장시킨 제 1 메쉬패널 및 연장바닥면부를 가지는 제 2 메쉬패널과 패널를 이용하여 절성토에 상하 및 좌우방향으로 다단의 옹벽층을 시공한 상태의 단면 개략도.
도 12는 본 발명의 제 2 실시예로 절개지에서 전방으로 바닥면부를 연장시킨 제 2 메쉬패널 및 하면바닥면부를 가지는 제 1 메쉬패널과 패널를 이용하여 절성토에 상하 및 좌우방향으로 다단의 옹벽층을 시공한 상태의 단면 개략도.
도 13은 본 발명의 제 2 실시예로 바닥보강재와 제 1,2 메쉬패널 및 패널를 이용하여 절성토에 상하의 옹벽층을 시공한 상태의 단면 개략도.
도 14는 본 발명의 제 3 실시예로 바닥패널과 제 1,2 메쉬패널 및 패널를 이용하여 절성토에 상하의 옹벽층을 시공한 상태의 단면 개략도.
도 15는 본 발명의 제 4 실시예로 벽부 보조매쉬패널의 설치상태를 보인 사시도.
도 16 및 도 17은 본 발명의 메쉬패널을 이용한 매쉬패널을 이용한 조립형 돌채움 옹벽 구조물에서 식물을 식생하는 상태를 보인 단면 개략도.
FIG. 1 is a perspective view showing a structure of a first mesh panel according to a first embodiment of the present invention. FIG.
2 is a structural view of a wall auxiliary mash panel according to a first embodiment of the present invention.
3 is a cross-sectional schematic view of a first embodiment of the present invention in which upper and lower retaining wall layers are formed on a cutting floor using a first mesh panel and a reinforcing soil compaction unit.
4 is a view illustrating a state in which a vertical mesh panel is installed in a reinforcing soil compaction unit according to a first embodiment of the present invention.
FIG. 5 is a flow chart of a construction of upper and lower retaining wall layers using a first mesh panel and a reinforcing soil compaction unit according to a first embodiment of the present invention. FIG.
6 is a perspective view showing a structure of a first mesh panel or a second mesh panel according to a second embodiment of the present invention;
7 is a perspective view showing a structure of a wall auxiliary mesh panel according to a second embodiment of the present invention;
8 is a perspective view showing a structure of a panel according to a second embodiment of the present invention.
FIG. 9 is a perspective view showing a structure of a wall auxiliary mesh panel according to a second embodiment of the present invention. FIG.
10 is a schematic cross-sectional view of a third embodiment of the present invention in which upper and lower retaining wall layers are formed on a cutting floor using first and second mesh panels and panels.
11 is a perspective view of a second mesh panel according to a second embodiment of the present invention, which has a first mesh panel extending from a front side with a cutout and a second mesh panel having an extended bottom surface, Fig.
12 is a diagram illustrating a second mesh panel according to a second embodiment of the present invention. The mesh panel has a second mesh panel having a bottom surface extending forward from a cutter, a first mesh panel having a bottom surface, and a plurality of multi- Fig.
13 is a schematic cross-sectional view of a second embodiment of the present invention, in which upper and lower retaining wall layers are formed on a cutting floor using a floor reinforcement, first and second mesh panels, and panels.
FIG. 14 is a schematic cross-sectional view of a third embodiment of the present invention in which upper and lower retaining wall layers are formed on a cutting floor using a floor panel, first and second mesh panels, and panels.
15 is a perspective view showing an installation state of a wall auxiliary mesh panel according to a fourth embodiment of the present invention.
FIG. 16 and FIG. 17 are schematic cross-sectional views showing a plant vegetation state in an assembled stone-filled retaining wall structure using a mesh panel using the mesh panel of the present invention.

이하, 본 발명의 바람직한 실시예를 첨부된 도면을 참조하여 상세히 설명하면 다음과 같다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명의 제 1 실시예로 제 1 메쉬패널의 구조를 보인 사시도이고, 도 2는 본 발명의 제 1 실시예로 벽부 보조매쉬패널의 구조도이며, 도 3은 본 발명의 제 1 실시예로 제 1 메쉬패널과 보강토다짐부를 이용하여 절성토에 상하의 옹벽층을 시공한 상태의 단면 개략도이고, 도 4는 본 발명의 제 1 실시예로 보강토다짐부에 수직메쉬패널을 설치한 상태도이며, 도 5는 본 발명의 제 1 실시예로 제 1 메쉬패널과 보강토다짐부를 이용한 상하 옹벽층 시공 흐름도를 도시한 것이다.FIG. 1 is a perspective view showing a structure of a first mesh panel according to a first embodiment of the present invention, FIG. 2 is a structural view of a wall auxiliary mesh panel according to a first embodiment of the present invention, FIG. FIG. 4 is a view illustrating a state in which a vertical mesh panel is installed in a reinforcing soil compaction unit according to a first embodiment of the present invention. FIG. 4 is a sectional view of the vertical mesh panel in a state in which upper and lower retaining wall layers are formed on a cleaved soil using a first mesh panel and a reinforcing soil compaction unit. And FIG. 5 is a flowchart illustrating the construction of the upper and lower retaining wall layers using the first mesh panel and the reinforcing soil compaction unit according to the first embodiment of the present invention.

첨부된 도 1 내지 도 5를 참조하면, 본 발명의 실시예에 따른 매쉬패널을 이용한 조립형 돌채움 옹벽 구조물은 내부에 돌을 채워 도로면의 절개지나 하천변의 축조시 무너짐을 막기 위해 연약지반에 시공되면서 절개지의 수직방향과 수평방향으로 돌채움공간을 다단 구성하여 다단의 옹벽층을 형성하는 것으로, 제 1 메쉬패널(10), 벽부 보조매쉬패널(30), 보강토다짐부(90), 그리고 마감재인 덮개패널(50)를 포함하는 것이다.1 to 5, an assembled stone-wall retaining wall structure using a mesh panel according to an embodiment of the present invention is formed by filling a stone in an inner wall of a soft ground The first mesh panel 10, the wall auxiliary mash panel 30, the reinforcing soil compaction unit 90, and the reinforcing soil compaction unit 90. The first mesh panel 10, the wall auxiliary mash panel 30, And a cover panel 50 which is a finishing material.

상기 제 1 메쉬패널(10)은 돌채움의 충격에 저항하고 구조적으로 안정되도록 다수의 종방향철선과 횡방향철선을 격자 형태로 반복되게 결합되어 절곡된 "L"자 코너부를 중심으로 제 1 벽부(11)와 제 1 바닥면부(12)를 형성한 망상 구조물인 것이다.The first mesh panel 10 has a plurality of longitudinal wires and a plurality of transverse wires repeatedly joined in a lattice form so as to resist the impact of the stone filling and structurally stabilize the first mesh panel 10, (11) and a first bottom surface (12).

상기 벽부 보조매쉬패널(30)는 상기 제 1 벽부(11)에 밀착된 상태로 포개어져 돌채움이 전방으로 이탈되는 것을 방지시키는 것으로, 다수의 종방향철선과 횡방향철선을 격자 형태로 반복되게 결합되는 망상 구조물인 것이다.The wall part auxiliary mesh panel 30 is superimposed on the first wall part 11 so as to prevent the stone filling from being forwardly separated. The wall part auxiliary mesh panel 30 has a structure in which a plurality of longitudinal and transverse wires are repeated in a lattice form It is a network structure to be combined.

