KR20130010935A - Apparatus to set up giogrid for raising the ground - Google Patents

Apparatus to set up giogrid for raising the ground Download PDF

Info

Publication number
KR20130010935A
KR20130010935A KR1020110071729A KR20110071729A KR20130010935A KR 20130010935 A KR20130010935 A KR 20130010935A KR 1020110071729 A KR1020110071729 A KR 1020110071729A KR 20110071729 A KR20110071729 A KR 20110071729A KR 20130010935 A KR20130010935 A KR 20130010935A
Authority
KR
South Korea
Prior art keywords
geogrid
plate
natural stone
fill
bolt
Prior art date
Application number
KR1020110071729A
Other languages
Korean (ko)
Other versions
KR101365061B1 (en
Inventor
임대영
Original Assignee
임대영
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 임대영 filed Critical 임대영
Priority to KR1020110071729A priority Critical patent/KR101365061B1/en
Publication of KR20130010935A publication Critical patent/KR20130010935A/en
Application granted granted Critical
Publication of KR101365061B1 publication Critical patent/KR101365061B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0225Retaining or protecting walls comprising retention means in the backfill
    • E02D29/0233Retaining or protecting walls comprising retention means in the backfill the retention means being anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/025Retaining or protecting walls made up of similar modular elements stacked without mortar
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0084Geogrids

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

PURPOSE: A device for installing a geogrid in an embanking area is provided to couple the end portion of the geogrid with the same by a plate set, thereby sufficiently supporting a large natural stone which is fastened to the end portion of the geogrid, and firmly maintaining a fastening state between them. CONSTITUTION: A geogrid(30) is horizontally unfolded inside an embankment(20). The end portion of the geogrid(30) is interposed between the upper plate(40) and the lower plate(42) of a plate set. A fastening state between the upper plate(40) and the lower plate(42) is maintained by bolts(46) and nuts(44). Link pieces(48) are interposed together with the geogrid(30) between the upper plate(40) and the lower plate(42) in response to each installation position of set anchors(14). The link pieces(48) are fastened by bolts(46) and nuts(44). Connecting devices(50,52) are connect the set anchors(14) and the link pieces(48) at one to one.

Description

성토부의 지오그리드 설치 장치{Apparatus to set up giogrid for raising the ground}Geogrid installation device of fill section {Apparatus to set up giogrid for raising the ground}

본 발명은 성토부의 지오그리드 설치 장치에 관한 것으로서, 보다 상세하게는 성토체 내에 전개되는 지오그리드를 상기 성토체의 전면의 옹벽을 이루는 자연석에 체결하는 구조를 개선한 성토부의 지오그리드 설치 장치에 관한 것이다.
The present invention relates to a geogrid installation apparatus for a fill section, and more particularly, to a geogrid installation apparatus for a fill section having an improved structure for fastening a geogrid deployed in a fill body to a natural stone forming a retaining wall in front of the fill body.

일반적으로 토목 또는 건축 현장에는 암반부 또는 대지를 절개함에 따라 형성되는 절개 경사면에 대한 보강이나 또는 지반을 성토하는 과정에서 고도가 다른 영역 간에 발생하는 성토 경사면에 대한 보강이 고려되어야 한다.In general, civil engineering or construction sites should consider reinforcement of incised slopes formed by cutting rock sections or grounds, or reinforcement of fill slopes that occur between different altitudes in the process of laying soil.

절토부는 암반부 또는 대지의 임의적인 절개에 의하여 형성된 상기 절개 경사면에 대한 보강 구조물이며, 성토부는 성토하는 과정에서 고도가 다른 영역 간에 발생하는 성토 경사면에 대한 보강 구조물이다.The cut section is a reinforcement structure for the inclined inclined surface formed by an arbitrary incision of a rock section or the ground, and the fill section is a reinforcement structure for a fill slope generated between areas having different altitudes during the filling process.

절토부와 성토부의 경사면을 보강하여 보호하기 위한 구조물인 옹벽은 다양한 방법으로 시공될 수 있으며, 그 시공 방법은 절개 경사면 및 성토 경사면의 특성에 따라서 다양하게 적용될 수 있다.The retaining wall, which is a structure for reinforcing and protecting the inclined surface of the cut portion and the fill portion, may be constructed in various ways, and the construction method may be variously applied according to the characteristics of the inclined slope and the fill slope.

대표적으로 절토부와 성토부의 옹벽은 콘크리트 타설을 이용한 구조물 또는 자연석을 이용한 구조물로 시공될 수 있다.Typically, the retaining walls of the cut and fill sections can be constructed as structures using concrete pouring or structures using natural stone.

