KR20140117783A - Train apparatus for crane operation - Google Patents

Train apparatus for crane operation Download PDF

Info

Publication number
KR20140117783A
KR20140117783A KR1020130032459A KR20130032459A KR20140117783A KR 20140117783 A KR20140117783 A KR 20140117783A KR 1020130032459 A KR1020130032459 A KR 1020130032459A KR 20130032459 A KR20130032459 A KR 20130032459A KR 20140117783 A KR20140117783 A KR 20140117783A
Authority
KR
South Korea
Prior art keywords
training
crane
operation panel
image
trainee
Prior art date
Application number
KR1020130032459A
Other languages
Korean (ko)
Other versions
KR101462407B1 (en
Inventor
신상호
김광태
성진호
한지윤
강효주
Original Assignee
(주)토탈소프트뱅크
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)토탈소프트뱅크 filed Critical (주)토탈소프트뱅크
Priority to KR1020130032459A priority Critical patent/KR101462407B1/en
Publication of KR20140117783A publication Critical patent/KR20140117783A/en
Application granted granted Critical
Publication of KR101462407B1 publication Critical patent/KR101462407B1/en

Links

Images

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B9/00Simulators for teaching or training purposes
    • G09B9/02Simulators for teaching or training purposes for teaching control of vehicles or other craft
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B19/00Teaching not covered by other main groups of this subclass
    • G09B19/16Control of vehicles or other craft
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B19/00Teaching not covered by other main groups of this subclass
    • G09B19/24Use of tools
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B5/00Electrically-operated educational appliances
    • G09B5/02Electrically-operated educational appliances with visual presentation of the material to be studied, e.g. using film strip

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • General Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Control And Safety Of Cranes (AREA)
  • Electrically Operated Instructional Devices (AREA)

Abstract

The present invention relates to a training apparatus for a crane operation, which enables a crane drive trainee to train for the operation of a crane, and which not only enables systematic training based on virtual reality in a simulation apparatus similar to a real crane cockpit, but also analyzes and evaluates the quantitative result of the training. Therefore, the training apparatus for a crane operation according to the present invention provides operating situations for various kinds of cranes based on virtual reality to enable a trainee to train for various types of crane operating situations, thereby reducing a training space, time, apparatus costs, etc., and to not only reduce risk of safety accident of a trainee in a beginner level, but also have an advantage of growing a trained technician.

Description

크레인 운전 훈련장치 {TRAIN APPARATUS FOR CRANE OPERATION}[0001] TRAIN APPARATUS FOR CRANE OPERATION [0002]

본 발명은 크레인 운전 훈련자가 크레인 운전을 훈련할 수 있는 크레인 운전 훈련장치에 관한 것으로서, 실제 크레인의 조정석과 유사한 모의 장비에서 가상현실 기반으로 체계적으로 훈련할 뿐 아니라 정량적인 훈련의 결과를 분석 및 평가할 수 있는 크레인 운전 훈련장치 관한 것이다.The present invention relates to a crane driving training device capable of training a crane driving trainer to train a crane driving train. The present invention not only systematically trains a virtual reality based simulator similar to a cockpit of an actual crane but also analyzes and evaluates the results of quantitative training Which is a crane driving training device.

일반적으로 크레인은 제조, 설비, 항만, 자동차 등의 전 산업분야에서 중량물을 이동할 때에 가장 많이 활용되는 장비이다.Generally, crane is the most used equipment when moving heavy goods in all industries such as manufacturing, facilities, port, and automobile.

보통, 크레인은 주행장치(Gantry), 횡행장치(Trolley), 권상권하장치(Hoist)로 구성되고, 크레인에 달 수 있는 달기 기구로는 와이어로프(Wire Rope : 와이어를 중량물의 후크에 걸어서 들어 올리는 달기기구), 마그네트리프트(Magnet Lift : 전자석을 이용하여 철판 등을 들어 올리는 달기기구), C 훅(C Hook : 코일 운반을 위해 특화된 달기기구), 클램프 (Clamp : 철 구조물을 집어 들어 올릴 때 사용하는 달기기구), 리프트(Lift : 코일 혹은 철판을 들어 올릴 때 사용하는 달기 기구), 바스켓(Basket : 흙이나 고철 형태의 산업자재를 운반할 때 사용하는 달기기구) 등이 있으며, 산업현장의 요구에 맞게 적절한 달기기구를 제작하여 사용하기도 한다.Usually, a crane is composed of a gantry, a trolley, and a hoist. A crane can be attached to a crane by means of a wire rope (C-Hook), clamp (Clamp), which is used to lift the steel structure, is used to lift the steel structure. Lifts (lifting devices used to lift coils or steel plates), and basket (basketing devices used to transport industrial materials in the form of soil or scrap iron). It is also used to make appropriate diving equipment to suit your needs.

이때, 크레인 운전은 지상의 레일 방향으로 이동하는 주행동작, 크레인 대차의 레일 방향으로 이동하는 횡행동작, 지상에서 상하로 이동하는 권상권하동작으로 구분된다.At this time, the crane operation is divided into a running operation for moving in the ground rail direction, a traverse operation for moving the crane truck in the rail direction, and a tilting operation for moving up and down from the ground.

또한, 크레인의 운전방법으로는 캐빈 탑승형, 유선 팬던트형, 무선 리모콘형으로 나눠지며, 캐빈 탑승형은 크레인 상방에 운전석이 별도로 정해져있어 운전자가 크레인 운전만을 전담하여 하방을 향해서 운전하며, 유선 팬던트형 또는 무선 리모콘형은 지상에서 현장의 작업자가 정면 또는 상방을 향해서 크레인 운전을 겸하는 방식이다.The operation of the crane is divided into a cabin type, a wire pendant type and a wireless remote control type. In a cabin type, a driver's seat is separately set above the crane, Type or wireless remote control type is a method in which a worker on the ground is used to operate the crane either directly or upwardly.

이와 같이, 여러가지 방식의 크레인 운전에서 가장 중요한 것은 전후좌우 및 상하로 중량물을 이동하면서 중량물의 진동에 의한 진폭을 최소화하고, 중량물의 흔들림에 영향을 주는 요소는 중량물의 크기, 중량물의 무게, 중량물의 무게편심, 이동속도, 와이어의 길이 등이며, 운전자는 전후좌우의 속도와 방향을 조정하여 최소화하는 것이다.In this way, the most important factor in crane operation in various ways is to minimize the amplitude caused by the vibration of the heavy object while moving the heavy object to the front and rear, left and right and up and down, and factors affecting the movement of the heavy object include the size of the heavy object, Weight eccentricity, speed of movement, length of wire, etc., and the driver adjusts the speed and direction of the front, rear, left and right to minimize.

그런데, 크레인은 거대한 장비이기 때문에 운전 시에 조작 미숙으로 인하여 화물 낙마, 기물 파손, 크레인 파손, 인명 사고 등의 안전사고가 많이 일어날 수 있으며, 이를 위하여 한국산업인력공단에서는 천장크레인운전기능사, 컨테이너크레인운전기능사, 타워크레인운전기능사, 기중기운전기능사 등 대형 크레인 장비를 안전하게 운전할 수 있는 기능 인력들을 양성하여 자격증을 발급하고 있는 실정이다.However, since the crane is a huge equipment, there are a lot of safety accidents such as cargo riding, property damage, crane damage, and human accidents due to inoperability during operation. For this purpose, Such as driving engineer, driving engineer, tower crane driving engineer, and crane driver engineer, in order to operate the large crane equipment safely.

그런데, 크레인을 운전할 수 있는 기능 인력들을 양성하기 위하여 실제 크레인에서 연습하는 것이 가장 좋지만, 고가일 뿐 아니라 거대한 크기의 실제 크레인을 이용하여 훈련하기 어려운 실정이다.However, it is best to practice on a real cranes to cultivate functional personnel capable of driving a crane, but it is not only expensive but also difficult to train using huge cranes.

따라서, 다양한 형태의 크레인에 맞추어 실제 작업 현장 및 상황에 능동적으로 대처할 수 있는 가상훈련 기반으로 크레인의 운전 연습할 수 있는 장치가 요구되고 있다.Accordingly, there is a demand for an apparatus that can practice driving of a crane as a virtual training base capable of actively coping with actual work sites and situations according to various types of crane.

본 발명은 상기한 종래 기술의 문제점을 해결하기 위하여 안출된 것으로서, 크레인의 종류에 따라 운전 연습하는 훈련 영상을 다양한 각도에서 제공할 수 있는 크레인 운전 훈련장치를 제공하는데 그 목적이 있다.SUMMARY OF THE INVENTION It is an object of the present invention to provide a crane driving training device capable of providing training images to be exercised according to the type of crane at various angles.

또한, 본 발명은 크레인의 종류에 따라 운전 연습하는 조작패널을 다양하게 제공할 수 있는 크레인 운전 훈련장치를 제공하는데 그 목적이 있다.It is another object of the present invention to provide a crane operation training device capable of variously providing operation panels to practice driving according to the type of crane.

또한, 본 발명은 크레인의 운전 상황 중에 물리적인 상태를 분석하여 가시화하여 실제 환경과 유사한 환경을 제공할 수 있는 크레인 운전 훈련장치를 제공하는데 그 목적이 있다.It is another object of the present invention to provide a crane operation training device capable of providing an environment similar to an actual environment by analyzing and visualizing a physical state during operation of the crane.

또한, 본 발명은 크레인의 운전 훈련결과를 수집하여 체계적으로 관리할 수 있는 크레인 운전 훈련장치를 제공하는데 그 목적이 있다.Another object of the present invention is to provide a crane operation training device capable of collecting and managing system operation results of a crane.

본 발명은 훈련자가 앉아서 크레인 운전을 훈련할 수 있는 테이블 형태의 멀티 플랫폼; 상기 멀티 플랫폼에 입체적으로 탈착되고, 크레인에서 볼 수 있는 영상을 서로 다른 각도에서 연속적으로 제공하는 복수개의 영상 스크린; 상기 멀티 플랫폼에 탈착되고, 크레인의 조작레버와 버튼과 스위치 및 램프가 구비된 조작패널; 상기 영상 스크린들에 표시된 영상을 보면서 작업자가 상기 조작패널을 통한 입력 신호를 기반으로 물리적 현상을 처리한 다음, 영상 처리를 수행하는 영상 제어부; 및 훈련자에게 적합한 훈련환경을 설정하고, 상기 영상 제어부로부터 입력된 정보를 기반으로 훈련 정보를 가시화하는 훈련 제어부;를 포함하는 크레인 운전 훈련장치를 제공한다.The present invention relates to a multi-platform, table-like platform in which a trainee can sit and train a crane driving; A plurality of image screens that are three-dimensionally attached to and detached from the multi-platform and continuously provide images viewed from the cranes at different angles; An operation panel detachably attached to the multi-platform and having an operation lever, a button, a switch, and a lamp of the crane; An image control unit for performing an image process after an operator processes physical phenomenon based on an input signal through the operation panel while watching an image displayed on the image screens; And a training control unit for setting a training environment suitable for the trainee and visualizing the training information based on the information input from the image control unit.

상세하게, 상기 멀티 플랫폼은, 상기 영상 스크린들이 탈착될 수 있는 스크린 거치대와, 상기 조작패널이 탈착될 수 있는 조작패널 거치대를 포함할 수 있다.In detail, the multiplatform may include a screen holder on which the image screens can be detached, and an operation panel holder on which the operation panel can be detached.

상세하게, 상기 스크린 거치대는, 상기 영상 스크린의 배면을 지지하는 복수개의 스크린 가이드와, 상기 스크린 가이드들을 설정 각도로 연결하는 복수개의 조립 클램프를 포함할 수 있다.In detail, the screen holder may include a plurality of screen guides for supporting a rear surface of the image screen, and a plurality of assembly clamps for connecting the screen guides at a predetermined angle.

보다 상세하게, 상기 스크린 거치대는, 상기 영상 스크린들을 작업자 시야를 기준으로 정면과 하방과 상방 중에 선택적으로 장착하도록 설치될 수 있다.More specifically, the screen stand may be installed to selectively mount the image screens on the front, lower, and upper sides based on an operator's field of view.

이때, 상기 조립 클램프들은 상기 스크린 가이드들을 135°또는 105°각도로 연결하도록 구성될 수 있다.At this time, the assembly clamps may be configured to connect the screen guides at an angle of 135 ° or 105 °.

또한, 상기 조작패널 거치대는, 상기 조작패널의 일면에 구비된 한 쌍의 돌기가 끼워질 수 있는 홈이 구비될 수 있다.In addition, the operation panel holder may be provided with a groove into which a pair of projections provided on one surface of the operation panel can be fitted.

