KR20140017381A - A reinforcement method of a foundation structure used a micro pile - Google Patents
A reinforcement method of a foundation structure used a micro pile Download PDFInfo
- Publication number
- KR20140017381A KR20140017381A KR1020120084428A KR20120084428A KR20140017381A KR 20140017381 A KR20140017381 A KR 20140017381A KR 1020120084428 A KR1020120084428 A KR 1020120084428A KR 20120084428 A KR20120084428 A KR 20120084428A KR 20140017381 A KR20140017381 A KR 20140017381A
- Authority
- KR
- South Korea
- Prior art keywords
- concrete
- micro pile
- foundation
- hole
- pile
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/01—Flat foundations
- E02D27/08—Reinforcements for flat foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/28—Stressing the soil or the foundation structure while forming foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
- E02D5/80—Ground anchors
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/003—Injection of material
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Description
The present invention forms a small diameter drilled hole enough to install a micro pile in the foundation structure when subsidence occurs in the foundation structure and reinforces it, and a drill hole of a large diameter is formed on the bottom of the foundation structure to support it. The present invention relates to a reinforcement method of a foundation structure using micro piles capable of supporting and reinforcing the settled foundation structure by forming concrete bulbs.
In general, when subsidence, cracks, etc. occur in the foundation structure to reinforce it, as shown in the prior art Figures 1a, 1b, the width of the width 500 to 700mm to install the
On the side of the rectangular boring hole, the reinforcing bar is fixed to the foundation concrete (not shown), and the micro pile having male threads formed on the outer circumferential surface to which the
However, in the conventional micro pile upper fixing method, the cross-sectional loss of the foundation concrete is increased by forming a wide drilling hole for installing the micro pile, and the pile punching shear (pile punching) at the coupling site as the reinforcement concrete is coupled to the foundation concrete. shear) is likely to occur,
It is not easy to fix the reinforcing bars to the foundation concrete in the rectangular hole, the noise and dust generated by the crushing of the foundation concrete to form the drilling hole, the construction period is long due to the curing of the reinforced concrete There is a problem.
Another prior art micro pile top fixing method (Patent No. 868987) using a key plate is shown in FIGS. 2A to 2D. FIG. 2A is a cross-sectional view showing that a micro pile is installed in a drilling hole. 2b is a plan view showing that the key plate installed on the micro pile is installed on the bottom of the base concrete,
FIG. 2C is a cross-sectional view illustrating a process of installing a micro pile using a jig, and FIG. 2D is a cross-sectional view illustrating a key plate supporting a bottom of a base concrete and a reinforcing concrete is filled in a drilling hole provided with a micro pile.
In FIGS. 2A and 2B, a drill hole is formed in the reinforcement part of the
The
The
2C and 2D, the
The conventional micro pile upper fixing method using the above-mentioned key plate requires precise drilling to form a large diameter hole in the center and two small diameter hole on both sides thereof, and a key plate must be manufactured separately. In addition, the heavy key plate makes installation difficult,
In order to install the micro pile, a jig, which is a position adjusting mechanism, should be used, and if a displacement occurs in the ground, the shape of the perforation hole is easily damaged, and the support structure of the key plate is unstable, so that the bottom of the foundation concrete cannot be widely supported. .
The present invention, in order to solve the problems of the prior art, to simplify the reinforcement structure of the foundation concrete, to form a perforation hole to minimize the cross-sectional loss, to stably support the bottom surface of the foundation concrete reinforcement portion to a predetermined width,
In addition, to prevent the occurrence of pile punching shear due to the installation of the micro pile, and to provide a reinforcement method of the foundation structure using a micro pile that can act as a foundation concrete and reinforcement concrete when displacement occurs in the ground.
The present invention is provided to achieve the above object is a step of forming a small
In order to install concrete bulbs supporting the lower surface of the
A step of installing a circular casing (23) having a hollow portion at a predetermined depth in the ground so that the micro pile (22) can be installed on the bottom of the large diameter hole (12a); A lock nut (21), a base plate (20) and a lock nut (21) are sequentially fastened to the micro pile (22) having male threads formed on an outer circumferential surface thereof, and the micro pile (22) is installed on the casing (23); And reinforcing
The reinforcement method of the foundation structure using the micro pile of the present invention as described above to form a small diameter boring hole with a minimum width that can be installed micro pile to minimize the cross-sectional loss of the foundation concrete, concrete bulb on the bottom of the foundation concrete reinforcement It is effective to stably support the foundation concrete to a predetermined width by forming a.
