KR20090127841A - Multihole-type internal fixture of tension wire removal type ground anchorage - Google Patents
Multihole-type internal fixture of tension wire removal type ground anchorage Download PDFInfo
- Publication number
- KR20090127841A KR20090127841A KR1020090059665A KR20090059665A KR20090127841A KR 20090127841 A KR20090127841 A KR 20090127841A KR 1020090059665 A KR1020090059665 A KR 1020090059665A KR 20090059665 A KR20090059665 A KR 20090059665A KR 20090127841 A KR20090127841 A KR 20090127841A
- Authority
- KR
- South Korea
- Prior art keywords
- wedge
- main body
- tension member
- hole
- screw
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
- E02D5/80—Ground anchors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/08—Members specially adapted to be used in prestressed constructions
- E04C5/12—Anchoring devices
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/12—Mounting of reinforcing inserts; Prestressing
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0026—Metals
- E02D2300/0029—Steel; Iron
- E02D2300/0034—Steel; Iron in wire form
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Description
본 발명은 인장재 제거식 그라운드 앵커용 다구형 내부정착체에 관한 것으로, 보다 상세하게는 상단에 보호캡이 나사결합되는 본체의 상면에 복수개의 인장재가 각각 삽입되는 복수개의 웨지삽입공이 관통형성되고 상기 웨지삽입공에는 상단에 웨지물림해제구가 결합된 웨지조립체가 각각 삽입설치되며 상기 본체의 상부에는 웨지조립체의 상단에 결합된 웨지물림해제구가 각각 체결되는 웨지물림해제판이 한 쌍의 지지대에 의해 본체의 상면으로부터 이격되게 설치되도록 구성함으로써, 조립시 본체의 웨지삽입공에 각각 삽입되는 복수개의 인장재를 견고하게 고정시킨 후 간편하고 용이하게 조립할 수 있게 하여 조립작업성을 대폭 향상시킬 수 있도록 할 뿐만 아니라 본체의 웨지삽입공에 각각 삽입되는 복수개의 인장재가 안정적인 웨지물림상태를 유지할 수 있게 하여 완성된 앵커의 운송과정이나 시공작업을 위한 취급시 외부충격이나 하중에 의해 인장재에 대한 고정 및 해제기능이 손상되는 것을 방지할 수 있도록 하며, 또 그라운드 앵커의 시공시 하나의 앵커공의 내부로 삽입되는 복수개의 인장재에 균일한 정착력을 가할 수 있게 하여 더욱 더 안정적인 정착상태를 유지할 수 있도록 하는 동시에 그라운드 앵커의 해체시 웨지물 림해제구와 웨지물림해제판의 결합에 의해 인장재에 대한 웨지물림상태를 간편하게 해제할 수 있게 하여 더욱 더 용이하게 인장재를 제거할 수 있도록 하는 인장재 제거식 그라운드 앵커용 다구형 내부정착체에 관한 것이다.The present invention relates to a multi-spherical inner fixing body for the tension member removable ground anchor, and more particularly, a plurality of wedge insertion holes through which a plurality of tension members are inserted into the upper surface of the main body to which the protective cap is screwed on the upper end thereof. The wedge insertion hole is inserted into each of the wedge assembly is coupled to the wedge release mechanism, the upper portion of the main body of the wedge release plate coupled to the wedge release mechanism coupled to the upper end of the wedge assembly by a pair of supports By being installed so as to be spaced apart from the upper surface of the main body, a plurality of tension members respectively inserted into the wedge insertion holes of the main body are firmly fixed and then easily and easily assembled, thereby greatly improving the assembly workability. Rather, a plurality of tension members inserted into the wedge insertion holes of the main body are stable wedge stitches. It is possible to prevent the fixing and releasing function of the tension member from being damaged by external impact or load when handling the finished anchor during transportation or construction work. Uniform anchoring force can be applied to a plurality of tension members inserted into the ball to maintain a more stable fixation state. At the same time, the wedge rim release mechanism and the wedge releasing plate are coupled to the tension member when the ground anchor is dismantled. The present invention relates to a multi-spherical internal fixture for a tension member-removable ground anchor that can easily release the wedge bite to remove the tension member even more easily.
