KR200450280Y1 - cap of drain pipe - Google Patents

cap of drain pipe Download PDF

Info

Publication number
KR200450280Y1
KR200450280Y1 KR2020080003314U KR20080003314U KR200450280Y1 KR 200450280 Y1 KR200450280 Y1 KR 200450280Y1 KR 2020080003314 U KR2020080003314 U KR 2020080003314U KR 20080003314 U KR20080003314 U KR 20080003314U KR 200450280 Y1 KR200450280 Y1 KR 200450280Y1
Authority
KR
South Korea
Prior art keywords
drain pipe
wall
soil
geotextiles
retaining wall
Prior art date
Application number
KR2020080003314U
Other languages
Korean (ko)
Other versions
KR20090009343U (en
Inventor
박제인
Original Assignee
주식회사 서영엔지니어링
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 서영엔지니어링 filed Critical 주식회사 서영엔지니어링
Priority to KR2020080003314U priority Critical patent/KR200450280Y1/en
Publication of KR20090009343U publication Critical patent/KR20090009343U/en
Application granted granted Critical
Publication of KR200450280Y1 publication Critical patent/KR200450280Y1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D39/00Filtering material for liquid or gaseous fluids
    • B01D39/14Other self-supporting filtering material ; Other filtering material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/70Drying or keeping dry, e.g. by air vents
    • E04B1/7038Evacuating water from cavity walls, e.g. by using weep holes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0085Geotextiles

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Paleontology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Architecture (AREA)
  • Hydrology & Water Resources (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Retaining Walls (AREA)

Abstract

본 고안은 암거의 날개벽 등 옹벽에 구비되는 배수관에 토사 유출 방지를 위하여 사용되는 배수관 캡에 관한 것이다. 본 고안의 바람직한 실시예에 따르면, 배수관의 내벽에 끼움 결합되는 몸체와, 토사 유출을 방지하는 토목섬유가 구비되되, 토목섬유는 상기 몸체의 내부 안쪽에 위치되는 배수관 캡과 관련된다.

또한, 토목섬유가 몸체의 내부 안쪽에 위치되도록, 몸체의 내벽에 끼움 결합되어 토목섬유의 가장자리를 지지하는 위치고정부재가 더 구비되는 배수관 캡과 관련된다.

이로써, 몸체를 배수관의 유입구에 삽입하여 고정함으로써 토목섬유의 장착이 완료되므로, 종래의 현장에서의 토목섬유를 재단하는 작업과, 실리콘 양생에 걸리는 시간 동안의 기다림 등이 배제되며, 작업이 간편하게 되어 시공의 편리성이 증대되며, 공기가 단축되는 효과를 갖는다.

Figure R2020080003314

배수, 옹벽

The present invention relates to a drain pipe cap used for preventing the outflow of soil in the drain pipe provided in the retaining wall, such as the wing wall of the culvert. According to a preferred embodiment of the present invention, the body is fitted to the inner wall of the drain pipe, and provided with geotextiles to prevent the outflow of soil, geotextiles associated with the drain pipe cap located inside the body.

In addition, it is related to the drain pipe cap is further provided with a position fixing member that is fitted to the inner wall of the body to support the edge of the geosynthetic, so that the geosynthetic fiber is located inside the body.

As a result, the installation of the geotextiles is completed by inserting and fixing the body to the inlet of the drain pipe, thereby eliminating the work of cutting the geotextiles in the conventional site, and waiting for the time required for curing the silicon, and thus simplifying the work. The convenience of construction is increased, and the air is shortened.

Figure R2020080003314

Drainage, retaining wall

Description

배수관 캡{cap of drain pipe}Cap of drain pipe

본 고안은 암거의 날개벽 등 옹벽에 구비되는 배수관에 토사 유출 방지를 위하여 설치작업이 간편하고 공기를 단축함과 아울러 기성제품화할 수 있도록 한 배수관 캡에 관한 것이다.The present invention relates to a drain pipe cap that is easy to install, shorten the air and ready-made products to prevent the outflow of soil in the drain pipe provided on the retaining wall, such as wing wall of the culvert.