In addition, when displacement occurs on the ground, the reinforcement concrete is formed in the inverted T shape to support the foundation concrete, so that the foundation concrete and the reinforcement concrete are integrated and act on the bottom of the foundation concrete. Prevent the occurrence of pile punching shear,
By forming a small diameter hole to minimize noise and dust during drilling, and by simplifying the reinforcing structure of the foundation structure, the workability is improved and the air is shortened.
Figure 1a is a plan view showing that the conventional micro pile is installed in the drilling hole
Figure 1b is a cross-sectional view showing that the conventional micro pile is installed on the ground and the reinforcement concrete is filled in the drilling hole
Figure 2a is a cross-sectional view showing that another conventional micro pile is installed in the drilling hole
Figure 2b is a plan view showing that the key plate installed in another conventional micro pile is installed on the bottom of the base concrete
Figure 2c is a cross-sectional view showing a process for installing another conventional micro pile using a jig
Figure 2d is a cross-sectional view showing that another conventional key plate supports the bottom of the base concrete, and the reinforcement concrete is filled in the drill hole in which the micro pile is installed
Figure 3a is a plan view showing that the micro pile is an embodiment of the present invention is installed in the drilling hole
Figure 3b is a cross-sectional view showing an embodiment of the present invention, large, small diameter hole drilling is formed
Figure 3c is a cross-sectional view showing that the micro pile is an embodiment of the present invention is installed in the drilling hole
Figure 3d is a cross-sectional view showing that the reinforcement concrete is filled in the drilling hole in which the micro pile is an embodiment of the present invention
DETAILED DESCRIPTION OF EXEMPLARY EMBODIMENTS Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.
The present invention minimizes the cross-sectional loss by forming a small diameter boring hole in the foundation concrete to install the micro pile, the foundation concrete base is supported by a predetermined width by the concrete bulb, even if the ground displacement occurs Support stably,
The foundation concrete concrete surface is formed on the bottom of the foundation concrete to prevent punching shear of reinforcement concrete due to the installation of micro piles, and the reinforcement concrete is formed in an inverted T shape so that the foundation concrete and reinforcement concrete are integrated. It is improved, and the technical features that the workability is improved by simplifying the reinforcement structure for the foundation structure.
Figure 3a is a plan view showing that the micro file is an embodiment of the present invention is installed in the drilling hole, Figure 3b is a cross-sectional view showing a large diameter hole is formed, which is an embodiment of the present invention, Figure 3c One embodiment is a cross-sectional view showing that the micro file is installed in the drilling hole, Figure 3d is a cross-sectional view showing that the reinforcement concrete is filled in the drilling hole in which the micro file is an embodiment of the present invention.
3a, 3b using a core drill in the center of the reinforcement portion of the base concrete (10) to form a small
In FIG. 3C, a
In FIG. 3D, the reinforcing
The inverted T-shaped reinforcement structure of the present invention prevents punching shear through micro pile installation, minimizes cross-sectional loss of the foundation concrete, and reinforcement concrete supports the foundation concrete to a predetermined width, compared to the conventional micro pile upper fixing method. There is a technical feature that improves the stability of the foundation structure.
In addition, the present invention is easy to drill by forming a small-diameter boring hole, compared to the conventional micro pile upper fixing method using a key plate (key plate), the reinforcing structure is simple, without using a jig to install the key plate Construction is easy,
When displacement occurs in the ground, reinforcement concrete is formed in an inverted T shape to support the bottom of the foundation concrete, thereby improving stability of the foundation structure, and having technical characteristics of preventing punching shear of the foundation concrete through micro pile installation.
