KR20120034441A - Precast concrete member and assembled concrete abutment of bridge - Google Patents

Precast concrete member and assembled concrete abutment of bridge Download PDF

Info

Publication number
KR20120034441A
KR20120034441A KR1020100096001A KR20100096001A KR20120034441A KR 20120034441 A KR20120034441 A KR 20120034441A KR 1020100096001 A KR1020100096001 A KR 1020100096001A KR 20100096001 A KR20100096001 A KR 20100096001A KR 20120034441 A KR20120034441 A KR 20120034441A
Authority
KR
South Korea
Prior art keywords
precast concrete
concrete member
shear key
hole
steel wire
Prior art date
Application number
KR1020100096001A
Other languages
Korean (ko)
Other versions
KR101204040B1 (en
Inventor
한만엽
Original Assignee
아주대학교산학협력단
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 아주대학교산학협력단 filed Critical 아주대학교산학협력단
Priority to KR1020100096001A priority Critical patent/KR101204040B1/en
Publication of KR20120034441A publication Critical patent/KR20120034441A/en
Application granted granted Critical
Publication of KR101204040B1 publication Critical patent/KR101204040B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/04Bearings; Hinges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/08Damp-proof or other insulating layers; Drainage arrangements or devices ; Bridge deck surfacings
    • E01D19/086Drainage arrangements or devices
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed
    • E01D2101/285Composite prestressed concrete-metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

PURPOSE: A precast concrete member and a prefabricated concrete abutment using the same are provided to reduce process and construction period by skipping cast-in-place and mortar works and construct with high density and high quality. CONSTITUTION: A prefabricated concrete abutment using a precast concrete member includes a foundation(110) and walls(120). The foundation has an insertion hole(111) where the walls are assembled on the top. The walls are composed of multiple precast concrete members(121,122). The precast concrete members are inserted along the insertion groove and consecutively connected to be assembled in the foundation.

Description

프리캐스트 콘크리트 부재 및 이를 이용한 조립식 콘크리트 교대{precast concrete member and assembled concrete abutment of bridge}Precast concrete member and assembled concrete abutment of bridge

본 발명은 프리캐스트 콘크리트 부재 및 이를 이용한 조립식 콘트리트 교대에 관한 것으로서, 보다 상세하게는 프리캐스트 콘크리트 부재와 이를 이용하여 교대 설치를 위한 별도의 가설 흙막이 벽체가 불필요하게 하는 조립식 콘크리트 교대에 관한 것이다.The present invention relates to a precast concrete member and a prefabricated concrete shift using the same. More particularly, the present invention relates to a precast concrete member and a prefabricated concrete shift which eliminates the need for a separate temporary wall for the installation using the same.

일반적으로 교량은 지지할 시설의 종류와 사용되어지는 용도에 따라서 그 종류와 모양이 다양한 구조물로 이루어지고, 그 역할은 교량이 받쳐주는 통로와 시설의 기능을 안전하게 유지하는 것으로서 충분한 강도과 내구성을 갖추어야 한다.In general, bridges are composed of structures of various types and shapes depending on the type of facility to be supported and the purpose of use, and its role should be sufficient strength and durability to safely maintain the function of the bridge and facilities supported by the bridge. .

종래 교량의 교대를 시공하기 위해서는 도1에 도시한 바와 같이, 교대(A)를 시공할 공간을 확보하기 위하여 가설토류벽(11)을 시공하고, 굴착공정을 거쳐 기초 파일(12)을 시공한 다음, 하부 기초를 철근과 거푸집 및 콘크리트로 시공한 뒤 벽체 등을 철근과 거푸집 및 콘크리트로 시공한 다음, 되메우기 공정을 거친 후 상부구조를 시공하였다.In order to construct a conventional bridge shift, as shown in FIG. 1, the temporary earth wall 11 is constructed to secure a space for the shift A, and the foundation pile 12 is constructed through an excavation process. After constructing the lower foundation with rebar, formwork, and concrete, the walls were constructed with rebar, formwork, and concrete, and then backfilled to construct the superstructure.

상기한 바와 같은 교량의 교대 시공은 일련의 작업공정이 복잡하고, 각 작업공정의 품질관리가 까다로우며, 공사기간이 매우 길며, 공사비 면에서도 경제적이지 못하다. The shift construction of the bridge as described above is complicated in a series of work processes, difficult to control the quality of each work process, the construction period is very long, and is not economical in terms of construction costs.

따라서, 최근에는 프리캐스트(precast) 콘크리트 부재를 이용하여 교대 설치를 위한 별도의 가설 흙막기 벽체가 불필요한 시공이 행해지고 있다. Therefore, in recent years, the construction which requires the use of a precast concrete member and which does not need a separate temporary block wall for alternating installation is performed.

종래 프리캐스트 콘크리트 부재를 이용한 교대는, 도2의 (a) 및 (b)에 도시한 바와 같은 사각형 또는 H형의 프리캐스트 콘크리트 부재(13)(14)를 맞대어 그 연결부의 공간(M1)(M2)에 콘크리트(몰탈)을 타설하여 벽체 파일을 연속적으로 연결하는 현장 작업에 의한 습식접합 방식으로 부착하고 상부에 캡 콘크리트를 현장 타설하여 그 위에 교좌장치를 설치하고, 기초와의 연결 또한 기초와 콘크리트 부재를 연결용 철근으로 연결 배근하여 콘크리트를 현장에서 타설하며, 교대 주변의 성토부(뒤채움재를 채워 다진 부분)를 지지하기 위한 날개벽을 현장에서 설치하여 시공하였다. Alternately using a precast concrete member, a square or H-shaped precast concrete member 13 (14) as shown in Figs. 2A and 2B is opposed to the space M1 of the connecting portion ( M2) is attached to the wet joint method by the site work that continuously connects the wall pile by pouring concrete (mortar), and by placing the cap concrete on the upper part and installing the teaching device on it. The concrete members were placed on the site by connecting and reinforcing the concrete members with connecting reinforcing bars, and a wing wall was installed on the site to support the filling part (the part filled with the backfill material) around the shift.

본 발명은 프리캐스트 콘크리트 부재와 이를 이용하되 몰타르 작업 및 현장 타설작업을 생략하여 공정을 줄이고 신속히 시공하여 공사기간을 현저히 단축하고 고강도 고품질로 시공할 수 있는 조립식 콘크리트 교대를 제공하는 데 그 목적이 있다.An object of the present invention is to provide a precast concrete member and a prefabricated concrete shift that can be used to reduce the process and quickly construction by eliminating the mortar work and on-site pouring work to significantly shorten the construction period and can be constructed with high strength and high quality. .