붕괴의 위험을 가지는 비탈면에는 토양이 흘러내리지 아니하도록 비탈면의 토압을 견디는 구조물인 옹벽이 설치된다. On the slopes with the risk of collapse, retaining walls, which are structures that withstand earth pressure on the slopes, are installed to prevent the soil from flowing down.

이러한 옹벽이 지지하는 배면 토양에 비, 눈, 지하수 등의 요인으로 물이 유입되는 경우에는 물이 함유된 토양의 토압 또는 수압이 증가되어 옹벽이 넘어가거나, 균열이 발생하는 원인이 되고 있다.When water flows into the back soil supported by the retaining wall due to rain, snow, groundwater, etc., the earth pressure or water pressure of the soil containing the water is increased, causing the retaining wall to pass over or cracking.

이를 해결하기 위하여, 도 4에 도시된 종래의 옹벽 단면도를 참조하여 설명하면, 옹벽(100)에는 배면 토양(S)으로 유입되는 물을 원활히 제거하기 위하여 옹벽을 관통하는 배수관(110)이 설치되어, 토양(S)에 유입된 물을 옹벽(100)의 전면으로 배출시킴으로써 물을 흡수한 토양의 토압 및 수압을 낮추어 옹벽이 설계된 범위 내에서 배면 토양을 지지할 수 있게 한다. 이러한 배수관(110)은 특히, 물의 침투로 배면 토양의 토압 등이 증대되기 쉬운 도로, 하천 등의 옹벽을 관통하도록 다 수가 형성되되, 물의 원활한 배출을 위하여 배수관의 유입구(111)에서 토출구(112)까지 점차 낮아지는 경사도를 갖도록 설계된다. 한편, 배수관의 유입구에는 물과 토사가 함께 유입되므로, 유입구에는 토사의 유출을 방지하기 위하여 부직포 등의 토목섬유(120)로 옹벽의 배수관의 유입구(111)를 덮게 된다.In order to solve this problem, referring to the conventional retaining wall section shown in FIG. 4, the retaining wall 100 is provided with a drain pipe 110 penetrating the retaining wall to smoothly remove water introduced into the back soil S. By discharging the water introduced into the soil (S) to the front of the retaining wall 100, the soil pressure and water pressure of the soil absorbing the water are lowered to support the back soil within the designed range of the retaining wall. In particular, a plurality of drain pipes 110 are formed to penetrate the retaining walls of roads, rivers, and the like, where soil pressure of the back soil is easily increased due to infiltration of water, and discharge holes 112 at the inlet 111 of the drain pipe for smooth discharge of water. It is designed to have a slope gradually lowering. On the other hand, since water and soil are introduced together at the inlet of the drainage pipe, the inlet is covered with the inlet 111 of the drainage pipe of the retaining wall with a geotextile 120 such as a nonwoven fabric to prevent the outflow of the soil.

이러한 구성을 가지는 배수관이 포함된 옹벽의 시공은 다음과 같다. 옹벽의 각 치수에 따른 거푸집의 조립시 거푸집에서 돌출되는 걸림 못 등에 배수관의 유입구와 배출구를 걸어 배수관을 위치시킨다. 이때, 배수관으로는 일반적으로 저렴한 PVC 파이프가 사용된다. 이후, 거푸집에 콘크리트를 타설, 양생시킨 후에 거푸집을 제거하고, 배수관의 유입구보다 넓은 면적을 가지는 토목섬유를 실리콘으로 콘크리트에 고정시키거나, 토목섬유의 가장자리를 쫄대와 콘크리트용 못을 이용하여 옹벽의 배면에 직접 고정한다. 이때, 토목섬유로는 침투성이 좋으며, 가격이 저렴한 부직포가 사용되는 것이 일반적이다. 이후, 옹벽의 배면에 토양을 되메워 완공하게 된다. The construction of the retaining wall including the drain pipe having such a configuration is as follows. When assembling the formwork according to each dimension of the retaining wall, the drainage pipe is placed by hanging the inlet and the outlet of the drainage pipe to a catching nail protruding from the formwork. In this case, a cheap PVC pipe is generally used as the drain pipe. Then, after the concrete is poured into the formwork, the formwork is removed and the geotextiles having a larger area than the inlet of the drain pipe are fixed to the concrete with silicon, or the edges of the geotextiles are lined with concrete nails and nails. Fix directly to the back. At this time, as a geotextile is good permeability, low cost non-woven fabric is generally used. After that, the soil is backfilled to the rear surface of the retaining wall.