그러나, 콘크리트 타설을 이용한 옹벽은 설치대상 경사지 및 암반 등의 형태에 대응한 유연성 및 가변성이 부족하다. 그리고, 유연성 및 가변성을 해결하기 위해서는 지지기반이 필요한데 지지기반을 확보하기 위해서는 상당한 공간이 필요하다. 또한 이러한 공간의 확보는 뒷채움 작업 등을 많이 필요로 하며 그에 따라서 공사기간이 연장되고 공사 비용이 많이 소요된다. 그리고, 차후 옹벽의 부분적인 파손이 발생한 경우에 보수가 곤란하며, 미관을 고려한 조경적인 측면이 충족되기 어렵다.However, the retaining wall using concrete pouring lacks flexibility and variability corresponding to the shape of the slope and rock to be installed. And a support base is needed to solve the flexibility and variability, but a considerable space is required to secure the support base. In addition, securing such space requires a lot of backfilling work, and thus, the construction period is extended and construction cost is high. In the case of partial breakage of the retaining wall in the future, repair is difficult, and the landscape aspect considering the aesthetics is difficult to be satisfied.

또한, 자연석을 이용한 옹벽은 조경적인 측면이 충족되고 설치대상 경사지 및 암반 등의 형태에 대한 유연성 및 가변성이 확보될 수 있으나 성토와 더불어 대형 자연석을 쌓는 경우 자연석이 직립 상태로 유지되기 어렵고 다층으로 쌓는 경우 고도로 숙련된 시공자가 아닌 경우 자연석이 쉽게 무너질 수 있다.In addition, the retaining wall using natural stone can satisfy the landscape aspect, and the flexibility and variability of the shape of the slope and the rock to be installed can be secured, but when the large natural stone is piled up with the fill, the natural stone is difficult to maintain in an upright state and is stacked in multiple layers. If you are not a highly skilled installer, natural stone can easily fall.

이 중 성토부의 옹벽을 대형 자연석으로 시공하는 경우 자연석은 보강재로서 성토체 내에 전개되는 지오그리드에 의하여 지지될 수 있다. 이 경우, 자연석은 자신에 설치된 셋 앙카들에 지오그리드의 단부가 체결됨으로써 지지된다. 여기에서 지오그리드와 자연석 간을 체결하는 체결 장치는 다양하게 제공될 수 있으나, 대개 지지바와 타이바를 이용한 체결 방식을 이용하여 자연석이 지오그리드 단부와 체결된다. 이와 같은 종래의 체결 방법은 대형 자연석을 지지할 정도의 충분한 지지력을 제공하기 어렵다. Among these, when constructing the retaining wall of the fill part as a large natural stone, the natural stone may be supported by the geogrid deployed in the fill body as a reinforcement material. In this case, the natural stone is supported by fastening the end of the geogrid to the set anchors installed therein. Here, the fastening device for fastening the geogrid and the natural stone may be provided in various ways, but the natural stone is fastened to the geogrid end by using a fastening method using a support bar and a tie bar. Such a conventional fastening method is difficult to provide sufficient support to support a large natural stone.

그러므로, 성토부에 시공되는 대형 자연석을 지오그리드로 견고히 체결하여 다층으로 적층되는 대형 자연석이 안정적으로 시공될 수 있는 체결 방법의 개발이 소망되고 있다.Therefore, it is desired to develop a fastening method capable of stably constructing a large natural stone stacked in multiple layers by fastening a large natural stone that is constructed in the fill part with a geogrid.

또한, 지오그리드에 의하여 지지되는 성토부의 자연석은 부정형으로 배치되고, 성토체 내에 전개되는 지오그리드는 전개되는 방향에 직교하는 방향으로 단부가 형성된다. 그러므로 자연석의 후면과 지오그리드의 단부 간의 이격 거리가 일정하게 유지되기 어렵다.In addition, the natural stone of the fill part supported by the geogrid is arranged in an irregular shape, and the geogrid developed in the fill body has an end portion formed in a direction orthogonal to the unfolding direction. Therefore, the spacing between the back of the natural stone and the end of the geogrid is difficult to remain constant.

상술한 바와 같이 위치 별로 이격 거리가 다른 자연석과 지오그리드의 단부 간을 체결하기 위항 턴 버클 등 고가의 체결 장치가 이용될 수 있으나, 이는 시공 비용을 상승시켜서 경제적인 효과를 떨어뜨리는 요인으로 작용한다.As described above, an expensive fastening device such as a turn buckle may be used to fasten the distance between the natural stone and the geogrid end having different distances for each location, but this increases the construction cost and lowers the economic effect.

따라서, 부정형으로 배치되는 자연석과 지오그리드 단부를 이격 거리에 유연하게 대응하면서 견고히 체결하고 비용이 저렴한 체결 장치의 제시가 필요한 실정이다.
Therefore, it is necessary to present a fastening device that is securely fastened and inexpensive while naturally responding to the separation distance between the natural stone and the geogrid end arranged in an irregular shape.