본 발명에 의한 프리캐스트 콘크리트 부재는, 원심성형 제작기법으로 제작되되, 서로 연속적으로 연결되도록 상호 대향하는 한쌍의 결합면이 구비되며, 어느 한 결합면에는 전단키가 돌출되고, 다른 한 결합면에는 상기 전단키가 삽입되는 전단키홈이 형성된 것을 특징으로 한다.The precast concrete member according to the present invention is manufactured by a centrifugal molding method, and is provided with a pair of coupling surfaces facing each other so as to be continuously connected to each other, one of the coupling surfaces protrudes a shear key, and the other coupling surface is Characterized in that the shear key groove is formed that the shear key is inserted.

본 발명에 의한 조립식 콘크리트 교대는, 기초부와 벽체부를 포함하여 이루어지되, 상기 기초부의 상면에는 상기 벽체부가 끼워져 조립되는 삽입홈이 형성되고, 상기 벽체부는 상기 삽입홈을 따라 끼워 맞추어져 연속적으로 연결되어 상기 기초부에 조립되는 다수의 프리캐스트 콘크리트 부재로 형성되고, 상기 프리캐스트 콘크리브 부재는 서로 연속적으로 연결되도록 상호 대향하는 한쌍의 결합면을 구비하며, 어느 한 결합면에는 전단키가 돌출되고, 다른 한 결합면에는 상기 전단키가 삽입되는 전단키홈이 형성된 것을 특징으로 한다. The prefabricated concrete shift according to the present invention includes a base portion and a wall portion, wherein an upper surface of the base portion is formed with an insertion groove into which the wall portion is fitted and assembled, and the wall portion is fitted along the insertion groove and connected continuously. And formed of a plurality of precast concrete members assembled to the foundation, the precast concrete members having a pair of mating surfaces facing each other so as to be continuously connected to each other, a shear key protrudes on one mating surface, The other coupling surface is characterized in that the shear key groove is formed is the shear key is inserted.

상기 전단키와 상기 전단키홈은, 상기 결합면의 종방향 또는 횡방향을 따라 연속되게 형성되거나, 상기 결합면의 종방향 또는 횡방향을 따라 간헐적으로 형성된다.The shear key and the shear key groove are continuously formed along the longitudinal direction or the transverse direction of the engagement surface, or intermittently formed along the longitudinal or transverse direction of the engagement surface.

상기 벽체부의 처음 프리캐스트 콘크리트 부재와 마지막 프리캐스트 콘크리트 부재는 성토부를 지지하는 플랜지가 달린 프리캐스트 콘크리트 부재이다.The first precast concrete member and the last precast concrete member of the wall portion are flanged precast concrete members supporting the fill portion.

상기 처음 프리캐스트 콘크리트 부재와 마지막 프리캐스트 콘크리트 부재의 플랜지는 서로 보강용 강선에 의해 연결된다.The flanges of the first precast concrete member and the last precast concrete member are connected to each other by reinforcing steel wires.

상기 처음 프리캐스트 콘크리트 부재와 마지막 프리캐스트 콘크리트 부재의 플랜지는 하측이 연장되고, 상기 기초부에는 삽입홈이 형성되어, 상기 플랜지의 연장부가 상기 삽입홈에 끼워져 있을 수도 있다.The flange of the first precast concrete member and the last precast concrete member is extended downward, the insertion portion is formed in the base portion, the extension of the flange may be fitted into the insertion groove.

상기 프리캐스트 콘크리트 부재에는 다수의 관통구멍이 형성되고, 연속적으로 연결된 상기 프리캐스트 콘크리트 부재의 관통구멍에는 프리스트레스를 발생시키는 긴장부재가 삽입되어 설치된다.A plurality of through holes are formed in the precast concrete member, and a tension member for generating prestress is inserted into the through holes of the precast concrete member connected continuously.

상기 관통구멍은 횡방향 강선 관통구멍과 횡방향 강선 관통구멍을 포함하고, 상기 횡방향 강선 관통구멍에는 프리캐스트 콘크리트 부재의 조립을 주목적으로 프리스트레스를 발생시키는 긴장부재가 삽입되어 설치되고, 상기 종방향 강선 관통구멍에는 상기 벽체부의 배면 토압을 지지하기 위해 프리스트레스를 발생시키는 긴장부재가 삽입되어 설치된다.The through hole includes a transverse steel wire through hole and a transverse steel wire through hole, and the transverse steel wire through hole is provided with a tension member for generating prestress mainly for assembling a precast concrete member and inserted therein. The steel wire through hole is provided with a tension member for generating prestress to support the back earth pressure of the wall portion.

상기 프리캐스트 콘크리트 부재에는 배수 배관 또는 전기 배선용 구멍이 형성된다.The precast concrete member is provided with holes for drainage piping or electrical wiring.

상기 기초부의 하부에는 지반층에 매설되어 상기 기초부를 지지하는 다수의 서포트 파일이 연결된다.A plurality of support piles embedded in the ground layer to support the foundation are connected to the lower portion of the foundation.

상기 프리캐스트 콘크리트 부재의 상부에는 거더가 걸리는 걸림부가 형성되고, 상기 걸림부에는 거더를 지지하는 교좌장치가 설치된다.The upper part of the precast concrete member is formed with a latching portion for catching a girder, the seating device for supporting the girder is installed.

본 발명에 의한 프리캐스트 콘크리트 부재 및 이를 이용한 조립식 콘크리트 교대에 의하면, 프리캐스트 콘크리트 부재를 이용하되 몰타르 작업 및 현장 타설작업을 생략하여 공정을 줄이고 신속히 시공하여 공사기간을 현저히 단축하고 고강도 고품질로 시공할 수 있다는 효과가 있다.According to the precast concrete member according to the present invention and prefabricated concrete shift using the same, the precast concrete member can be used to omit the mortar work and the site casting work, thereby reducing the process and constructing it quickly, significantly shortening the construction period and constructing high-quality high-quality construction. It can be effective.