이러한 기존 시공방식은 토목섬유를 전술된 소정의 크기로 절단하고, 옹벽에 부착하는 단순작업의 반복이어서 시간이 오래 걸리고, 번거로운 단점이 있다. 이러한 단점은 옹벽이 크게 형성되거나, 도로 시공시 다수의 암거에 따른 날개벽이 설치되는 현장에서 특히 공기와 관련하여 문제된다. This existing construction method is a repetition of a simple operation of cutting the geotextiles to the predetermined size described above, and attaching to the retaining wall takes a long time, and has a disadvantage. This drawback is a problem with air, especially in the site where the retaining wall is largely formed, or the wing wall is installed according to a number of culverts when the road construction.

한편, 실리콘을 사용하여 토목섬유를 부착하는 방식은 실리콘 양생을 위하여 1 ~ 2일 정도의 기간이 소요되므로 완공이 지연되는 문제가 있다.On the other hand, the method of attaching geotextiles using silicon has a problem that the completion is delayed because it takes a period of about 1 to 2 days for silicon curing.

한편, 쫄대와 콘크리트 못을 사용하여 토목섬유를 옹벽에 고정하는 경우에는 매 유입구마다 작업자의 고정 작업이 수작업으로 이루어져야 하므로 번거로우며, 다수의 쫄대와 콘크리트 못의 고정에 시간이 많이 소요됨에 따라 공정이 지연되는 문제가 있다. On the other hand, in the case of fixing the geotextiles to the retaining wall using a sack and concrete nails, it is cumbersome because the worker's fixing work must be done manually at each inlet, and the process is time-consuming for fixing a large number of stools and concrete nails. There is a delay.

또한, 토목섬유에 대한 쫄대의 가압력이 충분하지 못하여 토양을 되메우는 과정 중 유입된 토양에 의하여 토목섬유가 유입구 안쪽으로 말려 들어가는 문제가 있다.  In addition, there is a problem that the geosynthetic fiber is rolled into the inlet by the soil introduced during the process of backfilling the soil due to insufficient pressure on the geotextile.

한편, 다수의콘크리트 못의 고정에 의하여 옹벽에 균열이 발생될 소지도 있다.On the other hand, cracks may occur in the retaining wall by fixing a plurality of concrete nails.

더하여, 이러한 종래의 배수관 내에 부직포 등의 토목섬유가 그대로 노출되어 있으므로, 구멍을 형성하여 서식처로 삼는 소형야생동물에 의하여 쉽게 훼손되는 문제가 있다.In addition, since the geotextiles such as nonwoven fabrics are exposed in such a conventional drain pipe, there is a problem that they are easily damaged by small wild animals that form a hole and form a habitat.

본 고안은 전술된 문제점을 해결하기 위하여 안출된 것으로, The present invention is devised to solve the above problems,

일반적인 배수관을 포함하는 암거의 날개벽 등의 옹벽을 시공에 있어서, 종래의 토목섬유의 별도 고정에 따른 번거로움을 해소하기 위하여, 배수관 내부에 토목섬유를 한번에 설치할 수 있도록 기성제품화함과 아울러 종래에 주로 사용되는 PVC 파이프를 그대로 배수관으로 사용하면서도 그 배수관과 함께 사용될 수 있어 기존 시공 방식을 크게 변경하지 아니하면서, 간단한 조립으로 설치되어 공기를 단축시킬 수 있음은 물론 배수관 내부에 설치된 토목섬유를 소형야생동물 등에 의한 훼손에서 보호하도록 하는데 목적이 있다.In the construction of retaining walls, such as wing walls of culverts including general drainage pipes, in order to eliminate the inconvenience caused by the separate fixing of conventional geotextiles, the ready-made products can be installed at the same time so as to install the geotextiles inside the drainage pipe at once. The PVC pipe used can be used as a drain pipe as it is, but can be used with the drain pipe, so it is possible to shorten the air by installing a simple assembly without greatly changing the existing construction method. The purpose is to protect from damage caused by the back.

