KR20060088086A - The assembly anchor bolt structure which is reclaimed in the fundamental infrastructure and it used fundamental infrastructure operation method - Google Patents

The assembly anchor bolt structure which is reclaimed in the fundamental infrastructure and it used fundamental infrastructure operation method Download PDF

Info

Publication number
KR20060088086A
KR20060088086A KR1020060055794A KR20060055794A KR20060088086A KR 20060088086 A KR20060088086 A KR 20060088086A KR 1020060055794 A KR1020060055794 A KR 1020060055794A KR 20060055794 A KR20060055794 A KR 20060055794A KR 20060088086 A KR20060088086 A KR 20060088086A
Authority
KR
South Korea
Prior art keywords
anchor bolt
coupling
concrete
foundation structure
coupled
Prior art date
Application number
KR1020060055794A
Other languages
Korean (ko)
Other versions
KR100774885B1 (en
Inventor
최순근
Original Assignee
주식회사 인근개발
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 인근개발 filed Critical 주식회사 인근개발
Priority to KR1020060055794A priority Critical patent/KR100774885B1/en
Publication of KR20060088086A publication Critical patent/KR20060088086A/en
Application granted granted Critical
Publication of KR100774885B1 publication Critical patent/KR100774885B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F8/00Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic
    • E01F8/0005Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic used in a wall type arrangement
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Foundations (AREA)

Abstract

본 발명은 방음벽을 설치하기 위해 타설되는 콘크리트 기초구조물의 앵커 볼트에 관한 것으로서, 더욱 상세하게는 몸체(11) 상단부에 나사부(12)를 형성하며 하단부에 절곡부(13)를 갖는 앵커 볼트(10)를 형성하고, 상기 앵커 볼트(10) 상단 나사부(12)에 커플링(20)을 결합시켜 콘크리트 기초구조물(1)에 매립 설치되도록 구성된 것으로서, 본 발명은 자동 콘크리트 타설기로 방호벽 또는 방음벽 등의 콘크리트 기초구조물을 성형하기 위해 타설시 콘크리트 기초구조물에 설치되는 앵커 볼트에 방해를 받지 않도록 매설시켜 자동콘크리트타설기의 작업효율을 증진시키는 동시에 기초구조물 상부에 설치되는 구조물을 연결 지지하는 연결봉을 커플링에 간단 용이하게 결합할 수 있도록 된 방음벽 구조물 조립 앵커 볼트 구조에 관한 것이다.The present invention relates to an anchor bolt of a concrete foundation structure that is poured in order to install a soundproof wall, and more particularly, an anchor bolt (10) having a threaded portion (12) at the upper end of the body (11) and having a bent portion (13) at the lower end. ) And coupled to the anchor bolt 10, the upper threaded portion 12, coupled to the coupling 20 to be embedded in the concrete foundation 1, the present invention is an automatic concrete pourer such as a firewall or soundproof wall Coupling connecting rods to support the structure installed on the upper part of the foundation while enhancing the work efficiency of the automatic concrete placing machine by embedding it so as not to be disturbed by anchor bolts installed on the concrete foundation when pouring the concrete to form the concrete foundation. The present invention relates to an anchor bolt structure for assembling a soundproof wall structure that can be easily and easily coupled to a wall.

앵커 볼트, 커플링, 방음벽, 방호벽, 기초구조물 Anchor bolts, couplings, soundproof walls, barriers, foundations  

Description

기초구조물에 매립되는 조립식 앵커 볼트 구조 및 이를 이용한 기초구조물 시공방법{The assembly anchor bolt structure which is reclaimed in the fundamental infrastructure and It used fundamental infrastructure operation method}The assembly anchor bolt structure which is reclaimed in the fundamental infrastructure and It used fundamental infrastructure operation method}

도 1은 본 발명의 앵커볼트 조립구성과 커플링의 분리 사시도.1 is an exploded perspective view of the anchor bolt assembly and the coupling of the present invention.

도 2는 본 발명의 앵커 볼트와 연결봉의 결합상태 사시도.Figure 2 is a perspective view of the coupling state of the anchor bolt and the connecting rod of the present invention.

도 3은 본 발명의 기초구조물 타설시 앵커 볼트를 설치설치한 상태의 단면도. Figure 3 is a cross-sectional view of the installation state anchor bolt when installing the foundation structure of the present invention.

도 4는 본 발명의 앵커 볼트를 이용하여 기초구조물 상부에 구조물이 설치된 상태를 나타낸 단면도.Figure 4 is a cross-sectional view showing a state in which the structure is installed on top of the foundation structure using the anchor bolt of the present invention.

도 5는 본 발명의 앵커 볼트를 이용하여 기초구조물 상부에 구조물이 설치된 상태의 사시도. Figure 5 is a perspective view of a structure installed on top of the base structure using the anchor bolt of the present invention.

도 6은 본 발명의 기초구조물에 매립되는 조립식 앵커 볼트를 이용한 기초구조물 시공방법을 나타낸 공정도.Figure 6 is a process diagram showing the construction method of the foundation structure using the prefabricated anchor bolt embedded in the foundation structure of the present invention.

<도면의 주요 부분에 대한 부호 설명><Description of the symbols for the main parts of the drawings>

1:기초구조물 10:앵커볼트1: Foundation Structure 10: Anchor Bolt

11:몸체 12:나사부11: body 12: screw

13:절곡부 20:커플링13: Bend 20: Coupling

30:마감부재 40:철근골조30: finishing member 40: steel frame

50:연결봉 60:결속봉50: connecting rod 60: binding rod

70:구조물70: Structure

본 발명은 방음벽, 방호벽, 중앙분리대 등을 설치하기 위해 타설되는 콘크리트 기초구조물의 앵커 볼트에 관한 것으로서, 더욱 상세하게는 방음벽 기초 구조물를 자동콘크리트 타설기로 타설시 기초구조물에 설치되는 앵커 볼트에 의해 자동콘크리트 타설기가 방해받지 않도록 앵커 볼트가 기초구조물 상단면과 동일한 깊이로 매설되도록 하되 기초 구조물를 설치한 후 방음벽 등의 구조물을 간단 용이하게 설치할 수 있도록 앵커볼트 상단에 결합된 커플링에 연결봉을 결합할 수 있도록 하는 동시에 앵커 볼트를 이용하여 기초구조물의 시공방법을 제공함으로 더욱 더 안전하고 빠른 시공을 할 수 있도록 한 기초구조물에 매립되는 조립식 앵커볼트 구조 및 이를 이용한 기초구조물 시공방법에 관한 것이다.The present invention relates to an anchor bolt of a concrete foundation structure to be installed to install a soundproof wall, a protective wall, a central separator, and more particularly, by auto-concrete by anchor bolts installed on the foundation structure when the soundproof wall foundation structure is installed with an automatic concrete placing machine. The anchor bolt should be buried at the same depth as the upper surface of the foundation structure so that the pourer is not obstructed, but after installing the foundation structure, the connecting rod can be coupled to the coupling coupled to the top of the anchor bolt to easily install the structure such as the soundproof wall. At the same time, the present invention relates to a prefabricated anchor bolt structure that is embedded in the foundation structure to provide a construction method of the foundation structure using anchor bolts to allow a safer and faster construction, and the construction method of the foundation structure using the same.

종래에는 도로에 설치되는 방음벽 기초구조물 또는 도로의 낭떠러지에 설치 되는 낙하방지 구조물을 설치시 공사현장에 철근 골조와 거푸집을 설치한 후 콘크리트를 타설시켜 양생한 후 필요에 따라서 콘크리트 기초구조물 상부에 방음벽 등의 구조물을 설치하였다.Conventionally, when installing the soundproof wall foundation structure installed on the road or the drop prevention structure installed on the cliff of the road, reinforcement frames and formwork are installed at the construction site, and concrete is poured to cure the soundproof wall on the concrete foundation structure as needed. The structure of was installed.

이때 콘크리트 기초구조물 상부에 구조물을 설치하기 위해서는 기초 구조물를 성형시 거푸집 내부의 철근골조에 앵커 볼트를 고정시켜 나사부가 기초구조물 상부로 튀어나오도록 하여 상부에 방음벽, 기드레일 등의 구조물을 설치시 콘크리트 기초구조물에 고정시 킬 수 있도록 하였다.At this time, in order to install the structure on the upper part of the concrete foundation structure, anchor bolts are fixed to the reinforcing frame inside the formwork when forming the foundation structure so that the screw portion protrudes to the upper part of the foundation structure. It can be fixed to the structure.

그러나 이러한 콘크리트 기초구조물 타설 방법은 사람이 작업하는 노동집약적 시공방법으로서 많은 인력과 시간 등이 필요하게 되므로 공사비용과 공사기간이 많이 소요될 뿐만 아니라 작업할 사람을 구할 수 없는 것이 큰 문제점이었다. However, this concrete foundation structure placing method is a labor-intensive construction method that requires a lot of manpower and time, so that the construction cost and construction period takes a lot of time, it was a big problem to not be able to find people to work.

따라서, 이와 같이 자동으로 콘크리트를 타설 시켜 도로의 중앙분리대, 낙하방지 방호벽, 방음벽 등의 콘크리트 기초 구조물를 성형하고 있으나 이러한 자동 콘크리트 타설기는 콘크리트 상부로 튀어나오는 철근 또는 앵커 볼트에 의해 방해를 받게 됨으로 작업이 불가능하게 되는 문제점이 있다.Therefore, the concrete is automatically casted to form concrete foundation structures such as road dividers, fall prevention barriers, and soundproof walls, but such automatic concrete pouring machines are disturbed by reinforcing bars or anchor bolts protruding into the concrete. There is a problem that becomes impossible.

본 발명은 이와 같은 문제점을 해결하기 위한 것으로서, 앵커볼트 상단에 나사부를 형성하여 커플링을 결합시킨 후 스폰지 또는 스치로폼으로 커플링 상단부를 막아 콘크리트 기초구조물에 매립되도록 함으로서, 자동 콘크리트 타설기로 콘크리트 타설시 앵커 볼트에 의해 방해를 받지 않도록 하는 목적과 콘크리트 기초 구조 물를 설치한 후 앵커 볼트의 커플링에 연결봉을 결합시켜 방음벽, 중앙분리대, 광고 게시물 등의 구조물을 간단 용이하게 설치할 수 있도록 된 방음벽 구조물 조립 앵커볼트 구조를 제공할 수 있도록 함을 목적으로 한 것이다.The present invention is to solve such a problem, by forming a screw on the top of the anchor bolt to combine the coupling to prevent the top of the coupling with a sponge or styrofoam to be embedded in the concrete foundation structure, when the concrete is poured with an automatic concrete pourer Soundproof wall structure assembly anchor that can be easily installed soundproof wall, median divider, advertising posts by connecting connecting rod to coupling of anchor bolt after installing concrete foundation structure The purpose is to provide a bolt structure.

이하 본 발명을 상세히 설명하면 다음과 같다.Hereinafter, the present invention will be described in detail.

몸체(11) 상단부에 나사부(12)를 형성하며 하단부에 절곡부(13)를 갖는 앵커 볼트(10)를 형성하고, 상기 앵커볼트(10) 상단 나사부(12)에 마감부재(30)를 갖는 커플링(20)을 결합시켜 콘크리트 기초구조물(1)에 매립 설치되도록 구성된다.Anchor bolt 10 having a bent portion 13 is formed at the lower end and the threaded portion 12 is formed at the upper end of the body 11, and the finishing member 30 is formed at the upper threaded portion 12 of the anchor bolt 10. Coupled to the coupling 20 is configured to be embedded in the concrete foundation (1).

상기 앵커 볼트는 다수 개를 몸체(11)의 일측에 결속봉(60)으로 고정시켜 콘크리트 기초구조물(1)에 설치되도록 구성된다.The anchor bolt is configured to be fixed to the concrete foundation structure (1) by fixing a plurality of binding rods 60 to one side of the body (11).

상기 앵커 볼트는 콘크리트 기초구조물(1) 내의 철근골조(40)에 고정되도록 설치한 구성이다.The anchor bolt is installed to be fixed to the reinforcement frame 40 in the concrete foundation structure (1).

상기 커플링 상단부에 끼워지는 마감부재(30)는 스폰지, 경량합성수지, 스치로폼 중 어느 하나로 이루어진 구성이다.The finishing member 30 fitted to the upper end of the coupling is configured of any one of a sponge, a lightweight synthetic resin, and styrofoam.

이와 같이구성된 본 발명의 기초구조물에 매립되는 조립식 앵카볼트 구조에 의한 조립식 앵커볼트 구조를 이용한 기초구조물 시공방법을 설명하면 다음과 같다.The construction method of the basic structure using the prefabricated anchor bolt structure by the prefabricated anchor bolt structure embedded in the base structure of the present invention configured as described above is as follows.

콘크리트를 타설하여 기초구조물을 시공하는 방법에 있어서,In the method of constructing the foundation structure by pouring concrete,

기초구조물을 설치할 위치를 선정하고 철근을 배근한 후 준비된 앵커 볼트를 차후 설치되는 방음벽, 휀스, 차광판 등의 구조물을 고정할 수 있는 소정의 위치에 일치하도록 배근된 철근에 고정하는 단계와; Selecting a position to install the basic structure and fixing the reinforcing bars and fixing the prepared anchor bolts to the reinforcing bars so as to correspond to predetermined positions to fix structures such as soundproof walls, fences, and light shielding plates to be installed later;

철근에 고정된 앵커볼트 상부의 연결봉을 결합할 수 있도록 앵커볼트 나사부에 커플링을 결합하는 단계와;Coupling a coupling to the anchor bolt threaded portion so as to couple the connecting rod of the upper anchor bolt fixed to the rebar;

앵커볼트 나사부에 결합된 커플링 상부 구멍으로 콘크리트가 유입되지 않도록 스폰지, 스치로폼 중 어느 하나로 이루어진 마감부재로 막는 단계;Blocking with a finishing member made of any one of sponge, styrofoam so that concrete does not flow into the coupling upper hole coupled to the anchor bolt screw;

자동콘크리트 타설기로 기초 구조물이 성형될 수 있도록 콘크리트를 연속적으로 타설하는 단계;Continuously placing concrete so that the foundation structure can be molded by an automatic concrete placing machine;

기초 구조물을 성형 후 완전히 양생된 다음 커플링 상부 구멍을 막은 마감부재를 제거하고 연결봉을 결합하는 단계;Completely curing after forming the foundation structure, and then removing the closing member blocking the coupling upper hole and coupling the connecting rod;

커플링에 결합된 연결봉을 이용하여 방음벽, 휀스, 차광판 등의 구조물을 설치하는 단계로 조립식 앵커볼트 구조를 이용한 기초구조물 시공방법이 이루어진다.Using the connecting rod coupled to the coupling step of installing a structure, such as soundproof walls, fences, light shielding plate, the construction method of the basic structure using a prefabricated anchor bolt structure is made.

이와 같이 구성된 본 발명을 구체적으로 설명하면 다음과 같다.The present invention configured as described above is described in detail.

먼저, 소정의 길이를 갖는 앵커 볼트(10)의 몸체(11) 상단부에 나사부(12)를 형성하고 그 하단부는 절곡부(13)를 형성하여 기초구조물이 설치되는 시공 현장의 조건에 알맞은 앵커 볼트(10)를 미리 제작하여 준비한다.First, the threaded portion 12 is formed at the upper end of the body 11 of the anchor bolt 10 having a predetermined length and the lower end is formed with a bent portion 13 so that the anchor bolt suitable for the conditions of the construction site where the basic structure is installed Prepare and prepare (10) beforehand.

상기 앵커 볼트(10)가 준비되면 기초구조물(1)이 설치되는 위치에 기초구조물에 알맞은 철근을 배근한다.When the anchor bolt 10 is prepared to reinforce the reinforcing bar suitable for the foundation structure at the position where the foundation structure (1) is installed.

상기와 같이 기초구조물을 지지할 수 있는 철근을 배근한 후에는 준비된 앵커 볼트(10)를 배근된 철근에 고정하고, 앵커 볼트(10)의 몸체(11) 상단부에 형성 된 나사부(12)에는 커플링(10)을 결합한다. After reinforcing the reinforcing bar that can support the basic structure as described above, the prepared anchor bolt 10 is fixed to the reinforcing bar, and the screw portion 12 formed in the upper end of the body 11 of the anchor bolt 10 couples Engage ring 10.

상기 커플링(10)은 앵커 볼트의 나사부(12)에 전체길이의 1/2만 끼워지도록 결합한 후 상단부 구멍은 스폰지 또는 스치로폼재로 이루어진 마감부재(30)로 콘크리트가 유입되지 않도록 막는다.The coupling 10 is coupled to the threaded portion 12 of the anchor bolt so that only half of the total length is fitted, and the upper end hole prevents concrete from flowing into the finishing member 30 made of sponge or styrofoam material.

상기와 같이 앵커 볼트(10)의 상부 구멍을 마감부재로 막은 다음 자동콘크리트 타설기로 철근골조에 콘크리트를 타설시켜 기초콘크리트를 성형한다.As described above, the upper hole of the anchor bolt 10 is blocked with a finishing member, and then the concrete is poured into the reinforcing steel frame by the automatic concrete pouring machine to form the foundation concrete.

이때 성형된 콘크리트 기초구조물(1)의 상면과 내부에 매립되는 앵커 볼트(10)의 상면이 동일선상 위치되도록 설치된다. 상기 철근골조(40)에 설치된 앵커 볼트(10)는 콘크리트 기초구조물 상단 외면으로 돌출되는 경우에는 자동콘크리트 타설기의 콘크리트 타설 작업을 방해하게 되고 기계의 오동작이 발생함으로써 앵커 볼트(10)는 타설되는 콘크리트 기초구조물(1) 상단부와 동일선상에 위치하도록 한다.At this time, the upper surface of the molded concrete foundation structure (1) and the upper surface of the anchor bolt (10) embedded in the interior is installed to be located in the same line. When the anchor bolt 10 installed in the reinforcing frame 40 protrudes to the outer surface of the upper end of the concrete foundation structure, the concrete placing work of the automatic concrete placing machine is hindered and the malfunction of the machine occurs, thereby causing the anchor bolt 10 to be poured. It is located on the same line as the upper end of the concrete foundation structure (1).

상기 자동콘크리트 타설기는 통상적으로 설치되는 자동화 기계로서 현대에는 토목 건축 작업이 중노동인 관계로 사람들이 작업을 기피함으로 건설 현장의 작업자들이 부족함에 따라서 도로의 낭떠러지 부분에 설치되는 방호벽, 중앙분리대, 방음벽 등의 콘크리트 기초구조물(1)는 자동 콘크리트 타설기로 일부의 시공이 이루어지고 있다.The automatic concrete pourer is an automated machine that is usually installed as a construction work in modern times due to heavy labor, people do not work because the lack of workers on the construction site, the barriers, central separators, sound barriers, etc. The concrete foundation structure (1) is part of the construction is done by automatic concrete pouring.

따라서 본 발명은 상기 자동 콘크리트 타설기로 방음벽 또는 휀스, 차광막 등의 구조물(70)을 설치하기 위해 지반에 소정의 형상으로 성형되도록 콘크리트 기초구조물(1)을 타설하게 되며, 콘크리트 타설시 별도의 거푸집은 사용하지 않고 타 설기에 설치된 성형틀에 의해 거푸집 대용으로 사용된다.  Therefore, the present invention is to cast the concrete foundation structure (1) to be molded in a predetermined shape on the ground in order to install the structure 70, such as soundproof walls or fences, light shielding film with the automatic concrete pourer, when a separate formwork It is used as a substitute for the formwork by the molding die installed in the pouring machine without using it.

또한, 기초구조물의 내부에는 통상의 철근골조가 형성되며 철근골조는 콘크리트 내부에 깊숙하게 매립되므로 자동콘크리트 타설기에 방해가 되지 않게 되나 기초구조물(1) 위에 설치되는 방음벽, 휀스, 차관막 등의 구조물(70)을 설치하기 위해서는 앵커 볼트(10)를 반드시 설치해야 하며 앵커 볼트(10)가 기초구조물 상부로 돌출될 경우 자동콘크리트 타설기의 작동에 방해가 되므로 앵커 볼트는 콘크리트 기초구조물 상단부와 동일 높이로 매설되도록 설치한다.In addition, a normal reinforcing frame is formed inside the foundation structure, and since the reinforcing frame is embedded deep inside the concrete, it does not interfere with the automatic concrete placing machine, but is a structure such as soundproof walls, fences, and shields installed on the foundation structure (1). In order to install 70, the anchor bolt 10 must be installed. When the anchor bolt 10 protrudes to the upper part of the foundation structure, the anchor bolt is the same height as the upper part of the concrete foundation structure because it hinders the operation of the automatic concrete placing machine. Install to be buried.

상기와 같이 콘크리트 기초구조물(1)에 매립되도록 설치되는 앵커 볼트(10)는 차후 설치되는 구조물과의 연결이 용이하도록 연결봉(50)을 결합하기 위해 앵커볼트(10) 몸체(11)의 나사부에 커플링(20)이 결합된 상태이며, 상기 커플링은 콘크리트 기초구조물 내부에 매립시 커플링 구멍으로 콘크리트가 유입될 경우 연결봉(50)을 결합할 수 없게 되므로 커플링(20) 상단 구멍에는 스폰지, 경량 합성수지, 스치로폼과 같은 마감부재(30)을 끼워 커플링 내부로 콘크리트가 유입되지 않도록 하고 마감부재는 커플링(20) 상부로 돌출되더라도 자동콘크리트 타설기의 작동에는 방해하지 않게 된다. As described above, the anchor bolt 10 installed to be embedded in the concrete foundation structure 1 has a screw portion of the anchor bolt 10 body 11 to couple the connecting rod 50 to facilitate connection with the structure to be installed later. Coupling 20 is in a coupled state, the coupling is when the concrete is introduced into the coupling hole when the inside of the concrete foundation structure can not be coupled to the connecting rod 50, so the sponge in the upper hole of the coupling 20 To prevent the concrete from flowing into the coupling by fitting the finishing member 30, such as lightweight synthetic resin and styrofoam, the finishing member does not interfere with the operation of the automatic concrete placing machine even when the coupling 20 is protruded upward.

따라서 콘크리트를 타설한 다음 양생 후 커플링에 끼워진 스폰지, 스치로폼 등의 마감부재를 빼낸 후 연결봉(50)을 커플링(20)에 결합시켜 기초구조물(1) 상단에 설치되는 방음벽, 휀스, 차광막 등의 구조물(70)을 지지하는 연결봉(50)으로 사용할 수 있다.Therefore, after pouring concrete and removing the finishing members such as sponge, styrofoam, etc. inserted in the coupling after curing, the coupling rod 50 is coupled to the coupling 20, the soundproof wall, fence, light shielding film, etc. installed on the top of the foundation structure (1) Can be used as a connecting rod 50 to support the structure 70.

상기 기초구조물(1) 상부로 돌출되도록 설치되는 연결봉(50)은 하단부에 커 플링과 나사결합될 수 있도록 나사부가 형성되고, 상단부는 구조물에 따라서 너트를 끼워 조립할 경우에는 볼트로 형성하고 또는 나사부를 형성하지 않고 콘크리트 타설시 배근되는 철근골조와 연결하는 기초골조로 사용할 수 있게 된다.The connecting rod 50 installed to protrude to the upper portion of the foundation structure 1 has a screw portion formed to be coupled with the coupling at the lower end, and the upper end is formed of a bolt when the nut is assembled according to the structure, or the screw portion It can be used as a base frame to connect with the reinforcing bar reinforced when the concrete is poured without forming.

이하 첨부도면에 의거하여 본 발명의 실시 예를 상세히 설명하면 다음과 같다. Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명의 앵커볼트 조립구성과 커플링의 분리 사시도 로서, 앵커볼트 상단 나사부(12)에 커플링(20)을 결합한 후 4개의 앵커 볼트(10)를 결속봉(60)으로 고정한 것이다.1 is an exploded perspective view of the anchor bolt assembly and the coupling of the present invention, after coupling the coupling 20 to the anchor bolt upper threaded portion 12 is fixed to the four anchor bolts 10 by the binding rod 60. .

상기 도1과 같이 다수의 앵커 볼트를 결속봉으로 결합하고 상단 나사부에 커플링이 결합된 상태로 기초구조물(1) 내부에 매립설치된다. 물론 이때에는 커플링 상단부에 스폰지, 스치로폼 등으로 된 마감부재(30)가 끼워져 콘크리트가 유입되지 않도록 된다.As shown in FIG. 1, a plurality of anchor bolts are coupled to each other by a binding rod and embedded in the base structure 1 in a state in which a coupling is coupled to the upper threaded portion. Of course, at this time, the finishing member 30 made of sponge, styrofoam, etc. is inserted into the coupling upper end so that concrete does not flow.

상기 도1에 도시된 앵커 볼트는 실시 예를 나타낸 것으로서 반드시 결속봉(60)을 사용하여 4개를 하나의 구성으로 묶는 것은 아니며, 공사 현장의 싱황과 조건 또는 기초구조물 상부에 설치되는 구조물(70)의 구성에 따라서 달리할 수 있다. The anchor bolt shown in FIG. 1 shows an embodiment, and does not necessarily bind four to one configuration using the binding rod 60, and the structure 70 is installed on the construction site and the top of the foundation or condition of the construction site. ) May vary depending on the configuration.

도 2는 본 발명의 앵커 볼트와 연결봉의 결합상태 사시도로서, 도 2는 실시 예를 도시한 것으로 다수의 앵커 볼트가 결속봉(60)으로 결속되고 상단부는 커플링(20)이 결합되며 커플링 상단에는 연결봉(50)이 결합된 상태를 예시한 것이다.Figure 2 is a perspective view of the coupling state of the anchor bolt and the connecting rod of the present invention, Figure 2 shows an embodiment as a plurality of anchor bolts are bound by the binding rod 60 and the upper end coupling 20 is coupled to the coupling The top is an example of a state in which the connecting rod 50 is coupled.

도 3은 본 발명의 기초구조물 타설시 앵커 볼트를 설치한 상태를 나타낸 단 면도로서, 다수의 앵커 볼트(10)를 결속봉(60)으로 고정하고 상단부에 커플링(20)을 결합하되 커플링 상부는 원형 스틱형상의 스폰지 또는 스티로폼으로 된 마감부재(30)를 끼운 상태에서 콘크리트를 타설한 것이다. 상기 콘크리트가 타설된 후에는 콘크리트가 양생 된 다음에는 커플링 상단에 끼워진 스치로폼 등의 마감부재(30)를 빼낸 다음 연결봉을 결합하게 되는데, 이때 커플링 상단에 끼워진 마감부재(30)가 빠지지 않을 경우 불로 태우면 마감부재(30)는 쉽게 녹아 연결봉(50)을 커플링(20)에 결합할 수 있게 된다.Figure 3 is a stage showing the state in which the anchor bolt is installed when the foundation of the present invention, a plurality of anchor bolts 10 fixed by the binding rod 60 and the coupling 20 coupled to the upper end coupling The upper part is poured concrete in the state of sandwiching the finishing member 30 made of a sponge or styrofoam of the circular stick shape. After the concrete is poured, after the concrete is cured, the finishing member 30, such as a styrofoam fitted on the coupling top, is pulled out, and then the connecting rod is coupled. At this time, when the finishing member 30 fitted on the coupling top is not pulled out. When burned, the finishing member 30 is easily melted so that the connecting rod 50 can be coupled to the coupling 20.

따라서 본 발명의 커플링에 끼워지는 마감부재(30)는 불로 태우면 단시간에 녹을 수 있는 재질을 사용하는 것이 바람직하다. Therefore, it is preferable that the finishing member 30 fitted to the coupling of the present invention uses a material that can be melted in a short time when burned with fire.

도 4는 본 발명의 앵커볼트를 이용하여 기초구조물 상부에 구조물이 설치된 상태를 나타낸 단면도이고, 도 5는 본 발명의 앵커 볼트를 이용하여 기초구조물 상부에 구조물이 설치된 상태의 사시도로서, 상기 도 3과 같이 앵커 볼트를 설치한 후 콘크리트를 타설하여 기초구조물(1)를 성형한 다음 커플링(20)에 끼워져 있는 마감부재(30)을 제거한다.Figure 4 is a cross-sectional view showing a state in which the structure is installed on the upper structure using the anchor bolt of the present invention, Figure 5 is a perspective view of the structure is installed on the upper structure using the anchor bolt of the present invention, Figure 3 After installing the anchor bolt as shown in the concrete to form the foundation (1) and then remove the finishing member 30 fitted to the coupling 20.

상기 커플링(20)에서 마감부재를 제거한 후에는 연결봉(50)을 결합시켜 연결봉이 기초구조물(1) 상부로 돌출되도록 하여 방음벽을 지지하는 철근골조(40)와 연결하여 사용한다. After removing the finishing member from the coupling 20, the connecting rod 50 is coupled to the connecting rod 50 so as to protrude to the upper portion of the basic structure (1) to be used in connection with the reinforcing frame 40 supporting the soundproof wall.

도 5는 본 발명의 앵커 볼트를 이용하여 기초구조물 상부에 구조물을 설치한 예시도로서, 앵커 볼트와 연결된 연결봉(50) 상단부에 볼트를 형성하여 구조물(70) 하단부에 연결봉 상단부를 끼워 너트로 고정한 것이다.5 is an exemplary view in which the structure is installed on the upper part of the foundation structure by using the anchor bolt of the present invention. A bolt is formed at the upper end of the connecting rod 50 connected to the anchor bolt, and the upper end of the connecting rod is fixed to the lower end of the structure 70 by a nut. will be.

본 발명은 콘크리트 기초구조물(1) 상부에 설치되는 구조물(70)의 조립 형태에 따라서 앵커 볼트의 커플링에 결합된 연결봉의 상단부를 나사부를 형성하거나 또는 나사부를 형성하지 않고 철근 골조로 사용할 수 있다.According to the present invention, the upper end of the connecting rod coupled to the coupling of the anchor bolt according to the assembly form of the structure 70 installed on the concrete foundation structure 1 may be used as a reinforcing frame without forming a thread or a thread. .

도 6은 본 발명의 기초구조물에 매립되는 조립식 앵커볼트를 이용한 기초구조물 시공방법을 나타낸 공정도로서,6 is a process chart showing a method for constructing a foundation structure using a prefabricated anchor bolt embedded in the foundation structure of the present invention.

기초구조물을 설치할 위치를 선정하고 철근을 배근한 후 준비된 앵커볼트를 차후 설치되는 방음벽, 휀스, 차광판 등의 구조물을 고정할 수 있는 소정의 위치에 일치하도록 배근된 철근에 고정하는 단계, 철근에 고정된 앵커볼트 상부의 연결봉을 결합할 수 있도록 앵커볼트 나사부에 커플링을 결합하는 단계, 상기 앵커볼트 나사부에 결합된 커플링 상부 구멍으로 콘크리트가 유입되지 않도록 스폰지, 스치로폼 중 어느 하나로 이루어진 마감부재로 막는 단계, 상기 자동콘크리트 타설기로 기초 구조물이 성형될 수 있도록 콘크리트를 연속적으로 타설하는 단계, 기초 구조물을 성형후 완전히 양생된 다음 커플링 상부 구멍을 막은 마감부재를 제거하고 연결봉을 결합하는 단계, 커플링에 결합된 연결봉을 이용하여 방음벽, 휀스, 차광판 등의 구조물을 설치하는 단계로 조립식 앵커볼트 구조를 이용한 기초구조물 시공방법에 대한 공정을 나타낸 것이다.After selecting the location to install the basic structure and reinforcing the reinforcing bar, fixing the prepared anchor bolt to the reinforcing bar to match the predetermined position to fix the structure of the soundproof wall, fence, light shielding plate, etc. which will be installed later Coupling the coupling to the anchor bolt threaded portion so as to couple the connecting rods of the upper anchor bolt, and preventing the concrete from flowing into the coupling upper hole coupled to the anchor bolt threaded portion with a finishing member made of sponge or styrofoam. Step, pouring concrete continuously so that the foundation structure can be formed by the automatic concrete pourer, completely cured after forming the foundation structure, then removing the closing member blocking the coupling upper hole and coupling the connecting rod, coupling Structures such as soundproof walls, fences, and light shielding plates PL shows the process on the base structure construction method using the prefabricated anchor bolt structure with steps.

이상에서 설명한 바와 같이 본 발명은 콘크리트 기초구조물 상부에 설치되는 구조물은 콘크리트 구조물, 플라스틱구조물, 목재구조물 등이 선택적으로 설치하여 방음벽, 휀스, 차광막, 기타 구조물 등으로 사용할 수 있게 된다. As described above, in the present invention, the structure installed on the concrete foundation structure may be selectively installed in a concrete structure, a plastic structure, a wooden structure, etc., and thus may be used as a soundproof wall, a fence, a light shielding film, and other structures.

이와 같이 된 본 발명은 자동 콘크리트 타설기로 방호벽 또는 방음벽 등의 콘크리트 기초 구조물를 타설시 앵커볼트를 콘크리트 기초구조물에 상면과 동일하게 매립시킴으로서, 자동 콘크리트 타설기로 앵커볼트에 방해받지 않으므로 지동콘크리트 타설기의 작업효율을 증진시키고 더불어 콘크리트 기초구조물 상부에 설치되는 구조물을 지지하기 위한 연결봉을 고정할 수 있도록 커플링이 구비되어 도로의 방음벽, 휀스, 차광막 등을 간단 용이하게 설치함으로써 공기를 단축하고 공사소요 비용을 절감할 수 있는 효과가 있다.The present invention thus achieved by embedding the anchor bolt to the concrete foundation structure in the same way as the upper surface when placing a concrete foundation structure such as a protective wall or soundproof wall with automatic concrete pourer, work of the mobile concrete pourer because it is not disturbed by the anchor bolt with the automatic concrete pourer Couplings are provided to enhance the efficiency and to secure the connecting rods for supporting the structures installed on the upper part of the concrete foundation, thereby easily installing road sound barriers, fences, and shading screens, thereby shortening air and reducing construction costs. There is a saving effect.

Claims (4)

몸체(11) 상단부에 나사부(12)를 형성하며 하단부에 절곡부(13)를 갖는 앵커 볼트(10)를 형성하고, 상기 앵커볼트(10) 상단 나사부(12)에 마감부재(30)가 구비된 커플링(20)을 결합시켜 콘크리트 기초구조물(1)에 매립 설치되도록 구성된 것을 특징으로 하는 기초구조물에 매립되는 조립식 앵커볼트 구조.A bolt 12 is formed at an upper end of the body 11, and an anchor bolt 10 having a bent part 13 is formed at a lower end of the body 11, and a closing member 30 is provided at the upper end of the anchor bolt 10. Prefabricated anchor bolt structure embedded in the foundation structure, characterized in that the coupling is coupled to the coupling 20 is installed to be embedded in the concrete foundation structure (1). 제1항에 있어서,The method of claim 1, 앵커 볼트는 다수 개를 몸체(11)의 일측에 결속봉(60)으로 고정시켜 콘크리트 기초구조물(1)에 설치되도록 구성된 것을 특징으로 하는 기초구조물에 매립되는 조립식 앵커볼트 구조.Anchor bolt is a prefabricated anchor bolt structure embedded in the foundation structure, characterized in that configured to be installed on the concrete foundation structure (1) by fixing a plurality of binding rods 60 on one side of the body (11). 제1항에 있어서,The method of claim 1, 마감부재는 스폰지, 스치로폼, 경량 합성수지, 고무재 중 어느 하나로 이루어져 앵커 볼트의 커플링에 끼워진 것을 특징으로 하는 기초구조물에 매립되는 조립식 앵커볼트 구조. Finishing member is made of any one of a sponge, styrofoam, lightweight synthetic resin, rubber material prefabricated anchor bolt structure embedded in the foundation structure, characterized in that it is fitted to the coupling of the anchor bolt. 기초구조물을 설치할 위치를 선정하고 철근을 배근하고 콘크리트를 타설시켜 성형하는 기초콘크리트 시공방법에 있어서,In the basic concrete construction method to select the position to install the foundation structure, reinforce the reinforcement and cast concrete to form 앵커 볼트의 몸체 상부에 나사부를 형성하고 하단부는 소정의 길이를 갖도록 절곡하여 앵커볼트를 형성하는 단계;Forming a screw portion on the upper portion of the body of the anchor bolt and bending the lower portion to have a predetermined length to form an anchor bolt; 준비된 앵커 볼트는 차후 설치되는 방음벽, 휀스, 차광판 중 어느 하나의 구조물을 고정할 수 있는 소정의 위치와 일치하도록 철근에 고정하는 단계; Fixing the anchor bolt is fixed to the reinforcement to match a predetermined position to fix any one structure of the soundproof wall, fence, light shielding plate to be installed later; 철근에 고정된 앵커볼트 상부에 연결봉을 결합할 수 있도록 앵카볼트 나사부에 커플링을 결합하는 단계; Coupling a coupling to an anchor bolt threaded portion so as to couple the connecting rod to the upper anchor bolt fixed to the rebar; 앵커볼트 나사부에 결합된 커플링 상부 구멍으로 콘크리트가 유입되지 않도록 스폰지, 스치로폼, 경량합성수지 중 어느 하나로 이루어진 마감부재로 막는 단계;Blocking with a finishing member made of any one of a sponge, styrofoam, lightweight synthetic resin so that concrete does not flow into the coupling upper hole coupled to the anchor bolt screw; 자동콘크리트 타설기로 기초 구조물이 성형될 수 있도록 콘크리트를 연속적으로 타설하는 단계;Continuously placing concrete so that the foundation structure can be molded by an automatic concrete placing machine; 기초 구조물을 성형 후 완전히 양생된 다음 커플링 상부 구멍을 막은 마감부재를 제거하고 연결봉을 결합하는 단계;Completely curing after forming the foundation structure, and then removing the closing member blocking the coupling upper hole and coupling the connecting rod; 커플링에 결합된 연결봉을 이용하여 구조물을 설치하는 단계로 이루어진 것을 특징으로 하는 기초구조물에 매립되는 조립식 앵커볼트를 이용한 기초구조물 시공방법.A method of constructing a foundation structure using a prefabricated anchor bolt embedded in the foundation structure characterized in that the step of installing the structure using a connecting rod coupled to the coupling.
KR1020060055794A 2006-06-21 2006-06-21 The assembly anchor bolt structure which is reclaimed in the fundamental infrastructure and It used fundamental infrastructure operation method KR100774885B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020060055794A KR100774885B1 (en) 2006-06-21 2006-06-21 The assembly anchor bolt structure which is reclaimed in the fundamental infrastructure and It used fundamental infrastructure operation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020060055794A KR100774885B1 (en) 2006-06-21 2006-06-21 The assembly anchor bolt structure which is reclaimed in the fundamental infrastructure and It used fundamental infrastructure operation method

Publications (2)

Publication Number Publication Date
KR20060088086A true KR20060088086A (en) 2006-08-03
KR100774885B1 KR100774885B1 (en) 2007-11-09

Family

ID=37176643

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060055794A KR100774885B1 (en) 2006-06-21 2006-06-21 The assembly anchor bolt structure which is reclaimed in the fundamental infrastructure and It used fundamental infrastructure operation method

Country Status (1)

Country Link
KR (1) KR100774885B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200448776Y1 (en) * 2009-08-27 2010-05-20 이진주 Post stone of a knockdown building
KR100967888B1 (en) * 2007-10-17 2010-07-05 주식회사 케이에스월드 Bridge Support
KR101036237B1 (en) * 2010-07-27 2011-05-20 주식회사 케이씨전자 Pillar device for street furniture with street environment improvement structure
CN107100190A (en) * 2017-05-17 2017-08-29 新奥泛能网络科技股份有限公司 The built-in fitting device poured applied to Equipment Foundations

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102646641B1 (en) * 2020-12-31 2024-03-12 (주)유창이앤씨 Anchor construction method for water proof sill of roof

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200263965Y1 (en) * 2001-11-19 2002-02-19 주식회사 한솔엔지니어링 Guidepost fixing apparatus utilizing steel pipe pile
KR100540928B1 (en) * 2003-11-05 2006-01-11 김연찬 method for manufacturing anchor bolt carrying out and an anchor bolt
KR20050121124A (en) * 2004-06-21 2005-12-26 정혁수 Anchor and anchor installation method for structure installation
KR200391765Y1 (en) * 2005-05-25 2005-08-08 세화산업(주) A anchor bolt and assembly thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100967888B1 (en) * 2007-10-17 2010-07-05 주식회사 케이에스월드 Bridge Support
KR200448776Y1 (en) * 2009-08-27 2010-05-20 이진주 Post stone of a knockdown building
KR101036237B1 (en) * 2010-07-27 2011-05-20 주식회사 케이씨전자 Pillar device for street furniture with street environment improvement structure
CN107100190A (en) * 2017-05-17 2017-08-29 新奥泛能网络科技股份有限公司 The built-in fitting device poured applied to Equipment Foundations

Also Published As

Publication number Publication date
KR100774885B1 (en) 2007-11-09

Similar Documents

Publication Publication Date Title
KR100748636B1 (en) Concrete pier having copping and constructing method therefor
KR20170014570A (en) Building Construction Method Using PC Wall With Foundation Structure
KR200435077Y1 (en) Hock Strut Assembly Structure and Foundation Lid
KR100774885B1 (en) The assembly anchor bolt structure which is reclaimed in the fundamental infrastructure and It used fundamental infrastructure operation method
KR101615200B1 (en) Splice Sleeve And Conclusion Method Thereof
KR101008386B1 (en) Noise barrier base structure using cast in concret pile method and it&#39;s constructing method
KR100648979B1 (en) FRP-Concrete Composite Structures Using the DoubleInner and Outer Hollow Typed Fiber Reinforced Polymer Pipe and the Construction Method Using the Same
KR101675441B1 (en) Integrated wall structure, form and manufacturing method for integrated wall structure
KR101912324B1 (en) screw pile and construction method of retaing wall
KR101027016B1 (en) Construction Method of Support Plate for Grating
KR200431156Y1 (en) Concrete Pier having Copping
KR101835094B1 (en) Wall structure using precast concrete panel and construction method thereof
KR100492469B1 (en) Storage tank structure and constructing method thereof
KR100645024B1 (en) a precast structure for pillar
KR101091600B1 (en) Precast form structure for gutter and construction method using the same
KR102150402B1 (en) Conduit trench for draining water of the underground building structure
JP2018123537A (en) Method of constructing mat foundation, tubular formwork and mat foundation structure
KR102120849B1 (en) Installation structure and method of precast concrete culvert
KR101482523B1 (en) Nodular Box Girder, and Nodular Box Girder Bridge and Constructing Method thereof
KR100612938B1 (en) A construction system of the wall/dome and the the method thereof it
KR200341018Y1 (en) A mold for drainage
KR200375997Y1 (en) a precast structure for pillar
KR20020015520A (en) A pillar constructing method for a bridge
KR101799237B1 (en) Method of manufacturing grounding stone for pillar fixed and grounding stone for pillar fixed produced by the same
KR200293483Y1 (en) Storage tank structure

Legal Events

Date Code Title Description
A201 Request for examination
G15R Request for early opening
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
G170 Publication of correction
FPAY Annual fee payment

Payment date: 20120201

Year of fee payment: 5

LAPS Lapse due to unpaid annual fee