KR20130013196A - Splicing device for reinforcing bar - Google Patents
Splicing device for reinforcing bar Download PDFInfo
- Publication number
- KR20130013196A KR20130013196A KR1020110074699A KR20110074699A KR20130013196A KR 20130013196 A KR20130013196 A KR 20130013196A KR 1020110074699 A KR1020110074699 A KR 1020110074699A KR 20110074699 A KR20110074699 A KR 20110074699A KR 20130013196 A KR20130013196 A KR 20130013196A
- Authority
- KR
- South Korea
- Prior art keywords
- reinforcing bar
- fixing part
- connection ring
- fixing
- moved
- Prior art date
Links
- 230000003014 reinforcing effect Effects 0.000 title claims abstract description 68
- 238000003780 insertion Methods 0.000 claims abstract description 6
- 230000037431 insertion Effects 0.000 claims abstract description 6
- 238000003825 pressing Methods 0.000 claims abstract description 3
- 238000000034 method Methods 0.000 claims description 16
- 230000002787 reinforcement Effects 0.000 claims description 10
- 230000008878 coupling Effects 0.000 claims description 6
- 238000010168 coupling process Methods 0.000 claims description 6
- 238000005859 coupling reaction Methods 0.000 claims description 6
- 239000004567 concrete Substances 0.000 description 4
- 239000004570 mortar (masonry) Substances 0.000 description 4
- 229910000831 Steel Inorganic materials 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 238000002788 crimping Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000004568 cement Substances 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/16—Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
- E04C5/162—Connectors or means for connecting parts for reinforcements
- E04C5/163—Connectors or means for connecting parts for reinforcements the reinforcements running in one single direction
- E04C5/165—Coaxial connection by means of sleeves
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16B—DEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
- F16B7/00—Connections of rods or tubes, e.g. of non-circular section, mutually, including resilient connections
- F16B7/04—Clamping or clipping connections
- F16B7/0406—Clamping or clipping connections for rods or tubes being coaxial
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16B—DEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
- F16B7/00—Connections of rods or tubes, e.g. of non-circular section, mutually, including resilient connections
- F16B7/18—Connections of rods or tubes, e.g. of non-circular section, mutually, including resilient connections using screw-thread elements
- F16B7/182—Connections of rods or tubes, e.g. of non-circular section, mutually, including resilient connections using screw-thread elements for coaxial connections of two rods or tubes
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Reinforcement Elements For Buildings (AREA)
Abstract
Description
본 발명은 철근을 이음하기 위한 고정부 및 연결링을 조립할 경우 철근이 회전되지 않도록 할 수 있으며, 별도의 공구 없이 빠른 조립이 가능하여 작업시간을 단축시킬 수 있고, 이음자체에 내구성이 우수하며, 이음강도가 우수한 철근 이음장치에 관한 것이다.
The present invention can prevent the reinforcing bars when assembling the fixing portion and the connection ring for connecting the reinforcing bars, can be quickly assembled without a separate tool can shorten the working time, excellent durability in the joint itself, The present invention relates to a rebar joint apparatus having excellent joint strength.
철근 콘크리트 구조는 콘크리트가 압축력을 부담하고 철근이 인장력을 부담하는 구조로써 철근과 콘크리트의 결합에 의하여 이루어진 구조이다. 콘크리트는 거푸집을 설치하고 타설하므로 이를 일체로 시공할 수 있으나, 철근은 일정한길이의 규격품을 이어가며 시공해야 하는 바, 철근과 철근간의 조인트가 발생할 수밖에 없다. 따라서, 철근이 소요 인장력에 충분히 저항하기 위해서는 철근과 철근이 서로 긴밀하게 연결되어야 하며 이를 위해서는 통상 마디 편체식 이음방법, 모르타르 충진이음방법, 강관압착 이음방법, 나사식 이음방법, 용접 이음방법, 경첩 이음방법 등이 사용된다.
The reinforced concrete structure is a structure in which concrete bears compressive force and rebar bears tensile force, and is made by combining steel with concrete. Concrete can be installed integrally because the formwork is installed and poured, but the reinforcing bar has to be constructed while continuing the standard product of a certain length, the joint between the reinforcing bar and the reinforcing bar is bound to occur. Therefore, in order for the reinforcing bar to sufficiently resist the required tensile force, the reinforcing bar and the reinforcing bar should be closely connected with each other. For this purpose, the joint joint method, the mortar filling joint method, the steel pipe crimping method, the screw joint method, the welding joint method, the hinge The joint method is used.
