KR20060017433A - Foundation well bucket and bridge new construction method of large bridge - Google Patents

Foundation well bucket and bridge new construction method of large bridge Download PDF

Info

Publication number
KR20060017433A
KR20060017433A KR1020040066105A KR20040066105A KR20060017433A KR 20060017433 A KR20060017433 A KR 20060017433A KR 1020040066105 A KR1020040066105 A KR 1020040066105A KR 20040066105 A KR20040066105 A KR 20040066105A KR 20060017433 A KR20060017433 A KR 20060017433A
Authority
KR
South Korea
Prior art keywords
frp
well
foundation
pier
fixed
Prior art date
Application number
KR1020040066105A
Other languages
Korean (ko)
Inventor
남궁락
Original Assignee
주식회사 준별에프알피산업
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 준별에프알피산업 filed Critical 주식회사 준별에프알피산업
Priority to KR1020040066105A priority Critical patent/KR20060017433A/en
Publication of KR20060017433A publication Critical patent/KR20060017433A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/18Foundations formed by making use of caissons

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Bridges Or Land Bridges (AREA)
  • Foundations (AREA)

Abstract

본 발명은 대형 교량 공사에 적용되는 교량 기초 우물통과 수중부의 교량 신설 공법에 관한 것으로 더 상세하게는 교각 구조물을 축조함에 있어서 수중이면서도 쉬트 파일(Sheet pile) 공사를 하지 않고 교량 기초 우물통의 FRP 특수틀을 연결 조정하여 가물막이가 되게 하고 기초 우물통 안 공기 중에서 교각 구조물을 축조하고 FRP 고정기초 우물통 내부를 무근 콘크리트를 타설한 후, FRP 해체 가물막이 특수틀을 해체하여 기초 우물통과 교각 구조물을 완벽하게 축조하는 공법이다.The present invention relates to a bridge foundation well bucket applied to a large bridge construction and a bridge construction method of an underwater part. More specifically, the FRP of a bridge foundation well bucket without underwater sheet pile construction in the construction of a bridge structure. Connect and adjust the special frame to become a clam, build a pier structure in the air in the foundation well, cast a plain concrete inside the FRP fixed foundation well, and then disassemble the special frame of the FRP dismantlement membrane to disassemble the foundation well and the pier structure. It is a construction method to build a perfect.

본 발명의 기초 우물통 및 교각 신설 공법은 FRP 고정기초 우물통을 설치 위치에 운반하고 파일(H-pile)을 기초 우물통 주위에 박고 파일(H-pile) 상단에 있는 현조장치(Frame,체인부력)를 통해 FRP 해체 가물막이 FRP 내,외벽판을 매달아 수직, 수평으로 플랜지 접합하여 수중으로 내린다. 하상에 묻히는 FRP 고정기초 우물통은 플랜지가 내부에 있는 FRP 내,외벽판을 제작하고 그 위에 위치한 FRP 해체 가물막이 특수틀은 플랜지가 외부에 있는 FRP 내,외벽판을 제작하고, 그 FRP내,외벽판의 사이에는 수직, 수평, 사행 앵글을 규칙적으로 부착하여 암반상에 정착하도록 FRP 고정기초 우물통을 제작하는 단계.The foundation wells and piers new construction method of the present invention carries the FRP fixed foundation wells to the installation position, and puts the pile (H-pile) around the foundation well, and the hanging device (Frame, chain) at the top of the pile (H-pile) Buoyancy) through the FRP dismantling cladding suspending the inner and outer wall plate of the FRP and flanges vertically and horizontally to lower it underwater. The FRP fixed foundation wells buried in the bottom fabricate the inner and outer wall plates of the FRP with the flanges inside, and the FRP dismantlement cladding special frames placed on the top make the inner and outer wall plates of the FRP with the flanges outside. A step of manufacturing the FRP fixed base well to fix on the rock by regularly attaching vertical, horizontal and meandering angles between the outer wall plates.

상기 FRP 고정기초 우물통을 시공 위치로 운반하며 FRP 고정기초 우물통 주변에 파일(H-pile)을 박고, 파일(H-pile)상단에 현조장치를 설치하고 FRP 내,외벽판을 계속 연결하여 수중으로 내린다. 이때 일정한 놀이틀 안에 물을 넣어 자중에 의하여 하상까지 내려가도록 유도한다. 이때 기초 우물통(고정+해체)이 하상에 안 착되면 FRP해체 가물막이 특수틀 상단에 재하중을 실어 기초 우물통이 부력에 의하여 부상하지 않게하고, 우물통안에 있는 물을 배제하고, FRP 고정 기초 우물통 틀안에 콘크리트를 타설하는 단계.The FRP fixed base well container is transported to the construction position, and a pile (H-pile) is put around the FRP fixed base well, and a hanging device is installed on the top of the pile (H-pile), and the inner and outer wall plates are continuously connected to the FRP. Get underwater At this time, water is put in a certain playground to induce it to descend to the riverbed by its own weight. At this time, if the foundation well (fixed + dismantled) is seated on the bottom, the FRP dismantling cladding loads the upper part of the special frame to prevent the foundation well from being floated by buoyancy, excluding water in the well, and fixing the FRP. Pouring concrete into the foundation well frame.

FRP 기초 우물통을 하상 밑 암반에 정착시키기 위하여 FRP 고정기초 우물통 내부를 크레인 백호(back hoe) 또는 크람셀을 사용하여 굴착하는 단계.Excavating the inside of the FRP anchorage well using a crane back hoe or a clam shell to fix the FRP foundation well into the bedrock.

상기 단계를 거쳐 FRP 고정기초 우물통을 암반상에 정착시킨 다음 FRP 고정기초 우물통 내부 바닥을 고른 다음 일정한 높이까지 불분리 수중 콘크리트를 타설하여 외부에서 물이 유입되지 않도록한다. 콘크리트 양생 후에 물을 퍼내고 FRP기초 우물통(고정+해체)안 공기중에서 교각을 축조하는 단계.After the above steps, the FRP fixed foundation wells are settled on the rock, and then, the bottom of the FRP fixed foundation wells is selected, and then the non-separated underwater concrete is poured to a certain height so that water does not flow in from the outside. After concrete curing, drain the water and build the pier in the air in the FRP base well (fixed + dismantled).

