Blade installing apparatus and method of installing blade using thereof for wind turbine Download PDF

Info

Publication number
KR20140001704A
KR20140001704A KR1020120070250A KR20120070250A KR20140001704A KR 20140001704 A KR20140001704 A KR 20140001704A KR 1020120070250 A KR1020120070250 A KR 1020120070250A KR 20120070250 A KR20120070250 A KR 20120070250A KR 20140001704 A KR20140001704 A KR 20140001704A
Authority
KR
South Korea
Prior art keywords
blade
tower
gripper
unit
connection
Prior art date
Application number
KR1020120070250A
Other languages
Korean (ko)
Other versions
KR101358233B1 (en
Inventor
김성진
조영석
김성준
김성훈
이종환
조기용
Original Assignee
삼성중공업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 삼성중공업 주식회사 filed Critical 삼성중공업 주식회사
Priority to KR1020120070250A priority Critical patent/KR101358233B1/en
Publication of KR20140001704A publication Critical patent/KR20140001704A/en
Application granted granted Critical
Publication of KR101358233B1 publication Critical patent/KR101358233B1/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/10Assembly of wind motors; Arrangements for erecting wind motors
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25JMANIPULATORS; CHAMBERS PROVIDED WITH MANIPULATION DEVICES
    • B25J11/00Manipulators not otherwise provided for
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D1/00Wind motors with rotation axis substantially parallel to the air flow entering the rotor 
    • F03D1/06Rotors
    • F03D1/0608Rotors characterised by their aerodynamic shape
    • F03D1/0633Rotors characterised by their aerodynamic shape of the blades
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2230/00Manufacture
    • F05B2230/60Assembly methods
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Robotics (AREA)
  • Wind Motors (AREA)

Abstract

Disclosed are a device for installing blades for a wind power generator and a method using the same for installing the blades for a wind power generator. A device for installing blades for a wind power generator according to an embodiment of the present invention includes tower/blade connecting assemblies including blade posture adjusting units which adjust postures of the blades around to a hub for installing the blades on the hub while the tower and at least one blade are each gripped; and an align detecting unit which detects whether blade root units and blade connecting units are mutually aligned or not by extracting each edge from overlapped images of the blade root units and the blade connecting units of a hub where the blade root units are inserted and comparing the same.

Description

풍력발전기용 블레이드 설치장치 및 이를 이용한 풍력발전기용 블레이드 설치방법{BLADE INSTALLING APPARATUS AND METHOD OF INSTALLING BLADE USING THEREOF FOR WIND TURBINE}Blade installation device for wind turbines and blade installation method for wind turbines using the same

본 발명은, 풍력발전기용 블레이드 설치장치 및 이를 이용한 블레이드 설치방법에 관한 것이다.The present invention relates to a blade installation device for a wind turbine and a blade installation method using the same.

일반적으로, 전기를 생산하기 위한 대표적인 발전 형태로는 화석연료를 에너지원으로 하는 화력발전 및 핵분열을 이용하는 원자력발전을 들 수 있다.Generally, typical types of power generation for generating electricity include thermal power generation using fossil fuel as an energy source and nuclear power generation using nuclear power.

그러나, 화력발전은 화석연료의 연소에 의해 발생하는 에너지를 이용함에 따른 공해유발의 문제와 함께 막대한 건설비가 요구되는 문제점이 있다.However, thermal power generation has a problem of causing pollution due to utilization of the energy generated by the combustion of fossil fuel and a huge construction cost.

그리고, 원자력발전은 많은 양의 전기를 생산하는데 유리하지만 방사선 누출을 차단하기 위한 막대한 시설비가 요구됨은 물론 방사선 누출의 위험성 때문에 지역주민들의 강한 반발이 예상되며, 나아가 폐기물처리도 쉽지 않으며, 사소한 사고라할지라도 심각한 환경파괴를 초래할 수 있는 위험이 항상 존재하는 등 다양한 문제점이 있다.In addition, nuclear power generation is advantageous for producing a large amount of electricity, but it requires huge facility costs to block the radiation leakage and the strong reaction of local residents is expected due to the risk of radiation leakage, and it is not easy to dispose of waste, and it is a minor accident. However, there are various problems, such as always presenting a risk that can cause serious environmental damage.

이에, 화력이나 원자력 발전으로 인한 공해문제로부터 자유롭고 고갈될 염려없는 영구적인 에너지원으로서 풍력, 조력, 수력, 태양열 등과 같은 자연 에너지를 에너지원으로 활용하려는 연구들이 활발하게 진행되고 있다.Therefore, researches are actively conducted to utilize natural energy such as wind power, tidal power, hydroelectric power, and solar energy as an energy source as a permanent energy source free from exhaustion problems due to firepower or nuclear power generation.

특히, 자연 에너지를 이용한 발전 가운데 청정 에너지원을 이용한다는 측면에서 풍력발전이 대안으로 부각되고 있으며, 풍력발전은 구조나 설치 등이 간단함과 동시에 운영 및 관리가 용이하고 무인화 및 자동화 운전이 가능하기 때문에 최근에 도입이 비약적으로 증가하고 있는 실정이다.In particular, wind power is emerging as an alternative in terms of the use of natural energy among power generation using natural energy. Wind power generation is simple in structure and installation, easy to operate and manage, and unmanned and automated. As a result, the introduction has increased dramatically in recent years.

한편, 과거에는 풍력발전 구조물들이 주로 육상에서 이루어졌으나, 소음과 진동 등에 의한 환경피해가 속출하고 발전용량이 대형화되고, 미관, 장소의 제약 등의 여러문제로 인하여 최근에는 해상에 풍력발전단지를 집약적으로 집단화시켜 건설하는 것이 추세이다.On the other hand, in the past, wind power structures were mainly made on land, but due to various problems such as environmental damage caused by noise and vibration, increased power generation capacity, and aesthetics and limitations of place, wind farms have recently become intensive. The trend is to build them in groups.

풍력발전기는 바람에 의한 회전에너지로부터 전기에너지를 생산하는 장치로서, 바람에 의해 회전되는 복수의 블레이드(blade)가 연결되는 허브(hub)를 구비한 로터(rotor)와, 로터와 연결되는 나셀(nacelle)을 지지하면서 보호하는 나셀커버(nacelle cover)와, 블레이드, 로터, 나셀 및 나셀커버를 지지하는 타워(tower)를 포함한다.Wind power generator is a device for producing electrical energy from the rotational energy by the wind, a rotor having a hub to which a plurality of blades (blade) rotated by the wind, and a nacelle connected to the rotor ( and a nacelle cover for supporting and protecting the nacelle, and a tower for supporting the blades, the rotor, the nacelle, and the nacelle cover.

한편, 대형 풍력발전기의 경우, 타워와 마찬가지로 블레이드는 대단히 큰 거대 구조물, 예를들어 100m 내외에 이르는 거대 구조물이기 때문에 타워와 블레이드를 설치 장소로 이송시킨 후 허브에 복수의 블레이드를 설치하는 작업은 용이하지 않다.On the other hand, in the case of a large wind power generator, as in the case of a tower, the blade is a very large structure, for example, a large structure of about 100 m. Not.

타워와 블레이드를 이송함에 있어, 육상에서는 필요에 따라 다수의 덤프트럭과 크레인을 동원할 수 있으나, 작업 환경이 열악한 해상에서는 거대 구조물인 타워와 블레이드를 이송하는 작업 자체가 용이하지 않다.In transporting towers and blades, a large number of dump trucks and cranes can be mobilized on land as needed. However, the transport of towers and blades, which are large structures, is not easy in the offshore environment.

즉, 타워와 블레이드를 개별적으로 이송시키는 경우에 타워와 블레이드, 또는 블레이드들 상호간에 충돌이 발생되지 않기 때문에 손상 없이 용이하게 이송할 수 있지만 이송 선박 상의 공간적인 문제로 이송 효율이 상당히 떨어진다.That is, when the tower and the blades are individually transported, since the collision does not occur between the tower and the blades or the blades, the transport can be easily carried out without damage, but the transport efficiency is considerably reduced due to the space problem on the transport ship.

따라서, 타워와 블레이드를 묶음 형식으로 연결하여 이송시키는 것이 바람직하나, 이러한 기능을 수행하는 장치의 구현이 용이하지 않아 그에 대한 개발 필요성이 대두되고 있다.Therefore, it is preferable to transfer the tower and the blade in a bundled form, but it is not easy to implement a device for performing such a function, and the need for development thereof has emerged.

또한, 허브에 블레이드를 설치하는 작업은, 허브와 블레이드 간의 얼라인 여부를 확인한 후 허브에 대한 블레이드의 자세를 능동적으로 제어할 필요가 있으므로, 허브에 대한 블레이드의 자세를 능동적으로 제어할 수 있는 장치 개발이 요구된다.In addition, the installation of the blade in the hub, after confirming the alignment between the hub and the blade needs to actively control the attitude of the blade to the hub, the device capable of actively controlling the attitude of the blade to the hub Development is required.

[문헌1] 대한민국 공개특허 제2011-0037897호 (제너럴 일렉트릭 캄파니, 2011.04.13.)[Patent 1] Republic of Korea Patent Publication No. 2011-0037897 (General Electric Company, 2011.04.13.)

따라서 본 발명이 해결하고자 하는 기술적 과제는, 타워와 블레이드의 이송효율을 향상시킴과 아울러 허브에 블레이드를 설치함에 있어서 블레이드 루트부와 블레이드 접속부의 중첩된 영상으로부터 블레이드 루트부와 블레이드 접속부 간의 얼라인 여부를 검출한 후, 허브에 대한 블레이드의 자세를 능동적으로 조절할 수 있는 풍력발전기용 블레이드 설치장치 및 이를 이용한 풍력발전기용 블레이드 설치방법을 제공하는 것이다.Therefore, the technical problem to be solved by the present invention is to improve the transfer efficiency of the tower and the blade, and in the installation of the blade in the hub in the blade root portion and the blade connection portion from the overlapping image of the blade root portion and the blade connection in the alignment or not After detecting the, it is to provide a wind turbine blade installation device that can actively adjust the attitude of the blade with respect to the hub and a wind turbine blade installation method using the same.

본 발명의 일 측면에 따르면, 타워와 적어도 하나 이상의 블레이드를 각각 그립핑한 상태에서, 허브에 상기 블레이드를 설치하기 위하여 상기 허브에 대한 상기 블레이드의 자세를 조절하는 블레이드 자세 조절유닛을 구비한 타워/블레이드 연결 어셈블리; 및 상기 블레이드가 상기 허브에 접근하는 상태에서, 상기 블레이드의 루트부와 상기 블레이드 루트부가 삽입되는 상기 허브의 블레이드 접속부의 중첩된 영상으로부터 각각의 테두리를 추출하고 비교하여 상기 블레이드 루트부와 상기 블레이드 접속부 간의 상호 얼라인 여부를 검출하는 얼라인 검출유닛을 포함하는 풍력발전기용 블레이드 설치장치가 제공될 수 있다.According to an aspect of the invention, the tower and the tower having a blade attitude control unit for adjusting the attitude of the blade relative to the hub in order to install the blade in the hub, each gripping the at least one or more blades / Blade connection assembly; And extracting and comparing edges of the blade root portion and the blade contact portion from an overlapping image of the blade connection portion of the hub into which the blade root portion and the blade root portion are inserted while the blade approaches the hub. Blade installation apparatus for a wind power generator comprising an alignment detection unit for detecting mutual alignment between the two.

상기 얼라인 검출유닛은, 상기 블레이드 접속부 측에 마련되고, 상기 블레이드 루트부의 단면부와 상기 블레이드 접속부의 단면부가 중첩된 영상을 획득하는 영상획득부; 상기 중첩된 영상으로부터 추출된상기 블레이드 루트부 및 상기 블레이드 접속부의 특징점들을 이용하여 상기 블레이드 루트부의 단면부 및 상기 블레이드 접속부의 단면부 테두리를 산출하고, 각각의 테두리에 대한 곡률을 계산하여, 상기 블레이드 루트부의 단면부 및 상기 블레이드 접속부의 단면부 테두리의 중심위치가 일치하는지 여부 및 원형인지 여부를 판단하여 상기 블레이드 루트부와 상기 블레이드 접속부간의 상대 위치관계를 산출하는 상대 위치관계 산출부; 및 상기 상대 위치관계 산출부에서 획득한 상기 블레이드 루트부와 상기 블레이드 접속부 간의 상대 위치를 이용하여, 상기 블레이드 루트부와 상기 블레이드 접속부가 얼라인되도록 상기 블레이드 자세 조절유닛을 제어하는 블레이드 자세 제어부를 포함할 수 있다.The alignment detection unit may include: an image acquisition unit provided at the blade connection unit side and acquiring an image in which the cross section of the blade root unit and the cross section of the blade connection unit overlap; The edges of the cross section of the blade root portion and the cross section of the blade connection portion are calculated using feature points of the blade root portion and the blade connection portion extracted from the overlapped image, and the curvature of each of the edges is calculated to calculate the blades. A relative positional relationship calculating section for determining a relative positional relationship between the blade root portion and the blade connecting portion by determining whether the center position of the cross section of the root portion and the edge of the cross section of the blade connecting portion is coincident and circular; And a blade posture control unit configured to control the blade posture adjusting unit to align the blade root with the blade contact by using a relative position between the blade root and the blade connecting part obtained by the relative position relationship calculating unit. can do.

상기 얼라인 검출유닛은, 상기 블레이드 루트부의 단면부 및 상기 블레이드 접속부의 단면부 영상에서 각각 복수의 특징점을 추출하는 특징점 추출부를 더 포함할 수 있다.The alignment detecting unit may further include a feature point extracting unit configured to extract a plurality of feature points from the cross section of the blade root and the cross section of the blade connecting unit.

상기 타워/블레이드 연결 어셈블리는, 타워를 그립핑하는 타워 그립퍼; 및 블레이드를 그립핑하는 블레이드 그립퍼를 더 포함하며, 상기 블레이드 자세 조절유닛은, 상기 타워 그립퍼와 적어도 하나 이상의 상기 블레이드 그립퍼를 상호 연결할 수 있다.The tower / blade connection assembly includes: a tower gripper for gripping a tower; And a blade gripper for gripping the blade, wherein the blade attitude adjusting unit may interconnect the tower gripper and at least one blade gripper.

상기 블레이드 자세 조절유닛은, 상기 블레이드 그립퍼에 연결되고, 상기 블레이드 그립퍼를 상기 타워의 높이방향으로 승강시키는 블레이드 그립퍼 연결모듈; 및 상기 블레이드 그립퍼 연결모듈과 상기 타워 그립퍼 사이에 배치되고, 상기 타워에 대해 상기 블레이드를 상대 회동시켜 상기 허브에 대한 상기 블레이드의 자세를 조절하는 블레이드 자세 조절부를 포함할 수 있다.The blade posture adjusting unit is connected to the blade gripper, the blade gripper connection module for elevating the blade gripper in the height direction of the tower; And a blade attitude adjuster disposed between the blade gripper connection module and the tower gripper and adjusting the attitude of the blade relative to the hub by rotating the blade relative to the tower.