그러나, 마디 편체식 이음방법은 철근에 따른 호환성이 저하되고, 조립부품 수가 많이 요구되며, 압축에 대한 강성 및 변형률 감소로 내진성이 약화되고, 모르타르 충진이음방법은 비교적 고가의 무수축 모르타르가 요구되며, 무수축 모르타르 충진시 충진된 양을 확인하기 불가능하고, 강관압착 이음방법은 이음하고자 하는 철근의 직경이 다를 경우 이음이 어려우며, 그에 따른 작업시간 또한 많이 소요되고, 마디 치수 표준화 미비로 내구성이 감소되며, 나사식 이음방법은 콘크리트 없이 조합할 경우 별도의 부품이 요구되어 작업이 용이하지 못하고, 불연속부에 파손이 발생되며, 지속적으로 내진이 발생될 경우 변형량 감소의 한계가 뒤따르고, 용접 이음방법은 외부 기후에 민감하며, 열 입력에 의해 내구성이 감소되고, 경첩 이음방법은 열 입력에 의한 조직이 변화되고 내구성이 약화되며, 겹침에 의해 철근 손실이 크고, 이음부 자체에 내구성 감소로 내진성이 약화되며, 시멘트 충진성 및 충진량 감소로 내구성이 감소되는 문제점이 있다.
However, the knotted jointing method has reduced compatibility due to reinforcing bars, requires a large number of assembly parts, has reduced vibration resistance due to the reduction of rigidity and strain for compression, and the mortar-filled jointing method requires a relatively expensive non-shrinkable mortar. , It is impossible to check the amount of filling without shrinkage mortar filling, and the steel pipe crimping method is difficult to connect when the diameter of the reinforcing bar is different. If the joint is combined without concrete, it is not easy to work because it requires separate parts, and breakage occurs at discontinuous parts. Is sensitive to external climates, its durability is reduced by heat input, and the hinged method Due to the change in the structure and the durability is weakened, the reinforcement loss is large due to the overlap, the shock resistance is weakened by reducing the durability on the joint itself, there is a problem that the durability is reduced by reducing the cement filling and filling amount.
본 발명은 상기한 종래기술의 문제점을 해결하기 위하여 안출된 것으로서, 철근을 이음하기 위한 고정부 및 연결링을 조립할 경우 철근이 회전되지 않도록 할 수 있으며, 별도의 공구 없이 빠른 조립이 가능하여 작업시간을 단축시킬 수 있고, 이음자체에 내구성이 우수하며, 이음강도가 우수한 철근 이음장치를 제공하는데 그 목적이 있다.
The present invention has been made in order to solve the above problems of the prior art, when assembling the fixing portion and the connection ring for connecting the reinforcing bar can be prevented from rotating, and can be quickly assembled without a separate tool working time The purpose of the present invention is to provide a reinforcing bar joint apparatus which can shorten, excellent durability of the joint itself, and excellent joint strength.
상기한 목적과제를 달성하기 위한 본 발명의 수단은, 두개가 한조를 이루어 상,하로 대칭되게 결합되며, 내부에 철근이 삽입되는 고정부와; 상기 고정부가 결합되는 양측 외주연에 양방향으로 이동가능하게 각각 장착되고, 외주연에 볼트홀이 좌,우 방향으로 관통형성된 체결부가 간격을 두고 일체로 구비되는 연결링;으로 이루어져 구성되며, 상기 고정부는 중앙부의 반경이 양단부의 반경보다 더 커지도록 외측을 향해 절곡형성되고, 상기 연결링을 구성하는 체결부의 볼트홀에는 볼트를 각각 나선결합하여, 상기 볼트의 조임력에 의해 상기 연결링이 고정부의 양단부를 따라 중앙부로 이동되어 서로 간격이 좁혀지도록 하여 상기 한쌍의 고정부가 상,하 방향 및 연결링의 사이에서 이동되면서 밀착고정되도록 하여 내부에 삽입되는 철근이 압착되도록 하고, 상기 고정부의 내부에는 철근의 마디가 각각 삽입되는 삽입홈과, 상기 철근의 마디 사이에 각각 삽입되는 가압 고정부가 교차 형성되어 있어 상기 가압 고정부는 연결링에 의해 이동되는 고정부와 함께 이동되면서 철근의 마디 측면을 가압하여 고정하도록 한 것을 특징으로 한다.
