KR20090012570A - Multi-horizontal structure member forming method - Google Patents

Multi-horizontal structure member forming method Download PDF

Info

Publication number
KR20090012570A
KR20090012570A KR1020070076501A KR20070076501A KR20090012570A KR 20090012570 A KR20090012570 A KR 20090012570A KR 1020070076501 A KR1020070076501 A KR 1020070076501A KR 20070076501 A KR20070076501 A KR 20070076501A KR 20090012570 A KR20090012570 A KR 20090012570A
Authority
KR
South Korea
Prior art keywords
horizontal
formwork
structural member
reinforced concrete
sliding
Prior art date
Application number
KR1020070076501A
Other languages
Korean (ko)
Other versions
KR100968068B1 (en
Inventor
김광만
윤상문
Original Assignee
(주)바로건설기술
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)바로건설기술 filed Critical (주)바로건설기술
Priority to KR1020070076501A priority Critical patent/KR100968068B1/en
Priority to CN200880101053A priority patent/CN101796253A/en
Priority to JP2010519148A priority patent/JP5280445B2/en
Priority to US12/670,716 priority patent/US20100199597A1/en
Priority to PCT/KR2008/004416 priority patent/WO2009017354A2/en
Publication of KR20090012570A publication Critical patent/KR20090012570A/en
Application granted granted Critical
Publication of KR100968068B1 publication Critical patent/KR100968068B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/02Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for rooms as a whole by which walls and floors are cast simultaneously, whole storeys, or whole buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/22Sliding forms raised continuously or step-by-step and being in contact with the poured concrete during raising and which are not anchored in the hardened concrete; Arrangements of lifting means therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block
    • E04B1/3516Extraordinary methods of construction, e.g. lift-slab, jack-block characterised by erecting a vertical structure and then adding the floors from top to bottom
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block
    • E04B1/3505Extraordinary methods of construction, e.g. lift-slab, jack-block characterised by the in situ moulding of large parts of a structure

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A formation method of a multiple horizontal structure member is provided to cut down the cost, to shorten a period of construction and to economize in materials by applying an inexpensive concrete construction method such as a sliding form to a general building. A formation method of a multiple horizontal structure member comprises the steps of constructing a reinforced concrete vertical structure member(900) in the process of ascending a sliding form with a sliding method, fixing more than one pairs of horizontal mold frames to equipment of the sliding method to ascent together, installing a mold frame support structure, separating the horizontal mold frames from the equipment of the sliding method and descending, and then placing the horizontal mold frames to the mold frame support structure, forming a reinforced concrete horizontal structure member using the horizontal mold frames(800), and separating and descending the horizontal mold frames after the horizontal structure member is cured and placing on the mold frame support structure located on the lower layer.

Description

다중 수평구조부재 형성방법{Multi-Horizontal Structure Member Forming Method}Multi-Horizontal Structure Member Forming Method

본 발명은 건축물을 슬라이딩 공법을 이용한 수직구조부재 설치와 수평구조부재를 중간층부터 역순으로 설치하며, 여러 층을 동시에 작업하는 시공방법에 관한 것이다. 이를 더욱 자세히 설명하면, 본 발명은 건축물을 구축함에 있어 수직구조부재는 슬라이딩 공법으로 선행하여 구축하고, 구축된 수직구조부재에 의해 지지되는 수평구조부재를 여러 개의 중간지점부터 역순으로 설치함으로써 수평구조부재 설치시간을 단축시켜 신속하게 건축물을 구축하는 새로운 공법이다. The present invention relates to a construction method for installing a vertical structural member and a horizontal structural member in a reverse order from a middle layer by using a sliding method for a building, and simultaneously working several layers. In more detail, in the present invention, in the construction of a building, the vertical structural member is constructed in advance by a sliding method, and the horizontal structure is supported by the constructed vertical structural members by installing the horizontal structural members in reverse order from several intermediate points. It is a new construction method for building buildings quickly by shortening the installation time of members.

일반적으로 슬라이딩 공법은 주로 교각이나 대형 굴뚝, 사일로 등의 콘크리트 구조물을 구축할 때 주로 사용되어 지는데, 일정형태를 갖는 거푸집을 일정한 속도로 상승시키면서 거푸집 안에 콘크리트를 타설하여 콘크리트 구조물을 구축하도록 하는 것으로, 최저층에서 최상층에까지 거푸집의 해체나 분해, 조립 없이 콘크리트를 타설하므로 공사기간 단축, 자재비의 절감으로 공사비 절감을 할 수 있는 콘크리트 구축공법이다. In general, the sliding method is mainly used when constructing concrete structures such as bridge piers, large chimneys, silos, etc., to build concrete structures by placing concrete in the formwork while increasing the formwork having a certain shape at a constant speed. It is a concrete construction method that can reduce construction cost by reducing construction period and material cost by disposing concrete from the lowest floor to the top floor without dismantling, disassembling or assembling the formwork.

그리고 슬라이딩 공법에 의한 콘크리트 구조물 구축공법은 벽체, 기둥형상이 나 원통 형상의 구조물을 단시간에 저렴한 비용으로 구축하게 된다. And the concrete structure construction method by the sliding method is to build a wall, column or cylindrical structure in a short time at a low cost.

또한, 슬라이딩 공법은 콘크리트를 타설 및 양생하는 거푸집의 최저층에서 최상층까지 분해나 해체 없이 일정 속도로 상승시키면서 콘크리트를 양생시킴으로 인해 자재의 절감, 인건비의 절감, 공사기간 단축 등으로 인하여 건축 비용이 절감된다.In addition, the sliding method reduces construction costs due to material reduction, labor cost, and construction period reduction due to curing concrete while raising concrete at a constant speed without disassembling or dismantling from the lowest floor to the top floor of the formwork for placing and curing concrete. .

그러나 층층이 수평구조부재를 갖는 일반 건축물은 수평구조부재의 설치 문제로 인해 슬라이딩 공법만으로는 건축물을 신속하게 구축하지 못하는 문제가 있다.However, there is a problem in that a general building having a horizontal structural member has a problem in that the building cannot be quickly constructed only by the sliding method due to the installation problem of the horizontal structural member.

