KR20130031624A - Concrete pile setting method by utilizing an auger drilling maachine - Google Patents

Concrete pile setting method by utilizing an auger drilling maachine Download PDF

Info

Publication number
KR20130031624A
KR20130031624A KR1020110095322A KR20110095322A KR20130031624A KR 20130031624 A KR20130031624 A KR 20130031624A KR 1020110095322 A KR1020110095322 A KR 1020110095322A KR 20110095322 A KR20110095322 A KR 20110095322A KR 20130031624 A KR20130031624 A KR 20130031624A
Authority
KR
South Korea
Prior art keywords
concrete pile
guide
auger
drilling machine
rectangular
Prior art date
Application number
KR1020110095322A
Other languages
Korean (ko)
Inventor
김만진
Original Assignee
김만진
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김만진 filed Critical 김만진
Priority to KR1020110095322A priority Critical patent/KR20130031624A/en
Publication of KR20130031624A publication Critical patent/KR20130031624A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/04Guide devices; Guide frames
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/10Prefabricated parts, e.g. composite sheet piles made of concrete or reinforced concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/18Placing by vibrating
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/24Drilling using vibrating or oscillating means, e.g. out-of-balance masses
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1628Shapes rectangular
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0038Production methods using an auger, i.e. continuous flight type

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Earth Drilling (AREA)

Abstract

PURPOSE: A construction method for a rectangular concrete pile through an auger drilling machine is provided to embed the pile with the vibrator of a crane, and stably drill a hole through an extension guide, thereby shortening work hours and reducing cost. CONSTITUTION: A construction method for a rectangular concrete pile through an auger drilling machine includes: a step of forming an extension guide equipped with a guide groove at one lower side of the casing of an auger part; a step of respectively installing rectangular guiders among rollers on the inner side of the guide groove; a step of embedding the rectangular concrete pile using a vibrator mounted on a crane; and a step of making the groove of the rectangular concrete pile adjacent to the guide groove, and then drilling a hole.

Description

Concrete pile setting method by utilizing an auger drilling maachine}

The present invention relates to a method for constructing a rectangular concrete pile through an auger drilling machine, and more particularly, not only can a sheet pile be inserted into a high vertical body, but also shorten the working time and can be generated in a working process. The present invention relates to a sheet pile construction method through an auger drilling machine that can minimize the risk of component damage.

In general, when placing a port (beam) for foundation work using auger drilling machine, which is widely used, a leader mounted on a crane is erected vertically and rotated 90 degrees by a leader turning device. Therefore, a hole is drilled to a certain depth with a screw rotating by an auger, and then the beam is cast.

Such a conventional auger drilling machine is capable of pulling the casing formed on the outside of the auger drill to the wire formed on the top of the rudder to press the casing formed inside the auger drill into the vertical hole drilled by the auger drill If the tip of the vertical shaft drilled by the auger drill is a soft ground, the ground drilling can be easily performed. However, in a hard ground such as a rock, the auger drill and the casing cannot be inserted by magnetic force. .

In the conventional auger drilling machine, perforated soils such as clay and nito are firmly adhered to the upper surface of the auger drill, but foreign matters such as perforated soil stuck to the upper surface of the auger drill prevent the groundwork of the perforated soil from drilling. There was a problem of being an obstacle.

In order to solve this problem, the applicant has proposed an improved auger drilling machine through the registration number 20-444957.