일반적으로 그라운드 앵커란, 도 1에 도시되어 있는 바와 같이 지반(44)에 앵커공(40)을 천공형성하고 그 앵커공(40)에 인장강도가 우수한 인장재(41)를 내부정착체(31) 및 내하체(32)와 함께 삽입한 후 콘크리트 등의 그라우팅재(42)를 주입하여 견고하게 고정시킨 다음, 인장재(41)의 자유단에 하중을 걸고 외부정착체(33)로 고정시켜 강력한 정착력을 확보하므로써 토류벽(43)과 같은 구조물 등을 안전하게 지지할 수 있도록 한 것으로서, 건축 및 토목공사의 지하구조물용 굴착공사시 주변지반의 붕괴를 방지하기 위한 흙막이 공사나 연약지반 절개면의 토사 유실을 억제하기 위한 공사 등에 널리 사용된다.In general, a ground anchor is formed in the
이러한 그라운드 앵커(30)에 사용되는 인장재(41)로는 여러 가닥의 강선을 꼬아 만든 강연선을 사용하게 되는데, 이 강연선으로 된 인장재(41)는 일반 철근보다 그 강도가 월등하여 지중에 그대로 방치될 경우 지중 장애물화 되어 인접지의 추후개발시 지하보상권 등의 문제를 발생시킬 우려가 있으므로, 이러한 문제의 해결을 위해 공사완료 후 지중에 매설한 인장재(41)를 용이하게 제거할 수 있도록 하는 인장재 제거식 그라운드 앵커용 내부정착체가 특허 제411567호로 등록되어 공지된 바 있었다.As the
공지된 종래의 인장재 제거식 그라운드 앵커용 내부정착체는 도 2에 도시되 어 있는 바와 같이 상단과 웨지좌(21)사이에 캡체결용 속나사(22)가 형성되고 웨지좌(21)의 앞쪽에 후퇴하는 웨지가 벌어질 수 있는 여유부(23)를 둔 본체(20)와, 선단부에 형성된 벌림링홈에 웨지용 벌림링(24)을 장착하고 벌림링홈의 앞쪽에 나사뿔의 시트거치용 시트홈이 형성된 웨지(25a)로 이루어진 웨지조립체(25)와, 시트(26)의 상면복판에 캡에 체결되는 나사가 형성된 뿔나사(27)가 형성된 나사뿔(28)과 나사뿔 체결용 속나사(29)를 갖고 본체(20)의 캡체결용 속나사(22)에 체결되는 캡(30)으로 구성된다.Known conventional anchoring material for the tension removing ground anchor is a cap fastening
이와 같이 구성되는 종래의 인장재 제거식 그라운드 앵커용 내부정착체는 인장재(41)가 정착된 상태에서 외부정착체(33)를 해체하거나 외부정착체(33) 바로 안쪽의 인장재(41)부분을 용접기 등으로 절단하여 외부정착상태를 해제한 후 인장재(41)를 일측으로 회전시키게 되면, 상기 웨지조립체(25)가 나사뿔(28)이 캡(30)의 속나사(29)에 체결되는 힘에 이끌려 후퇴하면서 벌림링(24)에 의해 모든 웨지(25a)가 일시에 벌어져 인장재(41)의 선단에 대한 웨지물림을 해제하고, 이 상태에서 웨지조립체(25)에 결합된 나사뿔(28)이 캡(30)에 웨지조립체(25)를 고정함으로써 인장재(41)를 잡아당기더라도 웨지조립체(25)는 인장재(41)에 이끌려가지 못하게 한 가운데 간단히 인장재(41)를 인발 제거할 수 있게 된다.In the conventional tension member removal type ground anchor internal fixture configured as described above, the
그러나, 상기와 같이 구성된 종래의 인장재 제거식 그라운드 앵커용 내부정착체는 인장재(41)의 회전에 따라 웨지조립체(25)에 결합된 나사뿔(28)이 캡(30)의 속나사(29)에 제대로 체결되도록 하기 위해서 조립시 도 2에 도시되어 있는 바와 같이 웨지조립체(25)에 결합된 나사뿔(28)의 상단부가 캡(30)에 형성된 속나사(29) 의 입구에 거의 맞닿아 있도록 조립되어야 하는데, 이와 같이 조립된 종래의 내부정착체는 공장에서 제작된 앵커를 공사현장으로 운송하는 과정이나 시공작업시 취급하는 과정에서 내부정착체에 예기지 못한 충격이 가해져 나사뿔(28)의 상단부가 속나사(29)의 입구로부터 이격되는 경우가 발생되거나, 앵커 시공후 인장재(41)의 자유단부에 하중을 가할 때 인장재(41)의 선단을 물고 있는 웨지조립체(25)가 본체(20)의 웨지좌(21)에 꽉 끼워지면서 웨지조립체(25)에 결합된 나사뿔(28)의 상단부가 속나사(29)의 입구로부터 이격되는 경우가 빈번하게 발생되므로, 인장재의 제거시 나사뿔(28)과 속나사(29)의 체결이 제대로 이루어지지 않아 인장재(41)를 용이하게 제거할 수 없게 되는 문제점이 있었다.However, in the conventional tension member removable ground anchor inner fixing structure configured as described above, the threaded
한편, 그라운드 앵커(30)의 시공시에는 하나의 앵커공(40)을 천공하는 데 많은 비용이 소요될 뿐 아니라 천공하고자 하는 앵커공(40)의 직경이 커짐에 따라 그 비용도 증대되는 동시에 공사중 토압에 의해 앵커공(40)자체가 함몰될 위험이 높아지게 되므로, 대부분 앵커공(40)을 직경 100 ~ 150mm의 범위내로 천공한 후 이 앵커공(40)의 내부에 복수개의 인장재(41)를 동시에 삽입한 다음 그라우팅재(42)를 주입하여 견고하게 고정시키는 방식이 주로 사용되고 있는데, 이러한 그라운드 앵커(30)의 시공시 본체(20)의 내부에 하나의 인장재(41)를 고정하도록 구성된 종래의 인장재 제거식 그라운드 앵커용 내부정착체를 사용하게 되면 다음과 같은 문제점이 있었다.On the other hand, in the construction of the
즉, 종래의 인장재 제거식 그라운드 앵커용 내부정착체를 이용하여 직경 100 ~ 150mm인 앵커공(40)의 내부에 복수개의 인장재(41)를 삽입하여 고정할 경우 에는 복수개의 인장재(41)가 각각 결합되는 복수개의 내부정착체(31)를 앵커공(40)의 내부로 동시에 삽입해야 하는데, 복수개의 내부정착체(31)를 앵커공(40)의 내부로 동시에 삽입하기 위해 복수개의 내부정착체(31)를 한 덩어리로 묶게 되면 그 부피가 앵커공(40)의 직경보다 커지게 되어 앵커공(40)의 내부로 용이하게 삽입할 수 없게 된다.That is, when a plurality of
따라서, 복수개의 내부정착체(31)를 앵커공(40)의 내부로 동시에 삽입하기 위해서는, 도 1에 도시되어 있는 바와 같이 인장재(41)가 각각 결합되는 복수개의 내부정착체(31)를 2개씩 한 조로 하여 묶은 후 1 ~ 1.5m 정도의 거리만큼 서로 이격시켜 삽입할 수 밖에 없게 되는데, 이때 1 ~ 1.5m 정도의 거리만큼 서로 이격된 상태로 앵커공(40)의 내부에 삽입된 후 그라우팅(42)에 의해 고정되는 내부정착체(31)들은 그 이격된 거리만큼 정착력에 차이가 생기게 되면서 하나의 앵커공(40)에 삽입된 복수개의 인장재(41)에 의한 정착력이 균일하지 않게 되므로 이로 인해 그라운드 앵커(30)의 정착상태가 불안정해지게 되는 문제점이 있었다.Therefore, in order to simultaneously insert the plurality of
이와 같은 문제점을 해소하기 위하여 종래의 인장재 제거식 그라운드 앵커용 내부정착체를 복수개의 인장재를 동시에 고정할 수 있도록 다구형으로 제작하고자 하는 안이 제안된 바 있었으나, 종래의 인장재 제거식 그라운드 앵커용 내부정착체를 다구형으로 제작할 경우에는 웨지조립체(25)에 결합된 나사뿔(28)의 상단부가 캡(30)에 형성된 속나사(29)의 입구에 거의 맞닿아 있도록 조립되어야 하는 조립상의 특징으로 인해 본체(20)의 상부에 캡(30)을 체결할 때 조립웨지조립체(25)의 상부에 결합되는 나사뿔(28)과 캡(30)의 나사뿔 체결용 속나사(29)사이에 간섭이 생 겨 캡(30)을 회전시켜 체결할 수 없게 되므로 조립이 불가능하게 되는 문제점이 있었다.In order to solve such a problem, a proposal has been proposed to fabricate a conventional multi-spherical fixing member for fixing a plurality of tension members at the same time, but a conventional internal fixing for a tension member-removable ground anchor. In the case of manufacturing the sieve in a multi-spherical shape, due to the assembling feature, the upper end of the
본 발명은 상기의 문제점을 해결하기 위한 것으로서, 상단에 보호캡이 나사결합되는 본체의 상면에 복수개의 인장재가 각각 삽입되는 복수개의 웨지삽입공이 관통형성되고 상기 웨지삽입공에는 상단에 웨지물림해제구가 결합된 웨지조립체가 각각 삽입설치되며 상기 본체의 상부에는 웨지조립체의 상단에 결합된 웨지물림해제구가 각각 체결되는 웨지물림해제판이 한 쌍의 지지대에 의해 본체의 상면으로부터 이격되게 설치되도록 구성함으로써, 조립시 본체의 웨지삽입공에 각각 삽입되는 복수개의 인장재를 견고하게 고정시킨 후 간편하고 용이하게 조립할 수 있게 하여 조립작업성을 대폭 향상시킬 수 있도록 할 뿐만 아니라 본체의 웨지삽입공에 각각 삽입되는 복수개의 인장재가 안정적인 웨지물림상태를 유지할 수 있게 하여 완성된 앵커의 운송과정이나 시공작업을 위한 취급시 외부충격이나 하중에 의해 인장재에 대한 고정 및 해제기능이 손상되는 것을 방지할 수 있도록 하며, 또 그라운드 앵커의 시공시 하나의 앵커공의 내부로 삽입되는 복수개의 인장재에 균일한 정착력을 가할 수 있게 하여 더욱 더 안정적인 정착상태를 유지할 수 있도록 하는 동시에 그라운드 앵커의 해체시 웨지물림해제구와 웨지물림해제판의 결합에 의해 인장재에 대한 웨지물림상태를 간편하게 해제할 수 있게 하여 더욱 더 용이하게 인장재를 제거할 수 있도록 하는 것을 기술적 과제로 한다.The present invention is to solve the above problems, a plurality of wedge insertion holes through which a plurality of tension members are respectively inserted into the upper surface of the main body to which the protective cap is screwed on the top is formed through the wedge insertion hole at the top of the wedge insertion hole The wedge assembly is coupled to each other is installed and the upper portion of the main body by the wedge release plate to which the wedge release mechanism coupled to the upper end of the wedge assembly is fastened so as to be spaced apart from the upper surface of the body by a pair of supports When assembling, the plurality of tension members inserted into the wedge insertion holes of the main body are firmly fixed and then easily and easily assembled to greatly improve the assembly workability, and are respectively inserted into the wedge insertion holes of the main body. A plurality of tension members can maintain a stable wedge stitching state of the completed anchor It is possible to prevent the fixing and releasing function of the tension member from being damaged by external impact or load when handling for the transport process or construction work, and a plurality of tension members inserted into one anchor hole during the construction of the ground anchor. It is possible to apply a uniform fixing force to the wedge to maintain a more stable fixation state, and to easily release the wedge bite state of the tension member by combining the wedge bite release mechanism and the wedge bite release plate when dismantling the ground anchor. The technical problem is to make it possible to remove the tension member more easily.
상기의 기술적 과제를 달성하기 위한 본 발명은 상면에 상광하협으로 된 복 수개의 웨지삽입공과 한 쌍의 지지대설치용 나사공이 형성되고 하면에는 상기 웨지삽입공의 하부에 각각 연결되는 복수개의 인장재삽입용 나사공이 형성되며 상부외주면에는 캡체결용 수나사부가 형성된 원통형상의 본체와, 상기 본체의 웨지삽입공에 각각 삽입설치되는 것으로 3개의 원주분할웨지로 조립형성되며 중앙부에는 나사공이 관통형성되고 내측상부에는 플랜지결합홈부가 형성되며 외측상부에는 웨지조임링이 삽입되는 요홈부가 형성된 역원뿔대형상으로 된 웨지조립체와, 상기 웨지조립체의 상단에 각각 결합되는 것으로 상면중앙부에는 하부외주면에 수나사부가 형성된 결합핀이 돌출형성되며 하단부에는 결합용 플랜지가 돌출형성되고 하면중앙부에는 인장재삽입홈이 형성된 웨지물림해제구와, 상기 본체의 상면양측에 수직으로 설치되는 것으로 상단부에는 고정너트가 체결되는 너트체결부가 단이 지게 형성되며 하단부에는 본체의 지지대설치용 나사공에 체결되는 수나사부가 형성된 한 쌍의 지지대와, 상기 지지대의 상부에 설치되는 것으로 상기 웨지물림해제구의 결합핀이 각각 삽입되는 복수개의 나사공과 지지대의 너트체결부가 각각 삽입되는 삽입공이 관통형성된 원반형상의 웨지물림해제판과, 상기 본체의 상단에 밀폐링을 개재한 상태로 나사결합되는 것으로 내주면에 본체의 캡체결용 수나사부에 체결되는 암나사부가 형성된 보호캡으로 이루어진 것을 특징으로 한다.The present invention for achieving the above technical problem is formed with a plurality of wedge insertion hole and a pair of support rod installation screw hole of the upper and lower narrow side on the upper surface and a plurality of tension material insertion screw connected to the lower portion of the wedge insertion hole, respectively A ball is formed and the upper outer peripheral surface is formed into a cylindrical body formed with a cap screw for screwing, and inserted into the wedge insertion hole of the main body, which is assembled by three circumferential split wedges. The wedge assembly is formed in the outer upper portion of the wedge assembly having an inverted truncated conical shape having a concave groove into which the wedge tightening ring is inserted, and the upper end of the wedge assembly. The joining flange is protruded at the bottom and the center is Wedge bleeding release formed with a re-insertion groove, and is installed vertically on both sides of the upper surface of the main body, the upper end portion is formed with a nut fastening portion to which the fixing nut is fastened so that the lower end is formed with a male screw fastened to the support screw mounting hole of the main body A pair of supports, a disc-shaped wedge release plate through which a plurality of screw holes into which the coupling pins of the wedge release mechanism are inserted, and insertion holes into which nut fastening portions of the support are respectively inserted, are installed in the upper portion of the support; It is characterized by consisting of a protective cap formed on the inner circumferential surface of the body threaded part is fastened to the cap screw fastening male threaded portion of the main body to be screwed in the state via a sealing ring on the upper end of the main body.
상기한 바와 같이 본 발명에 의한 인장재 제거식 그라운드 앵커용 다구형 내부정착체는 상단에 보호캡이 나사결합되는 본체의 상면에 복수개의 인장재가 각각 삽입되는 복수개의 웨지삽입공이 관통형성되고 상기 웨지삽입공에는 상단에 웨지물 림해제구가 결합된 웨지조립체가 각각 삽입설치되며 상기 본체의 상부에는 웨지조립체의 상단에 결합된 웨지물림해제구가 각각 체결되는 웨지물림해제판이 한 쌍의 지지대에 의해 본체의 상면으로부터 이격되게 설치되도록 구성됨으로써, 조립시 본체의 웨지삽입공에 각각 삽입되는 복수개의 인장재를 견고하게 고정시킨 후 간편하고 용이하게 조립할 수 있게 되어 조립작업성을 대폭 향상시킬 수 있게 될 뿐만 아니라 본체의 웨지삽입공에 각각 삽입되는 복수개의 인장재가 안정적인 웨지물림상태를 유지할 수 있게 되어 완성된 앵커의 운송과정이나 시공작업을 위한 취급시 외부충격이나 하중에 의해 인장재에 대한 고정 및 해제기능이 손상되는 것을 방지할 수 있게 되며, 또 그라운드 앵커의 시공시 하나의 앵커공의 내부로 삽입되는 복수개의 인장재에 균일한 정착력을 가할 수 있게 되어 더욱 더 안정적인 정착상태를 유지할 수 있게 되는 동시에 그라운드 앵커의 해체시 웨지물림해제구와 웨지물림해제판의 결합에 의해 인장재에 대한 웨지물림상태를 간편하게 해제할 수 있게 되어 더욱 더 용이하게 인장재를 제거할 수 있게 되는 효과가 있다.As described above, according to the present invention, the multi-spherical inner fixing body for the tension member-removable ground anchor is formed with a plurality of wedge insertion holes through which a plurality of tension members are respectively inserted into the upper surface of the main body to which the protective cap is screwed. The wedge assembly is inserted into the ball and the wedge rim release is coupled to the top, respectively, and the top of the body is a wedge bleed release plate coupled to the top of the wedge assembly, respectively, the wedge release plate is coupled to the main body by a pair of supports Since it is configured to be spaced apart from the upper surface of the assembly, it is possible to easily and easily assemble a plurality of tension members respectively inserted into the wedge insertion hole of the main body at the time of assembly, thereby greatly improving the assembly workability. A plurality of tension members respectively inserted into the wedge insertion hole of the main body maintain a stable wedge bite state It is possible to prevent the anchoring and releasing function of the tension member from being damaged by external impact or load when handling the transport process or construction work of the completed anchor, and one anchor hole during the construction of the ground anchor. Uniform fixing force can be applied to a plurality of tension members inserted into the to maintain a more stable fixation state, and wedges for the tension members by the combination of the wedge bite release and the wedge bite release plate when dismantling the ground anchor Since the bite can be easily released, there is an effect that the tension member can be more easily removed.
이하, 상기의 목적을 달성하기 위하여 본 발명을 도 3 내지 도 6c를 참조하여 상세히 설명하면 다음과 같다.Hereinafter, the present invention will be described in detail with reference to FIGS. 3 to 6C in order to achieve the above object.
도 3은 본 발명에 의한 인장재 제거식 그라운드 앵커용 다구형 내부정착체의 구성을 나타내는 분해 사시도이며, 도 4는 본 발명에 의한 인장재 제거식 그라운드 앵커용 다구형 내부정착체의 조립상태를 나타내는 단면도이고, 도 5는 본 발명에 의한 인장재 제거식 그라운드 앵커용 다구형 내부정착체를 이용한 그라운드 앵커의 시공상태를 나타내는 설명도이며, 도 6a 내지 도 6c는 본 발명에 의한 인장재 제거식 그라운드 앵커용 다구형 내부정착체의 작용상태를 나타내는 설명도이다.Figure 3 is an exploded perspective view showing the configuration of the multi-spherical inner fixing body for the tension member removing ground anchor according to the present invention, Figure 4 is a cross-sectional view showing the assembled state of the multi-spherical inner fixing body for the tension member removing ground anchor according to the present invention. 5 is an explanatory view showing the construction state of the ground anchor using the multi-spherical inner fixing body for the tension member removal ground anchor according to the present invention, Figure 6a to 6c is a tension member removal ground anchor according to the present invention. It is explanatory drawing which shows the working state of a spherical internal fixation body.
본 발명에 의한 인장재 제거식 그라운드 앵커용 다구형 내부정착체는 도 3과 도 4에 도시되어 있는 바와 같이 본체(2), 복수개의 웨지조립체(10), 복수개의 웨지물림해제구(13), 한 쌍의 지지대(17a)(17b), 웨지물림해제판(20), 보호캡(21)으로 구성된다.As shown in Figs. 3 and 4, the tension member removing ground anchor according to the present invention includes a
상기 본체(2)는 원통형상으로 형성되는 것으로, 상면에는 상광하협으로 된 복수개의 웨지삽입공(3)과 한 쌍의 지지대설치용 나사공(4a)(4b)이 형성되고, 하면에는 상기 웨지삽입공(3)의 하부에 각각 연결되는 복수개의 인장재삽입용 나사공(5)이 형성되며, 상부외주면에는 캡체결용 수나사부(6)가 형성된다.The
상기 웨지조립체(10)는 본체(2)의 상면에 형성된 복수개의 웨지삽입공(3)에 각각 삽입설치되는 것으로서, 3개의 원주분할웨지(8)로 조립형성되는 역원뿔대형상으로 이루어지며, 중앙부에는 나사공(8a)이 관통형성되고, 내측상부에는 플랜지결합홈부(8b)가 형성되며, 외측상부에는 웨지조임링(9)이 삽입되는 요홈부(8c)가 형성된다.The
이 때, 상기 웨지조립체(10)의 요홈부(8c)에 삽입되는 웨지조임링(9)은 3개의 원주분할웨지(8)로 이루어진 웨지조립체(10)가 인장재의 선단부외주연에 밀착되도록 조여주는 역할을 하는 것으로서, 고무재질로 된 오링이 사용된다.At this time, the wedge tightening
상기 웨지물림해제구(13)는 웨지조립체(10)의 상단에 각각 결합되는 것으로서, 상면중앙부에는 하부외주면에 수나사부(11a)가 형성된 결합핀(11)이 돌출형성 되며, 하단부에는 웨지조립체(10)의 플랜지결합홈부(8b)에 결합되는 결합용 플랜지(12)가 돌출형성되고, 하면중앙부에는 인장재삽입홈(13a)이 오목하게 형성된다.The
상기 지지대(17a)(17b)는 본체(2)의 상면으로부터 이격되게 설치되는 웨지물림해제판(20)를 지지하기 위해 본체(2)의 상면양측에 수직으로 설치하는 것으로서, 상단부에는 지지대(17a)(17b)의 상부에 수평으로 설치되는 웨지물림해제판(20)이 걸릴 수 있도록 고정너트(14)가 체결되는 너트체결부(15)가 단이 지게 형성되며, 하단부에는 본체(2)의 지지대설치용 나사공(4a)(4b)에 체결되는 수나사부(16)가 형성된다.The
상기 웨지물림해제판(20)은 지지대(17a)(17b)의 상부에 수평으로 설치되는 것으로서, 원반형상으로 이루어지며 상기 웨지물림해제구(10)의 결합핀(11)이 각각 삽입되는 복수개의 나사공(18)과 지지대(17a)(17b)의 너트체결부(15)가 각각 삽입되는 삽입공(19a)(19b)이 관통형성된다.The
상기 보호캡(21)은 본체(2)의 내부로 수분이나 이물질이 침입하게 되는 것을 차단하기 위하여 본체(2)의 상단에 밀폐링(7)을 개재한 상태로 나사결합되는 것으로서, 내주면에 본체(2)의 캡체결용 수나사부(6)에 체결되는 암나사부(21a)가 형성된다. 이때 상기 밀폐링(7)으로는 고무재질로 된 오링이 사용된다.The
이와 같이 구성되는 본 발명에 의한 인장재 제거식 그라운드 앵커용 다구형 내부정착체는 직경 100 ~ 150mm의 범위로 천공되는 앵커공에 3개 내지 6개의 인장재를 동시에 고정시킬 수 있도록 3구형 내지 6구형으로 제작하는 것이 바람직한데, 그 이유는 본발명에 의한 다구형 내부정착체(1)를 3구형 이하로 제작하게 되면 종 래의 단구형 내부정착체를 2개 사용하는 것보다 내부정착체의 제조비용이 더 많이 소요되므로 2개의 인장재를 고정시키기 위한 비용 대비 효율이 현저히 저하되기 때문이며, 또 본 발명에 의한 다구형 내부정착체(1)를 6구형 이상으로 제작하게 되면, 내부정착체(1)의 직경이 그라운드 앵커를 설치하기 위해 지반에 천공할 수 있는 앵커공의 최대직경(150mm)보다 커지게 되므로 시공이 불가능하게 되기 때문이다.The multi-spherical inner fixing body for the tension member removal ground anchor according to the present invention configured as described above is a three-spherical to six-spherical shape so that three to six tension members can be simultaneously fixed to the anchor hole drilled in the range of 100 to 150 mm in diameter. It is preferable to manufacture, but the reason is that if the multi-spherical
상기와 같이 구성되는 본 발명의 다구형 내부정착체에 의한 인장재의 고정과정을 설명하면 다음과 같다.Referring to the fixing process of the tension member by the multi-spherical inner fixing body of the present invention configured as described above are as follows.
본 발명에 의한 다구형 내부정착체에 복수개의 인장재를 고정하기 위해서는, 우선 각 인장재(41)의 끝단부를 본체(2)의 하면에 관통형성된 인장재삽입용 나사공(5)으로 삽입하여 웨지삽입공(3)의 상부로 돌출시키게 된다. 이때 인장재(41)의 외측에 씌워진 튜브(41a)는 본체(2)의 하면에 관통형성된 인장재삽입용 나사공(5)의 내부에 튜브(41a)의 외측면에 나사산이 형성되도록 체결함으로써 그 틈새로 수분이나 이물질이 유입되지 않도록 한다.In order to fix the plurality of tension members to the multi-spherical inner fixing body according to the present invention, first, the end portions of the
이어서, 각 웨지삽입공(3)의 상부로 돌출시킨 인장재(41)의 끝단부외주연에는 3개의 원주분할웨지(8)로 이루어진 웨지조립체(10)를 결합하되, 웨지조립체(10)의 상단에는 웨지조립체(10)의 상부내주연에 형성된 플랜지결합홈부(8b)에 웨지물림해제구(13)의 하단에 형성된 결합용 플랜지(12)가 끼워지도록 웨지물림해제구(13)를 결합하고 웨지조립체(10)의 외측상부에 형성된 요홈부(8c)에는 웨지조임링(9)을 삽입한 후, 인장재(41)를 하방으로 끌어당겨 인장재(41)의 선단부에 결합 된 웨지조립체(10)가 본체(2)의 상면에 형성된 웨지삽입공(3)의 내부에 삽입되도록 한다.Subsequently, a
이 때, 상기 인장재(41)는 끝단부가 웨지조립체(10)의 상단에 결합되는 웨지물림해제구(13)의 인장재삽입홈(13a)까지 깊이 삽입되어 웨지조립체(10)의 나사공(8a)에 인장재(41)의 끝단부부터 물리지 않고 인장재(41)의 끝단부보다 안쪽부분부터 물리게 됨으로써 더욱 더 견고한 고정상태를 유지할 수 있게 된다.At this time, the
이어서, 상기 본체(2)의 상면양측에는 한 쌍의 지지대(17a)(17b)를 수직으로 설치하게 되는데, 이때 상기 지지대(17a)(17b)는 하단부에 형성된 수나사부(16)를 이용하여 본체(2)의 상면양측에 형성된 지지대설치용 나사공(4a)(4b)에 각각 나사결합하게 된다.Subsequently, a pair of
이어서, 상기 본체(2)의 상면양측에 수직으로 설치된 한 쌍의 지지대(17a) (17b)의 상부에는 원반형상으로 된 웨지물림해제판(20)을 수평으로 설치하게 되는데, 이때 상기 웨지물림해제판(20)은 본체(2)의 복수개의 웨지삽입공(3)에 각각 삽입설치된 웨지조립체(10)의 상단에 각각 결합된 웨지물림해제구(13)의 결합핀(11)에 복수개의 나사공(18)이 각각 삽입되는 동시에 본체(2)의 상면양측에 수직으로 설치된 한 쌍의 지지대(17a)(17b)의 너트체결부(15)에 삽입공(19a)(19b)이 각각 삽입되도록 하여 지지대(17a)(17b)의 상부에 수평으로 삽입설치한 후, 웨지물림해제판(20)의 삽입공(19a)(19b)을 관통하여 웨지물림해제판(20)의 상부로 돌출되는 지지대(17a)(17b)의 너트체결부(15)에 와셔를 개재한 상태로 고정너트(14)를 각각 체결하여 고정하게 된다.Subsequently, on the upper portion of the pair of
이와 같이 상기 본체(2)의 웨지삽입공(3)에 각각 삽입설치된 웨지조립체(10)의 상단에 결합된 웨지물림해제구(13)의 결합핀(11)의 상단부가 지지대(17a)(17b)의 상부에 수평으로 설치되는 웨지물림해제판(20)에 형성된 복수개의 나사공(18)에 각각 삽입되어 있게 되면, 각 웨지삽입공(3)에 삽입된 웨지조립체(10)가 웨지물림해제판(20)에 의해 안정적으로 지지됨에 따라 그라운드 앵커의 취급시 본체(2)에 가해지는 충격에 의해 각 웨지삽입공(3)에 삽입된 웨지조립체(10)가 웨지삽입공(3)으로부터 이탈하게 되는 것을 방지할 수 있게 되므로 인장재(41)에 대한 견고한 웨지물림상태를 유지할 수 있게 될 뿐만 아니라, 그라운드 앵커의 해체시 상기 웨지물림해제구(13)의 결합핀(11)의 하부외주면에 형성된 수나사부(11a)를 웨지물림해제판(20)의 나사공(18)에 더욱 더 용이하게 체결할 수 있게 되므로 인장재에 대한 웨지물림상태를 보다 간편하게 해제할 수 있게 된다.In this way, the upper ends of the coupling pins 11 of the
이어서, 상기 본체(2)의 캡체결용 수나사부(6)에 보호캡(21)의 암나사부(21a)가 나사결합되도록 본체(2)의 상부에 밀폐링(7)을 개재한 상태로 보호캡(21)을 체결함으로써 조립을 완료하게 된다.Subsequently, the
상기와 같이 조립되는 본 발명의 다구형 내부정착체에 의하면, 조립시 본체(2)의 웨지삽입공(3)에 각각 삽입되는 복수개의 인장재(41)를 견고하게 고정시킨 후 간편하고 용이하게 조립할 수 있게 되므로 조립작업성을 대폭 향상시킬 수 있게 될 뿐만 아니라, 본체(2)의 웨지삽입공(3)에 각각 삽입되는 복수개의 인장재(41)가 안정적인 웨지물림상태를 유지할 수 있게 되므로 완성된 앵커의 운송과정이나 시공작업을 위한 취급시 외부충격이나 하중에 의해 인장재에 대한 고정상태가 느슨해지 거나 해제되는 것을 방지할 수 있게 된다.According to the multi-spherical inner fixing body of the present invention assembled as described above, after assembling a plurality of
아울러, 상기와 같이 조립되는 본 발명의 다구형 내부정착체에 의하면, 도 5에 도시되어 있는 바와 같이 그라운드 앵커(30)의 시공시 하나의 앵커공(40)의 내부에 복수개의 인장재(41)를 동시에 동일한 깊이까지 삽입할 수 있게 되므로 시공이 간편할 뿐만 아니라 하나의 앵커공(40)의 내부로 삽입되는 복수개의 인장재(41)에 균일한 정착력을 가할 수 있게 되므로 더욱 더 안정적인 정착상태를 유지할 수 있게 된다.In addition, according to the multi-spherical inner fixing body of the present invention assembled as described above, a plurality of
다음은 본 발명의 다구형 내부정착체에 의해 고정된 인장재의 제거과정에 대해서 도 6a 내지 도 6c를 참조하여 설명한다.Next, a process of removing the tension member fixed by the multi-spherical inner fixing body of the present invention will be described with reference to FIGS. 6A to 6C.
본 발명의 다구형 내부정착체에 의해 고정된 인장재를 제거하기 위해서, 먼저 각 인장재(41)에 대한 외부정착상태를 해제한 후 망치 등을 이용하여 외부정착이 해제된 각 인장재(41)의 자유단부를 길이방향으로 타격하게 되면, 도 6a에 도시되어 있는 바와 같이 웨지조립체(10)의 상단에 결합되어 있던 웨지물림해제구(13)의 결합핀(11)이 웨지물림해제판(20)의 나사공(18)을 관통하여 웨지물림해제판(20)의 상부로 돌출되면서 본체(2)의 웨지삽입공(3)에 삽입되어 있던 웨지조립체(10)가 웨지삽입공(3)의 상부로 이동하게 된다. 이때 상기 웨지조립체(10)의 상단에 결합된 웨지물림해제구(13)의 결합핀(11)의 하부외주면에 형성된 수나사부(11a)가 웨지물림해제판(20)의 나사공(18)의 하부에 밀착된다.In order to remove the tension member fixed by the multi-spherical inner fixing body of the present invention, first release the external fixing state for each
이와 같이 상기 웨지물림해제구(13)의 결합핀(11)의 하부외주면에 형성된 수나사부(11a)가 웨지물림해제판(20)의 나사공(18)의 하부에 밀착된 상태에서 도 6b 에 도시되어 있는 바와 같이 인장재(41)의 자유단부를 시계방향으로 회전시키게 되면, 상기 웨지물림해제구(13)의 결합핀(11)의 하부외주면에 형성된 수나사부(11a)가 웨지물림해제판(20)의 나사공(18)에 체결되면서 웨지조립체(10)가 웨지삽입공(3)으로부터 완전히 이탈하게 되는데, 이렇게 웨지조립체(10)가 웨지삽입공(3)으로부터 완전히 이탈한 상태가 되면 웨지조립체(10)는 웨지삽입공(3)의 내측면으로부터 이격되어 더 이상 웨지효과를 발휘할 수 없게 되므로 인장재(41)에 대한 웨지물림상태가 해제된다.6B in the state in which the
이와 같이 웨지조립체(10)가 웨지삽입공(3)으로부터 완전히 이탈하여 인장재(41)에 대한 웨지물림상태가 해제된 상태에서 도 6c에 도시되어 있는 바와 같이 인장재(41)를 끌어당기게 되면 인장재(41)의 끝단부가 웨지조립체(10)로부터 분리되면서 인장재(41)를 용이하게 인출할 수 있게 되는데, 이러한 과정을 반복함으로써 본 발명에 의한 다구형 내부정착제(1)로부터 각 인장재(41)를 보다 용이하고 간편하게 제거할 수 있게 된다.As such, when the
도 1은 종래기술에 의한 인장재 제거식 그라운드 앵커용 내부정착체를 이용한 그라운드 앵커의 시공상태를 나타내는 설명도.1 is an explanatory view showing a construction state of the ground anchor using the inner fixing body for the tension member removal ground anchor according to the prior art.
도 2는 종래기술에 의한 인장재 제거식 그라운드 앵커용 내부정착체의 구성을 단면도.Figure 2 is a cross-sectional view of the internal fixing body for the tension member removal ground anchor according to the prior art.
도 3은 본 발명에 의한 인장재 제거식 그라운드 앵커용 다구형 내부정착체의 구성을 나타내는 분해 사시도.Figure 3 is an exploded perspective view showing the configuration of the multi-spherical inner fixing body for the tension member removal ground anchor according to the present invention.
도 4는 본 발명에 의한 인장재 제거식 그라운드 앵커용 다구형 내부정착체의 조립상태를 나타내는 단면도.Figure 4 is a cross-sectional view showing the assembled state of the multi-spherical inner fixing body for the tension member removal ground anchor according to the present invention.
도 5는 본 발명에 의한 인장재 제거식 그라운드 앵커용 다구형 내부정착체를 이용한 그라운드 앵커의 시공상태를 나타내는 설명도.5 is an explanatory view showing a construction state of the ground anchor using the multi-spherical inner fixing body for the tension member removal ground anchor according to the present invention.
도 6a 내지 도 6c는 본 발명에 의한 인장재 제거식 그라운드 앵커용 다구형 내부정착체의 작용상태를 나타내는 설명도.Figure 6a to Figure 6c is an explanatory view showing the working state of the multi-spherical inner fixing body for the tension member removable ground anchor according to the present invention.
〈도면의 주요부분에 대한 부호의 설명〉<Explanation of symbols for main parts of drawing>
1 : 내부정착체 2 : 본체1: internal fixing body 2: main body
3 : 웨지삽입공 4a, 4b : 지지대설치용 나사공3:
5 : 인장재삽입용 나사공 6 : 캡체결용 수나사부5: Threading hole for tension material insertion 6: Male thread for cap fastening
7 : 밀폐링 8 : 원주분할웨지7: sealing ring 8: circumferential split wedge
8a : 나사공 8b : 플랜지결합홈부8a: screw
8c : 요홈부 9 : 웨지조임링8c: groove portion 9: wedge tightening ring
10 : 웨지조립체 11 : 결합핀10: wedge assembly 11: binding pin
11a : 수나사부 12 : 결합용 플랜지11a: male thread portion 12: coupling flange
13 : 웨지물림해제구 13a : 인장재삽입홈13:
14 : 고정너트 15 : 너트체결부14: fixing nut 15: nut connection part
16 : 수나사부 17a, 17b : 지지대16:
18 : 나사공 19a, 19b : 삽입공18:
20 : 웨지물림해제판 21 : 보호캡20: wedge release plate 21: protective cap
21a : 암나사부21a: female thread
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090059665A KR100953995B1 (en) | 2009-07-01 | 2009-07-01 | Multihole-type internal fixture of tension wire removal type ground anchorage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090059665A KR100953995B1 (en) | 2009-07-01 | 2009-07-01 | Multihole-type internal fixture of tension wire removal type ground anchorage |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20090127841A true KR20090127841A (en) | 2009-12-14 |
KR100953995B1 KR100953995B1 (en) | 2010-04-21 |
Family
ID=41688418
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020090059665A KR100953995B1 (en) | 2009-07-01 | 2009-07-01 | Multihole-type internal fixture of tension wire removal type ground anchorage |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100953995B1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2719858A4 (en) * | 2011-06-13 | 2015-12-16 | Univ China Mining | Constant-resistance and large deformation anchor cable and constant-resistance device |
KR101924069B1 (en) * | 2017-10-16 | 2019-02-22 | 한국건설기술연구원 | Wedge anchorage with separable bolt and tendon anchoraging method therewith |
CN111706086A (en) * | 2020-06-19 | 2020-09-25 | 威胜利工程有限公司 | Clamping piece mounting auxiliary |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101206344B1 (en) | 2012-08-24 | 2012-12-03 | 장성호 | Precast panel for retaining wall and construction method therewith |
KR101442761B1 (en) * | 2014-02-25 | 2014-09-23 | (주) 포유엔지니어링 | Apparatus for reinforcing PHC file head |
CN104410033A (en) * | 2014-11-19 | 2015-03-11 | 国家电网公司 | Combined type cable quadrant convenient for transporting |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100411567B1 (en) * | 2001-05-15 | 2003-12-18 | 주식회사 삼우기초기술 | Inner fixing device for a tension member removetype ground anchor |
KR100435069B1 (en) * | 2001-12-17 | 2004-06-09 | 주식회사 삼우기초기술 | inner fixing device for a tension member removetype ground anchor |
KR200249170Y1 (en) | 2001-06-22 | 2001-10-17 | 주식회사 삼우기초기술 | anchorage device for ground anchor with removing tension member using a suntype wedge |
KR100586078B1 (en) | 2005-03-18 | 2006-06-08 | 하영이 | Internal fixture of tension wire removal type ground anchorage |
-
2009
- 2009-07-01 KR KR1020090059665A patent/KR100953995B1/en active IP Right Grant
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2719858A4 (en) * | 2011-06-13 | 2015-12-16 | Univ China Mining | Constant-resistance and large deformation anchor cable and constant-resistance device |
US9797248B2 (en) | 2011-06-13 | 2017-10-24 | China University Of Mining & Technology (Beijing) | Constant-resistance and large deformation anchor cable and constant-resistance device |
KR101924069B1 (en) * | 2017-10-16 | 2019-02-22 | 한국건설기술연구원 | Wedge anchorage with separable bolt and tendon anchoraging method therewith |
CN111706086A (en) * | 2020-06-19 | 2020-09-25 | 威胜利工程有限公司 | Clamping piece mounting auxiliary |
Also Published As
Publication number | Publication date |
---|---|
KR100953995B1 (en) | 2010-04-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100953995B1 (en) | Multihole-type internal fixture of tension wire removal type ground anchorage | |
JP2009174309A (en) | Ground anchor or lock anchor provided with anchor tension member composed of one or plurality of single elements and corrosion protected anchor head structural body | |
KR100876129B1 (en) | Ground anchor using steel strand and ground reinforcement method using the same | |
US8756877B2 (en) | Ground anchor | |
KR20140022304A (en) | Using pc strand ground anchor and method for ground reinforcement using the same | |
JP5431877B2 (en) | Repair method and repair tool for slope stabilization anchor | |
JP2016132868A (en) | Bar-form metal fitting | |
KR100586078B1 (en) | Internal fixture of tension wire removal type ground anchorage | |
KR101039201B1 (en) | Edge extension type rock bolt and construction method of the same | |
KR20090033290A (en) | Internal fixture of tension wire removal type ground anchorage | |
KR102130526B1 (en) | Anchor bolt to be used first for formwork | |
KR100568041B1 (en) | Permanent Anchor | |
KR100505330B1 (en) | Tension nail of construction | |
KR101424347B1 (en) | Shear anchor for joing new and old concrete and method for joining new and old concrete | |
KR200386826Y1 (en) | Internal fixture of tension wire removal type ground anchorage | |
KR102107793B1 (en) | Apparatus for fixing reinforced retainaing wall block | |
KR101793693B1 (en) | End tip for driven concrete pile and driven concrete pile therewith | |
KR101076695B1 (en) | A jig assembly for fixing waterproof members of a tension hose in the removable ground anchor | |
KR101074085B1 (en) | A compressed and dispersed composite anchor removable the tension member and constructing method the same | |
JP2017014799A (en) | Movement prevention method and system for slope frame | |
KR200346218Y1 (en) | The thing device which tightens a wire rope of falling rock prevention pence | |
KR102654544B1 (en) | Tubular steel pole and its joint method | |
KR200364631Y1 (en) | Fixing agent for ground anchor | |
JP7257029B2 (en) | Fixture, fixation structure and fixation method | |
KR101158417B1 (en) | A compressed and dispersed composite anchor removable the tension member and constructing method the same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E902 | Notification of reason for refusal | ||
G15R | Request for early opening | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20131001 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20140224 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20160405 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20170313 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20190411 Year of fee payment: 10 |