KR20110014363A - Free bolt tie for construction work - Google Patents
Free bolt tie for construction work Download PDFInfo
- Publication number
- KR20110014363A KR20110014363A KR1020090071990A KR20090071990A KR20110014363A KR 20110014363 A KR20110014363 A KR 20110014363A KR 1020090071990 A KR1020090071990 A KR 1020090071990A KR 20090071990 A KR20090071990 A KR 20090071990A KR 20110014363 A KR20110014363 A KR 20110014363A
- Authority
- KR
- South Korea
- Prior art keywords
- tie
- bolt
- flat
- male
- construction
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/06—Tying means; Spacers ; Devices for extracting or inserting wall ties
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/06—Tying means; Spacers ; Devices for extracting or inserting wall ties
- E04G17/065—Tying means, the tensional elements of which are threaded to enable their fastening or tensioning
- E04G17/0651—One-piece elements
- E04G17/0654—One-piece elements remaining completely or partially embedded in the cast material
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/06—Tying means; Spacers ; Devices for extracting or inserting wall ties
- E04G17/07—Tying means, the tensional elements of which are fastened or tensioned by means of wedge-shaped members
- E04G17/0707—One-piece elements
- E04G17/0721—One-piece elements remaining completely or partially embedded in the cast material
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/06—Tying means; Spacers ; Devices for extracting or inserting wall ties
- E04G17/075—Tying means, the tensional elements of which are fastened or tensioned by other means
- E04G17/0751—One-piece elements
- E04G17/0754—One-piece elements remaining completely or partially embedded in the cast material
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The present invention relates to a free bolt tie for construction work, the other side of the fixed portion is connected to the male flat tie formed with a bolt portion formed on the outer peripheral surface; And a female flat tie formed with a nut tube formed on an inner circumferential surface of the male flat thread so as to be screwed to the bolt portion of the male flat tie. By adjusting the length by the forward and reverse rotation of the arm flat ties, the pipe is screwed, it is possible to immediately respond in the field of fixing the formwork for forming the frame of the concrete structure there is no delay of construction, Made of only one type, the production cost is reduced, and after use, the free bolt tie can be applied to any construction site.
Description
The present invention relates to a pre-bolt tie for construction workers, and in detail, the length of the bolt tie for fixing between the formwork used as a frame for forming the reinforcement or H-beam concrete structure or between the formwork and the H-beam freely adjusted It's about bolt tie.
In general, a reinforcement or H-beam concrete structure such as a column is formed in the
However, since the
Therefore, if a large number of bolt ties of a certain length are manufactured according to the site conditions, the cost increases due to the delay of construction and the additional expenditure of the custom-made costs, and the recycling of the customized bolt ties is made. There is a problem with the back.
In addition, the conventional bolt tie is usually composed of a complex configuration, such as the bolt body and the spacing, Sepha bolt and cone nut, and the shape is also complicated, the production cost is not formidable, various conventional bolt tie proposed to improve this The composition and structure do not escape.
The present invention has been made to improve the above-mentioned problems, the object is a simple structure in which the male flat ties such as bolts and female flat ties such as nut pipes are screwed together, the male flat ties and screwed The arm flat ties move from side to side on the male flat ties by the forward and reverse rotation of the arm flat ties so that the overall length is freely changed, thereby forming a frame for the thickness of the concrete structure of any shape having various dimensions. Another object of the present invention is to provide a pre-bolt tie for a construction engineer who can fix the mold between the mold or the H beam according to the changed length between the mold and the H beam.
In order to achieve the above object, the construction worker's free bolt tie of the present invention includes: a male flat tie formed with a bolt formed on the outer circumferential surface of one side of the fixing part; And a female flat tie formed with a nut tube formed on an inner circumferential surface of the male flat thread so as to be screwed to the bolt portion of the male flat tie. It is characterized in that the length is adjusted by the forward and reverse rotation of the arm flat tie screwed tube.
In addition, the fixing portion of the male flat tie is formed with a first pin hole is inserted into the end of the wedge pin and the second cutting grooves facing each other for cutting side by side, the fixing portion of the female flat tie is flat iron end It is preferable that the second pinhole into which the wedge pin is inserted into the portion and the second cutting groove facing each other for cutting are formed side by side.
In addition, the fixing portion of the male flat tie is made of flat iron, and the third pin hole in which the wedge pin is inserted at the end and the third cutting grooves facing each other for cutting are formed side by side, the female flat tie is the be-shaped A-shaped bent portion It is desirable to form a female flat tie.
According to the construction of the pre-bolt tie of the present invention, the length is freely adjusted so that by using the pre-bolt tie according to the length according to the distance between the formwork for forming the reinforcement or H-beam concrete structure or the distance between the formwork and the H-beam In addition, there is no delay in construction due to immediate response at the site, and the production cost is reduced by only one form, and the free bolt tie after use can be recycled and used at any construction site.
In addition, the simple structure of the male flat tie and female flat tie and a simple structure that is only screwed together, there is an effect that is easy to manufacture and easy to use.
Hereinafter, with reference to the accompanying drawings a preferred embodiment of a construction bolt for construction work in accordance with the present invention will be described in detail. The present invention is not limited to the embodiments disclosed below, but can be implemented in various different forms, only this embodiment to complete the disclosure of the present invention and to those skilled in the art to fully understand the scope of the invention It is provided to inform you.
1 is a perspective view of a combination of construction bolts for construction work in accordance with an embodiment of the present invention, Figure 2 is a longitudinal cross-sectional view of FIG.
As shown in Figure 1 and 2, the construction work pre-bolt tie according to an embodiment of the present invention is a pre-bolt tie used in reinforced concrete structure consists of a male flat tie (1) and an arm flat tie (2) .
One side of the male flat tie (1) is made of flat iron is inserted into the wedge pin (9) of Figure 5 at the end is formed a first pin hole (30) is fixed to the formwork and a predetermined distance from the first pin hole (30) The
One side of the female flat tie (2) is made of flat iron is inserted into the wedge pin (9) of Figure 5 at the end is formed a
Accordingly, when the female
3 is a perspective view of the combination of construction bolts for construction work in accordance with another embodiment of the present invention, Figure 4 shows a longitudinal cross-sectional view of FIG.
As shown in Figure 3 and 4, the construction work pre-bolt tie according to another embodiment of the present invention is a pre-bolt tie used in the H-
One side of the male
One side of the L-shaped arm
Accordingly, the L-shaped female
Figure 5 shows a longitudinal cross-sectional view of the installation state of the construction for free bolt tie in accordance with an embodiment of the present invention.
As shown in Figure 5, after forming a frame with formwork (7) in the reinforcement (not shown) in the reinforcement to form a reinforced concrete structure such as a pillar to be formed by pouring concrete, the reinforced concrete structure of the As described above, according to the height or the thickness to adjust the length of the pre-bolt tie (100a) according to an embodiment of the present invention to fix the form (7).
That is, each of the pre-bolt tie (100a) is adjusted to match the length between the formwork (7) (7a) forming a frame and facing each other in the horizontal and vertical directions, respectively, the pre-bolt tie (100a) After passing the fixing portion (1a) of the male flat tie (1) and the fixing portion (2a) of the female flat tie (2) between the edges of the formwork (7) (7a) in close contact with each other, the fixing portion ( The through
As such, when the fixing of the formwork (7) (7a) is completed, the concrete is poured into the mold formed by the formwork (7) (7a) and cured, and then the formwork (7) (7a) is dismantled to complete the reinforced concrete structure. do.
At this time, the V-shaped
Figure 6 illustrates a longitudinal cross-sectional view of the installation state of the construction bolt for construction according to another embodiment of the present invention.
As shown in Figure 6, after forming a frame with the
That is, the pre-bolt tie (100a) is adjusted to match the length between the formwork (7) (7a) and the H-beam (11) facing each other and forming the frame in each direction, respectively However, after passing the
As such, when the fixing of the formwork (7) (7a) is completed, the concrete is poured into the mold formed by the formwork (7) (7a) and cured, and then the formwork (7) (7a) is dismantled to complete the H beam concrete structure. Done.
At this time, the V-shaped
Since the pre-bolt tie (100a) (100b) is a consumable material, it is preferable to use general low-cost iron as the material, and accordingly, properties such as tensile strength should be equivalent to that of ordinary iron. The changing length is made between about 15 and 90 cm and is between about 5 and 30 cm so that the entire length is changed within the range.
As described above with reference to the drawings illustrated for the construction work free bolt tie according to the present invention, the present invention is not limited by the embodiments and drawings disclosed herein, but within the scope of the technical idea of the present invention Of course, various modifications can be made by those skilled in the art.
1 is a perspective view of a combination of construction bolts for free construction in accordance with an embodiment of the present invention
2 is a longitudinal cross-sectional view of FIG.