삭제delete

삭제delete

상기와 같은 과제를 해결하기 위하여, 본 고안은 배수관의 내벽에 끼움 결합되는 몸체와, 토사 유출을 방지하는 토목섬유가 구비되되, 상기 토목섬유가 상기 몸체의 내부 안쪽에 위치되도록 상기 몸체의 내벽에 끼움 결합되어 상기 토목섬유의 가장자리를 지지하는 위치고정부재가 더 구비되며, 상기 토목섬유의 외측에는 상기 토목섬유를 보호하기 위한 보호망이 더 구비되는 것을 특징으로 하는 배수관 캡을 제시한다.In order to solve the above problems, the present invention is provided with a body that is fitted to the inner wall of the drain pipe, and geosynthetic fibers to prevent the outflow of soil, on the inner wall of the body so that the geosynthetic fibers are located inside the body The fitting is further provided with a position fixing member for supporting the edge of the geosynthetic fiber, the outer side of the geosynthetic fiber proposes a drain pipe cap characterized in that it is further provided with a protective net for protecting the geotextile.

삭제delete

삭제delete

본 고안의 바람직한 실시예에 따른 배수관 캡에 따르면, 몸체를 배수관의 유입구에 삽입하여 고정함으로써 토목섬유의 장착이 완료되므로, 종래의 현장에서의 토목섬유를 재단하는 작업과, 실리콘 양생에 걸리는 시간 동안의 기다림 등이 배제되며, 작업이 간편하게 되어 시공의 편리성이 증대되는 효과를 갖는다.According to the drain pipe cap according to a preferred embodiment of the present invention, since the installation of the geosynthetic fiber is completed by inserting and fixing the body to the inlet of the drain pipe, while cutting the geotextile in the conventional site, the time required for silicone curing Waiting and the like are eliminated, and the work becomes simple, and the convenience of construction is increased.

또한, 종래에 일반적으로 사용되는 원통형 플라스틱제의 배수관에 삽입가능하므로 범용성이 있으며, 이는 별도의 배수관을 준비하여야 하는 비용부담이 없다는 효과를 갖는다. 또한, 배수관 캡의 제작이 비교적 간단하므로 그 제작비용이 적어 경제적인 효과를 갖는다.In addition, since it can be inserted into the drain pipe made of a cylindrical plastic generally used in the prior art, it is versatile, which has the effect that there is no cost to prepare a separate drain pipe. In addition, since the production of the drain pipe cap is relatively simple, the production cost is low, which has an economic effect.

또한, 배수관 캡을 거푸집 조립단계에서 미리 배수관에 삽입하여 옹벽을 시공하거나, 거푸집을 탈형한 후 배수관에 배수관 캡을 삽입하는 시공을 하더라도 그 작업 속도가 빠르므로 공기가 단축되는 효과를 갖는다.In addition, the construction of the retaining wall by inserting the drain pipe cap into the drain pipe in advance in the formwork assembly step, or even if the construction to insert the drain pipe cap in the drain pipe after demolding the formwork has the effect that the air is shortened.

또한, 옹벽에 콘크리트 못을 사용하지 아니하므로, 옹벽에 균열이 발생될 우려가 없어, 옹벽의 손상이 없는 효과를 갖는다.In addition, since concrete nails are not used for the retaining wall, there is no fear of cracking in the retaining wall, and thus, the retaining wall is not damaged.

