KR20150129632A - Construction method using panel construction and the construction site construction panel for leaks that occur on the edge of the side edges of the upper and Building - Google Patents

Construction method using panel construction and the construction site construction panel for leaks that occur on the edge of the side edges of the upper and Building Download PDF

Info

Publication number
KR20150129632A
KR20150129632A KR1020150152897A KR20150152897A KR20150129632A KR 20150129632 A KR20150129632 A KR 20150129632A KR 1020150152897 A KR1020150152897 A KR 1020150152897A KR 20150152897 A KR20150152897 A KR 20150152897A KR 20150129632 A KR20150129632 A KR 20150129632A
Authority
KR
South Korea
Prior art keywords
building
edge
construction
cover panel
panel
Prior art date
Application number
KR1020150152897A
Other languages
Korean (ko)
Other versions
KR101621757B1 (en
Inventor
이성원
Original Assignee
유지씨 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 유지씨 주식회사 filed Critical 유지씨 주식회사
Priority to KR1020150152897A priority Critical patent/KR101621757B1/en
Publication of KR20150129632A publication Critical patent/KR20150129632A/en
Application granted granted Critical
Publication of KR101621757B1 publication Critical patent/KR101621757B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/64Insulation or other protection; Elements or use of specified material therefor for making damp-proof; Protection against corrosion
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6806Waterstops

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The present invention relates to an upper edge portion of a building which can quickly and easily construct a construction site such as a roof railing around an upper edge of a building and a peripheral surface of a building, The present invention relates to a construction panel for construction of a leaking portion on an edge side of a building and a construction method using the construction panel.
A maintenance area cleaning step (S100) for cleaning the area of the top edge of the building or the edge side of the building neatly by using a brush, water, or air pressure on the maintenance area where the water leakage and water leakage are peeled off, The fixing means 20 of the cover panel 10 is provided with a locking protrusion 70 for locking the cover panel 10 in the case of an upper edge portion of the cover panel 10, Shaped mounting member 40 for fixing the cover panel 10 in the case where the maintenance part is the edge side of the building and fixing the mounting member 40 made of the â- A fixing step (S200), a flat portion (50) formed by bending the upper end of the edge of the building or the edge side of the building at a predetermined interval after fixing the mounting member, And a fixing unit 20 corresponding to the mounting member 40 is fixed to one end of the vertical unit 30 in the inner direction A cover panel fixing step S300 in which the cover panel 10 formed of the cover panel 10 and the mounting member 40 is closely fitted and fixed to the mounting member 40, And a finishing step S400 of applying a finishing material containing silicon to the overlapping portions of the back-side panels S and the edges of the side panels S, respectively.

Description

BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction method and a construction method of a building, the upper and Building}

[0001] The present invention relates to a construction panel for construction of a leaking portion generated at an upper edge of a building and an edge of a building, and a construction method using the construction panel. More particularly, the present invention relates to a roof panel, The construction panel for the construction of the leaking portion on the edge of the edge of the building and the side edge of the building which can quickly and easily construct the construction site such as the leakage of water and the discoloration of the painted surface caused around the wall, And a method of using the same.

Generally, leakage occurs due to the crack 1 as shown in FIG. 1 at the upper edge of the building and the side edge of the building, which are constructed using concrete such as a house, a multi-family house, a villa, an apartment, an office building, and the like.

Conventionally, a waterproofing liquid is forcibly injected into a crack (1) region for a leaked portion as described above, or a thin panel (2) is used for repairing a crack, The construction was done to repair the phenomenon.

However, the method of forcibly injecting the waterproofing liquid is advantageous in that it is easy to repair and install the waterproofing liquid only at the corresponding site, but the disadvantage is that the surface is not clean due to irregular repair progress.

In addition, the thin panel method has the advantage that the painted paint on the surface of the building as well as the leakage surface can be repaired easily by discoloration such as stains, etc. However, since the panel is fixed with concrete nails, It rusted from the fixed part and was locally leaked or rusty due to rust, which also did not provide cleanliness.

On the other hand, as a prior art relating to repair work for a crack part of a building, there is a patent application No. 10-2012-0072812 entitled " Waterproofing and repairing method of a crack part of a building ".

In order to solve the above problems, the present invention has been devised in order to solve the above-mentioned problem. In the present invention, repairing work is performed by using a thin panel on the part where the paint is peeled off as well as the leakage part due to crack, And it is possible to prevent the recurrence of the leakage phenomenon due to rust even for a long period of time by blocking the phenomenon of the rusting of the fixing nails in advance, And an object of the present invention is to provide a construction panel for construction of a leaking area and a construction method using the construction panel.

In order to achieve the above object, a construction panel (S) for the construction of a water leakage portion, which is formed on an upper edge of a building and an edge of a building,

At least one flat portion 50 formed by being bent at a predetermined interval so as to be able to repair and install the leakage portion occurring at the upper edge of the edge of the building or the side edge of the building, A cover panel 10 formed at one end of the vertical portion 30 and having fixing means 20 corresponding to the mounting member 40 in an inner direction, A ┗ type fixing means 70 disposed at one end of the panel 10 and adapted to engage and fix the cover panel 10 at the same time as the fixing means 20, , And a mounting member (40) made of a planar '-' shape.

In addition, at one side of the fixing means 20, one or more mounting grooves 60 are formed in one direction so that they can be easily handled at the time of constructing the maintenance site on the edge side of the building.

Further, the fixing means 20 and the engaging means 70 are characterized in that they have a shape of one of a roll type 21, 71 formed to be curled or a projection type 22, 72 formed to protrude in the longitudinal direction .

In the construction method using the construction panel for the leakage portion occurring at the edge of the edge of the building and the side edge of the building,

A maintenance area cleaning step (S100) for cleaning the area of the top edge of the building or the edge side of the building neatly by using a brush, water, or air pressure on the maintenance area where the water leakage and water leakage are peeled off, The fixing means 20 of the cover panel 10 is provided with a locking protrusion 70 for locking the cover panel 10 in the case of an upper edge portion of the cover panel 10, Shaped mounting member 40 for fixing the cover panel 10 in the case where the maintenance part is the edge side of the building and fixing the mounting member 40 made of the â- A fixing step (S200), a flat portion (50) formed by bending the upper end of the edge of the building or the edge side of the building at a predetermined interval after fixing the mounting member, And a fixing unit 20 corresponding to the mounting member 40 is fixed to one end of the vertical unit 30 in the inner direction A cover panel fixing step S300 in which the cover panel 10 formed of the cover panel 10 and the mounting member 40 is closely fitted and fixed to the mounting member 40, And a finishing step S400 of applying a finishing material containing silicon to the edge of the construction panel S and the overlapping portion of the back-side panel S, as shown in Fig.

The construction method of the present invention for the construction of the leaking part on the upper edge of the edge of the building and the side edge of the building and the construction method using the construction panel are simple and quick in the part where the leaking water is peeled off It is possible to prevent the phenomenon that the panel is stained with rust while providing cleanness because the surface of the fixing nail is not on the outer surface after the construction.

FIG. 1 (a) is a cross-sectional perspective view showing a maintenance part generated at the upper end of the edge of a conventional building, and FIG. 2 (b)
2 is a perspective view showing a preferred embodiment of the present invention.
3 (a) is a perspective view showing a '┗' type mounting member, and FIG. 3 (b) is a perspective view showing a '
4 and 5 are perspective views showing another embodiment of the present invention.
Fig. 6 is a perspective view showing a state in which a mounting member is installed on a top edge of a building,
FIG. 7 is a perspective view showing a state in which the construction panel is installed on the upper end of the edge of the building,
Fig. 8 is a perspective view showing a state of use in which a construction member is installed on an edge side of a building,
FIG. 9 is a block diagram of a construction process block showing a preferred embodiment of the present invention

Hereinafter, a method of constructing a construction panel for constructing a leaking portion and a construction panel using the construction panel according to the present invention will be described in detail with reference to the accompanying drawings and preferred embodiments.

First, the technical core of the present invention is to cover and fix the same construction panel S as the surface of a building at a site requiring repair due to leakage or leakage of water, so that the fixing nail 80 used for fixing is completely covered Thereby preventing recurrence of leaks through the grooves of the nail 80 and providing a clean surface appearance.

The cover panel 10 is made of a non-ferrous metal material so that the cover panel 10 can be easily and efficiently operated. And a mounting member (40) for allowing the fixing to be engaged.

2 and 4 to 5, the cover panel 10 includes a flat portion bent at predetermined intervals so as to be able to perform maintenance work on a leakage portion occurring at the upper edge of the edge of the building or the side edge of the building 50 are provided at one or more stages and a vertical portion 30 formed by bending is formed at both ends of the flat surface portion 50. At one end of the vertical portion 30, The fixing means 20 is formed in the inward direction.

As the planar portion 50 is folded step by step, it can be easily handled around the roof of the building where the step is formed and the side portion of the building.

Particularly, as shown in FIG. 1, a protruding surface (3) artificially formed in the course of construction to maintain the bottom waterproofing of a roof or the like also occurs when a long time elapses, and leakage occurs due to the crack It will be done. Since the cover panel 10 according to the present invention, which can cover such protruding surfaces, can easily and quickly construct the leaked water and copes with the working conditions in the field, a clean appearance can be provided even after the construction.

The mounting member 40 disposed at one end of the cover panel 10 and adapted to fix the cover panel 10 at the same time as the cover panel 10 is engaged with the cover panel 10 has a hook Means 70 comprises a "┗" shape formed at one end and a "━" shape of a plane.

As shown in FIG. 5, one or more mounting grooves 60 are formed at one side of the fixing means 20 so as to be easily accommodated when a maintenance site on the side of a building is constructed.

The fixing means 20 and the engaging means 70 may be formed in any one of a roll type 21, 71 formed to be curled or a protrusion type 22, 72 protruded in the longitudinal direction.

In the construction method using the construction panel for the leakage portion occurring at the edge of the edge of the building and the side edge of the building,

Water (S100) is cleaned using a brush, water, or air pressure on the upper part of the edge of the building or the side of the edge of the building.

Most of the leaking parts are stained with paint due to water leakage, and the surrounding area is not clean, so it is desirable to use a brush, air pressure and water to clean it neatly.

A '┗' type having an engaging means 70 corresponding to the fixing means 20 of the cover panel 10 for fitting and fixing the cover panel 10 when the maintenance part is the upper edge of the building, A mounting member 40 having a flat shape for fixing the cover panel 10 when the maintenance part is the edge side of the building, (S200).

The mounting member 40 can be a concrete nail or the like, and after the fixing, the fixing nail is covered by the cover panel 10, which is advantageous in that it can not be confirmed as an appearance after construction.

In addition, at least one flat portion 50 formed by bending the upper end of the edge of the building or the side edge of the building at predetermined intervals after the fixing of the mounting member is provided at one step and bent at both ends of the flat portion 50 And a fixing member 20 corresponding to the mounting member 40 is formed in an inner side of the vertical member 30 at one end of the vertical member 30. The cover member 10 is attached to the mounting member 40, And is tightly fitted and fixed (S300).

A portion where the construction panel S is fixed after the installation and fixing of the construction panel S constituted by the cover panel 10 and the mounting member 40 is overlapped and a finishing material containing silicon is used at the edge of the construction panel S (S400), thereby completing the construction work.

In addition, the cover panel 10 may be a panel cut by 1 to 2M units. In this case, it is preferable that the cover panel 10 is constructed so that a part of the ends of the cover panel 10 overlap with each other. do.

A: Top B: Side
S: Construction panel 1: Crack
2: Panel 10: Cover panel
20: Fixing means 21, 71: Roll type
22:72: projection type 30: vertical part
40: mounting member 50:
60: mounting groove 70: engaging means
80: Fixing nail
S100: Cleaning section cleaning step
S200: fixing step of mounting member
S300: cover panel fixing step
S400: Finishing step

Claims (4)

At least one flat portion 50 formed by being bent at regular intervals so as to be able to repair and build up a leakage portion occurring at the edge of the edge of the building or the side edge of the building, A cover panel 10 formed at one end of the vertical portion 30 and having fixing means 20 corresponding to the mounting member 40 in an inner direction,
The cover panel 10 is disposed at one end of the cover panel 10 so that the cover panel 10 is locked at the same time as the cover panel 10 is clamped. , And a mounting member (40) of a planar '-'shape;
And an upper edge of the edge of the building and an edge of the edge of the building.
The method according to claim 1,
Characterized in that at least one mounting groove (60) is formed in one side of the fixing means (20) and opened in one direction so that it can be easily handled at the time of constructing a repair site on the edge side of the building. A construction panel for the construction of leaking parts on the edge side.
The method according to claim 1,
Characterized in that the fixing means (20) and the engaging means (70) are constituted by any one of a roll type (21, 71) formed to be curled or a protrusion type (22, 72) And an edge portion of the building.
A cleaning step (S100) for cleanly cleaning the maintenance area where the water leakage and water leakage are peeled off from the edge of the edge of the building or the edge side of the building using a brush, water and air pressure;
A '┗' type having an engaging means 70 corresponding to the fixing means 20 of the cover panel 10 for fitting and fixing the cover panel 10 when the maintenance part is the upper edge of the building, A mounting member 40 having a flat shape for fixing the cover panel 10 when the maintenance part is the edge side of the building, (S200);
(50) formed by bending at a predetermined interval on the upper end of the edge of the building or the edge side of the building after the fixing of the mounting member is formed at one or more steps, and at the same time, And a cover panel 10 having a fixing unit 20 corresponding to a mounting member 40 is formed at one end of the vertical part 30 in a direction perpendicular to the mounting member 40 (S300);
A portion where the construction panel S is fixed after the installation and fixing of the construction panel S constituted by the cover panel 10 and the mounting member 40 is overlapped and a finishing material containing silicon is used at the edge of the construction panel S (S400);
The method of claim 1, wherein the at least one edge of the edge of the building is formed with a plurality of projections.
KR1020150152897A 2015-11-02 2015-11-02 Construction method using panel construction and the construction site construction panel for leaks that occur on the edge of the side edges of the upper and Building KR101621757B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020150152897A KR101621757B1 (en) 2015-11-02 2015-11-02 Construction method using panel construction and the construction site construction panel for leaks that occur on the edge of the side edges of the upper and Building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020150152897A KR101621757B1 (en) 2015-11-02 2015-11-02 Construction method using panel construction and the construction site construction panel for leaks that occur on the edge of the side edges of the upper and Building

Publications (2)

Publication Number Publication Date
KR20150129632A true KR20150129632A (en) 2015-11-20
KR101621757B1 KR101621757B1 (en) 2016-05-17

Family

ID=54844262

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020150152897A KR101621757B1 (en) 2015-11-02 2015-11-02 Construction method using panel construction and the construction site construction panel for leaks that occur on the edge of the side edges of the upper and Building

Country Status (1)

Country Link
KR (1) KR101621757B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20190034166A (en) * 2019-03-12 2019-04-01 초연결 주식회사 Repair method of outer wall girt of concrete building and maintenance method of exterior wall using the repairing means
KR102274239B1 (en) * 2021-04-22 2021-07-07 유지씨 주식회사 Repair unit for roof railing repair and roof railing repair method using the repair unit

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100846833B1 (en) * 2007-05-07 2008-07-17 정도영 A nonslip for stairs and end-piece cap to combine with it

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20190034166A (en) * 2019-03-12 2019-04-01 초연결 주식회사 Repair method of outer wall girt of concrete building and maintenance method of exterior wall using the repairing means
KR102274239B1 (en) * 2021-04-22 2021-07-07 유지씨 주식회사 Repair unit for roof railing repair and roof railing repair method using the repair unit

Also Published As

Publication number Publication date
KR101621757B1 (en) 2016-05-17

Similar Documents

Publication Publication Date Title
KR101239383B1 (en) External heat insulating panel assembly and construction method for external heat insulation of building
KR20060008263A (en) Panel system
KR101621757B1 (en) Construction method using panel construction and the construction site construction panel for leaks that occur on the edge of the side edges of the upper and Building
KR20180001570U (en) Exterior panel for construction
US9140003B1 (en) Sillcock shroud for weatherproofing a sillcock
KR102063361B1 (en) Remodeling construction method for building outside wall
KR20130139663A (en) Frame assembly for fixing of interior and exterior panel
WO2015146475A1 (en) Panel attachment structure
KR101046222B1 (en) Method for remodelling a water tank using an enameled panel
KR101410013B1 (en) Marking tool for benchmark
RU49061U1 (en) DECORATIVE PROFILE FASTENING ASSEMBLY
JP6274613B2 (en) Sealing method and structure of joint gap
US20150135628A1 (en) System and method of stonework installation
KR102274239B1 (en) Repair unit for roof railing repair and roof railing repair method using the repair unit
KR101633604B1 (en) How to repair the ceiling by means of a clean ceiling and the clean means for building maintenance
JP2002371754A (en) Opening part remodeling frame
JP5893653B2 (en) Method for producing draining material using waterproof sheet
KR101038916B1 (en) Framing type inside wall finish structure of concrete water tank
KR20200022058A (en) constructing line
JP2012046884A (en) Panel joint structure
JP3005390U (en) Surface finishing structure of ALC outer wall surface and covering sheet material used for this
JPH0460041A (en) Finishing unit panel and tiled curtain wall
KR101325771B1 (en) Pollution prevention and leaks around window frames for repair parts repair material
JP2021116544A (en) Decorative modesty panel, outer wall repair structure, and repair method for outer wall material
CN103758346A (en) Inner wall decorating method and external corner protective part

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E601 Decision to refuse application
AMND Amendment
X701 Decision to grant (after re-examination)
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20190220

Year of fee payment: 4