KR20110092103A - Sidewalk block capable of storing water and planting - Google Patents
Sidewalk block capable of storing water and planting Download PDFInfo
- Publication number
- KR20110092103A KR20110092103A KR1020100011573A KR20100011573A KR20110092103A KR 20110092103 A KR20110092103 A KR 20110092103A KR 1020100011573 A KR1020100011573 A KR 1020100011573A KR 20100011573 A KR20100011573 A KR 20100011573A KR 20110092103 A KR20110092103 A KR 20110092103A
- Authority
- KR
- South Korea
- Prior art keywords
- hot water
- main body
- sidewalk block
- freshwater
- rainwater
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/24—Methods or arrangements for preventing slipperiness or protecting against influences of the weather
- E01C11/245—Methods or arrangements for preventing slipperiness or protecting against influences of the weather for preventing ice formation or for loosening ice, e.g. special additives to the paving material, resilient coatings
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/24—Methods or arrangements for preventing slipperiness or protecting against influences of the weather
- E01C11/26—Permanently installed heating or blowing devices ; Mounting thereof
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C15/00—Pavings specially adapted for footpaths, sidewalks or cycle tracks
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01H—STREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; DISPERSING OR PREVENTING FOG IN GENERAL CLEANING STREET OR RAILWAY FURNITURE OR TUNNEL WALLS
- E01H5/00—Removing snow or ice from roads or like surfaces; Grading or roughening snow or ice
- E01H5/10—Removing snow or ice from roads or like surfaces; Grading or roughening snow or ice by application of heat for melting snow or ice, whether cleared or not, combined or not with clearing or removing mud or water, e.g. burners for melting in situ, heated clearing instruments; Cleaning snow by blowing or suction only
- E01H5/102—Self-contained devices for melting dislodged snow or ice, e.g. built-in melting chambers, movable melting tanks
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C2201/00—Paving elements
- E01C2201/20—Drainage details
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
The present invention is separated and coupled to the main body and the cover, and provided with a plurality of storage compartments for storing rainwater inside the main body, the storage compartments are communicated with each other through a connection hole through the partition wall, rain water on the upper surface of the cover A plurality of rainwater inlet hole is formed to be introduced, the freshwater sidewalk block is configured to form a plurality of rainwater drainage holes so that the rain water is discharged on the bottom surface of the main body, the hot water pipes on the left and right sides and the front and rear sides of the main body, respectively, in the horizontal and vertical directions The first and second pipe hook grooves are formed to be installed in the direction, but the hot water pipes installed to cross by the first and second pipe hook grooves are different from each other by the positions of the first and second pipe hook grooves. To provide a freshwater sidewalk block having a hot water pipe, characterized in that configured, the present invention is a hot water pipe inside the body of the freshwater sidewalk block First and second pipe hook grooves are formed on the left and right sides and the front and rear sides of the main body so as to cross each other, and when the weather or snow falls in winter, the hot water is supplied to the hot water pipe to prevent the rainwater stored in the freshwater sidewalk block from freezing. In addition, since the snow accumulated on the upper surface of the freshwater sidewalk block is melted by hot water pipes, it is possible to prevent pedestrians from falling and injuring them on the snow road, and the rain water does not freeze even in sub-zero weather, so that the continuous discharge of the infiltration water is very useful. It is an invention.
Description
The present invention relates to a freshwater sidewalk block having a hot water pipe, and more particularly, to supply hot water to a hot water pipe installed to intersect in the freshwater sidewalk block to prevent freezing rainwater stored in the freshwater sidewalk block in subzero weather. In addition, since the snow is melted by the hot water pipe when the snow is accumulated on the upper surface of the fresh water sidewalk block relates to a fresh water sidewalk block having a hot water pipe to prevent the pedestrian falls over the snow.
In general, a number of sidewalk blocks of the same shape are continuously installed on the side of the side of the road, on the side of the road where people pass frequently, on large plazas, parks, etc. so that pedestrians can pass comfortably. Therefore, the road surface is prevented from being lost to provide a pleasant road environment.
Most of these sidewalk blocks are concrete structures having a certain thickness and size, and have a predetermined shape. The sidewalk blocks are assembled and constructed in a continuous form on the road surface where the flat work is completed.
The construction of the sidewalk block is completed in this way, a predetermined gap is generated between them. In rainy weather, a very small amount of rainwater is submerged into the underlying soil through the gap of the block, and most rainwater is not flooded. It flows along the surface and drains through the sewer.
However, the sidewalk block has a problem that the flooding area occurs frequently in the case where the drainage is vulnerable because the rainwater is not immersed through the ground below the block and concentrated to the sewer.
In particular, in the rainy season where heavy rains are expected, there is a need for countermeasures in the rainy season, such as flood damage, and the countermeasures are urgently needed. There was a problem that causes the groundwater to be exhausted.
Moreover, since the sidewalk blocks are mostly made of concrete composition, there are various inconveniences such as being impossible to recycle or not easy to maintain in case of breakage, and improving the environment of the road because they are provided in very general shapes and colors. There was a problem uncomfortable.
In addition, since the ground paved with the sidewalk block is almost blocked the flow of water and air, there is a problem that causes the imbalance of the ecosystem because it inhibits the growth of microorganisms inhabit the soil.
Therefore, in the related art, in order to solve the above problems, as shown in [FIG. 1] to [FIG. 2], in the sidewalk block installed in a continuous form on the floor of a roadside or a square, a park, etc., The
However, the conventional freshwater sidewalk block has a problem in that rainwater freezes in the storage compartment inside the main body in subzero weather and thus does not function properly as a penetration channel, and the winter snow falls and the cover of the sidewalk block When stacked on the upper surface, the snow accumulated on the upper surface of the cover is frozen as it is, there is a problem that pedestrians fall down and hurt.
Therefore, the present invention is to solve the above problems, the present invention is separated and coupled to the main body and the cover, a plurality of storage compartments for storing rain water is provided in the body, the storage compartment is connected through the partition wall In the freshwater sidewalk block is in communication with each other, a plurality of rainwater inlet hole is formed so that rainwater flows into the upper surface of the cover, and a plurality of rainwater drainage hole is formed so that rainwater is discharged on the bottom of the body, The first and second pipe hook grooves are formed on the left and right sides and the front and rear sides, respectively, to install the hot water pipes in the horizontal and vertical directions, respectively. Providing a fresh water sidewalk block having a hot water pipe, characterized in that configured so as to vary the position of the first and second pipe hook groove. Its purpose is to.
As such, the present invention forms the first and second pipe hook grooves on the left and right sides and the front and rear sides of the main body so that the hot water pipes intersect the inside of the main body of the freshwater sidewalk block, and when the weather or snow falls below zero in winter, the hot water in the hot water pipes By supplying the not only prevents the rainwater stored in the freshwater sidewalk block freezing and the snow accumulated on the upper surface of the freshwater sidewalk block is melted by the hot water pipes to prevent the pedestrian fall over the snow road and injured even in sub-zero weather. Since it is not frozen, it is a very useful invention that facilitates the continuous discharge of the infiltrated water.
1-exploded perspective view of a conventional freshwater sidewalk block.
Figure 2-a perspective view showing a conventional fresh water board block.
3 is an exploded perspective view showing a fresh water sidewalk block according to the present invention.
4-3 is a perspective view showing the combined state of FIG.
5 to 6-reference diagram showing a process in which the hot water pipe is installed in the freshwater walkway block of the present invention.
Hereinafter, the present invention for achieving the above object in more detail.
Fresh
The first
Of course, in order to position the hot water pipe (A) in the
The second
As such, the hot water pipe (A) by the first and second pipe hook grooves (130, 140), as shown in Figure 5, in the horizontal direction in the lower portion of the
At this time, the crossed hot water pipe (A) is installed at a predetermined interval apart, because when the hot water pipe (A) is installed in contact with each other, the hot water pipe located in the lower portion may be damaged by the load of the hot water pipe located in the upper portion. to be.
That is, by configuring the height of the hot water pipe (A) by varying the positions of the first and second pipe hook grooves (130, 140), the hot water pipe (A) installed to intersect the upper and lower parts can be maintained at a predetermined interval.