도1은 종래 교대의 시공방법은 나타내는 도면,
도2는 종래 프리캐스트 콘크리트 부재를 이용한 교대의 시공방법을 설명하기 위한 단면도,
도3는 본 발명이 적용된 교량을 나타내는 개략 구성도,
도4은 본 발명에 의한 조립식 콘크리트 교대를 나타내는 사시도,
도5는 도4의 긴장부재가 장착되는 다른 예를 나타내는 상세도,
도6는 도4의 프리캐스트 콘크리트 부재를 나타내는 사시도,
도7은 본 발명의 조립식 콘크리트 교대의 프리캐스트 콘크리트 부재의 다른 예를 나타내는 사시도,
도8은 본 발명의 양측 제2프리캐스트 콘크리트 부재를 강선으로 연결한 실시예를 나타낸 사시도,
도9은 본 발명의 제2프리캐스트 콘크리트 부재를 보강한 실시예를 나타낸 사시도,
도10의 (a), (b) 및 (c)는 종방향 강선 관통구멍이 추가로 형성된 본 발명의 프리캐스트 콘크리트 부재를 나타내는 평면도, 입면도 및 좌측면도,
도11의 (a) 및 (b)는 도10의 종방향 강선 관통구멍에 설치되는 강선부재의 작용상태도,
도12는 본 발명의 전단키 및 전단키홈의 다른 실시예를 나타내는 일부 평면도(분리 및 조립상태 포함),
도13은 본 발명의 전단키 및 전단키홈의 또 다른 실시예를 나타내는 일부 평면도(분리 및 조립상태 포함)이다.
1 is a view showing a conventional shift construction method,
Figure 2 is a cross-sectional view for explaining the alternate construction method using a conventional precast concrete member,
3 is a schematic configuration diagram showing a bridge to which the present invention is applied;
4 is a perspective view showing a prefabricated concrete shift according to the present invention,
5 is a detailed view showing another example in which the tension member of FIG. 4 is mounted;
6 is a perspective view showing the precast concrete member of FIG.
7 is a perspective view showing another example of the precast concrete member of the prefabricated concrete shift of the present invention;
8 is a perspective view showing an embodiment in which the second precast concrete members of the present invention are connected by a steel wire,
9 is a perspective view showing an embodiment in which the second precast concrete member of the present invention is reinforced;
10A, 10B, and 10C are a plan view, an elevation view, and a left side view showing a precast concrete member of the present invention in which a longitudinal steel wire through hole is further formed;
11 (a) and 11 (b) are an operating state diagram of the steel wire member provided in the longitudinal steel wire through hole of FIG. 10;
12 is a partial plan view showing another embodiment of the shear key and shear keyway according to the present invention (including separation and assembly),
Figure 13 is a partial plan view (including a separate and assembled state) showing another embodiment of the shear key and shear keyway of the present invention.

이하, 본 발명의 실시예에 대해 첨부도면을 참조하여 상세히 설명한다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도3는 본 발명이 적용된 교량을 나타내는 개략 구성도이다. 도시한 바와 같이, 본 발명이 적용된 교량의 양측 교대(100 : 조립식 콘크리트 교대) 사이에는 소정의 거리를 두고 다수의 교각(102)이 설치되고, 상기 각 교대(100) 및 각 교각(102)의 상단에 걸쳐 거더(104)가 설치된다. 상기 거더(104) 상에는 차량 등이 통행할 수 있는 슬래브(도시안됨)가 설치되고, 상기 거더(104)는 교좌장치(106)를 매개로 상기 교대(100) 및 교각(102)에 마운팅된다.3 is a schematic block diagram showing a bridge to which the present invention is applied. As shown, a plurality of bridges 102 are provided at a predetermined distance between both side shifts (100: prefabricated concrete shifts) of the bridge to which the present invention is applied, and each of the shifts 100 and each of the bridges 102 The girder 104 is installed over the top. On the girder 104, a slab (not shown) through which a vehicle or the like can pass is installed, and the girder 104 is mounted on the shift 100 and the pier 102 via the bridge device 106.

상기 교좌장치(106)는 상기 거더(104) 및 슬래브에 대한 수직방향의 하중, 진동 변위 등에 대응하는 한편 수평방향의 하중, 휨, 회전변위, 신축이동변위 등에 유연하게 대응하는 구조로 되어 있고, 고무 등의 탄성부재, 베어링, 댐퍼, 또는 지진이나 풍하중에 감쇠기능이 좋은 납면진시스템 등이 마운트를 통해 교대(100) 및 교각(102)에 하중을 전달하는 구조이다.The abutment device 106 has a structure corresponding to vertical loads, vibration displacements, etc. with respect to the girder 104 and the slab, and flexibly corresponding to horizontal loads, bending, rotational displacement, and telescopic displacement, An elastic member such as rubber, a bearing, a damper, or a seismic isolation system having a good damping function against an earthquake or wind load is a structure that transmits a load to the shift 100 and the pier 102 through a mount.

상기 교각(102), 거더(104) 및 교좌장치(106) 등은 다양한 구조로 구성될 수 있는 일반적인 구조이므로 자세한 설명은 생략한다.The pier 102, the girder 104 and the bridge device 106 is a general structure that can be configured in a variety of structures, so a detailed description thereof will be omitted.

도4은 본 발명에 의한 조립식 콘크리트 교대(100)를 나타내는 사시도이다. 도시한 바와 같이 상기 조립식 콘크리트 교대(100)는, 매트판 형태의 기초부(110)와, 상기 기초부(100)에 끼워져 세워지는 벽체부(120)로 이루어진다.4 is a perspective view showing a prefabricated concrete shift 100 according to the present invention. As shown in the figure, the prefabricated concrete shift 100 includes a base portion 110 in the form of a mat plate, and a wall portion 120 fitted to the foundation portion 100.

상기 기초부(110)의 상면에는 상기 벽체부(120)가 끼워져 세워져서 볼트 너트(도시안됨) 등으로 조립되는 삽입홈(111)이 길이방향을 따라 형성되고, 상기 기초부(110)의 하부에는 지반층(도시안됨)에 매설되어 상기 기초부(110)를 지지하는 다수의 서포트 파일(112)이 연결된다.On the upper surface of the base portion 110, the wall portion 120 is inserted and erected so that the insertion groove 111 is assembled along the longitudinal direction, such as bolt nut (not shown) is formed, the lower portion of the base portion 110 There are a plurality of support files 112 embedded in the ground layer (not shown) to support the base 110.

상기 벽체부(120)는 상기 삽입홈(111)을 따라 끼워 맞추어져 연속적으로 연결되어 상기 기초부(110)에 조립되는 다수의 프리캐스트 콘크리트 부재(121 : 제1프리캐스트 콘크리트 부재)로 형성되는데, 상기 벽체부(120)의 처음 프리캐스트 콘크리트 부재와 마지막 프리캐스트 콘크리트 부재는 성토부(뒤채움재를 채워 다진 부분)를 지지하는 플랜지(122b)(122'b)가 몸체(122a)(122'a)의 상부에서 수평방향으로 돌출한 프리캐스트 콘크리트 부재(122, 122' : 제2프리캐스트 콘크리트 부재)이다.The wall portion 120 is formed of a plurality of precast concrete members 121 (first: precast concrete members) that are fitted along the insertion groove 111 and continuously connected to each other to be assembled to the foundation 110. The first precast concrete member and the last precast concrete member of the wall portion 120 are flanges (122b, 122'b) for supporting the fill portion (minced portion filled with backfill) body 122a, 122 ' precast concrete members 122 and 122 ': second precast concrete members protruding horizontally from the top of a).

