KR20080098262A - Non-support construction method using the deckplate for wall girder - Google Patents

Non-support construction method using the deckplate for wall girder Download PDF

Info

Publication number
KR20080098262A
KR20080098262A KR1020070043725A KR20070043725A KR20080098262A KR 20080098262 A KR20080098262 A KR 20080098262A KR 1020070043725 A KR1020070043725 A KR 1020070043725A KR 20070043725 A KR20070043725 A KR 20070043725A KR 20080098262 A KR20080098262 A KR 20080098262A
Authority
KR
South Korea
Prior art keywords
deck plate
construction
wall
ready
rim
Prior art date
Application number
KR1020070043725A
Other languages
Korean (ko)
Other versions
KR100876853B1 (en
Inventor
최동섭
Original Assignee
(주)씨.에스 구조 엔지니어링
최동섭
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)씨.에스 구조 엔지니어링, 최동섭 filed Critical (주)씨.에스 구조 엔지니어링
Priority to KR1020070043725A priority Critical patent/KR100876853B1/en
Publication of KR20080098262A publication Critical patent/KR20080098262A/en
Application granted granted Critical
Publication of KR100876853B1 publication Critical patent/KR100876853B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0007Production methods using a mold
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

A non-support underground construction method is provided to omit the installation of support for wall girder construction and to reduce the construction period. A non-support underground construction method comprises following steps: (a) a step for carrying out the construction the slurry wall the shear key is embedded in junction with the wall girder to the extrusion; (b) a step for digging out slurry wall internal space; (c) a step for setting up the bracket for the deferment in the slurry wall under junction with the wall girder of the location in which the existing step is under construction; (d) a step for setting up the deck plate for the wall girder for the wall girder construction it surrounds the slurry wall; (e) a step for setting up the existing step it faces the slurry wall the end part is contained inside the deck plate for the wall girder; (f) a step for applying the concrete inside the deck plate for the wall girder; (g) a step for removing the bracket for the deferment.

Description

테두리보용 데크판을 이용한 무지주 지하구조물 시공방법{Non-support construction method using the deckplate for wall girder}Non-support construction method using the deckplate for wall girder}

도 1은 본 발명에 따른 테두리보용 데크판을 이용한 무지주 지하구조물 시공방법을 역타공법에 적용한 예를 보여주는 순서도이다.Figure 1 is a flow chart showing an example of applying the method of construction of the unsupported underground structure using the deck plate deck frame according to the present invention to the reverse drilling method.

도 2 및 도 3은 본 발명에서의 슬러리월과 테두리보의 접합상태의 일실시예를 도시한 도면이다.2 and 3 is a view showing an embodiment of a bonded state of the slurry wall and the rim beam in the present invention.

도 4는 슬러리월에 마련된 전단키의 종류에 따라 슬러리월과 테두리보의 접합상태의 다른 실시예를 보여주는 도면이다.4 is a view showing another embodiment of the bonding state of the slurry wall and the rim beam according to the type of shear key provided in the slurry wall.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

100: 슬러리월 110: 전단키100: slurry month 110: shear key

200: 거치용 브라켓 210: 받침대200: mounting bracket 210: stand

300: 테두리보 310: 테두리보용 데크판300: border beam 310: border beam deck plate

400: 기성보 410: 철골보400: ready-made beam 410: steel ball

500: 슬래브 510: 슬래브용 데크판500: slab 510: deck plate for slab

600: 센터파일 650: 매트기초600: center pile 650: mat base

본 발명은 테두리보용 데크판을 이용한 무지주 지하구조물 시공방법에 관한 것으로서, 더욱 상세하게는 지하흙막이벽으로 시공된 슬러리월에 테두리보를 시공하면서 상기 테두리보에 PC보 또는 철골보로 마련되는 기성보가 정착하도록 지하구조물을 시공하는 경우 테두리보용 데크판을 이용하여 테두리보를 시공함으로써 테두리보의 시공에 동바리 설치를 생략하는 것은 물론 테두리보와 슬래브의 동시시공이 가능해져 공기단축을 통한 시공성을 개선할 수 있게 한 무지주 지하구조물 시공방법에 관한 것이다.The present invention relates to a method for constructing an unsupported underground structure using a deck plate for edge beams, and more particularly, a ready-made beam provided with a PC beam or a steel frame beam is fixed to the edge beam while constructing a border beam on a slurry wall constructed as a basement wall. In the case of constructing underground structures, the construction of the rim beam using the edging beam deck plate eliminates the installation of ridges in the construction of the rim beam, as well as the simultaneous construction of the rim beam and the slab, thereby improving the constructability through air shortening. A method of constructing an unsupported underground structure.

지하에 구조물을 구축하기 위해서는 터파기가 필수적인데, 흙의 안식각(安息角)보다 큰 경사도로 흙파기가 이루어진다면 흙이 무너질 우려가 있으므로 터파기에 앞서 흙막이공사가 진행된다. 특히, 도심지 공사에서는 공사현장 제약 때문에 흙막이공사가 필수적으로 진행되고 있다.In order to build a structure underground, a trench is necessary. If the soil is dug at an inclination larger than the angle of repose of the soil, the soil may collapse, so the earthquake construction is carried out before the trench. In particular, the construction of the earthquake is inevitably underway due to the limitations of the construction site.