상기 블레이드 그립퍼 연결모듈은, 상기 블레이드 그립퍼에 연결되는 블레이드 그립퍼 연결부; 및 상기 블레이드 그립퍼 연결부에 연결되고, 상기 블레이드 그립퍼 연결부를 상기 타워의 높이방향으로 승강시켜 상기 타워의 높이방향으로 상기 블레이드를 선형 왕복운동 가능하게 하는 블레이드 선형운동부를 포함할 수 있다.The blade gripper connection module may include a blade gripper connection part connected to the blade gripper; And a blade linear movement part connected to the blade gripper connection part and configured to elevate the blade gripper connection part in the height direction of the tower to linearly reciprocate the blade in the height direction of the tower.

상기 블레이드 자세 조절부는, 상기 블레이드 그립퍼 연결모듈이 자유 회동가능하게 지지하는 회동 지지부재; 상기 블레이드 그립퍼 연결모듈에 연결되고, 상기 블레이드 그립퍼 연결모듈이 상기 회동 지지부재를 중심으로 회동되게 하는 구동력을 제공하는 구동부; 및 상기 구동부를 지지하는 구동부 지지부재를 포함할 수 있다.The blade attitude adjustment unit, the rotation support member for supporting the blade gripper connection module freely rotatable; A driving unit connected to the blade gripper connection module and providing a driving force to cause the blade gripper connection module to rotate about the pivot support member; And a driving unit support member supporting the driving unit.

상기 회동 지지부재는, 상기 블레이드 그립퍼 연결모듈을 회동가능하게 지지하는 유니버셜 조인트이며, 상기 구동부는, 상기 회동 지지부재를 중심으로 직교되는 위치에 쌍을 이루어 이격되게 배치되는 복수의 엑츄에이터를 포함하며, 상기 한 쌍의 엑츄에이터는 상기 블레이드 그립퍼 연결모듈에 연결되는 상부 간격이 하부 간격보다 더 클 수 있다.The pivot support member is a universal joint rotatably supporting the blade gripper connection module, and the driving part includes a plurality of actuators disposed in pairs at a position orthogonal to the pivot support member and spaced apart from each other. The pair of actuators may have an upper gap connected to the blade gripper connection module to be larger than a lower gap.

상기 블레이드 자세 조절유닛은, 일단부가 상기 타워 그립퍼에 연결되고 타단부가 상기 블레이드 자세 조절부에 연결되고, 상기 타워에 대한 상기 블레이드의 간격을 조절하기 위해 접철 가능하게 연결된 접철식 연결모듈을 더 포함할 수 있다.The blade posture adjusting unit may further include a foldable connecting module having one end connected to the tower gripper and the other end connected to the blade posture adjusting unit, and foldably connected to adjust the spacing of the blade with respect to the tower. Can be.

상기 접철식 연결모듈은, 상기 타워 그립퍼에 연결되는 제1 연결부; 상기 블레이드 자세 조절부에 연결되는 제2 연결부; 및 상기 제1 연결부와 상기 제2 연결부를 링크 타입으로 연결하는 복수의 링크부재를 포함할 수 있다.The foldable connection module, the first connection portion connected to the tower gripper; A second connection part connected to the blade attitude control part; And a plurality of link members connecting the first connection portion and the second connection portion in a link type.

상기 타워/블레이드 연결 어셈블리는, 상기 블레이드 자세 조절유닛으로부터 이격되고, 상기 타워와 상기 블레이드 사이의 간격을 일정하게 유지하여 상기 타워와 상기 블레이드가 상호 충돌되는 것을 방지하도록 상기 타워와 상기 블레이드에 각각 착탈가능하게 연결되는 간격 유지모듈을 더 포함할 수 있다.The tower / blade connection assembly is spaced apart from the blade posture adjusting unit, and is detachably attached to the tower and the blade to prevent the tower and the blade from colliding with each other by maintaining a constant distance between the tower and the blade. It may further include a gap maintaining module that is possibly connected.

본 발명의 다른 측면에 따르면, 제1항 내지 제11항 중 어느 한 항에 따른 풍력발전기용 블레이드 설치장치를 이용하여 풍력발전기 블레이드를 설치하는 방법에 있어서, 상기 블레이드의 루트부가 삽입되는 블레이드 접속부 측에 마련된 영상획득부를 이용하여 상기 블레이드 루트부의 단면부와 상기 블레이드 접속부의 단면부의 중첩된 영상을 획득하는 단계; 상기 중첩된 영상으로부터 블레이드 루트부 및 블레이드 접속부의 복수개의 특징점을 추출하는 단계; 상기 추출된 특징점들로부터 상기 블레이드 루트부의 단면부 및 블레이드 접속부의 단면부의 테두리들을 산출하는 단계; 상기 산출된 테두리들의 곡률 및 중심위치를 산출하는 단계; 상기 산출된 곡률 및 중심위치를 이용하여 상기 블레이드 루트부를 상기 블레이드 접속부에 얼라인하는 단계를 포함하는 풍력발전기 블레이드 설치 방법이 제공될 수 있다.According to another aspect of the present invention, in the method for installing a wind turbine blade using the wind turbine blade installation apparatus according to any one of claims 1 to 11, the blade connection portion into which the root portion of the blade is inserted Obtaining an overlapping image of the cross section of the cross section of the blade root portion and the cross section of the blade connecting portion using an image acquisition unit provided in the cross section; Extracting a plurality of feature points of the blade root portion and the blade contact portion from the superimposed image; Calculating edges of the cross section of the blade root portion and the cross section of the blade connecting portion from the extracted feature points; Calculating curvature and center positions of the calculated edges; Using the calculated curvature and the center position can be provided a wind turbine blade installation method comprising the step of aligning the blade root to the blade connecting portion.

상기 얼라인하는 단계는, 상기 산출된 테두리들의 곡률을 이용하여, 상기 블레이드 루트부의 테두리가 원형이 되도록 상기 블레이드 자세 조절유닛을 제어하여 상기 블레이드 루트부를 상기 블레이드 접속부에 얼라인하는 단계를 포함할 수 있다.The aligning may include controlling the blade posture adjusting unit so that the edge of the blade root is circular by using the calculated curvature of the edges, and aligning the blade root with the blade connecting portion. have.

상기 얼라인하는 단계는, 상기 산출된 테두리들의 중심위치가 일치하도록 상기 블레이드 자세 조절유닛을 제어하여 상기 블레이드 루트부를 상기 블레이드 접속부에 얼라인하는 단계를 포함할 수 있다.The aligning may include controlling the blade posture adjusting unit so that the calculated center positions of the edges coincide with each other to align the blade root with the blade connecting portion.

상기 얼라인하는 단계는, 상기 블레이드 루트부의 단면부 테두리가 상기 블레이드 접속부의 단면부 테두리의 내부에 위치하는 경우, 상기 블레이드 자세 조절유닛을 제어하여 상기 블레이드 루트부를 상기 블레이드 접속부 방향으로 이송하는 단계를 포함할 수 있다.The aligning may include transferring the blade root portion toward the blade connecting portion by controlling the blade posture adjusting unit when the edge portion of the blade root portion is positioned inside the edge portion of the blade connection portion. It may include.

본 발명의 실시예들은, 타워와 블레이드의 이송효율을 향상시킴과 아울러 허브에 블레이드를 설치함에 있어서 블레이드 루트부와 블레이드 접속부의 중첩된 영상으로부터 블레이드 루트부와 블레이드 접속부 간의 얼라인 여부를 검출한 후, 허브에 대한 블레이드의 자세를 능동적으로 조절할 수 있다.Embodiments of the present invention, after improving the transfer efficiency of the tower and the blade, and detecting the alignment between the blade root and the blade connection from the overlapping image of the blade root and the blade connection in installing the blade in the hub The position of the blade relative to the hub can be actively adjusted.

도 1은 풍력발전기의 정면도로서, 하나의 블레이드가 이송되는 상태를 나타내는 도면이다.
도 2는 본 발명의 일 실시예에 따른 풍력발전기용 블레이드 설치장치에 의해 타워와 복수의 블레이드가 연결된 상태를 나타내는 사시도이다.
도 3은 도 2의 요부 확대도로서, 타워/블레이드 연결 어셈블리에 의해 타워와 블레이드가 연결된 상태를 나타내는 도면이다.
도 4는 타워/블레이드 연결 어셈블리가 동작하기 전의 상태를 나타내는 도면이다.
도 5는 타워/블레이드 연결 어셈블리 동작에 의한 블레이드 롤링운동을 나타내는 동작상태도이다.
도 6은 타워/블레이드 연결 어셈블리 동작에 의한 블레이드 피칭운동을 나타내는 동작상태도이다.
도 7은 타워/블레이드 연결 어셈블리 동작에 의한 블레이드 요잉운동을 나타내는 동작상태도이다.
도 8은 타워/블레이드 연결 어셈블리 동작에 의한 블레이드 선형운동을 나타내는 동작상태도이다.
도 9는 블레이드 위치/자세 획득유닛의 제어블록도이다.
도 10은 얼라인 검출유닛의 영상획득부가 설치된 상태를 나타내는 도면이다.
도 11은 영상획득부에 의해 획득한 영상을 나타내는 도면이다.
도 12는 얼라인 모니터링 유닛을 나타내는 도면이다.
도 13a 및 도 13b는 본 발명의 다른 실시예에 따른 풍력발전기용 블레이드 설치방법을 나타내는 순서도이다.
도 14 내지 도 21은 풍력발전기용 블레이드 설치방법을 설명하기 위한 예시도이다.
1 is a front view of a wind turbine, showing a state in which one blade is transferred.
2 is a perspective view illustrating a state in which a tower and a plurality of blades are connected by a blade generator for a wind turbine according to an embodiment of the present invention.
3 is an enlarged view illustrating main parts of FIG. 2 and illustrates a state in which a tower and a blade are connected by a tower / blade connection assembly.
4 is a view showing a state before the tower / blade connection assembly operates.
5 is an operational state diagram showing the blade rolling motion by the tower / blade connection assembly operation.
6 is an operational state diagram showing the blade pitching movement by the tower / blade connection assembly operation.
7 is an operational state diagram showing the blade yawing motion by the tower / blade connection assembly operation.
8 is an operational state diagram showing blade linear motion by the tower / blade connection assembly operation.
9 is a control block diagram of the blade position / attitude acquisition unit.
10 is a diagram illustrating a state in which an image acquisition unit of an alignment detection unit is installed.
11 is a diagram illustrating an image acquired by an image acquisition unit.
12 is a diagram illustrating an alignment monitoring unit.
13A and 13B are flowcharts illustrating a method of installing a blade for a wind turbine according to another embodiment of the present invention.
14 to 21 is an exemplary view for explaining a blade installation method for a wind turbine.

본 발명과 본 발명의 동작상의 이점 및 본 발명의 실시에 의하여 달성되는 목적을 충분히 이해하기 위해서는 본 발명의 바람직한 실시 예를 예시하는 첨부 도면 및 첨부 도면에 기재된 내용을 참조하여야만 한다.In order to fully understand the present invention, operational advantages of the present invention, and objects achieved by the practice of the present invention, reference should be made to the accompanying drawings and the accompanying drawings which illustrate preferred embodiments of the present invention.

이하, 첨부된 도면을 참조하여 본 발명의 바람직한 실시 예를 설명함으로써, 본 발명을 상세히 설명한다. 각 도면에 제시된 동일한 참조부호는 동일한 부재를 나타낸다.Hereinafter, the present invention will be described in detail with reference to the preferred embodiments of the present invention with reference to the accompanying drawings. Like reference symbols in the drawings denote like elements.

도 1은 풍력발전기의 정면도로서, 하나의 블레이드가 이송되는 상태를 나타내는 도면이고, 도 2는 본 발명의 일 실시예에 따른 풍력발전기용 블레이드 설치장치에 의해 타워와 복수의 블레이드가 연결된 상태를 나타내는 사시도이고, 도 3은 도 2의 요부 확대도로서, 타워/블레이드 연결 어셈블리에 의해 타워와 블레이드가 연결된 상태를 나타내는 도면이고, 도 4는 타워/블레이드 연결 어셈블리가 동작하기 전의 상태를 나타내는 도면이고, 도 5는 타워/블레이드 연결 어셈블리 동작에 의한 블레이드 롤링운동을 나타내는 동작상태도이고, 도 6은 타워/블레이드 연결 어셈블리 동작에 의한 블레이드 피칭운동을 나타내는 동작상태도이고, 도 7은 타워/블레이드 연결 어셈블리 동작에 의한 블레이드 요잉운동을 나타내는 동작상태도이고, 도 8은 타워/블레이드 연결 어셈블리 동작에 의한 블레이드 선형운동을 나타내는 동작상태도이고, 도 9는 블레이드 위치/자세 획득유닛의 제어블록도이고, 도 10은 얼라인 검출유닛의 영상획득부가 설치된 상태를 나타내는 도면이고, 도 11은 영상획득부에 의해 획득한 영상을 나타내는 도면이고, 도 12는 얼라인 모니터링 유닛을 나타내는 도면이다.1 is a front view of a wind turbine, showing a state in which one blade is transported, Figure 2 shows a state in which a tower and a plurality of blades are connected by the blade installation device for a wind turbine according to an embodiment of the present invention 3 is an enlarged view illustrating main parts of FIG. 2, which illustrates a state in which a tower and a blade are connected by a tower / blade connection assembly, and FIG. 4 illustrates a state before the tower / blade connection assembly operates. 5 is an operational state diagram showing the blade rolling motion by the tower / blade connection assembly operation, Figure 6 is an operational state diagram showing the blade pitching movement by the tower / blade connection assembly operation, Figure 7 is a tower / blade connection assembly operation Operation state diagram showing the blade yawing motion by, Figure 8 is a tower / bla 9 is a control block diagram of a blade position / posture acquisition unit, FIG. 10 is a view illustrating a state in which an image acquisition unit of an alignment detection unit is installed, and FIG. 11. Is a diagram illustrating an image acquired by the image acquisition unit, and FIG. 12 is a diagram illustrating an alignment monitoring unit.

도 1을 참조하면, 풍력발전기는 나셀(nacelle, 미도시)에 연결되고 바람에 의해 회전되는 복수의 블레이드(110, blade)와, 블레이드(110)의 회전에 따라 회전하되 블레이드(110)가 연결되는 허브(121)를 구비한 로터(120,rotor)와, 나셀, 로터(120) 및 블레이드(110)를 지지하는 타워(140)를 포함한다.Referring to FIG. 1, the wind generator is connected to a nacelle (not shown) and rotates according to the rotation of the blades 110 and a plurality of blades 110 that are rotated by the wind, but the blades 110 are connected. Rotor 120 having a hub 121, and a tower 140 for supporting the nacelle, the rotor 120 and the blade 110.

블레이드(110)는 바람에 의해 회전되어 회전운동을 발생시키는 일종의 날개이다. 로터(120)를 기준으로 방사상으로 배치되는 블레이드(110)는 바람에 의해 쉽게 회전될 수 있도록 유선형의 날개 형상을 가진다.Blade 110 is a kind of wing that is rotated by the wind to generate a rotational movement. The blade 110 disposed radially with respect to the rotor 120 has a streamlined wing shape to be easily rotated by the wind.