상기 보강토다짐부(90)는 상기 제 1 벽부(11)와 일정간격을 유지하여 돌채움 공간을 형성하면서 상기 제 1 바닥면부(12)에 시공되는 것으로, 전방측으로는 토목섬유(부직포)로 이루어진 토립자의 유출을 막기위한 가름막(100)이 덮혀진 경사면을 형성하고, 후방측에는 유공관(91)이 시공되도록 한 것이다.The reinforcing soil compaction unit 90 is installed on the first bottom surface portion 12 while forming a stone filling space at a predetermined distance from the first wall portion 11 and is formed of a geosynthetic fiber A sloped surface covered with the membrane 100 for preventing the outflow of the soil particles is formed, and a pipe tube 91 is installed on the rear side.

여기서, 상기 토립자의 유출을 막기위한 가름막(100)은 상기 제 1 메쉬패널(10)의 제 1 벽부(11)로 연장되면서, 상기 제 1 메쉬패널(10)과 상기 보강토다짐부(90)의 사이에 일정간격의 돌채움 공간이 형성되도록 한 것이며, 상기 돌채움 공간에 돌이 체워질 때, 상기 돌은 상기 토립자의 유출을 막기위한 가름막(100)에 의해 유동이 방지되면서 외부로의 이탈이 방지될 수 있는 것이다.The first mesh panel 10 and the reinforcing soil compaction unit 90 extend from the first wall portion 11 of the first mesh panel 10 to the first mesh panel 10 to prevent the outflow of the ground particles. The stone is prevented from flowing by the seaweed 100 to prevent the outflow of the ground particles, and when the stone is filled in the stone filling space, Can be prevented.

상기 덮개패널(50)은 다단을 이루는 돌채움 공간에 돌채움이 이루어지도록 하면서 옹벽 최상단을 덮는 마감재로서, 다단 적층되는 상기 제 1 벽부(11)의 최상단 개구부와 상기 보강토다짐부(90)의 위를 덮는 것으로, 다수의 종방향철선과 횡방향철선을 격자 형태로 반복되게 결합한 ㄷ자 형상의 구조물인 것이다.The cover panel 50 is a finishing material for covering the uppermost end of the retaining wall so as to be filled with a stone filling space constituting a multi-stage structure. The covering panel 50 is formed of an uppermost opening of the first wall portion 11, And is a C-shaped structure in which a plurality of longitudinal and transverse wires are repeatedly combined in a lattice form.

이때, 상기 제 1 벽부(11)는 전면벽부이고, 상기 제 1 바닥면부(12)는 옹벽보강재 구간 끝까지 연장되는 하면바닥면부인 것이다.At this time, the first wall portion 11 is a front wall portion, and the first bottom wall portion 12 is a bottom floor portion extending to the end of the retaining wall reinforcement portion.

여기서, 상기 보강토다짐부(90)가 시공될 상기 제 1 메쉬패널(10)의 제 1 바닥면부(12)에는 보강토다짐을 지지하기 위한 적어도 하나의 수직메쉬패널(92)을 형성하도록 하였으며, 이는 다단으로 일정간격을 두고 형성할 수도 있는 것이다.At least one vertical mesh panel 92 for supporting reinforcing soil compaction is formed on the first bottom surface portion 12 of the first mesh panel 10 on which the reinforcing soil compaction unit 90 is to be installed. And may be formed at a predetermined interval in multiple stages.

이와 같이, 본 발명의 제 1 실시예에 따른 돌망태 옹벽은 첨부된 도 1 내지 도 5에서와 같이, 우선 지반이 견고한 암반 절개지에 바닥기초부를 시공한 후, 상기 바닥기초부의 위에 제 1 벽부(11)와 제 1 바닥면부(12)를 형성하는 "L'자 코너부를 가진 제 1 메쉬패널(10)을 일정간격을 두고 연속적으로 설치한 후, 상기 제 1 메쉬패널(10)의 제 1 벽부(11) 내측에 조밀한 망목으로 제작되는 벽부 보조매쉬패널(30)을 포개지도록 설치하여 철선으로 묶음 결합시킨다.As described above, the gabion retaining wall according to the first embodiment of the present invention is constructed such that, after the floor base portion is firstly applied to the rock foundation with a solid foundation, the first wall portion 11 ) Of the first mesh panel 10 and the first mesh panel 10 having the L-shaped corner portion forming the first bottom surface portion 12 are continuously installed at regular intervals, 11, the wall auxiliary mash panel 30 made of a dense mesh is installed so as to be superimposed and bundled with a wire.

다음으로, 상기 벽부 보조매쉬패널(30)이 포개진 상기 제 1 메쉬패널(10)의 내면으로 토립자의 유출을 막기위한 가름막(100)을 펼쳐지게 설치하되, 상기 토립자의 유출을 막기위한 가름막(100)의 일면을 상기 제 1 메쉬패널(10)의 제 1 벽부(11)에 걸침된 상태로 상기 제 1 메쉬패널(10)의 제 1 바닥면부(12)에 설치한다.Next, the membrane 100 for preventing the leakage of the particles to the inner surface of the first mesh panel 10 on which the wall auxiliary mesh panel 30 is placed is spread out, One surface of the first mesh panel 100 is installed on the first bottom surface portion 12 of the first mesh panel 10 while being stuck on the first wall portion 11 of the first mesh panel 10.

다음으로, 상기 제 1 메쉬패널(10)의 제 1 벽부(11)로부터 일정거리의 여유공간을 남기고 상기 토립자의 유출을 막기위한 가름막(100)의 위에 일정높이로 흙을 성토하고 이를 흙다짐하여 보강토다짐부(90)를 형성한 후, 상기 제 1 메쉬패널(10)의 제 1 벽부(11)에 걸침되었던 상기 토립자의 유출을 막기위한 가름막(100)의 선단으로 경사면과 유공관(91)이 형성되도록 보강토다짐부(90)의 전방을 감싸 올려줌으로써, 상기 제 1 메쉬패널(10)의 제 1 벽부(11)로부터 일정거리에 돌채움 공간을 형성한다.Next, soil is formed at a predetermined height on the shingle 100 to prevent the leakage of the soil particles, leaving a clearance of a certain distance from the first wall 11 of the first mesh panel 10, The reinforcing soil compaction unit 90 is formed so that the inclined surface and the hole 91 are formed at the front end of the bundle 100 for preventing the outflow of the ground particles that have been stuck on the first wall 11 of the first mesh panel 10, A stone filling space is formed at a certain distance from the first wall portion 11 of the first mesh panel 10 by raising the front portion of the reinforcing soil compaction portion 90 so as to form the space.

