KR20130105249A - A concrete filled circular steel tube with the three-dimensional diaphram and the joint structure - Google Patents

A concrete filled circular steel tube with the three-dimensional diaphram and the joint structure Download PDF

Info

Publication number
KR20130105249A
KR20130105249A KR1020120094708A KR20120094708A KR20130105249A KR 20130105249 A KR20130105249 A KR 20130105249A KR 1020120094708 A KR1020120094708 A KR 1020120094708A KR 20120094708 A KR20120094708 A KR 20120094708A KR 20130105249 A KR20130105249 A KR 20130105249A
Authority
KR
South Korea
Prior art keywords
steel pipe
circular steel
reinforcing plate
horizontal reinforcing
plate
Prior art date
Application number
KR1020120094708A
Other languages
Korean (ko)
Other versions
KR101335955B1 (en
Inventor
이문곤
전금석
유원석
김봉현
김재만
황민기
이상명
박남태
윤형철
Original Assignee
주식회사 씨엠파트너스건축사사무소
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 씨엠파트너스건축사사무소 filed Critical 주식회사 씨엠파트너스건축사사무소
Publication of KR20130105249A publication Critical patent/KR20130105249A/en
Application granted granted Critical
Publication of KR101335955B1 publication Critical patent/KR101335955B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/29Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures
    • E04C3/293Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being steel and concrete
    • E04C3/294Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being steel and concrete of concrete combined with a girder-like structure extending laterally outside the element
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/185Connections not covered by E04B1/21 and E04B1/2403, e.g. connections between structural parts of different material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/19Three-dimensional framework structures
    • E04B1/1903Connecting nodes specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/30Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts being composed of two or more materials; Composite steel and concrete constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/58Connections for building structures in general of bar-shaped building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

PURPOSE: A connection structure of a concrete filled circular steel pile column including a solid diaphragm and a steel beam is provided to improve accuracy of a correcting work of construction errors in construction fields and allow an operator to easily perform a correcting work. CONSTITUTION: A concrete filled circular steel pile column including a solid diaphragm comprises a circular steel pile column (100), a reinforcing cover plate (110), a latch (120), and the solid diaphragm. The reinforcing cover plate encloses the outer surface of the circular steel pipe column, and the latch is installed on the reinforcing cover plate. The solid diaphragm is mounted on the latch and is connected to the reinforcing cover plate with welding. The solid diaphragm comprises four unit reinforcing bodies (250), and the unit reinforcing body comprises a pair of vertical connection plates (260) and a pair of horizontal reinforcing plates (270). The vertical connection plate includes a mounting groove (261), and the horizontal reinforcing plates are individually and horizontally connected to the upper end and the lower end of the pair of vertical connection plates.

Description

입체 다이아프램을 가진 콘크리트 충전 원형 강관기둥 및 철골보와의 접합구조{a concrete filled circular steel tube with the three-dimensional diaphram and the joint structure}Concrete filled circular steel tube with the three-dimensional diaphram and the joint structure

본 발명은 콘크리트 충전 원형 강관기둥과 철골보를 모멘트접합하기 위하여 상기 강관기둥에 외부 다이아프램을 설치하는 구조에 관한 것으로서, 보다 구체적으로는 역타공법의 현장에서 원형 강관기둥과 철골보를 연결시킴에 있어서 시공상 불가피하게 발생하는 기둥의 수직도 등 시공오차에 대한 보정을 용이하게 하면서, 접합부의 강도를 향상시키고 시공의 안전성을 확보할 수 있는 입체 다이아프램을 가진 콘크리트 충전 원형 강관기둥 및 이에 접합되는 철골보와의 접합구조에 관한 것이다.
The present invention relates to a structure in which an external diaphragm is installed on the steel pipe column in order to moment-join the concrete-filled circular steel pipe column and the cheolgolbo, more specifically, the construction in connecting the circular steel pipe column and the cheolgolbo in the field of reverse drilling method. Concrete-filled round steel pipe pillars with three-dimensional diaphragms that can improve the strength of the joints and secure the safety of construction while facilitating the correction of construction errors such as verticality of columns that inevitably occur. It relates to a junction structure of.

역타공법(Top-Down Method)은 초기에 상부 구조물의 시공이 가능하므로 공사기간이 단축되고, 주변 지반과 인접 건물에 미치는 영향이 다른 공법에 비해 훨씬 작으며, 소음과 진동이 적고 날씨에 관계없이 지하공사를 진행할 수 있는 장점이 있기 때문에 최근 도심지에서는 건축물을 건축할 때 주로 역타공법 사용되고 있다.The Top-Down Method allows the construction of upper structures at an early stage, which shortens the construction period, has a much smaller impact on the surrounding ground and adjacent buildings than other construction methods, and reduces noise and vibration. Because of the advantage that can be carried out underground construction in recent years in urban centers are mainly used reverse construction method when building buildings.

상기 역타공법은 지상층과 지하층에 대한 기둥을 콘크리트 기초와 함께 시공하고, 상기 기둥에 철골보를 연결한 후 슬래브를 타설하면서 지하 바닥판까지 역타로 시공을 완료한 다음, 상기 기둥에 철근을 배근하고 지하바닥부터 지상층으로 콘크리트를 타설하여 철골철근콘크리트 기둥을 완성시키게 된다.In the above backfilling method, the column for the ground layer and the underground layer is constructed together with the concrete foundation, the steel beam is connected to the column, and the slab is installed while completing the installation to the underground floor plate. Then, Concrete is poured from the floor to the ground level to complete the steel reinforced concrete column.

이때 지하에 타설되는 기둥은 H형강이 사용되기도 하나, 최근에는 비용이 적게 들면서도 강성이 크고 내화 및 시공성이 좋다는 이유로 원형 또는 사각형상의 강관에 콘크리트를 충전시킨 콘크리트 충전 강관기둥(CFT, Concrete filled steel Tube)이 사용되는 사례가 증가하고 있으며, 특히 원형 강관기둥의 경우 사각 강관기둥에 비해 단면성능이 뛰어나 더욱 선호하는 추세에 있다.At this time, the H-shaped steel is used as a column to be placed underground, but recently, due to its low cost and high rigidity and good fire resistance and workability, concrete-filled steel pipe pillars (CFT, Concrete filled steel) are filled with concrete. Increasingly the use of tubes), especially in the case of the circular steel pipe column is more preferred because of the superior cross-sectional performance compared to the square steel pipe column.

한편 콘크리트 충전 강관기둥을 보 또는 슬래브 등의 수평구조체와 결합할 때 이들의 결합방법은 모멘트 결합과 전단 결합으로 나누어진다.On the other hand, when the concrete filled steel pipe columns are joined with horizontal structures such as beams or slabs, their coupling methods are divided into moment coupling and shear coupling.

그런데 상기 전단 결합의 경우는 콘크리트 충전 강관기둥의 외부에 많은 스터드 볼트를 설치한 후 여기에 콘크리트를 두텁게 타설하여 상기 스터드 볼트의 전단력으로써 슬래브의 하중을 콘크리트 충전 강관기둥에 전달하게 되는 것이므로, 주로 RC의 무량판 구조에서 사용되고 있을 뿐, 역타공법에서와 같이 철골보와의 결합구조에서는 사용이 어렵다.However, in the case of the shear coupling, since many stud bolts are installed on the outside of the concrete-filled steel pipe pillar, the concrete is poured thickly to transfer the load of the slab to the concrete-filled steel pipe pillar by the shear force of the stud bolt. It is only used in the flat plate structure, and it is difficult to use in the coupling structure with cheolgolbo as in the reverse drilling method.

콘크리트 충전 강관기둥에 철골보를 접합시키는 모멘트 결합의 경우에는, 보에 작용하는 힘에 의해 콘크리트 충전 강관기둥의 외피, 즉 철판이 찢어져 국부 파괴가 일어나거나 심한 경우 접합부가 조기에 파단되는 경우가 발생할 수 있다. 따라서 상기와 같은 모멘트 접합의 경우에는 콘크리트 충전 강관기둥의 상기 접합부에 다이아프램(diaphram)이라는 보강수단을 사용하여 휨하중을 대응하도록 하고 있다.In the case of moment coupling to join a steel beam to a concrete filled steel pipe column, the force applied to the beam may cause the shell of the concrete filled steel pipe column to be torn, causing local breakdown or severe failure of the joint at an early stage. have. Therefore, in the case of the moment bonding as described above, the bending portion is used to cope with the bending load by using a reinforcing means called a diaphragm in the joint portion of the concrete-filled steel pipe pillar.

통상적으로 사용되는 다이아프램 방식은 크게 콘크리트 충전 강관기둥의 내부에 삽입하는 내측 다이아프램방식, 상기 강관기둥의 외면에 테두리 형상으로 감쌓아 설치하는 외측 다이아프램 방식 및 상기 강관기둥을 관통시켜 내부에 설치하는 관통형 다이아프램 방식으로 나누어진다.The commonly used diaphragm method is an inner diaphragm method that is inserted into the inside of a concrete filled steel pipe pillar, an outer diaphragm method that is installed in an edge shape on the outer surface of the steel pipe pillar, and installed through the steel pipe pillar. It is divided into a through-type diaphragm system.