그리고, 본 실시예에 따른 풍력발전기는 바람의 특성을 최대한 활용하면서 안정성을 추구할 수 있도록 3개의 블레이드(110)를 구비하나, 이에 한정되지 않으며 블레이드(110)의 개수에 의해 본 발명의 권리범위가 제한되지 않는다.In addition, the wind power generator according to the present embodiment includes three blades 110 so as to pursue stability while maximizing the characteristics of the wind, but is not limited thereto. The scope of the present invention is limited by the number of blades 110. Is not limited.

로터(120)의 허브(121)는 복수의 블레이드(110)가 연결되는 장소이다.The hub 121 of the rotor 120 is a place where the plurality of blades 110 are connected.

허브(121)는 정면에서 바라볼 때 대략 원형의 형상을 가지며, 측면에서 바라볼 때는 돔(dome)형상을 가질 수 있다.The hub 121 may have a substantially circular shape when viewed from the front, and may have a dome shape when viewed from the side.

그리고, 허브(121)의 일측에는 블레이드(110)의 회전운동을 전달받아 전기에너지를 생산하는 나셀(nacelle, 미도시)이 연결되며, 나셀은 나셀커버(130, nacelle cover)에 의해 보호된다.And, one side of the hub 121 is connected to a nacelle (nacelle, not shown) that receives the rotational movement of the blade 110 to produce electrical energy, the nacelle is protected by a nacelle cover (130, nacelle cover).

나셀은 블레이드(110)의 회전운동을 전달받아 전기에너지를 생산하는 등 풍력발전기를 구동시키는데 있어 중요한 역할을 담당하는 기계부품들, 예컨대 허브에 연결된 회전샤프트(160), 관통삽입된 회전샤프(160)트를 지지하는 베어링하우징(170), 베어링하우징(170)을 관통한 회전샤프트(160)가 연결되는 기어박스(180), 기어박스(180)의 일측에 마련되되 기어박스(180)에서 전달된 회전샤프트(160)의 회전력에 의해 구동되는 발전기(미도시)와, 베어링하우징(170)과 기어박스(180) 등을 지지하는 프레임부(190) 등이 결합되어 있는 구조체를 통틀어 일컫는다.The nacelle receives the rotational motion of the blade 110 to produce electrical energy, such as mechanical parts that play an important role in driving a wind power generator, such as a rotating shaft 160 connected to a hub, a penetrating rotary shaft 160. The bearing housing 170 for supporting the shaft, the gear box 180 is connected to the rotating shaft 160 through the bearing housing 170, the gear box 180 is provided on one side of the gear box 180 to be transmitted from the gear box 180. The generator (not shown) driven by the rotational force of the rotating shaft 160, and a structure in which the bearing housing 170, the frame unit 190 supporting the gear box 180, and the like are combined are collectively referred to.

이처럼, 나셀커버(130)는 나셀의 외부에 결합되어 나셀을 보호하는 역할을 한다.As such, the nacelle cover 130 is coupled to the outside of the nacelle serves to protect the nacelle.

나셀커버(130)는 외기에 그대로 노출되어 눈, 비 혹은 햇볕 등에 상시 노출되기 때문에 어느 정도의 강성이 보장되어야 한다. 따라서 나셀커버(130)는 내구성이 우수한 비금속 혹은 금속 복합 재질로 제작된다.Since the nacelle cover 130 is exposed to the outside air as it is constantly exposed to snow, rain or sunlight, a certain degree of rigidity should be ensured. Therefore, the nacelle cover 130 is made of a non-metal or metal composite material with excellent durability.

한편, 타워(140)는 상하로 길게 배치되는 축으로서, 복수의 블레이드(110), 허브(121), 나셀 및 나셀커버(130) 등의 구조물에 대한 축 방향 하중을 지지한다.On the other hand, the tower 140 is an axis extending vertically, and supports the axial load on the structure, such as a plurality of blades 110, hub 121, nacelle and nacelle cover 130.

타워(140)는 위치별로 아랫부분의 로워 타워(lower tower)와, 윗부분의 어퍼 타워(upper tower)로 구분될 수 있다.The tower 140 may be divided into a lower tower at a lower portion and an upper tower at an upper portion by position.

타워(140)는 내부가 빈 파이프(pipe) 형의 구조물이며, 타워(140)의 내부 빈 공간을 통해 케이블(cable) 등이 통과된다. 케이블은 송전용 파워 케이블(power cable), 통신용 케이블(cable) 등을 포함한 다양한 종류의 케이블일 수 있다.The tower 140 is a hollow pipe-type structure, and a cable or the like is passed through the inner empty space of the tower 140. The cable may be various kinds of cables including power cables for power transmission, cables for communication, and the like.

한편, 사이즈 혹은 크기가 작은 풍력발전기의 경우에는 풍력발전기 설치에 커다란 어려움이 없으나, 본 실시예에서와 같이 타워(140)의 길이가 100 미터(m) 내외이고 블레이드(110)의 길이 역시 타워(140)에 준하는 길이를 갖는 대형 풍력발전기의 경우, 허브(121)에 인접하게 블레이드(110)를 이송하고 블레이드(110)를 허브(121)의 블레이드 접속부(미도시)에 삽입 및 체결하는 작업이 용이하지 않다.On the other hand, in the case of a small size or small wind power generator, there is no great difficulty in the installation of the wind power generator, as in this embodiment, the length of the tower 140 is about 100 meters (m) and the length of the blade 110 is also a tower ( In the case of a large wind power generator having a length equivalent to 140, the operation of transferring the blade 110 adjacent to the hub 121 and inserting and fastening the blade 110 into the blade connection portion (not shown) of the hub 121 is performed. Not easy

따라서, 풍력발전기를 설치함에 있어, 타워(140)와 블레이드(110)를 묶음 형식으로 연결하여 타워(140)와 블레이드(110)의 이송효율을 향상시키며, 블레이드 접속부(123)에 블레이드의 루트부(111)를 삽입 설치함에 있어 블레이드(110)의 자세를 능동적으로 제어할 수 있는 풍력발전기용 블레이드 설치장치가 요구된다.Therefore, in installing the wind power generator, the tower 140 and the blade 110 are connected in a bundled form to improve the transfer efficiency of the tower 140 and the blade 110, and the root portion of the blade at the blade connecting portion 123. In inserting 111, a wind turbine blade installation apparatus capable of actively controlling the posture of the blade 110 is required.

도 2 내지 도 12를 참조하면, 본 발명의 일 실시예에 따른 풍력발전기용 블레이드 설치장치는, 타워(140)와 적어도 하나 이상의 블레이드(110)를 각각 그립핑한 상태에서, 허브(121)에 블레이드(110)를 설치하기 위하여 허브(121)에 대한 블레이드(110)의 자세를 조절하는 타워/블레이드 연결 어셈블리(200)와, 블레이드(110)가 허브(121)에 접근하는 상태에서, 블레이드 루트부(111)와 블레이드 접속부(123)의 얼라인 유무를 감지하는 허브/블레이드 얼라인 감지유닛(300)을 포함한다.2 to 12, the blade installation apparatus for a wind turbine according to an embodiment of the present invention, in the state in which the tower 140 and the at least one or more blades 110 are gripped, respectively, to the hub 121 Tower / blade connection assembly 200 which adjusts the attitude of the blade 110 relative to the hub 121 to install the blade 110, and with the blade 110 approaching the hub 121, the blade root. It includes a hub / blade alignment detection unit 300 for detecting the alignment of the portion 111 and the blade connecting portion 123.

본 실시예에 따른 풍력발전기용 블레이드 설치장치는, 타워(140)와 적어도 하나 이상의 블레이드(110)를 묶음 형식으로 연결하여 타워(140)와 블레이드(110)의 이송효율을 향상시킬 수 있으며, 블레이드(110)를 삽입 설치함에 있어 블레이드 루트부(111)와 블레이드 접속부(123)의 얼라인 상태를 확인하면서 블레이드(110) 자세를 능동적으로 제어할 수 있다.Blade installation apparatus for a wind turbine according to the present embodiment, by connecting the tower 140 and at least one blade 110 in a bundled form can improve the transfer efficiency of the tower 140 and the blade 110, the blade In inserting 110, the attitude of the blade 110 may be actively controlled while checking the alignment state of the blade root 111 and the blade connecting portion 123.

본 실시예에 따른 타워/블레이드 연결 어셈블리(200)는, 타워(140)와 적어도 하나 이상의 블레이드(110)를 각각 그립핑한 상태에서 타워(140)와 블레이드(110)들을 상호 연결하는 역할을 한다. 또한, 타워/블레이드 연결 어셈블리(200)는 블레이드(110) 설치작업 중 블레이드(110)의 자세를 능동적으로 조절할 수 있는 역할을 한다.The tower / blade connection assembly 200 according to the present embodiment serves to interconnect the tower 140 and the blades 110 in a state in which the tower 140 and the at least one blade 110 are gripped, respectively. . In addition, the tower / blade connection assembly 200 serves to actively adjust the attitude of the blade 110 during the blade 110 installation work.

타워/블레이드 연결 어셈블리(200)는, 타워(140)를 그립핑하는 타워 그립퍼(210)와, 블레이드(110)를 그립핑하는 블레이드 그립퍼(220)와, 타워 그립퍼(210)와 적어도 하나 이상의 블레이드 그립퍼(220)를 상호 연결하되, 허브(121)에 블레이드(110)를 설치하기 위하여 허브(121)에 대한 블레이드(110)의 자세를 조절하는 블레이드 자세 조절유닛(230)과, 블레이드 자세 조절유닛(230)으로부터 이격되되 타워(140)와 블레이드(110) 사이의 간격을 일정하게 유지하여 타워(140)와 블레이드(110)가 상호 충돌되는 것을 방지하도록 타워(140)와 블레이드(110)에 각각 착탈가능하게 연결되는 간격 유지모듈(270)을 포함한다.The tower / blade connection assembly 200 includes a tower gripper 210 for gripping the tower 140, a blade gripper 220 for gripping the blades 110, a tower gripper 210 and at least one blade. The blade posture adjusting unit 230 and the blade posture adjusting unit interconnecting the grippers 220 to adjust the posture of the blade 110 with respect to the hub 121 so as to install the blade 110 in the hub 121. Spaced apart from the 230 but maintains a constant gap between the tower 140 and the blade 110 to prevent the tower 140 and the blade 110 from colliding with each other to the tower 140 and the blade 110, respectively. It includes a space maintaining module 270 that is detachably connected.

한편, 도 2에서 도시한 바와 같이, 본 실시예에서 타워/블레이드 연결 어셈블리(200)는 하나의 타워(140)에 3개의 블레이드(110)를 연결한 형태로 제작될 수 있으나, 블레이드(110)가 4개 이상인 경우에는 그에 대응되게 구조를 변경할 수 있다.Meanwhile, as shown in FIG. 2, the tower / blade connection assembly 200 may be manufactured in a form in which three blades 110 are connected to one tower 140, but the blades 110 may be formed. If 4 or more, the structure can be changed accordingly.

타워 그립퍼(210)는 타워(140)를 그립핑(gripping)하는 역할을 한다. 타워 그립퍼(210)는 타워(140)의 어떠한 위치를 그립핑해도 무방하다.The tower gripper 210 serves to grip the tower 140. The tower gripper 210 may grip any position of the tower 140.

그리고, 본 실시예에서는 타워 그립퍼(210)가 복수의 링 플랜지(150)에 결합되며, 결합방식은 후크식 걸이 방식일 수도 있고, 볼팅 방식일 수도 있으며, 경우에 따라서는 용접 방식일 수도 있다.In addition, in the present embodiment, the tower gripper 210 is coupled to the plurality of ring flanges 150, and the coupling method may be a hook type hook method, a bolting method, or a welding method in some cases.

블레이드 그립퍼(220)는 허브(121)의 블레이드 접속부(123)에 삽입 설치되는 블레이드(110)를 그립핑하는 역할을 한다.The blade gripper 220 grips the blade 110 inserted into the blade connecting portion 123 of the hub 121.

블레이드 그립퍼(220)는, 그립핑 바디(221)와, 그립핑 바디(221)에 연결되는 복수의 그립핑 암(222)과, 그립핑 암(222)들의 단부에 마련되어 블레이드(110)의 외표면에 접촉가압되는 접촉가압부(223)를 포함한다.The blade gripper 220 is provided at a gripping body 221, a plurality of gripping arms 222 connected to the gripping bodies 221, and ends of the gripping arms 222, so that the blade gripper 220 is disposed outside the blade 110. And a contact pressurizing part 223 which is pressed by contact with the surface.

본 실시예의 경우, 그립핑 바디(221)에 총 4개의 그립핑 암(222)(142)이 연결되어 블레이드(110)를 그립핑하고 있는데, 이러한 사항은 하나의 실시예에 불과하며, 도면의 형상에 의해 본 실시예의 권리범위가 제한되지 않는다.In the present embodiment, a total of four gripping arms 222 and 142 are connected to the gripping body 221 to grip the blade 110, which is just one embodiment. The scope of the present invention is not limited by the shape.

또한, 복수의 그립핑 암(222)은 실린더(224)에 의해 상호 좁아지거나 벌어지는 동작을 수행할 수 있다.In addition, the gripping arms 222 may perform an operation of narrowing or spreading each other by the cylinder 224.

접촉가압부(223)는 블레이드(110)의 외주면에 접촉된 후에 블레이드(110)를 가압하면서 그립핑하는 역할을 한다. 접촉가압부(223)는, 블레이드(110)의 외주면에 손상을 주지 않는 재질, 예컨대 고무, 실리콘, 우레탄 등의 재질로 제작될 수 있다.The contact pressing unit 223 serves to grip while pressing the blade 110 after being in contact with the outer circumferential surface of the blade 110. The contact pressing unit 223 may be made of a material that does not damage the outer circumferential surface of the blade 110, such as rubber, silicone, urethane, or the like.

또한, 접촉가압부(223)는 블레이드(110)의 외주면 형상에 대응되는 곡률을 가질 수 있는데, 이러한 경우 좀 더 넓은 표면적으로 블레이드(110)의 외주면을 가압할 수 있기 때문에 블레이드(110)가 찌그러지는 등 블레이드(110)에 변형이 발생되는 것을 방지할 수 있다.In addition, the contact pressing unit 223 may have a curvature corresponding to the shape of the outer circumferential surface of the blade 110. In this case, the blade 110 is crushed because it can press the outer circumferential surface of the blade 110 to a wider surface. It is possible to prevent deformation of the blade 110 such as losing.

따라서, 접촉가압부(223)는 블레이드(110)가 변형되는 것을 방지하면서 블레이드(110)를 안정적으로 그립핑할 수 있다.Therefore, the contact pressing unit 223 may stably grip the blade 110 while preventing the blade 110 from being deformed.

한편, 블레이드 자세 조절유닛(230)을 설명하기에 앞서 간격 유지모듈(270)에 대해 설명하기로 한다.On the other hand, before explaining the blade attitude adjustment unit 230 will be described with respect to the gap maintaining module 270.