다음으로, 상기 제 1 메쉬패널(10)과 보강토다짐부(90)의 사이에 확보된 돌채움 공간에 각각 돌채움을 충진하여 제 1 옹벽층을 형성하고, 돌채움이 완료되면 상기 제 1 옹벽층을 이루는 상기 제 1 메쉬패널(10)과 보강토다짐부(90)의 위에 제 2 옹벽층을 이루게 될 또 다른 제 1 메쉬패널(10)을 적층 조립하되, 제 1 옹벽층을 이루는 제 1 벽부(11)과 보강토다짐부(90)의 상단을 제 2 옹벽층을 이루게 될 제 1 메쉬패널(10)의 제 1 벽부(11)에 포개어지도록 연장시키면서, 연장된 제 1 벽부(11)와 제 1 바닥면부(12)에 포개어지는 벽부 보조매쉬패널(30)를 철선으로 묶음 결합시켜 1,2 옹벽층의 제 1 메쉬패널(10)을 연결 고정하고, 상기와 같은 과정을 반복하여 첨부된 도 3은 물론 도 5에서와 같이 수직방향 및/또는 수평방향으로 이루어진 다단의 옹벽층을 시공한다.Next, a stone filling space secured between the first mesh panel 10 and the reinforcing soil compaction portion 90 is filled with a stone filler to form a first retaining wall layer. When the stone filling is completed, A first mesh panel 10 to be a second retaining wall layer is laminated and assembled on the first mesh panel 10 and the reinforcing earth compaction unit 90 forming the first retaining wall layer, The first wall portion 11 and the reinforcing soil compaction portion 90 are extended so as to overlap the first wall portion 11 of the first mesh panel 10 constituting the second retaining wall layer, 1, the first mesh panel 10 of the retaining wall layer is connected and fixed by bundling the wall auxiliary mesh panel 30 superimposed on the first bottom surface portion 12 with a wire, and the above- 3, as shown in FIG. 5, a multi-stage retaining wall layer is formed in the vertical direction and / or the horizontal direction.

다음으로, 마무리공정으로서 상기 제 1 메쉬패널(10)과 보강토다짐부(90)의 최상단에 덮개패널(50)을 결합시키게 되면, 돌망태 옹벽이 완성될 수 있는 것이다.Next, as a finishing step, when the cover panel 50 is coupled to the uppermost ends of the first mesh panel 10 and the reinforcing soil compaction unit 90, the gabion retaining wall can be completed.

이때, 상기 제 1 메쉬패널(10)의 제 1 벽부(11)와 보강토다짐부(90)의 경사면으로 토립자의 유출을 막기위한 가름막(100)을 시공하는 것은, 상기 토립자의 유출을 막기위한 가름막(100)이 돌채움 공간내에 채워진 돌이 유동하는 것을 방지시킴은 물론, 보강토다짐부(90)의 경사면에서 잔여물이 돌채움 공간으로 흘러내리는 것을 방지할 수 있도록 하기 위함인 것이다.In this case, it is preferable that the separator 100 for preventing the leakage of the earth particles to the inclined surfaces of the first wall portion 11 of the first mesh panel 10 and the reinforcing soil compaction portion 90 is constructed to prevent the outflow of the earth particles It is possible to prevent the staple film 100 from flowing in the stone filling space and to prevent the residue from flowing on the inclined surface of the reinforcing soil compaction portion 90 into the stone filling space.

즉, 상기 토립자의 유출을 막기위한 가름막(100)은 보강토다짐부(90)에 가해지는 수평·수직 응력에 저항하는 구조체로서 거동하여 사이 보강토다짐부(90)의 형상을 유지시킴은 물론, 돌채움 공간에 채워진 돌의 유실을 방지시키는 역활을 수행하게 되는 것이다.That is, the mold 100 for preventing the outflow of the soil particles behaves as a structure that resists horizontal and vertical stress applied to the reinforcing soil compaction unit 90 to maintain the shape of the reinforcing soil compaction unit 90, Thereby preventing the loss of the stone filled in the stone-filling space.

한편, 첨부된 도 6은 내지 도 12는 본 발명의 제 2 실시예를 도시한 것으로, 본 발명의 제 2 실시예에 따른 매쉬패널을 이용한 조립형 돌채움 옹벽 구조물은 내부에 돌을 채워 도로면의 절개지나 하천변의 축조시 무너짐을 막기 위해 연약지반에 시공되면서 절개지의 수직방향과 수평방향으로 돌채움공간을 다단 구성하여 다단의 옹벽층을 형성하는 것으로, 제 1,2 메쉬패널(10)(20), 벽부 보조매쉬패널(30)(30')(30"), 철선(40), 그리고 덮개패널(50)를 포함하는 것이다.6 to 12 illustrate a second embodiment of the present invention. In the assembled stone-wall retaining wall structure using the mesh panel according to the second embodiment of the present invention, A plurality of stone filling spaces are formed in the vertical direction and the horizontal direction of the incision sheet to form a multi-stage retaining wall layer, so that the first and second mesh panels 10 20, a wall auxiliary mash panel 30 (30 ') 30 ", a wire 40, and a cover panel 50.

상기 제 1 메쉬패널(10)은 돌채움의 충격에 저항하고 구조적으로 안정되도록 다수의 종방향철선과 횡방향철선을 격자 형태로 반복되게 결합되어 절곡된 "L"자 코너부를 중심으로 제 1 벽부(11)와 제 1 바닥면부(12)를 형성한 망상 구조물인 것이다.The first mesh panel 10 has a plurality of longitudinal wires and a plurality of transverse wires repeatedly joined in a lattice form so as to resist the impact of the stone filling and structurally stabilize the first mesh panel 10, (11) and a first bottom surface (12).

상기 제 2 메쉬패널(20)은 상기 제 1 바닥면부(12)의 일정위치에서 수직하게 세워져 돌채움 공간을 형성한 후 채워지는 돌이 빠져나가지 않도록 다수의 종방향철선과 횡방향철선을 격자 형태로 반복되게 결합되어 절곡된 "L"자 코너부를 중심으로 제 2 벽부(21)와 상기 제 1 바닥면부(12)에 밀착되어 포개어지는 제 2 바닥면부(22)를 형성한 망상구조물인 것이다.The second mesh panel 20 is vertically erected at a predetermined position of the first bottom surface portion 12 to form a stone filling space. Then, a plurality of longitudinal and transverse wires are formed in a lattice shape so as to prevent the filling stone from escaping. And a second bottom surface portion 22 which is in close contact with the second bottom wall portion 21 and the first bottom surface portion 12 is formed around the L-shaped corner portion repeatedly joined and folded.

상기 벽부 보조매쉬패널(30)(30')(30")은 상기 제 1,2 벽부(11)(21)와 상기 제 1,2 바닥면부(12)(22)의 위에 밀착된 상태로 포개어져 돌채움이 전방 및 하방과 후방으로 이탈되는 것을 방지시키는 것으로, 다수의 종방향철선과 횡방향철선을 격자 형태로 반복되게 결합되는 망상 구조물인 것이다.The wall portion auxiliary mesh panels 30, 30 'and 30' 'are superposed on the first and second wall portions 11 and 21 in close contact with the first and second bottom wall portions 12 and 22, And is a network structure in which a plurality of longitudinal wires and a plurality of transverse wires are repeatedly combined in a lattice form.

상기 철선(40)은 다단 적층되는 상기 제 1,2 벽부(11)(21)의 일부를 상측의 벽부(11')로 연장시킬 때 그 연장된 상기 제 1,2 벽부(11')(21')의 내측에 밀착되는 벽부 보조매쉬패널(30')과 제 1,2 바닥면부(12)(22)의 위에 밀착되어 포개어지는 벽부 보조매쉬패널(30")을 각각 묶음 결합시키도록 구성하여둔 것이다.The wire 40 has a plurality of first and second wall portions 11 'and 21' extending from the upper wall portion 11 'when extending a part of the first and second wall portions 11 and 21, The wall auxiliary mash panel 30 'which is in close contact with the inner side of the first and second bottom face parts 12 and 22 and the wall auxiliary mash panel 30' .