상술한 문제점을 해결하기 위한 본 발명은 지오그리드 단부에 체결되는 대형 자연석을 충분히 지지하면서 체결 상태가 견고히 유지될 수 있는 성토부의 지오그리드 설치 장치를 제공함을 목적으로 한다.An object of the present invention for solving the above problems is to provide a geogrid installation apparatus of the fill portion that can be securely fastened while supporting large natural stone fastened to the geogrid end.

또한, 본 발명은 부정형으로 배치되는 자연석과 지오그리드 단부를 이격 거리에 유연하게 대응하여 체결할 수 있는 성토부의 지오그리드 설치 장치를 제공함을 다른 목적으로 한다.
In addition, another object of the present invention is to provide a geogrid installation apparatus of a fill section that can be fastened to correspond to the separation distance between the natural stone and the geogrid end in an irregular shape flexibly.

상술한 목적을 달성하기 위한 본 발명에 따른 성토부의 지오그리드 설치 장치는, 성토체의 전면에 배치되는 조경석의 후면에 일단이 삽입 고정되며 타단에 수나사가 형성된 셋 앙카들; 상부와 하부에서 상기 성토체 내에 수평으로 전개되는 지오그리드의 단부를 개재하며 자신들을 관통하는 볼트가 너트와 결합되어 체결 상태를 유지하는 상부 플레이트와 하부 플레이트 그리고 상기 셋 앙카들이 설치된 위치 별로 대응하여 상기 상부 플레이트와 상기 하부 플레이트 사이에 상기 지오그리드와 같이 개재되어 상기 볼트와 너트로 결합되는 링크 피스들을 포함하는 플레이트 세트; 및 상기 셋앙카와 상기 플레이트 세트의 상기 링크 피스들을 일대일로 연결되며 상기 자연석과 상기 지오그리드 간의위치 별 이격 거리에 대응되는 길이를 갖는 연결 장치들;을 포함함을 특징으로 한다.Geogrid installation apparatus of the fill portion according to the present invention for achieving the above object is set anchors one end is inserted into the rear of the landscaping stone disposed on the front of the fill body and the other end has a male thread; The upper plate and the lower plate through the end of the geogrid that is horizontally deployed in the fill body in the upper and lower, and the bolts penetrating them coupled with the nut to maintain a fastening state corresponding to the position where the three anchors are installed A plate set including link pieces interposed between the plate and the lower plate such that the geogrid is coupled to the bolt and the nut; And connecting devices connecting the link pieces of the set anchor and the plate set in a one-to-one relationship and having a length corresponding to a separation distance for each position between the natural stone and the geogrid.

여기에서, 상기 링크 피스는, 상기 상부 플레이트와 상기 하부 플레이트 사이에 개재되는 개재면과 상기 개재면에 일체로 연장되면서 직각으로 꺽여진 체결면을 포함하며 상기 체결면에 관통공이 형성되어서 상기 전산볼트의 단부가 관통되어 볼트로 체결됨이 바람직하다.Here, the link piece, the intervening surface interposed between the upper plate and the lower plate and a coupling surface bent at a right angle while being integrally extended to the interposition surface and through holes are formed in the coupling surface to form the threaded bolt It is preferable that the end of the through is fastened with a bolt.

그리고, 상기 연결 장치는, 관통되는 암나사를 가지며 일단에 각각의 상기 셋 앙카의 상기 수나사와 체결되는 연결 너트들; 및 상기 자연석과 상기 지오그리드 간의 위치 별 이격 거리에 대응하는 길이를 가지며 상기 연결 너트의 타단과 상기 플레이트 세트의 상기 링크 피스의 단부 간을 일대일로 체결하는 전산볼트들;을 포함함이 바람직하다.
The connecting device may include connecting nuts having a female thread penetrating therein and coupled to the male screw of each of the three anchors at one end thereof; Computational bolts having a length corresponding to the separation distance for each position between the natural stone and the geogrid and fastening one-to-one between the other end of the connection nut and the end of the link piece of the plate set.

본 발명에 의한 성토부의 지오그리드 설치 장치는 플레이트 세트로 지오그리드 단부와 결합되기 때문에 지오그리드 단부에 체결되는 대형 자연석을 충분히 지지하면서 체결 상태가 견고히 유지될 수 있는 효과가 있다.Geogrid installation device of the fill portion according to the present invention is coupled to the geogrid end in the plate set has the effect that the fastening state can be firmly maintained while sufficiently supporting the large natural stone fastened to the geogrid end.

또한, 자연석과 지오그리드 간의 위치 별 이격 거리에 대응하는 길이를 갖는 연결 너트를 이용함으로써 부정형으로 배치되는 자연석과 지오그리드 단부를 이격 거리에 유연하게 대응하여 체결할 수 있는 효과가 있다.
In addition, by using a connection nut having a length corresponding to the separation distance for each position between the natural stone and the geogrid, it is possible to flexibly correspond to the natural stone and geogrid ends arranged in an irregular shape corresponding to the separation distance.