상세하게, 상기 조작패널은 천장크레인, 컨테이너크레인, 타워크레인, 기중기 중 하나의 조작패널로 구성될 수 있다.In detail, the operation panel may be composed of a control panel of one of a ceiling crane, a container crane, a tower crane, and a crane.

상세하게, 상기 영상 제어부는, 상기 조작패널을 통한 입/출력 신호를 전달하는 제어처리부와, 상기 제어처리부로부터 입력된 신호를 비롯하여 크레인, 장애물 등의 물리적인 특성을 반영하여 위치정보를 전달하는 물리처리부와, 상기 제어처리부로부터 입력된 위치정보를 반영한 훈련 시나리오를 로딩하여 상기 영상 스크린들에 연속된 화면으로 제공하고, 훈련하는 동안 각종 평가 및 시지를 처리하는 영상처리부를 포함할 수 있다.In detail, the image control unit includes a control processing unit for transmitting input / output signals through the operation panel, and a physical controller for receiving the signals input from the control processing unit and reflecting the physical characteristics of the crane, And an image processing unit for loading the training scenarios reflecting the positional information inputted from the control processing unit and providing them to the continuous screens on the video screens and processing various evaluations and scenes during the training.

상세하게, 상기 훈련 제어부는, 크레인의 높이, 크기, 속도 및 무게와, 크레인에 갈리는 기구의 종류, 크기, 무게 및 편심 정보를 입력하여 상기 물리처리부로 전달하여 크레인 제원설정부와, 현장 작업을 훈련하도록 각종 장애물 및 훈련코스를 설정하는 훈련시나리오 설정부와, 훈련자가 훈련 진행 중에 각종 평가항목과 훈련의 방향성을 제시하는 훈련평가항목설정부와, 훈련자가 훈련 진행 후에 상기 훈련평가항목설정부에서 설정한 항목을 기반으로 훈련에 대한 평가 및 성과를 관리해주는 성과관리부와, 상기 영상처리부의 정보를 수집하여 훈련자의 훈련성과를 표시하는 훈련성과모니터링부와, 상기 조작패널을 조작하는 과정을 표시하는 조작패널모니터링부를 포함할 수 있다.In detail, the training control unit inputs the height, size, speed, and weight of the crane, the type, size, weight, and eccentricity information of the crane, and transmits the information to the physical processing unit, A training scenario setting unit for setting various obstacles and a training course for training, a training evaluation item setting unit for presenting various evaluation items and a training direction during a training of a trainee, A training performance monitoring unit for collecting information of the image processing unit and displaying the training results of the trainee and a process of operating the operation panel, And an operation panel monitoring unit.

본 발명에 따른 크레인 운전 훈련장치는 영상 스크린들을 멀티 플랫폼에 구비된 스크린 가이드들에 설정각도의 조립 클램프들을 이용하여 탈착함으로써, 크레인의 종류에 따라 훈련 영상을 다양한 각도에서 제공할 뿐 아니라 영상 스크린들의 설치 비용을 절감시키고, 크레인의 운전 상황을 훈련자의 시야에서 볼 때 실제와 유사한 가상 현실을 구현할 수 있는 이점이 있다.The crane operation training apparatus according to the present invention removes the image screens by using the assembly clamps of the set angle on the screen guides provided on the multiplatform, thereby providing the training image in various angles according to the type of the crane, It has the advantage of reducing the installation cost and realizing a realistic virtual reality when the driver's view of the crane is seen from the viewpoint of the trainee.

또한, 본 발명은 크레인의 종류에 따라 다양한 조작패널을 별도로 구비하더라도 조작패널의 돌기들을 멀티 플랫폼의 홀들에 탈착함으로써, 크레인의 종류에 따라 적합한 조작패널을 제공할 뿐 아니라 손쉽게 탈착시킬 수 있고, 훈련자로 하여금 크레인의 실제 조작원리를 빠르게 습득시킬 수 있는 이점이 있다.Further, according to the present invention, even if various operation panels are separately provided according to the type of crane, the protrusions of the operation panel are detachably attached to the multi-platform holes to provide an operation panel suitable for the type of crane, There is an advantage that the user can quickly learn the operation principle of the crane.

또한, 본 발명은 멀티 플랫폼에 내장된 영상 제어부가 크레인 시험, 선택코스, 장애물 등에 따라 가변될 수 있는 크레인의 운전 상황에 적합한 물리적 상태를 분석하여 영상 스크린들을 통하여 가시화함으로써, 크레인의 운전 상황을 실제와 유사한 가상 현실로 구현할 수 있어 크레인 시험에서 합격률을 높일 뿐 아니라 실제 크레인 운전 상황에서 현장적응력을 높일 수 있으며, 실제 크레인을 사용하지 않더라도 크레인 운전 훈련을 할 수 있어 소음과 진동 저감을 통한 쾌적한 훈련 환경을 제공하며, 나아가 에너지 및 비용을 절감시킬 수 있는 이점이 있다.In addition, the present invention can analyze the physical condition suitable for the operation state of the crane, which can be varied according to the crane test, the selection course, the obstacle, etc., , It can increase the pass rate in the crane test and increase the field adaptability in actual crane operation situation. Also, it is possible to train the crane without using the actual crane, and it is possible to provide a comfortable training environment And furthermore, there is an advantage that energy and cost can be saved.

또한, 본 발명은 훈련 제어부가 영상 스크린들과 조작패널과 운전 제어부로부터 전송되는 크레인의 운전 훈련결과를 수집하여 체계적으로 관리함으로써, 신속하고 정확한 운전 훈련 평가가 이뤄지고, 부족한 평가 항목에 대한 피드백이 가능하여 반복 훈련 시에 집중적으로 훈련시킬 수 있으며, 나아가 크레인의 운전 훈련결과에 대한 성과 관리를 통하여 훈련자의 운전능력에 따라 교육기간을 단축시킬 뿐 아니라 훈련 효과를 증대시킬 수 있는 이점이 있다.In addition, the present invention collects and systematically manages the operation training results of the crane transmitted from the video screens, the operation panel, and the operation control unit, so that the training control unit can perform quick and accurate driving training evaluation and feedback on the insufficient evaluation items In addition, there is an advantage that the training effect can be increased as well as shortening the training period according to the driving ability of the trainee through performance management of the result of the driving training of the crane.

따라서, 본 발명에 따른 크레인 운전 훈련장치는 다양한 종류의 크레인에 맞는 운전 상황을 가상 현실 기반으로 제공함으로써, 훈련자가 다양한 형태의 크레인의 운전 상황을 훈련할 수 있어 훈련 공간 및 시간, 장비 비용 등을 절감시킬 수 있고, 초보인 훈련자의 안전사고에 대한 위험을 감소시킬 뿐 아니라 숙련된 기능 인력을 양성할 수 있는 이점이 있다.Therefore, the crane operation training apparatus according to the present invention can provide the driving situation corresponding to various kinds of crane based on the virtual reality, so that the trainee can train the driving conditions of various types of crane, It has the advantage of being able to reduce the risk of safety accidents for novice trainees as well as nurture skilled workforce.

도 1은 본 발명의 실시예에 따른 크레인 운전 훈련장치의 사시도.
도 2는 본 발명의 실시예에 따른 크레인 운전 훈련장치의 구성도.
도 3 내지 도 4는 본 발명의 실시예에 따른 크레인 운전 훈련장치에 적용된 멀티 플랫폼이 도시된 사시도.
도 5는 본 발명의 실시예에 따른 크레인 운전 훈련장치에 적용된 스크린 가이드가 도시된 사시도.
도 6a 내지 도 6b는 본 발명의 실시예에 따른 크레인 운전 훈련장치에 적용될 수 있는 클램프의 실시예들이 도시된 정면도.
도 7은 본 발명의 실시예에 따른 크레인 운전 훈련장치에 적용된 영상 스크린의 정착구조가 도시된 사시도.
도 8은 본 발명의 실시예에 따른 크레인 운전 훈련장치에 적용된 조작패널의 착탈구조가 도시된 사시도.
도 9a 내지 도 9b는 본 발명의 실시예에 따른 크레인 운전 훈련장치에 적용될 수 있는 조작패널의 실시예들이 도시된 사시도.
도 10은 본 발명의 실시예에 따른 크레인 훈련과정이 도시된 순서도.
도 11은 본 발명의 실시예에 따른 크레인 운전 훈련과정 및 관리과정이 보다 상세히 도시된 순서도.
1 is a perspective view of a crane operation training device according to an embodiment of the present invention;
2 is a block diagram of a crane operation training device according to an embodiment of the present invention.
3 to 4 are perspective views showing a multi-platform applied to a crane operation training apparatus according to an embodiment of the present invention.
5 is a perspective view illustrating a screen guide applied to a crane operation training device according to an embodiment of the present invention.
6A and 6B are front views illustrating embodiments of a clamp that can be applied to a crane operation training apparatus according to an embodiment of the present invention.
FIG. 7 is a perspective view illustrating a fixing structure of an image screen applied to a crane operation training apparatus according to an embodiment of the present invention; FIG.
FIG. 8 is a perspective view illustrating a detachable structure of an operation panel applied to a crane operation training apparatus according to an embodiment of the present invention; FIG.
9A to 9B are perspective views illustrating embodiments of an operation panel that can be applied to a crane operation training apparatus according to an embodiment of the present invention.
10 is a flowchart showing a crane training process according to an embodiment of the present invention.
FIG. 11 is a flowchart showing a crane driving training process and a management process according to an embodiment of the present invention in more detail. FIG.

이하에서는, 본 실시예에 대하여 첨부되는 도면을 참조하여 상세하게 살펴보도록 한다. 다만, 본 실시예가 개시하는 사항으로부터 본 실시예가 갖는 발명의 사상의 범위가 정해질 수 있을 것이며, 본 실시예가 갖는 발명의 사상은 제안되는 실시예에 대하여 구성요소의 추가, 삭제, 변경 등의 실시변형을 포함한다고 할 것이다. Hereinafter, the present embodiment will be described in detail with reference to the accompanying drawings. It should be understood, however, that the scope of the inventive concept of the present embodiment can be determined from the matters disclosed in the present embodiment, and the spirit of the present invention possessed by the present embodiment is not limited to the embodiments in which addition, Variations.

도 1은 본 발명의 실시예에 따른 크레인 운전 훈련장치의 사시도이다.1 is a perspective view of a crane operation training apparatus according to an embodiment of the present invention.

본 발명에 따른 크레인 운전 훈련장치는 도 1에 도시된 바와 같이 멀티 플랫폼(100)과, 영상 스크린(200)과, 조작패널(300)과, 영상 제어부(400)와, 훈련 제어부(500)를 포함하도록 구성된다. 1, the crane operation training apparatus according to the present invention includes a multi-platform 100, an image screen 200, an operation panel 300, an image control unit 400, and a training control unit 500 .

상기 멀티 플랫폼(100)은 훈련자가 앞에 앉을 수 있는 테이블 형태로 구성되고, 상기 멀티 플랫폼(100)에 상기 영상 스크린(200)과 조작패널(300)이 선택적으로 장착될 뿐 아니라 상기 영상 제어부가 내장될 수 있도록 구성된다.The multi-platform 100 is configured in the form of a table in which a trainee can sit in front of the multi-platform 100. In addition to the video screen 200 and the operation panel 300 being selectively mounted on the multi-platform 100, Lt; / RTI >

상기 영상 스크린(200)은 훈련자의 시야를 기준으로 전방, 하방, 상방의 다양한 각도에서 상기 멀티 플랫폼(100)에 입체적으로 장착될 수 있다. 물론, 상기 영상 스크린(200)은 크레인의 종류에 따라 다양한 각도에서 볼 수 있는 화면을 제공하도록 복수개가 구비될 수 있으며, 여러 개의 영상 스크린(200)을 통하여 다양한 각도에서 연속적인 화면을 제공할 수 있도록 한다. 이때, 상기 영상 스크린(200)은 하기에서 설명될 스크린 거치대와 고정 클램프에 의해 상기 멀티 플랫폼(100)에 탈착 가능하게 설치될 수 있지만, 한정되지 아니한다. The image screen 200 may be three-dimensionally mounted on the multi-platform 100 at various angles of forward, downward, and upward based on the field of view of the trainee. Of course, the image screen 200 may be provided with a plurality of images to provide a viewable image at various angles according to the type of the crane, and may provide continuous images at various angles through the plurality of image screens 200 . At this time, the image screen 200 may be detachably installed on the multiplatform 100 by a screen mount and a clamp, which will be described later, but is not limited thereto.