상기 프리캐스트 콘크리트 부재(121)(122, 122')는 흙이 성토되는 동안에 전도되지 않도록 와이어(W)에 의해 상기 기초부(110)에 고정된다.The precast concrete members 121, 122, 122 ′ are fixed to the foundation 110 by wires W so that they do not fall during soil filling.

도6에 도시한 바와 같이, 상기 제1프리캐스트 콘크리트 부재(121)의 일측면(일측 결합면)에는 전단키(121a)가 돌출하여 형성되고 타측면(타측 결합면)에는 상기 전단키(121a)가 삽입되는 전단키홈(121b)이 형성되어, 인접하는 프리캐스트 콘크리트 부재가 서로 연속적으로 연결된다. 상기 전단키(121a)와 상기 전단키홈(121b)은 상기 결합면의 종방향을 따라 연속되게 형성된다. 전단키와 전단키홈은 결합면의 횡방향을 따라 형성될 수도 있으며, 전단키와 전단키홈은 결합면의 종방향 또는 횡방향을 따라 간헐적으로 형성될 수도 있다.As shown in FIG. 6, a shear key 121a is formed to protrude on one side (one coupling surface) of the first precast concrete member 121, and the shear key 121a is formed on the other surface (the other coupling surface). Shear key grooves 121b to be inserted are formed, and adjacent precast concrete members are continuously connected to each other. The shear key 121a and the shear key groove 121b are continuously formed along the longitudinal direction of the coupling surface. The shear key and shear key groove may be formed along the transverse direction of the mating surface, and the shear key and shear key groove may be intermittently formed along the longitudinal or transverse direction of the mating surface.

상기 제2프리캐스트 콘크리트 부재(122)(122')의 바깥쪽면에는 외관 품질을 높이도록 상기 전단키 또는 전단키홈이 형성되어 있지 않는 것이 바람직하다(도4에 도시).It is preferable that the shear key or shear key groove is not formed on the outer surface of the second precast concrete members 122 and 122 'to improve the appearance quality (shown in FIG. 4).

그리고, 상기 제1, 제2프리캐스트 콘크리트 부재(121)(122)(122')에는 다수의 횡방향 강선 관통구멍(H1)이 형성되고, 연속적으로 연결된 프리캐스트 콘크리트 부재의 상기 횡방향 강선 관통구멍(H1)에는 프리캐스트 콘크리트 부재의 조립을 주목적으로 프리스트레스틀 발생시키는 긴장부재(123)가 삽입되어 정착구(124)에 의해 고정된다.The first and second precast concrete members 121, 122, 122 ′ are provided with a plurality of transverse steel wire through holes H1 and penetrate the transverse steel wires of the precast concrete members connected continuously. In the hole H1, a tension member 123 for pre-stressing the main assembly of the precast concrete member is inserted and fixed by the fixing unit 124.

도5에 도시한 바와 같이, 상기 강선 관통구멍에는 가이드관(125)이 삽입되고, 상기 긴장부재(123)가 상기 가이드관(125) 내부에 삽입되어 정착구(124')에 의해 고정되는 구조로 조립될 수도 있다.As shown in FIG. 5, a guide tube 125 is inserted into the steel wire through hole, and the tension member 123 is inserted into the guide tube 125 to be fixed by the fixing unit 124 '. It may be assembled.

한편, 상기 제1, 제2프리캐스트 콘크리트 부재(121)(122)(122')에는 다수의 배수 배관 또는 전기 배선용 구멍(H2)이 형성된다. 종래 교대에서는 전기 배선 또는 배수 배관 등의 유틸리티 라인이 외부에 노출되게 설치되어 있으나, 본 발명에서는 상기 구멍(H2)을 통해 교량의 내부에 전기 배선 또는 배수 배관 등의 유틸리티 라인이 설치되므로 미관이 개선된다.The first and second precast concrete members 121, 122, 122 ′ are provided with a plurality of drain pipes or holes H 2 for electrical wiring. Conventional shifts are installed so that utility lines such as electrical wiring or drainage pipes are exposed to the outside, but in the present invention, utility lines such as electrical wires or drainage pipes are installed inside the bridge through the holes H2, thereby improving aesthetics. do.

상기 프리캐스트 콘크리트 부재(121)의 상부에는 상기 거더(104)의 단부가 걸려 설치되는 걸림부(126)가 형성되고, 상기 걸림부(126)의 수평면에는 상기 거더(104)를 지지하는 교좌장치(106)가 선택적으로 설치된다.The upper part of the precast concrete member 121, the engaging portion 126 is formed is caught by the end of the girder 104 is installed, the cross-section device for supporting the girder 104 on the horizontal surface of the engaging portion 126 106 is optionally installed.

상기 프리캐스트 콘크리트 부재(121)(122)(122')는 원심성형 제작기법으로 제작된 PHC 프리캐스트 콘크리트 부재로 이루어진다.The precast concrete members 121, 122, 122 'are made of a PHC precast concrete member produced by a centrifugal molding technique.

상기 PHC (Pretentioned spun High strength Concrete) 파일은 원심력을 응용하여 만든 콘크리트 압축강도가 78.5N/㎟(800Kgf/㎠) 이상의 프리텐션 방식에 의한 고강도 말뚝으로서, 콘크리트 허용압축응력이 대단히 크므로 종래의 PC(Prestressed Concrete) 파일보다 더 큰 축방향 하중에 견딜 수 있으며, 압축강도가 800Kgf/㎠ 이상인 콘크리트로 성형한 단면에 소요의 프리스트레스(prestresss)를 균일하게 도입하여 타격 내력에 우수할 뿐만 아니라, 항타시 발생하는 반사파에 의한 인장응력을 완전히 흡수하기 때문에 균열이 없고, 종래의 PC파일로는 항타가 곤란한 중간의 단단한 층도 용이하게 관입이 이루어지기에 더욱 깊고 단단한 지층에 관입이 가능하며, 콘크리트 휨인장응력이 크므로 축력과 수평력을 동시에 받는 내진설계시 가장 적합한 파일로 많이 사용되고 있다.The PHC (Pretentioned spun High strength Concrete) file is a high-strength pile based on the pretension method of concrete compressive strength of 78.5 N / mm2 (800Kgf / ㎠) made by applying centrifugal force, and the concrete allowable compressive stress is very large. (Prestressed Concrete) It can withstand greater axial load than pile, and evenly introduces prestresses as required in the section formed of concrete with compressive strength of 800Kgf / ㎠ or more, and is excellent in impact strength. Since it completely absorbs the tensile stress caused by the reflected wave, there is no crack, and even a hard layer in the middle, which is difficult to hit with a conventional PC pile, can be easily penetrated into a deeper and harder strata. Since the stress is large, it is widely used as the most suitable pile for seismic design that receives both axial and horizontal forces.