As described above, the present invention has been described by means of a limited embodiment, but the present invention is not limited thereto and is intended by the person skilled in the art to which the present invention pertains to the technical spirit of the present invention and the claims to be described below. Various modifications and variations are possible within the scope of equivalents.
* Description of the symbols for the main parts of the drawings *
100: present invention freshwater sidewalk block
110: main body 111: storage room
112:
120:
130: first pipe hook groove 140: second pipe hook groove
131, 141: pipe hook groove A: hot water pipe
Claims (1)
The first and second pipe hook grooves 130 and 140 are provided on the left and right sides and the front and rear sides of the main body 110 to respectively install the hot water pipes A in the horizontal and vertical directions, respectively. Hot water pipe (A) installed to cross by the grooves (130,140) is a fresh water sidewalk block having a hot water pipe, characterized in that configured by changing the position of the first and second pipe hook groove (130,140) so as to be spaced a predetermined interval.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020100011573A KR20110092103A (en) | 2010-02-08 | 2010-02-08 | Sidewalk block capable of storing water and planting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020100011573A KR20110092103A (en) | 2010-02-08 | 2010-02-08 | Sidewalk block capable of storing water and planting |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20110092103A true KR20110092103A (en) | 2011-08-17 |
Family
ID=44929099
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020100011573A KR20110092103A (en) | 2010-02-08 | 2010-02-08 | Sidewalk block capable of storing water and planting |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20110092103A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103590311A (en) * | 2012-08-16 | 2014-02-19 | *** | Cushion-layer-free permeable ecological grassing terrace forming die |
GB2540731A (en) * | 2015-05-12 | 2017-02-01 | Dura Composites Ltd | Station platform floor panel |
CN111705592A (en) * | 2020-06-25 | 2020-09-25 | 徐纯 | Water storage blind road brick for municipal construction |
-
2010
- 2010-02-08 KR KR1020100011573A patent/KR20110092103A/en active Search and Examination
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103590311A (en) * | 2012-08-16 | 2014-02-19 | *** | Cushion-layer-free permeable ecological grassing terrace forming die |
GB2540731A (en) * | 2015-05-12 | 2017-02-01 | Dura Composites Ltd | Station platform floor panel |
CN111705592A (en) * | 2020-06-25 | 2020-09-25 | 徐纯 | Water storage blind road brick for municipal construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4918686B2 (en) | Road surface cooling road structure | |
KR100435535B1 (en) | Block that have water save function | |
KR100822057B1 (en) | Cover protecting roadside tree of type keeping water | |
KR100868986B1 (en) | Sidewalk block that have function keeping water | |
KR20110092103A (en) | Sidewalk block capable of storing water and planting | |
JP4648129B2 (en) | Road surface cooling road structure | |
KR200358588Y1 (en) | Water keeping type sidewalk-block | |
KR101325787B1 (en) | Footpath block by sapareted and combined free | |
KR101206269B1 (en) | Rainwater management system integrated with water-storage | |
KR101190418B1 (en) | A sidewalk block assembly for en able to rain-watwe utilization | |
KR101418040B1 (en) | Variable rain storage tank | |
KR20140001756U (en) | A permeable block and a rainwater pipe permeable structure | |
KR101082063B1 (en) | Canal block | |
KR101230730B1 (en) | Ecology block based vegetation and construction method thereof | |
KR20080073633A (en) | Interspace block of a water permeability | |
JP2016079603A (en) | Rainwater storage tank | |
KR20100030528A (en) | Eco-friendly block of retaining wall | |
KR100672232B1 (en) | Environmental friendly medial divider for road of new town | |
CN211745563U (en) | Be used for circuitous shape formula environmental protection greenbelt that caves in both sides of road | |
CN212103524U (en) | Concrete permeable pavement brick | |
KR100895289B1 (en) | Fish Block | |
KR100718206B1 (en) | Permeable sidewalk block with non-slip protrusion | |
KR200370304Y1 (en) | Permeable Sidewalk Block with Non-slip Protrusion | |
JP5103575B1 (en) | Tile laying structure | |
KR100579758B1 (en) | A drain-plate having a storing function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E601 | Decision to refuse application | ||
AMND | Amendment |