한편 지하에 타설되는 기둥은 지상층에서 시공하는 것과는 달리 토질의 상태 또는 시공관리의 어려움 때문에 수직도가 정밀하게 유지되지 못하는 등으로 인하여 도 1에서 보이는 바와 같은 시공오차가 불가피하게 발생하게 되는 바, 원형 강관기둥의 경우는 일반적으로 철골보 접합부의 강성증대와 더불어 상기한 시공오차에 대한 보정수단으로 도 2에서와 같은 외측 다이아프램방식을 채택하고 있다. 그러나 상기 종래의 방식에 의하여 현장에서 외측 다이아프램을 설치하는 경우, 철골보와 시공오차에 의해 비틀어진 기둥 사이의 형상이 동일하지 않고 제각각의 형상으로 나타나기 때문에 각각의 형상에 일치되는 다이아프램 조각을 재단하고 이를 기둥과 보에 짜맞추어 용접하는 복잡한 공정의 작업으로 인하여 공기가 지연되는 문제점이 발생된다. 아울러 다이아프램 조각의 용접시 작업의 부주의로 인한 낙하시 또 다른 안전사고를 발생시킬 수 있다는 많은 문제점을 나타내고 있는 실정이다.
On the other hand, the pillars placed in the basement, unlike the construction in the ground floor, due to the condition of the soil or the difficulty of construction management, due to the inability to maintain the verticality precisely, as shown in FIG. In the case of the steel pipe column, the outer diaphragm method as shown in FIG. However, in the case of installing the outer diaphragm in the field by the conventional method, the diaphragm pieces matched to each shape are cut because the shapes between the cheolgolbo and the pillars twisted by the construction error are not the same and appear in different shapes. And there is a problem that the air is delayed due to the operation of the complex process of welding the welding to the column and beam. In addition, the welding of the diaphragm fragments show a number of problems that can cause another safety accident when the fall due to careless work.

본 발명은 상기와 같은 종래의 문제점을 해결하기 위한 것으로서, 현장에서의 시공오차 보정작업의 정밀성을 향상시킴과 아울러 상기 보정작업을 매우 간단하게 실시할 수 있으며, 상기 보정작업중 작업자의 안전성을 확보하고 원형 강관기둥에 접합되는 철골보의 크기 등에 따라 발생할 수 있는 단차에 대하여도 쉽게 대응할 수 있는 입체 다이아프램을 가진 콘크리트 충전 원형 강관기둥 및 철골보를 이에 접합시키는 구조를 제공함에 그 목적이 있다.
The present invention is to solve the above-mentioned conventional problems, to improve the precision of the construction error correction work in the field and to perform the correction work very simply, to ensure the safety of the operator during the correction work It is an object of the present invention to provide a structure for joining a concrete-filled circular steel pipe column and steel golbo beam having a three-dimensional diaphragm that can easily cope with the step that may occur depending on the size of the steel golbo joined to the circular steel pipe column.

상기 해결하고자 하는 과제를 위한 본 발명의 바람직한 실시예에 의하면, 원형 강관기둥과, 상기 원형 강관기둥의 외면을 감싸는 보강덧판과, 상기 보강덧판에 설치되는 걸쇠와, 상기 걸쇠에 거치된 후 상기 보강덧판과 용접결합되는 입체 다이아프램으로 이루어지되, 상기 입체 다이아프램은 4개의 단위 보강체로 이루어지며, 상기 단위 보강체는 거치용 홈이 형성된 한 쌍의 수직결합판과, 상기 수직결합판의 상, 하단에 수평으로 용접 결합되는 한 쌍의 수평보강판으로 이루어지는 것을 특징으로 하는 입체 다이아프램을 가진 콘크리트 충전 원형 강관기둥이 제공된다.According to a preferred embodiment of the present invention for the problem to be solved, a circular steel pipe pillar, a reinforcing plate surrounding the outer surface of the circular steel pipe column, a clasp installed on the reinforcing plate, and the reinforcement after being mounted on the clasp It consists of a three-dimensional diaphragm welded to the plate, the three-dimensional diaphragm is composed of four unit reinforcement, the unit reinforcement is a pair of vertical coupling plate formed with a mounting groove, the image of the vertical coupling plate, Provided is a concrete-filled circular steel pipe pillar having a three-dimensional diaphragm, characterized in that it consists of a pair of horizontal reinforcing plates welded to the bottom horizontally.

본 발명의 또 다른 바람직한 실시예에 의하면, 상기 걸쇠는 상면의 중앙부분에 내측으로 하향 경사진 면이 형성되고, 양 측단에는 내측으로 갈수록 깊어지는 걸림턱이 형성되도록 하는 것을 특징으로 하는 입체 다이아프램을 가진 콘크리트 충전 원형 강관기둥이 제공된다.According to another preferred embodiment of the present invention, the clasp has a three-dimensional diaphragm characterized in that the inclined surface is formed inwardly downward in the center portion of the upper surface, the engaging jaw is formed deeper toward both sides end Concrete filled circular steel pipe pillars are provided.

본 발명의 또 다른 바람직한 실시예에 의하면, 상기 거치용 홈은 그 상부가 수직결합판의 내측으로 상향 경사진 형태로 구성되어 상기 걸쇠 상면의 하향 경사진 면에 걸림고정되는 것을 특징으로 하는 입체 다이아프램을 가진 콘크리트 충전 원형 강관기둥이 제공된다.According to another preferred embodiment of the present invention, the mounting groove is a three-dimensional diamond, characterized in that the upper portion is configured in the form inclined upward toward the inner side of the vertical coupling plate is locked to the downward inclined surface of the upper surface of the clasp. A concrete filled round steel pipe column with a fram is provided.

본 발명의 또 다른 바람직한 실시예에 의하면, 원형 강관기둥과, 상기 원형 강관기둥의 외면을 감싸는 보강덧판과, 상기 보강덧판에 설치되는 거치용 앵글과, 상기 거치용 앵글에 거치되는 입체 다이아프램으로 이루어지되, 상기 거치용 앵글에 거치되는 입체 다이아프램은 2개의 단위 보강체로 이루어지며, 상기 2개의 단위 보강체는 각각 한 쌍의 수평보강판을 포함하여 구성되는 것을 특징으로 하는 입체 다이아프램을 가진 콘크리트 충전 원형 강관기둥이 제공된다.According to another preferred embodiment of the present invention, a circular steel pipe pillar, a reinforcing plate surrounding the outer surface of the circular steel pipe column, a mounting angle installed on the reinforcing plate, and a three-dimensional diaphragm mounted on the mounting angle Although, the three-dimensional diaphragm mounted on the mounting angle is made of two unit reinforcement, the two unit reinforcement having a three-dimensional diaphragm, characterized in that each comprises a pair of horizontal reinforcing plate A concrete filled round steel pipe column is provided.

본 발명의 또 다른 바람직한 실시예에 의하면, 상기 단위 보강체에는 원형 강관기둥에 접합되는 철골보의 규격차에 의해 발생하는 단차를 해결하기 위한 단차 적용수단이 더 부가되는 것을 특징으로 하는 입체 다이아프램을 가진 콘크리트 충전 원형 강관기둥이 제공된다.According to another preferred embodiment of the present invention, the unit reinforcement is a three-dimensional diaphragm characterized in that the step is applied to further solve the step caused by the standard difference of the cheolgolbo joined to the round steel pipe pillar Concrete filled circular steel pipe pillars are provided.

본 발명의 또 다른 바람직한 실시예에 의하면, 상기 단차 적용수단은, 단위 보강체의 수평보강판 중 상부에 위치한 수평보강판의 상면 또는 하부에 위치한 수평보강판의 하면에 적어도 하나 이상 설치되는 스티프너와, 상기 스티프너에 의해 연결되는 독립된 수평보강판으로 이루어지는 것을 특징으로 하는 입체 다이아프램을 가진 콘크리트 충전 원형 강관기둥이 제공된다.According to another preferred embodiment of the present invention, the step application means, at least one stiffener is installed on the upper surface or the lower surface of the horizontal reinforcing plate located on the bottom of the horizontal reinforcing plate of the upper of the horizontal reinforcing plate of the unit reinforcement and It is provided with a concrete-filled circular steel pipe pillar with a three-dimensional diaphragm, characterized in that consisting of independent horizontal reinforcing plate connected by the stiffener.

본 발명의 또 다른 바람직한 실시예에 의하면, 상기 단차 적용수단은, 단위 보강체의 상, 하부에 위치한 수평보강판 사이에 설치되는 수평보강판과, 상기 3개의 수평보강판 사이에 형성되는 2개의 공간중 어느 한 공간에 설치되는 적어도 하나 이상의 스티프너로 이루어지는 것을 특징으로 하는 입체 다이아프램을 가진 콘크리트 충전 원형 강관기둥이 제공된다.According to another preferred embodiment of the present invention, the step application means, a horizontal reinforcing plate is installed between the horizontal reinforcing plate located above and below the unit reinforcement, and two formed between the three horizontal reinforcing plate Provided is a concrete-filled round steel pipe column with a three-dimensional diaphragm, characterized in that it comprises at least one stiffener installed in any one of the spaces.

본 발명의 또 다른 바람직한 실시예에 의하면, 상기 단위 보강체에는 원형 강관기둥에 접합되는 철골보의 규격차에 의해 발생하는 단차를 해결하기 위한 단차 적용수단이 더 부가되되, 상기 단차 적용수단은, 단위 보강체의 상, 하부에 위치한 수평보강판 사이에 설치되는 수평보강판과, 상기 3개의 수평보강판 사이에 형성되는 2개의 공간중 어느 한 공간에 설치되는 적어도 하나 이상의 스티프너로 이루어지고, 상기 수직결합판과 결합되는 다수의 수평보강판중 수직결합판의 상단에 결합되는 수평보강판을 제외한 나머지 수평보강판이 수직결합판과 결합되는 부위의 수직결합판에는 하향 용접을 위한 용접홈이 형성되는 것을 특징으로 하는 입체 다이아프램을 가진 콘크리트 충전 원형 강관기둥According to another preferred embodiment of the present invention, the unit reinforcement is further provided with a step application means for solving the step caused by the standard difference of the cheolgolbo joined to the circular steel pipe pillar, the step application means, the unit A horizontal reinforcing plate installed between the horizontal reinforcing plates located above and below the reinforcement body, and at least one stiffener installed in any one of two spaces formed between the three horizontal reinforcing plates; Among the plurality of horizontal reinforcing plates coupled with the coupling plate, except for the horizontal reinforcing plate coupled to the top of the vertical coupling plate, the vertical coupling plate of the portion where the horizontal reinforcing plate is coupled with the vertical coupling plate is formed with a welding groove for downward welding. Concrete Filled Round Steel Pipe Column with Three-Dimensional Diaphragm

본 발명의 또 다른 바람직한 실시예에 의하면, 상기 단위 보강체에는 시공오차 보정수단이 더 설치되는 것을 특징으로 하는 입체 다이아프램을 가진 콘크리트 충전 원형 강관기둥이 제공된다.According to another preferred embodiment of the present invention, the unit reinforcement is provided with a concrete-filled circular steel pipe pillar having a three-dimensional diaphragm, characterized in that the installation error correction means is further installed.