PHC 파일을 제조하는 방법은 여러가지가 알려져 있는데, 가장 일반적인 원심성형 제조방법은, 직경 7~13mm의 PC 강봉 다수개를 축근으로 사용하여 통형태(일반적으로 원통)로 배열한 상태에서 그 축근의 주위에 보통 철선(직경 3.2mm)을 나선근으로 감아 돌려 축근과 나선근과의 접촉부를 스포트 용접하여 철근농으로 제작한 후에, 축근을 인장강도의 70%로 인장한 상태에서 콘크리트를 타설하여 철근농이 콘크리트 중에 매설되도록 한 후, 원심성형에 의해 콘크리트를 다진 후 고온고압양생(양생조건 : 오토크레이브조의 내부에 콘크리트 파일을 장입하고 기압을 10기압으로 올린 상태에서 4시간만에 180℃까지 승온시킨 후 3시간 유지, 이후에 상온까지 서냉)에 의하여 제조한다.There are many known methods for manufacturing PHC piles. The most common method for manufacturing centrifugal moldings is the use of multiple PC steel rods with a diameter of 7 to 13 mm as an axle. After winding ordinary steel wire (diameter 3.2mm) into spiral bar, spot weld the contact between shaft and spiral muscle to make reinforcing bar, and then cast concrete at 70% of tensile strength to reinforce bar After being embedded in the concrete, the concrete was chopped by centrifugal molding, and then the high temperature and high pressure curing (cure condition: charged to the inside of the autoclave tank and heated up to 180 ° C in 4 hours with the air pressure raised to 10 atm). After 3 hours, the mixture is prepared by slow cooling to room temperature).

상기 서포트 파일(112)도 상기 PHC 파일 제작 기법으로 제작된 프리캐스트 형태로 제조되어 조립되는 것이 바람직하다.The support pile 112 may also be manufactured and assembled in a precast form manufactured by the PHC pile manufacturing technique.

도7은 본 발명의 조립식 콘크리트 교대의 프리캐스트 콘크리트 부재의 다른 예를 나타내는 사시도이다. 본 실시예(도7)에서는, 제1프리캐스트 콘크리트 부재(221)의 일측면(일측 결합면)에는 전단키(221a)가 제1프리캐스트 콘크리트 부재(221)의 길이방향으로 따라 간헐적으로 배열되어 돌출 형성되고 타측면(타측 결합면)에는 상기 전단키(221a)가 삽입되는 전단키홈(221b)이 간헐적으로 배열되어 돌출 형성되어, 인접하는 프리캐스트 콘크리트 부재가 서로 연속적으로 연결된 구조로 되어 있다.7 is a perspective view showing another example of the precast concrete member of the prefabricated concrete shift of the present invention. In this embodiment (Fig. 7), the shear key 221a is intermittently arranged along the longitudinal direction of the first precast concrete member 221 on one side (one coupling surface) of the first precast concrete member 221. The front key groove 221b into which the front end key 221a is inserted is intermittently arranged and protrudingly formed on the other side surface (the other side of the mating surface), so that the adjacent precast concrete members are continuously connected to each other.

강선 관통구멍(H1), 걸림부(226), 교좌장치(206) 등은 도3 및 도5의 실시예와 동일하므로 자세한 설명은 생략한다.Since the steel wire through hole H1, the locking portion 226, the stapling device 206, and the like are the same as those in the embodiments of FIGS. 3 and 5, detailed description thereof will be omitted.

도8은 본 발명의 양측 제2프리캐스트 콘크리트 부재를 강선으로 연결한 실시예를 나타낸 사시도이다. 도시한 바와 같이 본 실시예에서는 벽체부(120)의 양측에 설치된 제2프리캐스트 콘크리트 부재(122)(122')의 플랜지를 보강용 강선(323)으로 연결하여 벽체부(120)를 보강한 상태이다. 이러한 실시예는 제2프리캐스트 콘크리트 부재(122)(122')의 플랜지 사이에 뒤채움재가 채워질 때 플랜지가 벌어지는 등의 손상을 방지한다. 도8의 나머지 구성은 도4의 실시예와 동일하므로 자세한 설명은 생략한다.Figure 8 is a perspective view showing an embodiment in which both sides of the second precast concrete member of the present invention connected by a steel wire. As shown in the present embodiment, the flanges of the second precast concrete members 122 and 122 'installed on both sides of the wall part 120 are connected to the reinforcing steel wire 323 to reinforce the wall part 120. It is a state. This embodiment prevents damage such as the flanges opening when the backfill is filled between the flanges of the second precast concrete members 122 and 122 '. Since the rest of the configuration of FIG. 8 is the same as that of the embodiment of FIG. 4, detailed description thereof will be omitted.

도9은 본 발명의 제2프리캐스트 콘크리트 부재를 보강한 실시예를 나타낸 사시도이다. 도시한 바와 같이 본 실시예는 제1프리캐스트 콘크리트 부재(421)와 제2프리캐스트 콘크리트 부재(422)(422')로 이루어지는 벽체부(420)에서 제2프리캐스트 콘크리트 부재(422)의 플랜지 하측이 연장되어, 제2프리캐스트 콘크리트 부재(422)(422')의 플랜지 하측이 기초부(410)의 삽입홈(411)에 끼워져 벽체부(420)가 보강되는 구조이다. 서포트 파일(412)을 비롯한 나머지 구성은 도3의 실시예와 동일하므로 자세한 설명은 생략한다.9 is a perspective view showing an embodiment in which the second precast concrete member of the present invention is reinforced. As shown, the present embodiment is a flange of the second precast concrete member 422 in the wall portion 420 consisting of the first precast concrete member 421 and the second precast concrete members 422 and 422 '. The lower side extends, and the lower side of the flange of the second precast concrete members 422 and 422 ′ is fitted into the insertion groove 411 of the base 410 to reinforce the wall 420. Since the rest of the configuration including the support file 412 is the same as the embodiment of FIG. 3, detailed description thereof will be omitted.

도10의 (a)와 (b) 및 (c)는 종방향 강선 관통구멍이 추가로 형성된 본 발명의 프리캐스트 콘크리트 부재를 나타내는 평면도, 입면도 및 좌측면도이다. 도시한 바와 같이 본 실시예의 제1프리캐스트 콘크리트 부재(521)에는 다수의 횡방향 강선 관통구멍(H1)외에 다수의 종방향 강선 관통구멍(H3)이 형성되어, 상기 관통구멍(H3)에 설치되는 긴장부재(도시안됨)에 의해 제1프리캐스트 콘크리트 부재(521)에 프리스트레스를 발생시키게 되어 있다. 즉, 상기 종방향 강선 관통구멍(H3)에는 상기 벽체부의 배면 토압을 지지하기 위해 프리스트레스를 발생시키는 긴장부재가 삽입되어 설치된다.10A, 10B, and 10C are a plan view, an elevation view, and a left side view showing a precast concrete member of the present invention in which a longitudinal steel wire through hole is further formed. As shown in the drawing, the first precast concrete member 521 is provided with a plurality of longitudinal steel wire through holes H3 in addition to a plurality of horizontal steel wire through holes H1, and is installed in the through holes H3. Prestress is generated in the first precast concrete member 521 by the tension member (not shown). That is, the longitudinal steel wire through hole (H3) is provided with a tension member for generating a prestress to support the back earth pressure of the wall portion.

한편 제2프리캐스트 콘크리트 부재에도 긴장부재를 설치하는 종방향 강선 관통구멍(H3)이 형성될 수 있음은 물론이다.On the other hand, the longitudinal steel wire through-hole (H3) for installing the tension member in the second precast concrete member may be formed, of course.

도11의 (a) 및 (b)는 도10의 종방향 강선 관통구멍에 설치되는 강선부재의 작용상태도이다. 도11의 (a)에 표시한 바와 같이 종방향 강선 관통구멍에 설치된 긴장부재를 긴장하면 프리캐스트 콘크리트부재(521)의 뒷면의 뒤채움 측 토압에 저항하는 저항력(도11의 (b)에 표시)이 발생하므로 흙막이 지지 기능을 기대할 수 있다.11 (a) and 11 (b) are operation state diagrams of the steel wire member provided in the longitudinal steel wire through hole of FIG. As shown in Fig. 11 (a), when the tension member provided in the longitudinal steel wire through hole is tensioned, a resistance force that resists the backfill side earth pressure on the back surface of the precast concrete member 521 (as shown in Fig. 11 (b)). ) Can be expected because of the support function.

한편, 본 발명은 도12에 도시한 바와 같이 전단키(721a) 및 전단키홈(721b)이 쐐기형으로 형성된 프리캐스트 콘크리트부재(721)로 이루어지거나, 도13에 도시한 바와 같이 전단키(821a) 및 전단키홈(821b)가 고리형으로 형성된 프리캐스트 콘크리트부재(821)로 이루어질 수도 있다.Meanwhile, the present invention is made of a precast concrete member 721 having a shear key 721a and a shear key groove 721b formed in a wedge shape as shown in FIG. 12, or as shown in FIG. 13, a shear key 821a and a shear key 721a. The shear key groove 821b may be made of a precast concrete member 821 formed in an annular shape.

그리고, 본 발명의 프리캐스트 콘크리트 부재에는 무게를 경감하도록 다수의 중공부(관통구멍 또는 홈)가 형성되어 있을 수도 있다.The precast concrete member of the present invention may be provided with a plurality of hollow portions (through holes or grooves) to reduce the weight.

본 발명에 의한 프리캐스트 콘크리트 부재 및 이를 이용한 조립식 콘크리트 교대에 의하면, 프리캐스트 콘크리트 부재를 원심성형 제작 기법을 이용하여 제작하므로 대량으로 고품질의 부재를 제작할 수 있고, 프리캐스트 콘크리트 부재를 부착하기 위한 몰타르 작업과 콘크리트를 현장 타설하는 작업이 없이 부재 간의 조립(건식 접합)만으로 교좌장치가 설치가능하므로 공사기간 단축효과가 우수하며, 벽체부에는 긴장부재에 의해 추가로 프리스트레스를 발생시키므로 기초부와 벽체부가 조립된 후에 흙이 성토되는 동안에 벽체부가 전도될 우려가 없으며, 벽체부의 좌우 측에는 플랜지를 가진 프리캐스트 콘크리트 부재가 조립되므로 조립작업이 용이하고 신속한 시공이 가능하며, 벽체부에는 배수 배관 또는 전기 배선용 구멍이 형성되므로 유틸리티 라인의 설치가 용이한 효과가 있다.
According to the precast concrete member according to the present invention and prefabricated concrete shift using the same, since the precast concrete member is manufactured using a centrifugal molding method, it is possible to manufacture a high quality member in large quantities, and to apply the mortar for attaching the precast concrete member. It is possible to install the device by only assembling (dry joining) the members without the work and placing the concrete on site, so the effect of shortening the construction period is excellent, and the pre-stress is generated by the tension member on the wall part. There is no fear that the wall part will fall during the soil filling after assembly. Since precast concrete members with flanges are assembled on the left and right sides of the wall part, the assembly work is easy and quick construction is possible. It forms so utilities It is easy to install the tee line.

본 발명은 도면에 도시된 실시예를 참고로 설명되었으나 이는 예시적인 것에 불과하며, 본 기술 분야의 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 다른 실시예가 가능함은 물론이고, 본 발명의 기술적 보호 범위는 첨부된 특허 청구범위의 기술적 사상에 의하여 정해져야 할 것이다.
While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is evident that many alternatives, modifications and variations will be apparent to those skilled in the art. The scope of the technical protection shall be determined by the technical idea of the appended claims.

100 : 교대 102 : 교각
104 : 거더 106, 206 : 교좌장치
110 : 기초부 111 : 삽입홈
112 : 서포트 파일 120 : 벽체부
121, 221 : 제1프리캐스트 콘크리트 부재
121a, 221a : 전단키 121b, 221b : 전단키홈
122, 122' : 제2프리캐스트 콘크리트 부재
122a, 122'a : 몸체 122b, 122'b : 플랜지
123 : 긴장부재 124, 124' : 정착구
125 : 가이드관 126, 226 : 걸림부
H1 : 횡방향 강선 관통구멍 H2 : 배관 또는 배선용 구멍
H3 : 종방향 강선 관통구멍
100: shift 102: pier
104: girders 106, 206: stapling device
110: foundation 111: insertion groove
112: support file 120: wall portion
121, 221: first precast concrete member
121a, 221a: Shear Key 121b, 221b: Shear Key Groove
122, 122 ': second precast concrete member
122a, 122'a: body 122b, 122'b: flange
123: tension member 124, 124 ': anchorage
125: guide tube 126, 226: locking portion
H1: Transverse steel wire through hole H2: Pipe or wiring hole
H3: Longitudinal steel wire through hole

Claims (13)

원심성형 제작기법으로 제작되되,
서로 연속적으로 연결되도록 상호 대향하는 한쌍의 결합면이 구비되며, 어느 한 결합면에는 전단키가 돌출되고, 다른 한 결합면에는 상기 전단키가 삽입되는 전단키홈이 형성된 것을 특징으로 하는 프리캐스트 콘크리트 부재.
It is manufactured by centrifugal molding technique,
A pair of coupling surfaces facing each other are provided so as to be continuously connected to each other, one of the coupling surface is a precast concrete member, characterized in that the shear key is protruded, the other coupling surface is formed with a shear key groove into which the shear key is inserted.
청구항 1에 있어서,
상기 전단키와 상기 전단키홈은 상기 결합면의 종방향 또는 횡방향을 따라 연속되게 형성된 것을 특징으로 하는 프리캐스트 콘크리트 부재.
The method according to claim 1,
The shear key and the shear key groove is a precast concrete member, characterized in that formed continuously along the longitudinal or transverse direction of the coupling surface.
청구항 1에 있어서,
상기 전단키와 상기 전단키홈은 상기 결합면의 종방향 또는 횡방향을 따라 간헐적으로 형성된 것을 특징으로 하는 프리캐스트 콘크리트 부재.
The method according to claim 1,
The shear key and the shear key groove is precast concrete member, characterized in that formed intermittently along the longitudinal or transverse direction of the coupling surface.
기초부와 벽체부를 포함하여 이루어지되,
상기 기초부의 상면에는 상기 벽체부가 끼워져 조립되는 삽입홈이 형성되고, 상기 벽체부는 상기 삽입홈을 따라 끼워 맞추어져 연속적으로 연결되어 상기 기초부에 조립되는 다수의 프리캐스트 콘크리트 부재로 형성되고,
상기 프리캐스트 콘크리브 부재는 서로 연속적으로 연결되도록 상호 대향하는 한쌍의 결합면을 구비하며, 어느 한 결합면에는 전단키가 돌출되고, 다른 한 결합면에는 상기 전단키가 삽입되는 전단키홈이 형성된 것을 특징으로 조립식 콘크리트 교대.
Including the foundation and the wall,
Insertion grooves are formed on the upper surface of the base portion is inserted into the wall is assembled, the wall portion is formed of a plurality of precast concrete member is fitted along the insertion groove and connected continuously to be assembled to the foundation,
The precast concrete member has a pair of coupling surfaces facing each other so as to be continuously connected to each other, one of the coupling surface is characterized in that the shear key is protruded, the other coupling surface is formed with a shear key groove is inserted into the shear key Prefabricated concrete shift.
청구항 4에 있어서,
상기 벽체부의 처음 프리캐스트 콘크리트 부재와 마지막 프리캐스트 콘크리트 부재는 성토부를 지지하는 플랜지가 달린 프리캐스트 콘크리트 부재인 것을 특징으로 하는 조립식 콘크리트 교대.
The method of claim 4,
And the first precast concrete member and the last precast concrete member of the wall portion are precast concrete members with flanges supporting the fill portion.
청구항 5에 있어서,
상기 처음 프리캐스트 콘크리트 부재와 마지막 프리캐스트 콘크리트 부재의 플랜지는 서로 보강용 강선에 의해 연결되어 있는 것을 특징으로 하는 조립식 콘크리트 교대.
The method according to claim 5,
And the flanges of the first precast concrete member and the last precast concrete member are connected to each other by reinforcing steel wires.
청구항 5에 있어서,
상기 처음 프리캐스트 콘크리트 부재와 마지막 프리캐스트 콘크리트 부재의 플랜지는 하측이 연장되고, 상기 기초부에는 삽입홈이 형성되어,
상기 플랜지의 연장부가 상기 삽입홈에 끼워져 있는 것을 특징으로 하는 조립식 콘크리트 교대.
The method according to claim 5,
The flange of the first precast concrete member and the last precast concrete member is extended to the lower side, the base portion is formed with an insertion groove,
Prefabricated concrete shifts characterized in that the extension of the flange is fitted in the insertion groove.
청구항 4에 있어서,
상기 프리캐스트 콘크리트 부재에는 다수의 관통구멍이 형성되고, 연속적으로 연결된 상기 프리캐스트 콘크리트 부재의 관통구멍에는 프리스트레스를 발생시키는 긴장부재가 삽입되어 설치된 것을 특징으로 하는 조립식 콘크리트 교대.
The method of claim 4,
And a plurality of through holes are formed in the precast concrete member, and a tension member for generating prestress is inserted into the through holes of the precast concrete member connected continuously.
청구항 8에 있어서,
상기 관통구멍은 횡방향 강선 관통구멍과 종방향 강선 관통구멍을 포함하고,
상기 횡방향 강선 관통구멍에는 프리캐스트 콘크리트 부재의 조립을 주목적으로 프리스트레스를 발생시키는 긴장부재가 삽입되어 설치된 것을 특징으로 하는 조립식 콘크리트 교대.
The method according to claim 8,
The through hole includes a transverse steel wire through hole and a longitudinal steel wire through hole,
Prefabricated concrete shifts, characterized in that the transverse steel wire through-hole is provided with a tension member for generating prestress mainly for the assembly of the precast concrete member.
청구항 8에 있어서,
상기 관통구멍은 횡방향 강선 관통구멍과 종방향 강선 관통구멍을 포함하고,
상기 종방향 강선 관통구멍에는 상기 벽체부의 배면 토압을 지지하기 위해 프리스트레스를 발생시키는 긴장부재가 삽입되어 설치된 것을 특징으로 하는 조립식 콘크리트 교대.
The method according to claim 8,
The through hole includes a transverse steel wire through hole and a longitudinal steel wire through hole,
Prefabricated concrete shifts characterized in that the longitudinal steel wire through-hole is provided with a tension member for generating a prestress to support the back earth pressure of the wall portion.
청구항 4에 있어서,
상기 프리캐스트 콘크리트 부재에는 배수 배관 또는 전기 배선용 구멍이 형성된 것을 특징으로 하는 조립식 콘크리트 교대.
The method of claim 4,
The precast concrete member is a prefabricated concrete shift, characterized in that the hole for drainage piping or electrical wiring is formed.
청구항 4에 있어서,
상기 기초부의 하부에는 지반층에 매설되어 상기 기초부를 지지하는 다수의 서포트 파일이 연결된 것을 특징으로 하는 조립식 콘크리트 교대.
The method of claim 4,
Prefabricated concrete shifts, characterized in that the lower portion of the foundation is embedded in the ground layer is connected to a plurality of support piles for supporting the foundation.
청구항 4에 있어서,
상기 프리캐스트 콘크리트 부재의 상부에는 거더가 걸리는 걸림부가 형성되고,
상기 걸림부에는 거더를 지지하는 교좌장치가 설치되는 것을 특징으로 하는 조립식 콘크리트 교대.
The method of claim 4,
The upper part of the precast concrete member is formed with a latching portion is caught,
Prefabricated concrete shift, characterized in that the locking unit is installed on the engaging portion supporting the girder.
KR1020100096001A 2010-10-01 2010-10-01 precast concrete member and assembled concrete abutment of bridge KR101204040B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020100096001A KR101204040B1 (en) 2010-10-01 2010-10-01 precast concrete member and assembled concrete abutment of bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100096001A KR101204040B1 (en) 2010-10-01 2010-10-01 precast concrete member and assembled concrete abutment of bridge