간격 유지모듈(270)은, 타워(140)와 블레이드(110) 사이의 간격을 일정하게 유지하여 이송 중에 타워(140)와 블레이드(110), 특히 블레이드 팁부(113)가 상호 충돌되는 것을 방지하는 역할을 한다.The gap maintaining module 270 maintains a constant gap between the tower 140 and the blade 110 to prevent the tower 140 and the blade 110 from colliding with each other during the transport, in particular the blade tip 113. Play a role.

간격 유지모듈(270)은, 후술할 블레이드 자세 조절유닛(230)으로부터 이격되며, 타워(140)와 블레이드 팁부(113)에 각각 착탈가능하게 결합된다.The gap maintaining module 270 is spaced apart from the blade posture adjusting unit 230 to be described later, and detachably coupled to the tower 140 and the blade tip 113.

간격 유지모듈(270)은, 타워(140)에 연결된 타워 결속부(271)와, 블레이드의 팁부(113)에 연결된 블레이드 결속부(273)와, 타워 결속부(271)와 블레이드 결속부(273)를 상호 연결하는 연결부재(275)를 포함한다.The space keeping module 270 includes a tower binding part 271 connected to the tower 140, a blade binding part 273 connected to the tip 113 of the blade, a tower binding part 271 and a blade binding part 273. ) And a connecting member 275 for interconnecting each other.

본 실시예에서 간격 유지모듈(270)은 타워(140)와 3개의 블레이드(110)를 동시에 결속하도록 도시되어 있으나, 타워(140)와 하나의 블레이드(110)를 결속한 단위 간격 유지모듈(270)을 복수개 마련할 수도 있다.In the present embodiment, the interval maintaining module 270 is shown to bind the tower 140 and three blades 110 at the same time, but the unit interval maintaining module 270 that binds the tower 140 and one blade 110 is performed. You can also provide multiple).

본 실시예에서 타워 결속부(271)는 타워 그립퍼(210)와 동일하게 구성될 수 있으며, 또한, 블레이드 결속부(273)도 역시 블레이드 그립퍼(220)와 동일하게 구성될 수 있다. 따라서, 타워 결속부(271) 및 블레이드 결속부(273)에 대한 상세한 설명은 생략하기로 한다.In the present embodiment, the tower binding unit 271 may be configured in the same manner as the tower gripper 210, and the blade binding unit 273 may also be configured in the same manner as the blade gripper 220. Therefore, detailed descriptions of the tower binding unit 271 and the blade binding unit 273 will be omitted.

이처럼, 도 2에서 도시한 바와 같이, 간격 유지모듈(270)을 이용하여 타워(140)와 3개의 블레이드(110)를 함께 묶어 이송하는 경우에, 특히 타워(140)와 블레이드 팁부(113) 간의 충돌 현상을 방지할 수 있어 타워(140)와 블레이드(110)가 파손 또는 손상되는 것을 방지할 수 있다.As such, as shown in FIG. 2, when the tower 140 and the three blades 110 are bundled and transported together using the space maintaining module 270, in particular, between the tower 140 and the blade tip portion 113. The collision phenomenon may be prevented to prevent the tower 140 and the blade 110 from being damaged or damaged.

한편, 블레이드 자세 조절유닛(230)은, 타워(140)와 블레이드(110)를 각각 그립핑한 타워 그립퍼(210)와 블레이드 그립퍼(220)를 상호 연결하며, 블레이드(110) 설치작업 시 허브(121)에 대한 블레이드(110)의 자세를 조절하는 역할을 한다.Meanwhile, the blade posture adjusting unit 230 connects the tower gripper 210 and the blade gripper 220 to which the tower 140 and the blade 110 are gripped, respectively, and the hub 110 when the blade 110 is installed. It serves to adjust the attitude of the blade 110 with respect to 121.

블레이드 자세 조절유닛(230)은, 블레이드 그립퍼(220)에 연결되되 블레이드 그립퍼(220)를 타워(140)의 높이방향으로 승강시키는 블레이드 그립퍼 연결모듈(240)과, 블레이드 그립퍼 연결모듈(240)과 타워 그립퍼(210) 사이에 배치되되 타워(140)에 대해 블레이드(110)를 상대 회동시켜 허브(121)에 대한 블레이드(110)의 자세를 조절하는 블레이드 자세 조절부(250)와, 일단부가 타워 그립퍼(210)에 연결되고 타단부가 블레이드 자세 조절부(250)에 연결되되 타워(140)에 대한 블레이드(110)의 간격을 조절하기 위해 접철 가능하게 연결된 접철식 연결모듈(260)을 포함한다.The blade attitude adjusting unit 230 is connected to the blade gripper 220, but the blade gripper connection module 240 for elevating the blade gripper 220 in the height direction of the tower 140, the blade gripper connection module 240 and A blade attitude adjusting unit 250 disposed between the tower grippers 210 and adjusting the attitude of the blade 110 relative to the hub 121 by rotating the blade 110 relative to the tower 140, and one end of the tower It is connected to the gripper 210 and the other end is connected to the blade attitude adjustment unit 250 includes a foldable connection module 260 foldably connected to adjust the spacing of the blade 110 with respect to the tower 140.

블레이드 그립퍼 연결모듈(240)은, 블레이드(110)를 그립핑한 블레이드 그립퍼(220)을 타워(140)의 높이방향으로 승강시키는 역할을 한다. 즉, 블레이드 그립퍼 연결모듈(240)은 블레이드 접속부(123)를 향해 블레이드 루트부(111)를 선형 왕복운동하게 하는 역할을 한다.The blade gripper connection module 240 serves to elevate the blade gripper 220 in which the blade 110 is gripped in the height direction of the tower 140. That is, the blade gripper connection module 240 serves to linearly reciprocate the blade root 111 toward the blade connecting portion 123.

블레이드 그립퍼 연결모듈(240)은, 블레이드 그립퍼(220)에 연결되는 블레이드 그립퍼 연결부(241)와, 블레이드 그립퍼 연결부(241)에 연결되되 블레이드 그립퍼 연결부(241)를 타워(140)의 높이방향으로 승강시켜 타워(140)의 높이방향으로 블레이드(110)를 선형 왕복운동 가능하게 하는 블레이드 선형운동부(243)를 포함한다.The blade gripper connection module 240 is connected to the blade gripper connection part 241 and the blade gripper connection part 241 connected to the blade gripper 220, but the blade gripper connection part 241 is elevated in the height direction of the tower 140. It comprises a blade linear movement portion 243 to enable a linear reciprocating motion of the blade 110 in the height direction of the tower 140.

블레이드 그립퍼 연결부(241)는 그립핑 바디(221)에 연결되는 부분이다. 블레이드 그립퍼 연결부(241)는 판상체의 플레이트 타입(plate type)일 수 있으며, 바아 타입(bar type)일 수도 있다.The blade gripper connection 241 is a part connected to the gripping body 221. The blade gripper connection portion 241 may be a plate type of a plate-shaped body or a bar type.

블레이드 선형운동부(243)는, 블레이드 그립퍼(220), 특히 블레이드 그립퍼(220)에 의해 그립핑된 블레이드(110)를 타워(140)의 높이방향으로 선형 왕복운동하게 하는 역할을 한다.The blade linear motion part 243 serves to linearly reciprocate the blade 110 gripped by the blade gripper 220, in particular, the blade gripper 220 in the height direction of the tower 140.

블레이드 선형운동부(243)는, 블레이드 그립퍼 연결부(241)의 일측에 타워(140)의 높이방향으로 마련되는 가이드레일(244)과, 일측이 가이드레일(244)에 연결되고 타측이 블레이드 자세 조절부(250)에 연결되어 블레이드 그립퍼 연결부(241)를 타워(140)의 높이방향으로 승강시키는 구동체(245)와, 구동체(245)를 지지하는 구동체 지지부재(246)를 포함한다.The blade linear motion part 243 includes a guide rail 244 provided at one side of the blade gripper connection part 241 in the height direction of the tower 140, and one side is connected to the guide rail 244, and the other side is a blade posture adjusting part. It is connected to the 250 includes a drive body 245 for elevating the blade gripper connection portion 241 in the height direction of the tower 140, and a drive body support member 246 for supporting the drive body 245.

여기서 가이드레일(244)은, 블레이드 그립퍼 연결부(241)의 일측에 타워(140)의 높이방향으로 마련된 랙기어이며, 구동체(245)는 랙기어에 치합되어 블레이드 그립퍼 연결부(241)를 타워(140)의 높이방향으로 승강시키는 피니언기어이다.Here, the guide rail 244 is a rack gear provided in the height direction of the tower 140 on one side of the blade gripper connection portion 241, the driving body 245 is meshed with the rack gear to the blade gripper connection portion 241 to the tower ( 140 is a pinion gear for elevating in the height direction.

따라서, 도 8에서 도시한 바와 같이 피니언기어의 구동에 의해 블레이드 그립퍼 연결부(241) 및 블레이드 그립퍼(220)가 선형 왕복운동하면서 블레이드(110)를 허브(121) 측 방향으로 선형 왕복운동하게 한다.Accordingly, as shown in FIG. 8, the blade gripper connection portion 241 and the blade gripper 220 linearly reciprocate by the drive of the pinion gear, thereby causing the blade 110 to linearly reciprocate in the direction of the hub 121.

구동체 지지부재(246)는 구동체(245)를 지지하는 부분으로서, 판상체의 플레이트 타입(plate type)일 수 있으며, 바아 타입(bar type)일 수도 있다.The driving member supporting member 246 is a portion for supporting the driving body 245, and may be a plate type of a plate-shaped body or a bar type.

블레이드 자세 조절부(250)는, 타워(140)에 대해 블레이드(110)를 상대 회동시켜 허브(121)에 대한 블레이드(110)의 자세를 조절하는 역할을 한다.The blade attitude adjusting unit 250 serves to adjust the attitude of the blade 110 with respect to the hub 121 by rotating the blade 110 relative to the tower 140.

즉, 블레이드 자세 조절부(250)는, 블레이드(110)의 롤링운동, 피칭운동, 요잉운동을 제어한다. That is, the blade attitude adjusting unit 250 controls the rolling motion, the pitching motion and the yawing motion of the blade 110.

여기서, 도 5를 참조하면 블레이드(110) 롤링운동은 블레이드(110)의 폭향향, 즉 Y축을 중심으로 블레이드(110)가 회전하는 운동이다. 그리고, 도 6를 참고하면 블레이드(110) 피칭운동은 타워(140)의 높이방향, 즉 X축을 중심으로 블레이드(110)가 회전하는 운동이다. 그리고, 도 7을 참조하면 블레이드(110) 요잉운동은 블레이드(110)의 높이방향, 즉 Z축을 중심으로 블레이드(110)가 회전하는 운동이다.Here, referring to FIG. 5, the rolling motion of the blade 110 is a direction in which the blade 110 rotates about the width direction of the blade 110, that is, the Y axis. In addition, referring to FIG. 6, the pitching motion of the blade 110 is a motion in which the blade 110 rotates about the height direction of the tower 140, that is, the X axis. In addition, referring to FIG. 7, the blade 110 yawing is a motion in which the blade 110 rotates about a height direction of the blade 110, that is, the Z axis.

블레이드 자세 조절부(250)는, 블레이드 그립퍼 연결모듈(240)이 자유 회동가능하게 지지하는 회동 지지부재(251)와, 블레이드 그립퍼 연결모듈(240)에 연결되되 블레이드 그립퍼 연결모듈(240)이 회동 지지부재(251)를 중심으로 회동되게 하는 구동력을 제공하는 구동부(253)와, 구동부(253)를 지지하는 구동부 지지부재(255)를 포함한다.The blade posture adjusting unit 250 is connected to the rotation support member 251 to which the blade gripper connection module 240 freely rotates, and the blade gripper connection module 240 to which the blade gripper connection module 240 rotates. And a driving unit 253 for providing a driving force to rotate about the supporting member 251 and a driving unit supporting member 255 for supporting the driving unit 253.

본 실시예에서 회동 지지부재(251)는 블레이드 그립퍼 연결모듈(240), 특히 구동체 지지부재(246)를 회동가능하게 지지하는 유니버셜 조인트이며, 구동부(253)는 유니버셜 조인트를 중심으로 직교되는 위치에 쌍을 이루어 이격되게 배치되는 복수의 엑츄에이터(253)를 포함한다.In this embodiment, the pivot support member 251 is a universal joint rotatably supporting the blade gripper connection module 240, in particular, the drive body support member 246, and the drive unit 253 is orthogonal to the universal joint. And a plurality of actuators 253 disposed in pairs and spaced apart from each other.

유니버셜 조인트는 블레이드(110)가 롤링, 피칭, 요잉운동을 하는 경우에 블레이드(110)가 원활하게 회전될 수 있도록 블레이드 그립퍼 연결모듈(240) 중 구동체 지지부재(246)의 하부를 지지한다.The universal joint supports the lower portion of the driving member support member 246 of the blade gripper connection module 240 so that the blade 110 can be smoothly rotated when the blade 110 is rolling, pitching, or yawing.

그리고, 구동부(253)를 구성하는 복수의 엑츄에이터(253)는 유니버셜 조인트를 중심으로 직교되게 쌍으로 배치되는 데, 구동체 지지부재(246)가 판상으로 형성된 경우에 각변의 중심에 쌍을 이루며 배치된다. 이는 구동체 지지부재(246)를 안정되게 지지하도록 하기 위함이다. 그리고, 각각의 엑츄에이터(253)는 양단부가 자유 회전가능하게 결합된다.In addition, the plurality of actuators 253 constituting the driving unit 253 are arranged in pairs orthogonally around the universal joint. When the driving body support member 246 is formed in a plate shape, the actuators 253 are arranged in pairs at the center of each side. do. This is to stably support the driving member support member 246. And, each actuator 253 is coupled both ends freely rotatable.

도 5에서 도시한 바와 같이, 블레이드(110)의 롤링운동은 X축 방향, 즉 구동체 지지부재(246)의 전면부 또는 후면부에 배치된 한 쌍의 엑츄에이터(253)를 신장 및 수축함으로써 달성된다.As shown in FIG. 5, the rolling motion of the blade 110 is achieved by stretching and contracting a pair of actuators 253 disposed in the X-axis direction, that is, the front part or the rear part of the driving body support member 246. .

그리고, 도 6에서 도시한 바와 같이, 블레이드(110)의 피칭운동은 Y축 방향, 즉 구동체 지지부재(246)의 양측면부에 배치된 한 쌍의 엑츄에이터(253)를 신장 및 수축함으로써 달성된다.And, as shown in Figure 6, the pitching motion of the blade 110 is achieved by stretching and contracting a pair of actuators 253 disposed in the Y-axis direction, that is, both side portions of the drive body support member 246. .