본 발명의 또 다른 바람직한 실시예에 의하면, 상기 시공오차 보정수단은 상하로 서로 인접한 2개의 수평보강판 사이에 설치되는 중간보강재인 것을 특징으로 하는 입체 다이아프램을 가진 콘크리트 충전 원형 강관기둥이 제공된다.According to another preferred embodiment of the present invention, the construction error correction means is provided with a concrete-filled circular steel pipe pillar having a three-dimensional diaphragm, characterized in that the intermediate reinforcement is installed between two horizontal reinforcing plates adjacent to each other up and down. .

본 발명의 또 다른 바람직한 실시예에 의하면, 상기 시공오차 보정수단은 수평보강판의 외측 단부에 판상으로 설치되는 위치보정판인 것을 특징으로 하는 입체 다이아프램을 가진 콘크리트 충전 원형 강관기둥이 제공된다.According to another preferred embodiment of the present invention, the construction error correction means is provided with a concrete-filled circular steel pipe column having a three-dimensional diaphragm, characterized in that the position correction plate is installed in the plate shape on the outer end of the horizontal reinforcement plate.

본 발명의 또 다른 바람직한 실시예에 의하면, 콘크리트 충전 원형 강관기둥(100)에 설치된 입체 다이아프램의 수평보강판에 철골보의 플랜지를 걸쳐 놓은 후, 상기 수평보강판의 상면에서 철골보의 플랜지를 용접하여 접합시키는 것을 특징으로 하는 콘크리트 충전 원형 강관기둥과 철골보의 접합구조가 제공된다.
According to another preferred embodiment of the present invention, after placing the flange of the steel golbo on the horizontal reinforcing plate of the three-dimensional diaphragm installed in the concrete-filled circular steel pipe pillar 100, by welding the flange of the steel golbo on the upper surface of the horizontal reinforcing plate Provided is a joining structure of a concrete-filled round steel tube column and cheolgolbo, characterized in that for joining.

본 발명은 원형 강관기둥과 입체 다이아프램을 형성시키기 위한 단위 보강체를 공장에서 제작하고, 현장에서는 이들을 단순 조립 및 결합시키기만 하기 때문에 공기를 단축시키고 시공정밀도를 향상시킬 수 있을 뿐 아니라, 시공의 안전성을 확보할 수 있다.The present invention manufactures a unit reinforcement for forming a circular steel pipe column and a three-dimensional diaphragm in the factory, and in the field, because they simply assemble and combine them, not only can shorten the air and improve the work process density, Safety can be secured.

아울러 본 발명은, 입체 다이아프램의 일체적 거동에 의해 응력전달이 명확하며, 원형 강관기둥에 접합되는 철골보의 규격에 관계없이 다양하게 적용시킬 수 있는 효과를 기대할 수 있다.
In addition, the present invention, the stress transmission is clear by the integral behavior of the three-dimensional diaphragm, and can be expected to be applied to a variety of applications irrespective of the specifications of the cheolgolbo bonded to the circular steel pipe column.

도 1은 지중에 원형 강관기둥을 설치한 경우 발생하는 시공오차를 설명하는 예시도이다.
도 2는 종래 기술에 의하여 외측 다이아프램이 원형 강관기둥에 설치된 구조이다.
도 3은 본 발명의 제1실시예에서 보강덧판이 부착된 원형 강관기둥에 걸쇠를 설치한 예와, 상기 걸쇠를 확대한 사시도이다.
도 4는 본 발명의 제1실시예에 의한 단위 보강체가 형성된 전체적인 구성을 나타내는 사시도이다.
도 5는 본 발명의 제1실시예에서 원형 강관기둥에 설치된 걸쇠에 단위 보강체의 수직결합판이 걸림고정된 상태를 나타내는 부분 사시도이다.
도 6은 본 발명의 제1실시예에서 수평보강판의 용접부위 및 상기 용접부위에 대하여 하향 용접을 위하여 수직결합판에 형성시킨 용접홈을 나타내는 부분 사시도이다.
도 7a, 7b는 본 발명의 제1실시예에 의한 입체 다이아프램이 설치된 원형 강관기둥에 철골보를 접합시키는 각 실시예의 사시도이다.
도 8은 본 발명의 제2실시예에서 보강덧판이 부착된 원형 강관기둥에 거치용 앵글이 설치되는 과정을 나타내는 사시도이다.
도 9는 본 발명의 제2실시예에 의한 단위 보강체를 나타내는 사시도이다.
도 10은 본 발명의 제2실시예에서 원형 강관기둥에 설치된 거치용 앵글에 단위 보강체가 설치되는 과정을 나타내는 설명도이다.
도 11은 본 발명의 제2실시예에서 원형 강관기둥에 입체 다이아프램이 설치된 모습을 나타내는 사시도이다.
도 12a 내지 12c는 본 발명의 시공오차 보정수단으로 중간보강재를 설치한 일 실시예를 나타내는 사시도이다.
도 13a 내지 13c는 본 발명의 시공오차 보정수단으로 위치보정판을 설치한 타 실시예를 나타내는 사시도이다.
도 14a , 14b는 본 발명의 단차 적용수단으로 독립된 수평보강판을 부가한 일 실시예의 사시도이다.
도 15a , 15b는 본 발명의 단차 적용수단으로 중간의 수평보강판을 부가한 타 실시예의 사시도이다.
1 is an exemplary view illustrating a construction error occurring when a circular steel pipe pillar is installed in the ground.
2 is a structure in which the outer diaphragm is installed in a circular steel pipe column according to the prior art.
3 is an example in which a clasp is installed on a circular steel pipe column having a reinforcing plate in the first embodiment of the present invention, and an enlarged perspective view of the clasp.
4 is a perspective view showing the overall configuration in which the unit reinforcement according to the first embodiment of the present invention is formed.
FIG. 5 is a partial perspective view illustrating a state in which a vertical coupling plate of a unit reinforcement is locked to a latch provided at a circular steel pipe pillar in a first embodiment of the present invention.
FIG. 6 is a partial perspective view illustrating a welding portion of a horizontal reinforcing plate and a welding groove formed in a vertical coupling plate for downward welding with respect to the welding portion in the first embodiment of the present invention.
Figure 7a, 7b is a perspective view of each embodiment for bonding the cheolgolbo to the circular steel pipe column is provided with a three-dimensional diaphragm according to the first embodiment of the present invention.
FIG. 8 is a perspective view illustrating a process of installing a mounting angle on a circular steel pipe column having a reinforcing plate in the second embodiment of the present invention.
9 is a perspective view showing a unit reinforcement according to a second embodiment of the present invention.
FIG. 10 is an explanatory view showing a process in which a unit reinforcement is installed in a mounting angle installed in a circular steel pipe pillar in a second embodiment of the present invention.
FIG. 11 is a perspective view illustrating a state in which a three-dimensional diaphragm is installed in a circular steel pipe pillar in a second embodiment of the present invention.
12A to 12C are perspective views showing an embodiment in which an intermediate reinforcement is installed as a construction error correction means of the present invention.
13A to 13C are perspective views illustrating another embodiment in which a position correction plate is installed as a construction error correction means of the present invention.
14A and 14B are perspective views of one embodiment in which an independent horizontal reinforcing plate is added as a step applying means of the present invention.
Figure 15a, 15b is a perspective view of another embodiment in which the intermediate reinforcing plate is added to the step application means of the present invention.

이하에서는 본 발명의 실시 예를 첨부된 도면을 참조하여 상세히 설명한다. 그러나 본 발명을 설명함에 있어 공지의 구성을 구체적으로 설명함으로 인하여 본 발명의 기술적 사상을 흐리게 하거나 불명료하게 하는 경우에는 위 공지의 구성에 관하여는 그 설명을 생략하기로 한다.
Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings. In the following description of the present invention, however, it is to be understood that the present invention is not limited to the disclosed embodiments.

본 발명에 의한 입체 다이아프램을 가진 콘크리트 충전 원형 강관기둥은, 원형 강관기둥(100)과, 상기 원형 강관기둥(100)의 외면을 감싸는 보강덧판(110)과, 상기 보강덧판(110)에 설치되는 걸쇠(120)와, 상기 걸쇠(120)에 거치된 후 상기 보강덧판(110)과 용접결합되는 입체 다이아프램(200)으로 이루어진다.Concrete filled circular steel pipe pillar having a three-dimensional diaphragm according to the present invention, the circular steel pipe pillar 100, the reinforcement plate 110 surrounding the outer surface of the circular steel pipe column 100 and installed in the reinforcement plate 110 The clasp 120 and the three-dimensional diaphragm 200 are mounted to the clasp 120 and then welded to the reinforcement plate 110.

원형 강관기둥(100)은 공장에서, 철판을 말아 만들어 용접부위가 한 곳인 롤 포밍(Roll Forming) 또는 프레스로 눌러서 모양의 반을 만든 후 용접으로 이어 붙이는 프레스 벤딩(Press bending)의 방식에 의해 제작된다.The circular steel pipe column 100 is manufactured by a press bending method in which a rolled steel plate is made in a factory, and a welding part is formed by a roll forming or a press to make a half of a shape, and then connected by welding. do.

