KR20060120544A - Pipe arrangement system for cold and hot water using one pipe - Google Patents
Pipe arrangement system for cold and hot water using one pipe Download PDFInfo
- Publication number
- KR20060120544A KR20060120544A KR1020060108766A KR20060108766A KR20060120544A KR 20060120544 A KR20060120544 A KR 20060120544A KR 1020060108766 A KR1020060108766 A KR 1020060108766A KR 20060108766 A KR20060108766 A KR 20060108766A KR 20060120544 A KR20060120544 A KR 20060120544A
- Authority
- KR
- South Korea
- Prior art keywords
- hot water
- cold
- pipe
- faucet
- water
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03C—DOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
- E03C1/00—Domestic plumbing installations for fresh water or waste water; Sinks
- E03C1/02—Plumbing installations for fresh water
- E03C1/04—Water-basin installations specially adapted to wash-basins or baths
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03C—DOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
- E03C1/00—Domestic plumbing installations for fresh water or waste water; Sinks
- E03C1/02—Plumbing installations for fresh water
- E03C1/021—Devices for positioning or connecting of water supply lines
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16K—VALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
- F16K31/00—Actuating devices; Operating means; Releasing devices
- F16K31/02—Actuating devices; Operating means; Releasing devices electric; magnetic
- F16K31/04—Actuating devices; Operating means; Releasing devices electric; magnetic using a motor
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D19/00—Details
- F24D19/10—Arrangement or mounting of control or safety devices
- F24D19/1006—Arrangement or mounting of control or safety devices for water heating systems
- F24D19/1051—Arrangement or mounting of control or safety devices for water heating systems for domestic hot water
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D2220/00—Components of central heating installations excluding heat sources
- F24D2220/04—Sensors
- F24D2220/042—Temperature sensors
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Chemical & Material Sciences (AREA)
- Thermal Sciences (AREA)
- Combustion & Propulsion (AREA)
- Physics & Mathematics (AREA)
- Domestic Plumbing Installations (AREA)
- Domestic Hot-Water Supply Systems And Details Of Heating Systems (AREA)
Abstract
Description
도 1은 일반적인 냉온수 배관시스템을 나타낸 구성도이다.1 is a configuration diagram showing a general cold and hot water piping system.
도 2는 본 발명인 1개의 공급관을 이용한 냉온수 배관시스템의 구성을 나타낸 구성도이다.Figure 2 is a block diagram showing the configuration of a cold and hot water piping system using one supply pipe of the present invention.
도 3은 본 발명인 1개의 공급관을 이용한 냉온수 배관시스템의 구성요부인 혼합부의 구성을 나타낸 구성도이다.Figure 3 is a block diagram showing the configuration of the mixing portion that is a component of the cold and hot water piping system using one supply pipe of the present invention.
도 4는 본 발명인 1개의 공급관을 이용한 냉온수 배관시스템의 구성요부인 혼합부의 또 다른 구성을 나타낸 구성도이다.Figure 4 is a block diagram showing another configuration of the mixing portion, which is a component of the cold and hot water piping system using one supply pipe of the present invention.
도 5 및 도 6은 본 발명인 1개의 공급관을 이용한 냉온수 배관시스템의 구성요부인 제어부와 입력부의 연결상태를 각각 나타낸 개념도이다.5 and 6 are conceptual views showing a connection state of a control unit and an input unit, which are components of a cold / hot water piping system using one supply pipe of the present invention, respectively.
<도면의 주요부분에 대한 부호의 설명><Description of the code | symbol about the principal part of drawing>
10 : 보일러 11 : 냉수관10
12 : 온수관 20 : 혼합부12: hot water pipe 20: mixing unit
21 : 전자밸브체 22, 23 : 혼합체21:
24 : 제어밸브 25 : 모터24: control valve 25: motor
26 : 온도센서 30 : 제어부26: temperature sensor 30: control unit
40 : 입력부 50 : 사용수전40: input unit 50: faucet
60 : 공급관60 supply pipe
본 발명은 주택이나 아파트 및 오피스텔, 호텔, 콘도 등과 같은 건물의 세면수전, 세탁수전, 욕조수전과 같은 사용수전에 냉수와 온수의 공급을 위해 설치되는 배관시스템에 관한 것으로서, 더욱 상세하게는 1개의 공급관을 이용하여 냉수와 온수가 공급되도록 함으로써 배관설비시에 발생되는 설비비용을 크게 줄일 수 있고, 작업능률이 향상될 수 있을 뿐만 아니라, 공사기간을 단축할 수 있는 1개의 공급관을 이용한 냉온수 배관시스템에 관한 것이다.The present invention relates to a piping system installed for supplying cold water and hot water in a faucet, a washing faucet, a faucet faucet, or a faucet in a building such as a house, an apartment, an officetel, a hotel, a condo, and the like. By supplying cold water and hot water by using supply pipes, the equipment cost incurred in plumbing equipment can be greatly reduced, work efficiency can be improved, and cold and hot water piping system using one supply pipe can shorten the construction period. It is about.
일반적으로, 주택이나 아파트 및 오피스텔, 호텔, 여관, 콘도 등과 같이 사람이 주거하기 위해 건설되는 건축물에는 욕조수전나 싱크수전 및 세탁수전 등과 같은 사용수전에 냉수와 온수를 공급하는 배관설비가 시공되고 있다.In general, plumbing facilities for supplying cold and hot water to faucets such as bathtub faucets, sink faucets, and wash faucets are being constructed in buildings that are built for human residence such as houses, apartments, officetels, hotels, inns, and condos. .
이러한, 배관설비는 도 1에 도시된 바와 같이 보일러(1)와, 상기 보일러(1)에 연결된 냉수공급관(2) 및 온수공급관(3)과, 상기 냉수공급관(2)과 온수공급관(3)이 연결되는 사용수전(4)의 밸브체로 구성되어 있다.Such a plumbing facility includes a boiler 1, a cold
따라서, 사용자는 냉수나 온수를 사용하고자 할 경우에 사용수전(4)에 설치되어 있는 밸브체(샤워기, 수도꼭지 등)를 조절하여 개방시킴으로써 상기 보일러(1)에 의해 데워진 온수나 데워지지 않은 냉수가 냉수공급관(2)과 온수공급관(3)을 통해 공급받아 사용하고 있다.Therefore, when the user wants to use cold water or hot water, the user adjusts and opens the valve body (shower, faucet, etc.) installed in the
그러나, 종래 배관시스템의 경우 보일러에 의해 데워진 온수가 사용수전에 공급되도록 하는 온수공급관(3)과, 보일러에 의해 데워지지 않은 냉수가 사용수전에 공급되도록 하는 냉수공급관(2)이 따로 설치되어 사용수전에 연결되어 온수와 냉수가 따로 사용수전에 공급되도록 한 다음, 사용수전에서 사용자가 밸브체를 조절하는 것에 의해 차가운 냉수나 또는 냉수와 온수가 적절하게 혼합된 온수를 밸브체에서 혼합하여 공급받도록 하기 때문에, 2개의 공급관이 같은 라인으로 각각 설치되어야 하는 문제점이 있다.However, in the case of the conventional piping system, the hot water supply pipe (3) for supplying the hot water heated by the boiler to the use water and the cold water supply pipe (2) for supplying the cold water unheated by the boiler is used separately installed Connected to the faucet so that the hot water and cold water are supplied separately to the use faucet, and then the user controls the valve body in the faucet so that the cold water or the hot water in which the cold and hot water are properly mixed is supplied from the valve body. Therefore, there is a problem that two supply pipes must be installed in the same line, respectively.
즉, 2개의 공급관이 각각 설치됨으로써 자재비가 2배로 들 수 밖에 없어 원가상승의 원인이 되고, 2개의 공급관을 작업자가 각각 따로 설치함에 따라 시공시간이 상당히 지연되어 작업성이 크게 저하되는 문제점이 있다.That is, since two supply pipes are installed separately, the cost of materials can only be doubled, causing a cost increase, and the installation time is considerably delayed due to the installation of two supply pipes separately by the worker, thereby greatly reducing workability. .
특히, 점차적으로 자원이 고갈되어 원자재의 값이 계속적으로 증가되고 있는 현재 사회에서 종래 냉수 및 온수를 공급하기 위해 2개의 공급관을 설치할 수 밖에 없는 점을 감안할 때, 냉온수 배관시스템을 시공하기 위해 드는 비용이 계속적으로 증가될 수 밖에 없는 문제점이 있다.In particular, the cost of constructing a cold / hot water piping system in consideration of the fact that in the current society where resources are gradually depleted and the value of raw materials is continuously increasing, two supply pipes have to be installed to supply cold water and hot water. This problem is inevitably increased.
종래 안출된 냉온수 배관시스템을 살펴보면, 특허등록 제515761호인 냉온수 배관 시스템의 시공방법이 안출된 바 있으며, 이는 그 등록공고된 공보의 청구범위에 기재된 바와 같이 앞쪽면이 트인 상자형의 케이스로 구성하여 벽내에 매립하되 앞쪽 트인부에 개폐문을 설치하며, 그 저부에 배수공을 뚫어 배수유도관을 설치하고, 상부는 분배기 저부의 배수공에 접속하고 하부는 건물배수구 근접부에 위치하 도록 구성된 분배기로 외부 공급부를 통하여 냉온수배관인 이중관을 세팅되어지는 분배기연결공정과, 배관출입구를 형성한 케이스와 개폐문으로 이루어진 통상의 수전용함을 시공하는 수전함 배치공정과, 상기 수전용함으로 분배기의 이중관을 유도하여 철근에 이중관이 결속선을 통해 결합 고정되어지되, 상기 이중관이 지지되게 이중관 주변의 철근에 하중지지체가 설치되어지는 수전용함연결공정 및 수전연결공정으로 이루어진 냉온수배관 시스템의 시공방법에 있어서, 상기 수전연결공정은 이중관의 연질관과 수전을 연결하는 플렉시블호스의 일단은 이경소켓을 통해 이중관으로 보호된 상기 연질관과 연결 결속하고, 상기 플렉시블호스의 타단은 수전에 연결 결속하되 개폐문에 마찰돌기와 보수용 구멍을 형성하며, 보수용 구멍의 외곽으로는 테두리부를 두어 오픈판으로 개폐할 수 있게 하고, 상기 수전의 연결관이 삽입 고정되는 이경소켓을 상기 오픈판의 일부에 형성된 소켓삽입구를 통해 오픈판과 고정됨과 동시에 상기 플렉시블호스와 결속되도록 구성되어 있다.Looking at the conventional cold and hot water piping system, the construction method of the cold and hot water piping system patent registration No. 55681 has been devised, which is composed of a box-shaped case with an open front as described in the claims of the registered notification. It is embedded in the wall, but the opening door is installed in the front opening, and the drainage induction pipe is installed by drilling the drain hole at the bottom, and the upper part is connected to the drain hole at the bottom of the distributor and the lower part is located near the building drain. Distributor connection process for setting the double pipe, which is the cold and hot water pipe through the unit, faucet arrangement process for constructing a general water receiving box consisting of a case and an opening door having a pipe entrance, and inducing the double pipe of the distributor with the water receptacle The double pipe is fixed to the coupling line through the binding line, so that the double pipe is supported around the double pipe In the construction method of the cold and hot water piping system consisting of a power receiving box connection process and a faucet connection process in which a load support is installed on the reinforcing bar, the faucet connection process is one end of the flexible hose connecting the soft pipe of the double pipe and the faucet. The other end of the flexible hose is connected to the faucet, and the other end of the flexible hose is connected to the faucet, and the friction protrusion and the repair hole are formed in the opening and closing door, and the edge of the repair hole is opened to open and close the open plate. It is configured to be coupled to the flexible hose and at the same time fixed to the open plate through the socket insertion hole formed in a part of the open plate is inserted and fixed to the connector of the faucet.
따라서, 시공성이 용이하도록 하고 냉온수배관이 파손되는 것을 방지하고자 한다.Therefore, it is intended to facilitate the construction and to prevent damage to the cold and hot water pipes.
다른 예로서, 특허등록 제104168호인 난방 온수겸용 보일러의 배관시스템이 안출된 바 있으며, 이는 그 등록공고된 공보에 기재된 바와 같이 난방 온수겸용 보일러에서 난방부하를 가열하는 대순환 회로와 온수를 사용하는 소순환 회로를 구성함에 있어서, 난방부하에 난방수를 공급하는 출수관에 바이패스관이 연결되어 이 바이패스관이 순환수를 열교환기에 순환시키기 위한 난방배관에 연결되고, 순환수의 차압에 의해 열림량이 조절되는 조절변이 상기 바이패스관의 일측부에 연결되 며, 난방부하로 부터 난방수가 환수되는 환수관이 상기 난방배관에 연결되고, 환수관의 일단부에 그 환수관을 개폐하는 개폐변이 설치되어 있다.As another example, a piping system of a heating hot water boiler, which is registered in Korean Patent No. 104168, has been devised, which is a small circulation using a large circulation circuit for heating a heating load in a heating hot water boiler as described in the registered publication. In constructing the circuit, a bypass pipe is connected to the outlet pipe for supplying heating water to the heating load, and the bypass pipe is connected to a heating pipe for circulating the circulating water to the heat exchanger, and the amount of opening due to the differential pressure of the circulating water is increased. The control valve to be controlled is connected to one side of the bypass pipe, the return pipe for returning the heating water from the heating load is connected to the heating pipe, the opening and closing valve for opening and closing the return pipe at one end of the return pipe is installed have.
따라서, 환수관을 개폐하는 개폐변과, 바이패스관을 관로의 압력에 따라 적정량 개폐하는 조절변을 사용하여 고가의 삼방변의 역할을 대신할 수 있게 됨으로써 우선 제품의 가격을 절감할 수 있고, 간단 구조이므로 고장을 감소시켜 신뢰성을 향상시킬 수 있으며, 배관 막힘 등에 효과적으로 대응할 수 있어서, 기기의 사용 편리성, 내구성을 향상시키는 효과를 기대하고 있다.Therefore, by using the opening and closing valve for opening and closing the return pipe, and the control valve for opening and closing the bypass pipe in an appropriate amount according to the pressure of the pipe can be replaced by the role of the expensive three-way, it is possible to reduce the price of the product first, simple Because of the structure, it is possible to improve the reliability by reducing the failure, and to effectively cope with the blockage of the pipe, thereby improving the usability and durability of the device.
그러나, 종래 안출되고 있는 냉온수 배관시스템들에 적용되는 냉온수 공급관은, 냉수와 온수가 각각 따로 공급되도록 하기 위해 2개의 공급관이 따로 시공되어야 함에 따라 전술한 문제점을 해결할 수 없다.However, the cold and hot water supply pipes applied to the conventional cold and hot water piping systems cannot solve the above-described problems, since two supply pipes must be separately installed so that the cold water and the hot water are supplied separately.
이와 같이 종래 시공되거나 제안되고 있는 냉온수 배관시스템들은, 시공성 향상과 냉온수 배관의 파손방지, 냉온수 배관의 막힘방지와 같은 문제점만을 해결하고자 노력하고 있을 뿐, 2개의 공급관이 시공될 수 밖에 없는 현실에서 탈피하지 못하고 있어 그에 따른 원가절감이나 용이한 시공성의 효과가 한정될 수 밖에 없는 문제점이 있다.The cold and hot water piping systems, which are conventionally constructed or proposed, are only trying to solve the problems such as improving the workability, preventing the breakage of the hot and cold water pipes, and preventing the blockage of the hot and cold water pipes, and are separated from the reality that only two supply pipes can be installed. There is a problem that can not be limited due to the cost saving or easy construction accordingly.
본 발명은 종래 냉온수 배관시스템이 지닌 문제점을 해결하기 위해 안출된 것으로, 욕조수전, 세면수존, 세탁수전 등과 같은 사용수전과, 냉수를 데워 온수를 공급하는 보일러를 연결하여 시공하는 공급관을 1개의 공급관으로 연결시공하되, 1개의 공급관을 통해 냉수는 물론 온수가 공급되도록 보일러로부터 공급되는 냉수와 온수를 혼합하는 혼합기를 더 구비하여 1개의 공급관에 의해 냉수와 온수가 같이 공급되도록 함으로써 종래 2개의 공급관을 각각 시공함에 따라 야기되던 문제점을 1개의 공급관으로 줄여 시공함에 따라 원가를 크게 절감시키고 작업시간의 단축은 물론, 작업효율성이 크게 향상될 수 있도록 한 1개의 공급관을 이용한 냉온수 배관시스템을 제공함에 그 목적이 있다.The present invention has been devised to solve the problems of the conventional cold and hot water piping system, a supply pipe for connecting the use faucets such as tub faucets, wash basins, washing faucets, and the like to connect the boiler for supplying warm water to supply hot water to one supply pipe It is connected to the construction, but through the one supply pipe cold water as well as the hot water is further provided with a mixer for mixing the cold water and hot water supplied from the boiler so that the cold water and hot water is supplied together by one supply pipe to provide a conventional two supply pipe The purpose is to provide a cold and hot water piping system using one supply pipe to reduce the cost caused by each construction to one supply pipe, thereby greatly reducing the cost, reducing working hours, and greatly improving work efficiency. There is this.
상기 목적을 달성하기 위해 본 발명인 1개의 공급관을 이용한 냉온수 배관시스템은, 온수 및 냉수를 공급하는 보일러와; 상기 보일러의 온수 및 냉수가 유입되어 적절한 온도로 혼합되는 혼합부와; 상기 혼합부를 제어하는 제어부와; 상기 제어부에 사용자가 원하는 물의 온도를 전달하는 입력부와; 세면수전, 욕조수전, 세탁수전의 사용수전과; 상기 사용수전과 혼합부를 연결하여 혼합부를 통해 적절한 온도로 혼합된 물이 사용수전을 통해 공급되도록 하는 1개의 공급관이 포함되어 이루어진 것을 특징으로 한다.Cold and hot water piping system using a single supply pipe of the present invention to achieve the above object, the boiler for supplying hot water and cold water; A mixing unit in which hot water and cold water of the boiler are introduced and mixed at an appropriate temperature; A control unit for controlling the mixing unit; An input unit which transmits a temperature of water desired by a user to the controller; Faucets used in washing faucets, bathtub faucets, and washing faucets; It is characterized in that it comprises one supply pipe to connect the used faucet and the mixing unit so that the water mixed at an appropriate temperature through the mixing unit is supplied through the using faucet.
상기 혼합부는, 상기 보일러와 연결된 냉수관과 온수관에 각각 설치되어 냉수관과 온수관을 개폐하는 2개의 전자밸브체와; 상기 전자밸브체에 의해 공급되는 냉수와 온수가 믹싱되어 혼합되는 혼합체가 포함되어 이루어진 것을 특징으로 한다.The mixing unit includes: two solenoid valve bodies installed in the cold water pipe and the hot water pipe connected to the boiler, respectively, to open and close the cold water pipe and the hot water pipe; Cold water and hot water supplied by the solenoid valve body is characterized in that the mixture comprises a mixture is mixed.
또한, 상기 혼합부는, 상기 보일러와 연결된 냉수관과 온수관이 각각 연결되는 혼합체와; 상기 혼합체의 내부에 삽입되어 혼합체에 각각 연결된 냉수관과 온수관을 통해 유입되는 냉수 및 온수의 유입을 제어하는 제어밸브와; 상기 제어밸브를 전기적인 힘에 의해 유동시키는 모터가 포함되어 이루어진 것을 특징으로 한다.The mixing unit may include: a mixture in which a cold water pipe and a hot water pipe connected to the boiler are respectively connected; A control valve inserted into the mixture to control inflow of cold water and hot water introduced through the cold water pipe and the hot water pipe connected to the mixture; It characterized in that the motor is made to flow the control valve by an electrical force.
상기 혼합체의 일측에는 혼합체의 내부에서 믹싱 혼합되는 물의 온도를 감지하는 온도센서가 더 구비될 수 있다.One side of the mixture may be further provided with a temperature sensor for sensing the temperature of the water mixed in the mixture.
상기 제어부에 사용자가 원하는 물의 온도를 전달하는 입력부는, 유선 및 무선방식에 의해 사용자가 입력한 입력값을 상기 제어부에 전달하도록 구성될 수 있다.The input unit for transmitting the temperature of the water desired by the user to the control unit may be configured to transmit the input value input by the user to the control unit by wired or wireless methods.
상기와 같은 특징으로 이루어진 본 발명인 1개의 공급관을 이용한 냉온수 배관시스템은, 1개의 공급관을 통해 사용수전에 냉수 및 온수가 공급되도록 시공됨으로써, 2개의 공급관을 설치하여 시공하던 종래의 배관시스템에 비해 약 50%의 원가절감을 얻을 수 있을 뿐만 아니라, 1개의 공급관을 시공함에 따라 작업시간의 단축은 물론 작업성이 크게 향상될 수 있다.Cold and hot water piping system using a single supply pipe of the present invention having the features described above, the cold water and hot water is supplied to the water supply through the use of one supply pipe, compared to the conventional piping system was installed by installing two supply pipes Not only can 50% cost reduction be achieved, but the construction of one supply pipe can shorten the working time and greatly improve workability.
본 발명의 특징 및 이점들은 첨부도면에 의거한 다음의 상세한 설명으로 더욱 명백해질 것이며, 본 명세서 및 청구범위에 사용된 용어나 단어는 발명자가 그 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다.The features and advantages of the present invention will become more apparent from the following detailed description based on the accompanying drawings, and the terminology or words used in the specification and claims are used to explain the invention in its best way. Based on the principle that the concept of can be properly defined, it should be interpreted as meaning and concept corresponding to the technical idea of the present invention.
도 2는 본 발명인 1개의 공급관을 이용한 냉온수 배관시스템의 구성을 나타낸 구성도이고, 도 3은 본 발명인 1개의 공급관을 이용한 냉온수 배관시스템의 구성요부인 혼합부의 구성을 나타낸 구성도이며, 도 4는 본 발명인 1개의 공급관을 이용한 냉온수 배관시스템의 구성요부인 혼합부의 또 다른 구성을 나타낸 구성도이 다.Figure 2 is a block diagram showing the configuration of the cold and hot water piping system using a single supply pipe of the present invention, Figure 3 is a block diagram showing the configuration of the mixing portion which is a constituent part of the cold and hot water piping system using a single supply pipe of the present invention, Figure 4 It is a block diagram which shows the another structure of the mixing part which is an essential part of the cold / hot water piping system using one supply pipe of this invention.
도시된 바와 같이 본 발명인 1개의 공급관을 이용한 냉온수 배관시스템은, 온수 및 냉수를 공급하는 보일러(10)와, 상기 보일러(10)의 온수 및 냉수가 유입되어 적절한 온도로 혼합되는 혼합부(20)와, 상기 혼합부(20)를 제어하는 제어부(30)와, 상기 제어부(30)에 사용자가 원하는 물의 온도를 전달하는 입력부(40)와, 세면수전, 욕조수전, 세탁수전의 사용수전(50)과, 상기 사용수전(50)과 혼합부(20)를 연결하여 혼합부(20)를 통해 적절한 온도로 혼합된 물이 사용수전(50)을 통해 공급되도록 하는 1개의 공급관(60)으로 구성된다.Cold and hot water piping system using a single supply pipe of the present invention as shown, the
상기와 같이 구성된 본 발명인 1개의 공급관을 이용한 냉온수 배관시스템은, 사용자가 원하는 온도의 물을 사용수전(50)을 통해 공급받고자 할 경우, 상기 입력부(40)에 사용자가 원하는 온도 예를 들어 30℃를 입력하게 되면, 상기 입력부(40)는 사용자가 30℃로 입력한 입력값을 상기 제어부(30)에 전달하게 되고 제어부(30)는 입력부(40)를 통해 입력된 입력값에 의해 상기 혼합부(20)를 작동시켜, 혼합부(20)에 연결된 보일러(10)의 냉수 및 온수를 적절하게 믹싱 혼합한 후, 혼합된 물을 상기 혼합부(20)와 사용수전(50)을 연결하는 1개의 공급관(60)을 통해 사용수전에 공급함으로써 사용자는 원하는 온도인 30℃의 물을 사용수전(50)을 통해 공급받아 사용할 수 있다.Cold and hot water piping system using a single supply pipe of the present invention configured as described above, when the user wants to receive the water of the desired temperature through the
상기 입력부(40)는, 사용수전(50) 예컨대 세면수전이나 세탁수전, 욕조수전에 설치되어 있는 밸브체인 샤워기나 수도꼭지의 일측에 구비되는 것이 사용자가 사용하기에 바람직하다.The
본 발명인 1개의 공급관을 이용한 냉온수 배관시스템의 구성요부인 상기 혼합부(20) 즉, 보일러를 통해 공급되는 온수와 냉수가 적절하게 혼합되는 혼합부(20)는 다양하게 구성될 수 있다.The
일예로, 도 3에 도시된 바와 같이 상기 혼합부(20)는, 상기 보일러(10)와 연결된 냉수관(11)과 온수관(12)에 각각 설치되어 냉수관(11)과 온수관(12)을 개폐하고 상기 제어부(30)와 전기적으로 연결되는 2개의 전자밸브체(21)(21)와, 상기 전자밸브체(21)(21)에 의해 공급되는 냉수와 온수가 믹싱되어 혼합되는 혼합체(22)로 구성될 수 있다.For example, as shown in FIG. 3, the
이 경우에는, 사용자의 입력값을 전달받은 상기 제어부(30)가 상기 2개의 전자밸브체(21)(21)를 구동시켜, 보일러(10)를 통해 공급되는 냉수관(11)의 냉수와 온수관(12)의 온수가 상기 혼합체(22)의 내부로 유입되는 유입량을 적절하게 조절함으로써, 사용자가 원하는 온도의 물이 혼합체(22)의 내부에서 혼합되어 1개의 공급관(60)을 통해 사용수전(50)으로 공급되도록 한다.In this case, the
또한, 도 4에 도시된 바와 같이 상기 혼합부(20)는, 상기 보일러(10)와 연결된 냉수관(11)과 온수관(12)이 각각 연결되는 혼합체(23)와, 상기 혼합체(23)의 내부에 삽입되어 혼합체(23)에 각각 연결된 냉수관(11)과 온수관(12)을 통해 유입되는 냉수 및 온수의 유입을 제어하는 제어밸브(24)와, 상기 제어밸브(24)를 전기적인 힘에 의해 유동시키고 상기 제어부(30)와 전기적으로 연결되는 모터(25)로 구성될 수 있다.In addition, as shown in FIG. 4, the
이 경우에는 사용자의 입력값을 전달받은 상기 제어부(30)가 상기 모터(25) 를 작동시켜 모터(25)와 연결된 상기 제어밸브(24)가 유동되도록 함으로써 상기 혼합체(23)의 내부로 유입되는 냉수관(11)의 냉수와 온수관(12)의 온수의 유입량을 적절하게 조절함으로써 혼합체(23)의 내부에서 사용자가 입력한 값의 온도를 갖는 물이 혼합되도록 하여 1개의 공급관(60)을 통해 사용수전(50)으로 혼합된 물이 공급되도록 한다.In this case, the
이외에도 상기 혼합부(20)의 구성은 다양하게 변형될 수 있다.In addition, the configuration of the mixing
또한, 상기 혼합체(22)(23)의 일측에는 혼합체(22)(23)의 내부에서 믹싱 혼합되는 물의 온도를 감지하는 온도센서(26)가 더 구비된다.In addition, one side of the
따라서, 상기 온도센서(26)가 상기 혼합체(22)(23)의 내부에서 혼합되고 있는 물의 온도를 감지하여 혼합체(22)(23)의 내부로 유입되는 냉수 및 온수의 유입량을 상기 전자밸브체(21) 및 제어밸브(24)를 통해 조절하도록 하여 항상 사용자가 원하는 온도의 물이 1개의 공급관(60)을 통해 사용수전(50)으로 공급되도록 한다.Therefore, the
도 5 및 도 6은 본 발명인 1개의 공급관을 이용한 냉온수 배관시스템의 구성요부인 제어부와 입력부의 연결상태를 각각 나타낸 개념도로서, 상기 제어부(30)에 사용자가 원하는 물의 온도를 전달하는 입력부(40)는, 유선 및 무선방식에 의해 사용자가 입력한 입력값을 상기 제어부에 전달하도록 구성될 수 있다.5 and 6 are conceptual views showing a connection state of a control unit and an input unit, which are components of a cold / hot water piping system using one supply pipe of the present invention, respectively, and an
도 5에 도시된 유선방식은 직접적인 전기선과 같은 유선을 이용하여 상기 입력부(40)와 제어부(30)를 연결시공하는 것이고, 도 6에 도시된 무선방식은, 리모콘트롤러나 모뎀 등과 같은 간접적인 통신수단에 의해 입력부(40)와 제어부(30)를 연결하는 방식이다.The wired method shown in FIG. 5 connects the
이외에도 본 발명인 1개의 공급관을 이용한 냉온수 배관시스템은 다양하게 변형실시가 가능한 것으로, 본 발명의 목적범위를 일탈하지 않는 한 변형되는 실시예들은 모두 본 발명의 권리범위에 포함되어 해석되어야 한다.In addition to the cold and hot water piping system using a single supply pipe of the present invention can be variously modified, the embodiments to be modified should be construed as being included in the scope of the present invention without departing from the scope of the present invention.
상술한 바와 같이 본 발명인 1개의 공급관을 이용한 냉온수 배관시스템에 의하면, 1개의 공급관을 통해 사용수전에 냉수 및 온수가 공급되도록 시공됨으로써, 2개의 공급관을 설치하여 시공하던 종래의 배관시스템에 비해 약 50%의 원가절감을 얻을 수 있을 뿐만 아니라, 1개의 공급관을 시공함에 따라 작업시간의 단축은 물론 작업성이 크게 향상될 수 있다.As described above, according to the cold and hot water piping system using the present invention, one supply pipe is constructed such that cold water and hot water are supplied to the used water through one supply pipe, which is about 50 compared to the conventional piping system in which two supply pipes are installed. In addition to achieving a cost reduction of%, by constructing one supply pipe, the work time can be shortened and the workability can be greatly improved.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020060108766A KR20060120544A (en) | 2006-11-06 | 2006-11-06 | Pipe arrangement system for cold and hot water using one pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020060108766A KR20060120544A (en) | 2006-11-06 | 2006-11-06 | Pipe arrangement system for cold and hot water using one pipe |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20060120544A true KR20060120544A (en) | 2006-11-27 |
Family
ID=37706688
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020060108766A KR20060120544A (en) | 2006-11-06 | 2006-11-06 | Pipe arrangement system for cold and hot water using one pipe |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20060120544A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101675337B1 (en) * | 2015-10-06 | 2016-11-17 | 김현 | A shower for water saving |
KR20180137275A (en) * | 2017-06-16 | 2018-12-27 | 최영환 | Electric water heater with indirect heating structure |
KR20190042239A (en) * | 2017-10-16 | 2019-04-24 | 최영환 | Hot water storage type water heater with warm air generating function |
JP2020046830A (en) * | 2018-09-18 | 2020-03-26 | 横浜ゴム株式会社 | Hot and cold water supply system for aircraft |
JP2020046832A (en) * | 2018-09-18 | 2020-03-26 | 横浜ゴム株式会社 | Hot and cold water supply system for aircraft |
US12037119B2 (en) | 2018-09-18 | 2024-07-16 | The Yokohama Rubber Co., Ltd. | Aircraft water supply system |
-
2006
- 2006-11-06 KR KR1020060108766A patent/KR20060120544A/en not_active Application Discontinuation
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101675337B1 (en) * | 2015-10-06 | 2016-11-17 | 김현 | A shower for water saving |
KR20180137275A (en) * | 2017-06-16 | 2018-12-27 | 최영환 | Electric water heater with indirect heating structure |
KR20190042239A (en) * | 2017-10-16 | 2019-04-24 | 최영환 | Hot water storage type water heater with warm air generating function |
JP2020046830A (en) * | 2018-09-18 | 2020-03-26 | 横浜ゴム株式会社 | Hot and cold water supply system for aircraft |
JP2020046832A (en) * | 2018-09-18 | 2020-03-26 | 横浜ゴム株式会社 | Hot and cold water supply system for aircraft |
US11459106B2 (en) | 2018-09-18 | 2022-10-04 | The Yokohama Rubber Co., Ltd. | Aircraft water supply system |
US12037119B2 (en) | 2018-09-18 | 2024-07-16 | The Yokohama Rubber Co., Ltd. | Aircraft water supply system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20030140966A1 (en) | Water control valve adaptable for use with bypass valves | |
KR101742568B1 (en) | Hot water supply control apparatus | |
CA2957690C (en) | Flushing station for a ring-pipe or series-pipe system, ring-pipe system as well as series-pipe system | |
WO2010134770A2 (en) | Cold/hot water supply system with an improved control unit | |
US20080223451A1 (en) | Hot water system | |
JP2011519011A (en) | Mixed water and cold / hot water supply system with easy temperature control | |
KR100695219B1 (en) | Pipe arrangement system for cold and hot water | |
KR20060120544A (en) | Pipe arrangement system for cold and hot water using one pipe | |
WO2009139602A2 (en) | A cold/hot water supply system with a thermo valve case facilitating control of temperature and distributtion/shutoff of mixed water, and a method of constructing the thermo valve case | |
US20110308641A1 (en) | Intelligent water supply cpu and water tap | |
CA2425237C (en) | Hot water recirculating system | |
KR100960708B1 (en) | A Cold And Warm Water Supply System | |
KR100940256B1 (en) | A boiler discharging cold water and mixid water by the thermo valve to large number of water outlet and warm water supply system of the instantaneous heater | |
WO2019064668A1 (en) | Hot water supply system | |
US20090139688A1 (en) | Waste water drain heat exchanger preheating cold water supply to a thermostatic control valve | |
KR101179863B1 (en) | Cold and hot water supplying system | |
JPH0735662B2 (en) | Pipes and construction method for water and hot water supply in dwelling units | |
KR100751640B1 (en) | Water tap of pipe arrangement system for cold and hot water | |
KR200431836Y1 (en) | Pipe arrangement system for cold and hot water | |
KR20110032135A (en) | Hot water saving device | |
KR100679605B1 (en) | Pipe freezingproof system | |
CN209857391U (en) | Intelligent control's hot-water heating system | |
KR100634112B1 (en) | piping method for water equipment installation | |
WO2019178662A1 (en) | Thermal energy or water circulator | |
CN213119537U (en) | Pipeline connecting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E90F | Notification of reason for final refusal | ||
E601 | Decision to refuse application |