또한, 도 7에서 도시한 바와 같이, 블레이드(110)의 요잉운동은 구동체 지지부재(246)의 각변에 배치된 한 쌍의 엑츄에이터(253) 중 구동체 지지부재(246)를 Z축을 중심으로 회전시키고자 하는 방향에 위치한 엑츄에이터(253)를 신장시키고, 나머지 엑츄에이터(253)는 구동체 지지부재(246)의 회전을 고려하여 수축함으로써 달성된다.In addition, as shown in FIG. 7, the yawing motion of the blade 110 causes the driving body support member 246 of the pair of actuators 253 disposed on each side of the driving body support member 246 about the Z axis. The actuator 253 located in the direction to be rotated is elongated, and the remaining actuator 253 is achieved by shrinking in consideration of the rotation of the driving body support member 246.

이때, 한 쌍의 엑츄에이터(253)는 구동체 지지부재(246)에 연결되는 일단부의 간격이 후술할 접철식 연결모듈(260)에 연결되는 타단부의 간격보다 더 크게 연결되는데, 이는, 블레이드(110) 요잉운동 시 엑츄에이터(253)의 신장에 의해 블레이드 그립퍼 연결모듈(240), 즉 구동체 지지부재(246)가 Z축을 중심으로 회전하는 경우에 회전방향을 결정할 수 있도록 하기 위함이다.At this time, the pair of actuators 253 is connected to the distance between one end connected to the driving member support member 246 is larger than the other end connected to the folding connection module 260 to be described later, which is, the blade 110 This is to determine the rotation direction when the blade gripper connection module 240, that is, the driving member support member 246 rotates about the Z axis by the extension of the actuator 253 during the yawing motion.

접철식 연결모듈(260)은, 타워(140)에 대한 블레이ㄷ의 이격거리를 조절하는 역할을 한다. 또한, 접철식 연결모듈(260)은 타워(140)에 대해 블레이드(110)를 이격시키면서 경사지게 배치하는 역할을 한다.The foldable connection module 260 serves to adjust the separation distance of the blade with respect to the tower 140. In addition, the folding connection module 260 serves to dispose the blade 110 with respect to the tower 140 while being inclined.

접첩식 연결모듈은 일단부가 타워 그립퍼(210)에 연결되고 타단부가 블레이드 자세 조절부(250), 특히 구동부 지지부재(255)에 연결된다.One end of the folding connection module is connected to the tower gripper 210 and the other end is connected to the blade posture adjusting unit 250, in particular, the driving unit support member 255.

즉, 접철식 연결모듈(260)은, 타워 그립퍼(210)에 연결되는 제1 연결부(261)와, 블레이드 자세 조절부(250) 중 구동부 지지부재(255)에 연결되는 제2 연결부(262)와, 제1 연결부(261)와 제2 연결부(262)를 링크 타입으로 연결하는 복수의 링크부재(263)를 포함한다.That is, the foldable connection module 260 may include a first connection part 261 connected to the tower gripper 210 and a second connection part 262 connected to the driving part support member 255 among the blade posture adjusting parts 250. And a plurality of link members 263 connecting the first connection part 261 and the second connection part 262 to a link type.

여기서 제1 연결부(261) 및 제2 연결부(262)는 판상체의 플레이트 타입(plate type)일 수 있으며, 바아 타입(bar type)일 수도 있다.The first connection part 261 and the second connection part 262 may be a plate type of a plate-shaped body or a bar type.

특히, 복수의 링크부재(263)는 타워(140)와 블레이드(110)를 이격시키는 역할을 한다.In particular, the plurality of link members 263 serves to space the tower 140 and the blade 110.

복수의 링크부재(263)는, 양단부가 제1 연결부(261)와 상기 제2 연결부(262)에 각각 자유 회동가능하게 연결되는 직선형 링크부재(264)와, 타워(140)의 높이방향을 따라 직선형 링크부재(264)의 상부에 배치되되 양단부가 제1 연결부(261)와 제2 연결부(262)에 각각 자유 회동가능하게 연결되는 절곡형 링크부재(265,266)와, 직선형 링크부재(264)와 절곡형 링크부재(265,266)를 구동시키는 엑츄에이터(267)를 포함한다.The plurality of link members 263 may include a straight link member 264 having both ends freely rotatably connected to the first connecting portion 261 and the second connecting portion 262, and along the height direction of the tower 140. A bent link member 265 and 266 disposed on an upper portion of the straight link member 264 and freely rotatably connected to the first connection part 261 and the second connection part 262, respectively; And an actuator 267 for driving the bent link members 265 and 266.

직선형 링크부재(264)가 하나의 막대 형상을 갖는데 반해 절곡형 링크부재(265,266)는 상호간 접철되는 한 쌍의 단위링크를 포함한다.While the straight link member 264 has a rod shape, the bent link members 265 and 266 include a pair of unit links that are folded together.

직선형 링크부재(264)와 절곡형 링크부재(265,266)는 각각 다수 개씩 배치될 수 있다. 직선형 링크부재(264)와 절곡형 링크부재(265,266)의 동작에 기인하여 타워(140)와 블레이드(110)가 서로 인접되게 접근되거나 이격 배치된다.A plurality of straight link members 264 and bent link members 265 and 266 may be arranged. Due to the operation of the straight link member 264 and the bent link members 265 and 266, the tower 140 and the blade 110 are approached or spaced apart from each other.

액추에이터는 링크부재가 동작되도록, 즉 직선형 링크부재(264)와 절곡형 링크부재(265,266)를 구동시키는 역할을 한다.The actuator serves to drive the link members, that is, the straight link members 264 and the bent link members 265 and 266.

엑츄에이터(267)는, 일단부가 타워 그립퍼(210) 또는 제1 연결부(261)에 회동 가능하게 연결되고 타단부가 제2 연결부(262)에 회동가능하게 연결되는 메인실린더(268)와, 양단부가 절곡형 링크부재(265,266)에 연결되는 서브실린더(269)를 포함한다.The actuator 267 may include a main cylinder 268 having one end rotatably connected to the tower gripper 210 or the first connecting portion 261 and the other end rotatably connected to the second connecting portion 262. And a subcylinder 269 connected to the bent link members 265 and 266.

메인실린더(268)와 서브실린더(269)는 모두 유압 실린더이나, 공압 실린더나 유공압 복합실린더가 적용될 수도 있다.Both the main cylinder 268 and the sub cylinder 269 may be a hydraulic cylinder, a pneumatic cylinder or a hydraulic pneumatic cylinder.

본 실시예의 경우, 메인실린더(268)의 일단부가 타워 그립퍼(210)에 회전 가능하게 연결되고 있으나, 메인실린더(268)의 일단부는 제1 연결부(261)에 회전 가능하게 연결될 수도 있다.In the present embodiment, one end of the main cylinder 268 is rotatably connected to the tower gripper 210, but one end of the main cylinder 268 may be rotatably connected to the first connection part 261.

상기한 바와 같은, 타워(140)와 블레이드(110)들을 이동시킬 때에는 도 2에서 도시한 바와 같이 타워(140)에 대해 블레이드(110)들이 인접되도록 접철식 연결모듈(260)을 접고, 블레이드(110)들을 블레이드 접속부(123)에 삽입하고자 하는 경우에는 도 5 내지 도 8에서 도시한 바와 같이 타워(140)에 대해 블레이드(110)들이 벌어지도록 접철식 연결모듈(260)을 펼친다.As described above, when moving the tower 140 and the blades 110, folding the folding connection module 260 so that the blades 110 are adjacent to the tower 140, as shown in Figure 2, the blade 110 ) To the blade connecting portion 123, the folding connection module 260 is expanded so that the blades 110 are opened with respect to the tower 140 as shown in FIGS.

이처럼 타워 그립퍼(210)가 타워(140)를, 블레이드 그립퍼(220)가 블레이드(110)를 그립핑된 상태에서 접철식 연결모듈(260)이 타워(140)와 블레이드(110)를 연결시킴으로써, 타워(140)와 3개의 블레이드(110)는 도 2에서 도시한 바와 같이 하나의 몸체처럼 묶인 구조가 된다.As such, the tower gripper 210 connects the tower 140 to the tower 140, and the folding grip module 260 connects the tower 140 to the blade 110 while the blade gripper 220 grips the blade 110. The 140 and the three blades 110 have a structure that is bundled as one body as shown in FIG. 2.

따라서 크레인 한 대만으로도 핸들링이 가능할 뿐만 아니라 이송 효율이 향상된다. 즉 타워(140)에 대해 블레이드(110)들을 접어 이송시키면 되기 때문에 많은 공간이 필요치 않을 뿐만 아니라 이송 효율이 향상된다.As a result, not only a single crane can handle it, but also the transfer efficiency is improved. That is, since the blades 110 are folded and transported with respect to the tower 140, not only a lot of space is required but also the transfer efficiency is improved.

또한, 접철식 연결모듈(260)의 동작에 의해 블레이드(110)를 타워(140)에 대해 비스듬히 경사지게 이격 배치한 후, 블레이드 자세 조절부(250)를 이용하여, 블레이드(110)를 롤링, 피칭, 요잉 및 선형 직선운동되게 함으로써 블레이드(110)의 설치작업이 보다 용이해질 수 있다.In addition, after the blade 110 is disposed obliquely inclined with respect to the tower 140 by the operation of the foldable connection module 260, the blade 110 is rolled, pitched, Yawing and linear linear motion can be easier to install the blade 110.

한편, 본 실시예에 따른 허브/블레이드 얼라인 감지유닛(300)은, 블레이드(110)를 설치함에 있어 블레이드 루트부(111)가 블레이드 접속부(123)에 접근하는 상태에서 블레이드 루트부(111)와 블레이드 접속부(123)를 얼라인하기 위한 정보를 제공하는 역할을 한다.On the other hand, the hub / blade alignment detection unit 300 according to the present embodiment, the blade root portion 111 in the state in which the blade root portion 111 approaches the blade connection portion 123 in installing the blade 110 And serves to provide information for aligning the blade connecting portion 123.

도 9 내지 도 12을 참조하면, 허브/블레이드 얼라인 감지유닛(300)은, 블레이드(110)가 허브(121)에 접근하는 상태에서, 블레이드 루트부(111)와 블레이드 접속부(123)의 중첩된 영상으로부터 각각의 테두리를 추출하고 비교하여 블레이드 루트부(111)와 블레이드 접속부(123) 간의 상호 얼라인 여부를 검출하는 얼라인 검출유닛(310)과, 블레이드(110)가 허브(121)에 접근하는 상태에서, 블레이드 루트부(111)에 마련된 복수의 볼트(160)와 블레이드 접속부(123)에 마련된 복수의 볼트홀(165)의 얼라인여부를 확인가능하게 하는 얼라인 모니터링 유닛(350)를 포함한다.9 to 12, the hub / blade alignment detecting unit 300 overlaps the blade root 111 and the blade connecting portion 123 in a state where the blade 110 approaches the hub 121. The alignment detecting unit 310 and the blade 110 detect the mutual alignment between the blade root 111 and the blade connecting portion 123 by extracting and comparing the respective edges from the captured image, and the blade 110 is connected to the hub 121. In the approaching state, the alignment monitoring unit 350 which enables the alignment of the plurality of bolts 160 provided in the blade root portion 111 and the plurality of bolt holes 165 provided in the blade connecting portion 123. It includes.

얼라인 검출유닛(310)은, 블레이드 루트부(111)와 블레이드 접속부(123), 특히 블레이드 루트부(111)에 마련된 복수의 볼트(160)와 블레이드 접속부(123)에 마련된 복수의 볼트홀(165)의 얼라인 여부를 검출하는 역할은 한다.The alignment detecting unit 310 may include a plurality of bolts 160 provided in the blade root portion 111 and a blade connecting portion 123, in particular, a plurality of bolt holes provided in the blade root portion 111 and a plurality of bolt holes provided in the blade connecting portion 123. 165) to detect whether or not to align.

얼라인 검출유닛(310)은, 블레이드 접속부(123) 측에 마련되되 블레이드 루트부(111)의 단면부와 블레이드 접속부(123)의 단면부가 중첩된 영상을 획득하는 영상획득부(311)와, 블레이드 루트부(111)의 단면부 및 블레이드 접속부(123)의 단면부 영상에서 각각 복수의 특징점을 추출하는 특징점 추출부(317)와, 중첩된 영상으로부터 추출된 블레이드 루트부(111) 및 블레이드 접속부(123)의 특징점들을 이용하여 블레이드 루트부(111)의 단면부 및 블레이드 접속부(123)의 단면부 테두리를 산출하고, 각각의 테두리에 대한 곡률을 계산하여, 블레이드 루트부(111)의 단면부 및 블레이드 접속부(123)의 단면부 테두리의 중심위치 및 원형인지 여부를 판단하여 블레이드 루트부(111)와 블레이드 접속부(123) 간의 상대 위치관계를 산출하는 상대 위치관계 산출부(313)와, 상대 위치관계 산출부(313)에서 획득한 블레이드 루트부(111)와 블레이드 접속부(123)의 상대 위치를 이용하여 블레이드 루트부(111)와 블레이드 접속부(123)가 얼라인되도록 블레이드 자세 조절유닛(230)을 제어하는 블레이드 자세 제어부(315)를 포함한다.The alignment detection unit 310 may include an image acquisition unit 311 provided on the blade connecting portion 123 and acquiring an image in which the cross section of the blade root portion 111 and the cross section of the blade connecting portion 123 overlap each other; The feature point extracting unit 317 extracts a plurality of feature points from the cross section of the blade root 111 and the cross section of the blade connecting unit 123, respectively, and the blade root 111 and the blade connecting unit extracted from the superimposed images. The cross-section of the blade root portion 111 and the cross-sectional edge of the blade connection portion 123 are calculated using the feature points of 123, and the curvature for each of the edges is calculated, so that the cross-sectional portion of the blade root portion 111 is calculated. And a relative positional relationship calculating unit 313 for determining the relative positional relationship between the blade root portion 111 and the blade connecting portion 123 by determining the center position and the circular position of the edge of the cross section of the blade connecting portion 123, and the relative position. top The blade posture adjusting unit 230 is aligned so that the blade root 111 and the blade connecting portion 123 are aligned using the relative positions of the blade root 111 and the blade connecting portion 123 obtained by the relationship calculating unit 313. It includes a blade posture control unit 315 for controlling.

영상획득부(311)는, 허브(121) 측 블레이드 접속부(123)에 마련되며, 영상획득부(311)를 이용하여 블레이드 루트부(111)의 단면부와 블레이드 접속부(123)의 단면부의 중첩된 영상을 획득한다.The image acquisition part 311 is provided in the blade connection part 123 at the hub 121 side, and the cross section of the blade root part 111 and the cross section of the blade connection part 123 are superimposed using the image acquisition part 311. The captured image.

블레이드 루트부(111)와 블레이드 접속부(123)의 단면부는 원형단면을 갖도록 형성되는데, 영상획득부(311)가 설치된 장소에 따라 원형단면으로 형성된 블레이드 루트부(111)의 단면부가 타원형 단면부 영상으로 획득될 수 있다.The cross section of the blade root portion 111 and the blade connecting portion 123 is formed to have a circular cross section, the cross section of the blade root portion 111 formed in a circular cross section according to the place where the image acquisition unit 311 is installed elliptical cross section image Can be obtained.