원형 강관기둥(100)은 얇은 철판으로 이루어져 있기 때문에 철골보(300)와의 접합부위에는 집중하중이 가해져 그 부분의 철판이 찢어지거나 변형될 우려가 있다. 따라서 원형 강관기둥(100)의 외면중 철골보(300)가 접합되는 부위, 즉 후술하는 외부 보강부재가 설치되는 부분에 대하여는 보강덧판(110)을 설치할 필요가 있다. 상기 보강덧판(110)은 2 ~ 4개로 분할하여 원형 강관기둥(100)에 접합시킬 수 있으며, 이러한 접합작업은 공장에서 이루어진다. 보강덧판(110)이 부착된 원형 강관기둥(100)은 현장으로 이송되며, 현장에서는 지반을 천공한 후 상기 원형 강관기둥(100)을 삽입하여 콘크리트 기초와 함께 시공한다. Since the circular steel pipe column 100 is made of a thin steel plate, a concentrated load is applied to the joint portion with the cheolgolbo 300, so that the steel plate of the portion may be torn or deformed. Therefore, it is necessary to install the reinforcement covering plate 110 in the outer surface of the circular steel pipe column 100 to which the cheolgolbo 300 is joined, that is, the portion where the external reinforcing member to be described later is installed. The reinforcement plate 110 is divided into 2 to 4 can be bonded to the circular steel pipe pillar 100, such a joining operation is made in the factory. The circular steel pipe pillar 100 to which the reinforcing plate 110 is attached is transferred to the site, and after the ground is drilled, the circular steel pipe pillar 100 is inserted to construct the concrete pipe together with the concrete foundation.

지중에 원형 강관기둥(100)의 설치가 완료되면, 상기 원형 강관기둥(100)에 부착되어 있는 보강덧판(110)의 외면에 외부 보강부재인 입체 다이아프램(200)을 거치시키기 위한 걸쇠(120)가 설치된다. 상기 걸쇠(120)는 철골보(300)가 설치되는 높이와 관련하여 정확한 설치위치를 측정한 후 보강덧판(110)의 소정의 위치에 용접으로 고정된다. 참고로 상기에서는 걸쇠(120)가 입체 다이아프램(200)을 거치시키기 위한 것이라고 설명하였으나, 상기 입체 다이아프램(200)은 후술하는 바와 같이 다수의 단위 보강체(250)가 결합된 것이므로, 상기 걸쇠(120)에 단위 보강체(250)가 거치된다는 표현과 다르지 않다는 것을 미리 주의할 필요가 있다.When the installation of the circular steel pipe pillar 100 in the ground is completed, the clasp 120 for mounting the three-dimensional diaphragm 200, which is an external reinforcing member on the outer surface of the reinforcing plate 110 attached to the circular steel pipe pillar (100). ) Is installed. The clasp 120 is fixed by welding to a predetermined position of the reinforcement plate 110 after measuring the exact installation position with respect to the height of the cheolgolbo 300 is installed. For reference, the clasp 120 described above is for mounting the three-dimensional diaphragm 200, but the three-dimensional diaphragm 200 is coupled to a plurality of unit reinforcement 250 as described later, the clasp Note that it is not different from the expression that the unit reinforcement 250 is mounted on the 120.

도 3은 보강덧판(110)이 부착된 원형 강관기둥(100)에 걸쇠(120)를 설치한 예와, 상기 걸쇠(120)를 확대한 사시도이다. 걸쇠(120)는 상기 도 3에 도시된 바와 같이, 상면(121)의 중앙부분에 내측으로 하향 경사진 면이 형성되어 있고, 양 측단에는 내측으로 갈수록 깊어지는 걸림턱(122)이 형성되어 있다. 부연 설명하면 원형 강관기둥(100)에 설치된 걸쇠(120)를 위에서 바라보면 걸쇠(120)의 상면(121)은 원형 강관기둥(100)쪽으로 갈수록 밑으로 파고드는 형상으로 되어 있어, 후술하는 수직결합판(260)이 거치되었을 때 수직결합판(260)의 거치용 홈(261)과 결합하여 입체 다이아프램(200)에 대하여 상향으로 하중이 가해지는 경우가 아니라면 어떠한 경우에도 원형 강관기둥(100)으로부터 상기 입체 다이아프램(200)은 이탈되지 않는다. 따라서 원형 강관기둥(100)에 입체 다이아프램(200)을 완전히 고정시키기 위하여 용접 등의 작업을 진행함에 있어 상기 입체 다이아프램(200)을 임시적으로 지지할 수단이 없어도 안전하고 정밀하며 용이하게 시공할 수 있다는 효과를 기대할 수 있을 것이다.3 is an example in which the clasp 120 is installed on the circular steel pipe pillar 100 to which the reinforcing plate 110 is attached, and an enlarged perspective view of the clasp 120. As shown in FIG. 3, the clasp 120 has a surface inclined downward inward at a central portion of the upper surface 121, and a latching jaw 122 deeper toward an inner side is formed at both side ends thereof. In detail, the upper surface 121 of the clasp 120 is shaped to dig downward toward the circular steel pipe pillar 100 when viewed from the top of the clasp 120 installed on the circular steel pipe pillar 100, which will be described later. When the plate 260 is mounted, in combination with the mounting groove 261 of the vertical coupling plate 260 is not a case that the load is applied upwards to the three-dimensional diaphragm 200 in any case round steel pipe pillar (100) The three-dimensional diaphragm 200 is not separated from. Therefore, in order to completely fix the three-dimensional diaphragm 200 to the circular steel pipe pillar 100, the construction can be safely, precisely and easily without the means for temporarily supporting the three-dimensional diaphragm 200. You can expect the effect.

본 발명의 원형 강관기둥(100)에 설치되는 입체 다이아프램(200)은 4개의 단위 보강체(250)로 이루어지며, 상기 단위 보강체(250)는 한 쌍의 수직결합판(260)과, 한 쌍의 수평보강판(270)으로 이루어진다. 도 4는 상기 단위 보강체(250)의 구성을 전체적으로 나타내고 있다.The three-dimensional diaphragm 200 installed in the circular steel pipe pillar 100 of the present invention is composed of four unit reinforcement 250, the unit reinforcement 250 is a pair of vertical coupling plate 260, It consists of a pair of horizontal reinforcing plate 270. 4 illustrates the configuration of the unit reinforcement 250 as a whole.

도 4에 도시된 바와 같이, 수직결합판(260)은 내측, 즉 원형 강관기둥(100)에 접하게 되는 측면에 거치용 홈(261)이 형성되어 있다. 상기 거치용 홈(261)은 걸쇠(120)의 내측으로 하향 경사진 상면에 대응되도록 홈의 내면은 안쪽으로 상향 경사지도록 구성된다. 따라서 도 5에 도시된 바와 같이, 입체 다이아프램(또는 단위 보강체)은 걸쇠(120)와 수직결합판(260) 간의 걸림고정에 의해 원형 강관기둥(100)에 자립하여 안전하게 거치되므로 작업자는 용접 등의 후속작업을 안전하게 시행할 수 있을 것임은 앞서 설명한 바와 같다.As shown in FIG. 4, the vertical coupling plate 260 has a mounting groove 261 formed at an inner side thereof, that is, at a side facing the circular steel pipe column 100. The mounting groove 261 is configured such that the inner surface of the groove is inclined upward inward so as to correspond to an upper surface inclined downward into the clasp 120. Therefore, as shown in Figure 5, the three-dimensional diaphragm (or unit reinforcement) is securely mounted to the circular steel pipe column 100 by the locking between the clasp 120 and the vertical coupling plate 260, so that the worker is welded As described above, it will be possible to safely perform the following work.

수평보강판(270)은 한 쌍의 수직결합판(260) 상, 하단에 각각 수평으로 용접 결합된다. 상기 수평보강판(270)의 내측은 원형 강관기둥(100)의 외경, 보다 구체적으로는 보강덧판(110)의 외경에 접할 수 있는 동일한 곡선으로 이루어지고, 외측은 철골보(300)의 상, 하 플랜지(310)에 접할 수 있도록 직선으로 이루어져 있다.The horizontal reinforcing plate 270 is horizontally welded to the bottom of the pair of vertical coupling plate 260, respectively. The inner side of the horizontal reinforcing plate 270 is made of the same curve that can be in contact with the outer diameter of the circular steel pipe pillar 100, more specifically, the outer diameter of the reinforcing plate 110, the outside is the upper, lower of the cheolgolbo 300 It is made of a straight line to be in contact with the flange (310).

이와 같이, 한 쌍의 수직결합판(260)과 수평보강판(270)으로 이루어지는 단위 보강체(250)는 4개가 결합됨으로써 하나의 입체 다이아프램(200)을 형성하게 되므로, 상기 수직결합판(260)에는 단위 보강체(250)들 간의 결합을 위한 체결공이 다수 개 형성된다. 아울러 상기 수직결합판(260)에는 하향 용접을 위한 용접홈(263)을 더 형성시키는 것이 바람직하다.  As such, the unit reinforcement 250 including the pair of vertical coupling plates 260 and the horizontal reinforcing plate 270 is combined to form one three-dimensional diaphragm 200, so that the vertical coupling plate ( 260 has a plurality of fastening holes for coupling between the unit reinforcement (250). In addition, it is preferable to further form a welding groove 263 for downward welding in the vertical coupling plate 260.

