KR20100010561A - Fixing device for gang form - Google Patents
Fixing device for gang form Download PDFInfo
- Publication number
- KR20100010561A KR20100010561A KR1020080071471A KR20080071471A KR20100010561A KR 20100010561 A KR20100010561 A KR 20100010561A KR 1020080071471 A KR1020080071471 A KR 1020080071471A KR 20080071471 A KR20080071471 A KR 20080071471A KR 20100010561 A KR20100010561 A KR 20100010561A
- Authority
- KR
- South Korea
- Prior art keywords
- gangform
- contact plate
- body bolt
- fixing device
- vertical bar
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/002—Workplatforms, railings; Arrangements for pouring concrete, attached to the form
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/16—Members, e.g. consoles, for attachment to the wall to support girders, beams, or the like carrying forms or moulds for floors, lintels, or transoms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
- E04G2011/067—Integrated forms comprising shuttering skin, bracing or strutting arrangements, workplatforms and railings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The present invention relates to a form fixing device, and more particularly to a form fixing device to facilitate the installation and dismantling process for the gangform.
To this end, a gap between a gang form constituting the outer wall formwork of concrete, a plurality of horizontal bars and vertical bars fixed to the outside of the gang form to support the gang form, and a flow form forming the inner wall side form of concrete through the gang form In the gangform fixing device to maintain the, The gangform fixing device is in close contact with the entire surface of the vertical bar, the contact plate is formed through the through; Through the through hole of the contact plate through the gangform exposed to the euroform through the gangform A body bolt comprising; a support member for selectively adhering the contact plate to the vertical bar, wherein the support member is installed on the contact plate, and has an elastic force on each rear surface of the vertical bar through the space between the vertical bars. It provides a gangform fixing device characterized in that the hanging.
Description
The present invention relates to a gangform fixing device, and more particularly to a gangform fixing device to be easily detached to the gangform constituting the formwork side of the building.
In general, when forming a wall of an apartment or a building, two formwork is installed in the space corresponding to the thickness of the wall, that is, the inner wall and the outer wall, respectively, and the form fixing device is installed so that the gap can be maintained firmly. .
The fixing device is fastened in a posture penetrating two formwork to maintain the spacing of the formwork, the inner fixing bar positioned in a posture penetrating the inner wall side formwork, and penetrates in a posture corresponding to the inner fixing bar in the outer wall side formwork. An outer fixing bar which is fastened by a screw coupling, and the fixing pin for detachably fixing the inner and outer fixing bar to the two formwork side.
At this time, a screw portion is formed at the engaging side front end of the inner fixing bar and is set in a normal posture corresponding to the outer wall side formwork spaced apart from the formwork through the inner wall side formwork.
In addition, the outer fixing bar is provided with a connector formed with a screw groove to be connected to the screw portion of the inner fixing bar, the inner fixing bar is fastened by screw coupling to the connector, and the free end sides of the inner and outer fixing bars are fixed pins. The two formwork is set to the posture for wall construction while being fixed to the inner and outer formwork respectively.
The connector is set so as to protrude between the two formwork spaced apart through the outer wall-side formwork, and when the aspect of the wall is completed after the concrete is placed, the fastening with the inner fixing bar is released and can be easily separated from the cured wall It is made of cone-shaped cylindrical bodies with different diameters.
The two formwork, that is, the formwork located on the inner wall side, use a functional panel such as a flow form, and on the outer wall side, a conventional gangform, in which a reinforcement such as metal pipes is combined with a single panel, is used.
When the curing of the wall is completed by placing concrete between the inner formwork and the outer formwork set in the inner wall side and the outer wall side area as described above, the formwork dismantling work in the wall, the inner formwork, that is, the euroform is fixed inside the Separate the foam pins from the inner wall of the wall by separating the bar pins.
The outer formwork, that is, the gangform, is released from the gangform by releasing the fastening of the outer fixing bar fastened to the inner fixing bar, and the gangform having the outer fixing bar separated therefrom, for example, for construction of an upper wall. It is transported as it is to the upper layer area by a separate transport device and is set again in the area for wall construction on the upper side.