상기 덮개패널(50)은 다단 적층되는 상기 제 1,2 벽부(11)(21)의 최상단 개구부를 덮는 것으로, 다수의 종방향철선과 횡방향철선을 격자 형태로 반복되게 결합한 ㄷ자 형상의 구조물인 것이다.The cover panel 50 covers the uppermost openings of the first and second wall portions 11 and 21 to be stacked in a multi-layered structure. The cover panel 50 is a C-shaped structure in which a plurality of longitudinal and transverse wires are repeatedly combined in a lattice- will be.

이때, 첨부된 도 10 및 도 11에서와 같이, 상기 제 1 벽부(11)는 전면벽부이고, 상기 제 2 벽부(21)는 후면벽부이며, 상기 제 1 바닥면부(12)는 옹벽보강재 구간 끝까지 연장되는 하면바닥면부이고, 상기 제 2 바닥면부(22)는 상기 제 1 바닥면부(12)의 위에 포개어지는 연장바닥면부인 것이다.10 and 11, the first wall portion 11 is a front wall portion, the second wall portion 21 is a rear wall portion, and the first bottom surface portion 12 is a portion of the retaining wall reinforcement section And the second bottom surface portion 22 is an extended bottom surface portion superimposed on the first bottom surface portion 12. [

또는, 첨부된 도 12에서와 같이, 상기 제 1 벽부(11)는 후면벽부이고, 상기 제 2 벽부(21)는 전면벽부이며, 상기 제 1 바닥면부(12)는 상기 제 2 바닥면부(22)에 포개어지는 연장바닥면부이고, 상기 제 2 바닥면부(22)는 옹벽보강재 구간 끝까지 연장되는 하면바닥면부일 수도 있는 것이다.12, the first wall portion 11 is a rear wall portion, the second wall portion 21 is a front wall portion, and the first bottom surface portion 12 is a portion of the second bottom surface portion 22, and the second bottom surface portion 22 may be a bottom surface portion extending to the end of the retaining wall reinforcement portion.

이와 같이, 본 발명의 제 2 실시예에 따른 돌망태 옹벽은 첨부된 도 6 내지 도 12에서와 같이, 우선 지반이 견고한 암반 절개지에 바닥기초부를 시공한 상태에서, 상기 바닥기초부 위에 절개지로부터 일정거리 이격되게 "L"자 코너부를 가진 제 1,2 메쉬패널(10)(20)을 일정간격을 두고 연속적으로 설치하여 돌채움 공간을 형성한다.As described above, the gabion retaining wall according to the second embodiment of the present invention is constructed such that, in a state in which a floor base portion is installed in a rock cutter having a solid ground, The first and second mesh panels 10 and 20 having the "L" -shaped corner portions are spaced apart from each other at regular intervals to form a stone fill space.

다음으로, 상기 제 1,2 메쉬패널(10)(20)의 제 1,2 벽부(11)(21) 내측과 제 1,2 바닥면부(12)(22)의 위에 조밀한 망목으로 제작되는 벽부 보조매쉬패널(30)(30')(30")를 포개지도록 설치한 후, 제 1,2 벽부(11)(21)에 포개어진 벽부 보조매쉬패널(30)(30')와 제 1,2 바닥면부(12)(22)에 포개어진 벽부 보조매쉬패널(30")를 철선(40)으로 묶음 결합시킨다.Next, the first and second wall portions 11 and 21 of the first and second mesh panels 10 and 20 and the first and second bottom surface portions 12 and 22 are made of a dense mesh The wall auxiliary mash panels 30 and 30 '' are installed so as to be superimposed on the first and second wall portions 11 and 21 and the wall auxiliary mash panels 30 and 30 ' , And the wall part auxiliary mesh panel 30 "superimposed on the two bottom surface portions 12 and 22 is bundled with the wire 40.

여기서, 상기 제 1 메쉬패널(10)의 제 1 바닥면부(12)는 옹벽의 폭을 고려한 길이를 가지는 것으로, 상기 제 1 바닥면부(12)의 끝이 절개지에 닿을 정도의 크기를 유지하는 것이 좋지만, 첨부된 도 13에서와 같이 절개지까지 닿지 않아도 상기 제 1 바닥면부(12)에 고리부(121)를 형성한 후 이에 바닥보강재(122)의 일단을 연결시킨 후, 상기 바닥보강재(122)를 절개지에 닿도록 시공할 수도 있는 것이다.Here, the first bottom surface portion 12 of the first mesh panel 10 has a length considering the width of the retaining wall, and the size of the first bottom surface portion 12 is maintained so as to touch the cut- 13, after the annular portion 121 is formed on the first bottom surface portion 12 and one end of the bottom stiffener 122 is connected to the first bottom surface portion 12, May be constructed so as to be brought into contact with the cut paper.

다음으로, 상기 제 1,2 메쉬패널(10)(20)에 의해 확보된 돌채움 공간에 각각 돌채움을 충진하여 제 1 옹벽층을 형성하고, 돌채움이 완료되면 상기 제 1 옹벽층을 이루는 상기 제 1,2 메쉬패널(10)(20)의 위에 제 2 옹벽층을 이루게 될 또 다른 제 1,2 메쉬패널(10)(20)을 적층 조립하되, 제 1 옹벽층을 이루는 제 1,2 벽부(11)(21)의 상단을 제 2 옹벽층을 이루게 될 제 1,2 메쉬패널(10)의 제 1,2 벽부(11)(21)에 포개어지도록 연장(11')(21')시키면서, 연장된 벽부(11')(21')와 바닥면부(12)(22)에 포개어지는 벽부 보조매쉬패널(30)(30")를 철선(40)으로 묶음 결합시켜 1,2 옹벽층의 제 1,2 메쉬패널(10)(20)을 연결 고정하고, 상기와 같은 과정을 반복하여 첨부된 도 10 내지 도 13에서와 같이 수직방향 및/또는 수평방향으로 이루어진 다단의 옹벽층을 시공한다.Next, a stone filling space secured by the first and second mesh panels 10 and 20 is filled with a stone filler to form a first retaining wall layer. When the stone filling is completed, the first retaining wall layer The first and second mesh panels 10 and 20, which will form a second retaining wall layer, are stacked on the first and second mesh panels 10 and 20, and the first and second mesh panels 10 and 20, The upper ends of the two wall portions 11 and 21 are extended to the first and second wall portions 11 and 21 of the first and second mesh panels 10 to form the second retaining wall layer. , The wall auxiliary mash panels 30 and 30 ", which are superimposed on the extended wall portions 11 ', 21' and the bottom wall portions 12, 22, are bundled together by the wire rods 40, The first and second mesh panels 10 and 20 are connected and fixed, and the above process is repeated to form a multi-stage retaining wall layer in the vertical direction and / or the horizontal direction as shown in FIGS. Construction.

다음으로, 마무리공정으로서 상기 제 1,2 메쉬패널(10)의 최상단 개구부에 패널(50)를 결합시키게 되면, 첨부된 도 16 및 도 17에서와 같이, 돌망태 옹벽이 완성될 수 있는 것이다.Next, when the panel 50 is coupled to the uppermost opening of the first and second mesh panels 10 as a finishing process, the gabion retaining wall can be completed as shown in FIGS. 16 and 17.