That is, as shown in FIGS. 1 to 5, the auger drilling machine 100 pre- filed by the applicant has a rudder 112 that is rotated by a rotating device on an upper portion of the crane 111 that supplies power while moving to a working position. And a plurality of driving pulleys 116 having wires 117 operating on the power of the crane 111 on the upper part of the rudder 112 with the pulley bracket 115, A rudder portion 110 having a rudder guide 114 formed on the perforation side, and a transfer pulley 122 having the wire 117 of the rudder portion 110 formed thereon are formed on an upper portion of the transfer bracket 121, and a transfer bracket A transfer guide 124 which is coupled to the rudder guide 114 to one side of the 121 and a transfer part 120 having a transfer coupling hook 123 formed at the bottom of the transfer bracket 121 and the transfer part ( The fixed coupling hook 133 is hingedly fixed to the upper portion of the fixed frame 131 to be coupled to the transfer coupling hook 123 of 120. Hinge fixed by the hook hinge 134 provided in the, and coupled to the rudder guide 114 to one side of the fixed frame 131 to form a fixed guide 132 guided during the vertical operation, the fixed coupling of the hook 133 The cylinder rod 139 of the operation cylinder 137 fixedly coupled to the fixed frame 131 by the cylinder fixing hinge 138 to one side is hinged by the hook operation hinge 136 to be fixed by the operation of the operation cylinder 137. A transfer fixing part 130 formed to operate the coupling and disassembly of the transfer coupling hook 123 of the transfer part 120 while the hook 133 rotates about the hook hinge, and a fixed frame of the transfer fixing part 130. When driving the auger drill 141 in the lower portion of the (131) to form a driving guide 143 is coupled to the rudder guide 114 to one side of the drill driving unit formed up and down operation cylinder 144 to operate up and down, Auger with casing 146 on the outer side driven under the drill drive In the auger boring machine comprising a five reject 140 to form a reel (141). The auger 140 is formed by extending the extension guide 146 formed with the guide groove 147 to the lower side of the casing 145 to the lower side to be poured into the hole drilled by the auger drill 141. (Sheet file) is configured to guide.

However, in the auger drilling machine of the present applicant, there is a problem that it takes a lot of time to draw the casing after drilling due to friction between the seat pile connecting ring and the guide groove of the extension guide.

In addition, when attempting to construct a rectangular concrete pile as a cast body rather than a sheet pile, the above problems will be very large.

The present invention was created to solve the problems of the above-described auger drilling machine previously filed by the present applicant, in addition to the advantages of the existing guide groove can prevent friction between the guide groove of the rectangular concrete pile and the extension guide, in particular the construction The purpose is to provide a square concrete pile construction method of the auger drilling machine that can be made stable to shorten the working time and cost reduction.

Square concrete pile construction method of the auger drilling machine according to the present invention in order to achieve the above object, the process of extending and forming an extension guide formed with a guide groove in the lower side of the casing of the auger; Axially rotatably supporting a plurality of rollers at predetermined intervals inside the guide groove of the extension guide; Providing a guider having a rectangular cross-sectional shape between the rollers; Mounting a rectangular concrete pile to be installed by mounting a vibrator on a crane; The step of adjoining and puncturing the groove of the square concrete pile in the adjacent guide guide of the extension guide; characterized in that consisting of.

The guider disposed between the rollers of the present invention is formed of a metal, is installed to protrude lower than the roller, and at the same time the auxiliary guider made of a square iron piece and a cylindrical pipe welded to the casing on the left and right outer sides of the guider. It is characterized by being further provided.

The roller of the present invention has a long and rectangular cross-sectional shape having the same cross-sectional shape as the rectangular concrete pile, characterized in that the iron plate of the same shape is interposed between each other.

An engaging shaft portion between the roller and the extension guide of the present invention is characterized in that the O-ring is interposed.

The vibrating letter of the present invention is characterized in that the air hose for injecting air into the groove formed in the center of the rectangular concrete pile is provided.

As described above, the method for constructing the square concrete pile of the auger drilling machine according to the present invention may be drilled through the extension guide by entering through the vibratory letter of the square concrete pile crane, and in particular, the extension guide and the auxiliary guide and the air hose during the drilling process. It is possible to stably drill through the back.

In addition, due to the interaction between the shape of the roller and the groove of the rectangular concrete pile body, it can be drilled firmly without shaking.

1 to 5 are schematic views of the auger drilling machine filed by the applicant.
6 is a perspective view of main parts of the present invention;
7 is a main portion front view.
8 is a plan view of main parts of the present invention;
9 is an enlarged cross-sectional view of the main portion of the present invention.

Hereinafter, a preferred embodiment of the sheet pile construction method of the auger drilling machine according to the present invention will be described.

Hereinafter, the present applicant will be described with reference to FIGS. 1 to 5.