실시예로서, 상기 영상스크린(200)은 표준 인체정보를 이용하여 몰입감을 최대로 느낄 수 있는 크기를 산정한 결과, 40인치 크기의 16:9 화면비율을 가지면서 Full HD 해상도를 가지며, 입력방식이 HDMI인 LED 모니터를 선정할 수 있다. As a result, the image screen 200 has a full HD resolution with a 16: 9 aspect ratio of 40 inches, and has an input method This HDMI LED monitor can be selected.

상기 조작패널(300)은 실제 크레인의 조작패널과 같은 형태로 조작레버와 버튼과 스위치 및 램프가 구비된다. 이때, 상기 조작패널(300)은 천장크레인, 컨테이너크레인, 타워크레인, 기중기 등과 같이 크레인의 종류에 따라 다양하게 구성될 수 있으며, 훈련하고자 하는 조작패널(300)을 선택적으로 상기 멀티 플랫폼(100)에 장착될 수 있다. 물론, 상기 조작패널(300)은 하기에서 설명될 고정돌기와 클램프에 의해 상기 멀티 플랫홈(100)에 탈착 가능하게 설치될 수 있지만, 한정되지 아니한다.The operation panel 300 includes an operation lever, a button, a switch, and a lamp in the same form as an operation panel of an actual crane. The operation panel 300 may be variously configured according to the type of the crane such as a ceiling crane, a container crane, a tower crane, a crane, As shown in FIG. Of course, the operation panel 300 may be detachably attached to the multi-platform 100 by means of a fixing protrusion and a clamp, which will be described later, but is not limited thereto.

상기 영상 제어부(400)는 상기 멀티 플랫폼(100)에 내장된 일종의 컴퓨터 본체로써, 상기 영상 스크린(200) 및 조작패널(300)과 통신할 수 있도록 구성된다. 이때, 상기 영상 제어부(400)는 상기 영상 스크린(200)에 표시된 영상을 보면서 작업자가 상기 조작패널(300)을 통한 입력 신호를 기반으로 물리적 현상을 처리한 다음, 영상 처리를 수행하도록 하는데, 하기에서 보다 상세한 구성을 설명하기로 한다.The image control unit 400 is a kind of computer body built in the multiplatform 100 and is configured to be able to communicate with the image screen 200 and the operation panel 300. At this time, the image controller 400 processes a physical phenomenon based on an input signal through the operation panel 300 while an operator views the image displayed on the image screen 200, and then performs image processing. A more detailed configuration will be described.

상기 훈련 제어부(500)는 관리자에 의해 관리될 수 있는 관리 시스템으로써, 모니터와 컴퓨터 본체로 구성될 수 있으며, 상기 영상 제어부(400)와 통신 가능하게 설치될 수 있다. 이때, 상기 훈련 제어부(500)는 훈련자에게 적합한 훈련환경을 설정할 뿐 아니라 상기 영상 제어부(400)로부터 입력된 정보를 기반으로 훈련 정보를 가시화하도록 구성되며, 하기에서 보다 상세한 구성을 설명하기로 한다.The training control unit 500 may be a management system that can be managed by an administrator, and may include a monitor and a computer main body, and may be installed so as to communicate with the image control unit 400. At this time, the training controller 500 not only sets the training environment suitable for the trainee, but also visualizes the training information based on the information input from the image controller 400, which will be described in more detail below.

이와 같이, 상기 영상 스크린(200)과 조작패널(300) 및 영상 제어부(400)는 상기 멀티 플랫폼(100)이 장착된 상태로 훈련자가 가상 현실을 기반으로 크레인 운전 훈련을 연습하는데 사용되고, 상기 훈련 제어부(500)는 관리자가 훈련환경을 설정할 뿐 아니라 훈련성과를 관리하는데 사용된다.The video screen 200, the operation panel 300, and the video controller 400 are used by the trainee to practice the crane driving training based on the virtual reality while the multiplatform 100 is mounted, The control unit 500 is used by an administrator not only to set up a training environment but also to manage training performance.

도 2는 본 발명의 실시예에 따른 크레인 운전 훈련장치의 구성도이다.2 is a block diagram of a crane operation training device according to an embodiment of the present invention.

상기 영상 스크린(200)과 조작패널(300)은 상기 멀티 플랫폼(100)을 통하여 상기 영상 제어부(400)와 통신 가능하게 연결되고, 상기 영상 제어부(400)도 상기 훈련 제어부(500)와 통신 가능하게 연결된다.The image screen 200 and the operation panel 300 are communicably connected to the image control unit 400 through the multiplatform 100 and the image control unit 400 can communicate with the training control unit 500. [ Lt; / RTI >

상기 영상 제어부(400)는 상기 조작패널(300)을 통하여 입력된 신호를 고려하여 상기 영상 스크린(200)에 영상을 제어할 수 있으며, 실시예에서 영상처리부(410)와, 물리처리부(420)와, 제어처리부(430)를 포함하도록 구성된다.The image control unit 400 may control an image on the image screen 200 in consideration of a signal input through the operation panel 300. In an exemplary embodiment, the image processing unit 410, the physical processing unit 420, And a control processing unit 430, as shown in FIG.

상기 영상처리부(410)는 상기 영상 스크린(200)에 표시되는 영상을 처리하는 부분으로써, 객체의 위치정보를 갱신함에 따라 현실과 같은 화면 영상을 제공할 수 있으며, 평가요소를 포함하는 훈련상태를 하기에서 설명될 훈련결과모니터링부(550)에 기록할 수 있다.The image processing unit 410 processes an image displayed on the image screen 200. The image processing unit 410 can provide a real image as the position information of the object is updated, May be recorded in the training result monitoring unit 550 described below.

실시예에서, 상기 영상처리부(410)는, 훈련환경 3D 모델링, 훈련과정 가이드, 훈련결과 레포팅, 다중화면 영상처리과정을 수행할 수 있다. In an embodiment, the image processing unit 410 may perform training 3D modeling, training course guide, training result reporting, and multi-screen image processing.

상기 훈련환경 3D 모델링은, 교육장 외형 및 건물내부의 시설물이 포함된 교육환경을 구축한다. 또한, 갠트리, 트롤리, 후크, 캐빈 및 중량물이 포함된 크레인을 구축한다. 또한, 후리잡기, 기본코스, 전문코스, 종합코스가 포함된 훈련시나리오를 구축한다. 또한, 폴 장애물, 넘기 장애물, 드럼 장애물 및 벽 장애물을 모델링한 후, 훈련시나리오를 기준으로 장애물을 배치한다. 또한, 배치된 장애물의 속성을 포함하여 훈련 평가의 기준들을 구축한다. 또한, 크레인의 기계음을 녹취하고, 바닥과 장애물 등의 충돌음을 녹취한 다음 튜닝을 하여 훈련환경 3D 모델링을 완료한다. The training environment 3D modeling establishes an educational environment including a superficial area of a superintendent and facilities inside the building. In addition, a crane containing gantry, trolley, hook, cabin and heavy object is constructed. In addition, we construct training scenarios that include catching, basic courses, specialized courses, and comprehensive courses. In addition, after modeling the pole obstacle, jumping obstacle, drum obstacle and wall obstacle, the obstacle is arranged based on the training scenario. It also establishes the criteria for training evaluation, including the attributes of the placed obstacles. In addition, we record the mechanical sound of the crane, record the collision sound of the floor and obstacles, and then perform the tuning to complete the training environment 3D modeling.

상기 훈련과정 가이드는, 문자 및 음성으로 충돌, 범위이탈, 현재 크레인정보 등을 훈련자에게 즉각적으로 제공하여 훈련효과를 높일 수 있다. The training course guide can improve the training effect by immediately providing the trainee with collision, out of range, current crane information, etc. with text and voice.

상기 훈련결과 레포팅은, 훈련시나리오 성공유무, 충돌 횟수, 범위이탈 횟수 등 평가항목을 훈련이 끝난 시점에 훈련자에게 보여줌으로서 즉각적인 훈련결과를 피드백할 수 있다. The training result reporting can instantly feedback the training results by showing the trainee at the end of the training evaluation items such as the success or failure of the training scenario, the number of collisions, and the number of out of range.

상기 다중화면 영상처리과정은, 상기 영상 스크린들(200)에서 제공하는 영상스크린의 개수, 각도 및 해상도에 대하여 화면을 다중으로 분할하여 제공할 수 있다.The multi-screen image processing may divide the screen into multiple screens for the number, angle, and resolution of the image screens provided by the image screens.

상기 물리처리부(420)는 상기 영상처리부(410)의 상태를 분석하여 크레인, 장애물 등의 물리적 현상을 처리한 다음, 객체의 위치정보를 다시 상기 영상처리부(410)로 전송할 수 있다.The physical processor 420 analyzes the state of the image processor 410 and processes physical phenomena such as a crane or an obstacle and then transmits the position information of the object to the image processor 410. [

실시예에서, 상기 물리처리부(420)는 후크 Dynamics, 장애물 Collision, 범위이탈 Detection, 달기기구 등의 물리적 현상을 처리할 수 있다. In an embodiment, the physical processor 420 may process physical phenomena such as hook dynamics, obstacle collision, range-out detection,

보통, 크레인은 일반적으로 캐빈을 중심으로 크레인을 좌, 우측으로 이동하는 동작으로, 운전방법은 운전 레버를 동작하면 해당 방향으로 레일을 따라 크레인이 이동하는 주행동작(Gantry), 트롤리를 전방 또는 후방으로 이동시킴으로서 트롤리 하부에 설치된 후크에 운송물을 매달아 전동기의 속도제어로 운전하는 횡행동작(Trolley), 전동기의 정, 역회전에 의해 와이어 드럼에 감겨 있는 와이어 로프를 통하여 화물을 상방 또는 하방으로 옮기는 권상/권하동작(Hoist)으로 구성된다.Generally, a crane is generally an operation of moving a crane to a left or right side around a cabin, a driving method is a gantry in which a crane moves along a rail in a corresponding direction when a driving lever is operated, To move the cargo upward or downward through the wire rope wound on the wire drum by forward and reverse rotation of the motor by moving the cargo to the hook installed on the lower part of the trolley by the speed control of the motor / Hoist motion.

상기 후크 Dynamics는 크레인 기능에서 가장 중요한 기능으로 와이어와 후크, 중량물의 관성 법칙과 진자 운동이 포함된 동역학이 적용되며, 크레인과 와이어, 와이어와 후크, 후크와 추의 관계를 운동 제약조건으로 설정한 후, 후크와 중량물의 무게에 의한 지구 중력운동의 특성이 포함된다. The hook dynamics is the most important function in the crane function. The dynamics including the inertia law of the wire and the hook and the pendulum motion are applied to the crane, and the relation between the crane and the wire, the wire and the hook, And features of gravitational motion by weight of hooks and heavy objects.

상기 장애물 Collision은 장애물 및 바닥과 중량물 또는 후크의 충돌현상이 제공되며, 장애물이 중량물 또는 후크에 부딪혔을 경우, 자연법칙에 의해 넘어지는 현상이 제공된다. 또한, 넘기 장애물을 넘어갈 경우 충돌현상 및 떨어지는 현상의 구현이 포함된다. The obstacle collision is provided with a collision phenomenon between an obstacle and a floor and a heavy object or a hook, and when the obstacle is hit by a heavy object or a hook, a phenomenon of falling due to natural laws is provided. In addition, it includes implementation of collision phenomenon and falling phenomenon when crossing over obstacle.

상기 범위이탈 Detection은 훈련자가 훈련할 시에 코스를 이탈할 경우, 이를 파악하여 경보 발생 기능이 적용된다. 또한 물리처리부에서 발생한 객체의 위치정보는 영상처리부로 전송되며, 영상처리부에서는 객체이동에 대한 영상을 처리하고 평가항목에 의한 결과를 저장하는 기능이 포함된다.When the trainer leaves the course at the time of training, the out-of-range detection detects the out-of-range detection and the alarm generating function is applied. Also, the position information of the object generated in the physical processing unit is transmitted to the image processing unit, and the image processing unit includes a function of processing the image of the object movement and storing the result of the evaluation item.