Figure 3 is a perspective view of the combination of construction bolts freebol tie according to another embodiment of the present invention
4 is a longitudinal cross-sectional view of FIG.
Figure 5 is a longitudinal sectional view and an enlarged view of the main part of the installation state of the construction bolt for construction work according to an embodiment of the present invention
Figure 6 is a longitudinal cross-sectional view and the main portion enlarged view of the installation state of the construction bolt for construction work according to another embodiment of the present invention
Figure 7a is a longitudinal cross-sectional view of the installation state of the conventional bolt tie used for fixing the formwork for forming a concrete pillar
FIG. 7B is a cross-sectional view of FIG. 7A
Figure 8 is a longitudinal cross-sectional view of the installation state of the conventional bolt tie used for fixing the formwork for forming a concrete pillar of another type
<Explanation of symbols for the main parts of the drawings>
1,10:
1a, 10a: fixing part of male
1b, 10b:
5: Male thread 6: Female thread
7,7a: formwork 8: through hole
9: wedge fin 11: H beam
30: first pinhole 31: second pinhole
32: third pin hole 40: first cutting groove
41: second cutting groove 42: third cutting groove
100a, 100b: Freebolt tie
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090071990A KR20110014363A (en) | 2009-08-05 | 2009-08-05 | Free bolt tie for construction work |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090071990A KR20110014363A (en) | 2009-08-05 | 2009-08-05 | Free bolt tie for construction work |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20110014363A true KR20110014363A (en) | 2011-02-11 |
Family
ID=43773574
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020090071990A KR20110014363A (en) | 2009-08-05 | 2009-08-05 | Free bolt tie for construction work |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20110014363A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102173904B1 (en) | 2020-05-25 | 2020-11-04 | 대호공구산업 주식회사 | Support for Maintaining the Spacing of Formwork |
CN113027127A (en) * | 2021-03-15 | 2021-06-25 | 山东方圆建筑材料有限公司 | Sleeve-free split screw and building template reinforcing method |
-
2009
- 2009-08-05 KR KR1020090071990A patent/KR20110014363A/en not_active Application Discontinuation
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102173904B1 (en) | 2020-05-25 | 2020-11-04 | 대호공구산업 주식회사 | Support for Maintaining the Spacing of Formwork |
CN113027127A (en) * | 2021-03-15 | 2021-06-25 | 山东方圆建筑材料有限公司 | Sleeve-free split screw and building template reinforcing method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102720206A (en) | Novel connecting structure of prestressed concrete pile and cushion cap | |
CN103114717A (en) | Formwork system of shear walls at two sides of extensible seam | |
CN203878615U (en) | Light combined type set-shaped steel formwork for inspection well | |
CN105040685A (en) | Prefabricated member with hollow structure | |
CN210507523U (en) | Construction structure of city utility tunnel and road | |
CN205617661U (en) | Short sleeve grout steel bar connection connects and connecting sleeve and pressure -bearing ring that have thereof | |
EA031974B1 (en) | Barricade component | |
CN201377141Y (en) | Reinforcing steel bar positioning clamp of reinforced concrete column | |
CN109826192A (en) | A kind of prefabricated PC fender post | |
CN204431456U (en) | Mechanization rigging | |
KR20110014363A (en) | Free bolt tie for construction work | |
CN106640545B (en) | Transition connecting piece, concrete tower and concrete tower construction method | |
CN105625187A (en) | Method for constructing concrete for large-section inclined column | |
CN207553599U (en) | Build concrete pours pipeline preformed hole mold | |
CN105114100A (en) | Corner reinforcing member of shield tunnel duct piece and application method thereof | |
CN106760522A (en) | A kind of concrete structure seam crossing prevents swollen mould mortar leakage prevention fixing device and method | |
JP2008101326A (en) | Connected concrete column | |
CN104196023A (en) | Precast concrete tubular pile tip with mechanical connection device and using method of precast concrete tubular pile tip | |
CN208056661U (en) | A kind of pinpoint device of pre embedded bolt | |
CN203579870U (en) | Prestress combined support pile steel mold structure | |
US10640946B2 (en) | Tip for a foundation pile | |
CN110820464B (en) | A protractile formula concrete stop device for road is widened | |
CN104908150B (en) | A kind of piping shaft making template and the method based on factorial praluction piping shaft | |
KR200485853Y1 (en) | Fixing apparatus for sleeve installation of reinforced concrete constructions | |
CN203625886U (en) | Prefabricated concrete square pile with high strength |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E601 | Decision to refuse application |