여기서, 첨부된 도 16 및 도 17에서와 같이, 돌망태 옹벽을 시공함에 있어, 절개지와 제 1,2 메쉬패널(10)(20)의 경계부분에는 부직포(70)를 시공할 수도 있으며, 이는 제 1,2 메쉬패널(10)(20)을 시공한 후 돌채움이 이루어질 때 절개지의 잔여물이 흘러내리는 것을 방지할 수 있도록 하기 위함이다.16 and 17, in the construction of the gabion retaining wall, the nonwoven fabric 70 may be applied to the boundary between the cutout and the first and second mesh panels 10 and 20, So as to prevent the residue of the cut paper from flowing down when the stone filling is performed after the 1,2 mesh panels 10 and 20 are installed.

즉, 옹벽구조물에 일정간격으로 부직포(70)를 설치하여 절개지의 성토재 사이마다 마찰력 또는 지압 저항력 발생시킴으로써, 이를 통해 상기 부직포(70)는 절개지의 성토재를 안정화시키는 기능을 수행할 수 있게 되는 것이다.That is, the nonwoven fabric 70 is installed at a predetermined interval in the retaining wall structures to generate a frictional force or an acupressure resistance force between the embossed tongues of the cut paper, thereby enabling the nonwoven fabric 70 to function to stabilize the embankment of the cut paper.

한편, 본 발명의 제 4 실시예로 첨부된 도 15에서와 같이, 상기 제 1 벽부(11)와 제 1 바닥면부(12)에는 조밀한 망목으로 다수의 종방향철선과 횡방향철선을 격자 형태로 반복되게 결합시킨 벽부 보조매쉬패널(60)을 일정간격을 두고 다단 구성할 수도 있음은 물론, 도면에는 도시하지 않았지만 상기 제 1 옹벽층은 물론 그 위에 제 2,3 옹벽층을 순차적으로 시공할 때 상기 옹벽 구조물의 최하단에 설치되는 제 1 옹벽층에는 상기 단위 메쉬패널(10)의 제 1 벽부(11)로 개방되는 파충류 대피공간 또는 물고기 산란공간을 돌채움과 함께 설치할 수도 있는 것이다.15, the first wall portion 11 and the first bottom wall portion 12 are provided with a plurality of longitudinal and transverse wires in a lattice pattern in a dense mesh, Walled auxiliary mesh panels 60 repeatedly combined with each other may be arranged at a predetermined interval. In addition, the second and third retaining wall layers may be successively formed on the first retaining wall layer The reptile evacuation space or the fish scattering space which is opened to the first wall portion 11 of the unitary mesh panel 10 may be installed in the first retaining wall layer provided at the lowermost end of the retaining wall structure together with the stone fill.

여기서, 상기 벽부 보조매쉬패널(60)은 제 1 옹벽층과 그 위에 차례로 적층 시공되는 제2, 제3옹벽층의 경우 시간이 경과함에 따라 돌채움의 하중에 의한 부분 침하가 발생할 때 이를 방지함은 물론, 수평방향으로의 흔들림 이동에 따른 바닥면부 침하를 방지할 수 있도록 설치가 이루어지는 것이다.Here, in the case of the first retaining wall layer and the second and third retaining wall layers stacked on the first retaining wall layer, the wall auxiliary mesh panel 60 prevents the partial settlement due to the load of the stone filling as time elapses As well as to prevent the bottom surface from sinking due to the shaking motion in the horizontal direction.

한편, 첨부된 도 14는 본 발명의 제 3 실시예로, 이는 다수의 종방향철선과 횡방향철선을 격자 형태로 반복되게 결합되어 절개지까지 연장되는 바닥패널(80)의 위에 제 1 메쉬패널(10)의 제 1 바닥면부(12)와 제 2 메쉬패널(20)의 제 2 바닥면부(22)가 포개어지도록 구성하여둔 것이다.14 is a third embodiment of the present invention in which a plurality of longitudinal and transverse wires are repeatedly combined in a lattice form to form a first mesh panel The first bottom surface portion 12 of the first mesh panel 10 and the second bottom surface portion 22 of the second mesh panel 20 are superimposed.

즉, 첨부된 도 15의 실시예는, 지반이 견고한 암반 절개지에 바닥기초부를 시공한 상태에서, 상기 바닥기초부의 위에 바닥패널(80)을 설치한다.That is, in the embodiment of Fig. 15 attached, the floor panel 80 is installed on the floor base portion in a state in which the floor base portion is installed in a rock foundation with hard ground.

다음으로, 상기 바닥패널(80)의 위에 절개지로부터 일정거리 이격되게 "L"자 코너부를 가진 제 1,2 메쉬패널(10)(20)을 일정간격을 두고 연속적으로 설치하여 돌채움 공간(A)을 형성한다.Next, the first and second mesh panels 10 and 20 having the "L" -shaped corner portion are spaced apart from the cutout on the bottom panel 80 continuously at predetermined intervals to form a stone fill space A ).

다음으로, 상기 바닥패널(80)과 제 1,2 메쉬패널(10)(20)의 제 1,2 벽부(11)(21) 내측, 그리고 제 1,2 바닥면부(12)(22)의 위에 조밀한 망목으로 제작되는 벽부 보조매쉬패널(30)(30')(30")를 포개지도록 설치한 후, 상기 바닥패널(80)에 포개어지는 벽부 보조매쉬패널(30")와 제 1,2 바닥면부(12)(22)에 포개어지는 벽부 보조매쉬패널(30')를 철선(40)으로 묶음 결합한다.Next, the inside of the first and second wall portions 11 and 21 of the bottom panel 80 and the first and second mesh panels 10 and 20 and the inside of the first and second bottom wall portions 12 and 22 The wall auxiliary mash panel 30 '', which is superimposed on the floor panel 80, and the first and second wall mashing panels 30 '' and 30 '', 2 The wall auxiliary mash panel 30 ', which is superimposed on the bottom surface portions 12 and 22, is bundled with the wire 40.

다음으로, 상기 제 1,2 메쉬패널(10)(20)에 의해 확보된 돌채움 공간(A)에 각각 돌채움을 충진하여 제 1 옹벽층을 형성하고, 돌채움이 완료되면 제 1 옹벽층을 이루는 상기 제 1,2 메쉬패널(10)(20)의 위에 제 2 옹벽층을 이루게 될 또 다른 제 1,2 메쉬패널(10)(20)을 적층 조립하되, 제 1 옹벽층을 이루는 제 1,2 벽부(11)(21)의 상단을 제 2 옹벽층을 이루게 될 제 1,2 메쉬패널(10)(20)의 제 1,2 벽부(11)(21)에 포개어지도록 연장시킨 상태에서, 바닥패널(80)과 제 1 바닥면부(22)에 각각 포개어지는 벽부 보조매쉬패널(30")(30')를 철선(40)으로 묶음 결합시켜 1,2 옹벽층의 제 1,2 메쉬패널(10)(20)을 연결 고정한 후 이를 반복하여 수직방향 및/또는 수평방향으로 다단의 옹벽층을 시공한 상태에서, 마무리공정으로서 상기 제 1,2 메쉬패널(10)(20)의 최상단 개구부에 패널(50)를 결합하여, 첨부된 도 16 및 도 17에서와 같이, 돌망태 옹벽을 완성할 수 있도록 한 것이며, 이하 첨부된 도 6 내지 도 13은 물론, 첨부된 도 15 내지 도 17에서와 동일부분에 대하여는 동일부호로서 그 중복되는 설명은 생략한 것이다.Next, the stone filling space A secured by the first and second mesh panels 10 and 20 is filled with a stone filler to form a first retaining wall layer. When the stone filling is completed, The first and second mesh panels 10 and 20 are formed by stacking the first and second mesh panels 10 and 20 to form a second retaining wall layer on the first and second mesh panels 10 and 20, The upper ends of the first and second wall portions 11 and 21 are extended to be superimposed on the first and second wall portions 11 and 21 of the first and second mesh panels 10 and 20 to be the second retaining wall layer The wall auxiliary mash panels 30 "and 30 ', which are respectively superimposed on the bottom panel 80 and the first bottom surface portion 22, are bundled together by the wire 40 to form the first and second The mesh panels 10 and 20 are connected and fixed, and then the mesh panels 10 and 20 are repeatedly installed to form a multi-stage retaining wall layer in the vertical direction and / By joining the panel 50 to the uppermost opening, 16 and 17, the gabion retaining wall can be completed. Hereinafter, the same parts as those in Figs. 15 to 17 are denoted by the same reference numerals as those in Figs. 6 to 13, The explanation is omitted.

이상에서 본 발명의 실시예들에 따른 돌망태에 대해 설명하였으나 본 발명은 이에 한정하지 아니하며 당업자라면 그 응용과 변형이 가능함은 물론이다.While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is to be understood that the invention is not limited to the disclosed exemplary embodiments.

본 발명은 상술한 바람직한 실시예에만 한정되는 것이 아니라 본 발명의 요지를 벗어나지 않는 범위 내에서 여러 가지로 개량, 변경, 대체 또는 부가하여 실시할 수 있는 것임은 당해 기술 분야에 통상의 지식을 가진 자라면 용이하게 이해할 수 있을 것이다. 이러한 개량, 변경, 대체 또는 부가에 의한 실시가 이하의 첨부된 청구범위의 범주에 속하는 것이라면 그 기술사상 역시 본 발명에 속하는 것으로 간주한다.It will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined by the appended claims. It will be easy to understand. It is also to be understood that the technical spirit of the invention is also deemed to belong to the scope of the appended claims if the practice of such improvements, alterations, substitutions or additions falls within the scope of the appended claims.

10; 제 1 메쉬패널 11; 제 1 벽부
11'; 제 1 벽부 연장부 12; 제 1 바닥면부
20; 제 2 메쉬패널 21; 제 2 벽부
21'; 제 2 벽부 연장부 22; 제 2 바닥면부
30,30,30"; 벽부 보조매쉬패널 40; 철선
50; 패널 60; 벽부 보조매쉬패널
70; 부직포 80; 바닥패널
90; 보강토다짐부 91; 유공관
92; 수직메쉬패널 100; 토립자의 유출을 막기위한 가름막
10; A first mesh panel 11; The first wall portion
11 '; A first wall extension 12; The first bottom surface
20; A second mesh panel 21; The second wall portion
21 '; A second wall extension 22; The second bottom surface
30, 30, 30 ", wall auxiliary mash panel 40,
50; Panel 60; Wall auxiliary mesh panel
70; Nonwoven fabric 80; Floor panels
90; Reinforcing soil compaction portion 91; A pipe
92; Vertical mesh panel 100; To prevent the outflow of soil particles

Claims (10)

내부에 돌을 채워 도로면의 절개지나 하천변의 구조물 축조시 무너짐을 막기 위해 사용되는 옹벽에 있어서,
돌채움의 충격에 저항하고 구조적으로 안정되도록 다수의 종방향철선과 횡방향철선을 격자 형태로 반복되게 결합되어 절곡된 "L"자 코너부를 중심으로 제 1 벽부와 제 1 바닥면부를 형성하면서 다단 적층되는 망상구조의 제 1 메쉬패널;
상기 제 1 벽부에 밀착된 상태로 포개어져 채움돌이 전방으로 이탈되는 것을 방지시키는 것으로, 다수의 종방향철선과 횡방향철선을 격자 형태로 반복되게 결합되는 망상구조의 벽부 보조매쉬패널;
상기 제 1 벽부와 일정간격을 유지하여 돌채움 공간을 형성하면서 상기 제 1 바닥면부에 시공되고, 전방측으로 토립자의 유출을 막기위한 가름막이 덮혀진 경사면을 형성하며, 후방측에 유공관이 시공되는 보강토다짐부; 를 포함하면서,
다단을 이루는 돌채움 공간에 돌채움이 이루어지도록 하면서 옹벽 최상단이 마감재로서 패널에 의해 덮혀지도록 구성하는 것을 특징으로 하는 매쉬패널을 이용한 조립형 돌채움 옹벽 구조물.
A retaining wall used for filling a stone inside to prevent collapse when a structure of a road surface is cut or a structure of a river side is built,
A plurality of longitudinal wires and a plurality of lateral wires repeatedly joined in a lattice form so as to resist the impact of the stone filling and structurally stabilize so as to form the first wall portion and the first bottom portion around the bent "L" A first mesh panel of a network structure to be stacked;
A wall auxiliary mesh panel having a network structure in which a plurality of longitudinal wires and a plurality of transverse wires are repeatedly coupled to each other in a lattice form so as to prevent the filling stone from being separated from the front wall by being overlapped with the first wall portion.
And a reinforcing layer formed on the first bottom surface portion to form a curved surface covered with a curtain to prevent the outflow of the ground particles to the front side, Compaction part; Lt; / RTI >
Characterized in that the upper end of the retaining wall is covered with a panel as a finishing material so that the stone filling space forming the multi-stages is filled with stone, and the panel is covered with the upper end of the retaining wall.
제 1 항에 있어서, 상기 제 1 벽부는 전면벽부이고, 상기 제 1 바닥면부는 옹벽보강재 구간 끝까지 연장되는 하면바닥면부인 것을 특징으로 하는 매쉬패널을 이용한 조립형 돌채움 옹벽 구조물.The assembled stone-filled retaining wall structure according to claim 1, wherein the first wall portion is a front wall portion, and the first bottom wall portion is a bottom floor portion extending to the end of the retaining wall reinforcement portion. 제 1 항에 있어서, 상기 제 1 메쉬패널과 보강토다짐부에 의해 형성되는 돌채움 공간은 다단 구성하여 다단의 옹벽층을 형성하는 것을 특징으로 하는 매쉬패널을 이용한 조립형 돌채움 옹벽 구조물.The assembled stone-filled retaining wall structure using the mash panel according to claim 1, wherein the stone filling spaces formed by the first mesh panel and the reinforcing soil compaction unit are multi-stage to form a multi-stage retaining wall layer. 제 1항에 있어서, 상기 제 1 벽부는 전면벽부이고, 상기 제 1 바닥면부는 돌채움 구간까지 연장되며 끝부분을 고리형태로 마감하여, 보강토 다짐부의 끝까지 시공되는 바닥 보강재가 걸림 설치되도록 구성함을 특징으로 하는 메쉬패널 조립형 돌채움 옹벽 구조물.The floor reinforcement according to claim 1, wherein the first wall portion is a front wall portion, the first bottom surface portion extends to a stone filling section, and the end portion is closed in a ring shape so that a floor reinforcement material to be installed to the end of the reinforcing- Wherein the mesh-panel-assembled stone-filled retaining wall structure is characterized by: 제 1 항에 있어서, 상기 토립자의 유출을 막기위한 가름막은 토목섬유인 것을 특징으로 하는 매쉬패널을 이용한 조립형 돌채움 옹벽 구조물.The assembled stone-walled retaining wall structure using the mash panel according to claim 1, wherein the membrane for preventing the outflow of the ground particles is a geosynthetic fiber. 내부에 돌을 채워 도로면이나 하천변의 구조물 축조시 무너짐을 막기 위해 시공되는 옹벽에 있어서,
돌채움의 충격에 저항하고 구조적으로 안정되도록 다수의 종방향철선과 횡방향철선을 격자 형태로 반복되게 결합되어 절곡된 "L"자 코너부를 중심으로 제 1 벽부와 제 1 바닥면부를 형성하면서 보강재를 구성하고, 채움돌이 전방과 하방으로 이탈되는 것을 방지하면서 다단 적층되는 망상구조의 제 1 메쉬패널;
상기 제 1 바닥면부의 일정위치에서 수직하게 세워져 돌채움 공간을 형성한 후 채워지는 돌이 후방으로 빠져나가지 않도록 다수의 종방향철선과 횡방향철선을 격자 형태로 반복되게 결합되어 절곡된 "L"자 코너부를 중심으로 제 2 벽부와 제 2 바닥면부를 형성하며 다단 적층이 이루어지는 망상구조의 제 2 메쉬패널;
상기 제 1 벽부에는 조밀한 망목으로 다수의 종방향철선과 횡방향철선을 격자 형태로 일정한 간격을 두며 반복되게 결합시킨 보조매쉬패널;
상기 제 1 벽부와 제 2 벽부의 사이에 일정한 간격을 두고 간격을 유지하면서 고정시키는 내부보강패널을 설치하고, 수직방향과 수평방향으로 다단 구성되는 옹벽층; 을 형성하는 것을 특징으로 하는 매쉬패널을 이용한 조립형 돌채움 옹벽 구조물.
In a retaining wall constructed to prevent collapse when a structure of a road surface or a river side is filled with a stone,
A plurality of longitudinal wires and a plurality of transverse wires are repeatedly joined in a lattice form so as to resist the impact of the stone filling and structurally stabilize and to form a first wall portion and a first bottom portion around the bent "L" A first mesh panel of a network structure having a plurality of layers stacked while preventing the filler stones from being separated from the forward and downward directions;
A plurality of longitudinal wires and a plurality of transverse wires are repeatedly coupled in a lattice form so as to prevent a stone to be filled after the stones are vertically erected at a predetermined position of the first bottom surface, A second mesh panel having a network structure in which a second wall portion and a second bottom surface portion are formed around a corner portion and multi-layered stacking is performed;
An auxiliary mesh panel in which a plurality of longitudinal wires and a plurality of transverse wires are repeatedly coupled to each other at regular intervals in a lattice pattern;
An inner reinforcing panel that fixes the first wall portion and the second wall portion while keeping a predetermined gap therebetween, and has a multi-stage structure in a vertical direction and a horizontal direction; Wherein the mash panel is formed in a shape of a curved surface.
제 6 항에 있어서, 상기 제 1 바닥면부는 일측 단부에 걸림고리를 형성하고, 상기 걸림고리에는 일단이 걸림되면서 보강토 다짐부의 끝까지 연장되는 바닥보강재를 결합 구성하는 것을 특징으로 하는 매쉬패널을 이용한 조립형 돌채움 옹벽 구조물.The assembly according to claim 6, wherein the first bottom surface portion is formed with a hooking ring at one end thereof, and a bottom reinforcement member extending from the hooking ring to the end of the reinforcing- Shaped stone retaining wall structure. 지반이 견고한 암반 절개지에 바닥기초부를 시공하는 단계;
상기 바닥기초부 위에 제 1 벽부와 제 1 바닥면부를 형성하도록 "L"자 코너부를 가진 제 1 메쉬패널을 설치하는 단계;
상기 벽부 보조매쉬패널가 포개진 상기 제 1 메쉬패널의 내면으로 토목섬유로 이루어진 토립자의 유출을 막기위한 가름막을 펼쳐지게 설치하되, 상기 토립자의 유출을 막기위한 가름막의 일면을 상기 제 1 메쉬패널의 제 1 벽부에 걸침된 상태로 상기 제 1 메쉬패널의 제 1 바닥면부에 설치하는 단계;
상기 제 1 메쉬패널의 제 1 벽부로부터 일정거리의 여유공간을 남기고 상기 토립자의 유출을 막기위한 가름막의 위에 일정높이로 흙을 성토하고 이를 흙다짐하여 보강토다짐부를 형성하는 단계;
상기 제 1 메쉬패널의 제 1 벽부에 걸침되었던 상기 토립자의 유출을 막기위한 가름막의 선단으로 보강토다짐부의 전방을 감싸 올려줌으로서, 상기 제 1 메쉬패널의 제 1 벽부로부터 일정거리에 돌채움 공간을 형성하는 단계;
상기 제 1 메쉬패널과 보강토다짐부의 사이에 확보된 돌채움 공간에 각각 돌채움을 충진하여 제 1 옹벽층을 형성하는 단계;
돌채움이 완료되면, 제 1 옹벽층을 이루는 상기 제 1 메쉬패널과 보강토다짐부의 위에 제 2 옹벽층을 이루게 될 또 다른 제 1 메쉬패널을 적층 조립하되, 제 1 옹벽층을 이루는 제 1 벽부의 상단을 제 2 옹벽층을 이루게 될 제 1 메쉬패널의 제 1 벽부에 포개어지도록 연장시키면서 벽부에 포개어지는 벽부 보조매쉬패널를 철선으로 묶음 결합시켜 1,2 옹벽층의 제 1 메쉬패널을 연결 고정하는 단계; 를 반복적으로 수행한 후,
상기 제 1 메쉬패널의 최상단 개구부에 패널를 결합시키는 단계; 를 포함하여 진행하는 것을 특징으로 하는 매쉬패널을 이용한 조립형 돌채움 옹벽 구조물 시공방법.
Constructing a floor base portion in a rock foundation having a solid ground;
Providing a first mesh panel having an "L" -shaped corner portion to form a first wall portion and a first bottom portion on the bottom base;
A first mesh panel having a first mesh panel and a second mesh panel attached to the first mesh panel, the first mesh panel having a wall part auxiliary mesh panel attached to the first mesh panel, Providing a first bottom surface portion of the first mesh panel in a state of being stuck on a wall portion;
Forming a reinforcing soil compaction unit by filling the soil with a certain height on the top of the topsheet to prevent the outflow of the soil particles leaving a clearance of a certain distance from the first wall of the first mesh panel;
A stone filling space is formed at a certain distance from the first wall portion of the first mesh panel by raising the front side of the reinforcing soil compaction portion with the tip end of the granule to prevent the outflow of the ground particles that have been stuck on the first wall portion of the first mesh panel ;
Filling a stone filling space secured between the first mesh panel and the reinforcing soil compaction portion to form a first retaining wall layer;
When the stone filling is completed, the first mesh panel constituting the first retaining wall layer and another first mesh panel constituting the second retaining wall layer are laminated and assembled on the reinforcing soil compaction portion, and the first wall panel constituting the first retaining wall layer A step of connecting and fixing the first mesh panel of the retaining wall layer by bundling the wall auxiliary mesh panel, which is superimposed on the wall portion, with the upper end to be superimposed on the first wall portion of the first mesh panel to be the second retaining wall layer, ; Lt; RTI ID = 0.0 >
Coupling a panel to a top opening of the first mesh panel; The method of claim 1, wherein the masonry panel comprises a plurality of masonry panels.
지반이 견고한 암반 절개지에 바닥기초부를 시공하는 단계;
상기 바닥기초부 위에 절개지로부터 일정거리 이격되게 "L"자 코너부를 가진 제 1,2 메쉬패널을 일정간격을 두고 연속적으로 설치하여 돌채움 공간을 형성하는 단계;
상기 제 1 메쉬패널의 일정위치에서 수직하게 세워져 돌채움 공간을 형성한 후 채워지는 돌이 후방으로 빠져나가지 않도록 다수의 종방향철선과 횡방향철선을 격자 형태로 반복되게 결합되어 절곡된 "L"자 코너부를 중심으로 제 2 벽부와 제 2 바닥면부를 형성하는 단계;
상기 제 1,2 메쉬패널에 의해 확보된 돌채움 공간에 각각 돌채움을 충진하여 제 1 옹벽층을 형성하는 단계;
돌채움이 완료되면, 제 1 옹벽층을 이루는 상기 제 1,2 메쉬패널 위에 제 2 옹벽층을 이루게 될 또 다른 제 1,2 메쉬패널을 적층 조립하되, 제 1 옹벽층을 이루는 제 1,2 벽부의 상단을 제 2 옹벽층을 이루게 될 제 1,2 메쉬패널의 제 1,2 벽부에 포개어지도록 연장시키면서 제 1 옹벽층의 제 1 메쉬패널 벽면부의 횡방향 철선과 제 2 옹벽의 제 1 매쉬패널의 바닥면부 횡방향 철선을 철선으로 묶음 결합시켜 1,2 옹벽층의 제 1,2 메쉬패널을 연결 고정하는 단계;
상기 제 1,2 메쉬패널의 제 1,2 벽부와 제 1,2 바닥면부에 일정간격을 두고 격자형을 이루는 벽부 보조매쉬패널을 설치하여 각각의 옹벽층에 돌채움 공간을 다단 형성하는 단계; 를 반복적으로 수행한 후,
상기 제 1,2 메쉬패널의 최상단 개구부에 패널을 결합시키는 단계; 를 더 포함하여 진행하는 것을 특징으로 하는 매쉬패널을 이용한 조립형 돌채움 옹벽 구조물 시공방법.
Constructing a floor base portion in a rock foundation having a solid ground;
The first and second mesh panels having an "L" -shaped corner portion spaced a predetermined distance apart from the cutout on the bottom base portion are continuously provided at regular intervals to form a stone fill space;
A plurality of longitudinal wires and a plurality of transverse wires are repeatedly coupled in a lattice form so as to prevent a stone to be filled up after being formed vertically at a predetermined position of the first mesh panel to form a stone filling space, Forming a second wall portion and a second bottom surface portion around the corner portion;
Filling a stone filling space secured by the first and second mesh panels with a stone filler to form a first retaining wall layer;
When the stone filling is completed, another first and second mesh panels, which will form a second retaining wall layer, are stacked on the first and second mesh panels constituting the first retaining wall layer, and the first and second mesh panels, The upper end of the wall portion is extended to be superimposed on the first and second wall portions of the first and second mesh panels to form the second retaining wall layer while the lateral wire of the first mesh panel wall portion of the first retaining wall layer and the first wire- Connecting and fixing the first and second mesh panels of the first and second retaining wall layers by bundling the transverse wire of the bottom surface of the panel with a wire;
Forming a plurality of stone filling spaces in each of the retaining wall layers by providing wall auxiliary mesh panels in a lattice shape at predetermined intervals on the first and second wall portions of the first and second mesh panels; Lt; RTI ID = 0.0 >
Coupling the panel to the uppermost opening of the first and second mesh panels; The method of claim 1, further comprising the steps of:
제 9 항에 있어서, 상기 제 1 메쉬패널은 절개지까지 연장되는 제 1 바닥면부를 가지거나 또는 절개지까지 연장되지 않고 일측끝단에 고리부를 형성한 후, 이에 바닥보강재를 연결하면서 상기 바닥보강재를 절개지까지 연장시키는 것을 특징으로 하는 매쉬패널을 이용한 조립형 돌채움 옹벽 구조물 시공방법.[10] The method of claim 9, wherein the first mesh panel has a first bottom surface extending to a cutout, or a ring is formed at one end of the cutout without extending to the cutout, and then the bottom reinforcement is connected to the cutout Wherein the method comprises the steps of:
KR1020140079763A 2014-06-27 2014-06-27 Wire cylinder type retaining wall and operation thereof KR20160001368A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020140079763A KR20160001368A (en) 2014-06-27 2014-06-27 Wire cylinder type retaining wall and operation thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020140079763A KR20160001368A (en) 2014-06-27 2014-06-27 Wire cylinder type retaining wall and operation thereof