Means of the present invention for achieving the above object, the two is a pair of up and down symmetrically coupled, the fixing portion is inserted into the reinforcement; It is configured to be mounted to each of the two outer periphery to which the fixing part is coupled so as to be moved in both directions, the connection ring integrally provided at intervals of the fastening portion formed through the bolt hole in the left and right directions at the outer periphery; The part is bent toward the outside so that the radius of the center portion is larger than the radius of both ends, and each of the bolts in the bolt hole of the fastening portion constituting the connection ring, helix coupling, so that the connection ring is fixed by the tightening force of the bolt Both ends are moved to the center part so that the gap is narrowed so that the pair of fixing parts are moved between the up and down direction and the connection ring so as to be tightly fixed so that the reinforcing bars inserted therein are compressed. Insertion grooves into which the bars of the bars are respectively inserted, and the pressure fixing parts respectively inserted between the bars of the bars are formed to cross each other. Control it is characterized in that as the press fixing part moves with the fixed part being moved by a connecting ring to secure and press the side surface of the reinforcing bars.
본 발명에 따른 철근 이음장치는, 이음할 두 개의 철근을 일렬로 정렬하고, 철근의 상,하부에 고정부를 결합하며, 고정부의 양측 외주연에 연결링을 장착한 다음 연결링의 체결부에 형성된 볼트홀에 볼트를 체결하여 고정부와 연결링이 결합되면서 두 개의 철근이 이음될 수 있도록 하므로서, 철근의 회전 없이 이음할 수 있는 효과가 있다.
Reinforcing bars according to the present invention, the two reinforcing bars to be aligned in a row, coupled to the upper and lower parts of the reinforcing bars, and mounting the coupling ring on both outer periphery of the fixing part of the fastening portion of the connecting ring By fastening the bolt to the bolt hole formed in the fixing part and the connecting ring is coupled so that the two reinforcing bars, there is an effect that can be connected without rotation of the reinforcing bar.
또한, 볼트의 회전동작만으로 고정부와 연결링을 결합하면서 철근을 이음할 수 있어 별도의 공구 없이 빠른 조립이 가능하여 작업시간을 단축시킬 수 있는 효과가 있다.
In addition, it is possible to couple the reinforcing bars by combining the fixing portion and the connection ring only by the rotation of the bolt can be quickly assembled without a separate tool has the effect of reducing the working time.
또한, 고정부와 연결링을 장착한 다음 볼트로 체결하여 결합하는 과정에서 연결링이 볼트의 조임력에 의해 고정부의 양단부 외주연을 따라 중앙부로 이동되어 서로 간격이 좁혀지면서 고정부를 밀착시키게 되어 고정부의 내부에 삽입된 철근이 압착되어 안정적으로 고정되며, 이와 동시에 고정부의 내부에 형성된 가압 고정부가 철근의 마디 측면을 가압하여 시키게 되어 철근이 유동되지 않도록 할 수 있어 이음자체에 대한 내구성이 우수하며, 이음강도가 우수한 효과가 있다.
In addition, in the process of attaching the fixing part and the connecting ring and then fastening by bolts, the connecting ring is moved to the center part along the outer circumference of both ends of the fixing part by the tightening force of the bolts, so that the interval between each other is narrowed so that the fixing part is in close contact with each other. Reinforcement inserted inside the fixing part is pressed and fixed stably.At the same time, the pressure fixing part formed inside the fixing part presses the node side of the reinforcing bar to prevent the reinforcing bar from flowing. Excellent, good joint strength.
도 1은 본 발명에 따른 철근 이음장치의 결합 사시도.
도 2는 본 발명에 따른 철근 이음장치의 분해 사시도.
도 3은 본 발명에 따른 철근 이음장치의 결합 단면도.
도 4는 본 발명에 따른 철근 이음장치의 일 실시예를 도시한 결합 사시도.
도 5는 본 발명에 따른 철근 이음장치의 일 실시시예를 도시한 결합 단면도.1 is a perspective view of the coupling of the reinforcing bar according to the present invention.
Figure 2 is an exploded perspective view of the reinforcing bar joint according to the present invention.
3 is a combined cross-sectional view of the reinforcing bar joint according to the present invention.
Figure 4 is a perspective view showing an embodiment of the reinforcing bar joint according to the present invention.
Figure 5 is a cross-sectional view showing an embodiment of the reinforcing bar joint according to the present invention.
이하 본 발명의 바람직한 실시 예를 첨부된 도면을 참조하여 함께 상세히 설명하면 더욱 명백해 질것이다.
Hereinafter, with reference to the accompanying drawings, preferred embodiments of the present invention will be more apparent.
도 1은 본 발명에 따른 철근 이음장치의 결합 사시도이고, 도 2는 본 발명에 따른 철근 이음장치의 분해 사시도이며, 도 3은 본 발명에 따른 철근 이음장치의 결합 단면도이고, 도 4는 본 발명에 따른 철근 이음장치의 일 실시예를 도시한 결합 사시도이며, 도 5는 본 발명에 따른 철근 이음장치의 일 실시시예를 도시한 결합 단면도이다.
1 is a perspective view of the reinforcing bar joint according to the present invention, Figure 2 is an exploded perspective view of the rebar joint according to the present invention, Figure 3 is a cross-sectional view of the reinforcing bar joint according to the present invention, Figure 4 Combined perspective view showing an embodiment of the reinforcing bar joint according to Figure 5 is a cross-sectional view showing an embodiment of the reinforcing bar joint according to the present invention.
상기 도 1 내지 도 3에 도시된 바와 같이, 본 발명에 따른 철근 이음장치는 두개의 철근(50)이 삽입되는 고정부(10)와, 상기 고정부(10)에 장착되는 연결링(20)으로 이루어져 구성된다.
As shown in Figures 1 to 3, the reinforcing bar coupling device according to the present invention is a
상기 고정부(10)는 그 단면이 대략 아치형상으로 형성되며, 두개가 한조를 이루어 철근(50)을 사이에 두고 상,하 방향으로 대칭되게 결합되며, 상기 고정부(10)는 중앙부의 반경이 양단부의 반경보다 더 커지도록 외측을 향해 절곡형성되어 테이퍼 형상으로 형성된다.The
예컨대, 이음할 두 개의 철근(50)을 일렬로 정렬하고 두개의 고정부(10)를 철근(50)의 상,하부에 각각 장착한 다음 상기 고정부(10)에 연결링(20)을 설치하면 두개의 철근(50)이 서로 결속될 수 있다.For example, two reinforcing
상기 고정부(10)의 중앙부 반경이 양단부의 반경보다 더 커지도록 형성한 이유는 철근(50)을 절단시 절단되는 부분에 노치가 발생 되어 크램핑에 장애를 주게되므로, 이를 방지하기 위해 고정부(10)의 중앙부 반경이 양단부의 반경보다 더 커지도록 형성한 것이다.The reason why the center radius of the
또한, 상기 고정부의 내부 중앙부분에는 상기 고정부(10)의 내부에 삽입되는 철근(50)의 끝단부 사이에 개재되어 내진이 발생될 경우 상기 철근(50)이 서로 밀어내지 않도록 한다.
In addition, the inner part of the fixing part is interposed between the ends of the reinforcing
상기 연결링(20)은 상기 고정부(10)가 상,하로 대칭되도록 결합된 상태에서 양측 외주연에 각각 장착되어 상기 고정부(10)를 고정시키고, 외주연에 체결부(21)가 간격을 두고 일체로 구비되며, 상기 체결부(21)에는 볼트홀(22)이 좌,우 방향으로 관통형성되고, 상기 체결부(21)의 볼트홀(22)에는 볼트(30)가 각각 나선결합된다.
The connecting
상기 연결링(20)은 고정부(10)의 양단부보다는 넓은 직경을 갖도록 형성되고 중앙부보다는 좁은 직경을 갖도록 형성되며, 상기 각각의 볼트(30)는 상기 고정부(10)의 일측에 장착되는 연결링(20)의 볼트홀(22)을 통과하여 고정부(10)를 사이에 두고 마주하는 연결링(20)의 볼트홀(22)에 체결될 수 있는 길이를 갖도록 형성된다.The
이에 따라 상기 연결링(20)을 구성하는 체결부(21)의 볼트홀(22)과 고정부(10)를 사이에 두고 마주하는 연결링(20)을 구성하는 볼트홀(22)에 볼트(30)를 나선결합하면 상기 볼트(30)의 조임력에 의해 상기 연결링(20)이 고정부(10)의 양단부 외주연을 따라 중앙부로 이동되어 서로 간격이 좁혀지며, 상기 연결링(20)이 고정부(10)의 외주연을 따라 이동되는 과정중 중앙부의 측벽과 접촉되면 이동이 제한된다. 그리고, 상기 연결링(20)이 볼트(30)에 의해 서로 간격이 좁혀지는 과정에서 상기 한쌍의 고정부(10)는 연결링(20)의 사이에서 상,하 방향으로 밀착되어 내부에 삽입된 철근(50)들이 압착되어 고정된다.Accordingly, the bolt (22) in the
또한, 상기 고정부(10)의 내부에는 철근(50)의 마디가 각각 삽입되는 삽입홈(11)과, 상기 철근(50)의 마디 사이에 각각 삽입되는 가압 고정부(12)가 교차 형성되어 있어, 상기 고정부(10)는 연결링(20)의 사이에서 밀착되면서 이동되는 연결링(20)에 의해 볼트(30)가 체결부(21)의 볼트홀(22)에 체결되는 방향으로 수평이동되고, 상기 고정부(10)의 내부에 형성된 가압 고정부(12) 또한 고정부(10)를 따라 이동되면서 철근의 마디 측면을 가압하여 철근(50)이 유동되지 않도록 고정한다.In addition, the inside of the
그리고, 철근의 마디는 직각마디, 경사마디 또는 X자형 마디가 있으므로, 상기 고정부(10)의 삽입홈(11)과 가압 고정부(12)는 상기 고정부(10)의 내부에 직각방향, 사선방향 또는 X자 형상으로 형성될 수 있다.
In addition, since the bars of the rebar have right angles, inclined nodes or X-shaped nodes, the
한편, 도 4는 본 발명에 따른 철근 이음장치의 일 실시예를 도시한 결합 사시도이며, 도 5는 본 발명에 따른 철근 이음장치의 일 실시시예를 도시한 결합 단면도로서, 고정부(10)의 내부 중앙부분에는 상기 고정부(10)의 내부에 삽입되는 철근(50)의 끝단부 사이에 개재되는 스토퍼(41)와, 상기 스토퍼(41)의 양측으로 간격을 두고 연결되며, 상기 고정부(10)의 가압 고정부(12)와 함께 철근(50)의 마디 측면을 가압하여 고정하는 가압 고정부(42)로 이루어지는 쐐기(40)가 더 형성되며, 상기 쐐기(40)는 스토퍼(41)가 철근(50)의 사이에 개재될 수 있도록 가압 고정부(42)보다 더 돌출되어 전체 형상이 대략 "山" 형상으로 형성된다.On the other hand, Figure 4 is a perspective view showing an embodiment of the reinforcing bar joint according to the present invention, Figure 5 is a cross-sectional view showing an embodiment of the reinforcing bar joint according to the present invention, the
먼저, 상기 스토퍼(41)는 상기 고정부(10)의 내부에 삽입되는 철근(50)의 끝단부 사이에 개재되어 내진이 발생될 경우 상기 철근(50)이 서로 밀어내지 않도록 한다.First, the
그리고, 상기 쐐기(40)의 가압 고정부(42)는 고정부(10)의 가압 고정부(12)와 동일하게 연결링(20)에 의해 볼트(30)의 진행방향으로 수평이동되는 고정부(10)와 동일한 방향으로 이동되면서 철근(50)의 마디 측면을 가압하여 고정한다.In addition, the
또한, 상기 고정부(10)의 양단부 중앙부분에는 크램핑 안내홈(13)이 길이방향으로 더 형성되어 상기 고정부(10)를 철근(50)에 크램핑시 용이하게 크램핑 되도록 할 수 있다.
In addition, the
10 : 고정부 11 : 삽입홈
12,42 : 가압 고정부 13,41 : 스토퍼
14 : 크램핑 안내홈 20 : 연결링
21 : 체결부 22 : 볼트홀
30 : 볼트 40 : 쐐기
50 : 철근10: fixing portion 11: insertion groove
12,42:
14: clamping guide groove 20: connection ring
21: fastening part 22: bolt hole
30: bolt 40: wedge
50: rebar
Claims (4)
상기 고정부(10)가 결합되는 양측 외주연에 양방향으로 이동가능하게 각각 장착되고, 외주연에 볼트홀(22)이 좌,우 방향으로 관통형성된 체결부(21)가 간격을 두고 일체로 구비되는 연결링(20);으로 이루어져 구성되며,
상기 고정부(10)는 중앙부의 반경이 양단부의 반경보다 더 커지도록 외측을 향해 절곡형성되고,
상기 연결링(20)을 구성하는 체결부(21)의 볼트홀(22)에는 볼트(30)를 각각 나선결합하여, 상기 볼트(30)의 조임력에 의해 상기 연결링(20)이 고정부(10)의 양단부를 따라 중앙부로 이동되어 서로 간격이 좁혀지도록 하여 상기 한쌍의 고정부(10)가 상,하 방향 및 연결링(20)의 사이에서 이동되면서 밀착고정되도록 하여 내부에 삽입되는 철근(50)이 압착되도록 하고,
상기 고정부(10)의 내부에는 철근(50)의 마디가 각각 삽입되는 삽입홈(11)과, 상기 철근(50)의 마디 사이에 각각 삽입되는 가압 고정부(12)가 교차 형성되어 있어 상기 가압 고정부(12)는 연결링(20)에 의해 이동되는 고정부(10)와 함께 이동되면서 철근의 마디 측면을 가압하여 고정하도록 한 것을 특징으로 하는 철근 이음장치.
A pair of two symmetrically coupled up and down in a pair, and a fixing part 10 into which reinforcing bars are inserted;
The fixing part 10 is mounted on both sides of the outer periphery to be coupled to each other so as to be movable in both directions, and the fastening part 21 formed through the bolt hole 22 in the left and right directions at the outer periphery is integrally provided at intervals. Being made of a connection ring 20;
The fixing portion 10 is bent toward the outside so that the radius of the center portion is larger than the radius of both ends,
Helical coupling of the bolts 30 to the bolt holes 22 of the fastening portion 21 constituting the connection ring 20, the connection ring 20 is fixed by the tightening force of the bolts 30 ( Reinforcing bars inserted into the inside by moving to the central portion along both ends of the 10 to narrow the gap to each other so that the pair of fixing portion 10 is moved between the up and down direction and the connection ring 20 to be fixed closely ( 50) is pressed,
The fixing groove 10 has an insertion groove 11 into which the nodes of the reinforcement 50 are inserted, and a pressure fixing part 12 respectively inserted between the nodes of the reinforcement 50 are formed to intersect. The pressure fixing part 12 is moved with the fixing part 10 which is moved by the connection ring 20, the reinforcing bar connecting device, characterized in that to press the node side of the reinforcement to fix.
상기 고정부의 내부 중앙부분에는 상기 고정부(10)의 내부에 삽입되는 철근(50)의 끝단부 사이에 개재되어 상기 철근(50)이 내진에 의해 밀려나가는 것을 방지할 수 있도록 하기 위해 돌출형성되는 스토퍼(13)가 더 구비되는 것을 특징으로 하는 철근 이음장치.The method of claim 1,
The inner central portion of the fixing part is interposed between the end of the reinforcing bar 50 inserted into the fixing part 10 to form a protrusion to prevent the reinforcing bar 50 is pushed out by the earthquake-resistant Reinforcing bar fittings, characterized in that the stopper 13 is further provided.
상기 고정부(10)의 내부 중앙부분에는 상기 고정부(10)의 내부에 삽입되는 철근(50)의 끝단부 사이에 개재되어 상기 철근(50)이 내진에 의해 밀려나가는 것을 방지할 수 있도록 하기 위한 스토퍼(41)와, 상기 스토퍼(41)의 양측으로 간격을 두고 연결형성되며 상기 철근(50)의 마디 사이에 각각 삽입되어 볼트(30)의 진행방향으로 이동되는 고정부(10)를 따라 이동되어 철근(50)의 마디 측면을 가압하여 고정하는 가압 고정부(42)로 이루어지는 쐐기(40)가 더 형성된 것을 특징으로 하는 철근 이음장치.The method of claim 1,
An inner central portion of the fixing part 10 is interposed between end portions of the reinforcing bar 50 inserted into the fixing part 10 to prevent the reinforcing bar 50 from being pushed out by the earthquake. Along the stopper 41 and the stopper 41 are formed at intervals on both sides of the stopper 41 and are inserted between the nodes of the reinforcement 50, respectively, along the fixing part 10 moving in the direction of travel of the bolt 30. Reinforcing bar connecting device, characterized in that the wedge 40 is formed of a pressing fixing part 42 which is moved to press and fix the node side of the reinforcing bar 50.
상기 고정부(10)의 양단부 중앙부분에는 크램핑 안내홈(13)이 길이방향으로 더 형성된 것을 특징으로 하는 철근 이음장치.The method of claim 3,
Reinforcing bar fittings, characterized in that the clamping guide groove 13 is further formed in the longitudinal direction in the central portion of both ends of the fixing portion (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020110074699A KR20130013196A (en) | 2011-07-27 | 2011-07-27 | Splicing device for reinforcing bar |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020110074699A KR20130013196A (en) | 2011-07-27 | 2011-07-27 | Splicing device for reinforcing bar |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20130013196A true KR20130013196A (en) | 2013-02-06 |
Family
ID=47893683
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020110074699A KR20130013196A (en) | 2011-07-27 | 2011-07-27 | Splicing device for reinforcing bar |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20130013196A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101665516B1 (en) * | 2016-03-16 | 2016-10-24 | 우경기술주식회사 | Construction method of duel tunnel using composite capable of bidirectional tensioning, pressure casting and tiebolting, and its duel tunnel |
CN116752701A (en) * | 2023-07-05 | 2023-09-15 | 中国建筑第五工程局有限公司 | BIM-based fabricated building element |
-
2011
- 2011-07-27 KR KR1020110074699A patent/KR20130013196A/en active IP Right Grant
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101665516B1 (en) * | 2016-03-16 | 2016-10-24 | 우경기술주식회사 | Construction method of duel tunnel using composite capable of bidirectional tensioning, pressure casting and tiebolting, and its duel tunnel |
CN116752701A (en) * | 2023-07-05 | 2023-09-15 | 中国建筑第五工程局有限公司 | BIM-based fabricated building element |
CN116752701B (en) * | 2023-07-05 | 2023-11-28 | 中国建筑第五工程局有限公司 | BIM-based fabricated building element |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110832151B (en) | One touch type steel bar connector | |
KR101403040B1 (en) | Iron-bar coupler | |
KR101371216B1 (en) | Iron-bar coupler | |
KR102069667B1 (en) | Pressure type coupler with means for individually pressing the wedge | |
KR20190115235A (en) | Connecting Structure of Steel Pipe Strut | |
KR101123347B1 (en) | Reinforcement binder mechanism | |
KR101374598B1 (en) | Reinforcing bar coupler | |
KR101285704B1 (en) | A reinforcing bar connector | |
KR20130013196A (en) | Splicing device for reinforcing bar | |
KR101752279B1 (en) | Apparatus for connecting of reinforcing bar | |
KR101498662B1 (en) | Reinforced seams coupling | |
KR100404425B1 (en) | Wedge shaped one-touch type steel-frame coupling device | |
KR200412860Y1 (en) | Rebar fixing coupler | |
KR100837113B1 (en) | Reinforcing bar coupler | |
KR20090009578A (en) | A connecting apparatus for steel reinforcement | |
KR101773434B1 (en) | Coupling device for concrete and steel File | |
KR102149032B1 (en) | One-touch quick coupler for connecting reinforcing bar | |
KR100244964B1 (en) | Splicing device for reinforcement steel bars | |
KR102317467B1 (en) | Reinforcing rod a coupling device | |
KR102301698B1 (en) | Connector for concrecte structure of reinforcing bar | |
KR20190031075A (en) | bar coupler for concrete construction | |
KR101224542B1 (en) | A reinforcing bar connector | |
KR101246678B1 (en) | One touch type reinforcing bar coupler | |
KR200257716Y1 (en) | Wedge shaped one-touch type steel-frame coupling device | |
KR101716675B1 (en) | Connecting Structure of Steel Pipe with the Reinforced Joint and Bridge with the Same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E90F | Notification of reason for final refusal | ||
E701 | Decision to grant or registration of patent right |