따라서 본 발명은 이러한 문제점을 해결하기 위해 발명된 것으로서, 공기단축 및 공기단축으로 인한 관리비 절감 등의 원가 절감을 할 수 있는 다중 수평구조부재 형성방법을 제공하는데 그 목적이 있다.Therefore, the present invention has been invented to solve such a problem, an object of the present invention is to provide a method for forming a multi-horizontal structural member that can reduce the cost, such as reduced management costs due to air shortening and air shortening.

이러한 목적을 달성하기 위하여 본 발명은 슬라이딩 공법에 의하여 슬라이딩 폼이 상승하는 과정에서 철근콘크리트 수직구조부재를 구축하는 단계와, 상기 슬라이딩 공법의 장비에 한 조 이상의 수평거푸집틀을 고정하여 같이 상승하도록 하는 단계와, 상기 구축된 수직구조부재에 한 개 층 이상의 철근콘크리트 수평구조부재가 구축될 위치의 하부에 거푸집틀받침구조를 설치하는 단계와, 상기 슬라이딩 공법의 장비에서 수평거푸집틀을 분리하고 하강시켜 상기 거푸집틀받침구조에 수평거푸집틀을 거치하는 단계와, 상기 수평거푸집틀을 이용하여 철근콘크리트 수평구조부재를 형성하는 단계와, 상기 수평구조부재가 양생된 후 상기 수평거푸집틀을 분리하고 하강시켜 그 하부 층에 위치된 상기 거푸집틀받침구조에 거치하는 단계를 한번 이상 반복하는 것을 포함하는 것을 특징으로 하는 다중 수평구조부재 형성방법을 제공한다.In order to achieve the above object, the present invention provides a step of constructing a reinforced concrete vertical structural member in a process of raising a sliding foam by a sliding method, and fixing one or more sets of horizontal formwork to the equipment of the sliding method to rise together. And installing a formwork supporting structure at a lower part of the position where at least one layer of reinforced concrete horizontal structural members are to be constructed on the constructed vertical structural member, and separating and lowering the horizontal formwork in the equipment of the sliding method. Mounting a horizontal formwork to the formwork supporting structure, forming a reinforced concrete horizontal structural member using the horizontal formwork, and separating and lowering the horizontal formwork after curing the horizontal structural member At least one and a half steps of mounting on the formwork supporting structure located on the lower layer That provides a multi-level structural member forming method, characterized in comprising.

그리고 상기 수평거푸집틀이 상하로 복수개가 마련될 수 있고, 상기 복수개의 수평거푸집틀을 다수개의 층마다 분리하여 고정한 후 철근콘크리트 수평구조부재를 형성하며, 각각의 수평거푸집틀은 상기 수평구조부재에서 분리되어 그 하부층 에서 반복하여 철근콘크리트 수평구조부재를 형성할 수 있다.And a plurality of the horizontal formwork can be provided up and down, after separating and fixing the plurality of horizontal formwork for each of a plurality of layers to form a reinforced concrete horizontal structural member, each horizontal formwork frame in the horizontal structural member It can be separated and repeated in its lower layer to form a reinforced concrete horizontal structural member.

또한, 상기 슬라이딩 공법의 장비에 수평거푸집틀을 고정하고 분리하는 단계에서 복수개의 수평거푸집틀을 고정하는 선반이 사용될 수 있다.In addition, a shelf for fixing a plurality of horizontal formwork in the step of fixing and separating the horizontal formwork to the equipment of the sliding method may be used.

한편, 상기 수평거푸집틀을 슬라이딩 공법의 장비에서 분리하여 거푸집틀받침구조까지 하강시킬 때, 또는 수평거푸집틀의 위치에 형성된 철근콘크리트 수평구조부재에서 분리하여 그 하부 층의 거푸집틀받침구조까지 하강시킬 때, 다수개의 케이블에 매달아 하강시키거나 다수개의 레일을 수직구조부재에 고정하고 상기 레일을 따라 하강시킬 수 있다.On the other hand, when the horizontal formwork is separated from the equipment of the sliding method and lowered to the formwork supporting structure, or separated from the reinforced concrete horizontal structural member formed at the position of the horizontal formwork to lower the formwork support structure of the lower layer. At this time, it can be suspended by hanging on a plurality of cables or a plurality of rails can be fixed to the vertical structural member and lowered along the rail.

이상에서 설명한 바와 같이 본 발명에 의하면, 슬라이딩 폼과 같이 저렴한 콘크리트 구축공법을 일반 건축물에 적용함으로써 원가절감 및 공기단축의 효과가 있다.As described above, according to the present invention, by applying an inexpensive concrete construction method such as a sliding foam to a general building, there is an effect of cost reduction and air shortening.

그리고 슬라이딩 공법의 장비는 15회 이상, 수평거푸집틀은 5회 이상 재사용 가능하여 자재절감의 효과가 있다.And the equipment of the sliding method can be reused more than 15 times, the horizontal formwork more than 5 times, there is a material saving effect.

또한, 선반을 사용하여 수평거푸집틀을 고정할 수 있고, 다수개의 케이블이나 레일을 이용하여 수평거푸집틀을 거푸집틀받침구조까지 하강시킬 수 있는 효과가 있다.In addition, the shelf can be fixed to the horizontal formwork, there is an effect that can be lowered to the formwork supporting structure by using a plurality of cables or rails.

이하, 본 발명의 바람직한 실시예를 첨부된 도면들을 참조하여 상세히 설명한다. 우선 각 도면의 구성요소들에 참조부호를 부가함에 있어서, 동일한 구성요소 들에 대해서는 비록 다른 도면상에 표시되더라도 가능한 한 동일한 부호를 가지도록 하고 있음에 유의해야 한다. 또한, 본 발명을 설명함에 있어, 관련된 공지 구성 또는 기능에 대한 구체적인 설명이 본 발명의 요지를 흐릴 수 있다고 판단되는 경우에는 그 상세한 설명은 생략한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. First of all, in adding reference numerals to the components of each drawing, it should be noted that the same reference numerals are designated as much as possible even if displayed on different drawings. In addition, in describing the present invention, when it is determined that the detailed description of the related well-known configuration or function may obscure the gist of the present invention, the detailed description thereof will be omitted.

도 1은 본 발명에 의한 초기 진행단계를 나타내는 단면도이고, 도 2는 도 1의 단계를 지나 제 1 수평거푸집틀이 거푸집틀받침구조에 안착된 단면도이며, 도 3는 도 2의 단계를 지나 제 1 수평거푸집틀에 수평구조부재가 타설되는 단면도이다.Figure 1 is a cross-sectional view showing an initial progress step according to the present invention, Figure 2 is a cross-sectional view of the first horizontal formwork seated in the formwork supporting structure after the step of Figure 1, Figure 3 is the second through the step of Figure 2 1 This is a sectional view in which horizontal structural members are placed on horizontal formwork.

본 발명인 다중 수평구조부재 형성방법은 슬라이딩 공법에 의하여 슬라이딩 폼이 상승하는 과정에서 철근콘크리트 수직구조부재를 구축하는 제 1 단계와, 상기 제 1 단계를 거친 후에 상기 슬라이딩 공법의 장비에 한 조 이상의 수평거푸집틀을 고정하여 같이 상승하도록 하는 제 2 단계와, 상기 제 2 단계를 거친 후에 상기 구축된 수직구조부재에 한 개 층 이상의 철근콘크리트 수평구조부재가 구축될 위치의 하부에 거푸집틀받침구조를 설치하는 제 3 단계와, 상기 제 3 단계를 거친 후에 상기 슬라이딩 공법의 장비에서 수평거푸집틀을 분리하고 하강시켜 상기 거푸집틀받침구조에 수평거푸집틀을 거치하는 제 4 단계와, 상기 제 4 단계를 거친 후에 상기 수평거푸집틀을 이용하여 철근콘크리트 수평구조부재를 형성하는 제 5 단계와, 상기 제 5 단계를 거친 후에 상기 수평구조부재가 양생된 후 상기 수평거푸집틀을 분리하고 하강시켜 그 하부 층에 위치된 상기 거푸집틀받침구조에 거치하는 제 6 단계를 한번 이상 반복하는 것을 포함하여 구성된다.The present invention is a method of forming a multi-level horizontal structural member is a first step of constructing a reinforced concrete vertical structural member in the process of the sliding foam is raised by the sliding method, and after the first step is at least one set of horizontal to the equipment of the sliding method The formwork supporting structure is installed in the lower part of the position where one or more layers of reinforced concrete horizontal structural members are to be constructed in the vertical structure member after the second step to fix the formwork and ascend together. And a fourth step of separating the horizontal formwork from the equipment of the sliding method and lowering the horizontal formwork on the formwork structure after passing through the third step. After the fifth step of forming a reinforced concrete horizontal structural member using the horizontal formwork, and the fifth step After the said horizontal structural member after curing pro is configured to include the separation of the horizontal mold frame, and lowered by repeated at the sixth step of the mold through the mold supporting structure located at the lower layer once.

그리고 상기 슬라이딩 공법의 장비에 수평거푸집틀을 고정하여 같이 상승하 도록 하는 제 2 단계에서 상기 수평거푸집틀이 상하로 복수개가 마련된다.And a plurality of the horizontal formwork frame is provided in the second step to the horizontal formwork is fixed to the equipment of the sliding method to rise together.

한편, 상기 슬라이딩 공법에 의하여 슬라이딩 폼이 상승하는 과정에서 철근콘크리트 수직구조부재를 구축하는 제 1 단계를 자세히 설명하면 다음과 같다.Meanwhile, the first step of constructing the reinforced concrete vertical structural member in the process of raising the sliding foam by the sliding method will be described in detail as follows.

상기 제 1 단계는 슬라이딩 폼(500)을 사전 제작 조립하고, 상기 작업대(400)를 마련하는 과정과, 상기 슬라이딩 폼(500)에 콘크리트를 타설하면서 하루에 3m 씩 슬라이딩 폼(500)을 상승시키는 과정이다.The first step is to pre-fabricate and assemble the sliding foam 500, to provide the work table 400, and to raise the sliding foam 500 by 3m per day while placing concrete on the sliding foam 500 It is a process.

상기 슬라이딩 공법에 사용되는 장비는 슬라이딩 폼(500)과, 상기 슬라이딩 폼(500)과 수직으로 마련된는 작업대(400)과, 상기 작업대(400)의 상부에 위치되는 유압잭(300)과, 상기 유압잭(300)의 주위에 마련된 요크(200)와, 상기 요크(200)와 연결된 로드(100)를 포함하여 구성된 장비로 이루어진다.The equipment used in the sliding method is a sliding foam 500, a work table 400 which is provided perpendicular to the sliding foam 500, the hydraulic jack 300 is located above the work table 400, and the hydraulic jack ( The yoke 200 provided around the 300 and the rod 100 is connected to the yoke 200 made of a device configured to include.

상기 슬라이딩 폼(500)은 콘크리트 타설에 의해 이루어지는 철근콘크리드 수직구조부재(900) 둘레를 완전하게 커버 할 수 있는 일체화된 거푸집 형상이며, 콘크리트의 마찰력을 줄이기 위하여 함석 및 왁스가 사용된다.The sliding foam 500 is an integrated form of shape that can completely cover the periphery of the reinforced concrete vertical structure member 900 made by concrete pouring, and the tin and wax is used to reduce the frictional force of the concrete.

그리고 유압잭(300)은 요크(Yoke)(200)를 유압배관을 통하여 상승시키는 기계이며, 1개당 3~10ton으로 자동제어기에 의해 수평유지 및 동일 길이 상승이 이루어진다.And the hydraulic jack 300 is a machine for raising the yoke (Yoke) 200 through the hydraulic pipe, the horizontal maintenance and the same length is made by the automatic controller to 3 ~ 10ton per one.

또한, 상기 요크(200)는 H형 강재 또는 채널로 만들어지며, 유압잭(300)과 슬라이딩 폼(500) 및 작업대(400)를 연결하는 부재이고, 상기 로드(100)(Rod)는 직경 32mm, 길이 3.4m 정도의 환봉으로 요크(200)로부터 전달되는 모든 하중을 상기 철근콘크리드 수직구조부재(900)의 하단까지 전달한다.In addition, the yoke 200 is made of H-type steel or channel, and is a member connecting the hydraulic jack 300, the sliding form 500 and the work table 400, the rod 100 (Rod) is 32mm in diameter, All loads transmitted from the yoke 200 are transferred to the bottom of the reinforced concrete vertical structural member 900 by a round bar having a length of about 3.4 m.

상기 제 1 단계를 거친 후에 상기 슬라이딩 공법의 장비에 한 조 이상의 수평거푸집틀을 고정하여 같이 상승하도록 하는 제 2 단계는 도 1과 같이 수평거푸집틀(800)을 수평으로 2군데에 설치하는 방법 등에 의하여 이루어지는 한 조 이상의 수평거푸집틀(800)을 마련한 후에, 선반(700)을 이용하여 상기 수평거푸집틀(800)을 이루는 상하로 인접된 복수개의 수평거푸집틀(801 내지 805) 사이의 간격을 소정 거리 유지한 채로 들어올리는 과정과, 슬라이딩 폼(500)을 계속 상승시키면서 상기 수평거푸집틀(800)을 6층 높이까지 들어올리는 과정을 포함한다.After passing through the first step, the second step of fixing the one or more sets of horizontal formwork to the equipment of the sliding method to ascend together is a method of installing the horizontal formwork 800 in two places as shown in FIG. After providing one or more sets of horizontal formwork 800 formed by the above, predetermined intervals between the plurality of horizontal formwork (801 to 805) adjacent to the vertical formwork forming the horizontal formwork 800 using the shelf 700 Lifting while maintaining the distance, and the process of lifting the horizontal formwork 800 up to six floors while continuing to raise the sliding foam (500).

상기 제 2 단계를 거친 후에 상기 구축된 수직구조부재에 한 개 층 이상의 철근콘크리트 수평구조부재가 구축될 위치의 하부에 거푸집틀받침구조를 설치하는 제 3 단계는 상기 수평거푸집틀(800) 중 최하부에 있는 제 1 수평거푸집틀 유닛(801)이 6층 높이이상 들어올려진 후에 상기 제 1 수평거푸집틀 유닛(801)의 하부에 위치되는 6층에서 2층까지의 위치 하부 중 한곳 이상에 거푸집틀받침구조(810)를 설치하는 과정이다.After passing through the second step, the third step of installing the formwork supporting structure at the lower part of the position where the one or more layers of reinforced concrete horizontal structural members are to be constructed in the vertical structure member is the lowermost part of the horizontal formwork 800. After the first horizontal formwork unit 801 is lifted more than six stories high, the formwork is supported at one or more of the lower positions from the sixth floor to the second floor located at the bottom of the first horizontal formwork unit 801. This is a process of installing the structure 810.

상기 제 3 단계를 거친 후에 상기 슬라이딩 공법의 장비에서 수평거푸집틀을 분리하고 하강시켜 상기 거푸집틀받침구조에 수평거푸집틀을 거치하는 제 4 단계는 도 2와 같이 슬라이딩 공법의 장비 중 작업대(400)에 케이블(720)의 상단을 고정하고, 상기 케이블(720)의 하단에 수평거푸집틀(800)을 연결한 후에 수평거푸집틀(800) 중 상기 제 1 수평거푸집틀 유닛(801)을 나머지 수평거푸집틀 유닛들과 분리한 후 하강시켜 상기 거푸집틀받침구조(810)의 상단에 안착시키고, 그외의 제 2 내지 제 5 수평거푸집틀 유닛(802, 803, 804, 805)은 선반(700)에 의해 계속 지지 되는 과정이다.After the third step, the fourth step of mounting the horizontal formwork on the formwork structure by separating and lowering the horizontal formwork from the equipment of the sliding method as shown in FIG. After fixing the upper end of the cable 720, and connecting the horizontal formwork 800 to the lower end of the cable 720, the first horizontal formwork unit 801 of the horizontal formwork 800, the remaining horizontal formwork It is separated from the frame units and then lowered and seated on the top of the formwork structure 810, and the other second to fifth horizontal formwork units 802, 803, 804, and 805 are provided by the shelf 700. It is a continuing process.

이때, 상기 케이블(720)은 상기 제 1 수평거푸집틀 유닛(801)을 슬라이딩 폼(500)에서 분리 하강시켜 상기 거푸집틀받침구조(810)에 설치하는 과정에만 사용되고 거푸집틀받침구조(810)에 제 1 수평거푸집틀 유닛(801)이 설치된 후에는 제거된다.In this case, the cable 720 is used only in the process of installing the first horizontal formwork unit 801 in the formwork structure 810 by separating and lowering the sliding form 500 to the formwork support structure 810. After the first horizontal formwork unit 801 is installed, it is removed.

상기 제 4 단계를 거친 후에 상기 수평거푸집틀을 이용하여 철근콘크리트 수평구조부재를 형성하는 제 5 단계는 철근콘크리드 수직구조부재(900)에 직각으로 수평부재인 철근콘크리드 수평구조부재가 타설되는 단계로 거푸집틀받침구조(810)에 의하여 지지되는 상기 제 1 수평거푸집틀 유닛(801)에 콘크리트를 타설하여 소정기간 양생하는 과정이다.After the fourth step, the fifth step of forming the reinforced concrete horizontal structural member using the horizontal formwork is a step in which the reinforced concrete horizontal structural member, which is a horizontal member perpendicular to the reinforced concrete vertical structural member 900, is poured. A process of curing concrete by pouring concrete into the first horizontal formwork unit 801 supported by the formwork structure 810.

그리고 이 과정에서는 상기 케이블(720)은 이미 제거된 상태이다.In this process, the cable 720 is already removed.

도 3는 6층 높이에서 첫번째 콘크리트 양생과정이 이루어지는 모습이다.Figure 3 is a state in which the first concrete curing process is made at six stories.

상기 제 5 단계를 거친 후에 상기 수평구조부재가 양생된 후 상기 수평거푸집틀을 분리하고 하강시켜 그 하부 층에 위치된 상기 거푸집틀받침구조에 거치하는 제 6 단계를 한번 이상 반복한다.After the fifth step, after the horizontal structural member is cured, the sixth step of separating and lowering the horizontal formwork and placing it on the formwork supporting structure located on the lower layer is repeated at least once.

즉, 상기 6층 높이에서 콘크리트 양생과정이 종료되면, 6층에서 사용된 제 1 수평거푸집틀 유닛(801)은 5층으로 이동되어 설치되는데, 5층으로 이동되는 제 1 수평거푸집틀 유닛(801)에는 6층에서 사용되던 거푸집틀받침구조(810)가 다시 하부에 설치된다.That is, when the concrete curing process at the sixth floor is finished, the first horizontal formwork unit 801 used in the sixth floor is moved to the fifth floor and installed, the first horizontal formwork unit 801 moved to the fifth floor. In the 6) the formwork structure 810 used in the sixth floor is installed in the lower back.

그리고 필요한 경우에는 6층에 사용된 거푸집틀받침구조(810)와는 별도로 5 층 내지 2층에 거푸집틀받침구조(810)를 미리 설치하여 작업할 수 있다. And if necessary, apart from the formwork supporting structure 810 used on the sixth floor can be installed by working in advance in the formwork supporting structure 810 on the fifth floor to the second floor.

또한, 상기 제 1 수평거푸집틀 유닛(801)이 6층에서 5층으로 이동되는데 사용되는 케이블(720)은 상단이 6층에 타설된 상기 철근콘크리드 수평구조부재에 고정되고 하단이 제 1 수평거푸집틀 유닛(801)에 연결되어 제 1 수평거푸집틀 유닛(801)이 5층 하부에 위치된 상기 거푸집틀받침구조(810) 위에 안착된 후에 제거된다.In addition, the cable 720 used to move the first horizontal formwork unit 801 from the sixth floor to the fifth floor is fixed to the reinforced concrete horizontal structural member placed on the sixth floor and the first horizontal formwork. It is connected to the frame unit 801 and is removed after the first horizontal formwork unit 801 is seated on the formwork structure 810 located below the fifth floor.

상기 과정을 거쳐 5층에 마련된 제 1 수평거푸집틀 유닛(801)에는 콘크리트가 타설 및 양생되어 5층 철근콘크리드 수평구조부재가 마련되고, 동일한 과정을 통하여 4층에서 2층까지 철근콘크리드 수평구조부재의 타설이 이루어진다.Through the above process, the first horizontal formwork unit 801 provided on the fifth floor is placed with concrete and cured to provide a five-layer reinforced concrete horizontal structural member, and through the same process, the reinforced concrete horizontal structural member from the fourth floor to the second floor. Casting is done.

한편, 필요한 경우에는 상기 제 1 수평거푸집틀 유닛(801)을 슬라이딩 공법의 장비에서 분리하여 거푸집틀받침구조(810)까지 하강시킬 때, 또는 제 1 수평거푸집틀 유닛(801)의 위치에 형성된 철근콘크리트 수평구조부재에서 분리하여 그 하부 층의 거푸집틀받침구조(810)까지 하강시킬 때, 다수개의 레일(미도시)을 수직구조부재(900)에 고정하고 제 1 수평거푸집틀 유닛(801)을 상기 레일(미도시)을 따라 거푸집틀받침구조(810)까지 하강시킬 수 있다.Meanwhile, if necessary, when the first horizontal formwork unit 801 is separated from the equipment of the sliding method and lowered to the formwork structure 810, or the rebar formed at the position of the first horizontal formwork unit 801. When separating from the concrete horizontal structural member to lower the formwork structure 810 of the lower layer, a plurality of rails (not shown) is fixed to the vertical structural member 900 and the first horizontal formwork unit 801 Along the rail (not shown) can be lowered to the formwork structure 810.

도 4은 도 3의 단계를 지나 제 2 수평거푸집틀에 수평구조부재가 타설되는 단면도이고, 도 5는 도 4의 단계를 지나 제 3 수평거푸집틀에 수평구조부재가 타설되는 단면도이다.4 is a cross-sectional view in which the horizontal structural member is poured on the second horizontal formwork after passing through the step of FIG. 3, and FIG. 5 is a cross-sectional view in which the horizontal structural member is poured on the third horizontal formwork after passing through the step of FIG. 4.

상기 슬라이딩 공법의 장비는 상기 케이블(720)이 상기 제 1 수평거푸집틀 유닛(801)을 6층 하부에 위치된 상기 거푸집틀받침구조(810)의 상단에 설치하는 과 정에만 사용된 후 제거되면 다시 상승하면서 철근콘크리드 수직구조부재(900)를 세우고 선반(700)에 연결된 제 2 내지 제 5 수평거푸집틀 유닛(802, 803, 804, 805)은 제 2 수평거푸집틀 유닛(802)이 6층에서 5층 더 상승된 높이인 11층 높이에 위치될 때까지 상승한다.When the equipment of the sliding method is removed after the cable 720 is used only to install the first horizontal formwork unit 801 on the top of the formwork structure 810 located below the sixth floor. The second to fifth horizontal formwork units 802, 803, 804, and 805 connected to the shelf 700 are mounted on the sixth floor of the second horizontal formwork unit 802 while raising the reinforced concrete vertical structural member 900 while rising again. Rise until it is located at 11th floor, which is 5 floors higher.

그리고 11층 높이에 위치된 상기 제 2 수평거푸집틀 유닛(802) 하부에는 거푸집틀받침구조(810)가 마련된다.In addition, a formwork structure 810 is provided under the second horizontal formwork unit 802 located at an eleven-story height.

상기 제 2 수평거푸집틀 유닛(802)에 콘크리트를 타설하여 철근콘크리드 수평구조부재를 제작하고, 다시 10층 내지 7층으로 단계적으로 이동되어 철근콘크리드 수평구조부재를 제작하는 과정은 상기 제 1 수평거푸집틀 유닛(801)의 사용과정과 동일하다.Placing concrete on the second horizontal formwork unit 802 to produce a reinforced concrete horizontal structural member, and step by step again to the 10th to 7th floor to produce a reinforced concrete horizontal structural member is the first horizontal formwork It is the same as the use process of the frame unit 801.

또한, 상기 제 3 내지 제 5 수평거푸집틀 유닛(803, 804, 805)의 사용과정도 적용되는 층수만 다를 뿐이고 내용은 상기 제 1 및 제 2 수평거푸집틀 유닛(801, 802)과 같다.In addition, only the number of layers to which the use process of the third to fifth horizontal formwork units 803, 804, and 805 is applied is different, and the content thereof is the same as that of the first and second horizontal formwork units 801 and 802.

제 5 수평거푸집틀 유닛(805)이 26층의 높이에 상승되어 26층의 철근콘크리드 수평구조부재가 완성되면 슬라이딩 공법의 장비는 제거된다. When the fifth horizontal formwork unit 805 is raised to the height of 26 floors and the 26-story reinforced concrete horizontal structural member is completed, the equipment of the sliding method is removed.

상기와 같이 본 발명은 상기 복수개의 수평거푸집틀을 다수개의 층마다 분리하여 고정한 후 철근콘크리트 수평구조부재를 형성하고, 상기 철근콘크리트 수평구조부재를 형성하는데 사용된 각각의 수평거푸집틀이 상기 철근콘크리트 수평구조부재에서 분리되어 그 하부층에서 반복하여 철근콘크리트 수평구조부재를 형성하는데 사용되는 특징이 있다.As described above, according to the present invention, the plurality of horizontal formwork is separated and fixed for each of a plurality of layers to form a reinforced concrete horizontal structural member, and each horizontal formwork used to form the reinforced concrete horizontal structural member is the reinforced concrete. It is characterized in that it is separated from the horizontal structural member and used repeatedly to form the reinforced concrete horizontal structural member on its lower layer.

그리고 필요한 경우에는, 수평거푸집틀 유닛의 개수를 더 많이 사용하여 26층 이상의 고층 건물도 건축가능하다.And if necessary, high-rise buildings with more than 26 floors can be constructed by using more horizontal formwork units.

한편, 상기와 같은 과정을 통하여 슬라이딩 공법의 장비는 15회 이상, 수평거푸집틀은 5회 이상 재사용 가능하여 자재가 절감된다.On the other hand, through the above process, the equipment of the sliding method more than 15 times, the horizontal formwork is reused more than 5 times, the material is saved.

이상의 설명은 본 발명의 기술 사상을 예시적으로 설명한 것에 불과한 것으로서, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자라면 본 발명의 본질적인 특성에서 벗어나지 않는 범위에서 다양한 수정 및 변형이 가능할 것이다. 따라서, 본 발명에 개시된 실시예들은 본 발명의 기술 사상을 한정하기 위한 것이 아니라 설명하기 위한 것이고, 이러한 실시예에 의하여 본 발명의 기술 사상의 범위가 한정되는 것은 아니다. 본 발명의 보호 범위는 아래의 청구범위에 의하여 해석되어야 하며, 그와 동등한 범위 내에 있는 모든 기술 사상은 본 발명의 권리범위에 포함되는 것으로 해석되어야 할 것이다.The above description is merely illustrative of the technical idea of the present invention, and those skilled in the art to which the present invention pertains may make various modifications and changes without departing from the essential characteristics of the present invention. Therefore, the embodiments disclosed in the present invention are not intended to limit the technical idea of the present invention but to describe the present invention, and the scope of the technical idea of the present invention is not limited by these embodiments. The protection scope of the present invention should be interpreted by the following claims, and all technical ideas within the equivalent scope should be interpreted as being included in the scope of the present invention.

도 1은 본 발명에 의한 초기 진행단계를 나타내는 단면도.1 is a cross-sectional view showing an initial progress step according to the present invention.

도 2는 도 1의 단계를 지나 제 1 수평거푸집틀이 거푸집틀받침구조에 안착된 단면도.2 is a cross-sectional view of the first horizontal formwork seated on the formwork structure after passing through the step of FIG.

도 3는 도 2의 단계를 지나 제 1 수평거푸집틀에 수평구조부재가 타설되는 단면도.3 is a cross-sectional view through which the horizontal structural member is poured into the first horizontal formwork after passing through the step of FIG.

도 4은 도 3의 단계를 지나 제 2 수평거푸집틀에 수평구조부재가 타설되는 단면도.4 is a cross-sectional view through which the horizontal structural member is poured into the second horizontal formwork after passing through the step of FIG.

도 5는 도 4의 단계를 지나 제 3 수평거푸집틀에 수평구조부재가 타설되는 단면도.5 is a cross-sectional view of the horizontal structural member is poured into the third horizontal formwork after passing through the step of FIG.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

200: 요크 300: 유압잭200: yoke 300: hydraulic jack

400: 작업대 500: 슬라이딩 폼400: workbench 500: sliding foam

700: 선반 800: 수평거푸집틀700: shelf 800: horizontal formwork

Claims (6)

슬라이딩 공법에 의하여 슬라이딩 폼이 상승하는 과정에서 철근콘크리트 수직구조부재를 구축하는 단계와;Constructing a reinforced concrete vertical structural member in a process of raising a sliding foam by a sliding method; 상기 슬라이딩 공법의 장비에 한 조 이상의 수평거푸집틀을 고정하여 같이 상승하도록 하는 단계와;Fixing one or more sets of horizontal formwork to the equipment of the sliding method to ascend together; 상기 구축된 수직구조부재에 한 개 층 이상의 철근콘크리트 수평구조부재가 구축될 위치의 하부에 거푸집틀받침구조를 설치하는 단계와;Installing a formwork structure below the position at which the reinforced concrete horizontal structural member of at least one layer is to be constructed on the constructed vertical structural member; 상기 슬라이딩 공법의 장비에서 수평거푸집틀을 분리하고 하강시켜 상기 거푸집틀받침구조에 수평거푸집틀을 거치하는 단계와;Separating the horizontal formwork from the equipment of the sliding method and lowering the horizontal formwork to mount the horizontal formwork on the formwork support structure; 상기 수평거푸집틀을 이용하여 철근콘크리트 수평구조부재를 형성하는 단계와;Forming a reinforced concrete horizontal structural member using the horizontal formwork; 상기 수평구조부재가 양생된 후 상기 수평거푸집틀을 분리하고 하강시켜 그 하부 층에 위치된 상기 거푸집틀받침구조에 거치하는 단계;After the horizontal structural member is cured, separating and lowering the horizontal formwork frame and mounting it on the formwork support structure located at the lower layer; 를 한번 이상 반복하는 것을 포함하는 것을 특징으로 하는 다중 수평구조부재 형성방법.Multiple horizontal structural member forming method comprising the step of repeating the at least once. 청구항 1에 있어서,The method according to claim 1, 상기 수평거푸집틀이 상하로 복수개가 마련되는 것을 특징으로 하는 다중 수평구조부재 형성방법.Multiple horizontal structural member forming method characterized in that the plurality of horizontal formwork is provided up and down. 청구항 1 또는 청구항 2에 있어서,The method according to claim 1 or 2, 상기 복수개의 수평거푸집틀을 다수개의 층마다 분리하여 고정한 후 철근콘크리트 수평구조부재를 형성하며, 각각의 수평거푸집틀은 상기 수평구조부재에서 분리되어 그 하부층에서 반복하여 철근콘크리트 수평구조부재를 형성하는 것을 특징으로 하는 다중 수평구조부재 형성방법.Separating and fixing the plurality of horizontal formwork for each of a plurality of layers to form a reinforced concrete horizontal structural member, each horizontal formwork is separated from the horizontal structural member to form a reinforced concrete horizontal structural member repeatedly in the lower layer Multiple horizontal structural member forming method, characterized in that. 청구항 1 또는 청구항 2에 있어서,The method according to claim 1 or 2, 상기 슬라이딩 공법의 장비에 수평거푸집틀을 고정하고 분리하는 단계에서 한 조 이상의 수평거푸집틀을 고정하는 선반이 사용되는 것을 특징으로 하는 다중 수평구조부재 형성방법.Multiple horizontal structural member forming method, characterized in that the shelf is fixed to one or more sets of horizontal formwork in the step of fixing and separating the horizontal formwork to the equipment of the sliding method. 청구항 1 또는 청구항 2에 있어서,The method according to claim 1 or 2, 상기 수평거푸집틀을 슬라이딩 공법의 장비에서 분리하여 거푸집틀받침구조까지 하강시킬 때, 또는 수평거푸집틀의 위치에 형성된 철근콘크리트 수평구조부재에서 분리하여 그 하부 층의 거푸집틀받침구조까지 하강시킬 때, 다수개의 케이블에 매달아 하강시키는 것을 특징으로 하는 다중 수평구조부재 형성방법.When the horizontal formwork is separated from the equipment of the sliding method to descend to the formwork structure, or when separated from the reinforced concrete horizontal structural member formed at the position of the horizontal formwork to lower the formwork structure of the lower layer, Multiple horizontal structural member forming method characterized in that the hanging by a plurality of cables to lower. 청구항 1 또는 청구항 2에 있어서,The method according to claim 1 or 2, 상기 수평거푸집틀을 슬라이딩 공법의 장비에서 분리하여 거푸집틀받침구조 까지 하강시킬 때, 또는 수평거푸집틀의 위치에 형성된 철근콘크리트 수평구조부재에서 분리하여 그 하부 층의 거푸집틀받침구조까지 하강시킬 때, 다수개의 레일을 수직구조부재에 고정하고 상기 레일을 따라 하강시키는 것을 특징으로 하는 다중 수평구조부재 형성방법.When the horizontal formwork is separated from the equipment of the sliding method and lowered to the formwork supporting structure, or when separated from the reinforced concrete horizontal structural member formed at the position of the horizontal formwork to lower the formwork of the lower layer, And a plurality of rails fixed to the vertical structural members and descending along the rails.
KR1020070076501A 2007-07-30 2007-07-30 Multi-Horizontal Structure Member Forming Method KR100968068B1 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
KR1020070076501A KR100968068B1 (en) 2007-07-30 2007-07-30 Multi-Horizontal Structure Member Forming Method
CN200880101053A CN101796253A (en) 2007-07-30 2008-07-29 Multi-horizontal structure member forming method
JP2010519148A JP5280445B2 (en) 2007-07-30 2008-07-29 Method for forming multiple horizontal structural members
US12/670,716 US20100199597A1 (en) 2007-07-30 2008-07-29 Multi-horizontal structure member forming method
PCT/KR2008/004416 WO2009017354A2 (en) 2007-07-30 2008-07-29 Multi-horizontal structure member forming method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070076501A KR100968068B1 (en) 2007-07-30 2007-07-30 Multi-Horizontal Structure Member Forming Method

Publications (2)

Publication Number Publication Date
KR20090012570A true KR20090012570A (en) 2009-02-04
KR100968068B1 KR100968068B1 (en) 2010-07-08

Family

ID=40305050

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070076501A KR100968068B1 (en) 2007-07-30 2007-07-30 Multi-Horizontal Structure Member Forming Method

Country Status (5)

Country Link
US (1) US20100199597A1 (en)
JP (1) JP5280445B2 (en)
KR (1) KR100968068B1 (en)
CN (1) CN101796253A (en)
WO (1) WO2009017354A2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103132692A (en) * 2013-03-12 2013-06-05 山东天齐置业集团股份有限公司 Inner inclined cylindrical form erecting device and form erecting method
CN103452315A (en) * 2013-08-23 2013-12-18 中国人民解放军63926部队 Construction method of high-precision heterogenic thin-walled concrete hole body structure
KR20200025766A (en) * 2018-08-31 2020-03-10 호서대학교 산학협력단 Automatic concrete form lifting apparatus and automatic concrete form lifting method using the same
CN114775450A (en) * 2022-06-20 2022-07-22 山西临汾市政工程集团股份有限公司 Building auxiliary template for steel box girder

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101974973B (en) * 2010-11-08 2011-11-09 四川华山建筑有限公司 Two-way stress base section of attached lifting scaffold
CN102127962B (en) * 2011-01-15 2015-09-23 苏茂兵 The bidirectional stress base section of the attached lift scaffold improved
CN103075009A (en) * 2013-01-25 2013-05-01 温州建设集团有限公司 Construction method of filler wall with cast-in-place foamed concrete
CN103114712B (en) * 2013-03-04 2014-07-16 温州建设集团有限公司 Buckle steel platform support system and construction method thereof
GB2543513A (en) * 2015-10-20 2017-04-26 Bryden Wood Tech Ltd Building system
CN106759924A (en) * 2017-01-20 2017-05-31 华电重工股份有限公司 A kind of lifting installation method of steel structure cooling tower
CN106760712A (en) * 2017-01-20 2017-05-31 华电重工股份有限公司 A kind of jacking installation method of steel structure cooling tower
CN113863665A (en) * 2021-10-08 2021-12-31 贵州建工集团第一建筑工程有限责任公司 Beam slab formwork support building method

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3275719A (en) * 1963-08-07 1966-09-27 Brian H Dudson Method of building in situ construction using sequential molding techniques
JPS5247254B2 (en) * 1972-05-12 1977-12-01
JPS61113965A (en) 1984-11-09 1986-05-31 清水建設株式会社 Construction of wall type building and construction apparatus used therein
US5152118A (en) * 1990-08-13 1992-10-06 Richmond Screw Anchor Co., Inc. Couplings for concrete reinforcement bars
JPH0518106A (en) * 1991-07-17 1993-01-26 Mitsubishi Heavy Ind Ltd Constructing device for concrete building
US5460499A (en) * 1993-08-27 1995-10-24 Franklin; James W. Concrete building frame construction apparatus
JP2002194892A (en) 2000-12-25 2002-07-10 Kumagai Gumi Co Ltd Construction method of building
KR100433561B1 (en) * 2001-02-26 2004-06-07 하동영 Wall ascending slab descending concrete casting method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103132692A (en) * 2013-03-12 2013-06-05 山东天齐置业集团股份有限公司 Inner inclined cylindrical form erecting device and form erecting method
CN103132692B (en) * 2013-03-12 2015-09-02 山东天齐置业集团股份有限公司 A kind of tilted cylinder erecting device and mold method
CN103452315A (en) * 2013-08-23 2013-12-18 中国人民解放军63926部队 Construction method of high-precision heterogenic thin-walled concrete hole body structure
KR20200025766A (en) * 2018-08-31 2020-03-10 호서대학교 산학협력단 Automatic concrete form lifting apparatus and automatic concrete form lifting method using the same
CN114775450A (en) * 2022-06-20 2022-07-22 山西临汾市政工程集团股份有限公司 Building auxiliary template for steel box girder

Also Published As

Publication number Publication date
CN101796253A (en) 2010-08-04
US20100199597A1 (en) 2010-08-12
WO2009017354A2 (en) 2009-02-05
JP2010534780A (en) 2010-11-11
WO2009017354A3 (en) 2009-03-26
JP5280445B2 (en) 2013-09-04
KR100968068B1 (en) 2010-07-08

Similar Documents

Publication Publication Date Title
KR100968068B1 (en) Multi-Horizontal Structure Member Forming Method
CN202090591U (en) Lift type climbing formwork of building operations
CN102661039A (en) Drum frame supporting power built-in integrated jacking steel platform formwork system and construction method
CN201962944U (en) Hydraulic climbing formwork for building construction
JP6503716B2 (en) Demolition system and demolition method
CN202850498U (en) Hydraulic support system used for elevator shaft mold
KR102059552B1 (en) Modular work platform of a long span bridge main tower rebar and construction method using the same
KR20070005533A (en) Gang form
KR940007319A (en) How to Build Stairs and Stairs, How to Build Stairs and Stair Members
KR101140884B1 (en) Gangform device constructed for wall and constructing method this using
KR101162971B1 (en) Concrete Construction Method For Slab And Core Wall Construction The Same Time Using Temporary Columns
CN101457587B (en) Template mutually lifting climbing apparatus and method
KR100934376B1 (en) Elevating and lowering platform and method of movement
JP5003253B2 (en) RC beam construction method
CN212743356U (en) Reverse construction method hangs mould system
JP2010255374A (en) Demolition method for skyscraper building
CN202689494U (en) Elevator shaft template support
KR101808296B1 (en) Method of installing scaffold for offshore plant
JP2006118245A (en) Construction method of large scaled high-rise tower structure by moving stage mounting heavy equipment thereon
CN211421802U (en) High-rise building construction machinery
CN213418468U (en) Device for pouring concrete into high-rise building supporting and hanging formwork
KR102620613B1 (en) Method for constructing prefabricated deck unit for elevator core construction
KR102096548B1 (en) Automatic concrete form lifting apparatus and automatic concrete form lifting method using the same
KR102653955B1 (en) Working platform
CN218912242U (en) Tripod extension jacking formwork platform for elevator shaft construction

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
AMND Amendment
E601 Decision to refuse application
J201 Request for trial against refusal decision
AMND Amendment
B601 Maintenance of original decision after re-examination before a trial
E801 Decision on dismissal of amendment
S901 Examination by remand of revocation
GRNO Decision to grant (after opposition)
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130415

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20140408

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20170327

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20180524

Year of fee payment: 9