상기 달기기구는 상기 후크에는 여러 가지 종류가 될 수 있으며, 상기 달기기구로는 와이어로프(Wire Rope : 와이어를 중량물의 후크에 걸어서 들어 올리는 달기기구), 마그네트리프트(Magnet Lift : 전자석을 이용하여 철판 등을 들어 올리는 달기기구), C 훅(C Hook : 코일 운반을 위해 특화된 달기기구), 클램프 (Clamp : 철 구조물을 집어 들어 올릴 때 사용하는 달기기구), 리프트(Lift : 코일 혹은 철판을 들어 올릴 때 사용하는 달기 기구), 바스켓(Basket : 흙이나 고철 형태의 산업자재를 운반할 때 사용하는 달기기구) 등이 있으며, 각 달기기구별로 물리적인 특성을 설정할 수 있다.The hooking mechanism may be various kinds of hooking mechanisms. Examples of the hooking mechanism include a wire rope (a mechanism for lifting a wire by hooking a hook on a heavy object), a magnet lift Lifts the coil or iron plate, lifts the coil or the iron plate, lifts the coil or iron plate, lifts the coil or the iron plate, And basket (basket), which is used to transport industrial materials in the form of soil or scrap iron. The physical characteristics can be set for each mechanism.

상기 제어처리부(430)는 훈련자가 상기 조작패널(300)을 통해 입력하는 조작신호를 수신하여 상기 물리처리부(420)로 전송할 수 있으며, 상기 조작패널(300)을 조작하는 훈련상태를 하기에서 설명될 조작패널모니터링부(560)에 기록할 수 있다.The control processor 430 may receive an operation signal input by the trainee through the operation panel 300 and may transmit the operation signal to the physical processor 420. The operation state of the operation panel 300 may be described below To the operation panel monitoring unit 560, which will be described later.

실시예에서, 상기 제어처리부(430)는 RS232C 통신방식의 USB 포트를 사용하며, 통신프로토콜관리, 제어보드로 신호 송수신 기능을 포함한다. In the embodiment, the control processor 430 uses a USB port of the RS232C communication method, and includes a communication protocol management function and a signal transmission / reception function to the control board.

따라서, 상기 제어처리부(430)의 기동 시에 통신 프로토콜을 초기화하는데, 제어보드와 조작패널을 Control off 상태로 초기화한다. 이때, Control off 버튼램프를 제외한 모든 램프는 Off 상태 명령을 송신한다. 훈련시에는 제어보드로부터 상기 조작패널(300)에서 입력되는 조작레버, 버튼 램프, 스위치의 신호를 상기 물리제어부(420)로 전달하며, 상기 물리제어부(420)로부터 발생하는 램프 등의 신호를 제어보드를 통해 상기 조작패널(300)로 전달하는 역할을 한다. Therefore, in initializing the communication protocol when the control processor 430 is started, the control board and the operation panel are initialized to the control off state. At this time, all lamps except the control off button lamp send Off status command. A button lamp and a switch signal input from the operation panel 300 from the control board to the physical controller 420 and controls a signal such as a lamp generated from the physical controller 420 To the operation panel 300 through the board.

상기 훈련 제어부(500)는 관리자의 설정에 의해 상기 영상 제어부(400)와 연동하면서 훈련과정을 모니터링 및 관리하도록 제어할 수 있다. The training control unit 500 may control the monitoring and management of the training process in cooperation with the image control unit 400 according to the setting of the administrator.

이때, 상기 훈련 제어부(500)는 후리잡기, 기본코스, 전문코스 및 종합코스의 환경을 설정하는 코스관리와, 크레인의 물리적인 제원을 설정하는 제원관리와, 훈련시 필요한 성과항목을 설정하거나 종료조건을 설정하는 훈련관리와, 훈련기록정보, 해상도 등 시스템 전반적인 운영환경을 관리하는 환경관리와, 훈련자의 정보를 입력함으로써 교수자와의 연계, 기수관리, 성과관리를 수행할 수 있는 사용자관리와, 훈련자의 성과를 분석평가하기 위한 성과관리를 수행하도록 구성된다. At this time, the training control unit 500 may be configured to perform course management for setting the environment of the picking, basic course, specialized course, and comprehensive course, specification management for setting physical specifications of the cranes, A user management that can perform a linkage with the instructor, rider management, and performance management by inputting the information of the trainee, And perform performance management to analyze and evaluate the performance of the trainee.

보다 상세하게, 상기 훈련 제어부(500)는 실시예에서 크레인제원설정부(510)와, 훈련형가항목설정부(520)와, 훈련시나리오설정부(530)와, 성과관리부(540)와, 훈련결과모니터링부(550)와, 조작패널모니터링부(560)를 포함하도록 구성된다.More specifically, the training control unit 500 includes a crane specification setting unit 510, a training type setting unit 520, a training scenario setting unit 530, a performance management unit 540, A result monitoring unit 550, and an operation panel monitoring unit 560.

상기 크레인제원설정부(510)는 크레인의 높이, 크기, 속도, 무게와, 달기기구의 종류, 크기, 무게, 편심정보 등을 입력 받으면, 해당 신호를 상기 물리처리부(510)로 전달할 수 있다.The crane specification setting unit 510 may transmit the signal to the physical processing unit 510 upon receipt of the height, size, speed, weight, type, size, weight, and eccentricity information of the crane.

실시예로서, 상기 크레인제원설정부(510)에서 훈련하고자 하는 대상 크레인의 권상/권하 속도, 횡행속도, 주행속도, 정격하중, 레일스팬, 트롤리 높이, 레일길이 및 운전방식을 설정하여 입력할 수 있다. As an embodiment, the hoisting / winding speed, traverse speed, running speed, rated load, rails fan, trolley height, rail length, and operation method of the target crane to be trained can be set and inputted in the crane specification setting unit 510 have.

보다 상세하게, 상기 크레인제원설정부(510)를 통하여 설정될 수 있는 세부 설정내용으로는 권상권하 1~4단 속도 및 가속도, 횡행 1~4단 속도/가속도/미끌림, 주행 1~4단 속도/가속도/미끌림, 크레인 형상/무게, 후크 형상/무게, 중량물 형상/무게, 폴 장애물 형상/무게, 드럼 장애물 형상/무게, 넘기 장애물 형상/무게, 중량물 진폭/진동수 등을 포함할 수 있다.More specifically, the detailed setting contents that can be set through the crane specification setting unit 510 include 1 ~ 4 speed / acceleration, 1 ~ 4 speed / acceleration / slip, 1 ~ 4 speed Speed / acceleration / slip, crane shape / weight, hook shape / weight, weight shape / weight, pole obstacle shape / weight, drum obstacle shape / weight, overhang obstacle shape / weight, weight amplitude / frequency.

상기 훈련평가항목설정부(520)는 훈련자가 크레인의 운전 훈련을 진행하는 상황에서 각종 평가항목을 보여주거나, 훈련의 방향성을 제시해 줄 수 있다.The training evaluation item setting unit 520 may show various evaluation items or present the direction of the training in a situation where the trainee carries out the driving training of the crane.

실시예로서, 상기 훈련평가항목설정부(520)에서 훈련 코스별로 넘기 장애물 우회 유무, 벽 장애물 우회 유무, 드럼 장애물 통과 유무, 드럼높이 초과 통과 유무, 드럼에 충돌하여 일정거리 벗어남, 코스범위 일정거리 벗어남, 폴 장애물 일정높이 벗어남, 중량물 지면 닿음 유무, 규정시간 초과, 폴 장애물 전도횟수, 넘기 장애물 전도 횟수, 벽 장애물 전도 횟수, 코스이탈 횟수, 범위이탈 횟수, 드럼 장애물 충돌횟수를 설정할 수 있으며, 종료조건은 흔들림의 진폭, 운전 훈련 시간, 중량물 위치 등 3가지 조건의 조합으로 결정할 수 있다.As an example, in the training evaluation item setting unit 520, the presence / absence of obstacle avoidance, wall obstacle avoidance, passage of obstacles of the drum, passage of the drum height exceeded, You can set the deviation, the deviation of the pole obstacle to a certain height, the presence or absence of the weight of the heavy object, the time exceeding the specified time, the number of the pole obstacle conduction, the number of passing obstacle obstacle, the number of wall obstacle evacuation, The condition can be determined by a combination of three conditions: amplitude of shaking, driving training time, and weight position.

상기 훈련시나리오설정부(530)는 훈련자가 훈련을 진행하기 전에 후리잡기, 기본코스, 전문코스, 종합코스 등의 훈련코스를 설정하거나, 현장작업을 훈련하기 위하여 각종 장애물 등을 설정할 수 있다.The training scenario setting unit 530 may set various training courses such as a training course, a basic course, a specialized course, a comprehensive course, and various obstacles in order to train the field work before the training of the trainee.

실시예로서, 상기 훈련시나리오설정부(530)에서 훈련코스별 코드형태, 훈련시작위치, 폴 장애물 위치/개수, 드럼 장애물 위치/개수, 벽 장애물 위치/개수, 넘기 장애물 위치/개수를 포함하여 시나리오를 설정할 수 있다. In the embodiment, the training scenario setting unit 530 sets the scenario, including the code type, the training start position, the pole obstacle position / number, the drum obstacle position / number, the wall obstacle position / Can be set.

보다 상세하게, 상기 훈련시나리오설정부(530)에서 후리잡기, 기본코스, 전문코스, 종합코스를 설정할 수 있다. In more detail, the training scenario setting unit 530 can set the picking, basic course, specialized course, and comprehensive course.

기본코스는 중량물의 흔들림을 최소화하면서 수평방향으로 이동을 하는 훈련으로, 1m 간격의 폴 장애물 7개를 수평으로 설치하여 지그재그로 이동하여 출발점으로 복귀하는 훈련으로 구성될 수 있다. The basic course consists of training to move horizontally while minimizing the shaking of heavy objects. It can be composed of training to return to the starting point by moving zigzag by horizontally installing 7 pole obstacles at intervals of 1m.

전문코스는 중량물의 흔들림을 최소화하면서 수평방향과 수직방향으로 이동하는 훈련으로, 기본코스에 1m 간격의 폴 장애물 7개를 1m 간격으로 좌우로 추가로 설치하여 지그재그로 이동하여 출발점으로 복귀하는 훈련으로 구성될 수 있다. Special course is training to move in horizontal direction and vertical direction while minimizing the shaking of heavy objects. It is training to move 7 steps of pole obstacle at 1m interval in 1m interval at 1m intervals to move to zig-zag and return to starting point. Lt; / RTI >

종합코스는 천장크레인기능사 실기시험과 동일한 코스를 가상으로 구축하여 가상의 환경에서 훈련 및 평가를 함으로써 기능사시험에 대비하는 훈련으로 구성될 수 있다.The comprehensive course can consist of training to build up the same course as the ceiling crane technician practical skill test and to prepare for the skill exam by training and evaluation in a virtual environment.

상기 성과관리부(540)는 훈련자가 훈련을 진행한 후에 상기 훈련평가항목설정부(520)에서 설정한 항목을 기반으로 훈련에 대한 평가 및 성과를 관리해 줄 수 있다.The performance management unit 540 may manage the evaluation and the performance of the training based on the items set by the training evaluation item setting unit 520 after the training of the trainee.

실시예로서, 상기 성과관리부(540)에서 관리되는 훈련성과 리스트로는 기수, 아이디, 훈련자, 훈련일자, 훈련명, 결과, 주행시간, 주행거리, 장애물, 코스이탈, 범위이탈의 정보가 포함될 수 있다. As an example, the training performance list managed by the performance management unit 540 may include information such as a rider, an ID, a trainee, a training date, a training name, a result, a driving time, a mileage, an obstacle, have.

보다 상세하게, 상기 성과관리부(540)의 동작을 살펴보면, 상기 기수, 아이디, 훈련자, 훈련기간, 훈련명을 입력한 다음, 보기버튼을 누르면, 입력한 정보에 해당하는 결과가 훈련성과 리스트에 출력된다. More specifically, the operation of the performance management unit 540 will be described below. If the user presses the view button after inputting the rider, ID, trainee, training period, and training name, do.

이때, 상기 훈련성과 리스트에서 하나의 훈련 행을 더블 클릭하면, 훈련기록지를 확인할 수 있다. 또한, 성과 관리의 통계버튼을 누르면, 상기 훈련성과 리스트의 화면에 출력된 내용을 통계하여 통계 리스트 화면에 출력하고, 상기 통계 리스트의 행을 클릭하게 되면, 우측에 훈련성공률 그래프가 나타난다. 물론, 상기 통계 리스트 데이터는 아이디, 코스, 도전횟수, 성공횟수, 성공률을 포함하며, 그래프는 기간에 따른 훈련성공률 변화 추이를 확인할 수 있다.At this time, if one training row is double-clicked on the training performance list, the training recording sheet can be confirmed. Also, when the statistics button of the performance management is clicked, the contents outputted on the screen of the training achievement list are statistically outputted to the statistical list screen, and when the row of the statistical list is clicked, the graph of the training success rate is displayed on the right side. Of course, the statistical list data includes the ID, the course, the number of challenges, the number of successes, and the success rate, and the graph shows the change in the success rate of the training according to the period.