Publications (2)

Publication Number Publication Date
KR20120034441A true KR20120034441A (en) 2012-04-12
KR101204040B1 KR101204040B1 (en) 2012-11-23

Family

ID=46136814

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100096001A KR101204040B1 (en) 2010-10-01 2010-10-01 precast concrete member and assembled concrete abutment of bridge

Country Status (1)

Country Link
KR (1) KR101204040B1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102142633B1 (en) * 2019-09-27 2020-08-07 주식회사 길교이앤씨 Accelerated construction method of integral abutment bridge and chambered precast segment wall applied to the same
CN111764302A (en) * 2019-04-02 2020-10-13 中铁十八局集团第五工程有限公司 Concrete pouring construction method under large-diameter flat hinge of swivel bridge
CN111827097A (en) * 2020-07-06 2020-10-27 上海崇明水利工程有限公司 Concatenation formula reinforced concrete bridge abutment structure
KR102181805B1 (en) * 2019-10-21 2020-11-24 (주)지승씨앤아이 Precast concrete abutment/pier block unit for jointless bridge and Construction method of jointless bridge using thereof
CN112431126A (en) * 2020-11-18 2021-03-02 上海市基础工程集团有限公司 Integral structure of built-in drainage system of prefabricated part

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101521084B1 (en) * 2014-10-22 2015-05-19 에스지신성건설 주식회사 Precast type integral abutment bridge
KR102316098B1 (en) * 2021-04-13 2021-10-22 주식회사 누리플랜 An abutment structure using and reinforced concrete construction method precast concrete block
KR102316106B1 (en) * 2021-04-13 2021-10-22 주식회사 누리플랜 A bridge structure using precast concrete block

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57151723A (en) 1981-03-10 1982-09-18 Koichi Honma Concrete sheet pile and its driving
KR100760681B1 (en) 2006-05-22 2007-09-28 (주)대우건설 Precast concrete barrier and barrier system of bridge
KR100971199B1 (en) * 2009-11-13 2010-07-20 (주)서현컨스텍 Precast box structure construction method using anchor and nut

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764302A (en) * 2019-04-02 2020-10-13 中铁十八局集团第五工程有限公司 Concrete pouring construction method under large-diameter flat hinge of swivel bridge
KR102142633B1 (en) * 2019-09-27 2020-08-07 주식회사 길교이앤씨 Accelerated construction method of integral abutment bridge and chambered precast segment wall applied to the same
KR102181805B1 (en) * 2019-10-21 2020-11-24 (주)지승씨앤아이 Precast concrete abutment/pier block unit for jointless bridge and Construction method of jointless bridge using thereof
CN111827097A (en) * 2020-07-06 2020-10-27 上海崇明水利工程有限公司 Concatenation formula reinforced concrete bridge abutment structure
CN111827097B (en) * 2020-07-06 2022-04-05 上海崇明水利工程有限公司 Concatenation formula reinforced concrete bridge abutment structure
CN112431126A (en) * 2020-11-18 2021-03-02 上海市基础工程集团有限公司 Integral structure of built-in drainage system of prefabricated part

Also Published As

Publication number Publication date
KR101204040B1 (en) 2012-11-23

Similar Documents

Publication Publication Date Title
KR101204040B1 (en) precast concrete member and assembled concrete abutment of bridge
KR100713692B1 (en) A prestresed connection set bridge post using unit filled concrete with internally confined hollow and a method for construction
JP2017534008A (en) Assembling-type reinforced concrete pier column member
JP5955108B2 (en) Pile reinforcement structure of existing building and its construction method
KR20110103000A (en) Precast bridge joint structure with composite hollow concrete filled tube and a construction method for the same
JP5023219B2 (en) Precast temporary structure and construction method thereof
JP7175725B2 (en) Reinforcing structure of masonry building
KR101478131B1 (en) Construction Method of Precast Pier
KR101328045B1 (en) Reinforced concrete composite columns using precast high-performance fiber-reinforced cement
EP2250323A2 (en) Masonry with vertical reinforced concrete strengthening
KR101507924B1 (en) Structure and method of constructing concrete footing structure of top structure
KR101670553B1 (en) Seismic reinforcement using precast concrete wall outside of building
CN111894045A (en) Anti-floating anchoring structure and anti-floating anchoring construction method for basement bottom plate
CN110578287A (en) assembled earth covering corrugated steel plate-prestressed concrete combined arch bridge and construction method thereof
KR20150102569A (en) The noise barrier foundation and its construction method
JP4017766B2 (en) Hollow cylindrical body and its construction method
KR102486675B1 (en) Precast concrete slab construction method and bridge fabricated by usinr the same
KR20120122024A (en) Uniting Method of Temporary earth wall with basement exterior Wall using Couplers and Bolts.
KR20120025945A (en) Reinforcement assembly of concrete file and building foundation
KR20090083586A (en) Reinforcement for reinforced concrete footing and construction method using the same
JP5860723B2 (en) Floor slab bridge using square steel pipe and its construction method.
JP2017206844A (en) Earthquake resistant wall structure
IT202000016588A1 (en) SYSTEM AND METHOD OF FOUNDATION WITH SEISMIC ISOLATION OF BUILDINGS
JP3963326B2 (en) Seismic reinforcement structure for bridge pier and its construction method
JP3138317U (en) Building

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20161004

Year of fee payment: 5

LAPS Lapse due to unpaid annual fee