Publications (1)

Publication Number Publication Date
KR20160001368A true KR20160001368A (en) 2016-01-06

Family

ID=55165264

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020140079763A KR20160001368A (en) 2014-06-27 2014-06-27 Wire cylinder type retaining wall and operation thereof

Country Status (1)

Country Link
KR (1) KR20160001368A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108222026A (en) * 2016-12-21 2018-06-29 中国矿业大学(北京) The restorative procedure of coal mine small-sized hillock

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108222026A (en) * 2016-12-21 2018-06-29 中国矿业大学(北京) The restorative procedure of coal mine small-sized hillock
CN108222026B (en) * 2016-12-21 2020-08-18 中国矿业大学(北京) Method for repairing small gangue dump of coal mine

Similar Documents

Publication Publication Date Title
AU2016221315B2 (en) A retaining wall method of precast block to prevent landslide
KR20120115704A (en) Soil retaining method using two rows pile
WO2007046142A1 (en) Retaining wall banking structure
CN106522244B (en) A kind of embankment combination binding structure and its construction method
JP5281974B2 (en) Drain structure
KR102490872B1 (en) Reinforced earth retaining wall and construction method using tensile force of steel rod piles
KR100889257B1 (en) Precast concrete facing panel using greening of retaining panel's front
KR20160001368A (en) Wire cylinder type retaining wall and operation thereof
US20200248426A1 (en) Retaining Wall with Reinforced Soil
JP5097249B2 (en) Drain structure and construction method of drain structure
JP2011219919A (en) Retaining wall unit and method of constructing retaining wall unit
KR102484636B1 (en) Retain wall structure
KR102334837B1 (en) Breast wall structure
KR101684340B1 (en) Scour protection system for shore and its installation methods
JP5049665B2 (en) Construction method of vertical retaining wall and vertical retaining wall
JP7046037B2 (en) Honeycomb reinforcement slope
JP2000328577A (en) Soil retaining cage frame and method of building steep grade banking using the cage frame
JPH10102497A (en) Method of greening face of slope, wall surface, etc.
KR100787593B1 (en) Steel frame retaining wall combined with steel net
KR100995094B1 (en) Method for constructing retaining wall block
JP3369879B2 (en) Greening structures such as slopes and walls
KR20130010982A (en) Wire cylinder type retaining wall and operation thereof
KR101505843B1 (en) The eco-friendly vegetation mesh retaining wall having supporting member and the method for constructing the same
KR101070700B1 (en) Reinforcement apparatus, retaing wall for planting using the same and construction method thereof
JP3111278U (en) Reinforced earth retaining wall

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E902 Notification of reason for refusal