또한, 배수관의 내벽에 고정되는 몸체에 구비되는 토목섬유는 위치고정부재에 의하여 지지되므로, 옹벽의 시공에 있어 토양의 되메우기 시 토목섬유가 유입구 안쪽으로 밀려 들어갈 염려가 없으므로, 정밀한 시공이 가능해지는 효과를 갖는다.In addition, since the geosynthetic fiber provided on the body fixed to the inner wall of the drain pipe is supported by the position fixing member, there is no fear that the geosynthetic fiber will be pushed into the inlet when the soil is refilled in the construction of the retaining wall, thereby enabling accurate construction. Has

한편, 보호망이 더 구비되는 경우에는 소형야생동물에 의한 토목섬유의 훠손을 방지하게 되므로, 토사 유출 방지가 보장되는 효과를 갖는다.On the other hand, when the protection net is further provided, because it prevents the damage of the geotextile by the small wild animal, it has the effect of preventing the outflow of soil.

이하, 첨부된 도면을 참고하여, 본 고안의 바람직한 실시예에 따른 배수관 캡의 기능, 구성 및 작용을 설명한다.Hereinafter, with reference to the accompanying drawings, it describes the function, configuration and operation of the drain pipe cap according to a preferred embodiment of the present invention.

도 1은 본 고안의 바람직한 실시예에 따른 배수관 캡의 분해도이고, 도 2는 도 1에 도시된 배수관 캡의 조립 후 단면도이다.1 is an exploded view of a drain pipe cap according to a preferred embodiment of the present invention, Figure 2 is a cross-sectional view after the assembly of the drain pipe cap shown in FIG.

본 고안의 바람직한 실시예에 따른 배수관 캡(1)에는 배수관(110)의 내벽(113)에 끼움 결합되는 몸체(10)와, 이 몸체의 내부는 물을 통과시키면서 토사 유출을 방지하는 토목섬유(20)가 구비된다.Drain pipe cap 1 according to a preferred embodiment of the present invention body 10 is fitted to the inner wall 113 of the drain pipe 110, and the inside of the body is a geotextile to prevent soil leakage while passing water ( 20).

이때, 몸체(10)는 배수관의 유입구(111) 끼워지는데, 배수관의 내벽(113)에 접하며 슬라이딩 결합되도록 몸체(10)의 외형은 배수관의 내벽(113)의 형상에 따라 형성된다. 즉, 배수관은 일반적으로 원통형 PVC 파이프가 사용될 때, 몸체 또한 배수관의 내벽의 형상에 따라 원통 형상을 가질 수 있다. 또한, 배수관의 내벽에 밀착되어 끼워질 수 있도록 몸체의 외경은 배수관의 내경과 동일한 길이를 가지도록 구성되어 억지 끼움 결합될 수 있다.At this time, the body 10 is fitted to the inlet 111 of the drain pipe, the outer shape of the body 10 is formed in accordance with the shape of the inner wall 113 of the drain pipe so as to slide in contact with the inner wall 113 of the drain pipe. That is, the drain pipe may generally have a cylindrical shape according to the shape of the inner wall of the drain pipe when a cylindrical PVC pipe is used. In addition, the outer diameter of the body is configured to have the same length as the inner diameter of the drain pipe so that it can be fitted in close contact with the inner wall of the drain pipe can be forcefully fitted.

이러한 외형을 가지는 몸체(10)는 배수관과의 결합에 있어서, 옹벽의 시공시 거푸집에 배수관 캡이 삽입된 배수관을 걸쳐 시공하는 방법과, 옹벽의 설치 후 배수관 내에 배수관 캡을 삽입하여 설치하는 방법이 있다.When the body 10 having such an appearance is combined with a drain pipe, a method of constructing a drain pipe with a drain pipe cap inserted into a formwork when installing the retaining wall, and inserting a drain pipe cap into the drain pipe after installing the retaining wall have.

보다 구체적으로 설명하면, 도 3에 도시된 바와 같이, 거푸집(130)의 조립시에 배수관 캡(1)이 설치된 배수관(110)을 거푸집의 내면에 돌출된 못(131)에 걸어 배수관(110)을 고정하고 콘트리트(140)를 타설하는 방법과, 배수관만을 거푸집 내에 미리 설치하여 콘크리트를 타설, 양생한 후 배수관의 유입구에 배수관 캡을 삽 입하는 방법이 사용될 수 있다.More specifically, as shown in FIG. 3, when assembling the formwork 130, the drainage pipe 110 is mounted on the nail 131 protruding from the inner surface of the formwork. The method of fixing the concrete 140 and placing the drain pipe in advance in the formwork only after pouring, curing and inserting the drain pipe cap into the inlet of the drain pipe can be used.

