KR20100037910A - Distributing board that power rates are displayed - Google Patents

Distributing board that power rates are displayed Download PDF

Info

Publication number
KR20100037910A
KR20100037910A KR1020080097252A KR20080097252A KR20100037910A KR 20100037910 A KR20100037910 A KR 20100037910A KR 1020080097252 A KR1020080097252 A KR 1020080097252A KR 20080097252 A KR20080097252 A KR 20080097252A KR 20100037910 A KR20100037910 A KR 20100037910A
Authority
KR
South Korea
Prior art keywords
electric charge
unit
power
amount
switchgear
Prior art date
Application number
KR1020080097252A
Other languages
Korean (ko)
Inventor
조창남
Original Assignee
한영전기공업주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한영전기공업주식회사 filed Critical 한영전기공업주식회사
Priority to KR1020080097252A priority Critical patent/KR20100037910A/en
Publication of KR20100037910A publication Critical patent/KR20100037910A/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/015Boards, panels, desks; Parts thereof or accessories therefor
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R11/00Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
    • G01R11/56Special tariff meters
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B15/00Supervisory desks or panels for centralised control or display

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

PURPOSE: A distributing board is provided to confirm an electric charge according to present power consumption by displaying an electric charge through an electric charge display device after computing an electric charge based on the amount of power. CONSTITUTION: An electric energy detection unit(210) detects consumed electric energy by a wattmeter. A controller(220) computes an electric charge according to consumed electric energy by using electric energy inputted from the electric energy detection unit. A display unit(230) displays an electric charge according to a current gradual advance kWh and electric energy by the control output of the controller. A setting unit(240) is composed of a plurality of function switches. The setting unit executes a function of selecting and setting a midnight electricity charge, an industrial electricity charge, and a conventional dwellings electric charge. An alarm part(250) outputs alarm by the output control from the controller during the predetermined time.

Description

전기요금이 표시되는 수배전반{Distributing board that power rates are displayed}Distribution board that power rates are displayed}

본 발명은 전기요금이 표시되는 수배전반에 관한 것으로, 더욱 상세하게는 수배전반에서 사용된 전력량을 전기요금으로 환산하고, 이를 디스플레이하여 현재의 소비 전력에 따른 전기요금을 인지 할 수 있도록 하여줌과 동시에, 소비된 전력량에 따라 누진되어지는 전기요금 변경시점의 일정시간 전에 알람을 통해 이를 알려주어, 절전에 대한 경각심을 불러일으키도록 하고, 필요시 당 수배전반에서 소비되는 전력량 및 이에 따른 전기요금을 원격지에서도 확인 및 관리할 수 있도록 한 전기요금이 표시되는 수배전반에 관한 것이다.The present invention relates to a switchgear panel in which an electric charge is displayed, and more particularly, converts the amount of electric power used in the switchgear into an electric bill, and displays the electric charge according to the current power consumption. According to the amount of electricity consumed, the alarm informs you of a certain amount of time before the change of electricity rate, and raises awareness about power saving, and if necessary, checks the amount of electricity consumed by the switchgear and the electricity rate accordingly. And a switchgear in which an electric charge is displayed so that it can be managed.

주지한 바와 같은 수배전반이라 함은, 특고압을 받아 강압하여 분배하여 주는 장치로서, 아파트나 공장, 빌딩 등에 사용되는 필수 전력장치이다.As is well known, a switchgear is a device that receives a special high pressure and steps down and distributes it, and is an essential power device used in an apartment, a factory, a building, and the like.

본 발명은 이러한 수배전반에 있어서, 수배전반에서 소비되는 전력량에 따른 실제 전기요금을 확인할 수 있도록 하여, 사용자들로 하여금 절전에 대한 경각심을 가지도록 하여 에너지 절감효과를 거두기 위해 안출된 것이다.In the switchgear, the present invention is designed to check the actual electric charge according to the amount of power consumed in the switchgear, so that users have an awareness of the power saving to achieve the energy saving effect.

종래, 수배전반에는 이러한 기능이 전혀 없어, 수배전반이 설치되어 전력이 공급되는 장소에서 어느 정도의 전기요금이 소비되는지에 대한 데이터나 근거가 전혀 알 수 없는 실정이었다. Conventionally, the switchgear does not have such a function at all, and there is no data or evidence on how much electric charges are consumed at the place where the switchgear is installed and supplied with power.

본 발명은 상기한 배경 하에서 안출된 것으로, 본 발명의 목적은 수배전반에서 사용된 전력량을 전기요금으로 환산하고, 이를 디스플레이하여 현재의 소비 전력에 따른 전기요금을 인지 할 수 있도록 하여줌과 동시에, 소비된 전력량에 따라 누진되어지는 전기요금 변경시점의 일정시간 전에 알람을 통해 이를 알려주어, 절전에 대한 경각심을 불러일으키도록 하고, 필요시 당 수배전반에서 소비되는 전력량 및 이에 따른 전기요금을 원격지에서도 확인 및 관리할 수 있도록 한 전기요금이 표시되는 수배전반을 제공하는 것에 있다.The present invention has been devised under the above-mentioned background, and an object of the present invention is to convert the amount of power used in the switchgear into an electric charge and display it so that the electric charge according to the current power consumption can be recognized and consumed at the same time. According to the amount of electricity consumed, the alarm informs you a certain amount of time before the change of electricity rate, and raises awareness about power saving, and if necessary, checks the amount of electricity consumed by the switchgear and the electricity rate accordingly. It is to provide a switchgear that displays an electric charge for management.