When dismantling the inner and outer formwork as described above, the euroform is located in the interior of the building, but not described above, the ceiling slab is constructed together with the wall in the lower floor, so vertical transportation is not possible in the assembled state due to the set position. Therefore, it is inevitable to separate each of them and transport them back to the upper floor area. Since the gangform is set in the outer area of the building, vertical transport is possible without being completely separated from the outer wall surface of the cured wall.
1 is an exploded perspective view of a conventional form fixing device, Figure 2 is a cross-sectional view of the state of use of the conventional form fixing device, the conventional form fixing device as shown in the drawing is the inner side to fix the inner flow path (F1) A
In this case, the device including the outer fixing bar 4, the
On the other hand, in the conventional form fixing device in the state in which the worker advanced the
When fixed at regular intervals by the inner and outer fixing bars (2, 4), the concrete is poured between the gang form (F2) and the euro form (F1) and cured. After the concrete wall is created, the worker forms the euro form (F1) on the inner wall. Remove the and the outer wall surface to raise the lock (26) and then rotate the outer fixing bar (4) to separate from the inner fixing bar (2) embedded in the concrete wall. When this operation is completed, the gangform (F2) is carried upwards to repeat the above operation continuously.
However, the above-mentioned conventional formwork fixing device, the gangform fixing device (4, 6, 22, 24) for fixing the gangform occurred the following problems.
First, there was a problem in which the gang form fixing device is mounted on the
That is, the configuration of the parts are many and complicated, due to a lot of airborne a series of processes for mounting the gangform fixing device on the
Second, looking at the fastening
That is, the lifting ring (I) is usually installed on the side of the vertical bar (10), due to this, interference with the
The present invention has been made to solve the above problems, an object of the present invention is to simplify the number of parts to simplify the mounting on the vertical bar, and to support the close contact plate supporting the inner side of the space between the vertical bar It was intended to provide a gangform fixture that is arranged so that interference with the lifting ring does not occur.
To this end, a gang form constituting the outer wall-side formwork of concrete, a plurality of horizontal bars and vertical bars fixed to the outside of the gang form to support the gang form, and the euro form passing through the gang form to form the inner wall side formwork of the concrete In the gangform fixing device to maintain the spacing, The gangform fixing device is in close contact with the entire surface of the vertical bar, the contact plate formed through holes; Conical nut exposed through the gangform through the gangform exposed to the euroforms A main body bolt comprising a support member for selectively contacting the contact plate to the vertical bar, wherein the support member is installed on the contact plate, the elastic force on each rear of the vertical bar through the space between the vertical bar It is provided with a gangform holding device characterized in that the hanging.
At this time, the support member, the fixing part fixed to the contact plate, an extension part which is gradually extended toward the outside from the fixing part, and the engaging portion bent toward the rear of the vertical bar from the end of the extension portion desirable.
At this time, the width between the extension portion is greater than the width between the vertical bar, it is preferable that the handle portion is further formed at the end of the engaging portion is bent back toward the outside.
In addition, the contact plate interferes with the inner diameter of the through hole and the separation prevention member having a smaller upper and lower width than the outer diameter of the main body bolt is further installed, the separation prevention member is accommodated around the body bolt corresponding to the separation prevention member It is preferable that the circumferential groove is partially formed, and the circumferential surface of the body bolt opens the separation preventing member by the rotation of the body bolt to temporarily release the interference of the through holes.
In addition, the rear end of the main body bolt is formed with a head portion having a larger outer diameter than the outer diameter of the main body bolt, it is preferred that the first washer is installed between the head portion and the contact plate.
At this time, a second washer is installed at the front end of the main body bolt, and a sealing member is installed between the second washer and the gangform, but the second washer is preferably prevented from being pushed by a protrusion formed around the main body bolt. .
According to the gangform fixing device according to the present invention has the following effects.
By simplifying the configuration of the parts, the number of mounting labor is reduced, there is an effect that the installation and disassembly operation of the device is simplified.
In addition, since the support member mounted on the vertical bar is disposed inside the vertical bars, there is an effect that does not interfere with the lifting ring provided on the outer surface of the vertical bar.
Hereinafter, with reference to the accompanying Figures 3 to 6b to explain the gangform fixing device according to a preferred embodiment of the present invention.
Prior to the description, the same components as in the prior art are denoted by the same reference numerals, and detailed description thereof will be omitted.
The gangform fixing device is configured to include the
The
At this time, the
In addition, the
In this case, the
At this time, the
The
In addition, through
At this time, the through holes (111, 121) is a place for the
In addition, in the
The
Detailed description thereof will be described later.
Meanwhile, a plurality of
Next, the
The
At this time, the
When the
The
That is, the two
The first washer W1 may be installed between the
The second washer W2 is further installed at a portion of the circumference of the
At this time, the second washer (W2) of the
In addition, a sealing member C is further installed between the second washer W2 and the gangform F2.
The sealing member (C) serves to prevent the concrete from leaking through the insertion hole (G1) formed in the gangform (F2), it is preferably a rubber material.
Next, the supporting
The
In this case, the
The fixing
In this case, the fixing
In addition, the
This is to further reinforce the elastic force of the
In addition, the locking
At this time, it is preferable that the
The
At this time, the
On the other hand, the distance between the pair of
This is to maximize the force of the support member 30 that is supported by the
On the other hand, the
The
The
At this time, the upper and lower width (H) of the
Accordingly, the
However, the
Hereinafter, the coupling process of the gangform fixing device made of the above configuration and the installation process for the gangform will be described.
The
Next, after passing the fixing
At this time, the fixing
Next, the
At this time, the
In addition, the
Thus, the
That is, since the stepped portion formed by the
On the other hand, the first washer (W1) is coupled between the
As a result, the coupling of the gangform fixing device is completed, and a process of installing the completed gangform fixing device on the formwork including the gangform and the euroform will be described with reference to FIGS. 6A and 6B.
First, the gangform fixing device is coupled to the prepared gangform (F2).
6A illustrates a state before the gangform fixing device is coupled to the gangform F2, and the interval between the pair of supporting
Thereafter, the user presses the
At this time, since the
On the other hand, after the retracted
At this time, the
At this time, the sealing member (C) installed in the portion of the
Next, the Sepha Tie bolt S is exposed toward the gang form F2 through the flow path F1 spaced apart from the gang form F2 by a predetermined distance.
At this time, the Sepha Tie bolt (S) is screwed to the
After that, the concrete is poured into the space formed between the gang form (F2) and the flow path (F1).
After that, concrete is cured after a certain time, and the gangform (F2) is dismantled from the cured concrete.
At this time, in order to dismantle the gang form (F2) by rotating the
At this time, referring to Figures 5a and 5b in detail the process of separating the
5A is also mentioned above, the
Then, when the
This is because the outer diameter of the
That is, as the
At this time, the
Then, when the coupling of the
1 is an exploded perspective view showing the fixing to the conventional formwork
2 is a side cross-sectional view of the combined view of FIG.
Figure 3 is a perspective view showing a gangform fixing device according to a preferred embodiment of the present invention
4 is an exploded perspective view of FIG.
5a and 5b is a cross-sectional view showing before and after the separation prevention member is opened by the rotation of the body bolt.
6A and 6B are cross-sectional views showing before and after the gangform fixing device is installed according to a preferred embodiment of the present invention.
* Description of Major Symbols in Drawings *
100: contact plate 101: bonding hole
102: engaging projection 110: the first plate
111,121: Through 120: Second Plate
120a: groove 122: jam hole
200: body bolt 201: peripheral groove
202: jungle prevention protrusion 210: cone nut
220: head portion 300: support member
310: fixed part 320: extension part
330: locking portion 340: handle portion
400: separation prevention member C: sealing member
S: Sepha Tie Bolt W1: First Washer
W2: Second washer H: Detachment member upper and lower width
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080071471A KR20100010561A (en) | 2008-07-23 | 2008-07-23 | Fixing device for gang form |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080071471A KR20100010561A (en) | 2008-07-23 | 2008-07-23 | Fixing device for gang form |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20100010561A true KR20100010561A (en) | 2010-02-02 |
Family
ID=42085172
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020080071471A KR20100010561A (en) | 2008-07-23 | 2008-07-23 | Fixing device for gang form |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20100010561A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200467915Y1 (en) * | 2012-01-16 | 2013-07-10 | 대산이엔지 주식회사 | fixing device for gang form |
KR101497688B1 (en) * | 2014-02-02 | 2015-03-12 | 이옥순 | Fixing device for maintain a distance and anchor bolt of mould |
KR200487327Y1 (en) | 2017-03-30 | 2018-09-04 | 곽준범 | Teaching aids using gyro effect |
KR20210054924A (en) * | 2019-11-06 | 2021-05-14 | 에스폼 주식회사 | Insulating gang form and construction method for wall concrete of building using insulating gang form |
CN115012658A (en) * | 2022-05-12 | 2022-09-06 | 国网河北省电力有限公司建设公司 | Fair-faced concrete mold, fair-faced concrete mold assembly and using method |
-
2008
- 2008-07-23 KR KR1020080071471A patent/KR20100010561A/en not_active Application Discontinuation
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200467915Y1 (en) * | 2012-01-16 | 2013-07-10 | 대산이엔지 주식회사 | fixing device for gang form |
KR101497688B1 (en) * | 2014-02-02 | 2015-03-12 | 이옥순 | Fixing device for maintain a distance and anchor bolt of mould |
KR200487327Y1 (en) | 2017-03-30 | 2018-09-04 | 곽준범 | Teaching aids using gyro effect |
KR20210054924A (en) * | 2019-11-06 | 2021-05-14 | 에스폼 주식회사 | Insulating gang form and construction method for wall concrete of building using insulating gang form |
CN115012658A (en) * | 2022-05-12 | 2022-09-06 | 国网河北省电力有限公司建设公司 | Fair-faced concrete mold, fair-faced concrete mold assembly and using method |
CN115012658B (en) * | 2022-05-12 | 2023-08-11 | 国网河北省电力有限公司建设公司 | Bare concrete mold, bare concrete mold assembly and use method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR20100010561A (en) | Fixing device for gang form | |
KR102002879B1 (en) | Magnetic type embeded anchor and manufacturing method thereof | |
KR20140137879A (en) | Anchor assembly for exterior materials including insulation of concrete wall | |
KR20120011760A (en) | Isolator fixing device of mold | |
KR20090037721A (en) | Device for fixing the sleeve for building | |
KR20130014410A (en) | Furring strip fixing member and constructing structure using the same | |
JP2006328812A (en) | Mounting device of faucet | |
KR100888987B1 (en) | Bolt | |
KR101009277B1 (en) | Sprinkler' head unit fixing apparatus | |
KR20090113476A (en) | Insert for concrete slab | |
KR101723410B1 (en) | Apparatus for fixing of stone net and stone net construction method thereof | |
KR200424652Y1 (en) | T bolt | |
KR200419782Y1 (en) | Concrete Formwork Bolt Assembly | |
KR20210013450A (en) | Scaffolding piece | |
KR200485218Y1 (en) | Joint apparatus for form | |
KR200394599Y1 (en) | Fixing device for form | |
KR101128401B1 (en) | structural steel assembly of celing | |
KR20190098408A (en) | Anchor bolt to be used first for formwork | |
KR101115411B1 (en) | A Device For Holding The Panel And Its Installation Structure | |
KR100898012B1 (en) | Anchor for a saftey net using under construction | |
KR20090113479A (en) | Fixing instrument for insulating material | |
KR200335555Y1 (en) | combination a mold | |
KR200314955Y1 (en) | Supporter for sheeting | |
KR20130010570A (en) | Install device of billiard fabric and install method thereby | |
KR200342749Y1 (en) | Device For Connecting Concrete Form |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E601 | Decision to refuse application |