도 1은 본 발명에 따른 성토부의 지오그리드 설치 장치의 바람직한 실시예를 나타내는 사시도.
도 2는 지오그리드를 참조하여 설명하는 도 1의 플레이트 세트의 분해 사시도.
도 3은 본 고안에 따른 실시예 적용에 의한 성토부의 단면도.
도 4는 본 고안의 실시예에 의하여 자연석과 지오그리드가 설치된 상태의 단면도.
1 is a perspective view showing a preferred embodiment of the geogrid installation apparatus of the fill section according to the present invention.
2 is an exploded perspective view of the plate set of FIG. 1 described with reference to the geogrid;
Figure 3 is a cross-sectional view of the fill portion by applying the embodiment according to the present invention.
Figure 4 is a cross-sectional view of the natural stone and geogrid is installed in accordance with an embodiment of the present invention.

이하, 첨부된 도면을 참조하여 본 고안에 따른 바람직한 실시예를 상세하게 설명하기로 한다. 그러나, 이하의 실시예는 이 기술분야에서 통상적인 지식을 가진 자에게 본 발명이 충분히 이해되도록 제공되는 것으로서 여러 가지 다른 형태로 변형될 수 있으며, 본 고안의 범위가 다음에 기술되는 실시예에 한정되는 것은 아니다. 도면상에서 동일 부호는 동일한 요소를 지칭한다.
Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings. However, the following embodiments are provided to those skilled in the art to fully understand the present invention, and may be modified in various forms, and the scope of the present invention is limited to the embodiments described below. It doesn't happen. Wherein like reference numerals refer to like elements throughout.

본 발명에 따른 지오그리드 설치 장치는 도 1 및 도 2와 같이 개시될 수 있으며, 실시예의 실시에 의하여 도 3와 같이 성토부가 이루어질 수 있다.The geogrid installation apparatus according to the present invention may be disclosed as shown in FIGS. 1 and 2, and the filling portion may be formed as shown in FIG. 3 by implementing the embodiment.

본 발명에서 성토부는 전면에 옹벽이 형성되고 옹벽의 후면에 성토체가 뒷채움된 구조체를 의미하는 것이며, 옹벽은 자연석(10)이 부정형으로 배치되면서 다층으로 적층되어 형성되는 구조체를 의미하고, 성토체(20)는 중력식 보강토 공법에 의하여 토사를 다짐하여 적층하며 보강재로서 수평으로 전개된 지오그리드(30)를 포함하는 구조체를 의미한다. 그리고, 자연석(10)은 조경용으로 가공된 발파석 등과 같은 대형 산석을 의미하며 300㎜ 이상의 두께를 가지며 적어도 100 내지 120㎜ 이상의 높이를 갖는 것이 이용됨이 바람직하나 이에 국한되지 않고 옹벽을 이루면서 지오그리드(30)와 체결이 필요한 다양한 형태 것이 포함될 수 있다.In the present invention, the fill portion means a structure in which the retaining wall is formed on the front surface and the fill body is filled on the rear surface of the retaining wall, and the retaining wall means a structure formed by stacking in multiple layers while the natural stone 10 is arranged in an irregular shape. 20) refers to a structure including a geogrid (30) laid horizontally as a reinforcing material by laminating the soil by the gravity reinforcement method. The natural stone 10 refers to a large mountain stone, such as blasted stone processed for landscaping, and preferably has a thickness of 300 mm or more and a height of at least 100 to 120 mm, but is not limited thereto, and forms a retaining wall. ) And various forms that need to be fastened.

도 1을 참조하면, 본 발명에 따른 실시예는 전면의 옹벽을 이루는 자연석(10)과 성토체(20) 내에 전개되는 지오그리드(30) 간을 체결하는 장치를 개시한다.Referring to FIG. 1, an embodiment according to the present invention discloses a device for fastening a natural stone 10 forming a retaining wall of a front surface and a geogrid 30 deployed in a fill body 20.

본 발명에 의한 성토부는 도 3과 같이 구성되며, 성토부를 이루기 위하여 지반(50)이 터파기된 후 콘크리트층(60)을 타설하여 상부에 최하층을 이루는 자연석(10)을 고정하고, 그 후 토사를 이용한 앞채움(62)과 자연석(10)을 상부로 다층으로 적층하면서 뒷채움하여 성토체(20)를 형성한다.The filling part according to the present invention is configured as shown in Figure 3, after the ground 50 is formed to form the filling part, the concrete layer 60 is poured to fix the natural stone 10 forming the lowest layer on the top, and then the earth and sand The front fill 62 and the natural stone 10 by using a multi-layer laminated to the top while forming the fill body 20.

성토체(20)는 자연석(10)으로 구성되는 옹벽의 후면의 뒷채움을 위하여 20㎝와 같이 일정한 높이로 토사나 잡석을 성토하고 90 내지 95 % 이상의 다짐도를 갖도록 다짐하는 과정을 반복적으로 수행하여 구성되는 것이며, 60㎝와 같이 일정한 높이로 보강재인 지오그리드(30)를 수평방향으로 전개하여 구성된다. 이때 성토체(20) 내에 수평으로 전개되는 지오그리드(20)의 일단이 본 고안에 따른 실시예에 의하여 자연석(10)과 체결된다.Fill body 20 is composed by repeatedly performing the process to fill the soil or rubble to a certain height, such as 20 ㎝ for the back filling of the back of the retaining wall consisting of natural stone 10 and have a compaction degree of 90 to 95% or more The geogrid 30, which is a reinforcing material, is developed in a horizontal direction at a constant height such as 60 cm. At this time, one end of the geogrid 20 that is horizontally deployed in the fill body 20 is fastened with the natural stone 10 by the embodiment according to the present invention.

다층으로 부정형으로 적층되는 자연석(10) 또는 수평 방향으로 부정형으로 배치되는 자연석 간의 결합력을 보강하기 위하여 'ㄷ' 형태로 꺽어진 이음쇠(70)가 인접한 자연석(10) 간에 설치될 수 있으며, 토사가 누출되는 것을 방지하기 위하여 부직포(72)가 자연석(10) 간 벌어진 공간에 구성될 수 있다.In order to reinforce the bonding force between the natural stone 10 stacked in an irregular shape in a multilayer or natural stone arranged in an irregular shape in a horizontal direction, a fitting 70 bent in a 'c' shape may be installed between adjacent natural stones 10. In order to prevent leakage, the nonwoven fabric 72 may be configured in a space formed between the natural stones 10.

자연석(10)의 후면에는 일정 깊이의 삽입공(12)이 형성되고, 삽입공(12)에는 셋 앙카(14)가 설치된다. 여기에서 삽입공(12)은 지오그리드(30)가 전개된 높이에 맞게 형성되며, 삽입공(12) 간의 수평 간격은 후술되는 지지바(32)에 체결되는 링크 피스(48)의 위치에 대응하여 결정될 수 있다. 그리고, 셋 앙카(14)은 통상 앙카와 볼트를 세트로 포함하며 앙카를 박아서 삽입공(12)에 거치하는 구성을 갖는다. 셋 앙카(14)는 앙카를 박은 상태에서 삽입공(12)에 충진되는 통상의 콘픽스에 의하여 견고히 지지될 수 있다. An insertion hole 12 having a predetermined depth is formed at the rear surface of the natural stone 10, and a set anchor 14 is installed at the insertion hole 12. Here, the insertion hole 12 is formed to fit the height of the geogrid 30, the horizontal spacing between the insertion hole 12 corresponds to the position of the link piece 48 is fastened to the support bar 32 to be described later Can be determined. And, the set anchor 14 usually includes an anchor and a bolt as a set and has a configuration in which the anchor is driven and placed in the insertion hole 12. The set anchor 14 may be firmly supported by a conventional fixation filled in the insertion hole 12 in the anchored state.

그리고, 지오그리드(30)의 단부와 결합되는 플레이트 세트는 상부 플레이트(40), 하부 플레이트(42), 너트(44), 볼트(46) 및 링크 피스(48)를 포함하는 구성을 갖는다.In addition, the plate set coupled to the end of the geogrid 30 has a configuration including an upper plate 40, a lower plate 42, a nut 44, a bolt 46, and a link piece 48.

링크 피스(48)는 삽입공(12)에 셋 앙카(14)가 설치된 위치 별로 대응되게 배치되며 상부 플레이트(40)와 하부 플레이트(42) 사이에 개재된다. 그리고, 링크 피스(48)는 상부 플레이트(40)와 하부 플레이트(42) 사이에 개재되는 개재면(48b)과 개재면(48b)에 일체로 연장되면서 직각으로 꺽여진 체결면(48a)이 형성된다. 개재면(48b)에는 상부 플레이트(40)와 하부 플레이트(42)를 관통하는 볼트(46)가 관통 가능한 관통홀(49b)이 형성되고 체결면(48a)에는 후술하는 전산 볼트(50)가 관통 가능한 관통홀(49a)이 형성된다.The link piece 48 is disposed to correspond to each position where the set anchors 14 are installed in the insertion hole 12 and is interposed between the upper plate 40 and the lower plate 42. The link piece 48 is integrally extended to the interposition surface 48b and the interposition surface 48b interposed between the upper plate 40 and the lower plate 42 to form a fastening surface 48a bent at right angles. do. A through hole 49b through which the bolt 46 penetrating the upper plate 40 and the lower plate 42 penetrates is formed in the interposition surface 48b, and the computer bolt 50 described later penetrates the fastening surface 48a. Possible through holes 49a are formed.

그리고, 상부 플레이트(40)와 하부 플레이트(42)의 링크 피스(48)가 개재되는 위치에는 볼트(46)가 관통 가능한 관통홀(40a, 40b)이 각각 형성된다.The through holes 40a and 40b through which the bolts 46 are formed are formed at positions where the link pieces 48 of the upper plate 40 and the lower plate 42 are interposed.

상술한 바와 같이 플레이트 세트가 구성됨으로써 상부 플레이트(40)와 하부 플레이트(42)는 지오그리드(30)의 단부와 링크 피스(48)를 개재하여 조립될 수 있다.As the plate set is configured as described above, the upper plate 40 and the lower plate 42 may be assembled through the end of the geogrid 30 and the link piece 48.

즉, 지오그리드(30)를 배치하여 단부를 접어서 단부를 정렬하고, 그 후 셋 앙카(14)가 설치된 위치 별로 링크 피스(48)를 지오그리드(30) 상에 배치한다.That is, the geogrid 30 is arranged to fold the ends to align the ends, and then the link pieces 48 are arranged on the geogrid 30 for each position where the set anchors 14 are installed.

이와 같이 지오그리드(30)와 링크 피스(48)가 정렬된 후 이들의 상부와 하부에 각각 상부 플레이트(40)와 하부 플레이트(42)를 위치하고, 볼트(46)를 상부 플레이트(40), 링크 피스(48) 및 하부 플레이트(42)의 각 관통홀(40a, 49b, 42a)을 관통시킨 후 볼트(46)의 양단을 너트(44)로 결합한다.After the geogrid 30 and the link piece 48 are aligned, the upper plate 40 and the lower plate 42 are positioned on the upper and lower portions thereof, and the bolt 46 is attached to the upper plate 40 and the link piece. After passing through the through holes 40a, 49b, and 42a of the 48 and the lower plate 42, the both ends of the bolt 46 are coupled with the nut 44.

상술한 바와 같이 플레이트 세트가 지오그리드(30)와 링크 피스(48)를 개재하도록 조립된 후 링크 피스(48)에 전산 볼트(50)의 단부가 관통되어 볼트가 조립되고, 전산 볼트(50)의 타단과 셋 앙카(14)의 단부 수나사가 연결 너트(52)로써 결합된다. 여기에서 연결 너트(52)는 관통된 암나사를 갖는 너트를 의미하며, 전산 볼트(50)는 통상적으로 외면이 전부 나사산이 형성된 볼트를 의미한다.As described above, after the plate set is assembled to interpose the geogrid 30 and the link piece 48, the end of the threaded bolt 50 penetrates the link piece 48, and the bolt is assembled. The other end and the end male thread of the set anchor 14 are engaged with the connecting nut 52. Here, the connection nut 52 refers to a nut having a penetrated female thread, and the threaded bolt 50 generally means a bolt on which all outer surfaces are threaded.

그리고, 링크 피스(48)와 셋 앙카(14) 사이를 연결하는 전산 볼트(50)와 연결 너트(52) 중 어느 하나가 자연석(10)과 지오그리드(30) 간의 이격 거리에 대응하여 위치 별로 가변된 길이를 갖는 것이 적용될 수 있다.In addition, any one of the computer bolt 50 and the connection nut 52 connecting the link piece 48 and the set anchor 14 is variable for each position in response to the separation distance between the natural stone 10 and the geogrid 30. One having a length can be applied.

연결 너트(52)에 비하여 전산 볼트(42)가 다양한 길이로 가공하여 사용될 수 있으므로 자연석(10)과 지오그리드(30) 간의 이격 거리에 따라 다양한 길이의 전산 볼트를 적용하여 자연석(10)과 지오그리드(30) 간을 체결함이 바람직하다.Compared with the connection nut 52, the computational bolt 42 may be processed to various lengths, so that the computational bolts of various lengths may be applied according to the separation distance between the natural stone 10 and the geogrid 30, and thus the natural stone 10 and the geogrid ( 30) It is preferable to fasten the liver.

자연석(10)과 지오그리드(30) 간의 거리가 너무 가까워서 셋 앙카(14)의 볼트와 링크 피스(48)가 직접 체결될 수 있는 경우 전산 볼트(50)와 연결 너트(52)가 사용되지 않을 수 있다. If the distance between the natural stone 10 and the geogrid 30 is so close that the bolt of the set anchor 14 and the link piece 48 can be directly engaged, the threaded bolt 50 and the connection nut 52 may not be used. have.

상술한 바와 같이 본 발명에 따른 성토부의 지오그리드 설치 장치가 구성됨으로써 지오그리드(30)를 도 4와 같이 부정형으로 배치되는 자연석(10)에 체결할 수 있다.As described above, since the geogrid installation apparatus of the fill portion according to the present invention is configured, the geogrid 30 may be fastened to the natural stone 10 arranged in an irregular shape as shown in FIG. 4.

자연석(10)은 옹벽이 자연스런 조경미를 갖질 수 있도록 부정형으로 배치된다. 자연석(10)이 부정형으로 배치됨에 따라서 위치 별로 후면에 전개되는 지오그리드(30)와 간격이 달라질 수 있다. Natural stone 10 is arranged in an irregular shape so that the retaining wall has a natural landscape beauty. As the natural stone 10 is arranged in an indeterminate shape, the distance from the geogrid 30 deployed on the rear surface may vary.

이와 같은 경우, 위치 별로 다른 거리는 다양한 길이의 전산 볼트(50) 또는 연결 너트(52)를 이용하여 완충할 수 있다. In this case, the distance different for each position may be buffered by using the computer bolt 50 or the connection nut 52 of various lengths.

따라서, 지오그리드는 전면의 옹벽을 이루는 자연석(10)의 배치 상태와 무관하게 안정적으로 자연석(10)의 후면에 체결될 수 있다.Therefore, the geogrid can be fastened to the rear of the natural stone 10 stably regardless of the arrangement state of the natural stone 10 forming the retaining wall of the front.

상술한 바와 같이 지오그리드가 안정적으로 배치될 수 있다.As described above, the geogrid may be stably disposed.

또한, 본 발명에 의하여 지오그리드(30) 단부가 플레이트 세트를 이루는 상부 플레이트(40)와 하부 플레이트(42) 사이에 견고하게 결합된 상태가 유지될 수 있기 때문에 지오그리드(30)에 결합되는 자연석(10)이 안정적으로 옹벽으로 구성될 수 있다.
In addition, since the end of the geogrid 30 can be maintained firmly coupled between the upper plate 40 and the lower plate 42 constituting the plate set according to the present invention, the natural stone 10 is coupled to the geogrid 30 ) Can be stably composed of retaining walls.

10 : 자연석 12 : 삽입공
14 : 셋 앙카 20 : 성토체
30 : 지오그리드 40 : 상부 플레이트
42 : 하부 플레이트 48 : 링크 피스
50 : 전산 볼트 52 : 연결 너트
50 : 지반 60 : 콘크리트층
62 : 앞채움 70 : 이음쇠
72 : 부직포
10: natural stone 12: insertion hole
14: three anchors 20: castle
30: geogrid 40: upper plate
42: lower plate 48: link piece
50: threaded rod 52: connection nut
50: ground 60: concrete layer
62: Front Fill 70: Fitting
72: nonwoven fabric

Claims (3)

성토체의 전면에 배치되는 조경석의 후면에 일단이 삽입 고정되며 타단에 수나사가 형성된 셋 앙카들;
상부와 하부에서 상기 성토체 내에 수평으로 전개되는 지오그리드의 단부를 개재하며 자신들을 관통하는 볼트가 너트와 결합되어 체결 상태를 유지하는 상부 플레이트와 하부 플레이트 그리고 상기 셋 앙카들이 설치된 위치 별로 대응하여 상기 상부 플레이트와 상기 하부 플레이트 사이에 상기 지오그리드와 같이 개재되어 상기 볼트와 너트로 결합되는 링크 피스들을 포함하는 플레이트 세트; 및
상기 셋앙카와 상기 플레이트 세트의 상기 링크 피스들을 일대일로 연결되며 상기 자연석과 상기 지오그리드 간의위치 별 이격 거리에 대응되는 길이를 갖는 연결 장치들;을 포함함을 특징으로 하는 성토부의 지오그리드 설치 장치.
Three anchors, one end of which is inserted into and fixed to the rear of the landscaping stone disposed on the front of the fill body, the male thread formed on the other end;
The upper plate and the lower plate through the end of the geogrid that is horizontally deployed in the fill body in the upper and lower, and the bolts penetrating them coupled with the nut to maintain a fastening state corresponding to the position where the three anchors are installed A plate set including link pieces interposed between the plate and the lower plate such that the geogrid is coupled to the bolt and the nut; And
And connecting devices having one-to-one connection between the set pieces and the link pieces of the plate set and having a length corresponding to a separation distance for each position between the natural stone and the geogrid. 11.
제1 항에 있어서, 상기 링크 피스는,
상기 상부 플레이트와 상기 하부 플레이트 사이에 개재되는 개재면과 상기 개재면에 일체로 연장되면서 직각으로 꺽여진 체결면을 포함하며 상기 체결면에 관통공이 형성되어서 상기 전산볼트의 단부가 관통되어 볼트로 체결되는 성토부의 지오그리드 설치 장치.
The method of claim 1, wherein the link piece,
An intervening surface interposed between the upper plate and the lower plate and a fastening surface that is integrally extended to the interposing surface and bent at a right angle, and a through hole is formed in the fastening surface so that the end of the computer bolt is penetrated and fastened with a bolt. Geogrid installation device of fill section.
제1 항에 있어서, 상기 연결 장치는,
관통되는 암나사를 가지며 일단에 각각의 상기 셋 앙카의 상기 수나사와 체결되는 연결 너트들; 및
상기 자연석과 상기 지오그리드 간의 위치 별 이격 거리에 대응하는 길이를 가지며 상기 연결 너트의 타단과 상기 플레이트 세트의 상기 링크 피스의 단부 간을 일대일로 체결하는 전산볼트들;을 포함하는 성토부의 지오그리드 설치 장치.
The method of claim 1, wherein the connection device,
Connecting nuts having a penetrating female screw and fastened to the male screw of each of the three anchors at one end thereof; And
And a computer bolt having a length corresponding to a separation distance for each position between the natural stone and the geogrid, and fastening one-to-one between the other end of the connection nut and the end of the link piece of the plate set.
KR1020110071729A 2011-07-20 2011-07-20 Apparatus to set up giogrid for raising the ground KR101365061B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110071729A KR101365061B1 (en) 2011-07-20 2011-07-20 Apparatus to set up giogrid for raising the ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110071729A KR101365061B1 (en) 2011-07-20 2011-07-20 Apparatus to set up giogrid for raising the ground

Publications (2)

Publication Number Publication Date
KR20130010935A true KR20130010935A (en) 2013-01-30
KR101365061B1 KR101365061B1 (en) 2014-02-19

Family

ID=47839990

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110071729A KR101365061B1 (en) 2011-07-20 2011-07-20 Apparatus to set up giogrid for raising the ground

Country Status (1)

Country Link
KR (1) KR101365061B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109296153A (en) * 2018-10-11 2019-02-01 安徽徽风新型合成材料有限公司 A kind of building wall TGXG and its working method
KR20200000729A (en) 2018-06-25 2020-01-03 서웅배 Embankment slope reinforcing structure and embankment slope reinforcing method

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105525627B (en) * 2016-01-29 2017-06-09 中冶集团武汉勘察研究院有限公司 A kind of two-way anchor fixed board retaining wall and its construction method
KR102510850B1 (en) * 2022-08-17 2023-03-16 더베스트테크 주식회사 Fixed Grid Structure for Earth Filling Part Reinforcement, and Blast-Stone Wall Construction Method by Using This

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR980009624U (en) * 1996-07-10 1998-04-30 김복희 Interior and exterior stone panel connector of building
KR200297440Y1 (en) * 2002-05-14 2002-12-12 이재경 Retaining wall structure capable of constructing retaining safely by natural stones
KR100802338B1 (en) * 2005-05-19 2008-02-12 비더씨건설 주식회사 Execution method for structure raising the ground level with a landscape architecture stone
KR100801480B1 (en) * 2007-01-30 2008-02-12 동아에스텍 주식회사 Geogrid connecting structure of breast wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20200000729A (en) 2018-06-25 2020-01-03 서웅배 Embankment slope reinforcing structure and embankment slope reinforcing method
CN109296153A (en) * 2018-10-11 2019-02-01 安徽徽风新型合成材料有限公司 A kind of building wall TGXG and its working method

Also Published As

Publication number Publication date
KR101365061B1 (en) 2014-02-19

Similar Documents

Publication Publication Date Title
US6416260B1 (en) Self-connecting, reinforced retaining wall and masonry units therefor
KR100802338B1 (en) Execution method for structure raising the ground level with a landscape architecture stone
KR101365061B1 (en) Apparatus to set up giogrid for raising the ground
KR101682510B1 (en) Construction method of retaining wall to secure safety using PC panel and permanent anchor
KR20090007144A (en) Retaining wall using stone for landscape
EP3420138B1 (en) Anchoring device for a fence
KR200393176Y1 (en) structure raising the ground level with a landscape architecture stone
KR101649874B1 (en) Retaning wall using formative block
KR20100136292A (en) Block for reinforcement wall, fixing method for the block, and construction method for reinforcement wall of slope stabilization using the same
KR101386275B1 (en) Reformed sheet plate and the method of installation of the same
KR200471401Y1 (en) Apparatus to set up giogrid for raising the ground
KR102490872B1 (en) Reinforced earth retaining wall and construction method using tensile force of steel rod piles
JP7115817B2 (en) Reinforced soil wall using large sandbags and retaining method using large sandbags
KR20190006310A (en) Construction Method of Reinforced Earth Retaining Wall
KR20180129150A (en) Block type reinforcement retaining wall structure and it's construction method
KR102022563B1 (en) Banking structure constructing method using wire head
KR101125072B1 (en) Reinforced earth retaining wall method in consideration of landscape
KR101205306B1 (en) Retaining wall structure using natural stone
KR20090020082A (en) Tension soil nail for slope stability and construction method of precast concrete block using the same
KR102066728B1 (en) Apparatus for building retaining wall
JP5830068B2 (en) Slope reinforcement method
KR101841996B1 (en) Retaining wall using block
KR101354969B1 (en) Retaining wall construction method
KR101224872B1 (en) Natural wall using fiber reinforcement
JP5773840B2 (en) Installation method of decorative panel on reinforced soil wall

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
N231 Notification of change of applicant
E90F Notification of reason for final refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20170103

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20180129

Year of fee payment: 5