그리고, 특징점 추출부(317)는 영상획득부(311)에서 획득된 중첩된 영상으로부터 블레이드 루트부(111) 및 블레이드 접속부(123)의 복수의 특징점을 추출한다.The feature point extractor 317 extracts a plurality of feature points of the blade root 111 and the blade connecting portion 123 from the overlapped image acquired by the image acquisition unit 311.

여기서, 특징점은 블레이드 루트부(111) 및 블레이드 접속부(123)의 형상을 대표하는 특징부로서, 블레이드 루트부(111) 및 블레이드 접속부(123)의 고유의 형상 또는 특이한 패턴이 될 수 있으며, 칼라 영상의 경우 색상으로 할 수 있다.Here, the feature point is a feature that represents the shape of the blade root portion 111 and the blade connecting portion 123, it may be a unique shape or unusual pattern of the blade root portion 111 and the blade connecting portion 123, the collar In case of video, it can be color.

본 실시예에서는 블레이드 루트부(111)에 마련된 볼트(160)와 블레이드 접속부에 마련된 볼트홀(165)을 특징점으로 선택한다.In this embodiment, the bolt 160 provided in the blade root portion 111 and the bolt hole 165 provided in the blade connecting portion are selected as the feature points.

참고로, 본 실시예에서는 블레이드 루트부(111)에 마련된 복수의 볼트(160) 중에 특징점을 나타내는 볼트(160)만을 도시하였으며, 또한 블레이드 접속부(123)에 마련된 복수의 볼트홀(165) 중에 특징점을 나타내는 볼트(160)가 삽입되는 볼트홀(165)만을 도시하였다.For reference, in the present embodiment, only the bolt 160 showing the feature point among the plurality of bolts 160 provided in the blade root portion 111 is illustrated, and the feature point among the plurality of bolt holes 165 provided in the blade connection portion 123. Only the bolt hole 165 into which the bolt 160 is inserted is shown.

상대 위치관계 산출부(313)는, 블레이드 루트부(111)의 단면부와 블레이드 접속부(123)의 단면부가 중첩된 영상에서 추출된 특징점들을 반영하여 블레이드 루트부(111)의 단면부 및 블레이드 접속부(123)의 단면부 테두리를 각각 산출할 수 있다.The relative position relationship calculating unit 313 reflects the feature points extracted from the image in which the cross section of the blade root 111 and the cross section of the blade connecting portion 123 overlap, and the cross section of the blade root 111 and the blade connecting portion. The edges of the cross section portion 123 can be calculated respectively.

그리고, 블레이드 루트부(111)의 단면부 및 블레이드 접속부(123)의 단면부 테두리에 대한 곡률을 계산하여 블레이드 루트부(111)의 단면부 및 블레이드 접속부(123)의 단면부 테두리의 중심위치를 알 수 있으므로, 블레이드 루트부(111)와 블레이드 접속부(123) 간의 상대 위치관계를 산출할 수 있다.Then, the curvature of the edge of the cross section of the blade root 111 and the edge of the cross section of the blade connecting portion 123 is calculated to determine the center positions of the cross section of the blade root 111 and the edge of the cross section of the blade connecting portion 123. As can be seen, the relative positional relationship between the blade root portion 111 and the blade connecting portion 123 can be calculated.

또한, 블레이드 루트부(111)의 단면부 및 블레이드 접속부(123)의 단면부 테두리를 각각 추출할 수 있으므로, 각각의 테두리 형상이 원형인지 여부를 알 수 있다.In addition, since the edges of the cross-section of the blade root portion 111 and the cross-section of the blade connecting portion 123 can be extracted respectively, it is possible to know whether each edge shape is circular.

본 실시예에서는 영상획득부(311)를 블레이드 접속부(123)에 설치하고, 영상획득부(311)는 블레이드 접속부(123)의 단면부 테두리를 기준으로 블레이드 접속부(123)의 단면부 테두리가 중첩되는 영상을 획득하므로, 블레이드 루트부(111)의 단면부 테두리가 원형인지 여부가 블레이드 루트부(111)와 블레이드 접속부(123)를 얼라인하는 기준이 된다.In the present embodiment, the image acquisition unit 311 is installed in the blade connection unit 123, and the image acquisition unit 311 overlaps the edge of the cross section of the blade connection unit 123 based on the edge of the cross section of the blade connection unit 123. Since the image is obtained, whether the edge of the cross section of the blade root 111 is circular becomes a reference for aligning the blade root 111 and the blade connecting portion 123.

상기와 같이, 블레이드 접속부(123)에 대한 블레이드 루트부(111)의 상대 위치관계를 산출한 경우에, 블레이드 자세 제어부(330)는 블레이드 접속부(123)와 블레이드 루트부(111) 간의 상대 위치를 이용하여, 블레이드 루트부(111)와 블레이드 접속부(123)가 얼라인되도록 제어신호를 블레이드 자세 조절유닛(230)에 송신하고, 블레이드 자세 조절유닛(230)을 제어하여 블레이드 루트부(111)에 마련된 복수의 볼트(160)가 블레이드 접속부(123)에 마련된 복수의 볼트홀(165)에 삽입 가능하게 얼라인한다.As described above, when the relative positional relationship of the blade root portion 111 with respect to the blade connection portion 123 is calculated, the blade posture control unit 330 determines the relative position between the blade connection portion 123 and the blade root portion 111. By using this, a control signal is transmitted to the blade posture adjusting unit 230 so that the blade root 111 and the blade connecting portion 123 are aligned, and the blade posture adjusting unit 230 is controlled to the blade root 111. The plurality of bolts 160 are aligned to be insertable into the plurality of bolt holes 165 provided in the blade connecting portion 123.

얼라인 모니터링 유닛(350)은, 블레이드 루트부(111)와 블레이드 접속부(123)가 얼라인된 상태를 실시간으로 확인가능하게 하는 역할을 한다.The alignment monitoring unit 350 serves to enable the blade root 111 and the blade connecting portion 123 to be aligned in real time.

즉, 얼라인 모니터링 유닛(350)은 블레이드 루트부(111)와 블레이드 접속부 (123) 간의 상대 위치관계에 따라 블레이드 자세 제어유닛(230)을 제어하여 블레이드(111)를 회동시키거나 선형 이송한 경우에 있어, 블레이드 루트부(111)에 마련된 복수의 볼트(160)가 삽입되는 블레이드 접속부(123)의 복수의 볼트홀(165) 간의 얼라인 상태를 확인가능하게 한다.That is, the alignment monitoring unit 350 controls the blade attitude control unit 230 according to the relative positional relationship between the blade root portion 111 and the blade connecting portion 123 to rotate or linearly transfer the blade 111. In the above, the alignment state between the plurality of bolt holes 165 of the blade connecting portion 123 into which the plurality of bolts 160 provided in the blade root portion 111 is inserted can be confirmed.

얼라인 모니터링 유닛(350)은, 블레이드 루트부(111)에 마련된 복수의 볼트(160) 중 적어도 셋 이상에 마련된 빔 조사부(351)와, 블레이드 접속부(123)의 복수의 볼트홀(165)에 빔 조사부(351)에 대응되게 마련된 빔 수신부(353)와, 빔 조사부(351)에서 조사된 빔이 빔 수신부(353)에 수신되는지 여부를 확인할 수 있는 디스플레이부(355)를 포함한다.The alignment monitoring unit 350 includes a beam irradiation unit 351 provided in at least three or more of the plurality of bolts 160 provided in the blade root unit 111, and a plurality of bolt holes 165 of the blade connecting unit 123. A beam receiver 353 provided corresponding to the beam irradiator 351 and a display unit 355 for checking whether the beam irradiated from the beam irradiator 351 is received by the beam receiver 353.

즉, 얼라인 모니터링 유닛(350)은 복수의 빔 조사부(351)에서 조사된 빔이 빔 수신부(353)에 수신된 상태를 디스플레이부(355)에서 확인가능하게 한다.That is, the alignment monitoring unit 350 enables the display unit 355 to check a state in which the beams irradiated from the plurality of beam irradiators 351 are received by the beam receiver 353.

따라서, 육안으로 실시간 얼라인 상태를 확인할 수 있어 블레이드(111)의 자세를 제어하는 데 있어 유용하다.Therefore, the real-time alignment state can be confirmed with the naked eye, which is useful for controlling the posture of the blade 111.

상기와 같이 구성되는 본 발명의 일 실시예에 따른 풍력발전기용 블레이드 설치장치를 이용한 블레이드 설치방법을 설명하면 다음과 같다.Referring to the blade installation method using the blade installation device for a wind turbine according to an embodiment of the present invention configured as described above are as follows.

도 13a 및 도 13b는 본 발명의 다른 실시예에 따른 풍력발전기용 블레이드 설치방법을 나타내는 순서도이고, 도 14 내지 도 21은 풍력발전기용 블레이드 설치방법을 설명하기 위한 예시도이다.13A and 13B are flowcharts illustrating a method for installing a blade for a wind turbine according to another embodiment of the present invention, and FIGS. 14 to 21 are exemplary views for describing a method for installing a blade for a wind generator.

도 13a 내지 도 21을 참조하면, 먼저, 타워/블레이드 연결 어셈블리(200)에 의해 그립핑된 타워(140) 및 적어도 하나 이상의 블레이드(110)를 크레인 등을 이용하여 수직되게 설치한다(S10).13A to 21, first, the tower 140 gripped by the tower / blade connection assembly 200 and at least one or more blades 110 are vertically installed using a crane or the like (S10).

이때, 타워(140) 및 블레이드(110)는 타워 그립퍼(210), 블레이드 그립퍼(220), 블레이드 자세 조절유닛(230) 및 간격 유지모듈(270)에 의해 묶음 형식으로 연결된다.In this case, the tower 140 and the blade 110 are connected in a bundled form by the tower gripper 210, the blade gripper 220, the blade attitude adjusting unit 230, and the gap maintaining module 270.

그리고, 타워(140)와 적어도 하나 이상의 블레이드(110)를 수직되게 설치한 후, 블레이드 자세 조절유닛(230)에 의한 블레이드(110)의 운동량을 감소시키기 위해, 블레이드 루트부(111)와 블레이드 접속부(123)를 1차적으로 얼라인시킨다.And, after installing the tower 140 and at least one blade 110 vertically, in order to reduce the momentum of the blade 110 by the blade attitude adjustment unit 230, the blade root portion 111 and the blade connecting portion 123 is primarily aligned.

즉, 허브(121)를 회전시켜 블레이드 접속부(123)가 블레이드 루트부(111)에 대향되게 한다(S20).That is, the blade 121 is rotated so that the blade connecting portion 123 is opposed to the blade root portion 111 (S20).

그리고, 도 14에서 도시한 바와 같이, 블레이드의 루트부(111)가 삽입되는 블레이드 접속부(123) 측에 마련된 영상획득부(311)를 이용하여 블레이드 루트부(111)의 단면부와 블레이드 접속부(123)의 단면부의 중첩된 영상을 획득한다(S30).As shown in FIG. 14, the cross section of the blade root portion 111 and the blade contact portion (using the image acquisition portion 311 provided on the blade connecting portion 123 side into which the root portion 111 of the blade is inserted) are provided. The superimposed image of the cross-section of 123 is obtained (S30).

블레이드 루트부(111)와 블레이드 접속부(123)의 단면부는 원형단면을 갖도록 형성되는데, 영상획득부(311)가 설치된 장소에 따라 원형단면으로 형성된 블레이드 루트부(111)의 단면부가 타원형 단면부 영상으로 획득될 수 있다.The cross section of the blade root portion 111 and the blade connecting portion 123 is formed to have a circular cross section, the cross section of the blade root portion 111 formed in a circular cross section according to the place where the image acquisition unit 311 is installed elliptical cross section image Can be obtained.

그리고, 중첩된 영상으로부터 블레이드 루트부(111) 및 블레이드 접속부(123)의 복수의 특징점을 추출한다(S40).Then, a plurality of feature points of the blade root portion 111 and the blade connecting portion 123 are extracted from the superimposed image (S40).

본 실시예에서는 블레이드 루트부(111)에 마련된 복수의 볼트(160) 중에 특징점을 나타내는 볼트(160)만을 도시하였으며, 또한 블레이드 접속부(123)에 마련된 복수의 볼트홀(165) 중에 특징점을 나타내는 볼트(160)가 삽입되는 볼트홀(165)만을 도시하였다.In the present embodiment, only the bolt 160 showing the feature point among the plurality of bolts 160 provided in the blade root portion 111 is illustrated, and the bolt showing the feature point among the plurality of bolt holes 165 provided in the blade connecting portion 123. Only the bolt hole 165 into which the 160 is inserted is shown.

그리고, 도 15에서 도시한 바와 같이, 추출된 특징점들로부터 블레이드 루트부(111)의 단면부 및 블레이드 접속부(123)의 단면부의 테두리들을 산출한다(S50).As shown in FIG. 15, the edges of the cross section of the blade root portion 111 and the cross section of the blade connecting portion 123 are calculated from the extracted feature points (S50).

본 실시예에서는 블레이드 접속부(123)에 설치된 영상획득부(311)를 이용하여 블레이드 루트부(111)의 단면부와 블레이드 접속부(123)의 단면부 영상을 획득하고, 블레이드 접속부(123)의 단면부 테두리는 사전에 알고 있으므로 블레이드 루트부(111)의 단면부 테두리만을 산출하면 된다.In this embodiment, the image of the cross section of the blade root portion 111 and the cross section of the blade connecting portion 123 is obtained by using the image acquisition unit 311 installed in the blade connecting portion 123, the cross section of the blade connecting portion 123 Since the minor edge is known in advance, only the edge of the cross section of the blade root 111 is required.

그리고, 도 16에서 도시한 바와 같이, 산출된 블레이드 루트부(111)의 단면부 테두리 및 블레이드 접속부(123)의 단면부 테두리의 곡률 및 중심위치를 산출한다(S60).As shown in FIG. 16, the calculated curvature and the center position of the edge of the cross section of the blade root 111 and the edge of the cross section of the blade connecting portion 123 are calculated (S60).

본 실시예에서는 블레이드 접속부(123)의 단면부 테두리의 곡률 및 중심위치는 사전에 알고 있으므로, 블레이드 루트부(111)의 단면부 테두리의 곡률 및 중심위치만을 산출한다.In this embodiment, since the curvature and the center position of the edge of the cross section of the blade connecting portion 123 are known in advance, only the curvature and the center position of the edge of the cross section of the blade root portion 111 are calculated.

그리고, 산출된 블레이드 루트부(111)의 단면부 테두리 및 블레이드 접속부(123)의 단면부 테두리의 곡률을 통해 각각의 테두리들이 원형인지 여부를 판단한다(S70).Then, it is determined whether each of the edges is circular through the curvature of the edge of the cross-section of the blade root 111 and the edge of the cross-section of the blade connection portion 123 (S70).

그리고, 블레이드 루트부(111)의 단면부 및 블레이드 접속부(123)의 단면부 형상이 원형인 경우에는, 블레이드 자세 조절유닛(230)을 이용하여 블레이드 루트부(111)의 중심위치를 블레이드 접속부(123)의 중심위치로 이송한다(S80).When the cross section of the blade root 111 and the cross section of the blade connecting portion 123 have a circular shape, the center position of the blade root 111 is determined by using the blade posture adjusting unit 230. Transfer to the center position of the (123) (S80).

그러나, 도 17에서 도시한 바와 같이, 블레이드 루트부(111)의 단면부 및 블레이드 접속부(123)의 단면부 형상이 원형이 아닌 경우에는, 산출된 블레이드 루트부(111)의 단면부 테두리 및 블레이드 접속부(123)의 단면부 테두리의 곡률 및 중심위치를 기초로 하여, 블레이드(110)의 회동량을 산출한 후, 블레이드 자세 조절유닛(230)을 이용하여 블레이드(110)를 회동시키고, 블레이드 루트부(111)의 단면부와 블레이드 접속부(123)의 단면부의 중첩된 영상을 다시 획득한다(S71).However, as shown in FIG. 17, when the cross-sectional shape of the blade root part 111 and the cross-sectional part shape of the blade connection part 123 are not circular, the calculated cross-sectional edge and blade of the blade root part 111 are calculated. After calculating the amount of rotation of the blade 110 based on the curvature and the center position of the edge of the cross section of the connecting portion 123, the blade 110 is rotated using the blade attitude adjusting unit 230, and the blade root is rotated. The superimposed image of the cross section of the section 111 and the cross section of the blade connecting unit 123 is acquired again (S71).

그리고, 블레이드 루트부(111)의 중심위치를 블레이드 접속부(123)의 중심위치로 이송한 경우에, 블레이드 루트부(111)의 단면부 테두리가 블레이드 접속부(123)의 단면부 테두리의 내부에 위치하는지 여부를 판단한다(S90).And, when the center position of the blade root portion 111 is transferred to the center position of the blade connecting portion 123, the edge of the cross section of the blade root 111 is located inside the edge of the cross section of the blade connecting portion 123. It is determined whether or not (S90).

그리고, 블레이드 루트부(111)의 단면부 테두리가 블레이드 접속부(123)의 단면부 테두리의 내부에 위치하는 경우에는, 블레이드 자세 조절유닛(230)을 이용하여 블레이드 루트부(111)를 블레이드 접속부(123) 방향으로 이송한다(S100).And, when the cross section edge of the blade root portion 111 is located inside the cross section edge of the blade connection portion 123, the blade root portion 111 is used to connect the blade root portion 111 using the blade posture adjustment unit 230. 123) to the direction (S100).

그러나, 도 18에서 도시한 바와 같이, 블레이드 루트부(111)의 단면부 테두리가 블레이드 접속부(123)의 단면부 테두리의 내부에 위치하지 않는 경우에는, 산출된 블레이드 루트부(111)의 단면부 및 블레이드 접속부(123)의 단면부 테두리들의 중심위치를 기초로, 블레이드 자세 조절유닛(230)을 이용하여 블레이드(110)를 선형 이송한 후, 블레이드 루트부(111)의 단면부와 블레이드 접속부(123)의 단면부의 중첩된 영상을 획득한다(S91).However, as shown in FIG. 18, when the cross section edge of the blade root part 111 is not located inside the cross section edge of the blade connection part 123, the calculated cross section of the blade root part 111 is calculated. And linearly conveying the blade 110 by using the blade posture adjusting unit 230 based on the center positions of the edges of the cross section of the blade connecting portion 123, and then the cross section of the blade root portion 111 and the blade connecting portion ( The superimposed image of the cross-section of 123 is obtained (S91).

즉, 블레이드 루트부(111)의 중심위치가 블레이드 접속부(123)의 중심위치에 위치하도록 블레이드(110)를 이송한다.That is, the blade 110 is transferred so that the center position of the blade root portion 111 is located at the center position of the blade connecting portion 123.

그리고, 블레이드 루트부(111)가 블레이드 접속부(123)에 접근하는 상태에서, 영상획득부(311)로 블레이드 루트부(111)에 마련된 복수의 볼트(160)와 블레이드 접속부(123)에 마련된 복수의 볼트홀(165)에 대한 영상을 획득한다(S110).Then, in a state where the blade root portion 111 approaches the blade connecting portion 123, the plurality of bolts 160 provided in the blade root portion 111 and the plurality of blades provided in the blade connecting portion 123 as the image acquisition portion 311. Obtain an image of the bolt hole 165 (S110).

그리고, 블레이드 루트부(111)에 마련된 복수의 볼트(160)와 블레이드 접속부(123)에 마련된 복수의 볼트홀(165)의 얼라인 유무를 판단한다(S120). Then, it is determined whether the plurality of bolts 160 provided in the blade root portion 111 and the plurality of bolt holes 165 provided in the blade connecting portion 123 are aligned (S120).

여기서, 복수의 볼트(160)와 복수의 볼트홀(165)의 얼라인 유무는 획득한 영상을 통해서 확인할 수도 있으나, 얼라인 모니터링 유닛(350)을 구성하는 빔 조사부(351)에서 조사된 빔이 빔 수신부(353)에 수신되었는지 여부를 통해 확인할 수 있다.Here, the alignment of the plurality of bolts 160 and the plurality of bolt holes 165 may be confirmed through the acquired image, but the beam irradiated from the beam irradiator 351 constituting the alignment monitoring unit 350 may be Whether it is received by the beam receiver 353 may be determined.

그리고, 복수의 볼트(160)와 복수의 볼트홀(165)이 얼라인되었다고 판단된 경우에는, 블레이드 자세 조절유닛(230)을 이용하여 블레이드 루트부(111)를 블레이드 접속부(123)에 인접하게 이송한다(S130).In addition, when it is determined that the plurality of bolts 160 and the plurality of bolt holes 165 are aligned, the blade root portion 111 is adjacent to the blade connecting portion 123 using the blade posture adjustment unit 230. Transfer (S130).

그러나, 도 19에서 도시한 바와 같이, 블레이드 루트부(111)의 복수의 볼트(160)와 블레이드 접속부(123)의 복수의 볼트홀(165)이 얼라인되지 않았다고 판단된 경우에는, 획득한 영상을 통해 블레이드(110)의 회동량을 산출한 후, 블레이드 자세 조절유닛(230)을 이용하여 블레이드(110)를 회동시키고, 영상획득부(311)로 복수의 볼트(160)와 복수의 볼트홀(165)에 대한 영상을 다시 획득한다(S121).However, as shown in FIG. 19, when it is determined that the plurality of bolts 160 of the blade root portion 111 and the plurality of bolt holes 165 of the blade connecting portion 123 are not aligned, the acquired image is obtained. After calculating the amount of rotation of the blade 110 through, by rotating the blade 110 using the blade attitude adjustment unit 230, a plurality of bolts 160 and a plurality of bolt holes with the image acquisition unit 311 The image of operation 165 is acquired again (S121).

그리고, 블레이드 루트부(111)를 블레이드 접속부(123)에 인접하게 이송한 경우에, 블레이드 루트부(111)의 단면부 테두리가 블레이드 접속부(123)의 단면부 테두리와 일치하는지 여부를 판단한다(S140).And when the blade root part 111 is conveyed adjacent to the blade connection part 123, it is determined whether the edge of the cross section of the blade root part 111 matches the edge of the cross section of the blade connection 123 ( S140).

이는 영상획득부(311)에 의해 획득된 영상 또는 얼라인 모니터링 유닛(350)을 이용하여 확인가능하다.This can be confirmed using the image acquired by the image acquisition unit 311 or the alignment monitoring unit 350.

그리고, 도 21에서 도시한 바와 같이, 블레이드 루트부(111)의 단면부 테두리가 블레이드 접속부(123)의 단면부 테두리와 일치하는 경우에는, 블레이드 자세 조절유닛(230)을 이용하여 블레이드 루트부(111)를 블레이드 접속부(123)에 삽입 설치한다(S150).As shown in FIG. 21, when the edge of the cross section of the blade root portion 111 coincides with the edge of the cross section of the blade connecting portion 123, the blade root portion (using the blade posture adjustment unit 230) is used. 111 is inserted into the blade connecting portion 123 and installed (S150).

그러나, 도 20에서 도시한 바와 같이, 블레이드 루트부(111)의 단면부 테두리와 블레이드 접속부(123)의 단면부 테두리가 일치하지 않는 경우에는, 블레이드 자세 조절유닛(230)을 이용하여 블레이드 루트부(111)를 블레이드 접속부(123)에 인접하게 이송한다.However, as shown in FIG. 20, when the edge of the cross section of the blade root portion 111 and the edge of the cross section of the blade connecting portion 123 do not coincide, the blade root portion using the blade posture adjustment unit 230 is used. The 111 is transferred adjacent to the blade connecting portion 123.

이와 같이 본 발명은 기재된 실시 예에 한정되는 것이 아니고, 본 발명의 사상 및 범위를 벗어나지 않고 다양하게 수정 및 변형할 수 있음은 이 기술의 분야에서 통상의 지식을 가진 자에게 자명하다. 따라서 그러한 수정 예 또는 변형 예들은 본 발명의 특허청구범위에 속한다 하여야 할 것이다.It will be apparent to those skilled in the art that various modifications and variations can be made in the present invention without departing from the spirit or scope of the invention. Accordingly, such modifications or variations are intended to fall within the scope of the appended claims.

110: 블레이드 111: 블레이드 루트부
113: 블레이드 팁부 120: 로터
121: 허브 123: 블레이드 접속부
130: 나셀커버 140: 타워
150: 링 플랜지 200: 타워/블레이드 연결 어셈블리
210: 타워 그립퍼 220: 블레이드 그립퍼
230: 블레이드 자세 조절유닛 240: 블레이드 그립퍼 연결모듈
241: 블레이드 그립퍼 연결부 243: 블레이드 선형운동부
244: 가이드레일 245: 구동체
246: 구동체 지지부재 250: 블레이드 자세 조절부
251: 회동 지지부재 253: 구동부
255: 구동부 지지부재 260: 접철식 연결모듈
261: 제1 연결부 262: 제2 연결부
263: 복수의 링크부재 264: 직선형 링크부재
265, 266: 절곡형 링크부재 267: 엑츄에이터
268: 메인실린더 269: 서브실린더
270: 간격 유지모듈 271: 타워 결속부
273: 블레이드 결속부 275: 연결부재
300: 허브/블레이드 얼라인 감지유닛 310: 얼라인 검출유닛
311: 영상획득부 313: 상대 위치관계 산출부
315: 블레이드 자세 제어부 317: 특징점 추출부
350: 얼라인 모니터링 유닛 351: 빔 조사부
353: 빔 수신부 355: 디스플레이부
110: blade 111: blade root portion
113: blade tip portion 120: rotor
121: hub 123: blade connection
130: nacelle cover 140: tower
150: ring flange 200: tower / blade connection assembly
210: tower gripper 220: blade gripper
230: blade posture adjustment unit 240: blade gripper connection module
241: blade gripper connection 243: blade linear motion
244: guide rail 245: drive body
246: drive body support member 250: blade attitude adjustment portion
251: rotation support member 253: drive unit
255: drive unit support member 260: folding connection module
261: first connecting portion 262: second connecting portion
263: a plurality of link members 264: straight link members
265, 266: bent link member 267: actuator
268: main cylinder 269: sub cylinder
270: spacing module 271: tower binding unit
273: blade engagement portion 275: connecting member
300: hub / blade alignment detection unit 310: alignment detection unit
311: image acquisition unit 313: relative position relationship calculation unit
315: blade posture control unit 317: feature point extraction unit
350: alignment monitoring unit 351: beam irradiation unit
353: beam receiving unit 355: display unit

Claims (15)

타워와 적어도 하나 이상의 블레이드를 각각 그립핑한 상태에서, 허브에 상기 블레이드를 설치하기 위하여 상기 허브에 대한 상기 블레이드의 자세를 조절하는 블레이드 자세 조절유닛을 구비한 타워/블레이드 연결 어셈블리; 및
상기 블레이드가 상기 허브에 접근하는 상태에서, 상기 블레이드의 루트부와 상기 블레이드 루트부가 삽입되는 상기 허브의 블레이드 접속부의 중첩된 영상으로부터 각각의 테두리를 추출하고 비교하여 상기 블레이드 루트부와 상기 블레이드 접속부 간의 상호 얼라인 여부를 검출하는 얼라인 검출유닛을 포함하는 풍력발전기용 블레이드 설치장치.
A tower / blade connection assembly having a blade posture adjusting unit configured to adjust the posture of the blade with respect to the hub in order to install the blade on the hub in a state in which the tower and the at least one blade are respectively gripped; And
With the blade approaching the hub, the edges of the blades and the blade roots are extracted from the overlapping images of the blade connection portions of the hub into which the blade root portions are inserted, and the respective edges are extracted and compared between the blade root portions and the blade connection portions. Blade installation device for a wind turbine comprising an alignment detection unit for detecting the mutual alignment.
제1항에 있어서,
상기 얼라인 검출유닛은,
상기 블레이드 접속부 측에 마련되고, 상기 블레이드 루트부의 단면부와 상기 블레이드 접속부의 단면부가 중첩된 영상을 획득하는 영상획득부;
상기 중첩된 영상으로부터 추출된상기 블레이드 루트부 및 상기 블레이드 접속부의 특징점들을 이용하여 상기 블레이드 루트부의 단면부 및 상기 블레이드 접속부의 단면부 테두리를 산출하고, 각각의 테두리에 대한 곡률을 계산하여, 상기 블레이드 루트부의 단면부 및 상기 블레이드 접속부의 단면부 테두리의 중심위치가 일치하는지 여부 및 원형인지 여부를 판단하여 상기 블레이드 루트부와 상기 블레이드 접속부간의 상대 위치관계를 산출하는 상대 위치관계 산출부; 및
상기 상대 위치관계 산출부에서 획득한 상기 블레이드 루트부와 상기 블레이드 접속부 간의 상대 위치를 이용하여, 상기 블레이드 루트부와 상기 블레이드 접속부가 얼라인되도록 상기 블레이드 자세 조절유닛을 제어하는 블레이드 자세 제어부를 포함하는 풍력발전기용 블레이드 설치장치.
The method of claim 1,
The alignment detection unit,
An image acquisition unit provided on the blade connection unit and acquiring an image in which the cross section of the blade root unit and the cross section of the blade connection unit overlap;
The edges of the cross section of the blade root portion and the cross section of the blade connection portion are calculated using feature points of the blade root portion and the blade contact portion extracted from the overlapped image, and the curvature of each of the edges is calculated to calculate the blades. A relative positional relationship calculating section for determining a relative positional relationship between the blade root portion and the blade connecting portion by determining whether the center position of the cross section of the root portion and the edge of the cross section of the blade connecting portion is coincident and circular; And
And a blade posture control unit configured to control the blade posture adjusting unit to align the blade root with the blade contact by using the relative position between the blade root and the blade connecting part obtained by the relative position relationship calculating unit. Blade installation device for wind power generators.
제2항에 있어서,
상기 얼라인 검출유닛은,
상기 블레이드 루트부의 단면부 및 상기 블레이드 접속부의 단면부 영상에서 각각 복수의 특징점을 추출하는 특징점 추출부를 더 포함하는 풍력발전기용 블레이드 설치장치.
3. The method of claim 2,
The alignment detection unit,
And a feature point extracting unit for extracting a plurality of feature points from the cross section of the blade root and the cross section of the blade connecting unit, respectively.
제1항에 있어서,
상기 타워/블레이드 연결 어셈블리는,
타워를 그립핑하는 타워 그립퍼; 및
블레이드를 그립핑하는 블레이드 그립퍼를 더 포함하며,
상기 블레이드 자세 조절유닛은, 상기 타워 그립퍼와 적어도 하나 이상의 상기 블레이드 그립퍼를 상호 연결하는 풍력발전기용 블레이드 설치장치.
The method of claim 1,
The tower / blade connection assembly,
A tower gripper for gripping the tower; And
Further comprising a blade gripper for gripping the blade,
The blade posture adjusting unit, the wind turbine blade installation device for interconnecting the tower gripper and at least one blade gripper.
제4항에 있어서,
상기 블레이드 자세 조절유닛은,
상기 블레이드 그립퍼에 연결되고, 상기 블레이드 그립퍼를 상기 타워의 높이방향으로 승강시키는 블레이드 그립퍼 연결모듈; 및
상기 블레이드 그립퍼 연결모듈과 상기 타워 그립퍼 사이에 배치되고, 상기 타워에 대해 상기 블레이드를 상대 회동시켜 상기 허브에 대한 상기 블레이드의 자세를 조절하는 블레이드 자세 조절부를 포함하는 풍력발전기용 블레이드 설치장치.
5. The method of claim 4,
The blade attitude adjustment unit,
A blade gripper connection module connected to the blade gripper and configured to elevate the blade gripper in a height direction of the tower; And
And a blade attitude control unit disposed between the blade gripper connection module and the tower gripper and configured to adjust the attitude of the blade with respect to the hub by rotating the blade relative to the tower.
제5항에 있어서,
상기 블레이드 그립퍼 연결모듈은,
상기 블레이드 그립퍼에 연결되는 블레이드 그립퍼 연결부; 및
상기 블레이드 그립퍼 연결부에 연결되고, 상기 블레이드 그립퍼 연결부를 상기 타워의 높이방향으로 승강시켜 상기 타워의 높이방향으로 상기 블레이드를 선형 왕복운동 가능하게 하는 블레이드 선형운동부를 포함하는 풍력발전기용 블레이드 설치장치.
The method of claim 5,
The blade gripper connection module,
A blade gripper connection portion connected to the blade gripper; And
And a blade linear movement part connected to the blade gripper connection part and configured to linearly reciprocate the blade in the height direction of the tower by elevating the blade gripper connection part in the height direction of the tower.
제5항에 있어서,
상기 블레이드 자세 조절부는,
상기 블레이드 그립퍼 연결모듈이 자유 회동가능하게 지지하는 회동 지지부재;
상기 블레이드 그립퍼 연결모듈에 연결되고, 상기 블레이드 그립퍼 연결모듈이 상기 회동 지지부재를 중심으로 회동되게 하는 구동력을 제공하는 구동부; 및
상기 구동부를 지지하는 구동부 지지부재를 포함하는 풍력발전기용 블레이드 설치장치.
The method of claim 5,
The blade attitude adjustment unit,
A rotation support member for freely supporting the blade gripper connection module;
A driving unit connected to the blade gripper connection module and providing a driving force to cause the blade gripper connection module to rotate about the pivot support member; And
Blade installation device for a wind turbine comprising a drive support member for supporting the drive.
제7항에 있어서,
상기 회동 지지부재는, 상기 블레이드 그립퍼 연결모듈을 회동가능하게 지지하는 유니버셜 조인트이며,
상기 구동부는, 상기 회동 지지부재를 중심으로 직교되는 위치에 쌍을 이루어 이격되게 배치되는 복수의 엑츄에이터를 포함하며,
상기 한 쌍의 엑츄에이터는 상기 블레이드 그립퍼 연결모듈에 연결되는 상부 간격이 하부 간격보다 더 큰 것인 풍력발전기용 블레이드 설치장치.
The method of claim 7, wherein
The pivot support member is a universal joint rotatably supporting the blade gripper connection module,
The driving unit includes a plurality of actuators spaced apart in pairs at positions orthogonal to the pivot support member,
The pair of actuator blade installation device for a wind turbine, the upper interval is connected to the blade gripper connection module is larger than the lower interval.
제5항에 있어서,
상기 블레이드 자세 조절유닛은,
일단부가 상기 타워 그립퍼에 연결되고 타단부가 상기 블레이드 자세 조절부에 연결되고, 상기 타워에 대한 상기 블레이드의 간격을 조절하기 위해 접철 가능하게 연결된 접철식 연결모듈을 더 포함하는 풍력발전기용 블레이드 설치장치.
The method of claim 5,
The blade attitude adjustment unit,
One end is connected to the tower gripper and the other end is connected to the blade attitude adjustment portion, the blade installation device for a wind turbine further comprises a foldable connection module foldably connected to adjust the spacing of the blade with respect to the tower.
제9항에 있어서,
상기 접철식 연결모듈은,
상기 타워 그립퍼에 연결되는 제1 연결부;
상기 블레이드 자세 조절부에 연결되는 제2 연결부; 및
상기 제1 연결부와 상기 제2 연결부를 링크 타입으로 연결하는 복수의 링크부재를 포함하는 풍력발전기용 블레이드 설치장치.
10. The method of claim 9,
The folding connection module,
A first connection part connected to the tower gripper;
A second connection part connected to the blade attitude control part; And
Blade installation device for a wind turbine comprising a plurality of link members for connecting the first connection portion and the second connection portion in a link type.
제4항에 있어서,
상기 타워/블레이드 연결 어셈블리는,
상기 블레이드 자세 조절유닛으로부터 이격되고, 상기 타워와 상기 블레이드 사이의 간격을 일정하게 유지하여 상기 타워와 상기 블레이드가 상호 충돌되는 것을 방지하도록 상기 타워와 상기 블레이드에 각각 착탈가능하게 연결되는 간격 유지모듈을 더 포함하는 풍력발전기용 블레이드 설치장치.
5. The method of claim 4,
The tower / blade connection assembly,
A space keeping module spaced apart from the blade posture adjusting unit and detachably connected to the tower and the blade so as to prevent the tower and the blade from colliding with each other by maintaining a constant distance between the tower and the blade. Blade installation device for a wind turbine further comprising.
제1항 내지 제11항 중 어느 한 항에 따른 풍력발전기용 블레이드 설치장치를 이용하여 풍력발전기 블레이드를 설치하는 방법에 있어서,
상기 블레이드의 루트부가 삽입되는 블레이드 접속부 측에 마련된 영상획득부를 이용하여 상기 블레이드 루트부의 단면부와 상기 블레이드 접속부의 단면부의 중첩된 영상을 획득하는 단계;
상기 중첩된 영상으로부터 블레이드 루트부 및 블레이드 접속부의 복수개의 특징점을 추출하는 단계;
상기 추출된 특징점들로부터 상기 블레이드 루트부의 단면부 및 블레이드 접속부의 단면부의 테두리들을 산출하는 단계;
상기 산출된 테두리들의 곡률 및 중심위치를 산출하는 단계;
상기 산출된 곡률 및 중심위치를 이용하여 상기 블레이드 루트부를 상기 블레이드 접속부에 얼라인하는 단계를 포함하는 풍력발전기 블레이드 설치 방법.
In the method for installing a wind turbine blade using the wind turbine blade installation apparatus according to any one of claims 1 to 11,
Acquiring an overlapping image of the cross section of the blade root portion and the cross section of the blade connection portion by using an image acquisition unit provided on the blade connection portion into which the root portion of the blade is inserted;
Extracting a plurality of feature points of the blade root portion and the blade contact portion from the superimposed image;
Calculating edges of the cross section of the blade root portion and the cross section of the blade connecting portion from the extracted feature points;
Calculating curvature and center positions of the calculated edges;
And aligning the blade root portion with the blade connection portion using the calculated curvature and the center position.
제12항에 있어서,
상기 얼라인하는 단계는,
상기 산출된 테두리들의 곡률을 이용하여, 상기 블레이드 루트부의 테두리가 원형이 되도록 상기 블레이드 자세 조절유닛을 제어하여 상기 블레이드 루트부를 상기 블레이드 접속부에 얼라인하는 단계를 포함하는 풍력발전기 블레이드 설치 방법.
The method of claim 12,
The aligning step,
And using the calculated curvature of the edges, aligning the blade root portion to the blade connection portion by controlling the blade posture adjusting unit so that the edge of the blade root portion is circular.
제12항에 있어서,
상기 얼라인하는 단계는,
상기 산출된 테두리들의 중심위치가 일치하도록 상기 블레이드 자세 조절유닛을 제어하여 상기 블레이드 루트부를 상기 블레이드 접속부에 얼라인하는 단계를 포함하는 풍력발전기 블레이드 설치 방법.
The method of claim 12,
The aligning step,
And controlling the blade posture adjusting unit so that the calculated center positions of the edges coincide with each other so as to align the blade root with the blade connection unit.
제12항에 있어서,
상기 얼라인하는 단계는,
상기 블레이드 루트부의 단면부 테두리가 상기 블레이드 접속부의 단면부 테두리의 내부에 위치하는 경우, 상기 블레이드 자세 조절유닛을 제어하여 상기 블레이드 루트부를 상기 블레이드 접속부 방향으로 이송하는 단계를 포함하는 풍력발전기 블레이드 설치 방법.
The method of claim 12,
The aligning step,
If the cross section edge of the blade root portion is located inside the cross section edge of the blade connection portion, controlling the blade posture adjustment unit to transfer the blade root portion in the direction of the blade connection portion comprising the wind turbine blade installation method .
KR1020120070250A 2012-06-28 2012-06-28 Blade installing apparatus and method of installing blade using thereof for wind turbine KR101358233B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120070250A KR101358233B1 (en) 2012-06-28 2012-06-28 Blade installing apparatus and method of installing blade using thereof for wind turbine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120070250A KR101358233B1 (en) 2012-06-28 2012-06-28 Blade installing apparatus and method of installing blade using thereof for wind turbine

Publications (2)

Publication Number Publication Date
KR20140001704A true KR20140001704A (en) 2014-01-07
KR101358233B1 KR101358233B1 (en) 2014-02-05

Family

ID=50139181

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120070250A KR101358233B1 (en) 2012-06-28 2012-06-28 Blade installing apparatus and method of installing blade using thereof for wind turbine

Country Status (1)

Country Link
KR (1) KR101358233B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108119314A (en) * 2017-12-31 2018-06-05 北京金风科创风电设备有限公司 Impeller assembling apparatus and impeller assembling method
WO2018215458A1 (en) * 2017-05-22 2018-11-29 Baggermaatschappij Boskalis B.V. Wind turbine installation
NO20180521A1 (en) * 2018-04-16 2019-10-17 Nat Oilwell Varco Norway As Tool, installation assembly, and method
TWI775985B (en) * 2018-11-16 2022-09-01 荷蘭商巴格瑪夏皮波絲卡利斯公司 Wind turbine installation

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060175465A1 (en) * 2002-09-04 2006-08-10 Paul Teichert Method and a device for lifting and/or lowering of objects at a wind turbine or the like and uses hereof
EP2144837B1 (en) * 2007-04-30 2012-06-20 Vestas Wind Systems A/S A mounting device
GB2483677B (en) * 2010-09-15 2014-04-16 Vestas Wind Sys As An apparatus for and method of mounting wind turbine blades on a wind turbine tower

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018215458A1 (en) * 2017-05-22 2018-11-29 Baggermaatschappij Boskalis B.V. Wind turbine installation
NL2018964B1 (en) * 2017-05-22 2018-12-04 Boskalis Bv Baggermaatschappij Wind turbine installation
AU2018274608B2 (en) * 2017-05-22 2022-07-14 Baggermaatschappij Boskalis B.V. Wind turbine installation
CN108119314A (en) * 2017-12-31 2018-06-05 北京金风科创风电设备有限公司 Impeller assembling apparatus and impeller assembling method
CN108119314B (en) * 2017-12-31 2020-04-21 北京金风科创风电设备有限公司 Impeller assembling apparatus and impeller assembling method
NO20180521A1 (en) * 2018-04-16 2019-10-17 Nat Oilwell Varco Norway As Tool, installation assembly, and method
WO2019203659A1 (en) * 2018-04-16 2019-10-24 National Oilwell Varco Norway As Tool, installation assembly, and method
NO345040B1 (en) * 2018-04-16 2020-08-31 Nat Oilwell Varco Norway As Tool, installation assembly, and method
US11566604B2 (en) 2018-04-16 2023-01-31 National Oilwell Varco Norway As Tool, installation assembly, and method for positioning a wind turbine blade
TWI775985B (en) * 2018-11-16 2022-09-01 荷蘭商巴格瑪夏皮波絲卡利斯公司 Wind turbine installation

Also Published As

Publication number Publication date
KR101358233B1 (en) 2014-02-05

Similar Documents

Publication Publication Date Title
CN109219701B (en) Multi-rotor wind turbine
US10822207B2 (en) Positioning assembly for a wind turbine rotor blade lifting device
EP2559890B1 (en) A device for handling a wind turbine rotor blade and a method for handling wind turbine rotor blades
EP2505823B1 (en) Transport frame for nacelle/rotor hub unit of a wind turbine, method of transporting and mounting a nacelle/rotor hub unit
EP2832988A1 (en) Method and apparatus for handling a rotor blade
KR101358233B1 (en) Blade installing apparatus and method of installing blade using thereof for wind turbine
KR101346180B1 (en) Blade installing system for wind turbine
EP3431751B1 (en) System and method for suspending a rotor blade of a wind turbine uptower
US8171614B2 (en) Systems and method of assembling a tower section
EP2796317B1 (en) Assembly method of wind power generation system
JPWO2012111094A1 (en) Pitch driving device for wind turbine blade, wind turbine rotor equipped with the same, and wind power generator
KR101358232B1 (en) Blade installing apparatus and method of installing blade using thereof for wind turbine
KR101358229B1 (en) Blade gripping apparatus for wind turbine
KR101379723B1 (en) Blade installing system for wind turbine
KR101358230B1 (en) Blade installing apparatus and method of installing blade using thereof for wind turbine
KR101379726B1 (en) Blade installing apparatus and method of installing blade using thereof for wind turbine
KR101346179B1 (en) Blade gripping apparatus for wind turbine
KR101346176B1 (en) Assembly robot for windmill blade
KR101408274B1 (en) A Horizontal Shifting Device of Wind Turbine Blade
JP2013527361A (en) Wind turbine system
KR20130140312A (en) Blade gripping apparatus for wind turbine
KR101379724B1 (en) Assembly robot for windmill blade
EP2487364A2 (en) Vessel and method for mounting an offshore wind turbine
KR101313811B1 (en) Assembly robot for windmill blade
CN106246474A (en) A kind of blade docking adjusting means

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee