KR20100001777A - Dismantle method of circular construction structure - Google Patents

Dismantle method of circular construction structure Download PDF

Info

Publication number
KR20100001777A
KR20100001777A KR1020080061825A KR20080061825A KR20100001777A KR 20100001777 A KR20100001777 A KR 20100001777A KR 1020080061825 A KR1020080061825 A KR 1020080061825A KR 20080061825 A KR20080061825 A KR 20080061825A KR 20100001777 A KR20100001777 A KR 20100001777A
Authority
KR
South Korea
Prior art keywords
dismantling
building structure
blasting
circular building
tension
Prior art date
Application number
KR1020080061825A
Other languages
Korean (ko)
Inventor
서영수
서영관
Original Assignee
서영수
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 서영수 filed Critical 서영수
Priority to KR1020080061825A priority Critical patent/KR20100001777A/en
Publication of KR20100001777A publication Critical patent/KR20100001777A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/08Wrecking of buildings
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques
    • F42D3/02Particular applications of blasting techniques for demolition of tall structures, e.g. chimney stacks
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D5/00Safety arrangements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

PURPOSE: A dismantling method of a circular construction structure is provided to rapidly and safely dismantle the circular construction structure such as a stadium and a ballpark in which tension exists. CONSTITUTION: A dismantling method of a circular construction structure comprises following steps. A lower part(110) of a circular construction structure(100) is destroyed. A core is bored for blasting. A tensile force dissipating part(130) is cut and formed. An upper part(120) is blasted by a blasting machine.

Description

원형 건축 구조물의 해체방법{dismantle method of circular construction structure}Dismantle method of circular construction structure

본 발명은 원형 건축 구조물의 해체 방법에 관한 것으로서, 특히 자체 긴장력을 형성하고 있는 야구장 또는 종합 운동장과 같은 원형 건축 구조물에 긴장력 해소부를 형성하여 긴장력을 해소함으로써, 발파시 붕괴 방향을 유도하여 안전하고 용이한 해체를 이루도록 한 원형 건축 구조물의 해체방법에 관한 것이다.The present invention relates to a method for dismantling a circular building structure, and in particular, by forming a tension release portion in a circular building structure, such as a baseball field or a comprehensive sports ground, which forms its own tension force to solve the tension force, to induce the collapse direction during blasting, safe and easy A method for dismantling a circular building structure to achieve a dismantling.

일반적으로 건축 구조물의 해체는 대형 브레이커, 압쇄기, 워터제트 등의 각종 장비 또는 이들을 혼합한 다양한 기계식 해체방법과, 구조물의 안정성에 관련된 주요 지점인 기둥이나 벽과 같은 곳에 천공한 후, 폭약을 삽입하여 발파함에 따라, 구조물의 안정성과 강성을 저하시켜 불안정한 상태로 만들어 구조물 자체의 하중으로 붕괴 되도록 유도하는 발파해체공법 등이 있다.In general, the dismantling of a building structure is carried out in a variety of mechanical dismantling methods, such as a large breaker, crusher, water jet, or a combination of them, and by drilling into a pillar or wall, which is a key point related to the stability of the structure, and then inserting explosives As the blasting, there is a blast dismantling method such as to deteriorate the stability and rigidity of the structure to make it unstable to collapse under the load of the structure itself.

그러나, 상기와 같은 해체방법 중, 기계식 해체방법은 중량의 장비에 의해 이루어지기 때문에 높은 구조물의 해체시에는 중량의 장비를 중기 인양시켜야 하고, 또 높은 위치로 중량의 장비를 인양시킨 후에도 하중에 따른 추락의 위험 등과 같은 안전문제로 인하여 저층에 국한하여 이용하게 되므로 높은 건축 구조물의 해 체에는 사용이 어려운 문제점이 있다.However, during the dismantling method as described above, the mechanical dismantling method is made by heavy equipment, so when dismantling a high structure, the heavy equipment must be lifted in the middle, and even after lifting the heavy equipment to a high position, Due to safety problems such as the risk of falling, it is limited to the lower floors, so it is difficult to use for dismantling high building structures.

그리고, 대표적인 원형 건축 구조물인 야구장 또는 종합 운동장의 해체에는 해체기간이 매우 오래 걸리는 문제점이 있었다. 즉, 상기 기계식 해체방법으로는 높은 위치에 있는 구조물 상부까지 해체장비를 닿게 할 수 없기 때문에 반드시 비계(발판)를 형성하기 위해 성토(盛土) 작업을 매우 높게 형성하여 장비를 이동시키면서 구조물 상부의 해체 작업을 해야 하거나, 또는 별도의 인력과 장비를 이용해야 하므로, 해체 작업이 매우 불편함은 물론 작업기간과 비용이 많이 소요되며, 추락의 위험 등과 같은 문제점이 있었다.In addition, the dismantling of a baseball stadium or a general sports ground which is a typical circular building structure has a problem that the dismantling period takes a very long time. In other words, the mechanical dismantling method does not allow the dismantling equipment to reach the upper part of the structure at a high position. Therefore, the work of dismantling the upper part of the structure while moving the equipment by forming the fill work is very high to form a scaffold. Since the work should be performed, or a separate manpower and equipment should be used, the dismantling work is very inconvenient, takes a long time and cost, and there is a problem such as the risk of falling.

또, 상기 발파해체 공법을 적용할 경우에는 원형 건축 구조물 자체에 존재하는 긴장력에 의해, 발파시 구조물의 붕괴 방향을 예측할 수 없음은 물론 매우 많은 파편이 비산 되므로 사고의 위험성이 높고, 또한 건축 구조물의 규모에 비하여 상당히 많은 부분을 발파 해체를 위한 사전 처리작업이 이루어짐에 따라 기계식 해체방법보다 오히려 많은 시간과 공사비가 소요되어 발파해체 작업의 장점을 살리지 못하는 문제점이 있었다.In addition, when the blasting and dismantling method is applied, the tension force present in the circular building structure itself may not predict the collapse direction of the structure during blasting, and very many fragments may be scattered. Due to the pre-treatment work for blasting and dismantling a considerable part compared to the scale, there was a problem in that it takes much time and construction cost rather than a mechanical dismantling method and thus cannot take advantage of the blasting and dismantling work.

이에, 본 발명은 상기한 문제점을 해결하기 위하여 창출된 것으로서, 본 발명의 목적은 긴장력이 존재하는 야구장 또는 종합 운동장과 같은 원형 건축 구조물의 해체를 안전하고, 신속하며, 용이하게 이룰 수 있도록 한 원형 건축 구조물의 해체방법을 제공하는 것이다. Accordingly, the present invention was created to solve the above problems, an object of the present invention is to provide a safe, fast and easy way to achieve the dismantling of a circular building structure, such as a baseball field or a comprehensive sports ground where tension exists It is to provide a method of dismantling a building structure.

상기한 목적을 달성하기 위해 본 발명은 원형 건축 구조물 해체 방법으로서, 상기 원형 건축 구조물의 하부를 기계식 장비를 이용하여 파쇄하는 단계와; 상부 발파를 위해 폭약을 장전하기 위한 위치와, 일부 범위를 약화시키는 절단작업을 원활히 하기 위해 절단 위치에 구멍을 뚫어 코어를 천공하는 단계와; 긴장력을 해소하여 발파시 안전하고 용이한 붕괴를 이루도록 다수의 구간에 일정 넓이의 긴장력 해소부를 절단 형성하는 단계와; 상기 천공 부분에 폭약과 뇌관을 결합하여 삽입한 후, 기폭을 위해 뇌관을 모두 연결하여 회로를 형성하고, 발파기를 이용하여 상부를 발파시키는 단계;를 포함하여 이루어지는 것을 특징으로 한다.In order to achieve the above object, the present invention provides a method for dismantling a circular building structure, comprising: crushing a lower portion of the circular building structure using mechanical equipment; Perforating the core by drilling a hole in the cutting position to facilitate a cutting operation for loading the explosives for top blasting and weakening some ranges; Cutting the tension force solving portion of a predetermined width in a plurality of sections so as to achieve a safe and easy collapse upon blasting by releasing the tension force; After inserting the explosives and the primer coupled to the perforated part, connecting all the primers for detonation to form a circuit, and blasting the upper portion using a blasting machine; characterized in that it comprises a.

선택적으로, 상기 긴장력 해소부의 넓이는 1m ∼ 5m로 형성되는 것을 특징으로 한다.Optionally, the width of the tension canceling portion is characterized in that formed from 1m to 5m.

또, 상기 긴장력 해소부의 형성은 분진발생을 억제하고 구조물에 손상을 주지 않으며, 비계작업을 최소화하도록 다이아몬드 와이어 쏘(Diamond Wire Saw)에 의해 이루어지는 것을 특징으로 한다.In addition, the formation of the tension-relieving portion is characterized in that it is made by a diamond wire saw (Diamond Wire Saw) to suppress dust generation, do not damage the structure, and minimize the scaffolding work.

상기 긴장력 해소부는 원형 건축 구조물의 곡면부와, 곡면부와 직선부의 경계를 이루는 지점에 다수 형성되는 것을 특징으로 한다.The tension relief portion is characterized in that a large number is formed at the point forming the boundary between the curved portion, the curved portion and the straight portion of the circular building structure.

이상에서와 같은 본 발명은 원형 건축 구조물의 곡면부와, 곡면부와 직선부의 경계를 이루는 지점에 형성한 다수의 긴장력 해소부를 통해 긴장력을 해제하여 붕괴 방향을 안전하게 유도하고, 파편의 무분별한 비산이 방지되도록 함으로써, 안 전하고 향상된 작업성을 이루도록 한 효과가 있다.As described above, the present invention releases the tension force through the curved portion of the circular building structure and a plurality of tension force canceling portions formed at the boundary of the curved portion and the straight portion to induce the collapse direction safely, and prevents indiscriminate scattering of debris. By doing so, there is an effect of achieving safe and improved workability.

또, 신속한 해체를 이룰 수 있으므로, 공사기간의 단축으로 인한 비용이 절감되는 효과가 있다. In addition, since it can be quickly dismantled, there is an effect that the cost is reduced due to the reduction of the construction period.

이하, 본 발명에 따른 바람직한 실시 예를 첨부된 도면에 의거하여 보다 구체적으로 설명한다.Hereinafter, preferred embodiments of the present invention will be described in more detail with reference to the accompanying drawings.

도 1은 본 발명의 바람직한 실시 예에 따른 원형 건축 구조물의 하나인 종합 운동장의 상부와 하부 및 긴장력 해소부를 나타낸 도면이고, 도 2는 도 1의 A-A선 단면을 나타낸 도면이며, 도 3은 본 발명의 바람직한 실시 예에 따른 원형 건축 구조물의 해체순서를 도시한 플로차트이다.1 is a view showing the upper and lower parts and the tension relief portion of the comprehensive sports ground which is one of the circular building structure according to a preferred embodiment of the present invention, Figure 2 is a view showing a cross-section line AA of Figure 1, Figure 3 A flowchart illustrating the dismantling sequence of a circular building structure according to a preferred embodiment of the present invention.

도 1 내지, 도 3에 도시된 바와 같이, 본 발명은 원형 건축 구조물(100)의 하부(110)를 파쇄하는 파쇄단계(S1)와, 상부(120) 발파를 위한 코어를 천공하는 천공단계(S2)와, 긴장력 해소부를 절단 형성하는 긴장력 해소부 형성단계(S3)와, 발파기를 이용하여 발파시키는 발파단계(S4)로 이루어진다.As shown in Figures 1 to 3, the present invention is a shredding step (S1) for crushing the lower portion 110 of the circular building structure 100, and a drilling step for drilling a core for blasting the upper portion (120) ( S2), the tension force solving portion forming step (S3) for cutting and forming the tension force solver, and the blasting step (S4) for blasting using a blasting machine.

상기 파쇄단계(S1)는, 주로 중장비에 결합 되어 파쇄, 절단, 쇄탄 동작하는 브레이커(breaker), 누르거나 쥐어서 으깨어 부수는 기계인 압쇄기(壓碎機), 암석이나 구조물 등에 구멍을 뚫는 기계인 천공기(穿孔機) 등을 이용하여 기계식으로 원형 건축 구조물, 예컨대 원형 종합운동장의 스탠드가 형성된 하부를 파쇄한다.The crushing step (S1) is a breaker (crusher) that is mainly coupled to heavy equipment, crushing, cutting, crushing operation, crusher (crushing), which is a machine that punches or crushed by pressing or grasping the rock or structure The lower part in which the stand of a circular building structure, for example, a circular sports ground, is mechanically crushed using a punching machine or the like.

상기 파쇄된 파쇄물은 필요에 따라 상부의 용이한 해체를 위해서 비계(발판)의 성토재료(盛土材料)로 사용하기도 하나, 성토를 위해서는 파쇄물을 운반해야 하 는 단점이 있으므로 반드시 필요한 부분에 대하여 실시하는 것이 바람직하다.The crushed crushed material may be used as a fill material of scaffolding for easy dismantling of the upper part as necessary. It is preferable.

그리고, 상기와 같은 기계식 해체방법의 적용을 원형 건축 구조물(100)의 하부(110)에 한정하여 이용함으로써, 중량의 장비를 높이 올리지 않아도 되므로 장비의 자유로운 이동 작업이 가능하게 되어, 장비의 인양 등으로 인한 작업효율저하와 공사기간의 지연을 방지할 수 있다.In addition, by using the application of the mechanical dismantling method as described above to the lower portion 110 of the circular building structure 100, it is not necessary to raise the weight of the equipment, it is possible to freely move the equipment, lifting of equipment, etc. It can prevent the decrease in work efficiency and delay of construction period.

상기 천공단계(S2)는, 원형 건축 구조물(100)의 상부(120) 발파를 위한 폭약 장전 위치와, 상기 긴장력 해소부(130)의 절단을 원활히 하기 위해 계획된 절단 위치에 다이아몬드 와이어 쏘(Diamond Wire Saw)를 삽입하기 위한 코어를 천공하기 위한 것으로서, 예컨대 전기해머드릴을 사용하여 천공 경을 개략 10㎜ ∼ 55㎜로 형성하고, 구멍과 구멍의 간격은 200㎜∼800㎜로 형성하며, 천공길이는 10㎝ ∼30㎝로 형성한다.The drilling step (S2) is a diamond wire saw (Diamond Wire saw) at the cutting position planned to facilitate the cutting of the explosive charge position for blasting the upper portion 120 of the circular building structure 100, the tension relief portion 130 For drilling a core for inserting a saw, for example, an electric hammer drill is used to form a drilling diameter of approximately 10 mm to 55 mm, and a gap between the hole and the hole is 200 mm to 800 mm, and the drilling length Is formed from 10 cm to 30 cm.

여기서, 상기 천공 경과 천공 길이는 사용되는 폭약류의 굵기, 길이, 양 및 절단을 위해 설치되는 다이아몬드 와이어 쏘의 삽입 길이 등에 따라 적절히 가감 형성하는 것이 바람직할 것이다. Here, it will be preferable to appropriately add or subtract the puncturing length and the puncturing length depending on the thickness, length, quantity of the explosives used, and the insertion length of the diamond wire saw installed for cutting.

상기 긴장력 해소부 형성단계(S3)는, 하부(110)의 파쇄, 해체완료 후 긴장력이 존재하는 원형 건축 구조물(100)의 상부(120) 발파시, 파편 비산 방지와 붕괴 방향을 유도하고 원활한 붕괴를 이루기 위하여 계획된 절단 위치에 형성된 천공 부분으로 다이아몬드 와이어 쏘를 삽입하여 긴장력 해소부(130)를 절단 형성하고, 절단된 구조물은 크레인 등을 이용하여 인양 제거한다.The step of releasing the tension (S3), the crushing of the lower part 110, when the blasting of the upper part 120 of the circular building structure 100 after the dismantling is complete, induce debris scattering and collapse direction and smooth collapse Insert the diamond wire saw into the drilled portion formed in the planned cutting position to achieve the cutting force forming the tension relief portion 130, and the cut structure is removed by lifting using a crane or the like.

또, 상기 긴장력 해소부(130)가 형성되는 넓이는 개략 1m ∼ 5m로 형성되는 것이 바람직하나, 구조물의 크기(규모)에 따라 추가로 가감할 수 있다.In addition, it is preferable that the width of the tension canceling unit 130 is formed to be approximately 1m to 5m, but may be further added or subtracted according to the size (scale) of the structure.

상기 긴장력 해소부(130)의 절단시 상기 다이아몬드 와이어 쏘(Diamond Wire Saw)를 이용함으로써, 분진발생을 억제하고 구조물에 손상을 주지 않으며, 비계(발판)작업을 최소화하도록 하였다.By using the diamond wire saw (Diamond Wire Saw) at the time of cutting the tension relief portion 130, to suppress the generation of dust and damage to the structure, to minimize the scaffolding (footrest) work.

여기서, 상기 긴장력 해소부(130)는 원형 건축 구조물(100)에 존재하는 긴장력을 해제하기 위하여 원형 구조물을 대상으로 일부 범위를 약화시켜 파편의 비산 방지와 원활한 붕괴를 유도하기 위한 개념으로 해석할 수 있다.Here, the tension solving portion 130 may be interpreted as a concept for inducing the scattering of the debris and smooth collapse by weakening a certain range of the circular structure in order to release the tension force present in the circular building structure 100. have.

즉, 화약류를 이용해 원형 건축 구조물(100)을 붕괴시키는 발파 해체 공법은 단지 화약만을 사용한다고 해서 구조물이 원하는 방향으로 안전하게 붕괴 되는 것은 아니다. 원형 구조체에는 구조적으로 상호 지지를 위한 긴장력이 존재하기 때문에 이를 제거하지 않고 발파 해체를 할 경우에는 붕괴 방향과 파편의 비산 방향을 예측할 수 없게 되어 매우 위험하게 된다.That is, the blast dismantling method of decomposing the circular building structure 100 using explosives does not mean that the structure is safely collapsed in a desired direction by using only explosives. Since there is a structurally mutual tension in the circular structure, if the blasting is dismantled without removing it, the collapse direction and the scattering direction of the fragments cannot be predicted, which is very dangerous.

따라서, 상기 긴장력 해소부(130)는 이러한 긴장력을 해제하기 위한 것으로서, 원형 건축 구조물의 일부 범위인 곡면부와, 곡면부와 직선부의 경계를 이루는 지점에 다수 형성하여 안전하고 용이한 붕괴를 이루게 한다.Therefore, the tension relief portion 130 is to release such a tension force, to form a large number of points forming the boundary between the curved portion and the curved portion and the straight portion of the circular building structure to form a safe and easy collapse. .

상기 상부 발파단계(S4)는 상기 폭약 장전 위치에 형성된 천공 부분에 폭약과 뇌관을 결합하여 삽입한 후, 기폭을 위해 뇌관을 모두 연결하여 회로를 형성하고, 발파기를 이용하여 발파시키게 된다.The upper blasting step (S4) is combined with the explosives and the primer inserted into the perforated portion formed at the explosive charge loading position, then connect all the primers for detonation to form a circuit, and to blast using a blasting machine.

여기서, 발파해체 공법은 해체 대상 구조물에 대한 구조역학적 문제와 구조물 붕괴시 진동을 발생시키는 지반에 전달되는 충격에너지의 양을 충분히 고려하여 최적의 발파위치 선정과 진동의 감소를 위한 발파시간 차의 배분이 가장 중요한 요소가 된다. 정확하고 효율적인 발파해체는 화약의 사용량을 최소화하면서 최대의 발파효과를 얻을 수 있어야 하며, 적절한 장약과 방호방법으로 발파의 효과를 최대한 상승시키면서 파편의 비산을 효과적으로 제어할 수 있어야 하는 것이다. Here, the blasting disassembly method considers the structural dynamics of the structure to be dismantled and the amount of impact energy transmitted to the ground that generates vibration when the structure collapses. This is the most important factor. Accurate and efficient blasting should be able to achieve the maximum blasting effect while minimizing the use of gunpowder, and it should be able to effectively control the scattering of debris while maximizing the blasting effect with the appropriate charge and protection method.

즉, 원형 건축 구조물(100)의 붕괴 유도 방향의 전방에 있는 기둥(121)과, 구조물 단면의 중심에 위치한 기둥(123)까지를 1차 발파 대상으로 하고, 붕괴 유도 방향으로부터 중심부 사이의 기둥(122), (124)까지를 2차 발파 대상으로 하므로, 원형 건축 구조물(100)을 지지하고 있는 기둥(121),(123)을 발파하면 나머지 P 지점에 있는 기둥(125)이 힌지 역할을 하여 구조물이 붕괴 유도방향으로 전도되기 시작하며 이때, 기둥(122),(124)을 발파하게 되면 전도에 필요한 운동거리를 확보할 수 있게 된다.That is, the pillar 121 in front of the collapse induction direction of the circular building structure 100 and the pillar 123 located at the center of the cross section of the structure are the primary blasting targets, and the pillar between the center and the center of the collapse induction direction ( 122), 124 to the second blasting target, if the blasting pillars 121, 123 supporting the circular building structure 100, the pillars 125 at the remaining P point acts as a hinge The structure starts to fall in the direction of collapse induction. At this time, the blasting of the pillars 122 and 124 ensures a movement distance necessary for conduction.

이와 같이, 횡 방향으로 배열되어 있는 기둥(121),(123),(122),(124)을 순차적으로 기폭하여 전도방향의 구조물 지지력을 없애주면 아직 파괴되지 않은 기둥(125)과 파괴되어 전도 낙하하는 부분 사이의 구조물들이 비틀림 등을 일으켜 부서지게 되며 전도운동이 지속적으로 발생하게 되어 구조물 전체가 발파 해체된다.As described above, when the pillars 121, 123, 122, and 124 arranged in the transverse direction are sequentially detonated to remove the supporting force of the structure in the conductive direction, the pillars 125, which are not destroyed yet, are destroyed and conducted. Structural structures between the falling parts are twisted and broken, and the conduction movement is continuously generated, thereby blasting and dismantling the whole structure.

따라서, 붕괴 방향은 구조물의 내측으로 안전하게 유도됨과 동시에 파편의 비산 방향도 내측으로 주로 유도되고, 비산 량도 매우 적게 된다.Therefore, the collapse direction is guided safely to the inside of the structure and at the same time the scattering direction of the debris is mainly guided inward, and the amount of scattering is very small.

이상에서 설명한 본 발명은 전술한 실시 예 및 첨부된 도면에 의해 한정되는 것이 아니고, 본 발명의 기술적 사상을 벗어나지 않는 범위 내에서 여러 가지로 치환, 변형 및 균등한 타 실시 예로의 변경이 가능함은 본 발명이 속하는 기술분야에 서 통상의 지식을 가진 자에게 있어서 명백할 것이다.The present invention described above is not limited to the above-described embodiments and the accompanying drawings, and various changes, modifications, and equivalent changes to other embodiments may be made without departing from the technical spirit of the present invention. It will be apparent to those skilled in the art to which the invention pertains.

도 1은 본 발명의 바람직한 실시 예에 따른 원형 건축 구조물의 하나인 종합 운동장의 상부와 하부 및 긴장력 해소부를 나타낸 도면이다.1 is a view showing the upper and lower portions and the tension relief portion of the comprehensive sports ground which is one of the circular building structure according to an embodiment of the present invention.

도 2는 도 1의 A-A선 단면을 나타낸 도면이다.2 is a cross-sectional view taken along the line A-A of FIG.

도 3은 본 발명의 바람직한 실시 예에 따른 원형 건축 구조물의 해체순서를 도시한 플로차트이다.3 is a flowchart illustrating a dismantling sequence of a circular building structure according to a preferred embodiment of the present invention.

※ 도면의 주요부분에 대한 부호의 설명 ※ ※ Explanation of code about main part of drawing ※

100 : 원형 건축 구조물 110 : 하부100: circular building structure 110: lower

120 : 상부 121, 122, 123, 124, 125 : 기둥120: upper part 121, 122, 123, 124, 125: column

130 : 긴장력 해소부130: relieves tension

Claims (4)

원형 건축 구조물 해체 방법으로서,As a method of dismantling a circular building structure, 상기 원형 건축 구조물의 하부를 기계식 장비를 이용하여 파쇄하는 단계와;Crushing the lower part of the circular building structure by using mechanical equipment; 상부 발파를 위해 폭약을 장전하기 위한 위치와, 일부 범위를 약화시키는 절단작업을 원활히 하기 위해 절단 위치에 구멍을 뚫어 코어를 천공하는 단계와;Perforating the core by drilling a hole in the cutting position to facilitate a cutting operation for loading the explosives for top blasting and weakening some ranges; 긴장력을 해소하여 발파시 안전하고 용이한 붕괴를 이루도록 다수의 구간에 일정 넓이의 긴장력 해소부를 절단 형성하는 단계와;Cutting the tension force solving portion of a predetermined width in a plurality of sections so as to achieve a safe and easy collapse upon blasting by releasing the tension force; 상기 천공 부분에 폭약과 뇌관을 결합하여 삽입한 후, 기폭을 위해 뇌관을 모두 연결하여 회로를 형성하고, 발파기를 이용하여 상부를 발파시키는 단계;를 포함하여 이루어지는 것을 특징으로 하는 원형 건축 구조물의 해체방법.After inserting the explosives and the primer coupled to the perforated part, connecting all the primers for detonation to form a circuit, and blasting the upper portion using a blasting apparatus; dismantling of the circular building structure comprising a Way. 제1항에 있어서, 상기 긴장력 해소부의 넓이는 1m ∼ 5m로 형성되는 것을 특징으로 하는 원형 건축 구조물의 해체방법.The method of dismantling a circular building structure according to claim 1, wherein an area of the tension canceling part is formed in a range of 1 m to 5 m. 제1항에 있어서, 상기 긴장력 해소부의 절단은 분진발생을 억제하고 구조물에 손상을 주지 않도록 다이아몬드 와이어 쏘에 의해 이루어지는 것을 특징으로 하는 원형 건축 구조물의 해체방법.The method for dismantling a circular building structure according to claim 1, wherein the cutting of the tension removing part is performed by a diamond wire saw to suppress dust generation and not damage the structure. 제1항에 있어서, 상기 긴장력 해소부는 원형 건축 구조물의 곡면부와, 곡면 부와 직선부의 경계를 이루는 지점에 다수 형성되는 것을 특징으로 하는 원형 건축 구조물의 해체방법. The dismantling method of the circular building structure according to claim 1, wherein the tension canceling part is formed at a point forming a boundary between the curved part of the circular building structure and the curved part and the straight part.
KR1020080061825A 2008-06-27 2008-06-27 Dismantle method of circular construction structure KR20100001777A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080061825A KR20100001777A (en) 2008-06-27 2008-06-27 Dismantle method of circular construction structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080061825A KR20100001777A (en) 2008-06-27 2008-06-27 Dismantle method of circular construction structure

Publications (1)

Publication Number Publication Date
KR20100001777A true KR20100001777A (en) 2010-01-06

Family

ID=41812041

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080061825A KR20100001777A (en) 2008-06-27 2008-06-27 Dismantle method of circular construction structure

Country Status (1)

Country Link
KR (1) KR20100001777A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105401742A (en) * 2015-10-09 2016-03-16 珠海***新技术开发有限公司 Blasting demolition construction key technology and construction method of intersecting-parallels-shaped high-rise building
WO2018074737A1 (en) * 2016-10-19 2018-04-26 루씨엠(주) Automated external defibrillator storage box and remote integrated management platform of automated external defibrillator

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105401742A (en) * 2015-10-09 2016-03-16 珠海***新技术开发有限公司 Blasting demolition construction key technology and construction method of intersecting-parallels-shaped high-rise building
WO2018074737A1 (en) * 2016-10-19 2018-04-26 루씨엠(주) Automated external defibrillator storage box and remote integrated management platform of automated external defibrillator

Similar Documents

Publication Publication Date Title
JP4201633B2 (en) Blasting and dismantling method of reinforced concrete structure
JP5620706B2 (en) Dismantling method
TWI622692B (en) Pile head treatment method
JP6423690B2 (en) Dismantling method
JP6893401B2 (en) How to dismantle a columnar structure
JP2005179924A (en) Method for blowing up and demolishing reinforced concrete structure
KR20100001777A (en) Dismantle method of circular construction structure
CN105043177B (en) The method and device that a kind of sillar is broken
KR100680032B1 (en) Method of Explosive Demolition on the Buildings by use of Explosives
KR101256584B1 (en) Tunnel Constructing Method Using Double Excavation method
KR100885925B1 (en) Blasting demolition method of the silo on a large cylindrical structure
JP2020063660A (en) Underground pile breaking method
JP2017125309A (en) Underground pile crushing method
KR100460752B1 (en) Blasting dissolution method of wall
JP6310181B2 (en) Dismantling method
JP6844082B2 (en) Underground pile crushing method
JP5795232B2 (en) Dismantling method
JP7295610B2 (en) Method for removing concrete from the surface of a reinforced concrete building
JP2010116682A (en) Method of demolishing concrete structure
KR101153367B1 (en) Method for blasting core center-cut
JP2017180000A (en) Demolition method by section of structure
JP6783493B2 (en) Underground pile removal method
WO2003004797A1 (en) Method for demolishing concrete structures provided with internal reinforcing
JP4780473B2 (en) Tunnel construction method
JP6603774B1 (en) Underground pile crushing method

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application