즉, FRP 고정 기초 우물통까지는 유로폼을 사용하고 양생 후에 유로폼을 해체한 후 FRP 고정기초 우물통 내부를 무근 콘크리트로 채우는 단계로 구축용 기초 우물통이 완료된다. 그 위에 FRP 해체 가물막이 특수틀 안에서 수면상까지는 교각 표면 보호를 위하여, FRP 특수틀 안에서 수면상까지는 교각 표면보호를 위하며, FRP 특수틀을 사용하여 교각을 축조하면 교각 콘크리트가 표면 보호가 되어 영구 구조물이 된다.That is, the foundation well is completed by using Euroform up to the FRP fixed foundation well and dismantling the Euroform after curing, and then filling the inside of the FRP fixed foundation well with plain concrete. In order to protect the pier surface from the surface of the pier in the special frame to the surface of the pier, and to protect the pier surface from the surface of the pier in the special frame of the FRP, when the pier is constructed using the special frame of the FRP, the pier concrete is surface protected and permanently It becomes a structure.

수면 위까지 교각축조가 완료되면 FRP 해체 가물막이 특수틀은 가물막이용이므로 해체하는 것을 특징으로 한다.When the pier construction is completed up to the surface of the water surface FRP dismantled special frame is characterized in that the dismantled because the use of the temporary film.

본 발명의 FRP 기초 우물통(고정+해체)은 내부가 FRP 내부벽판(101)으로 이루어지고 외부는 FRP 내부벽판과는 일정한 간격으로 떨어져 있는 FRP 외부벽판(102)으로 형성되어 FRP 기초 우물통의 단면 두께를 형성하게 하고, FRP 내부벽판의 외벽면을 따라 수직 방향으로 수직 앵글(103)이 설치되고, FRP 외부벽판의 내벽면을 따라 상기 FRP 내부벽판의 수직앵글과 대응되는 대칭적인 수직앵글(103)이 설치되며 FRP 내부벽판과 FRP 외부벽판 사이 두께공간으로는 수평 방향으로 규칙적으로 결합된 수평앵글(104)이 등 간격으로 설치되고 각각의 수평앵글의 간격을 따라 대각선 방향으로 향하는 사형앵글(105)를 설치하여 구성되며 사형앵글(105)과 수평앵글(104)이 접합되어 수직앵글(103)에 볼트로 고정되는 각각의 접선 고정부는 수직방향 기준으로 상호 교차점으로 형성되고 수직앵글(103)과 닿는 수평앵글(104)의 접촉면 사이에는 수직앵글(103)을 게재시켜 고정하게 된다.The FRP foundation well (fixed + dismantled) of the present invention is formed of an FRP inner wall plate (101) and the outside is formed of FRP outer wall plate (102) spaced apart at regular intervals from the FRP inner wall plate of the FRP foundation well A vertical angle 103 is installed in the vertical direction along the outer wall surface of the FRP inner wall plate, and a symmetrical vertical angle corresponding to the vertical angle of the FRP inner wall plate along the inner wall surface of the FRP inner wall board ( 103 is installed, and the horizontal space 104 regularly coupled in the horizontal direction is equally spaced in the thickness space between the FRP inner wall plate and the FRP outer wall plate, and the diagonal angles facing in the diagonal direction along the distance of each horizontal angle ( 105 and the tangent angle 105 and the horizontal angle 104 are joined to each other, and the tangential fixing portions that are bolted to the vertical angle 103 are formed as cross points with respect to the vertical direction. The vertical angle 103 is placed and fixed between the contact surfaces of the vertical angle 103 and the horizontal angle 104 in contact with each other.

이에 따라 대형 교량기초 우물통 및 교각(114)를 신설하는 경우에 수심이 깊은 곳에서는 교각(114)에 교각 FRP특수틀(116)을 부착하여 시공하므로서 안전성인 구조와 시공성이 뛰여나고 반영구 구조물로 유지관리 기능이 향상된다.Accordingly, when a large bridge foundation well and a pier 114 are newly established, the pier FRP special frame 116 is attached to the pier 114 in the depth of deep water so that the structure and workability are excellent and the semi-permanent structure. Maintenance function is improved.

파일(H-pile), FRP 고정기초 우물통, FRP해체 가물막이 특수틀, FRP 표면보호교각H-pile, FRP fixed foundation well, FRP dismantling special frame, FRP surface protection piers

Description

대형 교량의 기초 우물통 및 교각 신설 공법{omitted}Foundation wells and piers for large bridges

* 도 1은 본 발명에 따른 FRP 고정기초 우물통과 FRP해체 가물막이 특수틀* Figure 1 is a special frame of FRP fixed foundation well and FRP dismantling faucet in accordance with the present invention

a)는 평면도a) a top view

b)는 정면도b) front view

* 도 2는 본 발명에 따른 FRP 고정기초 우물통과 FRP 해체 가물막이 특수틀 설치 단면도* Figure 2 is a cross-sectional view of the installation of special frame of FRP fixed foundation well and FRP dismantling

* 도 3은 본 발명에 따른 FRP 고정기초 우물통과 FRP 해체 가물막이 특수틀 플랜지 접합 평면도* Figure 3 is a plan view of the FRP fixed foundation well and FRP dismantling faucet special frame flange joint according to the present invention

* 도 4는 본 발명에 따른 FRP 고정기초 우물통 내부 플랜지 접합 단면도* Figure 4 is a cross-sectional view of the FRP fixed foundation well inner flange joint according to the present invention

* 도 5는 본 발명에 따른 FRP 해체 가물막이 특수틀 외부 플랜지 접합 평면도* Figure 5 is a plan view of the outer flange joint of the special frame of FRP dismantlement seal according to the present invention

* 도 6은 본 발명에 따른 FRP 고정기초 우물통과 FRP 해체 가물막이 홈형강, 앵글 부착평면도* Figure 6 is a FRP fixed base well and FRP dismantling faucet grooved steel, angle attachment plan according to the present invention

* 도 7은 본 발명에 따른 FRP 고정기초 우물통, 홈형강, 앵글 부착 단면도* Figure 7 is a FRP fixed foundation well, grooved steel, angled sectional view according to the present invention

* 도 8은 본 발명에 따른 FRP 해체 가물막이 특수틀 홈형강, 앵글 부착 단면도* Figure 8 is a special frame grooved steel, angled sectional view of the FRP dismantled cladding according to the present invention