이러한 단위 보강체(250)는 공장에서 제작되어 현장으로 이송된 후, 현장에서 이들 4개를 조립하여 하나의 입체 다이아프램(200)을 형성시키게 된다. 상기 입체 다이아프램(200)의 형성과정을 구체적으로 설명하면, 지중에 설치된 원형 강관기둥(100)의 걸쇠(120)에 단위 보강체(250) 4개를 각 거치시킨 후, 상기 단위 보강체(250) 각각의 수직결합판(260)끼리 체결볼트로 체결함과 아울러 각 수평보강판(270)들 간에도 용접을 통해 이들을 완전 일체화시켜 하나의 입체 다이아프램(200)으로써 거동할 수 있도록 하게 한다. 이때 수직결합판(260)에 구비된 용접홈(263)은 수직결합판(260)의 하단에 위치한 수평보강판(270)의 결합부위(도 6 참조)에 대하여 하향 용접이 가능하게 하여 시공품질을 더욱 향상시킬 수 있게 한다. 아울러 단위 보강체(250)와 보강덧판(110) 사이도 용접으로 일체화시킴으로써 입체 다이아프램(200)과 원형 강관기둥(100) 사이에서의 응력전달이 명확하게 이루어질 수 있도록 한다. 도 7a, 7b는 입체 다이아프램(200)이 설치된 원형 강관기둥(100)에 철골보(300)를 접합시킨 예를 도시하고 있다.The unit reinforcement 250 is manufactured in a factory and transported to a site, and then, assembling four of them in a site, a single three-dimensional diaphragm 200 is formed. Referring to the formation process of the three-dimensional diaphragm 200 in detail, after mounting each of the four unit reinforcement 250 to the clasp 120 of the circular steel pipe pillar 100 installed in the ground, the unit reinforcement ( 250) Each of the vertical coupling plates 260 are fastened to each other with fastening bolts, and the horizontal reinforcing plates 270 are also integrally welded to each other so as to behave as a single three-dimensional diaphragm 200. At this time, the welding groove 263 provided in the vertical coupling plate 260 is the construction quality by enabling the downward welding to the coupling portion (see Fig. 6) of the horizontal reinforcing plate 270 located at the bottom of the vertical coupling plate 260 To further improve. In addition, by integrally welding between the unit reinforcement 250 and the reinforcement plate 110, the stress transfer between the three-dimensional diaphragm 200 and the circular steel pipe column 100 can be made clearly. 7A and 7B show an example in which the cheolgolbo 300 is bonded to a circular steel pipe column 100 provided with a three-dimensional diaphragm 200.

도 7a에 도시된 실시예에 의하면, 철골보(300)의 상, 하 플랜지(310)는 입체 다이아프램(200)의 상, 하부에 위치한 각 수평보강판(270)의 외측 단부에 용접으로 부착되고, 철골보(300)의 웨브(320)는 보강덧판(110)에 용접으로 설치된 덧댐판(330)에 볼트로 체결된다.According to the embodiment shown in Figure 7a, the upper, lower flange 310 of the cheolgolbo 300 is welded to the outer end of each horizontal reinforcing plate 270 located on the upper, lower portion of the three-dimensional diaphragm 200 The web 320 of the cheolgolbo 300 is fastened with a bolt to the back plate 330 installed by welding to the reinforcement plate (110).

도 7b에 도시된 타 실시예에 의하면, 철골보(300)의 상, 하 플랜지(310)를 입체 다이아프램(200)의 수평보강판(270)에 걸쳐 놓은 후, 상기 수평보강판(270)의 상면에서 철골보(300)의 플랜지(310)를 용접(W)함으로써 철골보(300)를 원형 강관기둥(100)에 접합시킬 수 있다.According to another embodiment illustrated in FIG. 7B, after the upper and lower flanges 310 of the steel frame 300 are placed over the horizontal reinforcing plate 270 of the three-dimensional diaphragm 200, the horizontal reinforcing plate 270 may be formed. By welding (W) the flange 310 of the cheolgolbo 300 on the upper surface can be bonded to the steel cheolgolbo 300 to the circular steel pipe column (100).

지금까지의 제1실시예에서는 입체 다이어프램(200)을 구성하는 단위 보강체(250)가 한 쌍의 수직결합판(260)과 한 쌍의 수평보강판(270)으로 이루어지는 것임을 전제로 하여 설명하였으나, 상기의 단위 보강체는 한 쌍의 수평보강판(270')만으로 구성할 수도 있다. 도 9는 제2실시예에 의한 단위 보강체(250')를 도시하고 있다. 제2실시예에 의한 단위 보강체(250')는 한 쌍의 수평보강판(270')이 서로 연결됨이 없이 독립된 상태로 위치하게 된다.In the first embodiment thus far, the unit reinforcement 250 constituting the three-dimensional diaphragm 200 has been described on the premise that the pair of vertical coupling plates 260 and a pair of horizontal reinforcing plates 270 are used. In addition, the unit reinforcement may be configured of only a pair of horizontal reinforcing plate 270 '. 9 shows the unit reinforcement 250 'according to the second embodiment. The unit reinforcement 250 ′ according to the second embodiment is positioned in an independent state without the pair of horizontal reinforcing plates 270 ′ connected to each other.

이와 같이 단위 보강체(250')가 한 쌍의 수평보강판(270')만으로 이루어지는 경우에는 제1실시예처럼 4개의 단위 보강체로 하나의 입체 다이아프램을 형성시킬 수도 있으나, 2개의 단위 보강체(250')만으로도 입체 다이아프램(200')을 형성시킬 수 있어, 작업공정을 더욱 단순화시킬 수 있다. 원형 강관기둥(100)에 입체 다이아프램(200')을 설치하기 위한 수단으로는 제1실시예의 걸쇠(120) 대신에 상기 한 쌍의 수평보강판(270')에 대응하는 한 쌍의 거치용 앵글(130)이 설치된다. 도 8은 보강덧판(110)이 부착된 원형 강관기둥(100)에 거치용 앵글(130)이 설치되는 과정을 나타내고 있다.As such, when the unit reinforcement 250 'is formed of only a pair of horizontal reinforcing plates 270', one unit diaphragm may be formed of four unit reinforcements as in the first embodiment. It is possible to form the three-dimensional diaphragm 200 'by only 250', thereby further simplifying the work process. As a means for installing the three-dimensional diaphragm 200 'on the circular steel pipe column 100, a pair of mounting portions corresponding to the pair of horizontal reinforcing plates 270' instead of the clasp 120 of the first embodiment. Angle 130 is installed. 8 shows a process in which the mounting angle 130 is installed on the circular steel pipe column 100 to which the reinforcing plate 110 is attached.

도 10은 상기의 제2실시예에서 거치용 앵글(130)에 단위 보강체(250')가 설치되는 과정을 나타내고 있으며, 도 11은 상기 제2실시예에 의하여 입체 다이아프램(200')이 설치된 모습을 나타내고 있다. 상기의 제2실시예에 의한 입체 다이아프램(200')이 설치되는 과정은 다음과 같다.FIG. 10 illustrates a process in which the unit reinforcement 250 ′ is installed in the mounting angle 130 in the second embodiment, and FIG. 11 illustrates a three-dimensional diaphragm 200 ′ according to the second embodiment. It is installed. The process of installing the three-dimensional diaphragm 200 ′ according to the second embodiment is as follows.

먼저, 원형 강관기둥(100)에 제1실시예와 마찬가지로 보강덧판(110)을 부착시킨 후 입체 다이아프램(200')을 설치하기 위한 레벨을 체크한다. 입체 다이아프램(200')의 설치 위치가 정해지면, 보강덧판(110)의 상기 정해진 위치에 거치용 앵글(130)을 부착시키되, 원형 강관기둥(100)에 접합되는 철골보(300)의 상하 플랜지에 대응하도록 상, 하부에 각각 설치한다. 상기 보강덧판(110)과 거치용 앵글(130)의 부착은 태그용접에 의하는 것이 바람직하다. 거치용 앵글(130)의 부착이 완료되면, 상기 상, 하부에 위치한 거치용 앵글(130)의 각 상단에 수평보강판(270')을 거치시켜 볼트로 가조립한 후 보강덧판(110)과 상기 수평보강판(270')의 접촉부위를 용접시킴으로써 일측의 단위 보강체(250')가 설치 완료된다. 상기와 같이 거치용 앵글(130)과 수평보강판(270')의 볼트에 의한 가조립을 위해서는 거치용 앵글(130)과 수평보강판(270')에는 볼트체결공이 형성되어야 할 뿐 아니라, 거치용 앵글(130)에 형성되는 볼트체결공은 장공으로 형성한다. 이러한 장공은 수평보강판의 설치위치를 조정할 수 있게 하여 시공의 정밀성 및 작업의 용이성을 향상시킨다.First, the reinforcing plate 110 is attached to the circular steel pipe column 100 as in the first embodiment, and then the level for installing the three-dimensional diaphragm 200 'is checked. When the installation position of the three-dimensional diaphragm 200 ′ is determined, the mounting angle 130 is attached to the fixed position of the reinforcement plate 110, and the upper and lower flanges of the cheolgolbo 300 joined to the circular steel pipe column 100. It is installed on the upper and lower parts so as to correspond to. Attachment of the reinforcement cover 110 and the mounting angle 130 is preferably by tag welding. When the attachment angle of the mounting angle 130 is completed, the horizontal reinforcing plate 270 ′ is mounted on each upper end of the mounting angle 130 located above and below, and then assembled by bolts, and then reinforcement cover 110 and the The unit reinforcement 250 'of one side is completed by welding the contact portion of the horizontal reinforcing plate 270'. As described above, in order to temporarily assemble the mounting angle 130 and the horizontal reinforcing plate 270 'by the bolts, the mounting angle 130 and the horizontal reinforcing plate 270' need to be formed with bolt fastening holes. The bolt fastening hole formed in the angle 130 is formed as a long hole. Such a long hole makes it possible to adjust the installation position of the horizontal reinforcing plate to improve the precision of construction and ease of operation.

상기한 바와 같은 동일한 방법으로 나머지의 단위 보강체(250')에 대한 설치가 완료되면, 단위 보강체(250')가 서로 접하는 부위의 두 수평보강판(270') 사이를 용접하여 일체화시킴으로써 하나의 입체 다이아프램(200')이 원형 강관기둥(100)에 설치되는 것이다.When the installation of the remaining unit reinforcement 250 ′ is completed in the same manner as described above, the unit reinforcement 250 ′ is welded and integrated between two horizontal reinforcing plates 270 ′ at a portion in contact with each other. The three-dimensional diaphragm (200 ') is to be installed in the circular steel pipe column (100).