10: foundation concrete 11: reinforced concrete
12a: large diameter drilled
20: base plate 21: lock nut
22: micro pile 23: casing
24: Ground 25: Key plate
26
Claims (1)
In order to install concrete bulbs supporting the lower surface of the foundation concrete 10 with a predetermined width, the width of the foundation concrete 10 is wider than the perforation hole 12b of the small diameter so as to have a predetermined depth. Forming a large diameter hole 12a in 24;
A step of installing a circular casing (23) having a hollow portion at a predetermined depth in the ground so that the micro pile (22) can be installed on the bottom of the large diameter hole (12a);
A lock nut (21), a base plate (20) and a lock nut (21) are sequentially fastened to the micro pile (22) having male threads formed on an outer circumferential surface thereof, and the micro pile (22) is installed on the casing (23); And
Reinforcing concrete (11) is filled in the drill hole of the small diameter and the large diameter; foundation structure reinforcement method using a micro pile.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020120084428A KR20140017381A (en) | 2012-08-01 | 2012-08-01 | A reinforcement method of a foundation structure used a micro pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020120084428A KR20140017381A (en) | 2012-08-01 | 2012-08-01 | A reinforcement method of a foundation structure used a micro pile |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20140017381A true KR20140017381A (en) | 2014-02-11 |
Family
ID=50266039
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020120084428A KR20140017381A (en) | 2012-08-01 | 2012-08-01 | A reinforcement method of a foundation structure used a micro pile |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20140017381A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101470796B1 (en) * | 2014-07-18 | 2014-12-08 | 김정인 | Method of reinforcing existing footing structure using micropile and structure thereof |
KR102092514B1 (en) | 2019-11-21 | 2020-03-23 | 황판용 | Ground drilling method for foundation reinforcement |
KR102324536B1 (en) * | 2020-09-08 | 2021-11-10 | 건설플러스(주) | Preferred load method of foundation structure for loading design load in advance of additional reinforced foundation structure and apparatus of the same |
KR102382028B1 (en) * | 2021-12-02 | 2022-04-01 | (주)진영컨설턴트 | Preloading method for reinforcing pile by total lifting |
KR20230052769A (en) | 2021-10-13 | 2023-04-20 | 황판용 | Concrete Reinforcing Method Using Reaction Anchor |
KR102619673B1 (en) | 2023-01-30 | 2023-12-29 | 에이에이아키그룹건축사사무소 주식회사 | Concrete Reinforcing Method Using Micropile And Dispersion Plate |
-
2012
- 2012-08-01 KR KR1020120084428A patent/KR20140017381A/en not_active Application Discontinuation
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101470796B1 (en) * | 2014-07-18 | 2014-12-08 | 김정인 | Method of reinforcing existing footing structure using micropile and structure thereof |
KR102092514B1 (en) | 2019-11-21 | 2020-03-23 | 황판용 | Ground drilling method for foundation reinforcement |
KR102324536B1 (en) * | 2020-09-08 | 2021-11-10 | 건설플러스(주) | Preferred load method of foundation structure for loading design load in advance of additional reinforced foundation structure and apparatus of the same |
KR20230052769A (en) | 2021-10-13 | 2023-04-20 | 황판용 | Concrete Reinforcing Method Using Reaction Anchor |
KR102382028B1 (en) * | 2021-12-02 | 2022-04-01 | (주)진영컨설턴트 | Preloading method for reinforcing pile by total lifting |
KR102619673B1 (en) | 2023-01-30 | 2023-12-29 | 에이에이아키그룹건축사사무소 주식회사 | Concrete Reinforcing Method Using Micropile And Dispersion Plate |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR20140017381A (en) | A reinforcement method of a foundation structure used a micro pile | |
KR101242476B1 (en) | Base construct method of building and base construct member of building | |
KR100886922B1 (en) | Footing reinforcing or structure recovering method | |
JP2006328716A (en) | Structure and method for underpinning of existing structure and method of constructing new structure near existing structure | |
KR20110072814A (en) | Constructing method of concrete pile having various cross-section | |
JP2014088732A (en) | Method for constructing steel pipe pile, and steel pipe pile member | |
KR100977526B1 (en) | Small dia. pile and constructure method for it | |
KR100978097B1 (en) | Structure for substructure strengthen non-destructive and methode there of | |
KR101331219B1 (en) | Method for constructing micro pile using reinforcing end bearing capacity | |
KR101491746B1 (en) | pile foundation and the installation method | |
KR20110029454A (en) | Reinforcing structure | |
KR101436119B1 (en) | Holding apparatus for CFT column and the construction method of the CFT column using it | |
KR100323112B1 (en) | Reinforcement structure for a foundation pile | |
KR100868987B1 (en) | Structure lifting and supporting method and apparatus by using a micro pile | |
KR101773823B1 (en) | Spin pile and construction method thereof | |
KR20170057808A (en) | Composite pile | |
KR101114860B1 (en) | Structure lifting and supporting method and apparatus by using a micro pile and shear plate | |
KR20160009386A (en) | Precast concrete pile with sheath and the construction method therewith | |
JP4789549B2 (en) | Reconstruction method for existing buildings | |
KR101657785B1 (en) | Micropile Construction method | |
JP2009162034A (en) | Method of constructing foundation of structure | |
KR101876414B1 (en) | Pile with reinforced tip and its construction method thereof | |
JP5563512B2 (en) | Columnar structure and installation method of columnar structure | |
KR20110095538A (en) | Method for head setting of micro-pile and apparatus for the same | |
KR20110087175A (en) | From first of all excavation reclamation methodof phc pickets will improve and the method will be able to the method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E601 | Decision to refuse application |