First, referring to FIGS. 1 to 5, the auger drilling machine 100 forms a rudder 112 that is rotated by a pivoting device on an upper portion of a crane 111 that supplies power while moving to a work position, and a rudder. A plurality of drive pulleys 116 having wires 117 operated by the power of the crane 111 on the upper part of the 112 are fixedly formed by the pulley bracket 115, and the rudder guide (to the perforation side of the rudder 112) Rudder portion 110 formed with 114,

Transfer guide pulley 122, the wire 117 of the rudder unit 110 is placed on the transfer bracket 121, the transfer guide is coupled to the rudder guide 114 to one side of the transfer bracket 121 A transfer part 120 forming a transfer coupling hook 123 at a lower portion of the transfer bracket 121,

The fixed coupling hook 133 is hinged to a hook hinge 134 provided on the hinged fixture on the upper portion of the fixed frame 131 so as to be coupled to the transfer coupling hook 123 of the transfer unit 120, and the fixed frame 131. It is coupled to the rudder guide 114 to one side of the to form a fixed guide 132 is guided when operating up and down, fixed to the fixed frame 131 by a cylinder fixing hinge 138 to one side of the fixed coupling hook 133 The cylinder rod 139 of the operation cylinder 137 is hinged by the hook operation hinge 136 to fix the hook 133 by the operation of the operation cylinder 137 while rotating the hook hinge about the transfer of the transfer part 120. Transfer hook 130 formed to engage and disengage the coupling hook 123,

When the auger drill 141 is driven to the lower part of the fixing frame 131 of the transfer fixing unit 130, a coupling guide is connected to the rudder guide 114 toward one side of the drill driving unit which forms a vertical operation cylinder 144 that operates up and down. The auger 140 is formed by forming a driving guide 143 and forming an auger drill 141 having a casing 146 at an outer side driven under the drill driving unit.

At this time, the auger 140 is substantially as having a characteristic element of the present invention, the auger drill 141 by extending the extension guide 10 formed with a guide groove 11 formed on the lower side of the casing 145 to the lower side. It is configured to guide the pour body 1 (square concrete pile, sheet pile) to be poured into the perforated hole.

On the other hand, in guiding the rectangular concrete pile 1 through the guide groove 11 by extending the extension guide 10, there is a fear of friction between each other.

In order to prevent this, the plurality of rollers 20 are axially rotatably supported at a predetermined interval inside the guide groove 11 of the extension guide 10.

In addition, the lower surface of the extension guide 10 between the roller 20 is interposed between the square guide 30 for the impact dispersion.

On the other hand, the cast body, that is, the rectangular concrete pile (1) is preferably entered through the vibrating letter 40 provided in the crane 111, this rectangular concrete pile (1) is a guide groove (11) of the extension guide (10) Perforated in the state adjacent to

At this time, the guide 21 for supporting the above-described roller 20 is formed of a metal, it is installed to protrude lower than the roller 20.

In addition, the left and right outer side of the guider 21 is further provided with an auxiliary guider 50 consisting of a square iron piece 51 and a cylindrical pipe 52 welded to the casing 146, the auxiliary guider 50 is It performs the function of guiding the side of the rectangular concrete pile (1) to be perforated.

In addition, the roller 20 has an elongated cross-sectional shape having the same cross-sectional shape as that of the rectangular concrete pile 1, and the frictional force can be reduced by interposing the steel plates 2 having the same shape therebetween. Would be desirable.

And it will be desirable to allow the roller 20 to be operated for a long time through the O-ring (O) in the coupling shaft portion between the roller 20 and the extension guide 10.

On the other hand, the air hose 60 for injecting air into the groove formed in the center of the rectangular concrete pile (1) is provided on the vibrator letter 40 for a more stable entrance of the rectangular concrete pile (1).

The present invention as described above, a plurality of rollers 20 and the rectangular guider in which the pour body is inserted through the vibrating letter 40, that is, the rectangular concrete pile 1 is interposed in the guide groove 11 of the extension guider 10 ( 30) It is also stably drilled without shaking by the auxiliary guider 50 composed of the iron piece 51 and the cylindrical pipe 52.

In addition, the air flows into the hole formed in the center of the square concrete pile 1 through the air hose 60 on the vibrator letter 40, thereby enabling more stable construction.

Meanwhile, the present invention has been described in detail only with respect to the specific examples described above, but it is obvious to those skilled in the art that various modifications and changes are possible within the technical scope of the present invention, and it is natural that such modifications and modifications fall within the claims. will be.

