KR20090089832A - Nature friendly polygon cell type coffering method for harbor, river and dam construction - Google Patents

Nature friendly polygon cell type coffering method for harbor, river and dam construction Download PDF

Info

Publication number
KR20090089832A
KR20090089832A KR1020090071030A KR20090071030A KR20090089832A KR 20090089832 A KR20090089832 A KR 20090089832A KR 1020090071030 A KR1020090071030 A KR 1020090071030A KR 20090071030 A KR20090071030 A KR 20090071030A KR 20090089832 A KR20090089832 A KR 20090089832A
Authority
KR
South Korea
Prior art keywords
pile
intersection
cell
outer member
piles
Prior art date
Application number
KR1020090071030A
Other languages
Korean (ko)
Other versions
KR100936161B1 (en
Inventor
김태형
윤동의
양준현
정혜영
Original Assignee
현대엔지니어링 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 현대엔지니어링 주식회사 filed Critical 현대엔지니어링 주식회사
Priority to KR1020090071030A priority Critical patent/KR100936161B1/en
Publication of KR20090089832A publication Critical patent/KR20090089832A/en
Application granted granted Critical
Publication of KR100936161B1 publication Critical patent/KR100936161B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • E02D31/04Watertight packings for use under hydraulic pressure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0061Production methods for working underwater

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Revetment (AREA)

Abstract

An environmentally-friendly polygonal cell type coffering method for harbor, river and dam construction is provided to secure dry construction area quickly and keep the cofferdam watertight in construction period effectively by constructing a cofferdam with excellent water-tightness and structural stability in a short time. An environmentally-friendly polygonal cell type coffering method for harbor, river and dam construction is as follows. An intersection pile(100) is set up in each vertex of a polygonal cell, wherein a plurality of joint parts and a plurality of joint grooves identical to hooks of a sheet pile(200) are formed in the intersection pile. A plurality of edge members(150) are installed so that both ends are combined to the joint grooves of adjacent intersection piles. The hooks are combined to the joint part of the intersection piles, and the sheet piles are inserted so that the polygonal cell is formed by the sheet piles connecting the intersection piles. A filler is filled in the polygonal cell.

Description

항만, 하천 및 댐 공사용 친환경 다변형 셀식 가물막이 공법{Nature friendly polygon cell type coffering method for harbor, river and dam construction}Nature friendly polygon cell type coffering method for harbor, river and dam construction

본 발명은 방조제, 조력발전소, 댐, 교량 및 항만 등 각종 수중 및 수변 구조물의 시공에 있어서 수면 이하의 작업공간 확보를 위하여 설치하는 가물막이공(假물막이工, coffering)에 관한 것으로, 다수의 교점파일(交點pile) 사이에 시트파일을 타입하여 평면상 폐합된 공간을 구축하고 그 내부에 모래나 사석 등의 속채움재를 충전하여 다변형(多邊形) 셀(cell)을 구성한 후, 완성된 셀과 일측 변(邊)을 공유하는 새로운 다변형 셀을 구축함으로써 연속된 다수의 셀을 구성하는 가물막이 공법이다.BACKGROUND OF THE INVENTION 1. Field of the Invention [0001] The present invention relates to façade shielding (coffering) installed for securing sub-surface work spaces in the construction of various underwater and waterside structures such as seawalls, tidal power plants, dams, bridges, and ports. The sheet pile is formed between piles to form a closed space in the plane, and filled with a filling material such as sand or sandstone to form a polymorphic cell. By constructing a new polymorphic cell that shares one side, a temporary film forming a plurality of continuous cells is a construction method.

가물막이공이란 그 사전적 의미에서와 같이 수면 이하의 건식 공사 구역을 확보하기 위한 임시구조물로서, 토석 또는 시트파일 등으로 공사 구역을 포위하는 차수벽 형태의 구조물을 구축한 후 내부의 물을 배제함으로써 구성되며, 대규모 공 사에 적용되는 가물막이공으로서 도 1에서와 같은 원형셀(圓形cell) 방식의 가물막이공을 일례로 들 수 있다.Temporary screening is a temporary structure to secure a dry construction area below the water level, as in the dictionary meaning, by constructing a barrier-type structure that surrounds the construction area with earth or sheet piles, and then excluding water from the inside. As an example, the temporary film processing of the circular cell type | mold as shown in FIG.

원형셀식 가물막이공은 도 1 및 도 2에서와 같이 다수의 플래트시트파일(flat sheet pile)을 원주(圓周) 상에 연속으로 타입한 후 내부에 모래나 사석 등을 충전하여 구성되는데, 도 3에서와 같이 원형의 메인셀(main cell)과 대칭 호형(弧形)의 아크셀(arc cell)이 교대로 연결되어 벽체를 구성하게 된다.Circular cell-type temporary film processing is composed by filling a number of flat sheet pile (flat sheet pile) continuously on the circumference as shown in Fig. 1 and 2 and then filling the sand or sandstone, etc., Fig. 3 As in the circular main cell (symmetric arc-shaped arc cell) is alternately connected to form a wall.

원형셀을 구성하는 플래트시트파일은 도 3 및 도 4에서와 같이, 인접한 플래트시트파일과 일정한 각도(θ)를 유지하면서 연속으로 타입됨으로써 평면상 원주(圓周) 또는 호(弧)를 형성하게 되는데, 통상 도 4에서와 같이 원형셀의 내주면에 접하는 일종의 임시 철골구조물인 원형템플레이트를 설치한 후 이를 기준으로 플래트시트파일을 타입함으로써 소기의 원형 또는 호형의 셀(cell)을 구성하게 된다.3 and 4, the plate pile constituting the circular cell is continuously formed while maintaining a constant angle θ with the adjacent plate pile to form a circumference or arc on a plane. In addition, as shown in FIG. 4, a circular template, which is a kind of temporary steel structure which is in contact with the inner circumferential surface of the circular cell, is installed, and then a plate file is formed based on this, thereby forming a desired circular or arc-shaped cell.

원형셀식 가물막이공에 있어서 각 셀에 작용하는 주요 외력은 수압과 셀 내부 속채움재로 인한 토압을 들 수 있는데, 평단면 형상이 원형인 원형셀은 내부 토압이 원형셀의 중심에서 방사상(放射狀)으로 작용하여 원주 상의 플래트시트파일들에 균일하게 분포되면서 균형이 유지됨과 동시에 각 플래트시트파일의 결속상태가 유지된다.The main external force acting on each cell in the circular cell type temporary membrane processing is the earth pressure due to the water pressure and the inner filling material inside the cell.In the circular cell of circular cross-section, the internal earth pressure is radial from the center of the circular cell. ), Evenly distributed on the platelets on the circumference, maintaining balance and at the same time maintaining the binding state of each plate pile.

따라서 원형셀식 가물막이공에서는 각 플래트시트파일을 인접한 플래트시트파일과의 결속상태를 유지하면서 원주 상의 정확한 위치에 타입하는 것이 관건이라 할 수 있는데, 이는 작업 전반이 선상(船上) 장비를 통하여 유속이 빠른 수중에서 이루어짐을 감안할 때 실로 어려운 작업이라 하지 않을 수 없다.Therefore, in the round cell type temporary gasket, it is important to type each plate pile at the exact position on the circumference while maintaining the binding state with the adjacent plate pile. Given the fast underwater, this is a difficult task.

특히, 플래트시트파일을 연속 타입함으로써 원형셀을 구성하기 위해서는 도 3에서와 같이 인접한 플래트시트파일과 일정한 각도(θ)를 정확하게 유지할 필요가 있는데, 이로 인하여 매 타입시 복잡한 검측과정이 수반될 뿐 아니라, 최종 폐합시 오차를 보정하기 위하여 플래트시트파일의 강제 변형을 유도하거나 이종(異種)의 플래트시트파일을 타입하게 되어 결과적으로 각 플래트시트파일에 불요(不要) 응력이 발생되어 구조적 안정성을 저해하게 된다.In particular, in order to form a circular cell by continuous type of plate file, it is necessary to maintain a constant angle (θ) with an adjacent plate file as shown in FIG. 3, which not only entails complicated detection process in every type. In order to compensate for errors in the final closing, the forced deformation of the plate pile file or the type of heterogeneous plate pile can be typed. As a result, unnecessary stresses are generated in each plate pile to impair structural stability. do.

또한, 플래트시트파일의 타입시 위치 및 각도의 정도(精度) 유지를 위하여 타입심도 및 지반특성에 제한이 있을 수 밖에 없으므로 플래트시트파일의 하부 지반을 경유하는 침투수 억제에 한계가 있으며, 이에 도 2에서와 같이 보조 성토부를 구성하거나 별도의 차수 그라우팅(grouting)을 실시할 필요성이 있는 바, 결과적으로 건식 공사 구역을 잠식하고 공사비를 증액하는 문제점이 있었다.In addition, in order to maintain the accuracy of the position and angle of the sheet pile file, there is no limit to the type depth and the ground characteristics, so there is a limit to the inhibition of penetration through the lower ground of the plate pile file. As in 2, there is a need to construct an auxiliary fill section or to perform separate order grouting, resulting in a problem of encroaching on dry construction areas and increasing construction costs.

특히, 전술한 바와 같이 플래트시트파일의 타입 공정 전반에서 검측 및 오차 보정 등의 부속 공정이 필요하므로 장기간의 공기(工期)가 소요되고 이에 따라 막대한 공사비가 소요될 뿐 아니라, 보조 성토부의 성토과정에서 오탁수(汚濁水)가 발생되고 차수 그라우팅 과정에서 그라우팅액이 누출되어 하천 및 해양 오염을 유발하는 심각한 문제점이 있었다.In particular, as described above, since the attachment process such as detection and error correction is required in the entire plate pile type process, a long period of air is required, and accordingly, a huge construction cost is required, and contaminated in the filling process of the auxiliary fill section. There was a serious problem that water is generated and grouting fluid leaks during the order grouting process, causing river and marine pollution.

본 발명은 전술한 문제점을 감안하여 창안한 것으로, 다수의 시트파일(200)이 타입되어 평면상 폐합된 다각형을 형성하고 그 내부에 속채움재가 충전되어 구성된 셀(cell)이 연속으로 구축되어 차수벽을 형성하는 셀식 가물막이 공법에 있어서, 다변형 셀의 각 변(邊)을 구성하는 시트파일(200)의 내측 면에 접하는 내곽프레임(300)을 설치하는 내곽보강단계(S10a)와, 시트파일(200)의 후크(209)와 일치하는 형상의 다수의 결속부(110)와 다수의 결합홈(120)이 형성된 교점파일(100)을 계획 다변형 셀의 각 꼭지점에 설치하는 교점파일근입단계(S10b)와, 인접한 교점파일(100)들의 결합홈(120)에 양단이 결합되는 다수의 외곽부재(150)를 설치하는 외곽보강단계(S20)와, 교점파일(100)의 결속부(110)에 후크(209)를 결속하여 시트파일(200)을 타입한 후, 후크(209)가 서로 결속되는 다수의 시트파일(200)을 연속으로 타입함으로써 각 교점파일(100)을 연결하는 시트파일(200)로 평면상 폐합된 다 변형 셀을 형성하는 폐합단계(S30)와, 다변형 셀의 내부에 속채움재를 포설하여 충전하는 충전단계(S40)로 이루어짐을 특징으로 하는 항만, 하천 및 댐 공사용 친환경 다변형 셀식 가물막이 공법이다.SUMMARY OF THE INVENTION The present invention has been made in view of the above-described problems, wherein a plurality of sheet piles 200 are formed to form a closed polygon in a plane, and a cell composed of a filling material filled therein is continuously constructed to form a barrier wall. In the cell temporary film forming method for forming a, the inner reinforcing step (S10a) for installing the inner frame 300 in contact with the inner surface of the sheet pile 200 constituting each side of the polymorphic cell and the sheet pile Intersect pile approach step of installing the intersection pile 100 formed with a plurality of binding portions 110 and a plurality of coupling grooves 120 of the shape corresponding to the hook 209 of the 200 at each vertex of the planar polymorphic cell. (S10b) and the outer reinforcing step (S20) for installing a plurality of outer members 150, both ends of which are coupled to the coupling grooves 120 of the adjacent intersection piles 100, and the binding portion 110 of the intersection pile 100 After fastening the hook 209 to the sheet pile 200, the hooks 209 are fastened to each other. By closing the number of sheet piles (200) in series to form a multi-deformed cell closed in planar plane to the sheet pile 200 for connecting each intersection pile 100 and the inside of the polymorphic cells Eco-friendly multi-variable cell-type clamshell method for harbor, river and dam construction, characterized in that the filling step (S40) to install and fill the filling material.

또한, 상기 교점파일(100)의 결합홈(120)에는 다단의 걸림턱(121)이 형성되되, 하측의 걸림턱(121) 폭이 상측의 걸림턱(121) 폭보다 크게 형성되어, 인접한 교점파일(100)들의 결합홈(120)에 양단이 결합되는 다수의 외곽부재(150)를 설치하는 외곽보강단계(S20)에서, 양단에 절개부(151)가 형성된 다수의 외곽부재(150)를 순차적으로 결합홈(120)의 걸림턱(121)에 거치하되 하측 외곽부재(150)의 절개부(151) 폭이 상측 외곽부재(150) 절개부(151) 폭보다 큰 것을 특징으로하는 항만, 하천 및 댐 공사용 친환경 다변형 셀식 가물막이 공법이고, 상기 외곽부재(150)의 양단에는 아래쪽으로 돌출된 지주(159)가 형성되어, 인접한 교점파일(100)들의 결합홈(120)에 양단이 결합되는 다수의 외곽부재(150)를 설치하는 외곽보강단계(S20)에서, 외곽부재(150)를 결합홈(120)에 순차적으로 결합함에 따라 하측 외곽부재(150)의 상부면에 상측 외곽부재(150)의 지주(159) 하단이 거치됨을 특징으로 하는 항만, 하천 및 댐 공사용 친환경 다변형 셀식 가물막이 공법이며, 상기 교점파일(100)의 결합홈(120) 측벽에는 종방향의 슬리트(slit)(123)가 형성되고, 외곽부재(150)의 양 단부에는 횡방향으로 돌출된 돌출부(153)가 형성되어, 인접한 교점파일(100)들의 결합홈(120)에 양단이 결합되는 다수의 외곽부재(150)를 설치하는 외곽보강단계(S20)에서, 양측 교점파일(100)의 결합홈(120)에 수평상태의 외곽부재(150) 양 단부를 투입하여 하강시키되 돌출부(153)를 수직상태로 유지하고, 외곽 부재(150)의 양 단부가 슬리트(123) 중앙부에 도달하면 외곽부재(150)를 중심축을 축으로 회전하여 돌출부(153)가 슬리트(123)에 결합되도록 함을 특징으로 하는 항만, 하천 및 댐 공사용 친환경 다변형 셀식 가물막이 공법이다.In addition, the engaging groove 120 of the intersection pile 100 is formed with a multi-stage locking jaw 121, the width of the lower locking jaw 121 is formed larger than the width of the upper locking jaw 121, the adjacent intersection In the outer reinforcement step (S20) of installing a plurality of outer members 150, both ends of which are coupled to the coupling grooves 120 of the piles 100, a plurality of outer members 150 having cutouts 151 formed at both ends thereof. Ports that are mounted on the locking step 121 of the coupling groove 120 in sequence, but the width of the cutout 151 of the lower outer member 150 is greater than the width of the cutout 151 of the upper outer member 150. The environment-friendly multi-variable cell-type temporary curtain for river and dam construction is a method, and both ends of the outer member 150 are formed with struts 159 protruding downward, and both ends are coupled to the coupling grooves 120 of adjacent intersection piles 100. In the outer reinforcement step S20 of installing a plurality of outer members 150, the outer members 150 are sequentially coupled to the coupling grooves 120. According to the upper surface of the lower outer member 150, the bottom of the support 159 of the upper outer member 150 is mounted, characterized in that the eco-friendly multi-variable cell-type clamshell method for the construction of ports, rivers and dams, the intersection pile (100) Slit 123 in the longitudinal direction is formed on the side wall of the coupling groove 120 of the, and both ends of the outer member 150 is formed with a projection 153 protruding in the transverse direction, adjacent intersection pile 100 In the outer reinforcement step (S20) of installing a plurality of outer members 150, both ends of which are coupled to the coupling grooves 120 of the two sides, the outer member 150 in a horizontal state in the coupling grooves 120 of both intersection files 100 ) Both ends are inserted and lowered, but the protrusions 153 are maintained in a vertical state, and when both ends of the outer member 150 reach the center portion of the slit 123, the outer member 150 is rotated about its central axis to protrude. Eco-friendly for harbor, river and dam construction characterized in that the 153 is coupled to the slit 123 A polymorphic cell temporary film is the method.

본 발명을 통하여, 수밀성 및 구조적 안정성이 뛰어난 가물막이공을 신속하게 설치할 수 있으며, 이로써 본 공사를 위한 건식 공사 구역을 신속하게 확보하고 공사 기간내 가물막이공의 수밀상태를 효과적으로 유지함으로써 전체 공기의 단축 및 공사비 절감 효과는 물론 시공품질을 제고하는 효과를 얻을 수 있다.Through the present invention, it is possible to quickly install a façade with excellent watertightness and structural stability, thereby quickly securing a dry construction zone for the construction and effectively maintaining the watertight state of the faucet during the construction period to reduce the overall air In addition to the cost savings, construction quality can be improved.

또한 별도의 보조 성토부 구성 및 차수 그라우팅 실시 필요성을 최소화함으로써 오탁수 발생 및 그라우팅액의 누출로 인한 하천 및 해양오염을 근본적으로 방지하는 효과를 얻을 수 있다.In addition, it is possible to fundamentally prevent the river and marine pollution caused by the generation of dirty water and leakage of grouting liquid by minimizing the need for a separate auxiliary fill part and implementing the order grouting.

본 발명의 상세한 구성 및 수행 과정을 첨부된 도면을 통하여 설명하면 다음과 같다.The detailed configuration and implementation process of the present invention will be described with reference to the accompanying drawings.

우선 도 5는 본 발명이 적용된 가물막이공이 방조제에 설치된 상태를 도시한 평면도로서, 동 도면에서와 같이 연속된 다변형(多邊形) 셀(cell)로 포위된 건식 공사 구역을 형성함으로써 수문(水門) 또는 수차(水車) 등의 설치 공사를 수행할 수 있다.First, FIG. 5 is a plan view showing a state in which the faucet gasket to which the present invention is applied is installed in a seawall, and as shown in the drawing, a dry construction zone surrounded by a continuous polymorphic cell is formed. Or installation work, such as an aberration, can be performed.

본 발명의 다변형 셀은 셀의 각 꼭지점에 교점파일(100)이 설치되고 이들 교점파일(100)을 연결하는 일련의 시트파일(200)이 타입되어 셀을 평면상에서 폐합하게 되며, 도 6에서와 같이 셀 내부에는 모래나 사석 등의 속채움재가 포설되고 교점파일(100)에는 다수의 외곽부재(150)가 결합되어 보강하게 된다.In the multi-variable cell of the present invention, the intersection pile 100 is installed at each vertex of the cell, and a series of sheet piles 200 connecting the intersection piles 100 are typed to close the cells on a plane, and in FIG. 6. As shown in the inside of the cell, a filling material such as sand or sandstone is installed, and a plurality of outer members 150 are coupled and reinforced to the intersection pile 100.

도 7은 본 발명 다변형 셀의 구조 및 인접 셀간 연결 방식을 예시한 것으로, 동 도면을 통하여 알 수 있는 바와 같이, 인접한 다변형 셀은 일측 변(邊)의 교점파일(100), 외곽부재(150) 및 시트파일(200)을 공유하게 된다.7 illustrates the structure of the present invention and the connection method between adjacent cells. As can be seen from the same figure, the adjacent polymorphic cells have one side of the intersection pile 100 and the outer member ( 150 and the sheet pile 200 will be shared.

이러한 본 발명 다변형 셀의 연속적인 구축 과정에 있어서 각 단계별 상황이 도 8 내지 도 21에 도시되어 있고, 전체 단계가 도 22에 정리되어 있으며, 이들 도면을 통하여 본 발명의 단계별 수행 과정을 상세히 설명하면 다음과 같다.The situation of each step in the continuous construction process of the present invention multivariate cell is shown in Figs. 8 to 21, the overall steps are summarized in Fig. 22, through these steps will be described in detail the step-by-step process of the present invention Is as follows.

우선 도 8 및 도 9는 다변형 셀 내부면에 접하는 철골구조물인 내곽프레임(300)을 설치하는 내곽보강단계(S10a)를 도시한 것으로, 내곽프레임(300)은 다변형 셀의 시트파일(200) 내측면에 접하며 시트파일(200)의 정확한 타입을 유도함과 동시에 폐합된 다변형 셀 내부의 물을 양수하는 과정에서 외부 수압으로 인한 시트파일(200)의 변형 및 파괴를 방지하는 역할을 수행한다.8 and 9 illustrate the inner reinforcement step (S10a) for installing the inner frame 300, which is a steel structure in contact with the inner surface of the polymorphic cell, the inner frame 300 is a sheet pile 200 of the polymorphic cell In contact with the inner surface and induces the correct type of the sheet pile 200 and at the same time serves to prevent deformation and destruction of the sheet pile 200 due to external water pressure in the process of pumping water inside the closed polymorphic cell. .

이러한 내곽프레임(300)은 다변형 셀의 규모 및 수심 등의 조건에 따라 그 설치가 생략될 수도 있다.The inner frame 300 may be omitted, depending on the conditions, such as the size and depth of the polymorphic cell.

본 발명에서는 내곽프레임(300)의 정확한 적치를 위하여 내곽프레임(300)에 다수의 유도공(309)을 형성하고, 이 유도공(309)에 결합되는 다수의 유도파일(310)을 지반에 타입하게 되는데, 도 8 및 도 9를 통하여 알 수 있는 바와 같이, 최 하 단의 내곽프레임(300)에 유도파일(310)을 결합한 상태로 크레인으로 내곽프레임(300)을 설치지점에 위치시킨 후 유도파일(310)을 지반에 타입하여 고정하고, 내곽프레임(300)을 하강시켜 유도파일(310) 하부의 지지부(311)에 내곽프레임(300)을 거치함으로써 최 하단의 내곽프레임(300) 설치를 완료하고, 이후 상단의 내곽프레임(300)을 유도파일(310)에 결합하여 하강 및 적치하는 방식으로 다단의 내곽프레임(300)을 설치하여 내곽보강단계(S10a)를 완료하게 된다.In the present invention, a plurality of guide holes 309 are formed in the inner frame 300 to accurately accumulate the inner frame 300, and a plurality of guide files 310 coupled to the guide hole 309 are typed on the ground. 8 and 9, after the guide frame 310 is attached to the lowermost inner frame 300 in a state where the guide frame 310 is coupled with a crane, the guide frame ( 310 is fixed on the ground, and the inner frame 300 is lowered to mount the inner frame 300 on the support part 311 below the guide file 310 to complete the installation of the innermost frame 300 at the lowest level. Afterwards, the inner frame 300 of the upper stage is combined with the guide file 310 to install the inner frame 300 of the multi-stage in a descending and stacking manner to complete the inner reinforcing step S10a.

내곽프레임(300)의 설치가 완료되면 도 10에서와 같이, 다변형 셀의 꼭지점에 해당되는 위치에 교점파일(100)을 설치하는 교점파일근입단계(S10b)를 수행하게 되는데, 교점파일(100)은 다수의 결속부(110) 및 결합홈(120)이 형성된 장주(長柱)형 부재로서, 압연공정을 통하여 단일부재로 제작될 수도 있으나 일반 형강에 비하여 복잡한 단면형상을 가지므로 H형강, 'ㄷ'자형 형강 또는 'ㄴ'자형 형강을 조합하여 용접하는 방식으로 제작될 수도 있다.When the installation of the inner frame 300 is completed, as shown in FIG. 10, the intersection file entering step (S10b) to install the intersection file 100 at a position corresponding to the vertex of the multivariate cell, the intersection file 100 ) Is a long column-shaped member having a plurality of binding portions 110 and coupling grooves 120, which may be manufactured as a single member through a rolling process, but has a complicated cross-sectional shape compared to general steel, H-shaped steel, It may be manufactured by welding a combination of 'c' shaped steel or 'b' shaped steel.

도 11은 교점파일(100)의 일 실시예 제작방식을 도시한 것으로, 한 쌍의 플랜지(flange)가 형성되고 플랜지 단부에 시트파일(200)의 후크(hook)(209)와 일치하는 형상의 결속부(110)가 형성된 'ㄷ'자형 형강 3개를 접합하여 하나의 교점파일(100)을 구성하고 있으며, 이 경우 각 'ㄷ'자형 형강의 플랜지간 공간이 결합홈(120)이 된다.FIG. 11 illustrates an embodiment manufacturing method of the intersection pile 100, in which a pair of flanges are formed, and a shape coincident with the hook 209 of the seat pile 200 at the flange end. Bonding portion 110 is formed by joining three 'c' shaped section steel is formed one intersection pile 100, in this case the space between the flange of the 'c' shaped section steel is the coupling groove 120.

교점파일(100)은 통상의 말뚝기초와 대동소이한 방식으로 지반에 근입(根入)되는데, 교점파일(100)을 계획 지점에 단순히 항타하는 방식이나 도 12에서와 같이 케이싱(199)을 이용하여 굴착공을 형성한 후 근입부에 콘크리트를 타설하여 고정하 는 방식 등 다양한 방식이 가능하다.The intersection pile 100 is entered into the ground in a manner similar to that of a conventional pile foundation, and simply uses the casing 199 as shown in FIG. 12 to simply drive the intersection pile 100 to a planned point. After the excavation hole is formed, a variety of methods are possible, such as the method of casting concrete to the entrance part and fixing it.

교점파일(100)은 시트파일(200)과 달리 단면의 기하학적 강성 및 휨강성이 우수하고 말뚝기초 형식으로 시공되는 바 충분한 근입장(根入長)을 확보할 수 있으며, 따라서 추후 교점파일(100)의 결속부(110)에 결합될 시트파일(200)을 견고하게 고정할 수 있을 뿐 아니라 시트파일(200)의 타입 기준으로도 활용될 수 있다.Unlike the sheet pile 200, the intersection pile 100 is excellent in geometric stiffness and flexural rigidity of the cross section, and can be secured to a sufficient root position because it is constructed in a pile foundation type. Not only can firmly secure the sheet pile 200 to be coupled to the binding unit 110, but may also be utilized as a type reference of the sheet pile 200.

교점파일(100)의 결합홈(120)은 다변형 셀의 각 변을 구성하는 시트파일(200)의 외측 면에 접하면서 셀 내부 속채움재로 인한 토압에 저항하는 수평부재인 외곽부재(150)가 결합되는 홈으로서, 도 13에서와 같이 교점파일(100)의 근입이 완료된 후 다변형 셀의 각 변 양단 교점파일(100)의 결합홈(120)에 외곽부재(150)의 양단을 결합하여 하강시켜 소정의 위치에 고정하게 된다.The coupling groove 120 of the intersection pile 100 is an outer member 150 which is a horizontal member that is in contact with the outer surface of the sheet pile 200 constituting each side of the polymorphic cell and resists earth pressure due to the inner filling material inside the cell. 13 is coupled to each other, as shown in FIG. 13 and after the entrance of the intersection pile 100 is completed by coupling both ends of the outer member 150 to the coupling groove 120 of the intersection pile 100 on each side of the multi-variable cell It is lowered and fixed to a predetermined position.

이렇듯 외곽부재(150)를 교점파일(100)의 결합홈(120)에 결합하는 외곽보강단계(S20)에 있어서 외곽부재(150)의 거치 내지 고정방식이 도 14 내지 도 16에 예시되어 있다.As such, the mounting or fixing method of the outer member 150 in the outer reinforcement step S20 of coupling the outer member 150 to the coupling groove 120 of the intersection pile 100 is illustrated in FIGS. 14 to 16.

도 14는 교점파일(100)의 결합홈(120)에 다단의 걸림턱(121)을 형성하되 하측의 걸림턱(121) 폭이 상측의 걸림턱(121) 폭보다 점차 커지도록 형성하고, 결합홈(120)에 결합되는 외곽부재(150) 양단에는 절개부(151)를 형성하되 이 역시 하측 외곽부재(150)의 절개부(151) 폭이 상측 외곽부재(150)의 절개부(151) 폭보다 점차 커지도록 형성함으로써, 다수의 외곽부재(150)가 순차적으로 다단의 걸림턱(121)에 거치될 수 있도록 한 것이다.14 is formed in the coupling groove 120 of the cross point pile 100, the multi-stage locking jaw 121 is formed so that the width of the lower locking jaw 121 is gradually larger than the width of the upper locking jaw 121, the coupling Cutouts 151 are formed at both ends of the outer member 150 coupled to the groove 120, but the cutout 151 of the lower outer member 150 has a width of the cutout 151 of the upper outer member 150. It is formed to be gradually larger than the width, so that the plurality of outer members 150 can be mounted on the locking step 121 of the multi-sequential.

즉, 최 하단 외곽부재(150)를 예로써 설명하면, 최 하단 외곽부재(150)의 절 개부(151) 폭은 최하단 걸림턱(121)의 폭보다는 작고 최하단 걸림턱(121) 상측 걸림턱(121)들의 폭보다는 크게 형성하여 최 하단 외곽부재(150)를 교점파일(100)의 결합홈(120)에 결합시 최 하단 걸림턱(121)을 제외한 모든 걸림턱(121)을 통과하여 하강한 후 최 하단 걸림턱(121)에 거치되는 것이며, 이후 상측의 외곽부재(150)들 역시 동일한 방식으로 각기 해당되는 걸림턱(121)에 거치되는 것이다.That is, when the lowermost outer member 150 is described as an example, the width of the cutout 151 of the lowermost outer member 150 is smaller than the width of the lowermost locking jaw 121 and the uppermost locking jaw 121 is the lower locking jaw 121 ( To form a width larger than the 121 of the lowermost outer member 150 when the coupling groove 120 of the intersection pile 100 when passing through all the locking jaw 121 except the lowest locking jaw 121 is lowered After being mounted on the lowermost locking jaw 121, and then the outer member 150 of the upper side is also mounted to the corresponding locking jaw 121 in the same manner.

도 15는 단순히 걸림턱(121)과 절개부(151)의 폭만을 변경하는 것이 아니라 그 형상 또한 각 단별로 변화시킴으로써 외곽부재(150)의 일층 견고한 거치가 가능하도록 한 것이며, 도 16은 걸림턱(121)과 외곽부재(150)의 양단에 각각 걸림홈(122)과 걸림돌부(152)를 형성하여 외곽부재(150)의 축방향 인장력에도 효과적으로 대응할 수 있도록 한 것이다.15 is to simply change the width of the locking jaw 121 and the cutout 151 not only by changing the shape of each step, but also to enable a more rigid mounting of the outer member 150, Figure 16 is a locking jaw The locking grooves 122 and the locking protrusions 152 are formed at both ends of the 121 and the outer member 150, respectively, to effectively cope with the axial tensile force of the outer member 150.

한편, 도 17은 교점파일(100)의 결합홈(120)에 다단의 걸림턱(121)을 형성하지 않고 외곽부재(150)의 양단에 아래쪽으로 돌출된 지주(159)를 형성하여, 외곽부재(150)의 설치시 외곽부재(150)를 결합홈(120)에 순차적으로 결합함에 따라 하측 외곽부재(150)의 상부면에 상측 외곽부재(150)의 지주(159) 하단이 거치되도록 함으로써, 더욱 신속한 시공이 가능하도록 한 것이며, 이 경우 교점파일(100)의 최 하단 외곽부재(150)를 고정하기 위한 걸림턱(121)만을 설치하면 이후 상측의 외곽부재(150)는 지주(159)에 의하여 소정거리 이격된 상태로 고정이 가능하게 된다.On the other hand, Figure 17 is to form a strut 159 protruding downward on both ends of the outer member 150 without forming a multi-stage latching jaw 121 in the coupling groove 120 of the intersection pile 100, the outer member By sequentially coupling the outer member 150 to the coupling groove 120 at the time of installation of the 150 so that the lower end of the strut 159 of the upper outer member 150 is mounted on the upper surface of the lower outer member 150, It is intended to enable more rapid construction, in this case, if only the installation of the locking jaw 121 for fixing the lowest outer member 150 of the intersection pile 100, then the outer member 150 of the upper side to the support 159 It is possible to fix in a state separated by a predetermined distance.

외곽부재(150) 설치를 통한 외곽보강단계(S20)가 완료되면, 다변형 셀의 각 변을 구성하며 다변형 셀을 평면상에서 폐합하는 시트파일(200)을 타입하는 폐합단계(S30)를 수행하게 되는데, 각각의 시트파일(200)은 양단의 후크(209)를 통하여 상호 결속되며, 각 변의 시점 및 종점 시트파일(200)은 도 18 및 도 19에서와 같이, 교점파일(100)의 결속부(110)에 결속됨으로써 견고하게 고정된다.When the outer reinforcement step (S20) is completed through the installation of the outer member 150, the closing step (S30) is performed to form each side of the polymorphic cell and to form the sheet pile 200 for closing the polymorphic cell on a plane. Each sheet pile 200 is bound to each other through the hooks 209 at both ends, and the starting point and end point sheet piles 200 of each side, as shown in FIGS. 18 and 19, are bonded to the intersection pile 100. It is firmly fixed by binding to the unit (110).

교점파일(100)의 결속부(110)는 시트파일(200)의 후크(209)와 동일한 형상을 가지며, 시트파일(200)을 견고하게 고정하는 역할과 함께 시트파일(200) 타입시의 기준점 역할 또한 수행하게 되며, 본 발명에서는 도 18에서와 같이 내곽프레임(300)과 외곽부재(150) 사이의 공간에 시트파일(200)을 일단 삽입한 상태에서 지반내 타입이 진행되므로 타입 정밀도를 유지하면서도 상대적으로 대심도의 타입이 가능하다.The binding unit 110 of the intersection pile 100 has the same shape as the hook 209 of the sheet pile 200, and serves to firmly fix the sheet pile 200, and a reference point when the sheet pile 200 is typed. In addition, in the present invention, the type of the ground is advanced in the state where the sheet pile 200 is inserted into the space between the inner frame 300 and the outer member 150 as shown in FIG. At the same time, relatively large depth types are possible.

즉, 종래기술인 원형셀 가물막이공의 플래트시트파일(flat sheet pile)의 경우 도 3 및 도 4에서와 같이, 원주상 정확한 위치에 시공되어야 함에도 불구하고 셀 내부의 원형템플레이트외에는 적절한 기준 수단이 전무하였으며, 원형템플레이트 또한 플래트시트파일의 정치 및 타입시 위치, 자세 및 타입방향을 구속하는 역할을 전혀 수행하지 못하므로 타입 정밀도의 확보가 지극히 어려울 뿐 아니라 대심도의 타입도 거의 불가능하였다.That is, in the case of the flat sheet pile of the conventional circular cell sputtering process, as shown in Figs. 3 and 4, there is no suitable reference means other than the circular template inside the cell, although it should be constructed at the exact position on the circumference. In addition, since the circular template does not play a role of restraining the position, posture and type direction at the time of standing and type of the plate pile, it is extremely difficult to secure the type precision and the type of the large depth is almost impossible.

따라서, 종래의 원형셀 가물막이공의 경우, 지반에 근입된 플래트시트파일에 의한 지지력은 거의 무시된 상태에서 원형셀의 면적 및 자중에 의한 중력식 자립 벽체로서 해석 및 설계되었으며, 이에 플래트시트파일의 근입장 확보를 통한 구조적 안정성 및 차수효과를 기대할 수 없는 바, 별도의 차수 그라우팅(grouting)을 실시함은 물론 도 2에서와 같은 보조 성토부의 구성이 필요하였다.Therefore, in the case of the conventional circular cell temporary film processing, the support force by the plate piles in the ground is almost neglected and analyzed and designed as a gravity freestanding wall by the area and the weight of the circular cell. Since the structural stability and the order effect cannot be expected through securing the position, additional grouting was required as well as the configuration of the auxiliary fill part as shown in FIG. 2.

이러한 차수 그라우팅 및 보조 성토부는 공사비의 증액을 야기할 뿐 아니라, 보조 성토부의 성토과정에서의 오탁수 발생 및 그라우팅액의 누출 등으로 인하여 공사지역의 하천 및 해양 환경을 파괴하는 심각한 문제점을 가지는 바, 시트파일(200)의 근입장을 충분히 확보하여 추가 차수시공 및 보조 성토부의 필요성을 최소화한 본 발명은 하천 및 해양 환경의 보존 측면에서 매우 유리한 공법이라 할 수 있다.Such order grouting and auxiliary fill parts cause an increase in construction cost, as well as serious problems of damaging the river and marine environment in the construction area due to the generation of dirty water and leakage of grouting liquid during the filling process of the auxiliary fill parts. The present invention, which sufficiently secures the position of the seat pile 200 and minimizes the need for additional order construction and auxiliary fill, may be a very advantageous method in terms of preservation of rivers and marine environments.

교점파일(100)을 연결하는 시트파일(200)의 타입이 완료되어 다변형 셀이 폐합되면, 도 20에서와 같이, 다변형 셀 내부에 모래 또는 사석 등의 속채움재를 투입하여 충전하는 충전단계(S40)를 수행하는데, 이때 내곽프레임(300)을 인양하여 재사용할 수도 있다.When the type of sheet pile 200 connecting the intersection pile 100 is completed and the polymorphic cell is closed, as shown in FIG. 20, a filling step of filling a filling material such as sand or sandstone into the polymorphic cell is filled. At step S40, the inner frame 300 may be salvaged and reused.

속채움재의 충전이 완료된 상태에서 내곽프레임(300)을 인양하는 것은 사실상 극히 어려우므로 속채움재의 충전과 동시에 토압과 수압의 균형을 유지하면서 내곽프레임(300)을 서서히 인양하게되며, 이때 유도파일(310)의 근입상태는 유지함으로써 내곽프레임(300)의 인양경로를 유도하여 인양과정에서 내곽프레임(300)이 시트파일(200)에 충격을 가하는 등의 사고를 방지한다.Since it is extremely difficult to lift the inner frame 300 while the filling of the filling material is completed, the inner frame 300 is gradually lifted while maintaining the balance between earth pressure and water pressure while filling the filling material, and the induction file ( Maintaining the indentation state of the 310 to induce the lifting path of the inner frame 300 to prevent the accident such as the inner frame 300 impacts the sheet pile 200 during the lifting process.

내곽프레임(300)의 인양과 속채움재의 충전이 완료되면 도 21에서와 같이, 유도파일(310)을 인발하여 재사용할 수도 있다.When the lifting and filling of the filling material of the inner frame 300 is completed, as shown in FIG. 21, the guide pile 310 may be drawn and reused.

도 22는 전술한 본 발명 다변형 셀의 시공과정을 정리한 것으로, 동 도면을 통하여 알 수 있는 바와 같이, 내곽보강단계(S10a) 내지 충전단계(S40a, S40b)를 통하여 하나의 다변형 셀이 완성되면, 이후 인접한 신규 다각형 셀을 구성함에 있어서 기존 다변형 셀 일측 변(邊)의 교점파일(100), 외곽부재(150) 및 시트파 일(200)을 공유하게 된다.FIG. 22 illustrates the construction process of the above-described multivariate cell of the present invention. As can be seen from the same figure, a single polymorphic cell is provided through an inner reinforcing step S10a to a filling step S40a and S40b. When completed, in the subsequent configuration of the adjacent new polygonal cell to share the intersection file 100, the outer member 150 and the sheet file 200 of one side of the existing polymorphic cell (邊).

즉, 도시된 바와 같은 사각형 셀의 경우 기존 셀과 인접한 신규 셀의 구축에 있어서 기존 셀과 공유하는 변과 대변(對邊)의 양단 지점에만 교점파일(100)을 설치하고, 기존 셀과 공유하는 변을 제외한 타 변의 외곽부재(150) 및 시트파일(200)만을 설치함으로써 신속한 셀의 구성이 가능한 것이다.That is, in the case of a rectangular cell as shown, in the construction of a new cell adjacent to the existing cell, the intersection file 100 is installed only at both ends of the sides and the stool shared with the existing cell and shared with the existing cell. By installing only the outer member 150 and the seat pile 200 of the other side excluding the side will be able to quickly configure the cell.

한편, 도 23 내지 도 26은 교점파일(100)의 각 플랜지 단부를 연결하는 보강판(130)을 구성하여 강성을 확보한 실시예로서, 도 23 내지 도 25에서와 같이 호형(弧形) 단면의 보강판(130)을 접합하여 전체적으로 원기둥형의 교점파일(100)을 구성하거나 도 26에서와 같이 평판형의 보강판(130)을 접합하는 등 다양한 변형이 가능하다.On the other hand, Figures 23 to 26 is an embodiment in which the rigidity is secured by configuring the reinforcing plate 130 connecting the flange end of the intersection pile 100, arc-shaped cross section as shown in Figures 23 to 25 Various modifications are possible, such as joining the reinforcement plate 130 of the cylindrical cross-section pile (100) as a whole or the flat plate reinforcement plate 130 as shown in FIG.

도 27 및 도 28은 교점파일(100)의 결합홈(120)에 외곽부재(150)를 결합함에 있어서 단순 거치하는 것이 아니라, 결합홈(120)과 외곽부재(150)에 각각 슬리트(123)와 돌출부(153)를 형성하여, 외곽부재(150)를 설치하는 외곽보강단계(S20)에서 이들이 서로 체결될 수 있도록 함으로써 외곽부재(150)의 일층 견고한 설치가 가능하도록 한 것이다.27 and 28 are not simply mounted in coupling the outer member 150 to the coupling groove 120 of the intersection pile 100, slits 123 to the coupling groove 120 and the outer member 150, respectively By forming the protrusion 153 and, so that they can be fastened to each other in the outer reinforcement step (S20) for installing the outer member 150 is to enable a solid installation of the outer member 150.

도 27에서와 같이, 교점파일(100)의 결합홈(120) 측벽에 교점파일(100)의 종방향 즉, 수직방향으로 슬리트(slit)(123)를 형성하고, 외곽부재(150)의 양 단부에는 횡방향 즉, 외곽부재(150)의 축과 직교하는 방향으로 돌출된 돌출부(153)를 형성하여, 도 28에서와 같이 일단 외곽부재(150)의 돌출부(153)가 교점파일(100)과 평행을 이루도록 외곽부재(150)를 결합홈(120)에 투입하여 하강시킨 후, 외곽부 재(150)의 양 단부가 슬리트(123) 중앙부에 도달하면 외곽부재(150)를 중심축으 축으로 회전하여 돌출부(153)가 슬리트(123)에 결합되도록 한 것이다.As shown in FIG. 27, slits 123 are formed in the longitudinal direction of the intersection pile 100, that is, in the vertical direction, on the sidewalls of the coupling groove 120 of the intersection pile 100, and the outer member 150 is formed. At both ends, protrusions 153 protruding in the transverse direction, that is, the direction orthogonal to the axis of the outer member 150 are formed, and as shown in FIG. 28, the protrusion 153 of the outer member 150 has the intersection pile 100. The outer member 150 is lowered by putting the outer member 150 into the coupling groove 120 so as to be parallel to the outer member 150. When both ends of the outer member 150 reach the center portion of the slit 123, the outer member 150 is centered. The protrusion 153 is coupled to the slits 123 by rotating in an axis.

이러한 외곽부재(150)의 축회전은 도 29에서와 같이, 외곽부재(150)와 크레인을 연결하는 주강선(155)외에 외곽부재(150) 외주면에 설치된 결선고리(154)에 별도의 구동선(156)을 결선한 후 이를 소정거리 끌어올리는 방식으로 이루어질 수 있는데, 본 공사의 완료 후 가물막이공의 해체시에도 동일한 방식으로 축회전 및 해체가 가능하다.The axial rotation of the outer member 150, as shown in Figure 29, in addition to the main steel wire 155 for connecting the outer member 150 and the crane, a separate drive line to the connection ring 154 installed on the outer peripheral surface of the outer member 150 After connecting (156) it can be made in a way to raise a predetermined distance, after the completion of the construction can be rotated and dismantled in the same manner in the dismantling of the temporary screening.

즉, 도 29에서와 같이, 외곽부재(150)의 외주면에 서로 직각을 이루는 한쌍의 결선고리(154a, 154b)를 구성하고 이들에 각각 별도의 구동선(156a, 156b)을 결선하게 되면, 구동선(156a, 156b)을 선택적으로 끌어올림으로써 외곽부재(150)의 회전방향을 조절할 수 있는 것이다.That is, as shown in FIG. 29, when a pair of connection rings 154a and 154b are formed at right angles to the outer circumferential surface of the outer member 150 and the respective drive lines 156a and 156b are connected to each other, driving is performed. By selectively pulling the lines (156a, 156b) it is possible to adjust the rotation direction of the outer member 150.

도 1은 종래의 원형셀식 가물막이공 평면 예시도1 is a schematic view of a conventional circular cell temporary film processing plane

도 2는 도 1의 A-A'선 단면도FIG. 2 is a cross-sectional view taken along the line AA ′ of FIG. 1.

도 3은 종래 원형셀을 구성하는 플래트시트파일 결속상태 평면도3 is a plan view of a plate pile binding state constituting a conventional circular cell

도 4는 종래 원형셀 설치상태 부분절단 사시도Figure 4 is a partial cutaway perspective view of a conventional circular cell installation state

도 5는 본 발명의 가물막이공 평면 예시도5 is an exemplary plan view of the temporary film processing of the present invention

도 6은 돈 5의 B-B'선 단면도6 is a cross-sectional view taken along line B-B 'of Don 5

도 7은 본 발명 다각형셀의 부분절단 사시도7 is a partial cutaway perspective view of the present invention polygonal cell

도 8은 본 발명의 내곽프레임 설치초기 사시도8 is an initial perspective view of the inner frame installation of the present invention

도 9는 본 발명의 내곽프레임 설치상태 사시도9 is a perspective view of the inner frame installation state of the present invention

도 10은 본 발명의 교점파일 근입상황 사시도Figure 10 is a perspective view of the intersection pile entrance of the present invention

도 11은 본 발명의 교점파일 제작방식 예시도11 is an exemplary view of the intersection file manufacturing method of the present invention

도 12는 본 발명의 교점파일 근입과정 예시도Figure 12 is an illustration of the intersection file access process of the present invention

도 13은 본 발명의 외곽부재 설치상태 사시도Figure 13 is a perspective view of the outer member installation state of the present invention

도 14는 본 발명 외곽부재의 거치방식 일 실시예 설명도14 is a view illustrating an embodiment of a mounting method of the outer member of the present invention

도 15는 본 발명 외곽부재 거치방식의 변형된 실시예 설명도15 is an explanatory view of a modified embodiment of the present invention the outer member mounting method

도 16은 걸림돌부가 구성된 본 발명 외곽부재의 거치방식 일 실시예 설명도16 is a view illustrating an embodiment of a mounting method of the outer member of the present invention having a locking protrusion

도 17은 지주가 구성된 본 발명 외곽부재의 거치방식 일 실시예 설명도Figure 17 is an embodiment explanatory diagram of the mounting method of the present invention the outer member is configured posts

도 18은 본 발명의 시트파일 타입방식 설명도18 is an explanatory diagram of a sheet pile type method of the present invention

도 19는 본 발명의 교점파일 및 시트파일간 결속방식 설명도19 is an explanatory diagram of a binding method between an intersection file and a sheet file of the present invention;

도 20은 본 발명의 속채움재 포설상태 사시도20 is a perspective view of the filling material installation state of the present invention

도 21은 본 발명의 유도파일 인발상태 사시도Figure 21 is a perspective view of the induced pile pulled state of the present invention

도 22는 본 발명의 단계별 평면 예시도Figure 22 is a plan view step by step of the present invention

도 23은 교점파일 보강판이 적용된 본 발명의 다변형 셀 예시도Figure 23 is an illustration of a multi-variable cell of the present invention to which the intersection pile reinforcement plate is applied

도 24는 호형 보강판이 적용된 본 발명 교점파일의 대표단면도24 is a representative cross-sectional view of the intersection file of the present invention to which the arc-shaped reinforcement plate is applied

도 25는 도 24의 교점파일과 시트파일의 결속상태 사시도25 is a perspective view of the binding state between the intersection pile and the sheet pile of FIG. 24.

도 26은 평판형 보강판이 적용된 교점파일과 시트파일의 결속상태 사시도Figure 26 is a perspective view of the binding state of the intersection pile and the sheet pile to which the flat plate reinforcement plate is applied

도 27은 슬리트가 형성된 교점파일과 외곽부재의 결합상태 부분절단 사시도27 is a perspective view of a partially cut state of the intersection pile and the outer member in which the slits are formed

도 28은 슬리트가 형성된 교점파일과 외곽부재의 결합과정 설명도28 is an explanatory view of the coupling process of the intersection pile and the outer member on which the slits are formed

도 29는 외곽부재의 회전방식 설명도29 is an explanatory view of the rotation method of the outer member

<도면의 주요부분에 대한 부호설명><Code Description of Main Parts of Drawing>

100 : 교점파일(交點pile)100: intersection file

110 : 결속부110: binding unit

120 : 결합홈120: coupling groove

121 : 걸림턱121: Hanging jaw

122 : 걸림홈122: hanging groove

123 : 슬리트(slit)123 slits

130 : 보강판130: reinforcement plate

150 : 외곽부재150: outer member

151 : 절개부151: incision

152 : 걸림돌부152: obstacles

153 : 돌출부153: protrusion

154 : 결선고리154: Final Ring

155 : 주강선155: cast steel

156 : 구동선156: drive line

159 : 지주159: prop

199 : 케이싱(casing)199 casing

200 : 시트파일(sheet pile)200: sheet pile

209 : 후크(hook)209 hook

300 : 내곽프레임(內郭frame)300: inner frame

309 : 유도공309: guide ball

310 : 유도파일310: guided file

311 : 지지부311: support part

S10a : 내곽보강단계S10a: Enhancement step

S10b : 교점파일근입단계S10b: Intersection file access step

S20 : 외곽보강단계S20: Outer reinforcement step

S30 : 폐합단계S30: closing stage

S40 : 충전단계S40: charging stage

Claims (5)

다수의 시트파일(200)이 타입되어 평면상 폐합된 다각형을 형성하고 그 내부에 속채움재가 충전되어 구성된 셀(cell)이 연속으로 구축되어 차수벽을 형성하는 셀식 가물막이 공법에 있어서,In the cell-type temporary film construction method in which a plurality of sheet piles 200 are typed to form a closed polygon in a plane and a cell formed by filling a filling material therein is continuously formed to form a barrier wall. 시트파일(200)의 후크(209)와 일치하는 형상의 다수의 결속부(110)와 다수의 결합홈(120)이 형성된 교점파일(100)을 계획 다변형 셀의 각 꼭지점에 설치하는 교점파일근입단계(S10b)와;Intersect pile for installing the intersection file 100 formed with a plurality of fastening portions 110 and a plurality of coupling grooves 120 of the shape corresponding to the hook 209 of the seat pile 200 at each vertex of the planar polymorphic cell. Ingress step (S10b); 인접한 교점파일(100)들의 결합홈(120)에 양단이 결합되는 다수의 외곽부재(150)를 설치하는 외곽보강단계(S20)와;An outer reinforcing step (S20) of installing a plurality of outer members 150 having both ends coupled to the coupling grooves 120 of the adjacent intersection files 100; 교점파일(100)의 결속부(110)에 후크(209)를 결속하여 시트파일(200)을 타입한 후, 후크(209)가 서로 결속되는 다수의 시트파일(200)을 연속으로 타입함으로써 각 교점파일(100)을 연결하는 시트파일(200)로 평면상 폐합된 다변형 셀을 형성하는 폐합단계(S30)와;After binding the hook 209 to the binding unit 110 of the intersection pile 100 to type the sheet pile 200, the hook 209 is continuously typed by a plurality of sheet piles 200 that are bound to each other A closing step (S30) of forming a polygonal cell closed in a plane by the sheet pile 200 connecting the intersection pile 100; 다변형 셀의 내부에 속채움재를 포설하여 충전하는 충전단계(S40)로 이루어짐을 특징으로 하는 항만, 하천 및 댐 공사용 친환경 다변형 셀식 가물막이 공법.Eco-friendly multi-variable cell cladding method for harbor, river and dam construction, characterized in that the filling step (S40) for filling and filling the inner filling material inside the polymorphic cell. 제1항에 있어서, 교점파일근입단계(S10b) 이전에, 다변형 셀의 각 변(邊)을 구성하는 시트파일(200)의 내측 면에 접하는 내곽프레임(300)을 설치하는 내곽보강 단계(S10a)를 수행함을 특징으로 하는 항만, 하천 및 댐 공사용 친환경 다변형 셀식 가물막이 공법.According to claim 1, Before the intersection pile access step (S10b), the inner reinforcement step of installing the inner frame 300 in contact with the inner surface of the sheet pile 200 constituting each side of the polymorphic cell ( S10a) Eco-friendly multi-variable cell-type cladding method for port, river and dam construction, characterized in that performing. 제1항 또는 제2항에 있어서, 교점파일(100)의 결합홈(120)에는 다단의 걸림턱(121)이 형성되되, 하측의 걸림턱(121) 폭이 상측의 걸림턱(121) 폭보다 크게 형성되어, 인접한 교점파일(100)들의 결합홈(120)에 양단이 결합되는 다수의 외곽부재(150)를 설치하는 외곽보강단계(S20)에서,According to claim 1 or 2, The engaging groove 120 of the intersection pile 100 is formed with a multi-stage locking jaw 121, the width of the lower locking jaw 121 is the upper locking jaw 121 width In a larger reinforcement step (S20) of installing a plurality of outer members 150, both ends of which are coupled to the coupling grooves 120 of adjacent intersection piles 100, 양단에 절개부(151)가 형성된 다수의 외곽부재(150)를 순차적으로 결합홈(120)의 걸림턱(121)에 거치하되 하측 외곽부재(150)의 절개부(151) 폭이 상측 외곽부재(150) 절개부(151) 폭보다 큰 것을 특징으로하는 항만, 하천 및 댐 공사용 친환경 다변형 셀식 가물막이 공법.Mount the plurality of outer members 150 having the cutouts 151 formed at both ends thereof in the latching jaw 121 of the coupling groove 120 in sequence, but the width of the cutouts 151 of the lower outer member 150 is the upper outer member. (150) Eco-friendly multi-variable cell-type cladding method for port, river and dam construction, characterized by greater than the incision 151 width. 제1항 또는 제2항에 있어서, 외곽부재(150)의 양단에는 아래쪽으로 돌출된 지주(159)가 형성되어, 인접한 교점파일(100)들의 결합홈(120)에 양단이 결합되는 다수의 외곽부재(150)를 설치하는 외곽보강단계(S20)에서,According to claim 1 or claim 2, Both ends of the outer member 150 is formed with a support 159 protruding downward, a plurality of outer edges are coupled to both ends of the coupling groove 120 of the adjacent intersection files 100 In the outer reinforcement step (S20) of installing the member 150, 외곽부재(150)를 결합홈(120)에 순차적으로 결합함에 따라 하측 외곽부재(150)의 상부면에 상측 외곽부재(150)의 지주(159) 하단이 거치됨을 특징으로 하는 항만, 하천 및 댐 공사용 친환경 다변형 셀식 가물막이 공법.Ports, rivers and dams characterized in that the lower end of the support 159 of the upper outer member 150 is mounted on the upper surface of the lower outer member 150 as the outer member 150 is sequentially coupled to the coupling groove 120 Eco-friendly multi-cell cell cladding method for construction. 제1항 또는 제2항에 있어서, 교점파일(100)의 결합홈(120) 측벽에는 종방향의 슬리트(slit)(123)가 형성되고, 외곽부재(150)의 양 단부에는 횡방향으로 돌출된 돌출부(153)가 형성되어, 인접한 교점파일(100)들의 결합홈(120)에 양단이 결합되는 다수의 외곽부재(150)를 설치하는 외곽보강단계(S20)에서,According to claim 1 or claim 2, Slit (123) in the longitudinal direction is formed on the side wall of the coupling groove 120 of the intersection pile 100, and both ends of the outer member 150 in the transverse direction Protruding protrusion 153 is formed, in the outer reinforcement step (S20) for installing a plurality of outer members 150, both ends of which are coupled to the coupling groove 120 of the adjacent intersection piles 100, 양측 교점파일(100)의 결합홈(120)에 수평상태의 외곽부재(150) 양 단부를 투입하여 하강시키되 돌출부(153)를 수직상태로 유지하고, 외곽부재(150)의 양 단부가 슬리트(123) 중앙부에 도달하면 외곽부재(150)를 중심축을 축으로 회전하여 돌출부(153)가 슬리트(123)에 결합되도록 함을 특징으로 하는 항만, 하천 및 댐 공사용 친환경 다변형 셀식 가물막이 공법.Lower both sides of the outer member 150 in a horizontal state into the coupling groove 120 of both intersection piles 100 to keep the protrusion 153 in a vertical state, and both ends of the outer member 150 are slits (123) When reaching the center portion, the outer member 150 is rotated about its central axis to project the projection 153 to the slits 123, characterized in that the eco-friendly multi-variable cell cladding method for port, river and dam construction .
KR1020090071030A 2009-07-31 2009-07-31 Nature friendly polygon cell type coffering method for harbor, river and dam construction KR100936161B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090071030A KR100936161B1 (en) 2009-07-31 2009-07-31 Nature friendly polygon cell type coffering method for harbor, river and dam construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090071030A KR100936161B1 (en) 2009-07-31 2009-07-31 Nature friendly polygon cell type coffering method for harbor, river and dam construction

Publications (2)

Publication Number Publication Date
KR20090089832A true KR20090089832A (en) 2009-08-24
KR100936161B1 KR100936161B1 (en) 2010-01-12

Family

ID=41207888

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090071030A KR100936161B1 (en) 2009-07-31 2009-07-31 Nature friendly polygon cell type coffering method for harbor, river and dam construction

Country Status (1)

Country Link
KR (1) KR100936161B1 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101914923A (en) * 2010-07-30 2010-12-15 中铁四局集团第六工程有限公司 Bearing reaction restraining fixed structure of height crane gantry
KR101106219B1 (en) * 2011-05-13 2012-01-19 (주)코아지질 Sheetpile type large-diameter casing for underwater structure and construction method thereof
WO2014184312A1 (en) * 2013-05-15 2014-11-20 Seahorn Energy Holding ApS A pumped storage facility
CN105369818A (en) * 2015-12-02 2016-03-02 浙江省水利水电勘测设计院 Comb teeth trench type division and closure construction method of double-row steel sheet-piled cofferdam of coast
CN105604074A (en) * 2016-02-03 2016-05-25 中交第三航务工程局有限公司宁波分公司 Closure gap closing construction method
CN106498956A (en) * 2016-12-13 2017-03-15 中国水利水电第五工程局有限公司 A kind of dirty groove of U-shaped section of Fast Installation
KR101983964B1 (en) 2019-04-15 2019-09-03 박영집 Cofferdam structure and cofferdam method using the same
CN112942241A (en) * 2021-02-03 2021-06-11 中国电建集团成都勘测设计研究院有限公司 Deadweight water retaining unit and deadweight water retaining system for potential breach of bank

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102168557B1 (en) 2020-04-27 2020-10-21 지더블유이엔씨 주식회사 Construction method of composite type steel temporary structure, and the intermediate supports used for it
KR20240058611A (en) 2022-10-26 2024-05-03 강창구 Compensation construction device in annular steel pilefoundation module of water sealing using steel pipe
KR20240079707A (en) 2022-11-29 2024-06-05 강창구 Annular construction device equipped with a blocking means

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3599431B2 (en) * 1995-07-27 2004-12-08 東亜建設工業株式会社 Construction method of temporary deadline
JP3379391B2 (en) 1997-07-03 2003-02-24 株式会社大林組 Temporary deadline method and temporary deadline structure
KR100505396B1 (en) * 2004-12-28 2005-07-29 현대엔지니어링 주식회사 Sheet Pile Connector

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101914923A (en) * 2010-07-30 2010-12-15 中铁四局集团第六工程有限公司 Bearing reaction restraining fixed structure of height crane gantry
CN101914923B (en) * 2010-07-30 2012-06-13 中铁上海工程局有限公司 Bearing reaction restraining fixed structure of height crane gantry
KR101106219B1 (en) * 2011-05-13 2012-01-19 (주)코아지질 Sheetpile type large-diameter casing for underwater structure and construction method thereof
WO2012157829A1 (en) * 2011-05-13 2012-11-22 (주)코아지질 Batch-installation-type large-caliber underwater casing installation structure using sheet pile and method for constructing same
AU2011368478B2 (en) * 2011-05-13 2014-10-02 Core Geotechnics Co., Ltd. Batch-installation-type large-caliber underwater casing installation structure using sheet pile and method for constructing same
WO2014184312A1 (en) * 2013-05-15 2014-11-20 Seahorn Energy Holding ApS A pumped storage facility
CN105369818A (en) * 2015-12-02 2016-03-02 浙江省水利水电勘测设计院 Comb teeth trench type division and closure construction method of double-row steel sheet-piled cofferdam of coast
CN105604074A (en) * 2016-02-03 2016-05-25 中交第三航务工程局有限公司宁波分公司 Closure gap closing construction method
CN106498956A (en) * 2016-12-13 2017-03-15 中国水利水电第五工程局有限公司 A kind of dirty groove of U-shaped section of Fast Installation
KR101983964B1 (en) 2019-04-15 2019-09-03 박영집 Cofferdam structure and cofferdam method using the same
CN112942241A (en) * 2021-02-03 2021-06-11 中国电建集团成都勘测设计研究院有限公司 Deadweight water retaining unit and deadweight water retaining system for potential breach of bank

Also Published As

Publication number Publication date
KR100936161B1 (en) 2010-01-12

Similar Documents

Publication Publication Date Title
KR100936161B1 (en) Nature friendly polygon cell type coffering method for harbor, river and dam construction
US20100232878A1 (en) Universal Framed Cofferdam
BR112021013872A2 (en) METHOD OF CONSTRUCTION OF AN UNDERWATER CONCRETE BLOCK STRUCTURE
JP6454674B2 (en) Construction method of water stop working space
AU2011368478B2 (en) Batch-installation-type large-caliber underwater casing installation structure using sheet pile and method for constructing same
CN104775446A (en) Cylindrical pier for fixing water structure and mounting and constructing method of cylindrical pier
CN110359476B (en) Construction method of construction platform for mounting steel sheet pile cofferdam inner support and bored pile steel casing
KR102012367B1 (en) Bridge using temporary bridge and construction method
KR20110107888A (en) Construction method of the pier without the temporary dam in the sea or the river
KR20140051531A (en) Structure of offshore structure, manufacturing and constructing method thereof
JP6613990B2 (en) Embankment
KR100951334B1 (en) Bundle type large diameter pile using small diameter pile
JP3905776B2 (en) Revetment structure
KR100995667B1 (en) System-block and construction method using the same
KR100553152B1 (en) Template guide frame, insert structure and pin pile establish method in cell type temporary levee protector construction
JPS63181805A (en) Breakwater and its construction and concrete caisson therefor
JP3790451B2 (en) Underwater foundation and installation method of underwater foundation
JP6337798B2 (en) Water structure and construction method of water structure
JP4146250B2 (en) Open caisson bottom plate construction method
JP6368758B2 (en) Foundation structure and foundation structure
KR100227536B1 (en) Bell type caisson foundation method
KR101106583B1 (en) Cell type temporary levee protector method
CN215801679U (en) Bias pressure foundation pit double-layer pipe pile and steel sheet pile combined enclosing structure
JPS63181804A (en) Breakwater and its construction and concrete caisson therefor
CN110004961B (en) Box jacket construction system and construction method thereof

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20121231

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20140103

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20141224

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20170102

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20180103

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20200103

Year of fee payment: 11