이와 같은 목적을 달성하기 위한 본 발명은 수배전반에 있어서, The present invention for achieving the above object in the switchgear,

상기 수배전반의 계측기부에 형성된 전력계로부터 이 수배전반을 통해 소비되는 전력을 검출하여 전기요금으로 환산하고, 이를 표시하여 주는 전기요금 표시장치를 더 포함하여 구성하되, It further comprises an electric charge display device that detects the power consumed through the switchgear from the power meter formed in the measuring unit of the switchgear, converted into an electric bill, and displays this,

상기 전기요금 표시장치는 상기 전력계로부터 소비되는 전력량을 검출하는 전력량검출부와, 상기 전력량검출부로부터 입력된 전력량을 이용하여 소비된 전력량에 따른 전기요금을 산출하고, 이 값을 저장하고 출력하여주는 제어부와, 상기 제어부의 제어출력에 의해 현재의 누진 소비 전력량 및 이 전력량에 따른 전기요금을 표시하여 주는 표시부와, 복수의 기능스위치들로 구성되어, 1개월 단위의 전기 요금 산출의 기산일, 또는 누진 전력량에 따른 요금단위를 설정하거나, 심야전기요금, 산업용전기요금, 일반주택전기요금을 선택 및 설정하는 기능을 수행하는 설정부와, 누진 전력량에 따른 전기요금 변경시점의 일정시간 이전에 상기 제어부로부터의 출력제어에 의해 일정시간 동안 알람을 출력하는 알람부를 포함하여 된 것을 특징으로 한다.The electric charge display device includes a power amount detector which detects the amount of power consumed by the power meter, a controller configured to calculate an electric charge according to the amount of power consumed by using the amount of power input from the power amount detector, and to store and output this value; And a display unit for displaying the current progressive power consumption by the control output of the control unit and the electric charge according to the electric power amount, and a plurality of function switches, the calculated date of the monthly electric charge calculation or the progressive power amount. A setting unit for setting a charge unit according to the charge rate, selecting and setting a midnight electricity rate, an industrial electricity rate, and a general house electricity rate; It characterized in that it comprises an alarm unit for outputting an alarm for a predetermined time by the control.

또한 본 발명은 전압계, 전류계, 전력계, 역률계 등의 계측부와, 마이컴, LCD부, 키입력부, 저장부를 포함하여 구성되는 수배전반의 계측기부에 있어서,In addition, the present invention is a measurement unit of the switchgear consisting of a measurement unit such as a voltmeter, an ammeter, a power meter, a power factor meter, a microcomputer, an LCD unit, a key input unit, a storage unit,

시계기능을 부여하기 위한 클럭부를 더 구성하고, The clock unit is further configured to give a clock function.

상기 마이컴은 상기 전력계로부터 소비되는 전력량을 검출하여 소비된 전력량에 따른 전기요금을 산출하고, 이 값을 저장부에 저장하고, LCD부에 출력하여주며, The microcomputer detects the amount of power consumed by the power meter, calculates an electric charge according to the amount of power consumed, stores the value in a storage unit, and outputs the value to the LCD unit.

상기 키입력부는 전기요금 표시를 위한 기능스위치들을 포함하며, 1개월 단위의 전기요금 산출의 기산일, 또는 누진 전력량에 따른 요금단위를 설정하거나, 심야전기요금, 산업용전기요금, 일반주택전기요금을 선택 및 설정하는 기능을 수행하도록 구성하여 된 것을 특징으로 한다.The key input unit includes a function switch for displaying an electric charge, and sets a charge unit according to a calculation date of a monthly electric charge calculation, or a progressive power amount, or selects a midnight electric charge, an industrial electric charge, and a general house electric charge. And configured to perform a setting function.

또한 본 발명은 OCR, OCGR, UVR, OVR 등의 계전부와, 전압계, 전류계, 전력계, 역률계 등의 계측부와, 마이컴, LCD부, 키입력부, 저장부를 포함하여 구성되는 수배전반의 계측기부에 있어서,In addition, the present invention is in the measurement unit of the switchgear composed of a relay unit such as OCR, OCGR, UVR, OVR, a measurement unit such as a voltmeter, an ammeter, a power meter, a power factor meter, a microcomputer, an LCD unit, a key input unit, and a storage unit ,

시계기능을 부여하기 위한 클럭부를 더 구성하고, The clock unit is further configured to give a clock function.

상기 마이컴은 상기 전력계로부터 소비되는 전력량을 검출하여 소비된 전력 량에 따른 전기요금을 산출하고, 이 값을 저장부에 저장하고, LCD부에 출력하여주며, The microcomputer detects the amount of power consumed by the power meter, calculates an electric charge according to the amount of power consumed, stores the value in a storage unit, and outputs the value to the LCD unit.

상기 키입력부는 전기요금 표시를 위한 기능스위치들을 포함하며, 1개월 단위의 전기요금 산출의 기산일, 또는 누진 전력량에 따른 요금단위를 설정하거나, 심야전기요금, 산업용전기요금, 일반주택전기요금을 선택 및 설정하는 기능을 수행하도록 구성하여 된 것을 특징으로 한다.The key input unit includes a function switch for displaying an electric charge, and sets a charge unit according to a calculation date of a monthly electric charge calculation, or a progressive power amount, or selects a midnight electric charge, an industrial electric charge, and a general house electric charge. And configured to perform a setting function.

이와 같은 본 발명은, 수배전반에서 사용된 전력량을 전기요금으로 환산하고, 이를 디스플레이하여 현재의 소비 전력에 따른 전기요금을 인지 할 수 있는 장점이 있다.Such the present invention has the advantage of recognizing the electric charge according to the current power consumption by converting the amount of power used in the switchgear to the electric charge, and display it.

또한 본 발명은 당 수배전반에서 소비된 전력량에 따라 누진되어지는 전기요금 변경시점의 일정시간 전에 알람을 통해 이를 알려주어, 사용자들로 하여금 절전에 대한 경각심을 불러일으켜 에너지 절감효과를 거둘 수 있는 효과가 있다.In addition, the present invention is notified by the alarm a certain time before the time when the electricity rate changes according to the amount of power consumed in the switchgear, through the alarm to the user to wake up to the power saving effect has the effect of achieving energy saving effect have.

또한 본 발명은 당 수배전반에서 소비되는 전력량 및 이에 따른 전기요금을 원격지에서도 확인 및 관리할 수 있도록 함으로써, 체계적이고 효울적인 전력분배 관리를 수행할 수 있는 이점이 있다.In addition, the present invention has the advantage that it is possible to check and manage the amount of power consumed in the switchgear and thus the electric charges from a remote location, to perform a systematic and efficient power distribution management.

이하 첨부된 도면을 참조하여 본 발명의 바람직한 실시 예를 보다 상세히 설 명한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명 전기요금이 표시되는 수배전반의 전체 구성도이다.1 is an overall configuration diagram of a switchgear in which the electric charge of the present invention is displayed.

도시된 바와 같이, 수배전반(100)은 각종 차단기들로 구성된 차단기부(110)와, 상기 차단기부(110)에 설치된 각 차단기들의 개폐동작을 제어하는 다수개의 계전기로 구성된 계전기부(120)와, 각종 계측기기로 구성된 계측기부(130)를 포함한다.As shown, the switchgear 100 is a circuit breaker 110 composed of various circuit breakers, a relay unit 120 composed of a plurality of relays for controlling the opening and closing operations of the circuit breakers installed in the circuit breaker 110, It includes a measuring unit 130 composed of various measuring devices.

상기 계전기부(120)는 시스템에 비정상적인 큰 전류가 흘렀을 때 신호를 내보내서 회로가 차단되도록 하는 과전류계전기(OCR: OverCurrent Relay)와, 중성선에 흐르는 전류를 감지해서 동작하는 OCGR(OverCurrent Ground Relay)과, 부족전압계전기(UVR: UnderVoltage Relay)와, 과전압계전기(OVR: OverVoltage Relay) 등을 포함한다.The relay unit 120 is an overcurrent relay (OCR: OverCurrent Relay) to block the circuit by sending a signal when abnormally large current flows in the system, and an OCGR (OverCurrent Ground Relay) that operates by sensing the current flowing in the neutral wire , UnderVoltage Relay (UVR), OverVoltage Relay (OVR) and the like.

또한 상기 계측기부(130)는 전압을 검출하는 전압계, 전류를 검출하는 전류계, 전력을 검출하는 전력계, 역률을 산출하는 역률계 등을 포함한다.In addition, the measuring unit 130 includes a voltmeter for detecting a voltage, an ammeter for detecting a current, a power meter for detecting power, a power factor for calculating a power factor, and the like.

여기서 본 발명의 구성은, 상기 수배전반(100)의 계측기부(130)에 형성된 전력계로부터 이 수배전반(100)을 통해 소비되는 전력을 검출하여 전기요금으로 환산하고, 이를 표시하여 주는 전기요금 표시장치(200)를 더 포함하여 된 것이다.The configuration of the present invention, the electric charge display device for detecting the power consumed through the switchgear 100 from the power meter formed in the measuring unit 130 of the switchgear 100 converted to an electric bill, and displays this ( 200) more.

상기 전기요금 표시장치(200)는 외부기기(300)와 더 연결되어 서로의 정보를 교환할 수 있도록 구성된다.The electric charge display device 200 is further connected to the external device 300 is configured to exchange information with each other.

또한 상기 전기요금 표시장치(200)는 수배전반(100)의 내부에 설치되거나 외 부에 설치될 수 있으며, 외부에는 전기요금 등을 표시하는 표시장치만 설치될 수 있도록 구성된다.In addition, the electric charge display device 200 may be installed inside or outside of the distribution panel 100, and configured to be installed only a display device for displaying an electric charge on the outside.

도 2를 참조하여, 상기 전기요금 표시장치(200)의 구체적인 구성을 살펴본다.Referring to FIG. 2, a detailed configuration of the electric charge display device 200 will be described.

상기 전기요금 표시장치(200)는 전력량검출부(210), 제어부(220), 표시부(230), 설정부(240), 알람부(250) 및 인터페이스부(260)를 포함한다.The electric charge display device 200 includes a power amount detector 210, a controller 220, a display unit 230, a setting unit 240, an alarm unit 250, and an interface unit 260.

상기 전력량검출부(210)는 수배전반(100) 계측기부(130)의 전력계로부터 전력량을 검출하여 그 값을 제어부(220)로 입력하여 준다.The power amount detection unit 210 detects the amount of power from the power meter of the measurement unit 130 of the switchgear 100 and inputs the value to the control unit 220.

상기 제어부(220)는 상기 전력량검출부(210)로부터 입력된 전력량을 이용하여 소비된 전력량에 따른 전기요금을 산출하고, 이 값을 저장하고 표시부(230)로 출력하여 준다.The controller 220 calculates an electric charge according to the amount of power consumed using the amount of power input from the power amount detector 210, stores the value, and outputs the value to the display unit 230.

상기 표시부(230)는 상기 제어부(220)의 제어출력에 의해 현재의 누진 소비 전력량 및 이 전력량에 따른 전기요금을 표시하여 준다.The display unit 230 displays the current progressive power consumption amount and the electric charge according to the power amount by the control output of the controller 220.

상기 설정부(240)는 복수의 기능스위치들로 구성되어, 1개월 단위의 전기요금 산출의 기산일, 또는 누진 전력량에 따른 요금단위를 설정하거나, 심야전기요금, 산업용전기요금, 일반주택전기요금 등을 선택 및 설정하는 기능을 수행한다. The setting unit 240 is composed of a plurality of function switches, and set the charge unit according to the calculation date of the monthly electricity bill calculation, or the amount of electric power, or the late-night electricity bill, industrial electricity bill, general house electricity bill, etc. Select and set the function.

상기 알람부(250)는 누진 전력량에 따른 전기요금 변경시점의 일정시간 이전에 상기 제어부(220)로부터의 출력제어에 의해 알람을 출력하여 준다.The alarm unit 250 outputs an alarm by the output control from the controller 220 before a predetermined time at the time of changing the electric charge according to the amount of progressive power.

상기 인터페이스부(260)는 상기 제어부(220)와 외부기기(300) 사이에 연결되 어, 상기 제어부(220)에서 검출한 전력량 및 산출된 전기요금을 외부기기(300)로 전송하거나, 상기 외부기기(300)에서 지령된 명령을 입력받아 제어부(220)로 전송하여 준다.The interface unit 260 is connected between the controller 220 and the external device 300 to transmit the amount of power detected by the controller 220 and the calculated electric charge to the external device 300 or the external device. The command received from the device 300 is received and transmitted to the control unit 220.

또한 상기 제어부(220)는 누진 전력량에 따른 전기요금 변경시점, 예를 들어 기본요금의 경우, 100kWh이하, 101~200kWh, 201~300kWh...의 구분에 따라 기본요금의 차이가 발생하고, 전력량 요금은 0~50kWh, 51~100kWh, 101~200kWh의 구분에 따라 요금이 변경되는 시점이 도래하기 일정시간 전에 알람을 일정시간 구동하여 사용자로 하여금 절전에 대한 경각심을 일깨워 준다.In addition, the control unit 220 when the electricity rate changes according to the progressive power amount, for example, the base rate, the difference in the base rate occurs according to the classification of 100 kWh or less, 101 ~ 200 kWh, 201 ~ 300 kWh ... The charge is triggered by alarming for a certain time before the time when the charge changes according to the division of 0 ~ 50kWh, 51 ~ 100kWh, 101 ~ 200kWh, to remind the user about the power saving.

또한, 상기 제어부(220)는 전기요금 계산 기산일로부터 1개월이 경과하면 산출된 누전 전기요금을 별도로 저장하고, 초기화 시킨 후 다시 소비전력에 따른 전기요금을 산출한다.In addition, the control unit 220 separately stores the electrical leakage rate calculated after one month from the electric bill calculation date, initializes and calculates the electricity rate according to the power consumption again.

또한 상기 외부기기(300)는 중앙 통제실(전기실)에 수용되는 컴퓨터(PC)가 될 수 있으며, 상기 PC를 통하여 각 건물에 배치된 수배전반(100)의 전력량 및 소비 전기요금을 동시에 확인할 수 있을 뿐 아니라, 필요시 각 수배전반(100)의 전기요금 표시장치(200)로 알람 또는 각종 메시지를 출력하여 줄 수 있게 된다.In addition, the external device 300 may be a computer (PC) accommodated in the central control room (electrical room), it is possible to simultaneously check the amount of electricity and electricity consumption of the switchboard 100 disposed in each building through the PC. In addition, when necessary, an alarm or various messages may be output to the electric charge display device 200 of each switchgear 100.

도 3은 본 발명 전기요금이 표시되는 수배전반의 제어 수순이다.3 is a control procedure of the switchgear in which the electric charge of the present invention is displayed.

도시된 바와 같이 본 발명 전기요금이 표시되는 수배전반의 제어수순은, As shown, the control procedure of the switchgear in which the electric charge of the present invention is displayed,

전기요금을 산출하기위한 기산일을 설정하고, 누진 전력량에 따른 요금단위, 심야전기요금, 산업용전기요금, 일반주택전기요금 등에 대한 설정을 수행한 후 전 기요금 표시장치(200)의 구동을 개시하는 과정(S11)과, 상기 전기요금 표시장치(200)의 전력량검출부(210)를 통해 수배전반(100)에서 소비되는 전력량을 검출하는 과정(S12)과, 상기 검출된 전력량에 따른 소비 전기요금을 산출하는 과정(S13)과, 상기 산출된 전기요금을 표시부(230)로 출력하는 과정(S14)과, 검출되는 누진 전력량이 전기요금 변경시점의 일정시간 이전 인가를 판단하는 과정(S15)과, 상기 판단과정(S15)에서 누진 전력량이 전기요금 변경시점의 일정시간 이전이 되었다면, 알람부(250)로 경보 알람을 일정시간 출력하는 과정(S16)과, 상기 전기요금 산출 기산일로부터 1개월이 지나 전기요금 정산마감일이 도래하였는지를 판단하는 과정(S17)과, 상기 판단과정(S17)에서 전기요금 1개월 정산마감일이 도래하였다면, 산출된 전기요금을 저장하고 이를 초기화하여주는 과정(S18)을 포함한다.After setting the calculation date for calculating the electric charge, and setting the charge unit, late night electric charge, industrial electric charge, general house electric charge, etc. according to the progressive power amount to start the operation of the electric charge display device 200 Step (S11), the step of detecting the amount of power consumed in the switchgear 100 through the power amount detector 210 of the electric charge display device 200 (S12), and calculates the electricity bill according to the detected amount of power And a step (S14) of outputting the calculated electric charge to the display unit 230, a step of determining whether the detected amount of accumulated power is before a predetermined time at the time of changing the electric charge (S15), and If the amount of power accumulated in the determination process (S15) before the predetermined time of the electricity rate change time, the process of outputting the alarm alarm to the alarm unit 250 for a predetermined time (S16), and the electricity is passed one month from the date of calculating the electricity bill fee If the acid deadline is determined whether the arrival process (S17) and the determination process of electrical charges on the one months settlement deadline (S17) that the arrival includes the step (S18) that stores an electrical charge output and initializes them.

이와 같이 구성된 본 발명 전기요금이 표시되는 수배전반의 전제 동작을 설명한다.The premise operation of the switchgear in which the electric charge of the present invention configured as described above is displayed will be described.

먼저, 사용자는 전기요금 표시장치(200)의 설정부(240)의 기능스위치를 통해 전기요금을 산출하기위한 기산일과, 누진 전력량에 따른 요금단위를 설정하고, 심야전기요금에 대한 선택, 산업용전기요금에 대한 선택, 일반주택전기요금에 대한 선택유무를 확인하여 선택 및 설정한다.First, the user sets the calculation date for calculating the electric charge and the charge unit according to the progressive power amount through the function switch of the setting unit 240 of the electric charge display device 200, and selects the late-night electric charge, industrial electricity Check and select the rate and general house electricity rate.

이와 같은 설정이 완료되면 운전 개시 키 신호를 입력하여준다. 따라서 전기요금 표시장치(200)는 운전을 수행한다.(S11과정)When the setting is completed, the operation start key signal is input. Therefore, the electric charge display device 200 performs operation.

이와 같이 구동이 개시되면, 제어부(220)는 전력량검출부(210)를 통해 수배 전반(100)에서 소비되는 전력을 검출하며, 상기 검출된 전력량에 따른 전기요금을 산출한다.(S12, S13과정)When the driving is started as described above, the control unit 220 detects the power consumed in the arrangement panel 100 through the power amount detection unit 210 and calculates an electric charge according to the detected power amount (steps S12 and S13).

여기서 상기 검출된 전력량에 따른 전기요금의 산출은 제어부(220)에 이미 저장된 전력량 대비 전기요금 데이터를 독출함으로써 가능하게 된다.Here, the calculation of the electric charge according to the detected electric power amount is possible by reading the electric charge data with respect to the electric power amount already stored in the controller 220.

상기 전기요금데이터는 상기 설정부(240)를 통해 그 데이터를 갱신할 수 있다.The electricity bill data may be updated through the setting unit 240.

상기 제어부(220)는 상기 전력량검출부(210)를 통해 검출된 수배전반(100)의 소비 누진 전력량과, 이 전력량에 따라 산출된 전기요금을 표시하여 준다.(S14과정)The controller 220 displays the amount of accumulated power consumption of the switchgear 100 detected by the power amount detector 210 and the electric charge calculated according to the amount of power (step S14).

그리고 상기 제어부(220)는 검출되는 수배전반(100)의 누진 전력량이 전기요금 변경시점의 일정시간 이전 인가를 판단한다. 즉 누진된 소비 전력량이 일정한 기준을 초과하여 그에 따른 전기요금이 누진 적용되는 시점의 일정시간 전의 시점을 판단하는 것이다.The controller 220 determines whether the amount of accumulated power of the switchboard 100 is detected before a predetermined time at the time of changing the electric charge. In other words, the accumulated power consumption exceeds a certain standard to determine a time point before a time when the electric charge is progressively applied.

이는 사용자에게 절전에 대한 경각심을 일으키도록 하는 것으로, 상기 시점이 도래하면 제어부(220)는 알람부(250)로 일정시간동안 알람 출력명령을 출력하여 상기 알람부(250)는 일정시간 알람을 출력한다.(S16 과정)This causes the user to be alert for power saving. When the time point arrives, the controller 220 outputs an alarm output command to the alarm unit 250 for a predetermined time, and the alarm unit 250 outputs an alarm for a predetermined time. (S16 process)

그리고 상기 제어부(220)는 전기요금 산출 기산일로부터 1개월이 지난 전기요금 정산마감일이 도래하였는지의 여부를 판단하여, 상기 정산마감일이 도래하였다면, 산출된 전기요금을 저장하고 이를 초기화하여주며, 프로그램 리턴한다.(S17,S18 과정)The controller 220 determines whether the electricity bill settlement deadline has passed one month from the electricity bill calculation settlement date, and if the settlement deadline arrives, stores the calculated electricity bill and initializes it, and returns the program. (Process S17, S18)

또한 상기 제어부(220)는 외부기기(300)로부터 산출된 전기요금 데이터의 요청이 있는 경우, 이 전기요금 데이터를 인터페이스부(260)를 거쳐 상기 외부기기(300)로 전송하며, 상기 외부기기(300)는 상기 전기요금 표시장치(200)로 각종 알람신호 또는 다양한 표시신호 등을 출력할 수 있다.In addition, when there is a request for electricity rate data calculated from the external device 300, the controller 220 transmits the electricity rate data to the external device 300 via the interface unit 260, and the external device ( 300 may output various alarm signals or various display signals to the electric charge display device 200.

도 4는 본 발명의 다른 실시 예에 따른 전기요금이 표시되는 수배전반의 구성 블록도이다.4 is a block diagram illustrating a switchgear in which an electric charge is displayed according to another embodiment of the present invention.

도시된 바와 같이, 본 발명의 다른 실시 예에 따른 전기요금이 표시되는 수배전반의 구성은, 기존의 계측기부(130A)에 전기요금 표시기능이 더 포함되도록 구성한 것이다.As shown, the configuration of the switchgear is displayed the electric charge according to another embodiment of the present invention, is configured to further include the electric charge display function in the existing measuring unit (130A).

즉 전압계, 전류계, 전력계, 역률계 등의 계측부와, 마이컴(131), LCD부(132), 키입력부(133), 저장부(134)를 포함하여 구성되는 수배전반(200)의 계측기부(130A)에 있어서,That is, the measuring unit 130A of the switchgear 200 including a measuring unit such as a voltmeter, an ammeter, a power meter, a power factor meter, a microcomputer 131, an LCD unit 132, a key input unit 133, and a storage unit 134. ),

시계기능을 부여하기 위한 클럭부(135)를 더 구성하고, Further configured a clock unit 135 for giving a clock function,

상기 마이컴(131)은 상기 전력계로부터 소비되는 전력량을 검출하여 소비된 전력량에 따른 전기요금을 산출하고, 이 값을 저장부(134)에 저장하고, LCD부(132)에 출력하여주며, The microcomputer 131 detects the amount of power consumed by the power meter, calculates an electric charge according to the amount of power consumed, stores this value in the storage unit 134, and outputs the value to the LCD unit 132.

상기 키입력부(133)는 전기요금 표시를 위한 기능스위치들을 포함하며, 1개월 단위의 전기요금 산출의 기산일, 또는 누진 전력량에 따른 요금단위를 설정하거나, 심야전기요금, 산업용전기요금, 일반주택전기요금을 선택 및 설정하는 기능을 수행하도록 구성하여 된 것이다.The key input unit 133 includes function switches for displaying an electric charge, and sets a charge unit according to a calculation date of a monthly electric charge calculation or a progressive power amount, or a midnight electric charge, an industrial electric charge, and a general house electricity. It is configured to perform the function of selecting and setting the fee.

또한, 상기 계전 및 계측기부(130A)에는 인터페이스부(136)가 더 포함될 수 있으며, 이 인터페이스부(136)는 상기 마이컴(131)과 외부기기(300) 사이에 연결되어, 상기 마이컴(131)에서 검출한 전력량 및 산출된 전기요금을 외부기기(300)로 전송하거나, 상기 외부기기(300)에서 지령된 명령을 입력받아 마이컴(131)으로 전송하여 준다.In addition, the relay and measurement unit 130A may further include an interface unit 136, which is connected between the microcomputer 131 and the external device 300, and the microcomputer 131. The amount of power detected and the calculated electric charge is transmitted to the external device 300, or the command received from the external device 300 is received and transmitted to the microcomputer 131.

도 5는 본 발명의 또 다른 실시 예에 따른 전기요금이 표시되는 수배전반의 구성 블록도이다.5 is a block diagram illustrating a switchgear in which an electric charge is displayed according to another embodiment of the present invention.

도시된 바와 같이, 본 발명의 또 다른 실시 예에 따른 전기요금이 표시되는 수배전반의 구성은, 계전기부와 계측기부가 일체로 구성된 계전 및 계측기부(140)에 전기요금 표시기능이 더 포함되도록 구성한 것이다.As shown, the configuration of the switchgear display the electric charge according to another embodiment of the present invention is configured to further include the electric charge display function in the relay and the measuring unit 140 is integrally configured with the relay unit and the measuring unit. .

즉 OCR, OCGR, UVR, OVR 등의 계전부와, 전압계, 전류계, 전력계, 역률계 등의 계측부와, 마이컴(131), LCD부(132), 키입력부(133), 저장부(134)를 포함하여 구성되는 수배전반(200)의 계전 및 계측기부(140)에 있어서,That is, the relay unit such as OCR, OCGR, UVR, OVR, measurement unit such as voltmeter, ammeter, power meter, power factor meter, microcomputer 131, LCD unit 132, key input unit 133, storage unit 134 In the relay and measuring unit 140 of the switchgear 200 configured to include,

시계기능을 부여하기 위한 클럭부(135)를 더 구성하고, Further configured a clock unit 135 for giving a clock function,

상기 마이컴(131)은 상기 전력계로부터 소비되는 전력량을 검출하여 소비된 전력량에 따른 전기요금을 산출하고, 이 값을 저장부(134)에 저장하고, LCD부(132)에 출력하여주며, The microcomputer 131 detects the amount of power consumed by the power meter, calculates an electric charge according to the amount of power consumed, stores this value in the storage unit 134, and outputs the value to the LCD unit 132.

상기 키입력부(133)는 전기요금 표시를 위한 기능스위치들을 포함하며, 1개 월 단위의 전기요금 산출의 기산일, 또는 누진 전력량에 따른 요금단위를 설정하거나, 심야전기요금, 산업용전기요금, 일반주택전기요금을 선택 및 설정하는 기능을 수행하도록 구성하여 된 것이다.The key input unit 133 includes function switches for displaying an electric charge, and sets a charge unit according to a calculation date of a monthly electric charge calculation or a progressive power amount, or a midnight electric charge, an industrial electric charge, and a general house. It is configured to perform the function of selecting and setting the electricity bill.

이러한 본 발명은 최근에 개발되어 보급되는 계전 및 계측기부(140)에 전술한 전기요금 표시기능이 더 포함되도록 하여 독립된 계전 및 계측기부(140) 자체에서 소비전력에 대한 전기요금이 표시되도록 한 것이다.The present invention is such that the electric charge display function as described above is further included in the relay and measuring unit 140 recently developed and spread so that the electric charge for power consumption in the independent relay and measuring unit 140 itself is displayed. .

도 1은 본 발명의 일실시예에 따른 전기요금이 표시되는 수배전반의 구성 블록도, 1 is a configuration block diagram of a switchgear in which an electric charge is displayed according to an embodiment of the present invention;

도 2는 본 발명에 따른 전기요금 표시장치의 상세 회로 블록도, 2 is a detailed circuit block diagram of an electric charge display device according to the present invention;

도 3은 본 발명 전기요금이 표시되는 수배전반의 제어 수순,3 is a control procedure of the switchgear in which the electric charge of the present invention is displayed;

도 4는 본 발명의 다른 실시 예에 따른 전기요금이 표시되는 수배전반의 구성 블록도, 4 is a block diagram illustrating a switchgear in which an electric charge is displayed according to another embodiment of the present invention;

도 5는 본 발명의 또 다른 실시 예에 따른 전기요금이 표시되는 수배전반의 구성 블록도이다.5 is a block diagram illustrating a switchgear in which an electric charge is displayed according to another embodiment of the present invention.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

100: 수배전반 110: 차단기부100: switchboard 110: breaker

120: 계전기부 130,130A: 계측기부120: relay unit 130,130A: measuring unit

131: 마이컴 132: LCD부131: microcomputer 132: LCD

133: 키입력부 134: 저장부133: key input unit 134: storage unit

135: 클럭부 136,260: 인터페이스부135: clock section 136,260: interface section

140: 계전 및 계측기부 200: 전기요금 표시장치140: relay and measurement unit 200: electric charge display device

210: 전력량 검출부 220: 제어부210: power amount detection unit 220: control unit

230: 표시부 240: 설정부230: display unit 240: setting unit

250: 알람부 300: 외부기기250: alarm unit 300: external device

Claims (5)

수배전반에 있어서, In the switchgear, 상기 수배전반의 계측기부에 형성된 전력계로부터 이 수배전반을 통해 소비되는 전력을 검출하여 전기요금으로 환산하고, 이를 표시하여 주는 전기요금 표시장치를 더 포함하여 구성하되, It further comprises an electric charge display device that detects the power consumed through the switchgear from the power meter formed in the measuring unit of the switchgear, converted into an electric bill, and displays this, 상기 전기요금 표시장치는 상기 전력계로부터 소비되는 전력량을 검출하는 전력량검출부와, 상기 전력량검출부로부터 입력된 전력량을 이용하여 소비된 전력량에 따른 전기요금을 산출하고, 이 값을 저장하고 출력하여주는 제어부와, 상기 제어부의 제어출력에 의해 현재의 누진 소비 전력량 및 이 전력량에 따른 전기요금을 표시하여 주는 표시부와, 복수의 기능스위치들로 구성되어, 1개월 단위의 전기요금 산출의 기산일, 또는 누진 전력량에 따른 요금단위를 설정하거나, 심야전기요금, 산업용전기요금, 일반주택전기요금을 선택 및 설정하는 기능을 수행하는 설정부와, 누진 전력량에 따른 전기요금 변경시점의 일정시간 이전에 상기 제어부로부터의 출력제어에 의해 일정시간 동안 알람을 출력하는 알람부를 포함하여 된 것을 특징으로 하는 전기요금이 표시되는 수배전반. The electric charge display device includes a power amount detector which detects the amount of power consumed by the power meter, a controller configured to calculate an electric charge according to the amount of power consumed by using the amount of power input from the power amount detector, and to store and output this value; And a display unit for displaying the current progressive power consumption and the electric charge according to the electric power by the control output of the control unit, and a plurality of function switches. A setting unit for setting a charge unit according to the charge rate, selecting and setting a midnight electricity rate, an industrial electricity rate, and a general house electricity rate; An alarm unit for outputting an alarm for a predetermined time by the control, characterized in that Switchgear is charged, is displayed. 제 1 항에 있어서, The method of claim 1, 상기 전기요금 표시장치는 제어부와 외부기기 사이에 연결되어, 상기 제어부 에서 검출한 전력량 및 산출된 전기요금을 상기 외부기기로 전송하거나, 상기 외부기기에서 지령된 명령을 입력받아 상기 제어부로 전송하여 주는 인터페이스부가 더 포함되는 것을 특징으로 하는 전기요금이 표시되는 수배전반. The electric charge display device is connected between a control unit and an external device, and transmits the amount of power detected by the control unit and the calculated electric charge to the external device, or receives a command commanded from the external device and transmits the command to the controller. Switchgear panel in which the electricity bill is characterized in that the interface unit is further included. 제 1 항에 있어서,The method of claim 1, 상기 전기요금 표시장치의 제어부는, The control unit of the electric charge display device, 전기요금을 산출하기위한 기산일을 설정하고, 누진 전력량에 따른 요금단위, 심야전기요금, 산업용전기요금, 일반주택전기요금 등에 대한 설정을 수행한 후 전기요금 표시장치의 구동을 개시하는 과정(S11)과, A process of setting the date of calculation for calculating the electric charge, setting the charge unit, the late-night electric charge, the industrial electric charge, and the general house electric charge according to the progressive electric power, and then starting the operation of the electric charge display device (S11). and, 상기 전기요금 표시장치의 전력량검출부를 통해 수배전반에서 소비되는 전력량을 검출하는 과정(S12)과, Detecting the amount of power consumed by the switchgear through the power amount detector of the electric charge display device (S12); 상기 검출된 전력량에 따른 소비 전기요금을 산출하는 과정(S13)과, Calculating a consumption electricity rate according to the detected amount of power (S13); 상기 산출된 전기요금을 표시부로 출력하는 과정(S14)과, Outputting the calculated electric charge to a display unit (S14); 검출되는 누진 전력량이 전기요금 변경시점의 일정시간 이전 인가를 판단하는 과정(S15)과, A process of determining whether the amount of accumulated power detected is before a predetermined time at the time of changing the electric charge (S15); 상기 판단과정(S15)에서 누진 전력량이 전기요금 변경시점의 일정시간 이전이 되었다면 알람부로 경보 알람을 일정시간 출력하는 과정(S16)과, Outputting an alarm alarm to the alarm unit for a predetermined time, when the amount of accumulated power is earlier than a predetermined time at the time of changing the electric charge in the determination process (S15); 상기 전기요금 산출 기산일로부터 1개월이 지나 전기요금 정산마감일이 도래하였는지를 판단하는 과정(S17)과, A process of determining whether an electricity bill settlement deadline has arrived one month after the date of calculating the electricity bill (S17); 상기 판단과정(S17)에서 전기요금 1개월 정산마감일이 도래하였다면 산출된 전기요금을 저장하고 이를 초기화하여주는 과정(S18)을 포함하는 것을 특징으로 하는 전기요금이 표시되는 수배전반. Switching panel that displays the electric charge, characterized in that it comprises the step (S18) of storing and initializing the calculated electric charge if the electricity bill one month settlement deadline arrives in the determination process (S17). 전압계, 전류계, 전력계, 역률계 등의 계측부와, 마이컴, LCD부, 키입력부, 저장부를 포함하여 구성되는 수배전반의 계측기부에 있어서,In the measurement unit of the voltmeter, ammeter, power meter, power factor meter and the like, and the switchgear of the switchgear including a microcomputer, an LCD unit, a key input unit and a storage unit, 시계기능을 부여하기 위한 클럭부를 더 구성하고, The clock unit is further configured to give a clock function. 상기 마이컴은 상기 전력계로부터 소비되는 전력량을 검출하여 소비된 전력량에 따른 전기요금을 산출하고, 이 값을 저장부에 저장하고, LCD부에 출력하여주며, The microcomputer detects the amount of power consumed by the power meter, calculates an electric charge according to the amount of power consumed, stores the value in a storage unit, and outputs the value to the LCD unit. 상기 키입력부는 전기요금 표시를 위한 기능스위치들을 포함하며, 1개월 단위의 전기요금 산출의 기산일, 또는 누진 전력량에 따른 요금단위를 설정하거나, 심야전기요금, 산업용전기요금, 일반주택전기요금을 선택 및 설정하는 기능을 수행하도록 구성하여 된 것을 특징으로 하는 전기요금이 표시되는 수배전반. The key input unit includes a function switch for displaying an electric charge, and sets a charge unit according to a calculation date of a monthly electric charge calculation, or a progressive power amount, or selects a midnight electric charge, an industrial electric charge, and a general house electric charge. And a switchgear on which an electric charge is displayed, which is configured to perform a setting function. OCR, OCGR, UVR, OVR 등의 계전부와, 전압계, 전류계, 전력계, 역률계 등의 계측부와, 마이컴, LCD부, 키입력부, 저장부를 포함하여 구성되는 수배전반의 계측기부에 있어서,In the measurement unit of the switchgear including the relay unit such as OCR, OCGR, UVR, OVR, measurement unit such as voltmeter, ammeter, power meter, power factor meter, microcomputer, LCD unit, key input unit, storage unit, 시계기능을 부여하기 위한 클럭부를 더 구성하고, The clock unit is further configured to give a clock function. 상기 마이컴은 상기 전력계로부터 소비되는 전력량을 검출하여 소비된 전력량에 따른 전기요금을 산출하고, 이 값을 저장부에 저장하고, LCD부에 출력하여주며, The microcomputer detects the amount of power consumed by the power meter, calculates an electric charge according to the amount of power consumed, stores the value in a storage unit, and outputs the value to the LCD unit. 상기 키입력부는 전기요금 표시를 위한 기능스위치들을 포함하며, 1개월 단위의 전기요금 산출의 기산일, 또는 누진 전력량에 따른 요금단위를 설정하거나, 심야전기요금, 산업용전기요금, 일반주택전기요금을 선택 및 설정하는 기능을 수행하도록 구성하여 된 것을 특징으로 하는 전기요금이 표시되는 수배전반. The key input unit includes a function switch for displaying an electric charge, and sets a charge unit according to a calculation date of a monthly electric charge calculation, or a progressive power amount, or selects a midnight electric charge, an industrial electric charge, and a general house electric charge. And a switchgear on which an electric charge is displayed, which is configured to perform a setting function.
KR1020080097252A 2008-10-02 2008-10-02 Distributing board that power rates are displayed KR20100037910A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080097252A KR20100037910A (en) 2008-10-02 2008-10-02 Distributing board that power rates are displayed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080097252A KR20100037910A (en) 2008-10-02 2008-10-02 Distributing board that power rates are displayed

Publications (1)

Publication Number Publication Date
KR20100037910A true KR20100037910A (en) 2010-04-12

Family

ID=42214958

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080097252A KR20100037910A (en) 2008-10-02 2008-10-02 Distributing board that power rates are displayed

Country Status (1)

Country Link
KR (1) KR20100037910A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102074902A (en) * 2010-12-10 2011-05-25 中国舰船研究设计中心 Visual alternating current distribution board with interlock protection function
KR20130055409A (en) * 2011-11-18 2013-05-28 삼성전자주식회사 Power managing apparatus and method for the same
KR101432125B1 (en) * 2011-12-25 2014-08-22 주식회사 케이티 Method and system for charging power rates
KR20150045269A (en) * 2013-10-18 2015-04-28 한병삼 Real Time Electric Charges Indicating Apparatus
US9537317B2 (en) 2010-10-12 2017-01-03 Samsung Electronics Co., Ltd. Power management system and method for controlling the same

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9537317B2 (en) 2010-10-12 2017-01-03 Samsung Electronics Co., Ltd. Power management system and method for controlling the same
CN102074902A (en) * 2010-12-10 2011-05-25 中国舰船研究设计中心 Visual alternating current distribution board with interlock protection function
KR20130055409A (en) * 2011-11-18 2013-05-28 삼성전자주식회사 Power managing apparatus and method for the same
KR101432125B1 (en) * 2011-12-25 2014-08-22 주식회사 케이티 Method and system for charging power rates
KR20150045269A (en) * 2013-10-18 2015-04-28 한병삼 Real Time Electric Charges Indicating Apparatus

Similar Documents

Publication Publication Date Title
JP4212369B2 (en) Power supply service method and system
US6121886A (en) Method for predicting fault conditions in an intelligent electronic device
US5959549A (en) Communal metering system
JP4584056B2 (en) Electricity supply and demand forecast and control system
KR101220773B1 (en) Intelligent Cabinet-Panel Having Energy Managing Function in the Smart Grid Environment
EP2475068A1 (en) Device for monitoring source of electric power supplied to storage battery in power supply system
US10468208B2 (en) Method and arrangement for electrical service disconnect
KR100722517B1 (en) Digital Intelligent Home Electric Management System and Method
KR101470448B1 (en) A smart grid for household meter and its control method
KR20100037910A (en) Distributing board that power rates are displayed
KR101299444B1 (en) Remote power administration system using power totalizer of ac/dc
EP2849302B1 (en) Energy management device, energy management method and program
KR100777828B1 (en) Electronic wattmeter capable of power distribution line and the fault monitoring method thereby
JP3551302B2 (en) Power monitoring system
KR20200089473A (en) power distribution board for household
EP1058934B1 (en) Method of detecting manual trips in an intelligent electronic device
KR101794580B1 (en) Apparatus for Control Smart Power Distribution Board and Method thereof
KR100550106B1 (en) Mornitoring system with electronic watthours-meter
KR200432760Y1 (en) Monitoring Device of Maximum Electric Power Demand
Shunmugalatha et al. Design and Development of Autonomous Smart Energy Meter with Remote Management Control
KR101423591B1 (en) Measurement system of electric power using charge
KR20160097680A (en) Power monitoring system and power monitoring device
JP2003109475A (en) Monitor system for circuit breaker and circuit breaker
JP4657965B2 (en) Power monitoring system
CN107390158B (en) Automobile charging pile system and method capable of carrying out electric energy metering virtual load test

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
NORF Unpaid initial registration fee