제2실시예에 의한 입체 다이아프램(200')이 설치된 경우에도 이에 철골보가 접합되는 방식은 제1실시예와 다르지 아니하므로, 이에 대한 구체적인 설명은 생략하기로 한다.
Even when the three-dimensional diaphragm 200 ′ according to the second embodiment is installed, the method in which the cheolgolbo is joined is not different from that of the first embodiment, and thus a detailed description thereof will be omitted.

한편, 앞서 설명한 바와 같이, 지중에 설치되는 원형 강관기둥(100)은 수직도를 정확하게 하는 것이 시공상 용이하지 아니하므로, 시공오차가 발생할 여지가 많고, 이러한 시공오차는 철골보(300)의 상, 하 플랜지(310)가 단위 보강체(250, 250')의 상,하부에 위치한 수평보강판(270, 270')에 일치시키는 것을 어렵게 한다. 따라서 단위 보강체(250, 250'))에 상기 시공오차를 흡수하기 위한 시공오차 보정수단을 더 부가하는 것이 바람직하다.On the other hand, as described above, since the circular steel pipe pillar 100 installed in the ground is not easy to precisely set the vertical degree, there is a lot of room for construction errors, such a construction error is the image of the cheolgolbo 300, The lower flange 310 makes it difficult to match the horizontal reinforcing plates 270 and 270 'located above and below the unit reinforcements 250 and 250'. Therefore, it is preferable to further add construction error correction means for absorbing the construction errors to the unit reinforcement (250, 250 ').

상기 시공오차 보정수단은 상하로 서로 인접한 2개의 수평보강판(270, 270') 사이에 중간보강재(280)를 설치하는 것일 수 있다. 도 12a 내지 12c는 제1실시예에서 상기 중간보강재(280)를 설치하여 시공오차를 흡수시키기 위한 구조의 일 실시예이다. 상기 중간보강재(280)은 시공오차의 보정 뿐 아니라 입체 다이아프램(200)의 강성 및 일체성을 보강하는 부가적 효과를 발휘하게 된다.The construction error correction means may be to install the intermediate reinforcing material 280 between the two horizontal reinforcing plates 270, 270 'adjacent to each other up and down. 12A to 12C illustrate one embodiment of a structure for absorbing construction errors by installing the intermediate reinforcing material 280 in the first embodiment. The intermediate reinforcing material 280 has the additional effect of reinforcing the rigidity and integrity of the three-dimensional diaphragm 200 as well as the correction of the construction error.

상기 시공오차 보정수단은 수평보강판(270, 270')의 외측 단부에 판상으로 설치되는 위치보정판(290)을 설치하는 것일 수 있다. 도 13a 내지 13c는 제1실시예의 예를 들어 본 발명의 위치보정판(290)을 수평보강판(270)에 설치하여 철골보(300)를 접합시키는 예를 나타내고 있다.The construction error correction means may be to install a position correction plate 290 which is installed in the plate shape on the outer end of the horizontal reinforcing plate (270, 270 '). 13A to 13C show an example of joining the cheolgolbo 300 by installing the position correction plate 290 of the present invention in the horizontal reinforcing plate 270 as an example of the first embodiment.

다른 한편으로, 원형 강관기둥(100)에 접합되는 철골보(300)의 규격에 따라 철골보(300)의 상면 또는 하면에 단차가 발생할 수 있다. 따라서 본 발명의 단위 보강체(250, 250')에는 단차 적용수단을 더 부가할 수 있는 것을 중요한 기술적 특징의 하나로 하고 있다.On the other hand, the step may occur on the upper or lower surface of the cheolgolbo 300 according to the specification of the cheolgolbo 300 is joined to the circular steel pipe pillar (100). Therefore, it is one of the important technical features that the unit reinforcement (250, 250 ') of the present invention can further add a step application means.

도 14a , 14b는 본 발명의 제1실시예를 들어 본 발명의 단차 적용수단으로 독립된 수평보강판(270)을 부가한 일 실시예를 나타낸 것으로서, 원형 강관기둥(100)에 접속되는 철골보(300)의 규격 차이로 인하여 하부 플랜지(310) 부분에 단차가 발생하는 경우의 단위 보강체(250)에 상기의 단차 적용수단을 적용하여 철골보(300)를 접합시키도록 하고 있다. 도 14a를 참조하면, 철골보(300)의 하부 플랜지(310) 부분에 단차가 발생한 경우 한 쌍의 수평보강판(270, 270')중 하부에 위치한 수평보강판(270, 270')의 하면에 하나 이상의 스티프너(265)를 설치한 후, 상기 스티프너(265)를 매개로 하여 독립된 수평보강판(270, 270') 하나를 더 설치함으로써 상기 하부의 단차 문제를 해결할 수 있다. 이와 반대로 철골보(300)의 상부 플랜지(310) 부분에 단차가 발생한 경우 한 쌍의 수평보강판(270, 270')중 상부에 위치한 수평보강판(270, 270')의 상면에 하나 이상의 스티프너(265)를 설치한 후, 상기 스티프너(265)를 매개로 하여 독립된 수평보강판(270, 270') 하나를 더 설치함으로써 상기 상부의 단차문제를 해결할 수 있다.14A and 14B illustrate an embodiment in which an independent horizontal reinforcing plate 270 is added as a step applying means of the present invention for the first embodiment of the present invention, and is connected to a circular steel pipe column 100. Due to the difference in the standard of the lower flange 310, when the step occurs in the unit reinforcement 250 in the case of applying the step applying means to the cheolgolbo 300 to join. Referring to FIG. 14A, when a step occurs in a portion of the lower flange 310 of the cheolgolbo 300, a lower surface of the horizontal reinforcing plates 270 and 270 ′ disposed at the lower side of the pair of horizontal reinforcing plates 270 and 270 ′ may be used. After installing one or more stiffeners 265, by installing one more horizontal reinforcing plate 270, 270 'via the stiffener 265 can solve the lower step problem. On the contrary, when a step occurs in the upper flange 310 of the cheolgolbo 300, one or more stiffeners on the upper surface of the horizontal reinforcing plate (270, 270 ') located at the top of the pair of horizontal reinforcing plate (270, 270') After installing 265, one more horizontal reinforcing plate 270 and 270 ′ may be installed through the stiffener 265 to solve the step difference problem at the upper portion.

도 15a, 15b는 본 발명의 제1실시예를 들어 본 발명의 단차 적용수단으로 단위 보강체(250)의 중간에 수평보강판(270)을 부가한 또 다른 실시예를 나타낸 것으로서, 상부 플랜지(310) 부분에 단차가 발생하는 경우의 단위 보강체(250)에 상기의 단차 적용수단을 적용하여 철골보(300)를 접합시키도록 하고 있다. 도 15a를 참조하면, 한 쌍의 수평보강판(270, 270') 사이에 또 다른 수평보강판(270, 270') 하나가 더 설치되고, 상기 3개의 수평보강판(270, 270') 사이에 형성되는 2개의 공간중 어느 한 공간에는 적어도 하나 이상의 스티프너(265)가 설치된다. 보다 구체적으로는 철골보(300)의 하부 플랜지(310) 부분에 단차가 발생한 경우에는 중간에 설치되는 수평보강판(270, 270')은 하부의 단차에 맞추어 최하부의 수평보강판(270, 270')에 인접하여 설치되며, 이들 사이에는 하나 이상의 스티프너(265)가 설치되어 수평보강판(270, 270') 사이의 일체적 거동을 유지시킨다. 이와 반대로 철골보(300)의 상부 플랜지(310) 부분에 단차가 발생한 경우에는 중간에 설치되는 수평보강판(270, 270')은 상부의 단차에 맞추어 최상부의 수평보강판(270, 270')에 인접하여 설치되며, 이들 사이에는 하나 이상의 스티프너(265)가 설치된다. 이때 제1실시예의 경우에는 수직결합판(260)의 면중 중간에 설치되는 수평보강판(270)이 접하는 위치에는 하향 용접을 위한 용접홈(263)을 더 설치하는 것이 바람직하다.15A and 15B illustrate another embodiment in which the horizontal reinforcing plate 270 is added to the middle of the unit reinforcement 250 as the step application means of the present invention, for example, the first flange of the first embodiment of the present invention. 310 is applied to the unit reinforcement 250 in the case where a step occurs in the portion to apply the step difference applying means to join the cheolgolbo 300. Referring to FIG. 15A, another horizontal reinforcing plate 270 and 270 'is installed between the pair of horizontal reinforcing plates 270 and 270', and between the three horizontal reinforcing plates 270 and 270 '. At least one stiffener 265 is installed in any one of two spaces formed in the space. More specifically, when a step occurs in the lower flange 310 of the cheolgolbo 300, the horizontal reinforcing plate (270, 270 ') is installed in the middle of the lower horizontal reinforcing plate (270, 270') in accordance with the lower step ) Is installed adjacent to each other, one or more stiffeners 265 are installed between them to maintain the integral behavior between the horizontal reinforcing plates (270, 270 '). On the contrary, when a step occurs in the upper flange 310 of the cheolgolbo 300, the horizontal reinforcing plate (270, 270 ') is installed in the middle of the upper horizontal reinforcing plate (270, 270') in accordance with the step of the upper Adjacently installed, one or more stiffeners 265 are installed between them. In this case, in the case of the first embodiment, it is preferable to further install a welding groove 263 for downward welding at a position where the horizontal reinforcing plate 270 installed in the middle of the surface of the vertical coupling plate 260 is in contact.

이와 같이, 시공오차 보정수단과 단차 적용수단을 구비한 본 발명의 단위 보강체(250, 250')는 다양한 현장조건에 쉽게 적용할 수 입체 다이아프램(200, 200')을 형성시킴으로써, 구조적으로 많은 장점을 가지고 있는 콘크리트 충전 원형 강관기둥(100)의 활용범위를 극대화시킬 수 있을 것이다.
As such, the unit reinforcements 250 and 250 'of the present invention having the construction error correction means and the step application means are structurally formed by forming the three-dimensional diaphragms 200 and 200' that can be easily applied to various field conditions. It will be able to maximize the utilization range of the concrete-filled circular steel pipe pillar (100) having many advantages.

이상에서 본 발명은 구체적인 실시 예를 참조하여 상세히 설명하였으나, 상기 실시 예는 본 발명을 이해하기 쉽도록 하기 위한 예시에 불과한 것이므로, 본 발명의 기술적 사상을 벗어나지 않는 범위 내에서 치환, 부가 및 변형된 실시 형태들 역시 하기의 특허청구범위에 의하여 정해지는 본 발명의 보호범위에 속한다고 할 것이다. 아울러 본 발명에 관하여 지하 구조물의 구축과 관련하여 설명하였으나, 이에 한정되는 것은 아니고 지상층의 건축물을 건축함에 있어서도 적용될 수 있는 것임은 자명한 사실이며, 하기의 특허청구범위에서 그 적용범위를 특별히 한정하지 아니하였다. 그러므로 본 발명의 실시를 지상층에 사용한다고 하여 본 발명의 보호범위를 벗어나는 것이라고 할 수 없을 것임은 명백한 것이다.
The present invention has been described in detail above with reference to specific embodiments, but the above embodiments are merely examples for easy understanding of the present invention, and therefore, substitutions, additions, and modifications within the scope do not depart from the spirit of the present invention. Embodiments will also belong to the protection scope of the present invention as defined by the claims below. In addition, the present invention has been described with reference to the construction of the underground structure, but is not limited to this, it is obvious that it can also be applied to the construction of the building of the ground floor, it is obvious that the scope of the claims is not specifically limited No. Therefore, it will be apparent that the use of the present invention in the ground layer does not depart from the protection scope of the present invention.

100: 원형 강관기둥 110: 보강덧판
120: 걸쇠 121: 상면
122: 걸림턱 130: 거치용 앵글
200, 200': 입체 다이아프램 250, 250': 단위 보강체
260: 수직결합판 261: 거치용 홈
262: 체결공 263: 용접홈
265: 스티프너 270, 270': 수평보강판
280: 중간보강재 290: 위치보정판
300: 철골보 310: 플랜지
320: 웨브 330: 덧댐판
W: 용접
100: round steel pipe column 110: reinforcement plate
120: clasp 121: top
122: engaging jaw 130: mounting angle
200, 200 ': solid diaphragm 250, 250': unit reinforcement
260: vertical coupling plate 261: mounting groove
262: fastener 263: welding groove
265: Stiffener 270, 270 ': Horizontal reinforcing plate
280: intermediate reinforcement 290: positioning plate
300: steel ball 310: flange
320: web 330: backing plate
W: welding

Claims (12)

원형 강관기둥과, 상기 원형 강관기둥의 외면을 감싸는 보강덧판과, 상기 보강덧판에 설치되는 걸쇠와, 상기 걸쇠에 거치된 후 상기 보강덧판과 용접결합되는 입체 다이아프램으로 이루어지되, 상기 입체 다이아프램은 4개의 단위 보강체로 이루어지며, 상기 단위 보강체는 거치용 홈이 형성된 한 쌍의 수직결합판과, 상기 수직결합판의 상, 하단에 수평으로 용접 결합되는 한 쌍의 수평보강판으로 이루어지는 것을 특징으로 하는 입체 다이아프램을 가진 콘크리트 충전 원형 강관기둥A circular steel pipe pillar, a reinforcing plate surrounding the outer surface of the circular steel pipe column, a clasp installed on the reinforcing plate, and a three-dimensional diaphragm mounted on the clasp and welded to the reinforcing plate, wherein the three-dimensional diaphragm Is composed of four unit reinforcements, wherein the unit reinforcement is composed of a pair of vertical coupling plate formed with a mounting groove, and a pair of horizontal reinforcing plate welded horizontally on the upper and lower ends of the vertical coupling plate Concrete Filled Round Steel Pipe Column with Three-Dimensional Diaphragm 제1항에 있어서, 상기 걸쇠는 상면의 중앙부분에 내측으로 하향 경사진 면이 형성되고, 양 측단에는 내측으로 갈수록 깊어지는 걸림턱이 형성되도록 하는 것을 특징으로 하는 입체 다이아프램을 가진 콘크리트 충전 원형 강관기둥According to claim 1, wherein the clasp is a concrete filled circular steel pipe having a three-dimensional diaphragm characterized in that the surface is inclined downward inwardly in the central portion of the upper surface, and both side ends are formed with a locking jaw deeper toward the inside. Pillar 제1항에 있어서, 상기 거치용 홈은 그 상부가 수직결합판의 내측으로 상향 경사진 형태로 구성되어 상기 걸쇠 상면의 하향 경사진 면에 걸림고정되는 것을 특징으로 하는 입체 다이아프램을 가진 콘크리트 충전 원형 강관기둥The method of claim 1, wherein the mounting groove is a concrete filling having a three-dimensional diaphragm characterized in that the upper portion is configured in the form inclined upward toward the inner side of the vertical coupling plate is locked to the downward inclined surface of the upper surface of the clasp. Round Steel Pipe Column 원형 강관기둥과, 상기 원형 강관기둥의 외면을 감싸는 보강덧판과, 상기 보강덧판에 설치되는 거치용 앵글과, 상기 거치용 앵글에 거치되는 입체 다이아프램으로 이루어지되, 상기 거치용 앵글에 거치되는 입체 다이아프램은 2개의 단위 보강체로 이루어지며, 상기 2개의 단위 보강체는 각각 한 쌍의 수평보강판을 포함하여 구성되는 것을 특징으로 하는 입체 다이아프램을 가진 콘크리트 충전 원형 강관기둥A circular steel pipe column, a reinforcing plate surrounding the outer surface of the circular steel pipe column, the mounting angle is installed on the reinforcement plate, and a three-dimensional diaphragm mounted on the mounting angle, but the three-dimensional mounted on the mounting angle The diaphragm is composed of two unit reinforcements, and the two unit reinforcements are concrete filled circular steel pipe pillars having three-dimensional diaphragms, each of which includes a pair of horizontal reinforcement plates. 제1항 또는 제4항에 있어서, 상기 단위 보강체에는 원형 강관기둥에 접합되는 철골보의 규격차에 의해 발생하는 단차를 해결하기 위한 단차 적용수단이 더 부가되는 것을 특징으로 하는 입체 다이아프램을 가진 콘크리트 충전 원형 강관기둥According to claim 1 or claim 4, wherein the unit reinforcement has a three-dimensional diaphragm characterized in that the step is applied to further solve the step caused by the standard difference of the cheolgolbo joined to the circular steel pipe pillar Concrete Filled Round Steel Pipe Column 제5항에 있어서, 상기 단차 적용수단은, 단위 보강체의 수평보강판중 상부에 위치한 수평보강판의 상면 또는 하부에 위치한 수평보강판의 하면에 적어도 하나 이상 설치되는 스티프너와, 상기 스티프너에 의해 연결되는 독립된 수평보강판으로 이루어지는 것을 특징으로 하는 입체 다이아프램을 가진 콘크리트 충전 원형 강관기둥The method of claim 5, wherein the step application means, at least one stiffener is provided on the upper surface of the horizontal reinforcing plate located in the upper or lower portion of the horizontal reinforcing plate of the unit reinforcement, and by the stiffener Concrete-filled round steel pipe column with a three-dimensional diaphragm, characterized in that consisting of independent horizontal stiffening plate connected 제5항에 있어서, 상기 단차 적용수단은, 단위 보강체의 상, 하부에 위치한 수평보강판 사이에 설치되는 수평보강판과, 상기 3개의 수평보강판 사이에 형성되는 2개의 공간중 어느 한 공간에 설치되는 적어도 하나 이상의 스티프너로 이루어지는 것을 특징으로 하는 입체 다이아프램을 가진 콘크리트 충전 원형 강관기둥The method of claim 5, wherein the step application means, the horizontal reinforcing plate is provided between the horizontal reinforcing plate located above and below the unit reinforcement, and any one of two spaces formed between the three horizontal reinforcing plate Concrete-filled round steel pipe pillar with a three-dimensional diaphragm, characterized in that consisting of at least one stiffener installed in the 제1항에 있어서, 상기 단위 보강체에는 원형 강관기둥에 접합되는 철골보의 규격차에 의해 발생하는 단차를 해결하기 위한 단차 적용수단이 더 부가되되, 상기 단차 적용수단은, 단위 보강체의 상, 하부에 위치한 수평보강판 사이에 설치되는 수평보강판과, 상기 3개의 수평보강판 사이에 형성되는 2개의 공간중 어느 한 공간에 설치되는 적어도 하나 이상의 스티프너로 이루어지고, 상기 수직결합판과 결합되는 다수의 수평보강판중 수직결합판의 상단에 결합되는 수평보강판을 제외한 나머지 수평보강판이 수직결합판과 결합되는 부위의 수직결합판에는 하향 용접을 위한 용접홈이 형성되는 것을 특징으로 하는 입체 다이아프램을 가진 콘크리트 충전 원형 강관기둥According to claim 1, wherein the unit reinforcement is further provided with a step application means for solving the step caused by the standard difference of the cheolgolbo joined to the circular steel pipe pillar, the step application means, the top of the unit reinforcement, A horizontal reinforcing plate installed between the horizontal reinforcing plate located in the lower portion, and at least one or more stiffeners installed in any one of two spaces formed between the three horizontal reinforcing plates, combined with the vertical coupling plate Three-dimensional diamond, characterized in that the welding groove for downward welding is formed in the vertical coupling plate of the portion where the horizontal reinforcing plate is coupled to the vertical coupling plate except the horizontal reinforcing plate coupled to the top of the vertical coupling plate of the plurality of horizontal reinforcing plate Concrete Filled Circular Steel Pipe Columns With Fram 제1항 또는 제4항에 있어서, 상기 단위 보강체에는 시공오차 보정수단이 더 설치되는 것을 특징으로 하는 입체 다이아프램을 가진 콘크리트 충전 원형 강관기둥The method of claim 1 or claim 4, wherein the unit reinforcement concrete filled circular steel pipe pillar having a three-dimensional diaphragm characterized in that the installation error correction means is further installed 제9항에 있어서, 상기 시공오차 보정수단은 상하로 서로 인접한 2개의 수평보강판 사이에 설치되는 중간보강재인 것을 특징으로 하는 입체 다이아프램을 가진 콘크리트 충전 원형 강관기둥10. The method of claim 9, wherein the construction error correction means is a concrete filled circular steel pipe pillar with a three-dimensional diaphragm characterized in that the intermediate reinforcement is installed between two horizontal reinforcing plates adjacent to each other up and down 제9항에 있어서, 상기 시공오차 보정수단은 수평보강판의 외측 단부에 판상으로 설치되는 위치보정판인 것을 특징으로 하는 입체 다이아프램을 가진 콘크리트 충전 원형 강관기둥10. The method of claim 9, wherein the construction error correction means is a concrete filled circular steel pipe pillar having a three-dimensional diaphragm, characterized in that the position correction plate installed in the plate shape on the outer end of the horizontal reinforcement plate 제1항 또는 제4항에 의한 콘크리트 충전 원형 강관기둥에 설치된 입체 다이아프램의 수평보강판에 철골보의 플랜지를 걸쳐 놓은 후, 상기 수평보강판의 상면에서 철골보의 플랜지를 용접하여 접합시키는 것을 특징으로 하는 콘크리트 충전 원형 강관기둥과 철골보의 접합구조After placing the flange of the steel golbo on the horizontal reinforcing plate of the three-dimensional diaphragm installed in the concrete-filled circular steel pipe pillar according to claim 1 or 4, the flange of the steel golbo on the upper surface of the horizontal reinforcing plate is welded and joined. Concrete filled circular steel pipe column
KR1020120094708A 2012-03-16 2012-08-29 a concrete filled circular steel tube with the three-dimensional diaphram and the joint structure KR101335955B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR20120027371 2012-03-16
KR1020120027371 2012-03-16

Publications (2)

Publication Number Publication Date
KR20130105249A true KR20130105249A (en) 2013-09-25
KR101335955B1 KR101335955B1 (en) 2013-12-04

Family

ID=49453944

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120094708A KR101335955B1 (en) 2012-03-16 2012-08-29 a concrete filled circular steel tube with the three-dimensional diaphram and the joint structure

Country Status (1)

Country Link
KR (1) KR101335955B1 (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200477104Y1 (en) * 2013-10-21 2015-05-06 이병희 Joint Structure of Steel Tube Column and Steel Beam
CN106088105A (en) * 2016-07-29 2016-11-09 天津大学建筑设计研究院 A kind of assembled foundation ditch Bracing Systems
KR20170136042A (en) * 2016-05-30 2017-12-11 주식회사 포스코 Bracket and joint structure of column and beam using same
CN108868002A (en) * 2018-07-10 2018-11-23 深圳市建筑设计研究总院有限公司 Polygon steel rod structure and rack
KR20180133758A (en) * 2017-06-07 2018-12-17 김명한 Frame structure for outsized vinyl house
KR20200081732A (en) * 2018-12-28 2020-07-08 우선애 Girder form system using deckplate and construction method for the same
CN111441469A (en) * 2020-04-23 2020-07-24 华南理工大学 FRP hoop node of thin-wall circular steel tube regenerated block concrete structure
CN114703965A (en) * 2022-06-06 2022-07-05 中国船舶重工集团国际工程有限公司 Steel structure quick-insertion connection node assembly and installation process thereof
KR20220098560A (en) * 2021-01-04 2022-07-12 한국전력공사 Arm connecting part reinforcing apparatus and joint method for tubular steel pole
CN115977246A (en) * 2022-12-05 2023-04-18 北京城建集团有限责任公司 Steel-pipe column and roof beam or truss chord member connected node that cross lacing plate is connected
KR102551667B1 (en) * 2022-12-06 2023-07-05 주식회사 우성세이프티 Connection structure of column and beam with enhanced seismic resistance using curved connecting members
KR102560891B1 (en) * 2022-12-01 2023-07-28 주식회사 힐 엔지니어링 Manufacturing method of circular cft column and circular cft column using the smae

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20190060351A (en) 2017-11-24 2019-06-03 호서대학교 산학협력단 Joint structure of concrete-filled steel tube column and steel girder
KR102215144B1 (en) * 2020-09-04 2021-02-10 태영강건(주) Steel frame of beam reinforced with steel pipe and concrete composite column and steel plate sleeve and its construction method
KR102215145B1 (en) * 2020-09-04 2021-02-15 태영강건(주) Steel frame of seismic performance structure in which circular steel pipe columns and double H-beams are joined and its construction method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3891085B2 (en) 2002-09-25 2007-03-07 新日本製鐵株式会社 Steel pipe column or steel pipe pile and beam joint structure and joining method
KR200358912Y1 (en) 2004-05-19 2004-08-12 박무용 Connection structure for girder & column
KR100932468B1 (en) 2009-05-29 2009-12-17 (주)네오크로스구조엔지니어링 Centrifugal precast concrete pile having hollow and construction method using the same, concrete and steel beam

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200477104Y1 (en) * 2013-10-21 2015-05-06 이병희 Joint Structure of Steel Tube Column and Steel Beam
KR20170136042A (en) * 2016-05-30 2017-12-11 주식회사 포스코 Bracket and joint structure of column and beam using same
KR101879034B1 (en) * 2016-05-30 2018-07-17 주식회사 포스코 Bracket and joint structure of column and beam using same
CN106088105A (en) * 2016-07-29 2016-11-09 天津大学建筑设计研究院 A kind of assembled foundation ditch Bracing Systems
KR20180133758A (en) * 2017-06-07 2018-12-17 김명한 Frame structure for outsized vinyl house
CN108868002B (en) * 2018-07-10 2024-05-07 深圳市建筑设计研究总院有限公司 Polygonal steel column structure and net rack
CN108868002A (en) * 2018-07-10 2018-11-23 深圳市建筑设计研究总院有限公司 Polygon steel rod structure and rack
KR20200081732A (en) * 2018-12-28 2020-07-08 우선애 Girder form system using deckplate and construction method for the same
CN111441469A (en) * 2020-04-23 2020-07-24 华南理工大学 FRP hoop node of thin-wall circular steel tube regenerated block concrete structure
KR20220098560A (en) * 2021-01-04 2022-07-12 한국전력공사 Arm connecting part reinforcing apparatus and joint method for tubular steel pole
CN114703965A (en) * 2022-06-06 2022-07-05 中国船舶重工集团国际工程有限公司 Steel structure quick-insertion connection node assembly and installation process thereof
KR102560891B1 (en) * 2022-12-01 2023-07-28 주식회사 힐 엔지니어링 Manufacturing method of circular cft column and circular cft column using the smae
CN115977246A (en) * 2022-12-05 2023-04-18 北京城建集团有限责任公司 Steel-pipe column and roof beam or truss chord member connected node that cross lacing plate is connected
CN115977246B (en) * 2022-12-05 2024-03-15 北京城建集团有限责任公司 Steel pipe column and beam or truss chord member connection node connected by cross batten plates
KR102551667B1 (en) * 2022-12-06 2023-07-05 주식회사 우성세이프티 Connection structure of column and beam with enhanced seismic resistance using curved connecting members

Also Published As

Publication number Publication date
KR101335955B1 (en) 2013-12-04

Similar Documents

Publication Publication Date Title
KR101335955B1 (en) a concrete filled circular steel tube with the three-dimensional diaphram and the joint structure
KR101523532B1 (en) Closed steel assembly for column
KR101368218B1 (en) a concrete filled steel tube with the inner reinforcing structure
KR102143566B1 (en) Seismic retrofit structure using fixing device for reinforcing panel zone and construction method thereof
KR101194170B1 (en) Joint structure of modular building and method thereof
KR101687495B1 (en) Partial top-down construction method for building underground structures
KR20130012898A (en) Joint of steel column
KR101174548B1 (en) Column system of concrete filled steel tube
KR102172323B1 (en) Joint of column and beam with hybrid diaphragm
KR102217178B1 (en) Non-welding beam-to-column connection structure with reinforcing plate and through bolt
KR101187666B1 (en) Joint structure of beam and column and joint method of the same
KR20140032594A (en) Joint structure between steel column and beam
KR100631363B1 (en) Panel zone system of y shape tied column reinforced with high tension bolts
KR20160137705A (en) Joint structure of CFT column and composite girder
JP2007297861A (en) Joint part structure of bridge pier with pile
KR101017800B1 (en) Reinforcement structure for connection of cold formed plate column and steel beam
KR101566982B1 (en) Connection structure for steel tube column and horizontal structure members
KR101254983B1 (en) Joint structure of concrete filled tube and beam
KR101950953B1 (en) Seismic reinforcing structures with frame shear wall
JP2016205054A (en) Steel reinforced concrete column and building using the same
JP5207078B2 (en) Construction method for seismic control columns
JP2009019362A (en) Structure for joining pile and column
KR101485563B1 (en) The horizontal structural frame
KR102138917B1 (en) A earthquake proof reinforcement structure installed on the outside or interior face of pillars and beams using a steel flame
JP6353647B2 (en) Seismic isolation device joint structure

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee