KR20060117898A KR1020060109915A KR20060109915A KR20060117898A KR 20060117898 A KR20060117898 A KR 20060117898A KR 1020060109915 A KR1020060109915 A KR 1020060109915A KR 20060109915 A KR20060109915 A KR 20060109915A KR 20060117898 A KR20060117898 A KR 20060117898A
Authority
KR
South Korea
Prior art keywords
steel
stairs
floor
frame
space
Prior art date
Application number
KR1020060109915A
Other languages
Korean (ko)
Other versions
KR100755213B1 (en
Inventor
세이분 요코모리
Original Assignee
가부시키가이샤 요코모리 세이사쿠쇼
두하요코모리주식회사
재단법인 포항산업과학연구원
대한주택공사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 가부시키가이샤 요코모리 세이사쿠쇼, 두하요코모리주식회사, 재단법인 포항산업과학연구원, 대한주택공사 filed Critical 가부시키가이샤 요코모리 세이사쿠쇼
Publication of KR20060117898A publication Critical patent/KR20060117898A/en
Application granted granted Critical
Publication of KR100755213B1 publication Critical patent/KR100755213B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/06Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall
    • E04G13/062Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall for stairs or steps
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof
    • E04F11/022Stairways; Layouts thereof characterised by the supporting structure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof
    • E04F2011/0203Miscellaneous features of stairways not otherwise provided for
    • E04F2011/0205Stairways characterised by the use of specific materials for the supporting structure of the treads
    • E04F2011/0209Stairways characterised by the use of specific materials for the supporting structure of the treads mainly of metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)
  • Ladders (AREA)

Abstract

A construction method of stairs is provided to construct a stairway wall without hindrance by attaching to steel attachments to be movable along stairs vertically and to construct safe and fine stairs without a gap between a stairway wall and stairs by placing the outside of stairs closely to a stairway wall. A construction method of stairs comprises the steps of: laying steel attachments(26) on the end of a floor landing place of the pre-installed floor; putting each steel attachment on the end of a floor frame(31) of an intermediate landing place to be constructed and the end of a floor frame of the next floor landing place and installing each floor frame temporarily; installing steel-frame stairs(10A) from the pre-installed floor landing place to the intermediate landing place, and installing steel-frame stairs(10B) from an intermediate landing place to the next floor landing place temporarily, and approaching both steel-frame stairs to the center and attaching the steel attachments to have a space(42) of the appointed width(D) on the outside of the steel-frame stairs from the edge of the existing stairs and to use the steel-frame stairs as stairs for works; constructing an inner frame(46) for a stairway wall(44), an outer frame(47) of a stairway wall and frames for other global bodies using the space; placing concrete to the intermediate landing place, the next floor landing place and other global bodies and anchoring the steel attachments to the global bodies as a part of the floor frames; emptying the space of the appointed width by removing the unnecessary installation members from the space, moving the steel-frame stairs outward to be spaced out from each other, locating the outside of the steel-frame stairs in the space and placing the outside(5) of the open side plate of the steel-frame stairs closely to the inside(44a) of the stairway wall; and fixing the top and bottom of the open side plates of the steel-frame stairs to fixing plates(18,19) of the steel attachment.

Description

계단구조 및 계단의 구축방법{STEP CONSTRUCTION AND METHOD FOR BUILDING STEP}Stair structure and construction method of stairs {STEP CONSTRUCTION AND METHOD FOR BUILDING STEP}

도 1은 본 발명의 실시예의 구축 도중의 계단의 종단면도이다. 1 is a longitudinal sectional view of a stairway during construction of an embodiment of the present invention.

도 2는 동일하게 F0 층의 횡단면도이다. 2 is a cross-sectional view of the F 0 layer in the same way.

도 3은 동일하게 F1층의 횡단면도이다. 3 is similarly a cross sectional view of the F 1 layer.

도 4는 중간 층계참 F0-1층의 확대 횡단면도로, (a)는 계단이동 후, (b)는 계단 이동전을 각각 나타낸다. Figure 4 is an enlarged cross-sectional view of the middle landing F 0-1 floor, (a) after the step movement, (b) shows before the step movement, respectively.

도 5는 도 4의 A-A선에 있어서의 확대 단면도이다. FIG. 5 is an enlarged cross-sectional view taken along the line A-A of FIG. 4.

도 6은 도 4의 B-B선에 있어서의 확대 단면도이다. FIG. 6 is an enlarged cross-sectional view taken along the line B-B in FIG. 4.

도 7은 도 4의 C-C선에 있어서의 확대 단면도이다. FIG. 7 is an enlarged cross-sectional view taken along the line CC of FIG. 4.

도 8은 도 4의 D-D선에 있어서의 확대 단면도이다. FIG. 8 is an enlarged cross-sectional view taken along the line D-D in FIG. 4.

도 9는 도 4의 E-E선에 있어서의 확대 단면도이다. 9 is an enlarged cross-sectional view taken along the line E-E of FIG. 4.

도 10은 도 4의 F-F선에 있어서의 확대 단면도이다. FIG. 10 is an enlarged sectional view taken along the line F-F in FIG.

도 11은 (a)는 본 발명의 실시예에 사용하는 철골계단의 평면도, (b)는 (a)의 G-G선에 있어서의 확대 단면도, (c)는 (a)의 H-H선에 있어서의 확대 단면도이다. 11 is a plan view of a steel staircase used in an embodiment of the present invention, (b) is an enlarged sectional view taken along the line GG of (a), and (c) is an enlarged view taken along the line HH of (a). It is a cross section.

도 12는 (a)는 본 발명의 실시예에 사용하는 부착철물의 평면도, (b)는 (a)의 J-J선에 있어서의 단면도, (c)는 (a)의 K-K 선에 있어서의 단면도이다. (A) is a top view of the attachment iron used for the Example of this invention, (b) is sectional drawing in the JJ line of (a), (c) is sectional drawing in the KK line of (a). .

도 13은 (a)는 도 4의 L부분의 확대도, (b)는 도 4의 M 부분의 확대도이다. (A) is an enlarged view of the L part of FIG. 4, (b) is an enlarged view of the M part of FIG.

도 14는 (a)∼(d)는 본 발명의 구축방법을 설명하는 개략 종단면도이다. (A)-(d) is a schematic longitudinal cross-sectional view explaining the construction method of this invention.

도 15는 (a)(b)는 본 발명의 실시예의 철골계단의 구성을 나타내는 개략 평면도와 측면도이다. Fig. 15 (a) and (b) are schematic plan and side views showing the structure of the steel stairway of the embodiment of the present invention.

도 16은 본 발명의 다른 철골계단을 사용한 실시예의 일부 종단면도로, (a)벽용 형틀을 구축한 상태, (b)는 벽용 형틀을 떼어낸 상태를 각각 나타내는 도면. Fig. 16 is a partial longitudinal sectional view of an embodiment using another steel staircase according to the present invention, (a) a state in which a form for a wall is constructed, and (b) a view showing a state in which the form for a wall is removed.

[부호의 설명][Description of the code]

1 디딤판 2 따낸옆판(내측)1 tread plate 2 side plate (inside)

3 따낸옆판(2)의 외면 3a 따낸옆판(2)의 내면3 Outside surface of the side plate (2) 3a Inside surface of the side plate (2)

4 따낸옆판(외측) 5 따낸옆판(4)의 외면4 Side plates (outer side) 5 Outside sides of side plate (4)

5a 따낸옆판(4)의 내면 6 끝판5a Inner side of end plate (4) 6 End plate

7 연결돌출판 8 연결구멍7 Connecting protrusion 8 Connecting hole

9 고정구멍 10 철골계단(계단부재)9 Fixing hole 10 Steel staircase (Stair member)

11 철골계단의 중간 층계참부 13 지지판11 Middle stairway of steel staircase 13 Support plate

15 부착판 16 부착판의 외면15 Mounting Plate 16 Exterior of Mounting Plate

16a 부착판의 내면 17 앵커Inside surface of 16a mounting plate 17 Anchor

18 고정판 19 고정판18 fixing plate 19 fixing plate

20 고정구멍 23 연결돌출판20 fixing hole 23 connecting protrusion

24 연결구멍 26 부착철물24 Connecting hole 26 Attachment hardware

28 기설치층(F0)의 플로어 층계참Floor landing of 28 existing floor (F 0 )

30 중간 층계참(F0-1)30 Middle Stairs (F 0-1 )

31 중간 층계참의 마루용 형틀 31 Flooring frame of middle landing

36 다음 층 F1의 플로어 층계참36 Floor landing on next floor F 1

37 F1의 마루용 형틀 39 볼트(연결봉)Floor frame for 37 F 1 39 bolts

40 너트 42 스페이스40 Nut 42 Space

44 계단실벽(승강방향)44 Stair room wall (elevation direction)

45 계단실벽(승강방향과 직각인 방향)45 stairs wall (direction perpendicular to elevation)

46 계단실벽용 내형틀 47 계단실벽용 외형틀46 Interior frame for stair room wall 47 Interior frame for stair room wall

49 종파이프 50 횡파이프49 Longitudinal Pipe 50 Lateral Pipe

51 폐쇄판 52 모르타르51 closing plate 52 mortar

본 발명은, 계단실벽을 가지는 계단의 구축에 최적인 계단구조 및 계단의 구축방법에 관한 것이다. The present invention relates to a staircase structure and a method of constructing a staircase that are optimal for the construction of a staircase having a staircase barrier wall.

철근 콘크리트제의 구체(軀體)의 구축에 앞서서, 본 설치의 철골계단을 부착하고, 임시 설치계단으로서 공사에 이용하는 공법이 각종 제안되고 있다. 이 앞서 부착한 계단을, 철골계단의 승강방향으로 계단실벽을 구축하는 계단실 구조에 적용하는 일이 있었다. Prior to constructing a concrete sphere made of reinforced concrete, various methods have been proposed to attach a steel staircase of the present installation and use it for construction as a temporary installation staircase. This previously attached staircase has been applied to a staircase chamber structure in which a staircase barrier wall is constructed in the lifting direction of steel stairs.

또, 계단실벽을 콘크리트제로 하는 경우에는, 계단실벽의 내형틀 (계단측의 형틀)을 임시로 설치하여 지지할 필요가 있어, 통상은, 임시틀로서 내외의 합판의 합판에 맞닿는 종타입, 종파이프에 교차하는 횡파이프로 양 합판을 끼워서, 벽용 형틀을 임시 설치하여 지지하고 있었다. In addition, when the stair room wall is made of concrete, it is necessary to temporarily install and support the inner mold of the stair room wall (the staircase on the staircase side), and is usually a bell type or a bell that abuts the plywood of the inner and outer plywood as a temporary frame. Both plywoods were sandwiched by transverse pipes intersecting the pipes to temporarily support the wall frame.

이 경우, 하나의 방법에 의하면, 철골계단을 임시 설치하여 지지한 후, 철골계단의 외측의 따낸옆판을 계단실벽의 내형틀의 일부로서 이용하고, 따낸옆판을 피하여 계단실벽의 형틀을 조립하고 있었다. In this case, according to one method, after temporarily installing and supporting the steel staircase, the side wall of the outside of the steel staircase was used as a part of the inner frame of the stair room wall, and the frame of the stair room wall was assembled without the side wall. .

또, 다른 방법에서는, 외측의 따낸옆판의 외측에, 따낸옆판과는 별도로 계단실의 내형틀을 구축하는 공법도 취해지고 있었다. Moreover, in another method, the method of constructing the inner frame of a staircase room was also taken in the outer side of the outside side plate which was taken out separately.

상기 종래기술 중, 전자의 경우, 일반적으로, 구체의 콘크리트는, 층마다 타설되기 때문에, 계단실의 형틀도 층마다의 단위로, 구축되어 있었다. 한편 철골계단은, 각 플로어 사이에 경사지게 구축되기 때문에, 따낸옆판에서 계단실벽의 형틀, 종파이프가 분단되어, 형틀가공, 조립이 번잡해지는 문제점이 있었다. In the former art, in the former case, since the concrete of the sphere is generally poured for each floor, the mold of the staircase room was also constructed in units for each floor. On the other hand, since the steel staircase is constructed to be inclined between the floors, there is a problem that the mold and the longitudinal pipe of the stair chamber wall are divided from the side plate, and the mold processing and assembly are complicated.

후자의 경우에는, 따낸옆판과 내형틀이 간섭하지 않고, 형틀의 가공이 번잡하지 않은데, 계단실벽과 따낸옆판의 외면 사이에, 형틀의 두께 및 종파이프 등의 간격( 7.5∼10 cm 정도)이 생겨서, 완성된 구조에서, 외관상 안좋은 경우가 생기고, 또, 간극을 통하여 물건이 하방으로 낙하할 위험이 있어, 경우에 따라서는 간 극을 막을 필요도 나오는 등 대책을 강구할 필요가 있었다. In the latter case, the side plate and the inner frame do not interfere, and the processing of the mold is not complicated. Between the stair room wall and the outer surface of the side wall, the thickness of the mold and the length of the longitudinal pipe (about 7.5 to 10 cm) In the finished structure, the appearance may be bad, and there is a risk of the object falling down through the gap, and in some cases, it is necessary to take measures to prevent the gap.

그런데 본 발명에서는, 계단부재의 상하를 구체에 부착하는 부착철물에, 이동가능하게 지지하였으므로, 상기 문제점이 해결되었다. However, in the present invention, since the upper and lower portions of the staircase member are supported by the attachment hardware attached to the sphere so as to be movable, the above problems are solved.

즉 본 발명은, 계단구축 위치에서, 병렬로 2개의 계단부재를 가설(架設)하고, 그 계단부재의 상하 양끝을 구체에 부착하는 계단의 구조로서, 상기 계단부재의 상하를 받치는 상측 부착철물 및 하측 부착철물을 각각 구체에 부착하고, 이 상하 받침기구에, 상기 계단부재의 상하끝을 횡방향으로 이동이 가능하게 부착하는 것을 특징으로 하는 계단의 구조이다. 또, 상기에 있어서, 부착철물에 돌출설치된 연결돌출판의 연결구멍과, 계단부재의 상하끝에 돌출설치된 연결돌출판의 연결구멍에, 미끄럼이동이 자유롭게 연결봉을 끼워 통과시키고, 부착철물과 계단부재를 이동 가능하게 부착한 계단의 구조이다. That is, the present invention is a staircase structure in which two staircase members are hypothesized in parallel at a stair-building position, and both upper and lower ends of the staircase members are attached to a sphere. A lower attachment hardware is attached to each sphere, and the upper and lower supporting mechanisms are attached to the upper and lower ends of the stair member so as to be movable in the lateral direction. In addition, in the above description, the connecting rod slides freely through the connecting hole of the connecting protrusion plate protruding from the attachment hardware and the connecting hole of the connecting protrusion plate protruding from the upper and lower ends of the staircase member. It is the structure of the stairs attached so that it was movable.

또, 구축방법의 발명은, 이하의 공정을 취하는 것을 특징으로 하는 계단의 구축방법이다. Moreover, the invention of the construction method is a stairs construction method characterized by taking the following steps.

(1) 구축예정인 계단부재의 위끝, 아래끝을 지지하는 구축예정의 구체위치에, 부착철물을 각각 배치하고, 각 부착철물을 임시 설치하여 지지한다. (1) Attachment hardwares are placed separately at the concrete positions of the construction site to support the upper and lower ends of the stairway members, which are to be constructed.

(2) 이어서, 상기 부착철물간에, 2개의 계단부재를 병렬하여 가설하고, 양 계단부재를 근접하게 하여, 상기 각 계단부재의 외측에 스페이스를 비우도록 배치한다. (2) Subsequently, two staircase members are hypothesized in parallel between the attachment hardware, and the two staircase members are placed in close proximity to each other so as to be spaced outside the respective staircase members.

(3) 상기 스페이스를 이용하여, 계단실벽의 내측의 형틀을 구축하고, 또 계 단실벽의 외측의 형틀 및 그 외의 구체용의 형틀을 구축한다. (3) Using the space, a mold inside the stair room wall is constructed, and a mold outside the stair room wall and a mold for other spheres.

(4) 상기 부착철물을 형틀의 일부로서 구체의 콘크리트를 타설하고, 부착철물을 구체에 정착하게 한다. (4) The concrete of the sphere is poured as a part of the mold by the attachment hardware, and the attachment hardware is fixed to the sphere.

(5) 이어서, 불필요한 임시 설치부재를 상기 스페이스로부터 제거하고, 상기 양 계단부재를 서로 이격하도록 이동하게 하고, 양 계단부재의 외측을 상기 스페이스에 위치하게 한다. (5) Then, unnecessary temporary installation members are removed from the space, the both step members are moved to be spaced apart from each other, and the outside of both step members is positioned in the space.

(6)소정위치에서, 계단부재를 부착철물에 고정한다. (6) At the prescribed position, fix the stair member to the attachment hardware.

또, 다른 구축방법은, 이하의 공정을 취하는 것을 특징으로 하는 계단의 구축방법이다. Another construction method is a stairs construction method characterized by taking the following steps.

(1) 기설치 층의 플로어 층계참의 끝부에 부착철물이 매설되어 있다. (1) Attachment hardware is embedded at the end of the floor landing of the existing floor.

(2) 구축예정인 중간 층계참, 다음 층 플로어 층계참의 마루용 형틀의 끝부에, 각각 부착철물을 얹어놓고, 각 마루용 형틀을 임시 설치하여 지지한다. (2) At the end of the floor frame of the middle landing and the next floor landing, which are to be constructed, the fitting hardware is placed on each end, and each floor frame is temporarily supported.

(3) 이어서, 기설치 층 플로어 층계참에서 중간 층계참까지의 계단부재(A)와, 중간 층계참에서 다음 층 플로어 층계참까지의 계단부재(B)를 각각 가설하고, 상기 양 계단부재(A, B)를 중앙측에 근접시켜서, 상기 부착철물에 부착하여, 상기 계단부재(A, B)의 외측에 스페이스를 비우도록 배치한다. (3) Subsequently, the step member A from the existing floor floor landing to the middle landing and the step member B from the intermediate landing to the next floor landing are respectively hypothesized. Is placed close to the center side, and attached to the attachment hardware, so as to empty the space outside the staircase members (A, B).

(4) 상기 스페이스를 이용하여, 계단실벽의 내측의 형틀을 구축하고, 또 계단실벽의 외측의 형틀 및 그 외의 구체용의 형틀을 구축한다. (4) Using the said space, the form of the inside of a stair room wall is built, and the form of the outside of a stair room wall, and the frame for other spheres are constructed.

(5) 상기 부착철물을 마루용 형틀의 일부로서, 중간 층계참, 다음 층 플로어 층계참, 다른 구체의 콘크리트를 타설하고, 상기 부착철물을 구체에 정착한다. (5) The attachment hardware is part of the flooring mold, and the intermediate landing, the next floor landing, and the concrete of the other spheres are poured, and the attachment hardware is fixed to the sphere.

(6) 이어서, 불필요한 임시 설치부재를 상기 스페이스로부터 제거하고, 상기 계단부재(A, B)를 서로 이격하도록 외측으로 이동하게 하여, 양 계단부재(A, B)의 외측을 상기 스페이스 내에 위치시킨다. (6) Then, unnecessary temporary installation members are removed from the space, and the step members A and B are moved outwardly so as to be spaced apart from each other, so that the outside of both step members A and B are positioned in the space. .

(7) 소정 위치에서, 계단부재(A, B)의 상하를 부착철물에 고정한다. (7) At the predetermined position, the top and bottom of the staircase members A and B are fixed to the attachment hardware.

상기에 있어서 구체란, 계단에 연속하는 마루 슬래브이고, 플로어 층계참, 중간 층계참 등을 가리킨다. 또, 중간 층계참이 일체로 된 계단부재에서는, 중간 층계참을 지지하는 계단실벽(승강방향과 직각인 방향)도 가리킨다. In the above, a sphere is a floor slab continuous to a staircase, and refers to a floor landing, an intermediate landing, and the like. Moreover, in the stair member which integrated the intermediate landing, the stairs room wall (direction perpendicular | vertical to a lifting direction) which supports an intermediate landing also points.

또, 상기에서의 계단부재로서 주로 철골계단을 사용하는데, 계단을 구성하는 재료는 상관없다. 또한, 철골계단이란, 계단형상으로 나열된 소정수의 디딤판을 강재로 이루어지는 따낸옆판으로 끼워 구성한 계단이다. 디딤판은, 강재, 모르타르·콘크리트계 재료, 또는 이들의 조합으로 주로 구성되는데, 디딤판의 재료는 임의이다. Moreover, although the steel frame stairs are mainly used as a staircase member in the above, the material which comprises a staircase does not matter. The steel staircase is a staircase formed by sandwiching a predetermined number of stepping plates arranged in a step shape with a side plate made of steel. The tread is mainly composed of a steel material, a mortar concrete material, or a combination thereof, but the tread plate is any material.

또, 계단부재는, 단차부만의 경우가 가장 유효한데, 플로어 층계참과 중간 층계참의 한쪽 또는 양쪽을 단차부와 일체로 구축한 계단부재로도 적용할 수 있다. Moreover, although the step member is the most effective case of a step part, it can also be applied also as a step member which integrated one or both of a floor landing and an intermediate landing with a step part.

[발명의 실시형태]Embodiment of the Invention

(1) 기설치 층(F0)의 플로어 층계참(28) 끝부에 부착철물(26)이 매설되어 있다(도 14(a)).(1) The attachment iron 26 is embedded at the end of the floor landing 28 of the existing layer F 0 (FIG. 14 (a)).

(2) 구축예정의 중간 층계참(F0-1)의 마루용 형틀(31)의 끝부, 다음 층 플로어 층계참(F1)의 마루용 형틀(37)의 끝부에, 각각 부착철물(26, 26)을 얹어놓고, 각 마루용 형틀(31, 37)을 임시 설치하여 지지한다. (2) Attachment hardware 26, 26 at the end of the flooring frame 31 of the intermediate landing (F 0-1 ) to be constructed, and at the end of the flooring frame 37 of the next floor landing (F 1 ), respectively. ), And each floor mold (31, 37) is temporarily installed and supported.

(3) 이어서, 기설치 층 플로어 층계참(28)으로부터 중간 층계참(30)까지의 철골계단(10A), 중간 층계참(30)으로부터 다음 층 플로어 층계참(36)까지의 철골계단(10B)을 각각, 가설하고, 양 철골계단(10A, 10B)을 중앙에 근접시킨 상태에서, 부착철물(26, 26)에 부착한다(도14(b)). 따라서, 철골계단(10A, 10B)의 외측에 본래의 계단의 끝가장자리로부터 폭(D)의 스페이스(42)가 빈다(도 4(b)). 이 상태에서, 철골계단(10A, 10B)은 작업용의 계단으로서 사용할 수 있다. (3) Subsequently, the steel stairs 10A from the pre-installed floor floor landing 28 to the middle landing 30, and the steel stairs 10B from the intermediate landing 30 to the next floor landing 36, respectively. It is hypothesized and attached to the attachment hardware 26, 26 in a state where both steel frame steps 10A, 10B are close to the center (Fig. 14 (b)). Therefore, the space 42 of the width | variety D becomes empty from the edge of the original stairs to the outer side of steel-frame stairs 10A and 10B (FIG. 4 (b)). In this state, the steel frame steps 10A and 10B can be used as steps for work.

(4) 스페이스(42)를 이용하여, 계단의 승강방향의 계단실벽(44)용의 내형틀(46)을 구축하고, 또 계단실벽(44)의 외형틀(47), 및 그 외의 구체용의 형틀을 구축한다(도 4(b), 도 13(b)). (4) Using the space 42, the inner mold 46 for the stair chamber wall 44 in the lifting direction of the stairs is constructed, and the outer mold 47 of the stair chamber wall 44, and other concrete The template of Figure 1 (b) and Figure 13 (b) is constructed.

(5) 부착철물(26, 26)을 마루용 형틀(31, 37)의 일부로서, 중간 층계참(30), 다음 층 플로어 층계참(36), 다른 구체의 콘크리트를 타설하여, 부착철물(26, 26)을 구체에 정착한다 (도14(c), 도1∼도 3). (5) The attachment hardware 26, 26 is part of the flooring molds 31, 37, and the intermediate landing 30, the next floor landing 36, and the concrete of other spheres are poured into the attachment hardware 26, 26) is fixed to a sphere (Fig. 14 (c) and Figs. 1 to 3).

(6) 이어서, 불필요한 임시 설치부재를 스페이스(42)로부터 제거하면, 폭(D)의 스페이스(42)가 빈다. 이어서, 철골계단(10A, 10B)을 서로 이격하도록 외측으로 이동시키면, 양 철골계단(10A, 10B)의 외측이 스페이스(42) 내에 위치하고, 철골계단(10A, 10B)의 외측의 따낸옆판의 외면(5)은, 계단실벽(44)의 내면(44a)에 근접한 위치에 배치된다. (6) Subsequently, when the unnecessary temporary installation member is removed from the space 42, the space 42 of the width D becomes empty. Subsequently, when the steel stair steps 10A and 10B are moved outwardly to be spaced apart from each other, the outer side of both steel stair steps 10A and 10B is located in the space 42 and the outer surface of the open side plate outside the steel stair steps 10A and 10B. (5) is arrange | positioned in the position near the inner surface 44a of the staircase room wall 44. As shown in FIG.

(7) 그 후, 철골계단(10A, 10B)의 따낸옆판(2, 4)의 상하를 부착철물(26)의 고정판(18, 19)에 고정하여 철골계단의 (10A, 10B)의 부착이 완료된다(도 4(a), 도 13(a), 도 14(d)). (7) After that, the upper and lower sides of the side plates 2 and 4 of the steel staircases 10A and 10B are fixed to the fixing plates 18 and 19 of the attachment hardware 26 so that the attachment of (10A and 10B) of the steel staircases is performed. It is completed (FIGS. 4 (a), 13 (a), 14 (d)).

철골계단(10)은, 2개의 철골계단(10)이 병렬된 배치로 되는 경우에 적용할 수 있고, 통상은 중간 층계참을 형성하는 되접기형식의 계단에 적용되는데 (도 15(a)), 직진용의 철골계단(10, 10)을 교차시킨 계단에도 적용할 수 있다(도 15(b)). The steel staircase 10 can be applied to the case where two steel staircases 10 are arranged in parallel, and is usually applied to a refold type stairway forming an intermediate landing (Fig. 15 (a)), It can also be applied to the staircase intersecting the steel staircase 10, 10 for going straight (Fig. 15 (b)).

또, 계단실벽(44, 45)을 구축하기 위한 형틀(46, 47)은, 일반적으로 합판(이른바 콤파네)을 사용하고, 이것을 파이프재나 각재(이른바 버터파이프, 버터각 등)를 사용하여 유지하는 경우에 적용된다. 또, 형틀(46, 47)은 강철제 형틀(메탈폼)이나 수지형틀 등 종래 사용되는 재료를 사용할 수도 있다. 또한, 계단실벽(44, 45)을 구축후에 철거되는 임시 설치한 형틀 이외에, 계단실벽(44, 45)과 일체로 구축되는 메워넣기 형틀을 사용할 수도 있다. 또, 이들을 혼재하여 사용할 수도 있다. 또, 형틀(46, 47)을 지지하는 구조도 임의이고, 종래 사용되는 지지구조를 채용할 수가 있다. In addition, the molds 46 and 47 for constructing the staircase walls 44 and 45 generally use plywood (so-called Compane), and are held using pipe materials or shell materials (so-called butterpipes, butter angles, etc.). Applies if In addition, the molds 46 and 47 can also use materials conventionally used, such as a steel mold (metal foam) and a resin mold. Further, in addition to the temporary molds in which the staircase walls 44 and 45 are removed after construction, a filling mold formed integrally with the staircase walls 44 and 45 may be used. Moreover, these can also be mixed and used. Moreover, the structure which supports the molds 46 and 47 is also arbitrary, and the support structure conventionally used can be employ | adopted.

[실시예 1]Example 1

도면에 의거하여 본 발명의 실시예를 설명한다. 계단부재로서의 철골계단(10)은 단차부만으로 구성하고, 플로어 층계참, 중간 층계참을, 현장에서 구축하는 실시예이다.EMBODIMENT OF THE INVENTION Embodiment of this invention is described based on drawing. The steel staircase 10 as a stair member is an embodiment which consists only of a step part, and builds a floor landing and an intermediate landing in the field.

[1] 철골계단(10)의 구성[1] steel frame stairs 10

소정 단수의 디딤판(1, 1)의 양측을, 내측의 따낸옆판(2) 및 외측의 따낸옆판(4)으로 끼워서, 고정하여, 철골계단(10)을 구성한다. 철골계단(10)은, 기준층 의 플로어 층계참으로부터 상측의 중간 층계참까지의 철골계단(10A)과, 중간 층계참으로부터 기준층의 상층의 플로어 층계참까지의 철골계단(10B)으로, 1층분의 철골계단을 구성한다(도11(a)(b)). Both sides of the predetermined number of stepping plates 1 and 1 are sandwiched between the inner side plate 2 and the outer side plate 4 to be fixed to form a steel staircase 10. The steel staircase 10 consists of steel staircase 10A from the floor landing of the reference layer to the middle landing of the upper side, and steel staircase 10B from the middle landing to the floor landing of the upper layer of the reference layer, and constitutes the steel staircase of one floor. (Fig. 11 (a) (b)).

따낸옆판(2, 4) 사이로서, 디딤판(1, 1)의 상하끝에, 디딤판(1)과 평행하게, 끝판(6, 6)을 각각 가설 고정한다. 각 끝판(6, 6)의 외면(디딤판(1)이 있는 측의 다른 측)의 중앙부에, 앵글재로 이루어지는 연결돌출판(7)을 각각 돌출 설치하고, 연결돌출판(7)에 횡방향의 연결구멍(8)을 각각 뚫어설치한다(도 11(c)). 또, 따낸옆판(2, 4)의 상하 양끝에서, 상기 연결구멍(8, 8)과 동일한 위치부근에, 부착용의 고정구멍(9, 9)을 상하 2개 뚫어설치한다(도 11(b)). Between the side plates 2 and 4 which were removed, the end plates 6 and 6 are hypothetically fixed to the upper and lower ends of the step plates 1 and 1, respectively, in parallel with the step plate 1. In the center of the outer surface of the end plates 6 and 6 (the other side of the side where the tread plate 1 is located), the connecting protrusions 7 made of angle materials are respectively protruded to the connecting protrusions 7 in the transverse direction. Each of the connecting holes 8 is installed (Fig. 11 (c)). In addition, at both upper and lower ends of the side plates 2 and 4, two fixing holes 9 and 9 for attachment are drilled and installed near the same position as the connection holes 8 and 8 (Fig. 11 (b)). ).

[2] 부착철물(26)의 구성[2] construction of attachment hardware 26

구축예정의 중간 층계참, 플로어 층계참의 폭에 대응한, 앵글재로부터 수평의 지지판(13)과 수직의 부착판(15)으로 이루어지는 기재(12)를 형성한다. 기재(12)의 부착판(15)에, 소정간격으로, 투시구멍을 뚫어설치하고, 부착판(15)의 외면(16)측(지지판(13)과는 반대측)으로부터 너트를 나사맞춤한 볼트의 축부를 투시구멍에 삽입한다. 볼트는, 그 두부(頭部)를 지지판(13)과는 반대측에 돌출시켜서 배치하고, 그 축부의 선단부를, 부착판의 양측에서 너트로 끼워서, 나사맞춤하여 긴밀히 연결하고, 부착판(15)에 고정하여, 앵커(17)를 구성한다(도 12). The base material 12 which consists of the horizontal support plate 13 and the vertical attachment plate 15 is formed from the angle material corresponding to the width of the intermediate landing and floor landing which are going to be constructed. Bolts provided with perforation holes in the attachment plate 15 of the base material 12 at predetermined intervals and screwed nuts from the outer surface 16 side (the opposite side to the support plate 13) of the attachment plate 15. Insert the shaft part of the hole into the see-through hole. The bolts are arranged by protruding their heads on the side opposite to the support plate 13, and the end portions of the shaft portions are fitted with nuts on both sides of the attachment plate, screwed together to closely connect the attachment plate 15. Anchor 17 is configured by fixing to (Fig. 12).

부착판(15)의 내면(16a)측(지지판(13)측)에, 철골계단(10)의 따낸옆판(2, 4)의 끝부위치에 대응하여, 4매의 고정판(18, 19)을 돌출설치한다. 고정판(18, 19)은 철골계단(10)의 최종 부착위치에 대응한 위치에 설치되고, 최종 부착위치에서, 양 끝측의 2매의 고정판(19, 19)은, 양 철골계단(10)의 외측의 따낸옆판(4)의 외면(5)(디딤판(1)이 접합된 측의 반대측)에 맞닿는 위치에서, 중앙측의 2매의 고정판(18, 18)은, 양 철골계단(10)의 내측의 따낸옆판(2)의 내면(3a)(디딤판(1)이 접합된 측)에 맞닿는 위치에, 각각 고정된다. 고정판(18, 18)에는, 따낸옆판의 고정구멍(9, 9)에 대응한 고정구멍(20, 20)이 뚫어설치되어, 고정구멍(20)에 연통하는 너트(21)가 각각 고착되어 있다. 또한, 외측의 고정판(19, 19)의 너트는 캡너트(22, 22)로 하여, 고정 판(19)의 외면에 고착되어 있다(도 12(a)(b)). On the inner surface 16a side (supporting plate 13 side) of the attachment plate 15, four fixing plates 18, 19 are placed in correspondence with the end positions of the side plates 2, 4 of the steel frame step 10. Install protrudingly. The stationary plates 18 and 19 are installed at positions corresponding to the final attachment positions of the steel stairways 10. At the final attachment positions, the two fixed plates 19 and 19 at both ends are connected to the two steel stairs 10. In the position which abuts the outer surface 5 (opposite side of the side to which the tread plate 1 was joined) of the outer side plate 4, the two fixed plates 18 and 18 of the center side of the two steel frame steps 10 Each position is fixed to the position which abuts on the inner surface 3a (side to which the tread plate 1 was joined) of the inner side board 2. Fixing holes 20 and 20 corresponding to the fixing holes 9 and 9 of the side plate are formed in the fixing plates 18 and 18, and nuts 21 communicating with the fixing holes 20 are fastened to each other. . In addition, the nuts of the outer fixing plates 19 and 19 are cap nuts 22 and 22, and are fixed to the outer surface of the fixing plate 19 (FIG. 12 (a) (b)).

또, 부착판(15)의 내면(16a)에, 철골계단(10)의 연결돌출판(7)에 대응한 위치에, 마찬가지로 앵글재로 이루어지는 연결돌출판(23, 23)이 고정되고, 철골계단(10)의 연결구멍(8)에 대응한 위치에 연결구멍(24)이 각각 뚫어설치되어 있다(도 12(a)(c)). Moreover, the connection protrusion boards 23 and 23 which consist of angle materials are similarly fixed to the inner surface 16a of the attachment plate 15 at the position corresponding to the connection protrusion board 7 of the steel-frame stairs 10, and the steel frame Connection holes 24 are drilled at positions corresponding to the connection holes 8 of the stairs 10, respectively (Fig. 12 (a) (c)).

또 지지판(13)에는, 마루형틀에 고정하기 위한 못구멍(25, 25)이 길이방향으로, 좌우대칭으로 뚫어설치되어 있다(도 12(a)). 이상과 같이 하여, 부착철물(26)을 구성한다(도 12). In the support plate 13, nail holes 25 and 25 for fixing to the floor mold are provided in the longitudinal direction and symmetrically (Fig. 12 (a)). As described above, the attachment hardware 26 is constituted (FIG. 12).

[3] 계단의 구축방법[3] construction of stairs

(1) 기준층(기설치층)(F0)에서는, 부착철물(26)의 일측에 하방으로부터의 철골계단(10)이 고정된 상태에서, 콘크리트제의 플로어 층계참(마루)(28)이 구축되어 있다(도 1∼도 3, 도 14(a)). (1) In the reference floor (installation layer) F 0 , a concrete floor landing 28 is constructed in a state where the steel stair step 10 from below is fixed to one side of the attachment hardware 26. 1 to 3 and 14 (a).

(2) 구축예정의 중간 층계참 층(F0-1)(F0와 F1의 중간층)을 구축하기 위한 층 계참용의 마루형틀(31), 다음 F1층의 플로어 층계참용의 마루형틀(37)을 종래의 방법에 의해 구축하여 임시 설치하여 지지한다. 이 때, 예를 들면 마루용의 형틀(31, 37)은, 수평으로 배치된 목제 각재(33, 33)을 통하여, 서포트(34, 34)로 지지한다(도 1). 또한, 마루용 형틀(31, 37)의 지지는 상기 예에 한정되지 않고, 종래 채용되는 각종의 지지구조를 적용할 수가 있다(도시생략). (2) Floor frame for floor landing 31 to build an intermediate landing layer (F 0-1 ) (intermediate floor between F 0 and F 1 ), and floor frame for floor landing of the next F 1 floor ( 37) is constructed by a conventional method, temporarily installed and supported. At this time, for example, the molds 31 and 37 for flooring are supported by the supports 34 and 34 through the wooden beam members 33 and 33 arranged horizontally (FIG. 1). In addition, the support of the floor molds 31 and 37 is not limited to the said example, The various support structures employ | adopted conventionally can be applied (illustration omitted).

(3) F0-1층의 마루용 형틀(31) 및 F1층의 마루용 형틀(37)에, 미리 계단위치에 맞추어 먹줄친 위치에 맞추어서, 각각 부착철물(26)을 고정한다(도 14(b)). 부착철물(26)의 고정은, 지지판(13)의 못구멍(25)으로부터 못이나 나사류를 마루형틀(31, 37)을 향하여 박아넣어 행한다. (3) The attachment hardware 26 is fixed to the flooring mold 31 of the F 0-1 floor and the flooring mold 37 of the F 1 floor in accordance with the position previously fed to the stair position, respectively (Fig. 14 (b)). The attachment hardware 26 is fixed by driving nails and screws from the nail holes 25 of the support plate 13 toward the floor molds 31 and 37.

또, 부착철물(26, 26)의 구축에 평행하며, 또는 구축후에, 구축 예정의 F0-1층을 향하는 일측의 철골계단(10A), 및 F0-1층으로부터 F1층을 향하는 철골계단(10B)을 배치하여, 철골계단(10A, 10B)의 연결돌출판(7, 7)을 부착철물(26, 26)의 연결돌출판(23, 23)에 대향시킨다(도 4(b)). In addition, attachment hardware (26, 26) in parallel to the building, or after building, the steel facing layer from the steel F 1 staircase (10A), and F 0-1 F 0-1 layers on one side facing the floor of the building will Steps 10B are arranged so that the connecting protrusions 7 and 7 of the steel frame steps 10A and 10B face the connecting protrusions 23 and 23 of the attachment hardware 26 and 26 (Fig. 4 (b)). ).

(4) 부착철물(26)의 연결돌출판(23)의 연결구멍(24)으로부터 볼트(39)를 끼워통과하게 하여, 너트(40, 40)를 나사맞춤함과 동시에, 철골계단(10A, 10B)의 연결돌출판(7)의 연결구멍(8)에 끼워통과하게 하여, 너트(20)를 더 나사맞춤한다. 양 철골계단(10A, 10B)을 가장 근접하도록 중앙에 가까이 댄 상태에서, 너트(20, 20)를 죄이고, 철골계단(10A, 10B)의 연결돌출판(7)을 각각 끼워서, 철골계단(10A, 10B)을 임시 부착한다(도 14(b)). 이 상태에서, 철골계단(10A, 10B)은, 작업용의 계단으로서 사용될 수 있다. 철골계단(10A, 10B)을 중앙측에 가까이 오게 하였으므로, 본래의 철골계단(10A, 10B)의 설치위치에서, 철골계단(10A, 10B)의 외측에 폭(D)(D = 7.5∼10 ㎝ 정도)의 스페이스(42, 42)가 생기고 있다(도 4(b)). (4) The bolts 39 are inserted through the connection holes 24 of the connection protrusion plate 23 of the attachment hardware 26, and the nuts 40 and 40 are screwed together, and the steel frame steps 10A, The nut 20 is further screwed into the connection hole 8 of the connection protrusion plate 7 of 10B. In the state closest to the center so that both steel stair steps 10A and 10B are closest to each other, the nuts 20 and 20 are tightened, and the connecting protrusions 7 of the steel stair steps 10A and 10B are fitted respectively, 10A and 10B) are temporarily attached (FIG. 14 (b)). In this state, the steel frame steps 10A and 10B can be used as steps for work. Since the steel stair steps 10A and 10B are brought closer to the center side, the width D (D = 7.5 to 10 cm outside the steel stair steps 10A and 10B at the installation position of the original steel stair steps 10A and 10B). The spaces 42 and 42 of degree are created (FIG. 4 (b)).

(5) 계단의 승강방향의 계단실벽(44)의 외형틀(47), 벽용 철근(도시생략)을 배근하여, 스페이스(42, 42) 내에, 벽용 내형틀(46)을 배치한다(도 13(b)). 양 형틀(46, 47)을 종래 사용되는 방법으로 고정한다. 예를 들면, 양 벽형틀(46, 47) 내에 배치한 세퍼레이터(53)를, 폼타이(55), 3형 리브시트(리브와셔)(54)를 부착하고, 벽형틀(46, 47)을 따른 종파이프(49, 49) 및 종파이프(49, 49)에 교차한 횡파이프(50, 50)를 고정한다(도 13(b)). (5) The outer frame 47 of the stair room wall 44 and the wall reinforcing bar (not shown) of the stair room wall 44 in the elevating direction of the stairs are disposed to arrange the inner frame 46 for the wall in the spaces 42 and 42 (FIG. 13). (b)). Both molds 46 and 47 are fixed in a conventional manner. For example, the separator 53 disposed in both wall molds 46 and 47 is attached to the form tie 55 and the three-type rib sheet (rib washer) 54, and the wall molds 46 and 47 are attached. The longitudinal pipes 49 and 49 and the transverse pipes 50 and 50 intersecting the longitudinal pipes 49 and 49 are fixed (Fig. 13 (b)).

이 때, 내형틀(46)의 두께는 통상 1∼2 cm 정도, 종파이프(49)의 외경은 통상 5 cm 정도이고, 내형틀(46) 및 종파이프(49)는, 폭(D)의 스페이스(42)내에 배치된다. 따라서, 내형틀(46) 및 종파이프(49)는, 철골계단(10A, 10B)과 간섭하지 않고, F0층에서 F1층까지 분단되는 일없이 구축될 수 있다. 또한, 횡파이프(50, 50)는 적절한 간격으로 사용하면 좋으므로, 평면에서 보아, 스페이스(42)의 외측에 배치되어도 좋다. At this time, the thickness of the inner mold 46 is usually about 1 to 2 cm, the outer diameter of the longitudinal pipe 49 is usually about 5 cm, and the inner mold 46 and the longitudinal pipe 49 have a width D. It is arranged in the space 42. Therefore, the inner mold 46 and the longitudinal pipe 49 can be constructed without interfering with the steel frame steps 10A and 10B and without being segmented from the F 0 layer to the F 1 layer. In addition, since the horizontal pipes 50 and 50 may be used at appropriate intervals, they may be disposed outside the space 42 in plan view.

또, 이 때, 플로어 층계참의 마루용 형틀(31), 중간 층계참의 마루용 형틀(37)과 함께, 부착철물(26, 26)을 임시 설치하여 지지하면, 철골계단(10A, 10B)을 지지하기 위한 임시 설치물을 불필요하게 할 수 있다(도 1). At this time, if the attachment hardware 26, 26 is temporarily installed and supported together with the floor mold 31 for the floor landing and the floor mold 37 for the middle landing, the steel frame stairs 10A and 10B are supported. It is possible to make the temporary installation to be unnecessary (FIG. 1).

(6) 계단실벽 이외의 형틀, 철근도 종래의 각종 방법에 의해 구축한다. 그 후, 마루용 형틀(31, 37), 벽용 형틀(46, 47)을 비롯한 형틀내에, 콘크리트를 타설하여, 중간 층계참(30), 플로어 층계참(36), 계단실벽(44)을 비롯하여, F0∼F1의 구체를 구축한다(도 1, 도 8, 도 14(c)). (6) Frames and reinforcing bars other than stair room walls are also constructed by various conventional methods. Thereafter, concrete is poured into the mold including the floor molds 31 and 37 and the wall molds 46 and 47, and including the intermediate landing 30, the floor landing 36 and the stairwell 44, specific constructs of 0 ~F 1 (Fig. 1, 8, 14 (c)).

이 때, 중간 층계참(30), F1 층의 플로어 층계참(36)에서는, 부착철물(26)의 부착판(15)이, 둑판(堰板)으로서 기능하여, 형틀의 일부가 된다. At this time, in the intermediate landing 30 and the floor landing 36 of the F 1 layer, the attachment plate 15 of the attachment hardware 26 functions as a check plate and becomes a part of the mold.

(7) 콘크리트가 고화발현(固化發現) 후, 임시지지의 형틀(31, 36) 등의 부재를 떼어낸다. 중간 층계참(30), 플로어 층계참(36)에서는, 부착철물(26)이, 앵커(17)가 매설되므로, 일체로 구축된다. 또, 부착철물(26)은 박아넣기형틀로서 남겨두고, 콘크리트제의 플로어 층계참(36), 중간 층계참(30)의 끝부가 부착철물로 보강된다. 또, 상기 부착철물(26)로부터 하방으로 돌출한 못은, 종래의 방법에 의해 절단된다. (7) After concrete is solidified, the members such as the molds 31 and 36 for temporary support are removed. In the intermediate landing 30 and the floor landing 36, the anchoring iron 26 is embedded in the attachment hardware 26 because the anchor 17 is embedded. In addition, the attachment hardware 26 is left as a mold, and the ends of the floor landing 36 and the intermediate landing 30 made of concrete are reinforced with the attachment hardware. Moreover, the nail which protruded below from the said attachment iron 26 is cut | disconnected by the conventional method.

또, 여기서, 계단실벽(44)의 내형틀(46), 종파이프(49) 등을 제거했으므로, 나중에 폭(D)의 스페이스(42)가 빈다. In addition, since the inner mold 46, the vertical pipe 49, etc. of the staircase chamber wall 44 were removed here, the space 42 of the width | variety D becomes empty later.

(8) 이어서, 계단실벽(44)의 내면의 필요한 처리가 완료되었으면, 연결돌출판(23, 7)에 나사맞춤된 볼트(39)의 너트(40, 40)를 느슨하게 풀어, 수동 등에 의해 철골계단(10A, 10B)을 외측(계단실벽(44) 측)에, 양 철골계단(10A, 10B)이 이격하도록 평행 이동하게 한다. 철골계단(10A, 10B)의 연결돌출판(7)의 연결구멍(8)에 볼트(39)가 삽입된 상태에서, 미끄럼이동한다. 철골계단(10A, 10B)의 따낸옆판(2, 4)이, 부착철물(26)의 고정판(18, 19)에 각각 맞닿은 상태에서, 철골계 단(10A, 10B)은 소정 위치에 배치되고, 폭(D)의 스페이스(42)는, 철골계단(10A, 10B)의 외측에서 점유된다. 또한, 철골계단(10A, 10B)의 이동은, 평행이동하는 것이 바람직한데, 상단측 또는 하단측의 어느 한쪽을 먼저 이동하게 하고, 이어서 다른 한 쪽을 이동시킬 수도 있다. (8) Subsequently, when necessary processing of the inner surface of the stair room wall 44 is completed, the nuts 40 and 40 of the bolts 39 screwed to the connecting protrusions 23 and 7 are loosened, and the steel frame is removed by manual or the like. Steps 10A and 10B are moved parallel to the outside (staircase chamber wall 44 side) so that both steel frame steps 10A and 10B are spaced apart. In the state where the bolt 39 is inserted in the connection hole 8 of the connection protrusion board 7 of steel-frame stairs 10A and 10B, it slides. The steel frame stages 10A and 10B are disposed at predetermined positions while the side plates 2 and 4 of the steel frame stages 10A and 10B abut on the fixing plates 18 and 19 of the attachment hardware 26, respectively. The space 42 of the width D is occupied by the outside of the steel frame steps 10A and 10B. In addition, although it is preferable to move the steel-frame stairs 10A and 10B in parallel, either one of an upper end or a lower end may be moved first, and then the other may be moved.

이 상태에서, 볼트(39)에 나사맞춤한 너트(40, 40)를 죄이고, 너트(40, 40)로, 철골계단(10A, 10B)의 연결돌출판(7, 7)을 끼워서 고정한다. 또, 내측(중앙측)의 따낸옆판(2, 2)의 고정구멍(9)과, 부착철물(26)의 내측의 고정판(18, 18)의 고정구멍(20)이 연통하고 있으므로, 이것에 볼트를 끼워 통과시켜서 너트(21)에 나사맞춤하여 견고히 연결한다. 또, 외측(계단실벽(44)측)의 따낸옆판(4, 4)에서도 고정구멍(9)과 부착철물(26)의 외측의 고정판(19)의 고정구멍(20)이 연통하고 있으므로, 이것에 볼트를 끼워통과시켜서 부착철물(26)의 캡 너트(22)에 나사맞춤하여 견고히 연결한다. In this state, the nuts 40 and 40 screwed to the bolt 39 are tightened, and the nuts 40 and 40 are fitted to fix the connecting protrusions 7 and 7 of the steel stairways 10A and 10B. . In addition, since the fixing holes 9 of the side plates 2 and 2 of the inner side (center side) and the fixing holes 20 of the fixing plates 18 and 18 inside the attachment hardware 26 communicate with each other, Insert the bolt through and screw it into the nut 21 to connect it firmly. Moreover, since the fixing hole 9 and the fixing hole 20 of the fixing plate 19 of the outer side of the attachment hardware 26 also communicate with the side plates 4 and 4 of the outer side (the staircase chamber wall 44 side), Thread the bolt into the cap nut 22 of the attachment hardware 26 to connect it firmly.

이상과 같이 하여, 철골계단(10A, 10B)을, 부착철물(26, 26)에 부착시키는 것이 완료된다(도 14(d)). 계단실벽(44)의 내면(44a)과 외측의 따낸옆판(4)의 외면(5)은, 거의 간극없이 배치할 수가 있다(도 2, 도 3, 도 4(a), 도 13(a)). 도면 중 45는, 평면으로, 계단의 승강방법과 직각인 방향의 계단실벽이다. As described above, the steel frame steps 10A and 10B are attached to the attachment hardware 26 or 26 (Fig. 14 (d)). The inner surface 44a of the stair room wall 44 and the outer surface 5 of the side plate 4 outside can be arrange | positioned with almost no gap (FIG. 2, FIG. 3, FIG. 4A, FIG. 13A). ). In the figure, 45 is a stair room wall in the direction perpendicular | vertical to the method of elevating a stairs in a plane.

(9) 이어서, 철골계단(10A, 10B)의 내측의 따낸옆판(2, 2)의 외면(3, 3)사이에서, 끝판(6, 6)에 연속하는 위치에, 폐쇄판(51)을 고정하고, 부착철물(26)의 지지판(13) 위(부착판(15)과, 끝판(6) 및 폐쇄판(51) 사이)에 모르타르(52)를 충전함과 동시에, 이것에 연속하여 플로어 층계참(36), 중간 층계참(30)의 위를 모르타 르(52)로 마무리한다. 고정판(18, 19), 연결돌출판(7, 23) 등은, 모르타르(52)에 매설되므로, 보호됨과 동시에, 외부에서 이들이 보이지 않으므로, 외관상 좋다(도 5∼도 7, 도 9, 도 10). (9) Subsequently, between the outer surfaces 3, 3 of the side plates 2, 2 inside the steel frame steps 10A, 10B, the closing plate 51 is placed at a position continuous to the end plates 6, 6; The mortar 52 is fixed on the support plate 13 (between the attachment plate 15 and the end plate 6 and the closing plate 51) of the attachment hardware 26, and the floor is continuously connected thereto. The top of the landing 36, the intermediate landing 30 is finished with mortar (52). Since the fixed plates 18 and 19 and the connecting protrusions 7 and 23 are embedded in the mortar 52, they are protected and at the same time, since they are not visible from the outside, they are good in appearance (Figs. 5 to 7, 7, 9 and 10). ).

(10) 또한, 상기에 있어서, 플로어 층계참(36), 중간 층계참(30)의 콘크리트가 고화 발현한 상태에서, F1층으로부터 다음 다음 F2층을 향한 작업을, 상기와 마찬가지로 진행할 수가 있다. (10) In the above, the floor landing 36, in the concrete is solidified the expression state of the intermediate landings (30), the action towards the following and F 2 layer from the F 1 layer, it is possible to proceed as in the foregoing.

(11) 이상으로, 철골계단(10A, 10B)의 구축이 완료된다(도 1, 도 2, 3).(11) or more, the construction of the steel frame stairs 10A, 10B is completed (FIGS. 1, 2, 3).

[4] 다른 실시예[4] another embodiment

(1) 상기에 있어서, 철골계단(10)의 이동을 안내하는 수단으로서, 연결돌출판과 이것에 나사맞춤한 볼트 및 너트를 사용했으므로, 작업효율이 좋은데, 다른 방법을 취할 수도 있다. 즉, 부착철물 또는 철골계단의 끝판의 한쪽에 횡방향의 레일을 부착하고, 다른 쪽에, 레일 위를 이동할 수 있는 차륜을 부착하여 구성할 수도 있다. (1) In the above, as the means for guiding the movement of the steel staircase 10, a connection protrusion plate and bolts and nuts screwed thereto are used, so the work efficiency is good, but other methods can be taken. That is, a rail in the transverse direction may be attached to one of the end pieces of the attachment hardware or the steel frame stairs, and a wheel capable of moving on the rail may be attached to the other.

(2) 또, 상기 실시예에 있어서, 부착철물(26)의 앵커(17)는 볼트로 구성하였으므로, 가공이 용이하고 짧은 길이로 필요한 정착길이를 확보할 수 있으므로 바람직한데, 콘크리트제의 층계참(30, 36) 내에 매설되어, 정착할 수 있는 구조이면, 철근 등 다른 형상에 의해 구성할 수도 있다(도시생략). (2) Further, in the above embodiment, since the anchor 17 of the attachment hardware 26 is constituted by bolts, it is preferable because it is easy to process and can secure the required fixing length with a short length. If it is a structure which can be embedded in 30 and 36 and can be fixed, it can also be comprised by other shapes, such as a steel bar (not shown).

(3) 또, 상기 실시예에 있어서, 부착철물(26)은, 부착판(15)의 외면(16)에 앵커(17)를, 내면(16a)에 고정판(18, 19), 연결돌출판(23)을 돌출 설치했는데, 반 대로 부착판(15)의 내면(16a)에 앵커(17)를, 외면(16)에 고정판(18, 19), 연결돌출판(23)을 돌출설치하여 구성할 수도 있다(도시생략). (3) In addition, in the above embodiment, the attachment hardware 26 includes anchors 17 on the outer surface 16 of the attachment plate 15, fixing plates 18 and 19 on the inner surface 16a, and connection protrusions. (23) is protrudingly installed, on the contrary, the anchor 17 is mounted on the inner surface 16a of the attachment plate 15, and the fixing plates 18, 19 and the connection protrusion 23 are mounted on the outer surface 16. You can (not shown).

(4) 또, 상기 실시예에 있어서, 스페이스(42)의 폭(D)은, 적어도 계단실벽용의 내형틀(46), 종파이프(49)가 수용될 수 있는 폭이 확보되면 좋다. 즉, 작업 효율상에서는 가능한 한 넓은 쪽이 바람직한데, 철골계단(10)의 이동 거리를 가능한 한 짧게 하는 편이, 시공이 용이하고, 이것과 비교 검토하여 결정된다. (4) In addition, in the above embodiment, the width D of the space 42 may be such that the width at which the inner mold 46 and the vertical pipe 49 for the staircase room wall can be accommodated at least. In other words, in terms of work efficiency, the wider one is preferable. The shorter the moving distance of the steel frame stairs 10 is, the easier the construction is, and it is determined by comparison with this.

(5) 또, 상기 실시예에서는, 단차부만으로 구성했는데, 중간 층계참부(11)도 일체로 구성한 따낸옆판(2, 4)을 사용한 철골계단(11)을 사용할 수도 있다(도 16). 이 경우에는, 부착철물(26)의 앵커(17)는, 선단부를 벽을 따라서 굴곡한 형상으로 형성된다. (5) In the above embodiment, only the stepped portion is used. However, the steel staircase 11 using the side plates 2 and 4 formed integrally with the intermediate stairwell portion 11 may also be used (FIG. 16). In this case, the anchor 17 of the attachment hardware 26 is formed in the shape which bent the front-end part along the wall.

즉, 가설한 중간 층계참부(11)를 가지는 철골계단(11)을 상기 방법과 마찬가지로, 가설하여, 소정 위치에 배치한 부착철물(26)에 연결한다(도 16(a)). 또한, 이 실시예에서는, 부착철물은, 평면에서 보아 승강방향으로 직교하는 방향의 계단실벽(45)의 내면부근에 배치된다. 또, 중간 층계참의 형틀(31)이 생략되므로, 철골계단의 중간 층계참부(11), 부착철물(26)의 어느 한 쪽 또는 양쪽을 서포트류로 하방에서 지지한다(도시생략). 또한, 철골계단(10)과 부착철물(26)의 고정은, 상기와 마찬가지로, 연결돌출판(7)과 연결돌출판(23)을 볼트(39), 너트(40, 40)로 고정한다(도 4(b)). That is, the steel frame stair 11 which has the temporary intermediate step part 11 was hypothesized and connected to the attachment hardware 26 arrange | positioned in the predetermined position similarly to the said method (FIG. 16 (a)). In this embodiment, the attachment hardware is disposed near the inner surface of the staircase chamber wall 45 in the direction orthogonal to the lifting direction in plan view. In addition, since the mold 31 of the intermediate landing is omitted, either or both of the intermediate landing 11 and the attachment hardware 26 of the steel staircase are supported by the support downward (not shown). In addition, the fixing of the steel frame staircase 10 and the attachment hardware 26, the connection projection plate 7 and the connection projection plate 23 is fixed with bolts 39 and nuts 40, 40 as described above ( 4 (b)).

이어서, 계단실벽(45)용의 내형틀(46), 외형틀(47)을 소정간격으로 배치하고, 종파이프(49) 및 횡파이프(50)로 누름과 동시에, 세퍼레이터(53), 폼타이(55), 3형 리브시트(54)로 전체를 유지한다(도 16(a)). Subsequently, the inner mold 46 and the outer mold 47 for the stair room wall 45 are arranged at predetermined intervals, and the separator 53 and the form tie are pressed while being pressed by the longitudinal pipe 49 and the transverse pipe 50. (55), the whole is hold | maintained with the 3 type | mold rib sheet 54 (FIG. 16 (a)).

또, 철골계단(10)은, 상기와 마찬가지로 내측으로 근접되어 있어, 승강방향의 계단실벽(44) 측에, 스페이스(42)가 형성되고, 마찬가지로, 계단실벽(44)용의 형틀(46, 47)이 구축된다(도4(b), 도 13(b)). 이어서, 그 외의 구체용 형틀을 구축한 후에, 상기와 같이 콘크리트를 타설한다. 콘크리트가 고화 발현후에 형틀(46, 47)이나 3형 리브시트(54)외에, 서포트류를 철거한다. In addition, the steel frame staircase 10 is proximate to the inside in the same manner as described above, and a space 42 is formed on the stair chamber wall 44 side in the lifting direction, and similarly, the mold 46 for the stair chamber wall 44 is formed. 47) are constructed (Fig. 4 (b) and Fig. 13 (b)). Subsequently, after constructing the other concrete mold, concrete is poured as described above. After the concrete solidifies, the supports are removed in addition to the molds 46 and 47 and the type 3 rib sheet 54.

계단실벽(44)측에서, 형틀(46, 47)을 철거한 후에, 폭(D)의 스페이스(42)가 비기 때문에, 상기와 같이, 중간 층계참부(11)를 가지는 철골계단(10, 10)을 서로가 이격하도록 외측을 향하여 이동시킨다. Since the space 42 of the width D is empty after the molds 46 and 47 are removed from the staircase wall 44 side, the steel frame stairs 10 and 10 having the intermediate stairway portion 11 as described above. ) Are moved outward so that they are spaced apart from each other.

이상과 같이 하여, 철골계단(10)과 계단실벽(44, 45)이 거의 간극없이, 근접한 상태로 배치된다(도4(a), 도13(a), 도16(b)). 이 상태에서, 상기와 마찬가지로, 따낸옆판(2, 4)과, 부착철물(26)의 고정판(18, 19)을, 볼트로 고정하여, 철골계단(10)의 부착이 완료된다. As described above, the steel frame stairs 10 and the staircase chamber walls 44 and 45 are arranged in close proximity with almost no gaps (Figs. 4 (a), 13 (a) and 16 (b)). In this state, similarly to the above, the side plates 2, 4 and the fixing plates 18, 19 of the attachment hardware 26 are fixed with bolts, and the attachment of the steel frame stairs 10 is completed.

이 발명은, 상하에 배치된 부착철물에, 계단부재의 상하를 횡방향으로 이동이 자유롭게 부착했으므로, 병렬한 계단부재를 중앙으로 오게하여 계단실벽을 구축하고, 그 후, 계단부재를 이격하도록 옆으로 이동시킬 수가 있어, 임시 설치한 계단부재가 간섭하지 않고, 지장없이 계단실벽을 구축할 수 있는 효과가 있다. 또한, 계단부재의 외측을 계단실벽에 근접한 위치에 배치할 수 있으므로, 계단실벽과 계단부재에 간극이 없어, 안전하고 외관상 좋은 계단을 구성할 수 있는 효과가 있 다. In the present invention, since the up and down movement of the staircase member is freely attached to the mounting hardware disposed above and below, the staircase walls are constructed by bringing the parallel staircase members to the center, and then the side members are spaced apart from each other. It is possible to move the step, so that the temporary staircase member does not interfere, and there is an effect that the stair room wall can be constructed without any problems. In addition, since the outside of the stair member can be disposed in a position close to the stair room wall, there is no gap between the stair room wall and the stair member, there is an effect that can constitute a safe and good appearance stairs.

Claims (4)

계단구축 위치에서, 병렬하여, 2개의 계단부재를 가설하고, 그 계단부재의 상하 양끝을 구체에 부착하는 계단의 구조로서, As a step structure in which two step members are installed in parallel at the stepping position, and both upper and lower ends of the step members are attached to the sphere. 상기 계단부재의 상하를 받치는 상측 부착철물 및 하측 부착철물을 각각 구체에 부착하고, 그 상하 받침기구에, 상기 계단부재의 상하끝을 횡방향으로 이동가능하게 부착하는 것을 특징으로 하는 계단의 구조.An upper attachment hardware and a lower attachment hardware supporting the upper and lower sides of the stair member are attached to a sphere, respectively, and the upper and lower supporting mechanisms are movably attached to the upper and lower ends of the stair member in a lateral direction. 제 1 항에 있어서, 부착철물에 돌출설치한 연결돌출판의 연결구멍과, 계단부재의 상하끝에 돌출설치한 연결돌출판의 연결구멍에, 미끄럼이동 자유롭게 연결봉을 끼워 통과시켜서, 부착철물과 계단부재를 이동가능하게 부착한 것을 특징으로 하는 계단의 구조. 2. The attachment hardware and the step member according to claim 1, wherein the connecting rod slides freely through the connection hole of the connection protrusion plate protruding to the attachment hardware and the connection hole of the connection protrusion plate protruding at the upper and lower ends of the stair member. Stair structure, characterized in that attached to the movable. 이하의 공정을 취하는 것을 특징으로 하는 계단의 구축방법. The construction method of stairs characterized by the following steps. (1) 구축예정인 계단부재의 위끝, 아래끝을 지지하는 구축예정의 구체 위치에, 부착철물을 각각 배치하여, 각 부착철물을 임시 설치하여 지지한다. (1) Attachment hardwares are placed at the concrete positions of the planned construction of supporting the upper and lower ends of the staircase members, which are to be constructed, and temporarily installed and supported. (2) 이어서, 상기 부착철물간에, 2개의 계단부재를 병렬하여 가설하여, 양 계단부재를 근접하게 하여, 상기 각 계단부재의 외측에 스페이스를 비우도록 배치한다. (2) Subsequently, two staircase members are hypothesized in parallel between the attachment hardware to bring the two staircase members close to each other, and are disposed so as to leave a space outside the respective staircase members. (3) 상기 스페이스를 이용하여, 계단실벽의 내측의 형틀을 구축하고, 또 계 단실벽의 외측의 형틀 및 그 외의 구체용의 형틀을 구축한다. (3) Using the space, a mold inside the stair room wall is constructed, and a mold outside the stair room wall and a mold for other spheres. (4) 상기 부착철물을 형틀의 일부로서 구체의 콘크리트를 타설하고, 부착철물을 구체에 정착한다. (4) The concrete of the sphere is poured as a part of the mold by the attachment hardware, and the attachment hardware is fixed to the sphere. (5) 이어서, 불필요한 임시 설치부재를 상기 스페이스로부터 제거하고, 상기 양 계단부재를 서로 이격하도록 이동시키고, 양 계단부재의 외측을 상기 스페이스에 위치하게 한다. (5) Then, unnecessary temporary installation members are removed from the space, the both step members are moved to be spaced apart from each other, and the outside of both step members is positioned in the space. (6) 소정위치에서, 계단부재를 부착철물에 고정한다. (6) At a predetermined position, the step member is fixed to the attachment hardware. 이하의 공정을 취하는 것을 특징으로 하는 계단의 구축방법. The construction method of stairs characterized by the following steps. (1) 기설치 층의 플로어 층계참의 끝부에 부착철물이 매설되어 있다. (1) Attachment hardware is embedded at the end of the floor landing of the existing floor. (2) 구축예정인 중간 층계참, 다음 층 플로어 층계참의 마루용 형틀의 끝부에, 각각 부착철물을 얹어놓고, 각 마루용 형틀을 임시 설치하여 지지한다. (2) At the end of the floor frame of the middle landing and the next floor landing, which are to be constructed, the fitting hardware is placed on each end, and each floor frame is temporarily supported. (3) 이어서, 기설치 층 플로어 층계참에서 중간 층계참까지의 계단부재(A)와, 중간 층계참에서 다음 층 플로어 층계참까지의 계단부재(B)를 각각 가설하고, 상기 양 계단부재(A, B)를 중앙측에 근접하게 하여, 상기 부착철물에 부착하고, 상기 계단부재(A, B)의 외측에 스페이스를 비우도록 배치한다. (3) Subsequently, the step member A from the existing floor floor landing to the middle landing and the step member B from the intermediate landing to the next floor landing are respectively hypothesized. Is placed close to the center side, attached to the attachment hardware, and disposed so as to empty the space outside the staircase members (A, B). (4) 상기 스페이스를 이용하여, 계단실벽의 내측의 형틀을 구축하고, 또 계단실벽의 외측의 형틀 및 그 외의 구체용의 형틀을 구축한다. (4) Using the said space, the form of the inside of a stair room wall is built, and the form of the outside of a stair room wall, and the frame for other spheres are constructed. (5)상기 부착철물을 마루용 형틀의 일부로서, 중간 층계참, 다음 층 플로어 층계참, 그 외의 구체의 콘크리트를 타설하여, 상기 부착철물을 구체에 정착한다. (5) The attached hardware is part of the flooring mold, and the concrete of the intermediate landing, the next floor landing, and other spheres is poured to fix the attached hardware to the sphere. (6) 이어서, 불필요한 임시 설치부재를 상기 스페이스로부터 제거하고, 상기 계단부재(A, B)를 서로 이격하도록 외측으로 이동시키고, 양 계단부재(A, B)의 외측을 상기 스페이스 내에 위치하게 한다. (6) Then, unnecessary temporary installation members are removed from the space, and the step members A and B are moved outwardly so as to be spaced apart from each other, and the outside of both step members A and B are positioned in the space. . (7) 소정 위치에서, 계단부재(A, B)의 상하를 부착철물에 고정한다. (7) At the predetermined position, the top and bottom of the staircase members A and B are fixed to the attachment hardware.
KR1020060109915A 2002-04-02 2006-11-08 Connector and stair assembly KR100755213B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JPJP-P-2002-00099617 2002-04-02
JP2002099617A JP4016130B2 (en) 2002-04-02 2002-04-02 Stair structure and staircase construction method

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020020072248A Division KR100695275B1 (en) 2002-04-02 2002-11-20 Step construction and method for building step

Publications (2)

Publication Number Publication Date
KR20060117898A true KR20060117898A (en) 2006-11-17
KR100755213B1 KR100755213B1 (en) 2007-09-04

Family

ID=28786226

Family Applications (2)

Application Number Title Priority Date Filing Date
KR1020020072248A KR100695275B1 (en) 2002-04-02 2002-11-20 Step construction and method for building step
KR1020060109915A KR100755213B1 (en) 2002-04-02 2006-11-08 Connector and stair assembly

Family Applications Before (1)

Application Number Title Priority Date Filing Date
KR1020020072248A KR100695275B1 (en) 2002-04-02 2002-11-20 Step construction and method for building step

Country Status (4)

Country Link
JP (1) JP4016130B2 (en)
KR (2) KR100695275B1 (en)
CN (1) CN100335729C (en)
TW (1) TW542868B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100911803B1 (en) * 2008-07-23 2009-08-12 김용근 Assembly stairway
CN112081320A (en) * 2020-08-27 2020-12-15 衡东县佳时鸿丰建材有限责任公司 Adjustable wood stair and use method thereof

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100500306B1 (en) * 2002-06-14 2005-07-11 두하요코모리주식회사 assembly type steel frame ladder of reinforcement concrete building and construction method thereof
KR100464594B1 (en) * 2002-06-17 2005-01-03 두하요코모리주식회사 The method of constructing the prefabricated step on reinforced concrete building
KR101012298B1 (en) * 2008-09-08 2011-02-08 삼광티엘티(주) Slide module of portable terminal
CN104141367A (en) * 2014-07-07 2014-11-12 张跃 Concrete stairs with hoisting seats and connecting pieces
CN104295095A (en) * 2014-10-08 2015-01-21 中国化学工程第十三建设有限公司 Steel and wood composite stair template
JP6666781B2 (en) * 2016-04-12 2020-03-18 鹿島建設株式会社 Stair structure, stair structure construction method, main member of stair structure and intermediate member of stair structure
CN106958349B (en) * 2017-05-24 2022-12-27 中国建筑第二工程局有限公司 Last three-step mold matching system of aluminum alloy template stair and stair
CN110821166B (en) * 2018-08-09 2023-04-07 李宜君 Building stair forming method and forming module thereof
JP7329992B2 (en) * 2019-07-01 2023-08-21 株式会社横森製作所 steel stairs
CN113279529B (en) * 2021-06-28 2023-09-29 北京城建集团有限责任公司 Large-span disassembly-free ladder structure based on steel bar truss floor support plate and construction method thereof
CN114319852B (en) * 2022-01-20 2023-04-14 深圳市嘉盛建筑工程有限公司 Aluminum alloy totally-enclosed stair template

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR0141463B1 (en) * 1992-09-04 1999-02-18 세이분 요코모리 Method of prefabricating stairway
JP3087195B2 (en) * 1992-09-04 2000-09-11 株式会社横森製作所 How to build stairs
JP3196043B2 (en) * 1992-09-11 2001-08-06 株式会社横森製作所 Construction method of stairs and staircase, construction method of stairs, and stair members
KR100201539B1 (en) 1996-09-21 1999-06-15 김헌출 Unit steel-frame staircase and its construction method
JP3569861B2 (en) * 1998-07-21 2004-09-29 株式会社横森製作所 Construction method of stairs and staircase, staircase support device, and staircase structure
CN2349289Y (en) * 1998-11-28 1999-11-17 李岭群 Prefabricated integral stairs board
JP4061611B2 (en) * 2000-01-24 2008-03-19 株式会社横森製作所 PCa stairs mounting structure, PCa stairs mounting method, PCa stairs
JP2002013207A (en) * 2000-06-30 2002-01-18 Taisei Corp Receiving fastener for steel staircase

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100911803B1 (en) * 2008-07-23 2009-08-12 김용근 Assembly stairway
CN112081320A (en) * 2020-08-27 2020-12-15 衡东县佳时鸿丰建材有限责任公司 Adjustable wood stair and use method thereof

Also Published As

Publication number Publication date
TW542868B (en) 2003-07-21
KR100755213B1 (en) 2007-09-04
CN100335729C (en) 2007-09-05
KR20030079657A (en) 2003-10-10
CN1448600A (en) 2003-10-15
JP4016130B2 (en) 2007-12-05
KR100695275B1 (en) 2007-03-14
JP2003293538A (en) 2003-10-15

Similar Documents

Publication Publication Date Title
KR100755213B1 (en) Connector and stair assembly
US20060260238A1 (en) Refinement to the construction systems for structures in reinforced concrete or some other material of high-precision intergral modular forms
US7062885B1 (en) Foundation wall, construction kit and method
WO2007011127A1 (en) Precast stairway system, unit structure thereof, and method of constructing stairway system using the same
KR20160039855A (en) Construction methods of precast concrete slab having its connection part being concealed by coupled ribs and, precast concrete slab used therefor
JP5725596B2 (en) Staircase structure and its construction method
KR100385012B1 (en) Prefabricated Structure
CN109441031B (en) Structure Liang Yincang type overhanging type open rotary stair structure and construction method thereof
JPH11200578A (en) Concrete assembling stair and constitution thereof
EP2588687A1 (en) Pre- fabricated module for forming a staircase
KR20070009061A (en) Simultaneous working type installation method for stair hall equipped prefabricated stair using pc form
KR100500306B1 (en) assembly type steel frame ladder of reinforcement concrete building and construction method thereof
JPH08312090A (en) Construction method of concrete stair with stepped form left, and stepped form
JP3421298B2 (en) Internal stairs for buildings and method of construction
KR200209599Y1 (en) A knockdown stairs mold
KR100464594B1 (en) The method of constructing the prefabricated step on reinforced concrete building
KR100501270B1 (en) Prefabricated form for stair hall
KR200288515Y1 (en) assembly type steel frame ladder of reinforcement concrete building
JPH01190866A (en) Stair made of concrete and building method thereof
KR200270297Y1 (en) A stairway mould
JP2004204508A (en) Construction method of staircase, and form for staircase
JP3634120B2 (en) Construction method of RC external staircase using precast corrugated board
JP2000352169A (en) Inner stair for building, its construction method and assembly jig for erection therefor
JPH0437153Y2 (en)
JPH0237466B2 (en)

Legal Events

Date Code Title Description
A107 Divisional application of patent
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120829

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20130829

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20140829

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20150828

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20160819

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20170803

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20180803

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20190802

Year of fee payment: 13