* 도 9는 본 발명에 따른 FRP 고정기초 우물통과 FRP 해체 가물막이 특수틀 홈형강, 앵글부착 상세 평면도* Figure 9 is a detailed plan view of the FRP fixed base well and FRP dismantled cladding special groove groove steel, angle

* 도 10은 본 발명에 따른 공사 완료 후 기초 우물통, 교각 단면도10 is a foundation well, pier cross-section after the completion of the construction according to the present invention

※ 도면의 중요 부분에 대한 부호의 설명※ Explanation of code about important part of drawing

101 : FRP 내부벽판 102 : FRP 외부벽판101: FRP inner wall board 102: FRP outer wall board

103 : 수직 앵글 104 : 수평 앵글103: vertical angle 104: horizontal angle

105 : 사형 앵글 106 : 볼트105: death angle 106: bolt

107 : 수평홈형강 108 : 수직홈형강107: horizontal grooved steel 108: vertical grooved steel

109 : 너트 110 : 파일 (H-pile)109: nut 110: pile (H-pile)

111 : 현조장치 112 : 내부형 플랜지111: stringing device 112: internal flange

113 : 외부형 플랜지 114 : 교각113: external flange 114: pier

115 : 유로폼 116 : 교각 FRP특수틀115: Euroform 116: Pier FRP special frame

117 : 물방위 FRP특수틀 118 : 무근 콘크리트117: water defense FRP special frame 118: plain concrete

119 : FRP 고정기초 우물통 120 : FRP 해체 가물막이 특수틀119: FRP fixed base well 120: FRP dismantled special curtain

121 : 불분리 수중 콘크리트 122 : 앵글 버팀대121: un-separated underwater concrete 122: angle brace

본 발명은 대형 교량 공사에 적용되는 교량의 기초우물통 신설공법에 관한 것으로 더 상세하게는 교각 구조물의 수중 산화와 타설 콘크리트 구조물의 부식 가속화 현상으로 인한 안전성 및 수질 오염 등과 관련되는 교량 기초 구조물의 구조 적 단점을 개선하고 수심이 깊은 곳에서도 별도로 쉬트 파일(sheet pile) 공사를 하지 않고 FRP 고정기초 우물통 상단에 FRP 해체 가물막이 특수틀을 수면상까지 연장하며 가물막이로 사용하고 해체하여 다시 사용할 수 있으며 공기중에서 교각 공사를 실시하는 공법과 그 시공용 기초 우물통을 제공하는 것이다. 교량 신설 공사의 시공은 도1과 같이 해체 가물막이 특수틀(120)을 조립하기 위해서 부분 FRP 특수틀을 현조장치(111)에 매달아 수직, 수평으로 플랜지로 연결 우물틀을 형성하고 수중 하상 바닥에 내려 놓은 다음 콘크리트를 타설하여 정통 굴착 방식에 따라 수면하상속에 설치하고 정통 내부 기초를 불분리 수중 콘크리트(121)를 타설 양성하고 물을 퍼낸 다음 교각을 설치하는 공법으로 시공되고 있다. 여기서 사용되는 우물통의 형태는 도2 와 같은 FRP 고정기초 우물통틀은 FRP 내,외부벽판의 플랜지가 안으로 되어 있고 FRP 해체 가물막이 특수틀은 FRP 내,외부벽판의 플랜지가 외부형으로 제작되고 수평홈형강(107), 수직홈형강(108)이 내재되어 있는 FRP 내부벽판(101)과 수평홈형강(107), 수직홈형강(108)이 내재되어 있는 FRP 외부벽판(102) 사이에는 앵글 버팀대(122)가 규칙적으로 설치되어 있고 FRP 내,외부벽판(101)(102) 사이에는 콘크리트 타설 공간으로 되어 있으며 구조적으로는 측압에 안전하도록 발명되었다.The present invention relates to a foundation well construction method of a bridge applied to a large bridge construction, and more specifically, the structure of a bridge foundation structure related to the safety and water pollution due to the oxidation of the bridge structure and the acceleration of corrosion of the cast concrete structure. It can improve the shortcomings and extend the special frame of the FRP dismantling clam on the top of the FRP fixed base well without using sheet pile construction even in the depth of water. It is to provide construction method to carry out bridge work in air and foundation well for the construction. In the construction of the bridge construction, as shown in Fig. 1, in order to assemble the dismantlement shield special frame 120, the special FRP special frame is hung on the hanging device 111 to form a well frame connecting the flange vertically and horizontally, After laying down concrete, the concrete is installed under the water surface in accordance with the orthodox excavation method. The shape of the wells used here is the FRP fixed foundation well frame as shown in Fig. 2 in which the flanges of the inner and outer wall plates are in FRP, and the special frames of the FRP dismantlement barriers are made of the flanges of the inner and outer wall plates in FRP. An angle is formed between the FRP inner wall plate 101 having the horizontal grooved steel 107 and the vertical grooved steel 108 and the FRP outer wall plate 102 having the horizontal grooved steel 107 and the vertical grooved steel 108 embedded therein. The brace 122 is regularly installed, and between the inner and outer wall plates 101 and 102 of the FRP is a concrete placing space and structurally invented to be safe to the side pressure.

우물통 속을 공기중으로 만들어 교각(114)을 시공하는 경우 기존 공법은 쉬트파일 가물막이 설치공사를 시행하고 본 공사를 시행하기 때문에 공사비가 과다하게 소요될 뿐만 아니라 공사기간이 길어 문제점이 있다.In the case of constructing the pier 114 by making the well in the air, the existing construction method performs the construction of the sheet pile clam, and this construction is not only excessively expensive, but also has a long construction period.

본 발명은 FRP 고정기초 우물통(119) 위에 FRP 해체 가물막이 특수틀(120)을 설치하여 공기중에서 교각(114) 공사를 시행하고 교각 FRP특수틀(116)을 교각 표면에 부착하여 시공하기 때문에 FRP 해체 가물막이 특수틀(120)을 해체한 후에도 수중 구조물이 부식되지 않는 기술로 발명되었다.Since the present invention is to install the special frame 120 of the FRP dismantling clamshell 120 on the FRP fixed base well 119, to carry out the construction of the pier 114 in the air and to attach the pier FRP special frame 116 to the pier surface construction FRP dismantling was invented by a technology that does not corrode the underwater structure even after dismantling the special frame (120).

따라서 본 발명의 목적은 우물통 속에서 교량의 교각을 만들기 위한 구조물인 우물통을 FRP틀로 제작하여 영구적인 구조물로 만드는 동시에 교각 시공을 공기 중에서 가능하도록 발명되었고 교각자체로 FRP틀로 표면보호가 되어 FRP 해체 가물막이 특수틀을 제거 후에도 교각도 영구적인 구조물이 된다.Therefore, the object of the present invention was to invent a permanent structure by making a well structure, which is a structure for making a bridge pier in a well barrel, into a permanent structure, and at the same time invented a bridge construction in the air. The pier also becomes a permanent structure after the demolition clam has removed the special frame.

이러한 목적을 달성하기 위한 본 발명의 특징은 내외부 거푸집을 임의의 공간과 간격을 두어 설치하고 그 거푸집에 마련된 공간과 간격 사이에 콘크리트를 타설하여 교량의 기초 교각을 시공하는 교량의 교각 시공 공법에 있어서 상기 교량의 교각 시공 공법은 FRP 고정기초 우물통은 안쪽으로 플랜지가 있는 FRP 내외벽판을 제작하고 그 FRP 내외벽판의 사이에는 수직, 수평, 사형 앵글을 규칙적으로 부착하여 교량의 FRP 기초 우물통을 제작하고 FRP 해체 가물막이 특수틀은 바깥쪽으로 플랜지가 있는 FRP 내, 외벽판을 제작하고 그 FRP 내, 외벽판의 사이에는 수직, 수평, 사형 앵글을 규칙적으로 부착하며 FRP 해체 가물막이 특수틀을 제작하는 단계.Features of the present invention for achieving this object is in the bridge construction method of the bridge to install the inner and outer formwork at any space and spaced apart from the space and spacing provided in the formwork to construct the foundation piers of the bridge In the bridge construction method of the bridge, FRP fixed foundation wells are manufactured with FRP inner and outer wall plates with flanges inward, and vertical, horizontal and sand angles are regularly attached between the FRP inner and outer wall plates to produce FRP foundation wells of bridges. The FRP dismantlement faucet special frame is to manufacture the outer wall plate inside the FRP with flanges to the outside, and the vertical, horizontal and sand angles are regularly attached between the FRP and the outer wall plate. step.

상기 FRP 고정기초 우물통을 시공위치인 파일(H-pile) 항타 장소로 운반하고 그 위에 FRP 해체 가물막이 특수틀을 현조장치에 의거 조립한 후 FRP 고정기초 우물통의 내부 공간에 콘크리트를 타설하는 단계.The FRP fixed base well is transported to the construction site of the pile (H-pile) driving place, and the FRP dismantlement barrier is assembled based on the suspension device, and concrete is then poured into the internal space of the FRP fixed base well. step.

상기 FRP 고정기초 우물통에 콘크리트 타설을 완료하고 FRP 고정기초 우물통 을 하상외 암반에 정착시키기 위해 기초 우물통 내부를 크레인 백호(back hoe) 및 크람셀을 사용하여 굴착하는 단계.Excavating the inside of the foundation well using a crane back hoe and the clam shell to complete the concrete casting in the FRP fixed foundation well and to fix the FRP fixed foundation well to the rock bed out of the lower bed.

상기 단계를 통해 FRP 기초우물통을 접착한 후 기초우물통 내부 기초부분을 불분리 수중콘크리트를 타설하는 단계.Adhering the FRP foundation well through the above step and pouring the water-disintegrated underwater concrete into the foundation part inside the foundation well.

상기 단계를 통해 불분리 수중콘크리트가 양생되면 물을 푸고 FRP 특수틀을 사용하여 교각(Pier)을 공기중에서 축조하여 콘크리트를 타설하고 양생후에는 FRP 고정기초 우물통 부분은 거푸집을 해체하고 FRP 해체 가물막이 특수틀 부분은 FRP 특수틀로 교각에 고정 표면 보호를 하게 하고 FRP 고정기초 우물통 내부를 콘크리트로 채우는 단계로 교각을 시공하는 것을 특징으로 한다.Through the above steps, when the undisintegrated underwater concrete is cured, the water is released and concrete is built by piercing the piers in the air using a special frame of FRP.After curing, the part of the FRP fixed foundation well is dismantled and the FRP dismantlement Membrane special frame part is the FRP special frame to provide a fixed surface protection to the pier, and the pier construction by filling the inside of the FRP fixed foundation wells with concrete.

본 발명의 특징은 내부틀과 외부틀로 구분하고 상기 내부틀과 외부틀 사이에 설치되어 틀의 보강과 측압에 대한 휨응력도에 안전하도록 FRP판넬 내부에 일정 간격으로 수평, 수직 홈 형강을 배열 FRP로 적층(Over lay)하고 콘크리트 타설 공간 확보를 위하여 다수의 앵글을 구비하여 상기 내부틀과 외부틀이 플랜지를 구비하는 교량의 교각 시공을 위한 기초 우물통에 있어서 상기 기초 우물통은 내부가 FRP 내부 벽판과는 일정한 간격으로 떨어져 있는 FRP 외부 벽판으로 구분되어 기초 우물통의 단면 두께를 형성하게 된다.The features of the present invention are divided into inner frame and outer frame and installed between the inner frame and the outer frame to arrange the horizontal and vertical grooves at regular intervals inside the FRP panel so as to be safe for bending stress against reinforcement and lateral pressure of the frame. In the foundation well for pier construction of bridges with overlays and a plurality of angles to secure concrete placing space, the inner frame and the outer frame is provided with a flange, the inside of the foundation well inside the FRP The wall plate is divided into FRP outer wall plates spaced at regular intervals to form the cross-sectional thickness of the foundation well.

상기 FRP내부 벽판의 수평방향, 수직방향으로 홈형강을 설치하고 FRP로 적층하여 합성구조로 만든다. 상기 FRP 내,외부 벽면의 안쪽 수직 홈형강과 수직 앵글이 용접되어 수직 앵글이 설치되며 상기 FRP 내부벽판과 FRP 외부벽판 사이 두께 공간으로는 수평방향으로 규칙적으로 결합된 수평 앵글이 동간격으로 설치되고 상 기 각각의 수평 앵글의 간격에 따라 대각선 방향으로 향하는 사형 앵글을 설치하여 구성되며 상기 사형 앵글과 수평 앵글이 만나 수직 앵글에 볼트로 고정되는 각각의 접선 고정부는 수직방향 기준으로 상호 교차적으로 형성되고 수직 앵글과 닿는 수평 앵글의 접촉면 사이에는 FRP판넬에 부착된 홈형강과 용접으로 고정한 것을 특징으로 한다.The grooved steel is installed in the horizontal and vertical directions of the inner wall plate of the FRP, and laminated with FRP to form a composite structure. The vertical angle is installed by welding the inner vertical grooved steel of the FRP inner and outer walls and the vertical angle, and the horizontal angles regularly connected in the horizontal direction are installed at equal intervals in the thickness space between the FRP inner wall plate and the FRP outer wall plate. Formed by installing a diagonal angle facing in the diagonal direction according to the interval of each horizontal angle, and the tangential fixing portion that is bolted to the vertical angle where the square angle and the horizontal angle is formed to cross each other on the basis of the vertical direction Between the contact surface of the vertical angle and the contact angle of the horizontal angle is characterized in that the grooved steel attached to the FRP panel and fixed by welding.

이렇게 교량의 교각을 시공하는데 있어서 FRP 기초 우물통을 사용하여 시공하면 기초 우물통의 콘크리트의 부식 및 세굴 현상을 방지할 수 있을 뿐만 아니라 유지보수의 이득을 함께 얻을 수 있으며 구조적으로는 FRP 기초 우물통이 시공성과 유지관리의 효율성 등을 제공받게되어 아주 경제적이다.The construction of bridge piers using FRP foundation wells not only prevents the corrosion and scour of the concrete in the foundation wells, but also provides the benefits of maintenance. It is very economical because it is provided with construction efficiency and efficiency of maintenance.

이하 본 발명의 실시 예를 도면을 참고로 설명하면 다음과 같다.Hereinafter, an embodiment of the present invention will be described with reference to the drawings.

도 1 a는 본 발명에 따른 FRP 고정기초 우물통과 FRP 해체 가물막이 특수틀의 평면도이고, 1 a is a plan view of the FRP fixed foundation well and the FRP dismantlement faucet special frame according to the present invention,

도 1 b는 정면도이다.1B is a front view.

도 2는 본 발명에 따른 FRP 고정기초 우물통과 FRP 해체 가물막이 특수틀 설치 단면도2 is a cross-sectional view of the installation of the special frame of the FRP fixed foundation well and FRP dismantling clam according to the present invention

도 3은 본 발명에 따른 FRP 고정기초 우물통과 FRP 해체 가물막이 특수틀 플랜지 접합 평면도Figure 3 is a plan view of the FRP fixed foundation well and FRP dismantlement cladding special frame flange joint according to the present invention

도 4는 본 발명에 따른 FRP 고정기초 우물통 내부 플랜지 접합 단면도Figure 4 is a cross-sectional view of the FRP fixed foundation well inner flange joint according to the present invention

도 5는 본 발명에 따른 FRP 해체 가물막이 특수틀 외부 플랜지 접합 단면도Figure 5 is a cross-sectional view of the FRP dismantled clamshell special flange outer flange in accordance with the present invention

도 6은 본 발명에 따른 FRP 고정기초 우물통과 FRP 해체 가물막이 홈형강, 앵글 부착 평면도Figure 6 is a FRP fixed foundation well and FRP dismantling faucet groove, angle attachment plan according to the present invention

도 7은 본 발명에 따른 FRP 고정기초 우물통 홈형강, 앵글 부착 단면도7 is a FRP fixed foundation well well grooved steel, angled sectional view according to the present invention

도 8은 본 발명에 따른 FRP 해체 가물막이 특수틀 홈형강, 앵글 부착 단면도Figure 8 is a special frame groove steel, angled sectional view of the FRP dismantling clamshell according to the present invention

도 9는 본 발명에 따른 FRP 고정기초 우물통과 FRP 해체 가물막이 특수틀 홈형강, 앵글부착 상세 평면도9 is a detailed plan view of the FRP fixed base well and the FRP dismantled cladding groove special steel, angled

도 10은 본 발명에 따른 공사 완료 후 기초 우물통 교각 단면도.10 is a cross-sectional view of the foundation well pier after completion of the construction according to the present invention.

본 발명의 FRP 기초 우물통(119)은 도 1에서 도 10과 같이 내부벽판과 외부벽판으로 구분되고 상기 내부벽판과 외부 벽판 자체에 홈형강이 설치되어 벽판의 축압에 대한 보강과 내부벽판과 외부벽판 사이에는 다수의 앵글을 규칙적으로 구비하여 내외벽을 튼튼하게 유격거리를 만들어 콘크리트를 타설할 수 있는 공간을 확보하고 상기 외부벽판과 내부벽판의 결합 해당 부분에는 플랜지로 결속한다.The FRP foundation well 119 of the present invention is divided into an inner wall plate and an outer wall plate as shown in FIG. 1 to 10, and groove-shaped steel is installed on the inner wall plate and the outer wall plate itself to reinforce the pressure of the wall plate and to the inner wall plate and the outside. Regularly provided with a plurality of angles between the wall plate to make a strong clearance distance between the inner and outer walls to secure a space for placing concrete and to bind the corresponding portion of the outer wall plate and the inner wall plate by a flange.

즉 내부가 FRP 내부벽판(101)으로 이루어지고 외부는 FRP 내부벽판(101)과는 일정한 간격으로 떨어져 있는 FRP 외부벽판(102)으로 구분되어 기초우물통의 단면 두께를 형성하고 FRP 판넬에 일정한 간격으로 FRP 판넬에 부착 수평 홈형강(107), FRP 판넬에 부착 수직 홈형강이 설치되어 콘크리트 측압이나 수압에 견딜 수 있도록 발명되었고 FRP 내부벽판(101)과 FRP 외부벽판(102)이 수직앵글(103)과 대응되는 대칭적인 수직앵글(103)이 설치되며 FRP 내부벽판(101)과 FRP 외부벽판(102)사이 두께 공간으로는 수평방향으로 규칙적으로 결합된 수평앵글(104)이 등간격으로 설치되고 각각의 수평앵글(104)의 간격을 따라 대각선 방향으로 향하는 사형앵글(105)을 설치하여 구성된다.That is, the inside is made of the FRP inner wall plate 101 and the outside is divided into the FRP outer wall plate 102 spaced apart at regular intervals from the FRP inner wall plate 101 to form the cross-sectional thickness of the foundation wells and the regular intervals on the FRP panel The horizontal grooved steel 107 attached to the FRP panel and the vertical grooved steel attached to the FRP panel were invented to withstand the concrete side pressure or the hydraulic pressure, and the FRP inner wall plate 101 and the FRP outer wall plate 102 were vertical angles 103 A symmetrical vertical angle 103 corresponding to) is installed, and horizontal angles 104 regularly coupled in the horizontal direction are installed at equal intervals in the thickness space between the FRP inner wall plate 101 and the FRP outer wall plate 102. It is configured by providing a square angle 105 facing in the diagonal direction along the interval of each horizontal angle (104).

또한 사형앵글(105)과 수평앵글(104)이 만나 수직앵글(103)에 볼트(106)로 고정되는 각각의 접선고정부는 수직방향 기준으로 상호 교차적으로 형성된고 수직앵글(103)과 닿는 수평앵글(104)의 접촉면 사이에는 FRP판넬 부착 수직 홈형강(108)에 용접하여 체결 고정되었다. 그리고 FRP 내,외부벽판(101)(102)과 수직앵글(103), 수평앵글(104), 사형앵글(105)의 적합한 결합방법은 볼트(106) 및 너트(109)에 의한 플랜지 결합방법이 적용된다.In addition, each tangential fixing part in which the square angle 105 and the horizontal angle 104 meet and are fixed to the vertical angle 103 by the bolts 106 is formed to cross each other on a vertical basis and horizontally contacts the vertical angle 103. Between the contact surfaces of the angle 104 was welded and fixed to the vertical grooved steel 108 with FRP panel. In addition, a suitable coupling method of the inner and outer wall plates 101 and 102, the vertical angle 103, the horizontal angle 104, and the square angle 105 in the FRP includes a flange coupling method using the bolt 106 and the nut 109. Apply.

FRP 고정부분 기초 우물통(119)과 FRP 해체부분 가물막이 특수틀을 사용하는 교각 시공 공법은 다음과 같다.Pier construction method using the FRP fixed part foundation well (119) and the FRP dismantling part cladding frame is as follows.

먼저 FRP 고정부분 기초 우물통(119)을 설명하면 플랜지가 FRP 내,외벽판(101)(102) 만나는 쪽에 오도록 제작하고 그 FRP 내,외벽판(101)(102)의 사이에는 수직, 수평, 사형 앵글을 규칙적으로 부착하여 FRP 해체부분 가물막이 특수틀(120)을 제작한다.First, the FRP fixing base foundation well 119 will be described so that the flange is located on the side where the inner wall plate (101, 102) meets the FRP, and the vertical, horizontal, between the inner wall plate (101, 102) of the FRP. Regularly attaches the sand-angle angle to produce a special frame 120 of the FRP dismantling part.

다음에는 FRP고정부분 기초우물통(119)을 조립하는 것을 설명하면 위에 방법으로 제작된 FRP 내,외부벽판(101)(102)을 현장으로 운반하여 현조장치(111)에 매달아 고정부분 기초 우물통(119)은 FRP 내,외부벽판 안에서 플랜지로 수직 연결하여 단을 만들고 단과 단을 수평 연결하여 하상에 내리고 위와 같은 방법을 반복하여 FRP 고정부분 기초 우물통(119)조립이 완료되면 FRP 해체부분 가물막이 특수틀(120)을 위와 같은 방법을 반복하여 외부형 플랜지 FRP 내,외벽판(101)(102)을 FRP 내,외벽판(101)(102) 밖에서 플랜지로 수직 연결하여 단을 만들고 단과 단 을 수평 연결하여 내리고 FRP 해체부분 가물막이 특수틀(120)을 조립한다. FRP 고정부분 기초 우물통(119)의 내부 공간에 콘크리트를 타설하는 단계.Next, when the assembly of the FRP fixed part foundation well 119 will be described, the inner and outer wall plates 101 and 102 of the FRP manufactured by the above method are transported to the site and hung on the hanging device 111 to fix the fixed part foundation well. 119 is a vertical connection with a flange in the inner and outer wall of the FRP to make a stage, and the stage and the stage is connected horizontally to the bottom and repeat the above method FRP fixed part foundation wells 119 when the assembly is completed FRP dismantlement part Membrane repeats the same method as above to form a step by vertically connecting the inner and outer wall plates 101 and 102 to the flange outside the FRP, outside the outer wall plates 101 and 102 to form a step. Lower the horizontal connection and assemble the special frame 120 of the FRP dismantling part. Placing concrete in the interior space of the FRP fixed part foundation well (119).

FRP 고정부분 기초 우물통(119)을 하상의 암반에 정착시키기 위해 기초 우물통 내부를 크레인 백호(back hoe) 및 크람셀을 사용하여 굴착하는 단계와 상기 단계를 통해 FRP 고정부분 기초 우물통(119)을 정착한 후 우물통 및 내부에 불분리 수중콘크리트를 타설하여 양생 후 물을 퍼내고 공기중에서 교각(Pier)을 설치하는데 FRP 고정부분 기초 우물통(119)까지는 해체용 거푸집을 사용하여 그 위부터는 수면 위까지 FRP 특수틀을 사용 부착시키며 교각(Pier)이 영구 구조물이 되도록하는 단계.Excavating the inside of the foundation well using a crane back hoe and a clam shell to fix the FRP fixing portion foundation well 119 to the bedrock of the lower bed and the FRP fixing portion foundation well 119 through the above steps. ) And then set up firewater and concrete in the well and inside to pour out the water after curing and install a pier in the air. From the surface to the surface using the FRP special frame to make the pier (Pier) permanent structure.

FRP 고정부분 기초 우물통(119)의 내부를 무근 콘크리트로 채우는 단계.Filling the inside of the FRP fixed part foundation well 119 with plain concrete.

마지막으로 FRP 해체부분 가물막이 특수틀(120)을 해체하는 단계로 교각을 시공한다.Finally, the construction of the piers in the step of dismantling the special frame 120 the FRP dismantling part.

따라서 교량의 수중 교각 시공을 위해 FRP 고정부분 기초우물통(119)을 사용하는 경우 종전과 같이 수중에서 구조물이 중성화로 인해 부식하는 일이 없고 FRP 해체부분 가물막이 특수틀(120)을 사용하므로서 시공이 간단할 뿐만 아니라 경제적이여서 과거에 있던 어떤 공법보다 우수하다. 이와 같은 본 발명에 의하면 FRP 기초 우물통을 교량의 교각 시공에 직접 적용하므로서 영구적인 구조물이 되며 시공성 향상에 의한 원가 절감과 공기단축에 도움을 줄 수 있는 경제성도 있으며 교각의 색상 변화나 부식을 방지하여 시각적으로도 양호한 교각 구조물을 시공할 수 있는 효과가 있다.Therefore, when the FRP fixed part foundation well 119 is used for the construction of underwater bridges of bridges, the structure is not corroded due to neutralization in the water as in the past, and the construction is performed by using the special frame 120 of the FRP dismantling part curtain. Not only is this simple, but also economical, it is superior to any process in the past. According to the present invention, by applying the FRP foundation well directly to the bridge piers construction, it becomes a permanent structure, there is also economical to help cost reduction and air shortening by improving the workability and prevent color change or corrosion of the piers In addition, there is an effect that can be constructed visually good bridge structure.

이와 같은 본 발명에 의하면 FRP 기초 우물통과 교각 시공에 적용하므로서 구조물이 영구 구조물이 될 뿐만 아니라 대대적인 가물막이 공사를 하지 않아도 되며 FRP 내,외벽판을 간단하게 조립 시공으로 시공성을 향상시키는 효과가 있고 시공성 향상에 따른 원가 절감과 공기 단축에 도움을 줄 수 있는 경제성도 있어 양호한 대형 교량 기초 우물통 및 교각 구조물을 시공할 수 있는 효과가 있다.According to the present invention, by applying to the construction of the FRP foundation wells and piers, not only the structure becomes a permanent structure, but also does not have to make a large cladding work, and there is an effect of improving the workability by simply assembling the inner and outer wall plates of the FRP. There are also economics that can help to reduce costs and shorten the air due to the improved construction, which makes it possible to construct good large bridge foundation wells and bridge structures.

Claims (2)

FRP 내,외부벽판을 고정부분과 해체부분을 임의의 공간과 간격을 두어 설치하고 고정부분 벽판에 마련된 공간과 간격 사이에 콘크리트를 타설하여 교량의 기초 교각을 시공하는 교량의 기초 우물통 시공 공법에 있어서 상기 교량의 기초 우물통 시공공법은 FRP 내,외벽판의 사이에는 수직, 수평, 사형 앵글을 규칙적으로 부착하여 교량의 교각 구축용 FRP 고정기초 우물통을 제작하는 단계.In the foundation well construction method of the bridge where the inner and outer wall boards are installed at fixed intervals and the dismantling sections at random intervals, and concrete is installed between the spaces and gaps provided on the fixed wall walls. In the basic well construction method of the bridge in the step of manufacturing the FRP fixed base well for building bridge piers by regularly attaching vertical, horizontal, sandbox angle between the inner and outer wall plate of the FRP. 수심이 깊은 곳에서 공기중에서 교각을 축조하기 위해서 FRP 해체 가물막이 특수틀을 제작하는 단계.Produce a special frame of FRP dismantlement cladding to build bridge piers in the air at depths. 상기 FRP 고정기초 우물통을 시공 위치로 운반하고 주위에 파일(H-pile)을 박고 파일 상부에 현조장치를 만들어 FRP 고정기초 우물통상에 연속해서 조립하여 FRP 내,외벽판을 매달아 FRP 고정기초 우물통상에 연속해서 조립하여 FRP 해체 가물막이 특수틀을 수면상까지 올라올 때까지 조립하여 FRP 기초 우물통(고정+해체)을 하상에 안착시키는 단계.The FRP fixed base well is transported to the construction position, and the pile (H-pile) is put around, and the suspension device is made on the top of the pile to assemble continuously on the FRP fixed base well. Assembling continuously until the FRP dismantlement membrane is raised to the surface of the special frame to assemble in succession normally, and seats the FRP foundation well (fixed + dismantle) on the bottom. 다음에는 FRP 해체 가물막이 특수틀 상단에 재하중을 실어 FRP 기초 우물통 부력에 의한 부상을 억제하고 물을 배제한 후 콘크리트를 FRP 고정기초 우물통까지 타설하는 단계.Next, the FRP dismantling cladding loads the upper part of the special frame to suppress the injury caused by the FRP foundation well buoyancy, excluding water, and then pours concrete to the FRP fixed base well. 콘크리트가 양생된 다음 FRP 기초 우물통 내부를 크레인 백호(back hoe) 및 크람셀을 사용하여 굴착하는 단계.After the concrete is cured, the inside of the FRP foundation well is excavated using crane back hoe and clam shell. 상기 단계를 통해 FRP 기초 우물통을 암반상에 정착한 후 FRP 고정기초 우물 통 내부 바닥에 불분리 수중 콘크리트를 타설하고, 물을 퍼낸 후 교각(pier)를 축조하는데 FRP 고정기초 우물통 구간은 거푸집을 해체하고 FRP 해체 가물막이 특수틀 구간은 FRP 특수틀을 교각 표면 보호를 위해 콘크리트 타설과 동시에 영구 부착 단계.After the FRP foundation well is settled on the rock through the above steps, the fireproof concrete is poured into the bottom of the FRP fixed foundation well bucket, the water is pumped out, and the pier is constructed. Dismantle and FRP dismantle the special frame section permanently attach the concrete to the FRP special frame to protect the pier surface. 상기 단계를 통해 FRP 기초 우물통 내의 교각이 완료되면 FRP 고정기초 우물통의 내부를 무근 콘크리트로 채우는 단계.Filling the inside of the FRP fixed foundation well with plain concrete when the pier in the FRP foundation well is completed through the above steps. FRP 고정기초 우물통 물방(기초우물통슬라브)을 FRP로 적층하여 콘크리트 표면 보호 단계. Preservation of concrete surface by stacking FRP fixed base wells (basin wells slabs) with FRP. 상기 단계를 통해 FRP 기초 우물통의 시공이 완료되면 마지막으로 FRP 해체부분 가물막이 특수틀을 완전 해체하는 것을 특징으로 하는 대형 교량 기초 우물통 및 교각 신설 공법.When the construction of the FRP foundation well through the above step is completed, the final construction of a large bridge foundation well and pier, characterized in that the complete dismantling of the special frame of the FRP dismantling part. 내부틀과 외부틀로 구분되고 상기 내부틀과 외부틀 사이에 설치되어 틀의 보강과 콘크리트 타설 측압에 대한 수평, 수직, 사형 철골로 다수의 앵글을 구비하며 상기 콘크리트 타설 구간은 외부틀과 내부틀이 서로 마주보며 플랜지가 구비되고 해체 가물막이 구간은 외부틀과 내부틀이 밖으로 플랜지가 구비하는 교량의 교각 시공을 위한 기초 우물통에 있어서 상기 기초 우물통은 내,외부가 홈형강이 부착되어 있는 FRP 내,외부 벽판으로 이루어지고 FRP 내부벽판과는 일정한 간격으로 떨어져 있는 FRP 외부벽판으로 구분되어 기초 우물통의 단면 두께를 형성하는 것을 특징으로 하는 대형 교량의 기초 우물통 및 교각 신설 공법.It is divided into inner frame and outer frame, and is installed between the inner frame and the outer frame and has a plurality of angles with horizontal, vertical, and sand steel for reinforcement of frame and lateral pressure of concrete. A flange is provided facing each other and the dismantling clamper section is a foundation well for pier construction of a bridge in which an outer frame and an inner frame are provided with a flange. The foundation well has internal and external grooved steels attached thereto. The foundation wells and piers new construction method of large bridges, characterized in that the cross section of the foundation wells made of the inner and outer wall of the FRP and separated from the FRP inner wall plate at regular intervals to form the thickness of the foundation wells.
KR1020040066105A 2004-08-20 2004-08-20 Foundation well bucket and bridge new construction method of large bridge KR20060017433A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020040066105A KR20060017433A (en) 2004-08-20 2004-08-20 Foundation well bucket and bridge new construction method of large bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020040066105A KR20060017433A (en) 2004-08-20 2004-08-20 Foundation well bucket and bridge new construction method of large bridge

Publications (1)

Publication Number Publication Date
KR20060017433A true KR20060017433A (en) 2006-02-23

Family

ID=37125511

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020040066105A KR20060017433A (en) 2004-08-20 2004-08-20 Foundation well bucket and bridge new construction method of large bridge

Country Status (1)

Country Link
KR (1) KR20060017433A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100964978B1 (en) * 2009-03-17 2010-06-21 정광옥 Constructing method for submarine plaza using steel casing retaining wall
CN109944267A (en) * 2019-03-20 2019-06-28 中铁大桥勘测设计院集团有限公司 Driving into type bridge deepwater open caisson and bridge foundation and construction method
KR20190122929A (en) 2018-04-23 2019-10-31 허인구 Pier Unification Method for Extended Rock Mass Boring
KR102207292B1 (en) 2020-01-28 2021-01-25 지앤에스건설 주식회사 Pier construction structure for measurement and re-tension
CN112627212A (en) * 2021-01-08 2021-04-09 安徽省公路桥梁工程有限公司 Water-faced cofferdam inner tube well dewatering dry excavation construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100964978B1 (en) * 2009-03-17 2010-06-21 정광옥 Constructing method for submarine plaza using steel casing retaining wall
KR20190122929A (en) 2018-04-23 2019-10-31 허인구 Pier Unification Method for Extended Rock Mass Boring
CN109944267A (en) * 2019-03-20 2019-06-28 中铁大桥勘测设计院集团有限公司 Driving into type bridge deepwater open caisson and bridge foundation and construction method
KR102207292B1 (en) 2020-01-28 2021-01-25 지앤에스건설 주식회사 Pier construction structure for measurement and re-tension
CN112627212A (en) * 2021-01-08 2021-04-09 安徽省公路桥梁工程有限公司 Water-faced cofferdam inner tube well dewatering dry excavation construction method

Similar Documents

Publication Publication Date Title
JP4698491B2 (en) Temporary closing method and structure of underwater structure
JP6010070B2 (en) Temporary closing method for existing underwater structures
KR100982827B1 (en) Construction method of basement exterior wall applying the floor slab as the strut against the earth pressure from the temporary earth wall = TSW(Thrusting slabbed wall) method
KR100819624B1 (en) Waterproof open caisson assembly and concrete foundation construction method using the same
KR101687495B1 (en) Partial top-down construction method for building underground structures
KR20090094971A (en) Under ground top-down method
KR20120096605A (en) Bracket support type downward construction system and method
KR20100099495A (en) Central connecting apparatus engaged with lattice type steel pipe pile and construction method of assembling slab bridge using the same
CN108396711A (en) A kind of detachable gravity dam and its construction, method for dismounting
KR100768031B1 (en) Complex pile commected integral steel pile to prestressed concrete composite pile and method for working using it
KR100937740B1 (en) A method of constructing precast concrete house under water using caisson
KR101173029B1 (en) Under Water Structure Building and Maintenance and Reinforce Method Using Water Tightened Caisson
KR101169462B1 (en) Top-down construction method using post member
JP2018168600A (en) Concrete structure and method for constructing the same
KR20060096706A (en) Deck suspension top-down method of sub-structure
KR20060017433A (en) Foundation well bucket and bridge new construction method of large bridge
KR102168165B1 (en) Reinforcement method of Pile­Support Intake Tower using Earthquake­Resistant Pile and Slab
KR20040039271A (en) Shoe coffering method for new construction and repair, reinforcement of bridge open caisson foundation
KR100912574B1 (en) Retaining wall system using strut assembly and excavating method using the same
KR20060106159A (en) The engineering-works structure using composite pile and steel sheet pile, and it's construction method
JP5432814B2 (en) Construction method of concrete body for septic tank protection
CN111206592B (en) Construction method of prefabricated steel-concrete combined support foundation pit supporting structure
KR20210119935A (en) Underground structure using strut and method construturing the same
JP3208100U (en) Scaffolding device for construction of underground structures
JP7416438B2 (en) Flood prevention wall, construction method of flood prevention wall, and precast concrete wall

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application