슬러리월(slurry wall, 지하연속벽) 공법은 다양한 흙막이공사 방법 중 하나로서, 지반굴착시 안정액을 사용하여 지반의 붕괴를 방지하면서 굴착하여 그 속에 철근망을 넣고 콘크리트를 타설하여 연속으로 콘크리트 흙막이벽을 시공해가는 공법이다. 이와 같은 슬러리월 공법은 저소음, 저진동으로 시공가능하고 역타공법에 유용하게 적용할 수 있어 도심지 공사에 적합하다. 또한, 슬러리월은 강성이 크고 차수성이 우수하여 그 하나로 흙막이벽은 물론 지하구조물의 지하외벽으로 역할하 게 할 수 있으므로, 지하구조물 시공공정을 단순화할 수 있다는 점에서 유리하다.Slurry wall method is one of various earthquake construction methods. In case of ground excavation, using a stabilizer to excavate the ground while preventing the collapse of the ground, reinforcing the steel bars into the concrete and placing concrete in a row Construction method is going. Such slurry wall construction method is low noise and low vibration, and can be usefully applied to reverse drilling method. In addition, the slurry wall is advantageous in that the construction of the underground structure can be simplified because the rigid wall is excellent in rigidity and can serve as an underground outer wall of the underground structure.

상기한 바와 같이 슬러리월로서 흙막이벽을 시공하는 경우에는 지하외벽 생략에 따라 지하구조물의 층간구조체(보 및 슬래브)가 직접 슬러리월에 접합되면서 시공되는데, 종래에는 슬러리월과 층간구조체의 일체화와 원활한 토압전달을 위해 슬러리월을 둘러싸는 테두리보를 시공하면서 층간구조체를 시공해 왔다. 이때, 테두리보는 현장에서 진행되는 습식공사방법을 따르게 된다. 즉, 거푸집 및 동바리를 설치한 후 콘크리트를 타설하고, 콘크리트가 양생되면 거푸집 및 동바리를 해체하는 방법으로 진행하는 것이다. 하지만, 이와 같은 공사진행은 동바리 설치 및 해체작업에 따라 작업성 저하와 공기 지연으로 이어지며, 이러한 문제는 특히 다층의 지하구조물을 역타공법으로 시공하는 경우에 심각하게 나타난다. 왜냐하면, 콘크리트가 완전히 양생된 후에야 비로소 동바리를 해체한 후 다시 굴토작업에서부터 콘크리트 타설까지 반복하여 진행할 수 있으므로, 층간 작업시간이 상당히 소요되기 때문이다. As described above, when the wall is constructed as a slurry wall, the interlayer structures (beams and slabs) of the underground structures are directly bonded to the slurry walls according to the omission of the basement walls. In the past, the slurry walls and the interlayer structures are seamlessly integrated with each other. The interlayer structure has been constructed by constructing a rim beam that surrounds the slurry wall for earth pressure transfer. At this time, the border beam will follow the wet construction method to be carried out in the field. In other words, after installing the formwork and clubbing, the concrete is poured, and if the concrete is cured, the method is to proceed to dismantle the formwork and clubbing. However, such collocation leads to deterioration of workability and delay of air due to the installation and dismantling of the group, and this problem is particularly serious when the multi-layered underground structure is constructed by reverse drilling. This is because, after the concrete is completely cured, it is possible to repeatedly proceed from the excavation work to the concrete pouring after dismantling the copper bar.

본 발명은 상기한 종래 문제를 개선하고자 안출된 것으로서, 테두리보용 데크판을 이용하여 테두리보를 시공함으로써 테두리보의 시공에 동바리 설치를 생략하는 것은 물론 테두리보와 슬래브의 동시시공이 가능해져 공기단축을 통한 시공성을 개선할 수 있게 한 무지주 지하구조물 시공방법을 제공하는데 그 기술적 목적이 있다.The present invention has been made to improve the above-mentioned conventional problems, by omitting the installation of the rim beam in the construction of the rim beam by using the rim beam deck plate, as well as the simultaneous construction of the rim beam and slab is possible to shorten the air The technical purpose is to provide a method of construction of unsupported underground structures that can improve the workability.

본 발명의 다른 목적은 역타공법에 유용하게 적용가능한 무지주 지하구조물 시공방법을 제공하는 것이다.Another object of the present invention is to provide a method for constructing an unsupported underground structure that can be usefully applied to the reverse drilling method.

상기한 목적달성을 위해 본 발명은 지하흙막이벽으로 시공된 슬러리월에 테두리보를 시공하면서 상기 테두리보에 PC보 또는 철골보로 마련되는 기성보가 정착하도록 지하구조물을 시공함에,In order to achieve the above object, the present invention constructs an underground structure such that a ready beam provided as a PC beam or a steel frame beam is fixed to the edge beam while constructing a rim beam on the slurry wall constructed as an underground mud wall.

(a)테두리보와의 접합부에 전단키가 돌출 매입되도록 슬러리월을 시공하는 단계; (b)슬러리월 내부 공간을 굴착하는 단계; (c)기성보가 시공되는 위치의 테두리보와의 접합부 아래 슬러리월에 거치용 브라켓을 설치하는 단계; (d)상기 거치용 브라켓 위에 거치하되 돌출된 전단키를 내부에 수용하면서 슬러리월을 둘러싸도록 테두리보 시공을 위한 테두리보용 데크판을 설치하는 단계; (e)단부를 상기 테두리보용 데크판 내부에 수용시키면서 슬러리월을 향하도록 기성보를 설치하는 단계; (f)상기 테두리보용 데크판 내부에 콘크리트를 타설하는 단계; 그리고, (g)상기 거치용 브라켓을 제거하는 단계;를 포함하여 이루어지며,(a) constructing a slurry wall such that a shear key is protrudingly embedded at the junction with the border rib; (b) excavating the interior of the slurry wall; (c) installing a mounting bracket on the slurry wall under the junction with the edge beam at the position where the ready beam is constructed; (d) installing the rim beam deck plate for rim beam construction so as to be mounted on the mounting bracket but enclosing the slurry wall while receiving the protruding shear key therein; (e) installing a ready-made beam to face a slurry wall while accommodating the end inside the deck plate for edge beams; (f) pouring concrete into the rim beam deck plate; And, (g) removing the mounting bracket;

상기 (e)단계는 기성보를 테두리보용 데크판 바로 위로 설치하거나, 테두리보용 데크판 위에 받침대를 설치한 후 받침대 위로 기성보를 설치하여 과정으로 이루어지는 것을 특징으로 하는 테두리보용 데크판을 이용한 무지주 지하구조물 시공방법을 제공한다.The step (e) is a step of installing a ready-made beam directly above the border beam deck plate, or after installing the support on the deck beam deck plate to install the ready-made beam on the pedestal, the unsupported underground structure using the deck beam deck plate, characterized in that the process Provide construction method.

이하, 첨부한 도면 및 바람직한 실시예에 따라 본 발명을 상세히 설명한다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings and preferred embodiments.

도 1은 본 발명에 따른 테두리보용 데크판을 이용한 무지주 지하구조물 시공방법을 역타공법에 적용한 예를 보여주는 순서도이고, 도 2 내지 도 4는 본 발명에서의 슬러리월과 테두리보의 접합상태를 보여주는 도면으로, 이들 도면을 참고하여 본 발명을 단계적으로 설명하면 다음과 같다.1 is a flow chart showing an example of applying the method of construction of the unsupported underground structure using the deck plate deck frame according to the present invention to the reverse drilling method, Figure 2 to Figure 4 shows the bonding state of the slurry wall and the rim beam in the present invention With reference to the drawings, the present invention will be described step by step with reference to these drawings.

(a)슬러리월 시공단계- 도 1(a)(a) Slurry Wall Construction Step- FIG. 1 (a)

테두리보(300)와의 접합부에 전단키(110)가 돌출 매입되도록 슬러리월(100)을 시공한다. 상기 슬러리월(100)은 지하구조물 외곽선에 맞춰 통상적인 방법으로 시공된다. The slurry wall 100 is constructed such that the shear key 110 protrudes and embeds at the junction with the edge beam 300. The slurry wall 100 is constructed in a conventional manner according to the outline of the underground structure.

슬러리월(100)에 돌출 매입되는 전단키(110)는 정착철근 타입, 임베디드플레이트 타입, 등 다양한 형태로 마련할 수 있다. 도 2(a)에서와 같은 정착철근 타입은 ㄱ자형으로 절곡한 정착철근을 슬러리월(100)에 매입한 후 향후 절곡상태를 펴거나 슬리브를 슬러리월(100)에 매입한 후 슬리브에 다우웰바를 설치하는 방법으로 전단키(110)를 마련할 수 있고, 도 4에서와 같은 임베디드플레이트(Embeded plate) 타입은 스터드가 접합된 플레이트를 슬러리월(100)에 매입한 후 플레이트 표면에 거싯플레이트(gusset plate), 스터드 등을 접합하여 전단키(110)를 마련할 수 있다.The shear key 110 protrudingly embedded in the slurry wall 100 may be provided in various forms such as a fixing rebar type, an embedded plate type, and the like. As shown in FIG. 2 (a), the reinforcing bar type purchases the fixed reinforcing bar bent into a L-shape in the slurry wall 100, and then expands the bending state in the future or purchases the sleeve in the slurry wall 100 and then the dowel in the sleeve. Shear key 110 can be provided by a method of installing a bar, and an embedded plate type as shown in FIG. 4 is provided with a gusset plate (gusset) on the surface of the plate after the stud-bonded plate is embedded in the slurry wall 100. shear key 110 may be prepared by joining plates, studs, and the like.

규모가 큰 다층의 지하구조물이라면 경제성을 고려할 때 역타공법으로 시공하는 것이 바람직한데, 이 경우에는 슬러리월(100) 시공과 함께 기둥위치에 센터파 일(600)을 시공하도록 한다. 센터파일(600)은 도 1(a)에서와 같이 지상의 기둥위치에서 기초위치까지 굴착하여 그라우팅재를 투입한 후 굴착부분에 센터파일(600)을 집어넣어 기초구근을 형성시키면서 설치한다.If the large-scale multi-level underground structure is preferable to be constructed by reverse drilling method in consideration of economics, in this case, the center file 600 to be constructed in the column position with the slurry wall 100 construction. The center pile 600 is excavated from the ground column position to the foundation position as shown in FIG. 1 (a), and the grouting material is put therein, and the center pile 600 is inserted into the excavation portion to install the foundation bulb.

(b)굴착단계- 도 1(b)(b) Excavation step- FIG. 1 (b)

슬러리월(100) 내부 공간을 굴착한다. 역타공법으로 진행하는 경우에는 슬러리벽(600)이 자립하여 충분히 토압을 지지할 수 있을 정도의 깊이로 굴착하도록 한다.The inner space of the slurry wall 100 is excavated. In the case of the reverse drilling method, the slurry wall 600 is self-supporting to excavate to a depth sufficient to support the earth pressure.

(c)거치용 브라켓 설치단계- 도 1(c)(c) Mounting bracket installation step-Figure 1 (c)

기성보(400)가 시공되는 위치의 테두리보(300)와의 접합부 아래 슬러리월(100)에 거치용 브라켓(200)을 설치한다. 물론, 지하구조물이 장스팬으로 설계되는 경우에는 상기 거치용 브라켓(200)은 기성보(400)가 시공되는 위치 외에도 추가적으로 더 설치할 수 있다.The mounting bracket 200 is installed on the slurry wall 100 under the junction with the edge beam 300 at the position where the ready-made beam 400 is constructed. Of course, when the underground structure is designed as a long span, the mounting bracket 200 may be additionally installed in addition to the position where the ready-made beam 400 is constructed.

거치용 브라켓(200)은 테두리보(300) 시공단계에서 테두리보용 데크판(310)과 기성보(400)를 지지하기 위한 지지대로서 역할하는 가설용 구성으로, 향후 테두리보(300) 시공이 완료되어 테두리보(300)에 의해 슬러리월(100)과 기성보(400)가 일체화되면 제거된다. 다만, 거치용 브라켓(200)은 콘크리트가 완전히 양생된 후에 제거하도록 함이 바람직하다.Mounting bracket 200 is a temporary construction to serve as a support for supporting the rim beam deck plate 310 and the ready-made beam 400 in the construction step of the rim beam 300, the construction of the rim beam 300 is completed in the future When the slurry wall 100 and the ready-made beam 400 is integrated by the rim beam 300 is removed. However, the mounting bracket 200 is preferably to be removed after the concrete is completely cured.

거치용 브라켓(200)은 도 2(a)에서와 같이 슬러리월(100)에 앵커로서 직접 고정 설치하거나, 도 4에서와 같이 전단키(110) 마련을 위해 설치된 임베디드플레이트에 고정 설치하는 방법으로 설치할 수 있다. The mounting bracket 200 is fixedly installed as an anchor directly to the slurry wall 100 as shown in FIG. 2 (a), or fixedly installed in an embedded plate installed to prepare the shear key 110 as shown in FIG. Can be.

(d)테두리보용 데크판 설치단계- 도 1(d)(d) Steps for installing the deck plate for border ribs-Figure 1 (d)

거치용 브라켓(200) 위에 거치하되 돌출된 전단키(110)를 내부에 수용하면서 슬러리월(100)을 둘러싸도록 테두리보(300) 시공을 위한 테두리보용 데크판(310)을 설치한다. 테두리보용 데크판(310)은 도 3에서와 같이 역L자형 강판이면 족하다.Mounted on the mounting bracket 200, but installs the rim beam deck plate 310 for the construction of the rim beam 300 so as to surround the slurry wall 100 while receiving the protruding shear key 110 therein. Edge plate deck plate 310 is sufficient as inverted L-shaped steel plate as shown in FIG.

테두리보용 데크판(310)은 자체 내력을 가질 뿐만 아니라 테두리보용 데크판(310) 내부에 테두리보철근, 슬러리월(100)에 돌출 매입된 전단키(110), 기성보(400)의 단부가 수용되면서 테두리보용 데크판(310)에 구속되므로, 전체 강성이 증대되어 동바리 없이 거치용 브라켓(200)만으로도 콘크리트 타설압을 충분히 지지할 수 있게 된다.The edge beam deck plate 310 has its own strength as well as the edge of the edge beam deck plate 310, the edge of the prosthetic reinforcement, the shear key 110 protruded into the slurry wall 100, the end of the ready-made beam 400 is accommodated While being bound to the rim beam deck plate 310, the overall rigidity is increased to be able to sufficiently support the concrete placing pressure even with the mounting bracket 200 without the rim.

테두리보용 데크판(310)에는 기성보(400)가 수용되는데, 이를 위해 테두리보용 데크판(310)에는 기성보(400)가 수용되는 부분을 미리 절취하여 수용홈(311)을 형성시키도록 한다. 도 3에서는 기성보(400)로 H형 철골보(410)를 채택하기 때문에 테두리보용 데크판(310)에 철골보(410) 모양(역T형)으로 절취하여 수용홈(311)을 형성시키고 있다.The edge beam deck plate 310 is accommodated in the ready-made beam 400, for this purpose, the edge beam deck plate 310 to cut in advance the portion where the ready-made beam 400 is accommodated to form a receiving groove 311. . In FIG. 3, since the H-shaped steel ball 410 is adopted as the ready-made beam 400, the receiving groove 311 is formed by cutting the steel-beam beam 410 into a shape (reverse T type) on the deck beam plate 310.

(e)기성보(400) 설치단계- 도 1(e)(e) Installation steps 400-Figure 1 (e)

단부를 상기 테두리보용 데크판(310) 내부에 수용시키면서 슬러리월(100)을 향하도록 기성보(400)를 설치한다. 기성보(400)는 철골보(410) 또는 PC보로 채택가능하다.The ready-made beam 400 is installed to face the slurry wall 100 while accommodating an end portion of the edge plate deck plate 310. The ready-made beam 400 may be adopted as the cheolgolbo 410 or PC beam.

기성보(400)와 테두리보(300)의 보춤이 서로 동일한 경우라면 테두리보용 데크판(310) 위로 바로 기성보(400)를 설치하면 될 것이고, 테두리보(300)의 토압지지력 향상을 위해 테두리보(300)의 보춤을 기성보(400)보다 크게 설계한 경우라면 테두리보용 데크판(310) 위에 받침대(210)를 설치한 후 받침대(210) 위로 기성보(400)를 설치하도록 한다. 테두리보용 데크판(310) 내부에 콘크리트가 타설되면 상기 받침대(210)는 콘크리트에 영구적으로 매입된다. 도 2 내지 도 4에서는 기성보(400)로 철골보(410)를 채택한 예를 보여주는데, 도 2 및 도 3은 테두리보(300)의 보춤을 크게 설계한 예로서 테두리보용 데크판(310) 위에 받침대(210)를 더 설치한 예이며, 도 4는 테두리보(300)와 철골보(410)의 보춤을 거의 동일하게 설계한 예로서 철골보(410)를 테두리보용 데크판(310) 바로 위에 설치한 예이다.If the beams of the ready-made beam 400 and the rim beam 300 is the same as each other, the ready-made beam 400 will be installed directly on the deck beam deck plate 310, and the edge for improving the earth pressure bearing capacity of the rim beam 300 will be improved. If the beam of the beam 300 is designed to be larger than the ready-made beam 400, after installing the pedestal 210 on the rim beam deck plate 310 to install the ready-made beam 400 over the pedestal 210. When concrete is poured into the frame deck plate 310, the pedestal 210 is permanently embedded in the concrete. 2 to 4 show an example of adopting the cheolgolbo 410 as a ready-made beam 400, Figures 2 and 3 is an example of a large design of the bowing of the rim beam 300 as an example of the pedestal on the deck plate 310 An example of further installing 210, Figure 4 is an example in which the bowing of the rimbo 300 and the cheolgolbo 410 is designed almost the same example of installing the cheolgolbo 410 directly on the deck plate 310 for the rimbo to be.

기성보(400) 위로는 슬래브 시공을 위해 슬래브용 데크판(510)을 설치하게 되는데, 이때 슬래브용 데크판(510)은 슬래브(500) 시공시점을 고려하여 설치하게 된다. 즉, 슬래브(500) 시공은 기성보(400)와 함께 매층마다 시공할 수도 있으나, 지하구조물의 골조를 완성한 후 최하층에서부터 순차적으로 시공할 수도 있으므로, 선택되는 방법에 따라 슬래브용 데크판(510)의 설치시점이 정해지는 것이다. 다만, 슬래브(500)에 의한 토압지지효과를 기대하기 위해서는 슬래브(500)를 기성보(400)와 함께 시공하는 것이 바람직하므로, 이를 감안한다면 기성보(400) 설치와 함께 슬래브용 데크판(510)을 설치하도록 한다. 물론, 슬래브용 데크판(510) 또한 무지주 공법을 구현하기 위해 충분한 내력확보가 중요하므로 트러스철근이 접합된 트러스데크를 채택하는 것이 바람직하겠다.Above the ready-made beam 400 is to install the slab deck plate 510 for the slab construction, the slab deck plate 510 is installed in consideration of the construction point of the slab 500. That is, the construction of the slab 500 may be constructed every floor with the ready-made beam 400, but may be constructed sequentially from the lowest floor after completing the frame of the underground structure, according to the method selected slab deck plate 510 The point of installation will be determined. However, in order to expect the earth pressure supporting effect by the slab 500, it is preferable to construct the slab 500 together with the ready-made beam 400, if considering this, deck plate 510 for the slab with the ready-made beam 400 installed Install). Of course, the deck plate 510 for the slab is also important to secure enough strength to implement the unsupported method, it is preferable to adopt a truss deck bonded to the truss rebar.