DESCRIPTION OF THE REFERENCE NUMERALS
10: extension guide 11: guide groove
20: roller 30: guider
40: Vibe Letter 50: Assistant Guider
51: iron piece 52: cylindrical pipe
60: air hose
O: O-ring 140: Ogre
145: casing 1: square concrete pile

Claims (5)

A step of extending and forming an extension guide having a guide groove formed on one side of the casing lower portion of the auger;
Axially rotatably supporting a plurality of rollers at predetermined intervals inside the guide groove of the extension guide;
Providing a guider having a rectangular cross-sectional shape between the rollers;
Mounting a rectangular concrete pile to be installed by mounting a vibratory letter to a crane;
A method of constructing a square concrete pile through an auger drilling machine, characterized in that the step of adjoining the perforated groove of the rectangular concrete pile into the guide groove of the extension guide.
The method of claim 1,
The guider disposed between the rollers is formed of metal and installed to protrude lower than the rollers.
Square concrete pile construction method through the auger drilling machine, characterized in that the left and right outer side of the guider is further provided with an auxiliary guider consisting of a square iron piece and a cylindrical pipe welded to the casing.
The method of claim 1,
The roller is a rectangular concrete pile construction method through the auger drilling machine, characterized in that it has a long and rectangular cross-sectional shape having the same cross-sectional shape and the rectangular concrete pile, and the iron plate of the same shape between each other,
The method of claim 1,
A method of constructing a sheet pile through an auger drilling machine, characterized in that the coupling shaft portion between the roller and the extension guide is interposed through an O-ring.
The method of claim 1,
The vibrating letter is a square concrete pile construction method through an auger drilling machine, characterized in that the air hose for injecting air into the groove formed in the center of the square concrete pile is provided.
KR1020110095322A 2011-09-21 2011-09-21 Concrete pile setting method by utilizing an auger drilling maachine KR20130031624A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110095322A KR20130031624A (en) 2011-09-21 2011-09-21 Concrete pile setting method by utilizing an auger drilling maachine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110095322A KR20130031624A (en) 2011-09-21 2011-09-21 Concrete pile setting method by utilizing an auger drilling maachine

Publications (1)

Publication Number Publication Date
KR20130031624A true KR20130031624A (en) 2013-03-29

Family

ID=48180728

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110095322A KR20130031624A (en) 2011-09-21 2011-09-21 Concrete pile setting method by utilizing an auger drilling maachine

Country Status (1)

Country Link
KR (1) KR20130031624A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104674872A (en) * 2015-01-17 2015-06-03 宋姝娴 Excavator drill for square holes
CN109989709A (en) * 2019-04-03 2019-07-09 江苏省建筑工程集团有限公司 A kind of electric screw drilling machine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104674872A (en) * 2015-01-17 2015-06-03 宋姝娴 Excavator drill for square holes
CN109989709A (en) * 2019-04-03 2019-07-09 江苏省建筑工程集团有限公司 A kind of electric screw drilling machine

Similar Documents

Publication Publication Date Title
JP6467693B2 (en) Core drill equipment for excavator installation
KR20070016292A (en) Pile construction apparatus capable of drilling and piling at a time
KR101210589B1 (en) drilling machine
WO2015100688A1 (en) Hydrostatic pile driver of full-stroke hole guiding type
AU2011308106A1 (en) Punching device having head part
US20220154569A1 (en) Drill control device
KR200450765Y1 (en) Excavator-mounted rock drilling device for head cleaning work of concrete foundation pile
CN109083591B (en) Drilling bored concrete pile body and pile cap integrated drilling pore-forming method
JP6085484B2 (en) Pile driver
CN112878330A (en) Precast pile sinking equipment and construction method thereof
KR101851105B1 (en) A middle pulley assembly for duide of hammer wire in pile driver
JP2014141839A (en) Pile driving machine
KR20130031624A (en) Concrete pile setting method by utilizing an auger drilling maachine
KR20130085354A (en) Apparatus for piling screw pile
JP2012219574A (en) Method and apparatus for burying concrete pile
KR102178354B1 (en) Pile pullout apparatus
KR101094276B1 (en) Sheet pile setting method utilizing ouger drilling machine
JP2010031523A (en) Vertical shaft excavator
KR20110048964A (en) Rock drilling apparatus
JP2013053475A (en) Excavator and excavated hole forming method
KR101044485B1 (en) Casing for deep depth filing hole
KR200444957Y1 (en) Auger Drilling Machine
KR200398533Y1 (en) Pile for using construction
JP4874443B2 (en) Tubing installation method
CN220284806U (en) Bored pile construction device for foundation pit support

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application