상기 훈련결과모니터링부(550)는 훈련자가 훈련하는 동안 상기 영상처리부(410)의 정보를 수집하여 훈련자의 훈련성과를 관리자가 볼 수 있도록 표시해줄 수 있다.The training result monitoring unit 550 may collect the information of the image processing unit 410 during the training of the trainee so that the training result of the trainee can be displayed for the administrator to view.

실시예에서, 상기 훈련결과모니터링부(550)는 훈련자의 훈련결과를 표현해 주는 훈련기록지, 훈련자의 성과를 훈련기록통계, 교수자가 관리하는 훈련자들의 성과를 표현해 주는 평가기록통계를 포함할 수 있다.In the embodiment, the training result monitoring unit 550 may include a training recording sheet for expressing the training results of the trainee, training record statistics for the performance of the trainee, and evaluation record statistics for expressing the performance of the trainee-managed trainees.

상기 훈련기록지는 아이디, 성명, 기수, 훈련일자, 훈련명, 담당교수, 입과일을 기준으로 주행시간, 주행거리, 코스이탈, 범위이탈, 폴 전도수, 넘기 장애물 전도수, 벽 장애물 전도수, 드럼 충돌수, 합격유무를 확인할 수 있다. 또한, 실격사유에서는 훈련 중 실격 사유 앞에 V가 되어있다. 또한, 코스 기록에서는 훈련 중 추의 궤적을 확인하며, 구간에 따른 점수, 훈련시간과 훈련 시간 그래프를 확인 할 수 있다. 또한, Print 버튼을 누르면 현재 화면이 출력될 수 있다.The training recording papers are classified into three groups according to their names, ID, name, rider, training date, training name, driving instructor, You can check the number of drum collisions and whether or not they pass. In addition, the reason for disqualification is V before disqualification reason during training. Also, in the course record, the trace of the weight during training is checked, and the score, the training time and the training time graph according to the section can be confirmed. Also, if the Print button is pressed, the current screen can be outputted.

상기 훈련기록통계는 아이디, 성명, 기수, 훈련명, 담당교수, 입과일, 수료일을 기준으로 훈련기간에서는 선택한 기간을 확인하여, 성공횟수, 훈련시간, 주행거리, 장애물충돌, 코스이탈, 폴전도수, 넘기 장애물 전도수, 벽 장애물 전도수, 드럼 충돌 횟수, 종합점수를 합계, 평균 별로 확인할 수 있다. 또한, 훈련시간, 주행거리, 코스이탈, 범위이탈, 폴전도수, 넘기 장애물 전도수, 벽 장애물 전도수, 드럼 충돌수, 종합점수를 기간별 추이로 확인할 수 있다. 또한, 구간 기록에서는 구간에 따른 훈련시간 평균과 합계, 점수 평균과 합계, 구간별 평균 시간 그래프를 확인 할 수 있다. 또한, Print 버튼을 누르면 현재 화면이 출력될 수 있다.The training record statistics include the number of success times, training time, mileage, obstacle collision, course deviation, and the number of times the training is performed based on the ID, name, You can check the number of conduction water, the passage obstacle conduction water, the wall obstacle conduction water, the number of drum collision, and the total score by total and average. In addition, it is possible to confirm the training time, mileage, deviation from the course, out of range, pole conduction number, passing obstacle conduction number, wall obstacle conduction number, drum collision number, Also, in the interval recording, the average of the training time according to the interval, the sum of the points, the average of the points and the sum, and the average time interval by the interval can be confirmed. Also, if the Print button is pressed, the current screen can be outputted.

상기 평가기록통계는 교수자가 관리하는 기수 정보에서는 기수 인원, 훈련명, 담당교수 입과일, 수료일, 기간을 기준으로 합격횟수, 훈련시간, 주행거리, 코스이탈, 범위이탈, 폴 전도수, 넘기 장애물 전도수, 벽 장애물 전도수, 드럼 충돌수, 종합평균의 합계 평균을 확인할 수 있다. 또한, 합격율, 종합점수의 기간별 추이 그래프도 확인할 수 있다. 또한, Print 버튼을 누르면 현재 화면과 개별 점수가 출력될 수 있다. 또한, 개별점수 버튼을 누르면 개별 점수 기록을 확인할 수 있다. 또한, 개별 점수에서는 순위, 이름, 성공율, 훈련점수, 훈련시간, 주행거리, 코스이탈, 범위이탈, 폴 전도수, 넘기 장애물, 벽 장애물, 드럼충돌을 확인할 수 있다. 또한, 개별 점수의 순위는 성공율로 정할 수 있다.The evaluation record statistics include the number of passes, training time, mileage, departure from the course, departure from the distance, number of turns of the pole, number of passes, Obstacle conduction water, wall obstacle conduction water, drum impact number, and total average of total mean can be confirmed. Also, you can check the passing rate graph of the passing score and total score. Also, if you press Print button, current screen and individual score can be output. You can also check individual score records by pressing the individual score button. Individual scores can also identify rank, name, success rate, training score, training time, mileage, course deviations, range deviations, pole evasions, overhang obstacles, wall obstructions, and drum crashes. In addition, the ranking of the individual scores can be determined by the success rate.

상기 조작패널모니터링부(560)는 훈련자가 상기 조작패널(300)을 조작하는 과정을 관리자가 볼 수 있도록 표시해줄 수 있다.The operation panel monitoring unit 560 may display the process of the operator operating the operation panel 300 so that the administrator can view the operation panel.

실시예에서, 상기 조작패널모니터링부(560)는 상기 조작패널(300)을 모니터링할 수 있는 프로그램으로 버튼 및 조작 레버의 이상 유무를 체크할 수 있다. 훈련자가 조작하고 있는 주행, 횡행, 권상권하 작동을 모니터링할 수 있으며, 조작반의 비상정지, CONTROL OFF, CONTROL ON, SIREN상태를 모니터링할 수 있다. 또한, 현재 훈련하고 있는 크레인의 작동상태를 각종 램프를 통해서 확인할 수 있다. 또한, 모니터링 프로그램에서 버튼램프 또는 램프를 클릭하면, 상기 조작패널(300)의 버튼램프 또는 램프를 켜거나 끌 수 있다.In the embodiment, the operation panel monitoring unit 560 can monitor the operation panel 300 and check whether the buttons and the operation lever are abnormal. It is possible to monitor the running, traverse, and winding-up operation that the trainee is operating, and can monitor the operation panel's emergency stop, CONTROL OFF, CONTROL ON, SIREN status. In addition, the operation status of the crane that is currently being trained can be confirmed through various lamps. When the button lamp or the lamp is clicked in the monitoring program, the button lamp or lamp of the operation panel 300 can be turned on or off.

이와 같이, 상기 영상 제어부(400)와 훈련 제어부(500)는 크레인의 종류와 훈련 방법에 적합한 영상을 상기 영상 스크린(200)에 제공할 뿐 아니라 훈련과정을 체계적으로 관리할 수 있는 다양한 형태로 구성될 수 있으며, 한정되지 아니한다.The image controller 400 and the training controller 500 may provide various images suitable for the type and training method of the crane to the video screen 200 and systematically manage the training process And is not limited.

도 3 내지 도 4는 본 발명의 실시예에 따른 크레인 운전 훈련장치에 적용된 멀티 플랫폼이 도시된 사시도이다.3 to 4 are perspective views illustrating a multi-platform applied to a crane operation training apparatus according to an embodiment of the present invention.

상기 멀티 플랫폼(100)은 수납반(110)과, 영상스크린거치대(120)와, 조작패널거치대(130)와 도어(140)를 포함하도록 구성되고, 훈련자가 실제 크레인에 탑승했을 때와 유사한 형태로 훈련할 수 있도록 구성된다,The multiplatform 100 is configured to include a storage compartment 110, an image screen holder 120, an operation panel holder 130 and a door 140, and has a shape similar to that when the trainee rides on an actual crane The training is organized so that,

상기 수납반(110)은 상기 영상 제어부(300)로 사용되는 영상컴퓨터 및 우퍼 스피커(111)가 내장된다. 이때, 상기 수납반(110)의 전면 하단부 좌우에 하단스피커(112a,112b)가 배치되며, 전면 상단부 좌우에는 상단스피커(113a,113b)가 배치되어 입체음향 효과를 생성하며, 구성품들의 안정성을 보장한다.The storage unit 110 includes a video computer and a woofer speaker 111 used as the video controller 300. At this time, the lower loudspeakers 112a and 112b are disposed on the left and right lower ends of the front surface of the storage unit 110, and the upper loudspeakers 113a and 113b are disposed on the left and right of the upper end of the front surface to generate a stereo sound effect. do.

상기 영상스크린거치대(120)는 훈련자가 하방을 향해 몰입할 수 있도록 앉은 키의 표준 눈높이를 근거로 제작되는데, 실시예에서 하방의 영상스크린 높이의 시작점을 약 400mm로 유지하며 각도는 약 15도 각도로 제작될 수 있다. 이때, 상기 영상스크린거치대(120)는 하기에서 설명될 영상스크린가이드(121 : 도 5에 도시) 또는 영상스크린(200 : 도 1에 도시)을 고정하기 위해 홀이 배치될 수 있다.The image screen holder 120 is fabricated on the basis of the standard eye level of the sitting key so that the trainee can be immersed downward. In the embodiment, the starting point of the image screen height downward is maintained at about 400 mm, . At this time, the image screen holder 120 may be provided with a hole for fixing the image screen guide 121 (shown in FIG. 5) or the image screen 200 (shown in FIG. 1) to be described later.

상기 조작패널거치대(130)의 오른쪽 측면 중간에는, 상기 조작패널(300 : 도 1에 도시)로부터 인입되는 USB장치를 꽂기 위한 USB허브(131)와, 상기 조작패널(300 : 도 1에 도시)로 출력되는 조작패널전원콘센트(132)와, 상기 영상 제어부(400 : 도 1에 도시)인 영상컴퓨터의 전원을 켜기위한 영상컴퓨터전원스위치(133)와, 상기 스피커들(111,112a,112b,113a,113b)의 입체음향의 소리를 조절하기 위한 스피커볼륨조절기(134)를 구비하여, 크레인 운전 훈련자 또는 관리자가 쉽게 조작할 수 있도록 한다. 물론, 상기 조작패널거치대(130)의 측면에는 전원 및 네트웍 케이블이 인입될 수 있도록 인입홀(미도시)도 구비된다.1, a USB hub 131 for plugging in a USB device inserted from the operation panel 300 (shown in FIG. 1), and an operation panel 300 (shown in FIG. 1) A video computer power switch 133 for turning on the power of a video computer as the video controller 400 (shown in FIG. 1), and a speaker 111, 112a, 112b, and 113a And 113b to adjust the sound of the stereo sound, so that the crane driving trainer or the manager can easily operate the speaker volume controller 134. Of course, an inlet hole (not shown) is also provided on the side surface of the operation panel holder 130 so that a power supply and a network cable can be drawn in.

이때, 상기 조작패널거치대(130)의 전면 양측에는, 천장크레인, 컨테이너크레인 등 다양한 크레인 조작패널을 안정적으로 삽입시키기 위해 조작패널고정홀(136)이 좌우에 가공된다. 또한, 상기 조작패널거치대(130)의 좌우 측면에는, 상기 조작패널(300)이 상기 조작패널거치대(130)의 전면에 안정적으로 고정시키기 위해 조작패널클램프(135)가 구비된다. 따라서, 상기 조작패널거치대(130)가 상기 조작패널이 고정되면, 훈련자가 과도한 힘으로 상기 조작패널을 조작해도 안정적인 고정시킬 수 있다.At this time, on both sides of the front surface of the operation panel holder 130, the operation panel fixing holes 136 are machined to the left and right to stably insert various crane operation panels such as a ceiling crane and a container crane. An operation panel clamp 135 is provided on the left and right sides of the operation panel holder 130 to stably fix the operation panel 300 on the front surface of the operation panel holder 130. Therefore, when the operation panel holder 130 is fixed to the operation panel, the trainer can be stably fixed even if the operator operates the operation panel with an excessive force.

상기 도어(140)는 구성품의 도난방지와 발열문제를 해결하기 위해 설치된다. The door 140 is installed to prevent the components from being stolen and to generate heat.

실시예에서, 상기 도어(140)는 작업시 뒤쪽 공간을 최소한으로 유지하기 위해 양문으로 제작되는데, 하방 좌우에 흡입구(141)가 설치되고, 상방 좌우에 배기팬(142)가 설치되어 환기를 원활하게 한다. 또한, 상기 도어(140)에는 시건장치(143)가 설치되어 도난을 예방할 수 있다. 따라서, 상기 멀티 플랫폼(100)은 후방의 도어(140)를 통해서만 구성품들을 분해하거나 설치할 수 있다.In the embodiment, the door 140 is formed as a side door in order to keep the rear space to a minimum in operation. The air inlet 141 is installed on the lower left and right sides and the exhaust fan 142 is installed on the upper left and right sides. . In addition, the door 140 is provided with a locking device 143 to prevent theft. Accordingly, the multi-platform 100 can disassemble or install components only through the rear door 140.

도 5는 본 발명의 실시예에 따른 크레인 운전 훈련장치에 적용된 스크린 가이드가 도시된 사시도이고, 도 6a 내지 도 6b는 본 발명의 실시예에 따른 크레인 운전 훈련장치에 적용될 수 있는 클램프의 실시예들이 도시된 정면도이다.FIG. 5 is a perspective view illustrating a screen guide applied to a crane operation training apparatus according to an embodiment of the present invention. FIGS. 6A to 6B are views showing examples of clamps applicable to a crane operation training apparatus according to an embodiment of the present invention Fig.

도 1에 도시된 바와 같이 영상 스크린들(200)은 멀티플랫폼(100)에 다양한 각도로 설치될 수 있는데, 도 5와 도 6a 및 도 6b에 도시된 스크린 가이드(121)와, 135°클램프(122)와, 105°클램프(123)에 의해 다양한 형태로 장착될 수 있다. 따라서, 크레인 운전자가 캐빈에 탑승하거나, 지상에서 운전하는 효과를 이루기 위하여 4개 이하의 훈련영상을 하방, 정면, 상방으로 자유롭게 배치하여 훈련자가 가상의 환경에서 사물의 정확한 상태에 몰입하여 훈련할 수 있다.As shown in FIG. 1, the image screens 200 can be installed at multiple angles in the multi-platform 100, including the screen guides 121 shown in FIGS. 5 and 6A and 6B, 122 and a 105 ° clamp 123, as shown in FIG. Therefore, in order to achieve the effect that a crane driver can ride on a cabin or operate on the ground, four or less training images can be arranged freely downward, frontal, and upward so that a trainer can immerse himself in the accurate state of things in a virtual environment have.

상기 스크린 가이드(121)는 사각형을 구성하는 네 개의 프레임(121a)과, 두 개의 프레임(121a)을 가로지르는 고정판(121b)을 포함하도록 구성되며, 상기 영상스크린(200 : 도 1에 도시)이 상기 고정판(121b)에 지지되는 동시에 고정될 수 있다.The screen guide 121 is configured to include four frames 121a constituting a quadrangle and a fixing plate 121b crossing two frames 121a, and the image screen 200 (shown in FIG. 1) And can be fixed and fixed to the fixing plate 121b.

상기 135°클램프(122)는 하방, 전방 및 상방과 양측의 영상스크린을 조립하거나, 전방과 상방의 영상스크린을 조립할 수 있는 클램프로서, 상기 스크린 가이드와(121)는 볼트로 단단히 고정한다. The 135 ° clamp 122 is a clamp that can assemble the image screens of the downward, frontward, and upper and both sides, or assemble the front and upper image screens, and firmly fix the screen guide 121 with the bolts.

상기 105°클램프(123)는 하방과 전방의 영상스크린을 조립할 수 있는 클램프로서, 마찬가지로 상기 스크린 가이드(121)와는 볼트로 단단히 고정한다. The 105 ° clamp 123 is a clamp that can assemble the downward and forward video screens, and is similarly fastened to the screen guide 121 with a bolt.

도 7은 본 발명의 실시예에 따른 크레인 운전 훈련장치에 적용된 영상 스크린의 정착구조가 도시된 사시도이다.7 is a perspective view illustrating a fixing structure of an image screen applied to a crane operation training apparatus according to an embodiment of the present invention.

상기 영상 스크린들(200)은 상기 스크린 가이드들(121)에 고정되는데, 훈련자를 기준으로 하방과 양측면에 위치하도록 상기 135°클램프들(122)에 의해 서로 고정되고, 하방과 전면에 위치하도록 상기 105°클램프들(123)에 의해 서로 고정되며, 전면과 상방에 위치하도록 상기 135°클램프들(122)에 의해 서로 고정될 수 있다.The image screens 200 are fixed to the screen guides 121. The image screens 200 are fixed to each other by the 135 ° clamps 122 so as to be positioned on the lower side and the both side surfaces based on the trainee, Are fixed to each other by the 105 ° clamps 123 and can be fixed to each other by the 135 ° clamps 122 so as to be positioned above the front face.

이와 같이, 상기 영상 스크린들(200)은 훈련자를 기준으로 다양한 각도에서 장착될 수 있는데, 이는 크레인의 종류에 따라 훈련자의 시야를 다르게 제공할 수 있어 실제 크레인 운전과 같은 효과를 도모할 수 있다.In this way, the video screens 200 can be mounted at various angles based on the trainee, which can provide different views of the trainee depending on the type of the crane, and can provide the same effect as the actual crane operation.

실시예로서, 상기 영상 스크린들(200)이 전면과 양측을 기준으로 하는 전면 3채널과, 하방과 양측을 기준으로 하는 하방 3채널과, 상방과 양측을 기준으로 하는 상방 3채널을 자유롭게 조합하여 다양하게 구성할 수 있으며, 한정되지 아니한다. 다만, 도 7에 도시된 영상 스크린들(200)은 전면 1채널과, 하방 3채널과, 상방 1채널로 구성한 것으로 볼 수 있다. In an embodiment, the video screens 200 may be freely combined with three channels on the front side and three channels on the lower side and both sides, and three channels on the upper side and the upper side on both sides But can be variously configured and not limited. However, it can be seen that the video screens 200 shown in FIG. 7 are composed of one front channel, three down channels, and one upward channel.

도 8은 본 발명의 실시예에 따른 크레인 운전 훈련장치에 적용된 조작패널의 착탈구조가 도시된 사시도이다. FIG. 8 is a perspective view showing the detachment structure of the operation panel applied to the crane operation training apparatus according to the embodiment of the present invention.

상기 조작패널(300)은 크레인 운전자가 캐빈에 탑승하여 크레인의 조작반을 활용하여 운전훈련을 하는 자세와 유사한 형태로 구성함으로써, 실제의 훈련과 동일한 훈련을 수행할 수 있도록 한다. The operation panel 300 is configured in a manner similar to a posture in which a crane driver is aboard a cabin and utilizes an operation panel of a crane to perform a driving exercise so that the same training as the actual exercise can be performed.

하지만, 훈련하고자 하는 대상 크레인의 조작반이 달라지거나, 전혀 다른 종류의 크레인을 훈련하고자 한다면 많은 수의 훈련장비가 배치되어야 하므로 고객의 입장에서는 비용의 부담을 느낄수 있다. 따라서, 본 발명의 실시예에서는, 다양한 크레인의 종류에 따라 다양한 형태의 조작반이 상면에 구비된 조작패널(300)을 구성하지만, 상기 조작패널(300)은 상기에서 설명한 멀티 플랫폼(100 : 도 1에 도시)에 안정적으로 탈부착 가능한 구조가 구비되는 것이 바람직하다.However, if the operator of the target cranes to be trained is changed or if they want to train completely different types of cranes, a large number of training equipments must be arranged, so that the customer may feel the cost burden. Accordingly, in the embodiment of the present invention, various types of operation panels constitute the operation panel 300 provided on the upper surface in accordance with various crane types. However, the operation panel 300 includes the multi platform 100 It is preferable that a structure capable of being attached and detached stably is provided.

보다 상세하게, 상기 조작패널(300)의 후면 양측에는 고정용돌기(311)가 각각 구비되는데, 상기 고정용돌기들(311)은 탈착의 용이성을 높이기 위하여 서로 길이가 다르게 형성될 수 있다. 또한, 상기 조작패널(300)의 양측면 후단에는 조작패널클램프(312)가 각각 구비된다. 물론, 상기 조작패널(300)은 사용자가 손쉽게 잡고 이동시킬 수 있는 손잡이(미도시)가 별도로 구비될 수 있다.More specifically, the fixing protrusions 311 are provided on both sides of the rear surface of the operation panel 300. The fixing protrusions 311 may be formed to have different lengths from each other in order to increase ease of detachment. Further, operation panel clamps 312 are provided at the rear ends of both sides of the operation panel 300, respectively. Of course, the operation panel 300 may be provided with a handle (not shown) that can be easily held and moved by the user.

그 외에도, 상기 조작패널(300)은 조작반의 신호를 전달하는 신호처리용 USB(321)와, 전원을 공급하는 전원선(322)이 연결된다.In addition, the operation panel 300 is connected to a signal processing USB 321 for transmitting a signal of the operation panel and a power supply line 322 for supplying power.

이와 같이 구성된 조작패널(300)을 도 3과 도 7을 참조하여 상기 멀티 플랫폼(100)에 조립하는 과정을 살펴보면, 상기 조작패널(300)의 손잡이를 잡고, 상기 고정용돌기(311)들 중 길이가 긴 것과 짧은 것을 차례대로 상기 멀티 플랫폼(100)의 조작패널삽입홀들(136)에 끼우게 된다. 이때, 상기 조작패널(300)은 상기 멀티 플랫폼(100)의 전방에 걸림된 상태를 유지하게 된다.Referring to FIGS. 3 and 7, a process of assembling the operation panel 300 having the above-described structure to the multi-platform 100 will be described. The long and short lengths are inserted into the operation panel insertion holes 136 of the multi-platform 100 in order. At this time, the operation panel 300 is held in the front of the multi-platform 100.

다음, 상기 조작패널(300)과 멀티 플랫폼(100)의 양측에 각각 구비된 조작패널클램프들(312,135)을 서로 체결하면, 상기 조작패널(300)을 상기 멀티 플랫폼(100)에 안정적으로 고정시킬 수 있다.Next, when the operation panel 300 and the operation panel clamps 312 and 135 provided on both sides of the multi-platform 100 are fastened to each other, the operation panel 300 is stably fixed to the multi-platform 100 .

다음, 상기 조작패널(300) 측의 USB 허브(321)와 전원선(322)을 상기 멀티 플랫폼(100) 측의 USB 허브(131)와 조작패널전원콘센트(132)에 연결하면, 상기 조작패널(300)이 상기 영상 제어부(400 : 도 1에 도시) 및 훈련 제어부(500 : 도 1에 도시)와 통신 가능하게 연결된다.When the USB hub 321 and the power line 322 on the operation panel 300 side are connected to the USB hub 131 on the multiplatform 100 side and the operation panel power outlet 132, (300) is communicably connected to the image control unit (400) (shown in FIG. 1) and the training control unit (500 shown in FIG. 1).

물론, 상기 조작패널(300)에는 키보드 등을 비롯하여 다른 구성품이 더 포함될 수 있으며, 추가적으로 연결될 수도 있지만, 한정하지 아니한다.Of course, the operation panel 300 may further include other components such as a keyboard and the like, and may additionally be connected thereto, but is not limited thereto.

상기와 같이 조립된 조작패널(300)의 해체는 상기의 과정을 반대로 진행하면 된다.The disassembly of the operation panel 300 assembled as described above may be reversed.

도 9a 내지 도 9b는 본 발명의 실시예에 따른 크레인 운전 훈련장치에 적용될 수 있는 조작패널의 실시예들이 도시된 사시도이다.9A to 9B are perspective views illustrating embodiments of operation panels that can be applied to a crane operation training apparatus according to an embodiment of the present invention.

도 9a는 천장크레인 조작패널(330)을 도시한 것으로써, 실제 천장크레인의 조작반에서 실 장비의 상태 및 조작할 수 있는 조작레버, 버튼류, 램프류가 많이 구비될 수 있지만, 실시예에서는 천장크레인 운전 훈련에 꼭 필요한 부품만을 배치하도록 구성되지만, 한정되지 아니한다.9A illustrates a ceiling crane operation panel 330. In the actual ceiling crane operation panel, a state of the actual equipment and a plurality of operation levers, buttons, and lamps that can be operated can be provided. However, But is not limited to, arranging only the components necessary for driving training.

상기 천장크레인 조작패널(330)의 좌측조작반(330A)에는, 천장크레인의 달기기구를 전후좌우로 이동하게 하는 조작레버(331)와, 비상스위치(332)와, CONTROL ON 램프버튼(333)과, 그 아래쪽에 여러개의 좌측 램프(334)가 배치된다.An operation lever 331 for moving the ceiling crane moving mechanism in the front, rear, left, and right directions, an emergency switch 332, a CONTROL ON lamp button 333, And a plurality of left lamps 334 are disposed below the lamps 334.

이때, 상기 좌측 램프(334)는 A/H BRAKE OPEN, T/S BRAKE OPEN, T/L NORMAL SOFT STARTER READY, M/H BRAKE OPEN, T/L NO.2 MORTOR OVER CURRENT, M/H MOTOR OVER CURRENT, MASTER CONTROL OFF, T/L NO.1 MOTOR VOER CURRENT, M/H STAND BY THYRISTOR READY, MASTER CONTROL ON, T/L STAND BY SOFT STARTER READY 및 M/H NORMAL THYRISTOR READY 램프를 포함할 수 있다. At this time, the left lamp 334 is turned on by the A / H BRAKE OPEN, T / S BRAKE OPEN, T / L NORMAL SOFT STARTER READY, M / H BRAKE OPEN, T / L NO.2 MORTOR OVER CURRENT, M / H STANDBY READY, MASTER CONTROL ON, T / L STAND BY SOFT STARTER READY, and M / H NORMAL THYRISTOR READY lamp.

상기 천장크레인 조작패널(330)의 우측조작반(330B)에는, 천장크레인의 달기기구를 상하로 이동하게 하는 조작레버(335)와, SIREN 및 CONTROL OFF 램프버튼(336,337)과, 그 아래쪽에 마찬가지로 여러개의 우측 램프(338)가 배치될 수 있다.The right operating panel 330B of the ceiling crane operating panel 330 is provided with an operating lever 335 for moving the ceiling crane moving mechanism upward and downward, SIREN and CONTROL OFF lamp buttons 336 and 337, The right ramp 338 of the right side of FIG.

이때, 상기 우측 램프(338)는 T/L BRAKE OPEN, SPARE, SPARE, A/H MOTOR OVER CURRENT, T/L NO.1 BRAKE OVER CURRENT, T/S MOTOT OVER CURRENT, A/H STAND BY THYRISTOR READY, T/S BRAKE OVER CURRENT, T/S STAND BY SOFT STARTER READY, A/H NORMAL THYRISTOR READY, T/L NO.2 MOTOR OVER CURRENT 및 T/S NORMAL SOFT STARTER READY 램프를 포함할 수 있다. At this time, the right ramp 338 is turned ON / OFF according to the T / L BRAKE OPEN, SPARE, SPARE, A / H MOTOR OVER CURRENT, T / L NO.1 BRAKE OVER CURRENT, T / S MOTOT OVER CURRENT, A / H STAND BY THYRISTOR READY , T / S BRAKE OVER CURRENT, T / S STAND BY SOFT STARTER READY, A / H NORMAL THYRISTOR READY, T / L NO.2 MOTOR OVER CURRENT and T / S NORMAL SOFT STARTER READY lamp.

도 9b는 컨테이너크레인 조작패널(340)을 도시한 것으로써, 실제 컨테이너크레인의 조작반에서 실 장비의 상태 및 조작할 수 있는 조작레버, 버튼류, 램프류가 많이 구비될 수 있지만, 실시예에서는 컨테이너크레인 운전 훈련에 꼭 필요한 부품만을 배치하도록 구성되지만, 한정되지 아니한다.9B shows a container crane operation panel 340. In an actual operation of the container crane, there are many operation levers, buttons, and ramps that can be operated and conditions of the actual equipment, But is not limited to, arranging only the components necessary for driving training.

상기 컨테이터크레인 조작패널(340)의 좌측조작반(340A)은 컨테이너크레인의 스프레더를 전후로 이동하게 하는 조작레버(341)와, 비상스위치(342)와, TRIM LEFT/RIGHT와 LIST INB/OUTB를 조정하는 조그(343)와, SKEW CW/CCW 스위치(344a)와, TRIM/LIST/SKEW HOME POSITION 램프버튼(344b)과, 그 아래쪽에 여러개의 스위치(344c)가 배치될 수 있다.The left operation panel 340A of the container crane operation panel 340 includes an operation lever 341 for moving the spreader of the container crane back and forth, an emergency switch 342 and TRIM LEFT / RIGHT and LIST INB / OUTB The SKEW CW / CCW switch 344a, the TRIM / LIST / SKEW HOME POSITION lamp button 344b, and a plurality of switches 344c below the jog 343.

이때, 상기 스위치(344c)는 FLIPPER 1 WS ENABLE/DISABLE 스위치, FLIPPER 2 WS ENABLE/DISABLE 스위치, FLIPPER 3 WS ENABLE/DISABLE 스위치, FLIPPER 4 WS ENABLE/DISABLE 스위치를 포함할 수 있다. At this time, the switch 344c may include a FLIPPER 1 WS ENABLE / DISABLE switch, a FLIPPER 2 WS ENABLE / DISABLE switch, a FLIPPER 3 WS ENABLE / DISABLE switch, and a FLIPPER 4 WS ENABLE / DISABLE switch.

상기 컨테이너크레인 조작패널(340)의 우측조작반(340B)은 컨테이너크레인의 스프레더를 좌우 및 상하로 이동하게 하는 조작레버(345)와, CONTROL ON 램프버튼(346)과, SPREADER TWIST LOCKS 스위치(347)와, 그 아래쪽에 여러개의 램프버튼(348)이 배치될 수 있다.The right operation panel 340B of the container crane operation panel 340 includes an operation lever 345 for moving the spreader of the container crane left and right and up and down, a CONTROL ON lamp button 346, a SPREADER TWIST LOCKS switch 347, And a plurality of lamp buttons 348 disposed under the lamp buttons 348. [

이때, 상기 램프버튼(348)은 CONTROL OFF 램프버튼, SPREADER PUMP ON 램프버튼, SPREADER PUMP OFF 램프버튼, SPREADER TELESCOPIC LENGTH 20FT 램프버튼, SPREADER TELESCOPIC LENGTH 40FT 램프버튼을 포함할 수 있다. At this time, the lamp button 348 may include a CONTROL OFF lamp button, a SPREADER PUMP ON lamp button, a SPREADER PUMP OFF lamp button, a SPREADER TELESCOPIC LENGTH 20FT lamp button, and a SPREADER TELESCOPIC LENGTH 40FT lamp button.

상기 컨테이너크레인 조작패널(340)의 중앙램프부(340C)는 스프레더가 컨테이너를 착상하는 상태를 나타내는 SPREADER LANDED 램프(349a)와, SPREADER TWIST LOCKS : UNLOCKED 램프(349b)와, SPREADER TWIST LOCKS : LOCKED 램프(349c)와, CENTER HOUSING 램프(349d)가 포함될 수 있다.The central lamp section 340C of the container crane operation panel 340 includes a SPREADER TWO LOCKS: UNLOCKED lamp 349b, a SPREADER TWIST LOCKS: LOCKED lamp 349a, A lamp controller 349c, and a CENTER HOUSING lamp 349d.

도 10은 본 발명의 실시예에 따른 크레인 훈련과정이 도시된 순서도이다.10 is a flowchart showing a crane training process according to an embodiment of the present invention.

본 실시예의 크레인 운전 훈련장치를 이용하여 훈련과정을 살펴보면, 훈련자 가 성과정보를 활용하기 위해 사용자 로그인하고, 훈련상황을 가상환경으로 설정하기 위하여 훈련시나리오를 선택한다.(S1,S2 참조)In the training process using the crane operation training apparatus of this embodiment, a user logs in to utilize the performance information, and a training scenario is selected to set the training situation as a virtual environment (see S1 and S2)

다음, 훈련자는 선택한 훈련시나리오에 따라 크레인운전훈련을 수행하고, 설정된 미션을 따라 훈련을 수행하게 된다.(S3 참조) Next, the trainer performs the crane driving training according to the selected training scenario and performs the training according to the set mission (see S3).

물론, 훈련자는 영상 스크린들의 영상을 보고, 조작패널의 조작반을 움직이기 때문에 실제와 같은 상황에 몰입하여 훈련할 수 있으며, 훈련과정 및 훈련결과는 모두 저장된다. Of course, the trainer views the images of the video screens and moves the operator panel of the control panel, so that the trainee can immerse himself in the actual situation, and the training process and training results are stored.

이때, 훈련자는 상기 영상 스크린들을 통하여 크레인 제원기반으로 생성된 가상현실기반의 영상을 보고, 상기 조작패널의 조작함에 따라 입력하게 된다. 물론, 상기 영상 제어부에서 입력 신호를 기반으로 물리적인 현상을 처리한 후, 상기 영상 스크린들을 통하여 영상처리를 수행하는 과정을 반복하게 된다. 따라서, 상기 영상 제어부에 의해 입력되는 정보를 바탕으로 가시화함으로써, 실제와 같은 상황에 몰입하여 효과적으로 훈련할 수 있다.At this time, the trainer views the virtual reality-based image generated on the basis of the crane specification through the image screens, and inputs the image according to the manipulation of the operation panel. Of course, the image controller processes the physical phenomenon based on the input signal, and then performs the image processing through the image screens. Therefore, visualization based on the information input by the image control unit allows the user to immerse himself / herself in the actual situation and effectively train the user.

다음, 훈련자가 훈련을 마치면, 훈련자는 훈련결과와, 훈련기록지를 볼 수 있다.(S4,S5 참조)Next, when the trainer finishes the training, the trainee can see the training results and the training records (see S4 and S5).

이와 같은 과정을 통하여 훈련이 반복되면, 관리자는 훈련결과 및 훈련성과를 분석하여 성과관리를 수행하고, 훈련자는 웹 또는 네트웍을 통하여 훈련에 대한 성과관리를 제공받을 수 있다.(S6 참조)If the training is repeated through this process, the manager analyzes the training results and the training results to perform the performance management, and the trainee can receive the performance management through the web or network (see S6).

도 11은 본 발명의 실시예에 따른 크레인 운전 훈련과정 및 관리과정이 보다 상세히 도시된 순서도이다.11 is a flowchart illustrating a crane driving training process and a control process according to an embodiment of the present invention in more detail.

도 11을 참조하여 관리자 및 훈련자의 기능연계도를 보면, 관리자는 훈련코스를 등록하는 코스관리를 수행한 뒤, 크레인의 제원을 등록함으로써, 훈련시나리오를 작성한다.(S101,S102,S108,S109 참조) Referring to FIG. 11, the administrator views the function linkage of the trainee, and the manager creates the training scenario by registering the specification of the crane after performing the course management for registering the training course (S101, S102, S108, S109 Reference)

다음, 훈련자는 관리자에 의해 등록된 훈련을 선택하여 훈련을 수행하게 된다. (S110 참조)Next, the trainee selects the training registered by the manager and performs the training. (See S110)

물론, 관리자는 훈련자를 기수별로 등록하여 일괄적으로 훈련결과를 관리 및 평가하며, 운영환경을 설정할 수 있다.(S103.S104 참조)Of course, administrators can register trainees on a radar basis, collectively manage and evaluate training results, and set the operating environment (see S103.S104).

이와 같이, 훈련자가 훈련을 수행한 후, 훈련 기록이 작성되어 훈련자는 훈련기록지를 통해 결과를 확인할 수 있다.(S111,S112,S113 참조)Thus, after the trainer performs the training, the training record is created and the trainee can confirm the result through the training record sheet (see S111, S112, S113).

또한, 관리자는 기록된 훈련기록을 기준으로 제시되는 성과관리 및 통계를 확인할 수 있다.(S106,S107 참조)
In addition, the manager can confirm the performance management and statistics presented based on the recorded training record (refer to S106 and S107)

100 : 멀티 플랫폼 200 : 영상 스크린
300 : 조작패널 400 : 영상 제어부
500 : 훈련 제어부
100: Multiplatform 200: Video screen
300: Operation panel 400:
500: training control unit

Claims (9)

훈련자가 앉아서 크레인 운전을 훈련할 수 있는 테이블 형태의 멀티 플랫폼;
상기 멀티 플랫폼에 입체적으로 탈착되고, 크레인에서 볼 수 있는 영상을 서로 다른 각도에서 연속적으로 제공하는 복수개의 영상 스크린;
상기 멀티 플랫폼에 탈착되고, 크레인의 조작레버와 버튼과 스위치 및 램프가 구비된 조작패널;
상기 영상 스크린들에 표시된 영상을 보면서 작업자가 상기 조작패널을 통한 입력 신호를 기반으로 물리적 현상을 처리한 다음, 영상 처리를 수행하는 영상 제어부; 및
훈련자에게 적합한 훈련환경을 설정하고, 상기 영상 제어부로부터 입력된 정보를 기반으로 훈련 정보를 가시화하는 훈련 제어부;를 포함하는 크레인 운전 훈련장치.
A platform in the form of a table where the trainer can sit and train the crane driving;
A plurality of image screens that are three-dimensionally attached to and detached from the multi-platform and continuously provide images viewed from the cranes at different angles;
An operation panel detachably attached to the multi-platform and having an operation lever, a button, a switch, and a lamp of the crane;
An image control unit for performing an image process after an operator processes physical phenomenon based on an input signal through the operation panel while watching an image displayed on the image screens; And
And a training control unit for setting a training environment suitable for the trainee and visualizing the training information based on the information input from the image control unit.
제1항에 있어서,
상기 멀티 플랫폼은,
상기 영상 스크린들이 탈착될 수 있는 스크린 거치대와,
상기 조작패널이 탈착될 수 있는 조작패널 거치대를 포함하는 크레인 운전 훈련장치.
The method according to claim 1,
The multi-
A screen holder on which the image screens can be detached,
And an operation panel rest which can be detached from the operation panel.
제2항에 있어서,
상기 스크린 거치대는,
상기 영상 스크린의 배면을 지지하는 복수개의 스크린 가이드와,
상기 스크린 가이드들을 설정 각도로 연결하는 복수개의 조립 클램프를 포함하는 크레인 운전 훈련장치.
3. The method of claim 2,
The screen stand comprises:
A plurality of screen guides for supporting a back surface of the image screen,
And a plurality of assembly clamps connecting the screen guides at a set angle.
제3항에 있어서,
상기 스크린 거치대는,
상기 영상 스크린들을 작업자 시야를 기준으로 정면과 하방과 상방 중에 선택적으로 장착하도록 설치되는 크레인 운전 훈련장치.
The method of claim 3,
The screen stand comprises:
Wherein the image screens are installed to selectively mount the image screens on the front side, the lower side, and the upper side based on the worker's field of view.
제3항에 있어서,
상기 조립 클램프들은 상기 스크린 가이드들을 135°또는 105°각도로 연결하도록 구성된 크레인 운전 훈련장치.
The method of claim 3,
Wherein the assembly clamps are configured to connect the screen guides at an angle of 135 ° or 105 °.
제2항에 있어서,
상기 조작패널 거치대는,
상기 조작패널의 일면에 구비된 한 쌍의 돌기가 끼워질 수 있는 홈이 구비된 크레인 운전 훈련장치.
3. The method of claim 2,
The operation panel holder includes:
And a pair of projections provided on one surface of the operation panel.
제1항에 있어서,
상기 조작패널은 천장크레인, 컨테이너크레인, 타워크레인, 기중기 중 하나의 조작패널로 구성될 수 있는 크레인 운전훈련장치.
The method according to claim 1,
The operating panel may comprise a control panel of one of a ceiling crane, a container crane, a tower crane, and a crane.
제1항에 있어서,
상기 영상 제어부는,
상기 조작패널을 통한 입/출력 신호를 전달하는 제어처리부와,
상기 제어처리부로부터 입력된 신호를 비롯하여 크레인, 장애물 등의 물리적인 특성을 반영하여 위치정보를 전달하는 물리처리부와,
상기 제어처리부로부터 입력된 위치정보를 반영한 훈련 시나리오를 로딩하여 상기 영상 스크린들에 연속된 화면으로 제공하고, 훈련하는 동안 각종 평가 및 시지를 처리하는 영상처리부를 포함하는 크레인 운전 훈련장치.
The method according to claim 1,
The image control unit includes:
A control processor for transmitting an input / output signal through the operation panel;
A physical processor for transmitting the positional information reflecting the physical characteristics of the crane, the obstacle and the like as well as the signal input from the control processor;
And a video processing unit for loading a training scenario reflecting positional information input from the control processing unit and providing the continuous screen to the video screens, and processing various evaluations and schedules during training.
제8항에 있어서,
상기 훈련 제어부는,
크레인의 높이, 크기, 속도 및 무게와, 크레인에 갈리는 기구의 종류, 크기, 무게 및 편심 정보를 입력하여 상기 물리처리부로 전달하여 크레인 제원설정부와,
현장 작업을 훈련하도록 각종 장애물 및 훈련코스를 설정하는 훈련시나리오 설정부와,
훈련자가 훈련 진행 중에 각종 평가항목과 훈련의 방향성을 제시하는 훈련평가항목설정부와,
훈련자가 훈련 진행 후에 상기 훈련평가항목설정부에서 설정한 항목을 기반으로 훈련에 대한 평가 및 성과를 관리해주는 성과관리부와,
상기 영상처리부의 정보를 수집하여 훈련자의 훈련성과를 표시하는 훈련성과모니터링부와,
상기 조작패널을 조작하는 과정을 표시하는 조작패널모니터링부를 포함하는 크레인 훈련장치.
9. The method of claim 8,
The training control unit,
Size, weight, and eccentric information of the crane, and transmits the inputted information to the physical processing unit,
A training scenario setting unit for setting various obstacles and training courses to train the field work,
A training evaluation item setting unit for presenting various evaluation items and the direction of training during the training of the trainee,
A performance management unit for managing the evaluation and performance of the training based on the items set by the training evaluation item setting unit after the training of the trainee,
A training performance monitoring unit for collecting information of the image processing unit and displaying training results of the trainee,
And an operation panel monitoring unit for indicating a process of operating the operation panel.
KR1020130032459A 2013-03-27 2013-03-27 Train apparatus for crane operation KR101462407B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020130032459A KR101462407B1 (en) 2013-03-27 2013-03-27 Train apparatus for crane operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020130032459A KR101462407B1 (en) 2013-03-27 2013-03-27 Train apparatus for crane operation

Publications (2)

Publication Number Publication Date
KR20140117783A true KR20140117783A (en) 2014-10-08
KR101462407B1 KR101462407B1 (en) 2014-11-17

Family

ID=51990761

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020130032459A KR101462407B1 (en) 2013-03-27 2013-03-27 Train apparatus for crane operation

Country Status (1)

Country Link
KR (1) KR101462407B1 (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160058536A (en) * 2014-11-17 2016-05-25 두산인프라코어 주식회사 Method for virtual validating of visibility
KR20160099917A (en) 2015-02-13 2016-08-23 조영철 Method and apparatus for practicing driving
CN108510831A (en) * 2018-06-04 2018-09-07 上海振华重工(集团)股份有限公司 Automate bridge crane remote operation simulator
KR101950698B1 (en) * 2017-10-10 2019-02-21 김종민 Construction machine virtual reality education device and construction machine using it Virtual reality education/evaluation method
CN109637258A (en) * 2019-02-28 2019-04-16 北京瞭望者科技有限责任公司 Chemical defence VR simulated training system
KR20190053689A (en) 2017-11-10 2019-05-20 김종민 Simulator apparatus for tower crane VR education and system using them
CN110021197A (en) * 2019-05-28 2019-07-16 西安文理学院 A kind of view-based access control model conveys the teaching demonstration device of design
KR102034549B1 (en) * 2018-11-13 2019-11-08 김종민 Virtual reality-based experience-based construction machine safety education method and solution system
CN110728874A (en) * 2019-11-08 2020-01-24 西南石油大学 Industrial equipment interactive virtual assembly customization and training method and system
CN110767003A (en) * 2019-11-22 2020-02-07 焦作大学 Trade management teaching system based on virtual reality technology and use method
CN112017498A (en) * 2020-07-10 2020-12-01 福建省特种设备检验研究院 Crane operator operation training system based on video acquisition and recognition technology
WO2021167558A1 (en) * 2020-02-20 2021-08-26 Borcelik Celik San. Tic. A.S. A training system for being applied in a bridge crane simulator

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101874826B1 (en) * 2016-05-17 2018-08-02 (주)토탈소프트뱅크 A training evaluation device for simulator of overhead crane
KR102038891B1 (en) * 2017-05-31 2019-11-26 (주)토탈소프트뱅크 Training apparatus for heavy crane operation
KR102541767B1 (en) 2020-12-15 2023-06-12 빅픽쳐스 주식회사 National competency standards based driving machine training system in virtual reality enviroment
KR20220102685A (en) 2021-01-13 2022-07-21 대우조선해양 주식회사 System and method for simulation of crane operation and computer-readable recording medium including the same

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR19980044037A (en) * 1996-12-05 1998-09-05 유상부 Crane control simulator and control method
KR200218106Y1 (en) * 2000-08-28 2001-03-15 주식회사앞선 container crane simulator
KR100390050B1 (en) * 2001-08-10 2003-07-04 주식회사 앞선 Portable Container Crane Simulator
JP5073727B2 (en) * 2009-10-14 2012-11-14 本田技研工業株式会社 Bicycle simulation equipment

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160058536A (en) * 2014-11-17 2016-05-25 두산인프라코어 주식회사 Method for virtual validating of visibility
KR20160099917A (en) 2015-02-13 2016-08-23 조영철 Method and apparatus for practicing driving
KR101950698B1 (en) * 2017-10-10 2019-02-21 김종민 Construction machine virtual reality education device and construction machine using it Virtual reality education/evaluation method
KR20190053689A (en) 2017-11-10 2019-05-20 김종민 Simulator apparatus for tower crane VR education and system using them
CN108510831A (en) * 2018-06-04 2018-09-07 上海振华重工(集团)股份有限公司 Automate bridge crane remote operation simulator
KR102034549B1 (en) * 2018-11-13 2019-11-08 김종민 Virtual reality-based experience-based construction machine safety education method and solution system
CN109637258A (en) * 2019-02-28 2019-04-16 北京瞭望者科技有限责任公司 Chemical defence VR simulated training system
CN110021197A (en) * 2019-05-28 2019-07-16 西安文理学院 A kind of view-based access control model conveys the teaching demonstration device of design
CN110728874A (en) * 2019-11-08 2020-01-24 西南石油大学 Industrial equipment interactive virtual assembly customization and training method and system
CN110767003A (en) * 2019-11-22 2020-02-07 焦作大学 Trade management teaching system based on virtual reality technology and use method
WO2021167558A1 (en) * 2020-02-20 2021-08-26 Borcelik Celik San. Tic. A.S. A training system for being applied in a bridge crane simulator
CN112017498A (en) * 2020-07-10 2020-12-01 福建省特种设备检验研究院 Crane operator operation training system based on video acquisition and recognition technology
CN112017498B (en) * 2020-07-10 2022-11-08 福建省特种设备检验研究院 Crane operator operation training system based on video acquisition and recognition technology

Also Published As

Publication number Publication date
KR101462407B1 (en) 2014-11-17

Similar Documents

Publication Publication Date Title
KR101462407B1 (en) Train apparatus for crane operation
US12020589B2 (en) Systems and methods for vehicle simulation
KR100896450B1 (en) A booth system for simulator
CN201465338U (en) Ejection training simulator
JP2008265935A (en) Elevator simulator device and elevator simulation system
CN107909876A (en) Locomotive crane drive simulation experience system
CN103218947A (en) Simulative elevator electrical installation and adjustment evaluation training system for teaching
CN110570744A (en) Interactive hoisting operation simulation safety training teaching system
KR20180068355A (en) Joint training simulator for railway driving workers and method for evaluating joint training of railway driving workers using the same
KR20190053689A (en) Simulator apparatus for tower crane VR education and system using them
KR101874826B1 (en) A training evaluation device for simulator of overhead crane
RU154990U1 (en) TRAINING COMPLEX OF OPERATIVE STAFF OF SORTING SLIDES
WO2017155488A1 (en) A forklift training simulator system
CN203013117U (en) Training system for checking and evaluating electric installation and adjustment of simulation elevator in teaching
JPH08244691A (en) Simulator for parachute manufacturing training
CN106075914B (en) Shooting game interaction system
KR100965419B1 (en) Train driving simulator installed in container for moving
CN106530936A (en) Portable motor-train-unit ATP vehicle-mounted equipment simulation drilling apparatus
RU118093U1 (en) TRAINING COMPLEX OF OPERATIVE STAFF OF SORTING SLIDES
CN110461749A (en) The method of elevator device and operation elevator device
KR102107782B1 (en) Elevator simulation education apparatus for child
KR101418483B1 (en) Flight Simulator Device for Special Mission Training and Controlling Method for the Same
EP3613693A1 (en) Elevator system with thermal sensors
JP2021128196A (en) Helicopter pilot training system
KR102121830B1 (en) Joint training simulator for railway driving workers and method for evaluating joint training of railway driving workers using the same

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
AMND Amendment
E601 Decision to refuse application
AMND Amendment
X701 Decision to grant (after re-examination)
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20171110

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20181112

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20191010

Year of fee payment: 6