한편, 부직포 등의 토목섬유(20)는 거푸집에 배수관 캡이 삽입된 배수관을 설치하는 방법이 가능하도록 몸체(10)의 단면에서 내부 안쪽에 위치된다. 즉, 거푸집(130) 내부에 돌출된 못(131)에 의하여 배수관의 유입구(111)과 토출구(112)가 각각 걸릴 수 있도록 토목섬유(20)는 몸체(10)의 내부로 함몰된 위치에 형성된다. On the other hand, geotextiles 20, such as non-woven fabric is located inside the inside of the cross section of the body 10 to enable a method of installing a drain pipe inserted into the formwork drain cap. That is, the geotextile 20 is formed at a position recessed into the body 10 so that the inlet 111 and the outlet 112 of the drain pipe can be respectively caught by the nail 131 protruding inside the formwork 130. do.

즉, 토목섬유는 몸체의 내부로 함몰된 위치에 형성되어 거푸집에 돌출된 못에 배수관의 유입구의 내벽(또는 배수관의 내벽에 끼워진 몸체의 내벽)에 걸릴 수 있게 되므로, 종래에 널리 사용되는 PVC 파이프를 거푸집의 내측에 거는 옹벽의 시공방식이 그대로 활용될 수 있는 잇점이 있다.In other words, the geosynthetic fiber is formed in a recessed position into the interior of the body to be caught on the inner wall of the inlet of the drain pipe (or the inner wall of the body fitted to the inner wall of the drain pipe) to the nail protruding into the formwork, PVC pipes widely used in the prior art There is an advantage that the construction of the retaining wall hanging inside the formwork can be utilized as it is.

한편, 본 고안의 바람직한 실시예에 따른 배수관 캡(1)에는 토목섬유(20)가 몸체(10)의 내부 안쪽에 위치되도록 몸체(10)의 내벽에 끼움 결합되어 토목섬유(20)의 가장자리를 지지하는 위치고정부재(30)가 더 구비될 수 있다.On the other hand, the drain pipe cap 1 according to a preferred embodiment of the present invention is fitted to the inner wall of the body 10 so that the geosynthetic fiber 20 is located inside the body 10 to the edge of the geosynthetic fiber 20 Supporting position fixing member 30 may be further provided.

위치고정부재(30)는 몸체(10)의 내부에 삽입되어 끼워지도록 몸체의 내부 형상에 따른 외형을 가져 몸체의 일측에 슬라이딩되어 끼움 결합된다. 이때, 전술된 바와 같이 배수관이 PVC 파이프인 경우 몸체가 원통 형상을 가지므로, 이 몸체에 끼워지는 위치고정부재(30)도 원통 형상을 가질 수 있다.Position fixing member 30 has a shape according to the internal shape of the body to be inserted and inserted into the interior of the body 10 is fitted by sliding to one side of the body. At this time, when the drain pipe is a PVC pipe as described above, since the body has a cylindrical shape, the position fixing member 30 fitted to the body may also have a cylindrical shape.

이러한 위치고정부재(30)는 일측면으로 토목섬유(20)의 가장자리를 지지하게 되어, 토목섬유는 몸체의 내벽에 닿는 측면테두리와 함께 견고하게 고정될 수 있다. 이때, 토목섬유의 고정은 접착제를 사용한 부착의 방식 등이 사용될 수 있다.The position fixing member 30 is to support the edge of the geosynthetic fiber 20 to one side, the geosynthetic fiber can be firmly fixed together with the side border to the inner wall of the body. At this time, the fixing of the geotextile may be used, such as the method of attachment using an adhesive.

한편, 토목섬유(20)의 외측에는 소형야생동물에 의한 토목섬유의 훼손을 방지하기 위한 보호망(40)이 더 구비될 수 있다.On the other hand, the outer side of the geosynthetic fiber 20 may be further provided with a protective net 40 for preventing damage to the geosynthetic fiber by a small wild animal.

토목섬유의 토사가 유입되는 방향과 반대 방향은 배수관의 토출구로부터 침입하는 소형야생동물에 노출되어, 토양에 굴을 형성하는 쥐 등의 소형야생동물이 옹벽에 형성된 배수관을 타고 굴을 형성하기 위하여 토목섬유를 훼손할 수 있는데, 보호망(40)은 이러한 소형야생동물의 침투를 방지하는 역할을 하는 것이다.The direction opposite to the inflow of earth and sand of geotextiles is exposed to small wild animals invading from the discharge port of the drain pipe, so that small wild animals such as rats that form oysters in the soil are formed through the drain pipe formed on the retaining wall to form a civil The fiber can be damaged, the guard net 40 is to prevent the penetration of such small wild animals.

이를 위한 보호망(40)은 플라스틱 등의 합성수지 재질 또는 금속 재질로 제작되어, 배수관의 토출구 방향으로 노출된 토목섬유의 외측에 고정된다. 구체적으로 도 2에 도시된 바와 같이 토목섬유(20)에 부착되어 형성되거나, 토목섬유에서 이격된 상태로 몸체(10)의 내벽에 고정될 수 있다.Protection net 40 for this is made of a synthetic resin material or a metal material such as plastic, it is fixed to the outside of the geotextile exposed in the discharge port direction of the drain pipe. Specifically, as shown in Figure 2 may be attached to the geosynthetic fiber 20, or may be fixed to the inner wall of the body 10 in a state spaced apart from the geotextile.

한편, 야생동물의 접근을 방지하기 위하여 배수관의 토출구 방향으로 돌출된 가시(도시 생략)가 형성될 수 있다.On the other hand, in order to prevent the access of wild animals, a barbed (not shown) protruding toward the discharge port of the drain pipe can be formed.

이 경우, 보호망(40)으로 소형야생동물의 침입에 의한 토목섬유(20)의 훼손이 방지되므로, 토목섬유(20)가 오랜 기간 동안 토사 유출 방지의 기능을 발휘할 수 있게 된다. In this case, since the damage to the geotextile 20 by the invasion of the small wild animal to the protection net 40, the geotextile 20 can exert a function of preventing the outflow of soil for a long time.

도 1은 본 고안의 바람직한 실시예에 따른 배수관 캡의 분해도.1 is an exploded view of the drain cap according to a preferred embodiment of the present invention.

도 2는 도 1에 도시된 배수관 캡의 조립 후 단면도.FIG. 2 is a cross-sectional view after assembling the drain pipe cap shown in FIG. 1; FIG.

도 3은 도 1에 도시된 배수관 캡의 사용상태를 나타낸 단면도.3 is a cross-sectional view showing a state of use of the drain pipe cap shown in FIG.

도 4는 종래의 배수관의 시공을 간략히 나타낸 단면도.4 is a cross-sectional view briefly showing the construction of a conventional drain pipe.

* 도면의 주요부분에 대한 부호설명 ** Explanation of Signs of Major Parts of Drawings *

1 : 배수관 캡1: drain pipe cap

10 : 몸체 20 : 토목섬유10: body 20: geotextile

30 : 위치고정부재 40 : 보호망30: position fixing member 40: protection net

100 : 옹벽 110 : 배수관100: retaining wall 110: drain pipe

111 : 유입구 112 : 토출구111: inlet 112: outlet

113 : 내벽 120 : 토목섬유113: inner wall 120: geotextile

130 : 거푸집 131 : 못130: die 131: nail

140 : 콘크리트 S : 토양140: concrete S: soil

Claims (3)

배수관(110)의 내벽에 끼움 결합되는 몸체(10)와, 토사 유출을 방지하는 토목섬유(20)가 구비되되, 상기 토목섬유(20)가 상기 몸체(10)의 내부 안쪽에 위치되도록 상기 몸체(10)의 내벽에 끼움 결합되어 상기 토목섬유(20)의 가장자리를 지지하는 위치고정부재(30)가 더 구비되며, 상기 토목섬유(20)의 외측에는 상기 토목섬유(20)를 보호하기 위한 보호망(40)이 더 구비되는 것을 특징으로 하는 배수관 캡.Body 10 is fitted to the inner wall of the drain pipe 110, and the geosynthetic fiber 20 to prevent soil leakage is provided, so that the geosynthetic fiber 20 is located inside the body 10 inside the body Fitted to the inner wall of the 10 is further provided with a position fixing member 30 for supporting the edge of the geosynthetic fiber 20, the outer side of the geotextile 20 to protect the geotextile 20 Drain cap, characterized in that the guard net 40 is further provided. 삭제delete 삭제delete
KR2020080003314U 2008-03-13 2008-03-13 cap of drain pipe KR200450280Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020080003314U KR200450280Y1 (en) 2008-03-13 2008-03-13 cap of drain pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020080003314U KR200450280Y1 (en) 2008-03-13 2008-03-13 cap of drain pipe

Publications (2)

Publication Number Publication Date
KR20090009343U KR20090009343U (en) 2009-09-17
KR200450280Y1 true KR200450280Y1 (en) 2010-09-17

Family

ID=41532120

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020080003314U KR200450280Y1 (en) 2008-03-13 2008-03-13 cap of drain pipe

Country Status (1)

Country Link
KR (1) KR200450280Y1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09279610A (en) * 1996-04-18 1997-10-28 Takeshi Isshi Method for constructing retaining wall and equipment therefor
KR20010032299A (en) * 1997-11-21 2001-04-16 데이비드 엠. 에브젠 Method and apparatus for opening containers and reducing waste from containers
KR200417597Y1 (en) * 2006-03-14 2006-06-02 이옥신 Structure of draining guidance for concrete and filter used therefor

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09279610A (en) * 1996-04-18 1997-10-28 Takeshi Isshi Method for constructing retaining wall and equipment therefor
KR20010032299A (en) * 1997-11-21 2001-04-16 데이비드 엠. 에브젠 Method and apparatus for opening containers and reducing waste from containers
KR200417597Y1 (en) * 2006-03-14 2006-06-02 이옥신 Structure of draining guidance for concrete and filter used therefor

Also Published As

Publication number Publication date
KR20090009343U (en) 2009-09-17

Similar Documents

Publication Publication Date Title
US9769045B2 (en) Valve system for a fiberglass swimming pool body
US9758944B2 (en) Free-flowing waterproofing system
US20140157510A1 (en) Channel Drain With Water Stop
KR101734026B1 (en) Retaining Wal1 Construction Method Using PHC Pile
KR200450280Y1 (en) cap of drain pipe
US6669404B2 (en) Foundation drain system
KR100924794B1 (en) Inflow reduction method for transition zone btween cut and coer bored tunnel
JP3180226U (en) Penetration
KR20170136420A (en) The retaining wall using pile
KR101876825B1 (en) Perforated drainpipe culvert having double filter layer
KR100481148B1 (en) Drainage System using Hexa-Tube Connector
JP2012219591A (en) Permeation structure, water collecting facility with the same and installation method for the same
US9822541B2 (en) Drainage system for a fiberglass swimming pool body
KR200414038Y1 (en) Drainage filter for retaining wall type side opening
KR100593190B1 (en) Drain structure for wall outside of a underground building
JP6034732B2 (en) Rainwater storage piping structure and weir member used therefor
JP3859942B2 (en) Water stop structure around the pipe
KR101653722B1 (en) A structure for drainage and this method using the same
KR100905661B1 (en) Connector and system for apparatus draining
JP2009097151A (en) Permeable structure
JP4454760B2 (en) Drainage pipe equipment and drainage pipe construction method for soil concrete
CN216615926U (en) Waterproof curtain for foundation pit
KR100577851B1 (en) Road drainpipe protection apparatus for secession prevention
CA2831357C (en) Device and method for keeping humidity/water away from a concrete slab sitting on a footing
CN115354685B (en) Waterproof and integrative water drainage hole structure of drainage of mountain area along river barricade

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20130906

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20150907

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20160908

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20170907

Year of fee payment: 8

EXPY Expiration of term