(f)콘크리트 타설단계(f) Concrete pouring stage

상기 테두리보용 데크판(310) 내부에 콘크리트를 타설한다. 콘크리트 타설로서 테두리보(300)에 의한 슬러리월(100)과 기성보(400)의 일체화가 완성되며, 그 결과 토압 지지체계가 완성된다. 즉, 슬러리월(100)에서 테두리보(300)로, 기성보(400)로, 센터파일(600)로, 다시 기성보(400)로, 테두리보(300)로, 슬러리월(100)로 토압전달메커니즘이 완성되는 것이다. Concrete is poured into the border plate deck plate 310 inside. As the concrete pouring, the integration of the slurry wall 100 and the ready-made beam 400 by the rim beam 300 is completed, and as a result, the earth pressure support system is completed. That is, from the slurry wall 100 to the rim beam 300, to the ready beam 400, to the center pile 600, back to the ready beam 400, to the border beam 300, to the slurry wall 100 The earth pressure transmission mechanism is completed.

물론, 앞서 기성보(400) 설치단계에서 슬래브용 데크판(510)이 설치되었다면 콘크리트를 테두리보용 데크판(310) 내부에 타설하면서 슬래브용 데크판(510) 위에도 함께 타설하도록 하여 슬래브(500) 또한 토압을 지지하는 구조체로서 역할하게 할 수 있다.Of course, if the slab deck plate 510 is installed in the ready-made beam 400 before the slab (500) by placing concrete on the slab deck plate 510 while placing concrete inside the rim beam deck plate 310 It can also serve as a structure for supporting earth pressure.

(g)반복 시공단계(g) Repeat construction stage

상기 (b)굴착단계 내지 (f)콘크리트단계까지 층간 반복적으로 지하 최하층까지 진행하면, 역타공법으로 지하구조물을 완성할 수 있게 된다. 반복시공하는 과정에는 여건에 따라 지상구조물의 공사를 함께 진행할 수 있는 것은 당연하다. If (b) the excavation step to the (f) concrete step repeatedly proceeds to the lowest basement floor between the layers, it is possible to complete the underground structure by reverse drilling method. In the process of repetitive construction, it is natural to be able to proceed with the construction of ground structures depending on the circumstances.

앞서 테두리보용 데크판(310)을 이용하여 시공하기 때문에 동바리 설치를 생략할 수 있으므로, 콘크리트가 완전히 양생하지 않더라도 바로 하부층 시공을 위한 굴착단계를 수행할 수 있어 공기를 단축할 수 있게 된다. Since the construction can be omitted using the rim beam deck plate 310, it is possible to shorten the air to perform the excavation step for the construction of the lower floor even if the concrete is not completely cured.

(h)매트기초 시공단계(h) Mat base construction stage

지하층의 골조가 완성되면, 기초구근(200) 위까지 굴토한 후 지하 최하층 바닥 높이로 매트기초(650)를 완성한다. 이로써 지하구조물의 구조체 공사가 완료된다.When the frame of the basement floor is completed, the base foundation 200 is pitted up to complete the mat base 650 to the bottom of the basement floor. This completes the construction of the underground structure.

이상에서 본 발명은 실시예를 참조하여 상세히 설명되었으나, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자라면 상기에서 설명된 기술적 사상을 벗어나지 않는 범위 내에서 여러가지 치환, 부가 및 변형이 가능할 것임은 당연하며, 이와 같은 변형된 실시 형태들 역시 아래에 첨부한 특허청구범위에 의하여 정하여지는 본 발명의 보호 범위에 속하는 것으로 이해되어야 할 것이다.While the present invention has been described in detail with reference to the embodiments, it will be apparent to those skilled in the art that various substitutions, additions, and modifications are possible within the scope without departing from the spirit as described above. It is to be understood that such modified embodiments also fall within the protection scope of the invention as defined by the appended claims below.

이상과 같은 본 발명에 따르면 다음과 같은 효과가 기대된다.According to the present invention as described above is expected the following effects.

첫째, 지하흙막이벽으로 시공된 슬러리월에 테두리보를 시공하면서 상기 테두리보에 PC보 또는 철골보로 마련되는 기성보가 정착하도록 지하구조물을 시공할 때, 테두리보용 데크판을 이용하여 테두리보를 시공함으로써 테두리보의 시공에 동바리 설치를 생략하는 것은 물론 테두리보와 슬래브의 동시시공이 가능해져 공기단축을 통한 시공성을 개선할 수 있게 된다.First, when constructing a girder beam on a slurry wall constructed as an underground mud wall, and constructing a basement structure so that a ready beam provided as a PC beam or a steel frame beam is fixed to the rim beam, a rim beam is constructed by using a rim beam deck plate. In addition to eliminating the installation of the copper bar in the construction of the rim beam and the slab can be installed at the same time, it is possible to improve the construction through the air shortening.

둘째, 본 발명은 역타공법에 유용하게 적용할 수 있게 되며, 특히 무지주 공법으로 층간 구조체를 시공할 수 있어 콘크리트 양생을 기다리지 않고 바로 다음단계 공정으로 진행할 수 있으며, 그 결과 상당한 공기단축이 기대된다.Secondly, the present invention can be usefully applied to the reverse drilling method, and in particular, the interlayer structure can be constructed by the non-holding method so that the process can proceed to the next step without waiting for concrete curing, and as a result, considerable air reduction is expected. .

Claims (4)

지하흙막이벽으로 시공된 슬러리월(100)에 테두리보(300)를 시공하면서 상기 테두리보(300)에 PC보 또는 철골보(410)로 마련되는 기성보(400)가 정착하도록 지하구조물을 시공함에,In the construction of the underground structure so that the ready-made beam 400 is provided as a PC beam or steel cheolgolbo 410 on the rim beam 300 while constructing the rim beam 300 in the slurry wall 100 constructed as a basement wall , (a)테두리보(300)와의 접합부에 전단키(110)가 돌출 매입되도록 슬러리월(100)을 시공하는 단계;(A) constructing the slurry wall 100 so that the shear key 110 is protrudingly embedded in the junction with the border rib 300; (b)슬러리월(100) 내부 공간을 굴착하는 단계;(b) digging the inner space of the slurry wall 100; (c)기성보(400)가 시공되는 위치의 테두리보(300)와의 접합부 아래 슬러리월(100)에 거치용 브라켓(200)을 설치하는 단계;(c) installing the mounting bracket 200 on the slurry wall 100 under the junction with the edge beam 300 at the position where the ready beam 400 is constructed; (d)상기 거치용 브라켓(200) 위에 거치하되 돌출된 전단키(110)를 내부에 수용하면서 슬러리월(100)을 둘러싸도록 테두리보(300) 시공을 위한 테두리보용 데크판(310)을 설치하는 단계;(d) Installing the rim beam deck plate 310 for the construction of the rim beam 300 so as to be mounted on the mounting bracket 200 to accommodate the protruding shear key 110 therein to surround the slurry wall 100. step; (e)단부를 상기 테두리보용 데크판(310) 내부에 수용시키면서 슬러리월(100)을 향하도록 기성보(400)를 설치하는 단계; 그리고,(e) installing the ready-made beam 400 so as to face the slurry wall 100 while accommodating the end inside the deck plate 310 for rim beam; And, (f)상기 테두리보용 데크판(310) 내부에 콘크리트를 타설하는 단계; (f) pouring concrete into the edge beam deck plate 310; 를 포함하여 이루어지며,It is made, including 상기 (e)단계는 Step (e) is 기성보(400)를 테두리보용 데크판(310) 바로 위로 설치하거나, 테두리보용 데크판(310) 위에 받침대(210)를 설치한 후 받침대(210) 위로 기성보(400)를 설치 하는 과정으로 이루어지는 것을 특징으로 하는 테두리보용 데크판을 이용한 무지주 지하구조물 시공방법.Installation of the ready-made beam 400 directly above the rim beam deck plate 310, or after installing the support 210 on the rim beam deck plate 310 and the installation of the ready-made beam 400 over the pedestal 210 Method of construction of unsupported underground structure using the deck plate deck frame characterized in that. 제1항에서,In claim 1, 상기 (e)단계에는 설치완료된 기성보(400) 위에 슬래브용 데크판(510)을 설치하는 단계가 더 포함되며,The step (e) further includes the step of installing the slab deck plate 510 on the installed ready-made beam 400, 상기 (f)단계에는 슬래브용 데크판(510) 위에 콘크리트를 타설하는 단계가 더 포함되는 것을 특징으로 하는 테두리보용 데크판을 이용한 무지주 지하구조물 시공방법.In the step (f), the step of placing concrete on the deck plate 510 for slabs, the method for constructing underground structures using the deck plate deck frame, characterized in that it further comprises. 제1항 또는 제2항에서,The method of claim 1 or 2, 상기(a)단계에는 기둥위치에 센터파일(600)을 시공하는 단계가 더 포함되며,The step (a) further includes the step of constructing the center pile 600 at the column position, 상기 (f)단계 후에 상기 (b)단계 내지 (f)단계가 층간 반복적으로 수행되어 지하구조물이 역타로 시공되는 것을 특징으로 하는 테두리보용 데크판을 이용한 무지주 지하구조물 시공방법.After step (f), the steps (b) to (f) are repeatedly performed between the layers, so that the underground structure is constructed as a reverse stroke. 제1항 또는 제2항에서,The method of claim 1 or 2, 상기 (f)단계 후에 거치용 브라켓(200)을 제거하는 단계가 더 포함되는 것을 특징으로 하는 테두리보용 데크판을 이용한 무지주 지하구조물 시공방법.After the step (f) step of removing the mounting bracket 200 further comprises a non-supporting underground structure construction method using a rim beam deck plate, characterized in that it further comprises.
KR1020070043725A 2007-05-04 2007-05-04 Construction method of unsupported underground structure using deck plate KR100876853B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070043725A KR100876853B1 (en) 2007-05-04 2007-05-04 Construction method of unsupported underground structure using deck plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070043725A KR100876853B1 (en) 2007-05-04 2007-05-04 Construction method of unsupported underground structure using deck plate

Publications (2)

Publication Number Publication Date
KR20080098262A true KR20080098262A (en) 2008-11-07
KR100876853B1 KR100876853B1 (en) 2008-12-31

Family

ID=40285825

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070043725A KR100876853B1 (en) 2007-05-04 2007-05-04 Construction method of unsupported underground structure using deck plate

Country Status (1)

Country Link
KR (1) KR100876853B1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100938918B1 (en) * 2009-05-18 2010-01-27 (주)씨엠파트너스건축사사무소 Top-down construction method using steel frame by channel
KR101035404B1 (en) * 2010-08-25 2011-05-20 (주)씨엠파트너스건축사사무소 Slurry wall and slab junction structure and its using top-down construction method
KR101221970B1 (en) * 2010-05-04 2013-01-15 양숙경 Construction Method for Basement Structure without Temporary Structure
KR101401057B1 (en) * 2013-02-28 2014-05-29 (주)바로건설기술 Method to build underground structures using the pillars and the stigma and steel beam and slab structures are formed
CN106320377A (en) * 2016-08-31 2017-01-11 中铁二局工程有限公司 Water-rich soft soil area deep foundation pit cover and excavation top-down construction method
CN108691414A (en) * 2017-11-12 2018-10-23 江苏揽月工程科技发展股份有限公司 Core Walls Structure shear wall converts boom device without wall without creeping formwork seat in the plane at beam

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100383268B1 (en) * 2000-07-14 2003-05-12 조재형 method for underground construction of building by using permanent structural member as strut for support retaining wall
KR200370107Y1 (en) * 2004-09-06 2004-12-14 삼성중공업 주식회사 Forms for edge girder construction

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100938918B1 (en) * 2009-05-18 2010-01-27 (주)씨엠파트너스건축사사무소 Top-down construction method using steel frame by channel
WO2010134731A2 (en) * 2009-05-18 2010-11-25 (주)씨엠파트너스건축사사무소 Top-down construction method using a branch-type steel frame with channels for the continuous construction of an underground retaining wall
WO2010134731A3 (en) * 2009-05-18 2011-01-27 (주)씨엠파트너스건축사사무소 Top-down construction method using a branch-type steel frame with channels for the continuous construction of an underground retaining wall
KR101221970B1 (en) * 2010-05-04 2013-01-15 양숙경 Construction Method for Basement Structure without Temporary Structure
KR101035404B1 (en) * 2010-08-25 2011-05-20 (주)씨엠파트너스건축사사무소 Slurry wall and slab junction structure and its using top-down construction method
KR101401057B1 (en) * 2013-02-28 2014-05-29 (주)바로건설기술 Method to build underground structures using the pillars and the stigma and steel beam and slab structures are formed
CN106320377A (en) * 2016-08-31 2017-01-11 中铁二局工程有限公司 Water-rich soft soil area deep foundation pit cover and excavation top-down construction method
CN108691414A (en) * 2017-11-12 2018-10-23 江苏揽月工程科技发展股份有限公司 Core Walls Structure shear wall converts boom device without wall without creeping formwork seat in the plane at beam

Also Published As

Publication number Publication date
KR100876853B1 (en) 2008-12-31

Similar Documents

Publication Publication Date Title
KR101014796B1 (en) Top-down underground construction method using prefabricated concrete column member as temporary bridge column
KR100938918B1 (en) Top-down construction method using steel frame by channel
KR100788623B1 (en) Top-down method using precast-concrete colum
KR100876853B1 (en) Construction method of unsupported underground structure using deck plate
JP4623574B2 (en) How to build a pile
KR20060092552A (en) The non-strut down framework construction method of having used cast in place concrete pile
KR100960603B1 (en) Construction method of retaining wall using phc pile
KR102286225B1 (en) Method for constructing underground structure busing PC integrating method without support
KR20190022132A (en) Top-down method using precast-concrete colum
JP5092705B2 (en) Support structure of structure, construction method of underground structure, replacement method of foundation load
KR20090090742A (en) Bottom-up construction method of underground structure using permanent strut
KR102223856B1 (en) Foundation structure of waste landfill site and construction method thereof
KR20100094140A (en) Wall structure capable of earth retaining and the building method of the same
KR100976621B1 (en) Construction method for basement extention
KR100673475B1 (en) A pc girder member for frame of underground layer and assembling structure of frame of underground by using of it and the method therof
JP2006207265A (en) Joining method of pile and column and its structure
KR100912574B1 (en) Retaining wall system using strut assembly and excavating method using the same
JP4228308B2 (en) Reinforcement method for existing floors and seismic isolation method for existing buildings
JP4465571B2 (en) Seismic isolation system for existing buildings
KR20100110927A (en) Post tension tunnel method
KR100941437B1 (en) 2 arch tunnel construction method for upper girder void proofing and efficient construction
JPH11310928A (en) Vibration isolation reinforcing method for existing structure
KR100650134B1 (en) Early remove support method
JPH09302703A (en) Base isolation method for existing structure having pile foundation
JP7115923B2 (en) Foundation structure reinforcement method and foundation structure reinforcement structure

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee