KR200444900Y1 - Pipe-line supporting apparatus - Google Patents
Pipe-line supporting apparatus Download PDFInfo
- Publication number
- KR200444900Y1 KR200444900Y1 KR2020070007616U KR20070007616U KR200444900Y1 KR 200444900 Y1 KR200444900 Y1 KR 200444900Y1 KR 2020070007616 U KR2020070007616 U KR 2020070007616U KR 20070007616 U KR20070007616 U KR 20070007616U KR 200444900 Y1 KR200444900 Y1 KR 200444900Y1
- Authority
- KR
- South Korea
- Prior art keywords
- vertical channel
- guide bracket
- pipe
- support device
- insert plate
- Prior art date
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/22—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals
- F16L3/221—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals having brackets connected together by means of a common support
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L55/00—Devices or appurtenances for use in, or in connection with, pipes or pipe systems
- F16L55/02—Energy absorbers; Noise absorbers
- F16L55/033—Noise absorbers
- F16L55/035—Noise absorbers in the form of specially adapted hangers or supports
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Supports For Pipes And Cables (AREA)
Abstract
본 고안의 배관 지지장치는 상부측에 플랜지(111)가 형성되고 내면에 다수개의 구멍(112)이 통공된 수직찬넬(110)과; 상기 수직찬넬(110)의 하부측에 횡방향으로 연결되고 상기 수직찬넬(110)의 구멍(112)에 볼트체결되는 체결공(121)이 다수개 통공된 수평찬넬(120)과; 상기 수직찬넬(110)의 상부측에 끼워지되, 상기 수직찬넬(110)의 플랜지(111)보다 적은 폭의 가이드홈(131)이 내측에 통공되고, 내면에 볼트공(132)이 통공된 외향플랜지(133)가 양측에 연장형성된 가이드 브라켓(130)과; 상기 가이드 브라켓(130)의 볼트공(132)에 인입되는 볼트(141)가 인서트되어 체결되도록 양측에 너트부(142)가 형성된 인서트 플레이트(140)를 포함하는 것을 특징으로 한다.Piping support device of the present invention is a vertical channel 110, the flange 111 is formed on the upper side and a plurality of holes 112 through the inner surface; A horizontal channel 120 connected to the lower side of the vertical channel 110 in a lateral direction and having a plurality of fastening holes 121 that are bolted to the holes 112 of the vertical channel 110; Is inserted into the upper side of the vertical channel 110, the guide groove 131 of a width smaller than the flange 111 of the vertical channel 110 through the inner side, the bolt hole 132 through the inner surface outward A guide bracket 130 having flanges 133 extending on both sides thereof; It characterized in that it comprises an insert plate 140, the nut portion 142 is formed on both sides so that the bolt 141 is inserted into the bolt hole 132 of the guide bracket 130 is inserted and fastened.
배관 지지장치, 배관클램프, 배관설비, 인서트 플레이트Piping Support, Piping Clamp, Piping Equipment, Insert Plate
Description
도 1a는 종래예를 개략적으로 도시한 전체 측면도이다.
도 1b는 도 1a의 요부 단면도이다.1A is an overall side view schematically showing a conventional example.
FIG. 1B is a cross-sectional view illustrating main parts of FIG. 1A. FIG.
도 2는 본 고안의 일실시예에 의한 배관 지지장치에 의해 배관을 지지한 상태를 개략적으로 도시한 도면이다.2 is a view schematically showing a state in which a pipe is supported by a pipe support device according to an embodiment of the present invention.
도 3은 본 고안의 일실시예에 의한 배관 지지장치의 가이드 브라켓을 개략적으로 도시한 사시도이다.3 is a perspective view schematically showing a guide bracket of a pipe support apparatus according to an embodiment of the present invention.
도 4a 및 도 4b는 본 고안의 일실시예에 의한 배관 지지장치의 가이드 브라켓에 수직찬넬의 이동범위를 개략적으로 도시한 개념도이다.4A and 4B are conceptual views schematically illustrating a moving range of a vertical channel on a guide bracket of a pipe support apparatus according to an embodiment of the present invention.
도 5는 본 고안의 일실시예에 의한 배관 지지장치에 적용되는 다른 브라켓을 개략적으로 도시한 개념도이다.5 is a conceptual diagram schematically showing another bracket applied to a pipe support apparatus according to an embodiment of the present invention.
<도면의 주요부분에 대한 부호의 설명><Description of the code | symbol about the principal part of drawing>
110 : 수직찬넬 111 : 플랜지110: vertical channel 111: flange
112 : 구멍 120 : 수평찬넬112: hole 120: horizontal channel
121 : 체결공 130 : 가이드 브라켓121: fastener 130: guide bracket
131 : 가이드 홈 132 : 볼트공131: guide groove 132: bolt hole
133 : 외향플랜지 140 : 인서트 플레이트133: outward flange 140: insert plate
141 : 볼트 142 : 너트부141: bolt 142: nut part
본 고안은 배관 지지장치에 관한 것으로서, 특히 건축물의 기계설비 공사의 각종 배관공사시에 천장으로부터 배관을 이격되게 용이하게 설치할 수 있음과 동시에, 작업효율성을 향상시킬 수 있는 배관 지지장치에 관한 것이다.The present invention relates to a pipe support device, and more particularly, to a pipe support device that can easily install a pipe from a ceiling at the time of various plumbing work of a mechanical equipment construction of a building, and can improve work efficiency.
일반적으로, 재래식 배관 시공법은 일반 형강류인 "ㄱ"형, "ㄷ"형, "I"형, "H"형 등의 형강류를 작업 현장에서 산소절단 또는 스피드 커터(Speed Cutter) 등으로 절단하여 용접한 뒤 이를 배관 지지대로 사용하고 있었다.In general, the conventional pipe construction method is to cut the general steel, such as "a" type, "c" type, "i" type, "h" type, etc. by cutting oxygen or speed cutter at the work site. After welding, it was used as a pipe support.
그러나, 이와 같은 시공법은 기존의 형강류를 현장에 반입하여 녹막이 도장을 실시하여야 하고, 또한 완성단계인 보온공사까지 다단계의 공정을 거쳐야만 함으로써 작업자가 현장에서 배관 지지장치를 조립하는 작업시간의 증대와 조립성이 떨어진다는 등의 문제점이 있었다.However, such a construction method should bring the existing section steel into the site and carry out rust coating, and also increase the working time for the operator to assemble the pipe support device in the field by going through the multi-step process until the completed insulation work. There was a problem such as poor assembly.
또한, 종래의 용접에 의한 시공법은 환경오염은 물론 전기 감전사고의 염려가 있을 뿐만 아니라, 시공 공정이 많아 작업기피 현상과 함께 화재발생의 우려가 있으며, 공기지연과 현장의 자재소모 및 공구류의 낭비가 심하고, 원가상승을 유발한다는 등의 여러 가지 문제점이 있었다.In addition, the conventional method of welding by welding not only causes environmental pollution but also electric shock accidents, and there are many construction processes, which may lead to work evasion and fire, as well as air delay, waste of materials and waste of tools. There are many problems such as severe and cost increase.
이러한 문제점을 해결하기 위하여 본 출원인은 등록실용신안 제388694호인 충격흡수용 조립식 배관 지지장치를 안출한 바 있으며, 이는 도 1a 및 도 1b에 도시된 바와 같이 건축구조물에 고정되어 배관을 지지하는 조립식 배관 지지장치에 있어서, 단면이 "ㄷ" 자 형태이고 장공(24)이 연속적으로 형성된 다수의 수직 찬넬(20)과, 단면이 "ㄷ"자 형태이고 장공(24)이 연속적으로 형성되고 상기 다수의 수직찬넬(20)을 직각으로 체결하여 상기 배관을 지지하는 수평 찬넬(30)과, 상기 수직찬넬(20)의 상측단에 형성된 새들 브라켓(22)과, 상기 건축 구조물에 삽입 고정되어 상기 새들 브라켓(22)과 볼트체결되는 인서트 플레이트(40) 및 상기 새들 브라켓(22) 및 상기 인서트 플레이트(40) 사이에 삽입되는 충격 흡수재(10)로 구성되어 있다.In order to solve this problem, the present applicant has devised a shock-absorbing prefabricated pipe support device, which is registered utility model No. 388694, which is fixed to a building structure as shown in FIGS. 1A and 1B to support the pipe. In the supporting device, a plurality of
따라서, 상기 수평찬넬과 수직찬넬로 이루어진 배관 지지장치를 볼트·너트에 의해 등간격으로 천장에 설치하는 구성이어서 조립성이 우수하여 작업시간의 단축과 생산비용 및 원가 상승을 절감하고, 상기 배관 지지장치의 조립시 충격흡수재를 함께 조립하여 외부 충격 및 배관의 진동에 따른 소음의 발생을 줄이고 진동을 감쇠하여 배관시설물의 피해 발생을 줄일 수 있을 뿐만 아니라, 또한 방진고무재를 배관 지지장치의 가이드 브라켓과 플랜지 사이에 설치하여 배관에서 직접적으로 발생되는 저·중·고주파의 진동을 1차 감쇠시켜 진동에 따른 소음발생 및 진동에 의한 배관 시설물의 피해 발생을 방지하는 효과를 기대하고 있다.Therefore, since the pipe support device consisting of the horizontal channel and the vertical channel is installed on the ceiling at equal intervals by bolts and nuts, the assembly is excellent, thereby reducing work time, reducing production cost and cost, and supporting the pipe. When assembling the device, the shock absorber can be assembled together to reduce the noise caused by external shocks and vibrations of the pipe and to reduce the damage of the piping facilities by damping the vibrations. It is expected to have the effect of preventing the occurrence of noise caused by vibration and damage of piping facilities due to vibration by firstly attenuating low, medium and high frequency vibration generated directly from the pipe by installing between the flange and the flange.
그러나, 종래 배관 지지장치를 인서트 플레이트와 체결함에 있어서, 상기 인서트 플레이트의 하단측과, 수직찬넬의 상부측을 볼트 및 너트로 체결함에 있어서, 인서트 플레이트에 형성된 구멍과, 배관 지지장치에 형성된 구멍이 서로 정확하게 일치하지 못함에 따라, 이들의 구멍간격을 서로 맞추어서 작업하여야 하므로, 작업성이 저하되는 문제점이 있었다.However, when fastening the pipe supporter with the insert plate, the hole formed in the insert plate and the hole formed in the pipe support device are fastened by fastening the lower end side of the insert plate and the upper side of the vertical channel with bolts and nuts. Since they do not exactly match each other, the hole spacing must be matched with each other, there is a problem that workability is reduced.
뿐만 아니라, 억지로 구멍을 맞추어 볼트를 이용하여 지지가대와 인서트 플레이트를 체결할 경우, 볼트가 휘거나 하는 등의 문제점이 발생하고 있었을 뿐만 아니라, 서로의 체결력이 저하되어 작은 충격이나 지진이 발생할 경우, 지지가대에 설치된 배관이 떨어지거나 조립이 풀린다는 등의 문제점이 있었다.In addition, when forcing the support stand and the insert plate using bolts by forcibly adjusting the holes, not only the bolts are bent, but also a small impact or an earthquake occurs when the fastening force of each other decreases. There was a problem that the pipes installed on the support stand were dropped or loosened.
더욱이, 배관 지지장치와 인서트 플레이트의 구멍이 서로 일치하지 않을 경우에는 천장 슬라브에 매설된 인서트 플레이트와는 별도로 배관 지지장치를 체결하기 위한 세트 앵커를 추가적으로 천장 슬라브에 재시공하여 배관 지지장치를 설치함에 따라 추가적인 작업에 의해 시공기간이 지연되고 작업성이 크게 떨어지는 문제점이 있었다.In addition, if the holes of the pipe support and the insert plate do not coincide with each other, a set anchor for fastening the pipe support separately from the insert plate embedded in the ceiling slab is additionally re-installed on the ceiling slab to install the pipe support. There was a problem that the construction period is delayed and workability is greatly reduced by the additional work.
따라서, 본 고안은 종래 배관 지지자치를 체결함에 있어서 야기되는 상기 여러 가지 문제점을 해결하기 위해 안출된 것으로, 본 고안의 목적은 배관 지지장치의 상부측에 끼워지고 인서트 플레이트와 볼트체결되는 가이드 브라켓을 더 구비하여 상기 가이드 브라켓에 의해 인서트 플레이트와 배관 지지장치의 상부를 용이하게 체결할 수 있도록 함으로써, 체결작업이 용이하여 작업효율성을 향상시킬 수 있고, 물론 공사기간을 단축할 수 있는 배관 지지장치를 제공하는데 있다.Therefore, the present invention is devised to solve the various problems caused by the conventional fastening of the pipe support, the object of the present invention is to insert a guide bracket which is fitted to the upper side of the pipe support device and bolted to the insert plate Further provided by the guide bracket so that the upper part of the insert plate and the pipe support device can be easily fastened, the fastening work is easy to improve the work efficiency, and of course the pipe support device that can shorten the construction period To provide.
상기 목적을 달성하기 위하여 본 고안의 일실시예에 의한 배관 지지장치는 상부측에 플랜지가 형성되고 내면에 다수개의 구멍이 통공된 수직찬넬과; 상기 수직찬넬의 하부측에 횡방향으로 연결되고 상기 수직찬넬의 구멍에 볼트체결되는 체결공이 다수개 통공된 수평찬넬과; 상기 수직찬넬의 상부측에 끼워지되, 상기 수직찬넬의 플랜지보다 적은 폭의 가이드홈이 통공되고, 볼트공이 통공된 외향플랜지가 양측에 연장형성된 가이드 브라켓과; 상기 가이드 브라켓의 볼트공에 인입되는 볼트가 인서트되어 체결되도록 양측에 너트부가 형성된 인서트 플레이트를 포함하는 것을 특징으로 한다.Pipe support device according to an embodiment of the present invention in order to achieve the above object is a vertical channel formed with a plurality of holes through the flange formed on the inner side; A horizontal channel connected to the lower side of the vertical channel in a transverse direction and having a plurality of fastening holes through which fastening holes are bolted to the holes of the vertical channel; A guide bracket fitted to an upper side of the vertical channel, the guide groove having a smaller width than the flange of the vertical channel, and having outward flanges through which bolt holes are extended; It characterized in that it comprises an insert plate formed with a nut portion on both sides so that the bolt that is inserted into the bolt hole of the guide bracket is inserted and fastened.
상기 가이드 브라켓의 외향플랜지 내면에 통공된 볼트공은 장방형으로 형성되는 것을 특징으로 한다.The bolt hole through the inner surface of the outward flange of the guide bracket is characterized in that it is formed in a rectangular shape.
상기 수직찬넬은, "T"형, "ㄱ"형, "ㄷ"형, "I"형, "H"형상 중 어느 하나의 형상으로 형성되는 것을 특징으로 한다.The vertical channel is characterized in that it is formed in any one shape of "T" type, "a" type, "c" type, "I" type, "H" shape.
상기와 같이 이루어진 본 고안의 배관 지지장치는 배관클램프가 설치되는 수평찬넬을 양측에서 지지하는 수직찬넬의 상부측에 가이드 브라켓이 더 끼움결합되어 상기 인서트 플레이트와 체결되고, 상기 가이드 브라켓의 내측에 가이드홈이 통공되고 또한 가이드 브라켓의 양측에 볼트공이 장방형으로 통공되어 있음에 따라, 인서트 플레이트와의 체결이 용이하게 이루어짐으로써 세트 앵커를 체결하거나 하지 않고도 쉽게 배관 지지장치를 설치할 수 있어 작업효율성이 크게 향상될 뿐만 아니라, 견고한 체결력에 의해 배관클램프의 배관이 작은 충격이나 또는 지진 발생시에 유동되거나 떨어지는 현상이 방지된다.Pipe support device of the present invention made as described above is further coupled to the insert plate to the upper side of the upper side of the vertical channel for supporting the horizontal channel in which the pipe clamp is installed is fastened to the insert plate, the guide inside the guide bracket Since the groove is bored and the bolt hole is rectangularly bored on both sides of the guide bracket, the fastening with the insert plate is easy, so that the pipe support device can be easily installed without tightening the set anchor, thereby greatly improving the work efficiency. In addition, the tight clamping force prevents the pipe clamp pipe from flowing or falling in the event of a small impact or an earthquake.
이하, 본 고안의 일실시예에 의한 배관 지지장치에 대하여 첨부도면을 참조하여 상세히 설명한다.Hereinafter, a pipe support apparatus according to an embodiment of the present invention will be described in detail with reference to the accompanying drawings.
도 2는 본 고안의 일실시예에 의한 배관 지지장치에 의해 배관을 지지한 상태를 개략적으로 도시한 도면이고, 도 3은 본 고안의 일실시예에 의한 배관 지지장치의 가이드 브라켓을 개략적으로 도시한 사시도이고, 도 4a 및 도 4b는 본 고안의 일실시예에 의한 배관 지지장치의 가이드 브라켓에 수직찬넬의 이동범위를 개략적으로 도시한 개념도이고, 도 5는 본 고안의 일실시예에 의한 배관 지지장치에 적용되는 다른 브라켓을 개략적으로 도시한 개념도이다.FIG. 2 is a view schematically showing a state in which a pipe is supported by a pipe support device according to an embodiment of the present invention, and FIG. 3 schematically shows a guide bracket of a pipe support device according to an embodiment of the present invention. 4A and 4B are conceptual views schematically illustrating a moving range of a vertical channel on a guide bracket of a pipe support apparatus according to an embodiment of the present invention, and FIG. 5 is a pipe according to an embodiment of the present invention. A conceptual diagram schematically showing another bracket applied to the support device.
도 1 내지 도 5에 도시된 바와 같이 본 고안의 일실시예에 의한 배관 지지장치는 천장 슬라브로부터 이격되어 배관을 설치할 때 사용되는 것이다. 본 고안의 일실시예에 의한 배관 지지장치는 상부측에 플랜지(111)가 형성되고 다수개의 구멍(112)이 통공된 수직찬넬(110)과, 상기 수직찬넬(110)의 하부측에 횡방향으로 연결되고 상기 수직찬넬(110)의 구멍(112)에 볼트체결되는 체결공(121)이 다수개 통공된 수평찬넬(120)과, 상기 수직찬넬(110)의 상부측에 끼워지되, 상기 수직찬넬(110)의 플랜지(111)보다 적은 폭의 가이드홈(131)이 통공되고, 볼트공(132)이 통공된 외향플랜지(133)가 양측에 연장형성된 가이드 브라켓(130)과, 상기 가이드 브라켓(130)의 볼트공(132)에 인입되는 볼트(141)가 인서트되어 체결되도록 양측에 너트부(142)가 형성된 인서트 플레이트(140)로 구성된다.1 to 5, the pipe support device according to an embodiment of the present invention is used to install the pipe spaced apart from the ceiling slab. Piping support device according to an embodiment of the present invention is a
상기 수평찬넬(120)의 상부측에는 배관(P)이 인입되는 배관클램프(C)가 체결 고정됨으로써 배관(P)이 천장 슬라브로부터 일정간격 이격되게 설치된다.The upper side of the
상기와 같이 구성된 본 고안의 일실시예에 의한 배관 지지장치는 상기 수직찬넬(110)의 상부측에 플랜지(111)가 더 형성되어 있고 또한, 상기 플랜지(111)가 가이드 브라켓(130)의 내측에 형성된 가이드 홈(131)의 외부측으로 연장되어 있음에 따라, 상기 가이드 홈(131)의 내측범위에서 자유로이 좌/우측 또는 전/후측으로 이동이 가능하여 상기 인서트 플레이트(140)의 하단측에 볼트(141)를 이용하여 상기 가이드 브라켓(130)은 물론, 수직찬넬(110)의 견고한 체결이 가능하고, 체결작업이 수월하게 이루어져 작업효율성이 향상된다.In the pipe support apparatus according to the embodiment of the present invention configured as described above, the
즉, 상기 인서트 플레이트(140)에 수직찬넬(110)을 체결할 때에 수직찬넬(110)의 상부측에 끼워진 상기 가이드 브라켓(130)을 상기 인서트 플레이트(140)의 하단측에 먼저 체결한 후, 상기 수직찬넬(110)을 조절하여 수직찬넬(110)과 또 다른 수직찬넬(110)에 수평찬넬(120)을 연결하여 시공하는 것으로, 상기 가이드 브라켓(130)의 가이드홈(131)에 끼워진 수직찬넬(110)이 상기 가이드홈(131)의 내측부로부터 좌/우 또는 전/후측으로 자유로이 이동됨으로써, 상기 인서트 플레이트(140)와 가이드 브라켓(130)은 물론 수직찬넬(110)과 수평찬넬(120)과의 체결작업이 쉽고 용이하게 이루어진다.That is, when the
또한, 상기 가이드 브라켓(130)의 외향플랜지(133)에 통공된 볼트공(132)은 도 5에 도시한 바와 같이 장방형으로 형성됨으로써, 인서트 플레이트(140)에 상기 가이드 브라켓(130)의 체결작업이 더욱 수월하게 이루어질 수 있는 바, 상기 장방형의 볼트공(132)을 상기 인서트 플레이트(140)의 너트부(142)에 맞춘 다음 볼트(141)를 상기 볼트공(132)과 너트부(142)에 장입하여 체결함에 따라, 상기 인서트 플레이트(140)와 상기 가이드 브라켓(130)과의 체결작업이 더욱 수월하게 이루어진다.In addition, the
또한, 본 고안의 일실시예에 의한 배관 지지장치는 도시하지는 않았으나 상기 수직찬넬(110)의 형상이 "T"형, "ㄱ"형, "ㄷ"형, "I"형, "H"형상 중 어느 하나의 형상으로 형성될 수 있으며, 상기 가이드 브라켓(130)에 형성된 가이드 홈(131)의 상부에는 방진고무판(150)이 더 끼워질 수 있다.In addition, the pipe support device according to an embodiment of the present invention is not shown, but the shape of the
이외에도, 본 고안의 일실시예에 의한 배관 지지장치는 다양하게 변형실시가 가능한 것으로, 본 고안의 목적범위를 일탈하지 않는 한 변형되는 실시예들은 모두 본 고안의 권리범위에 포함되는 것은 물론이다.In addition, the pipe support device according to an embodiment of the present invention can be variously modified, and the embodiments to be modified are not included in the scope of the present invention unless the deviation from the object of the present invention.
상술한 바와 같이 본 고안의 일실시예에 의한 배관 지지장치에 의하면, 배관 클램프가 설치되는 수평찬넬을 양측에서 지지하는 수직찬넬의 상부측에 가이드 브라켓이 더 끼움결합되어 상기 인서트 플레이트와 체결되고, 상기 가이드 브라켓의 내측에 가이드홈이 통공되고, 또한 가이드 브라켓의 양측에 볼트공이 장방형으로 통공되어 있음에 따라, 인서트 플레이트와의 체결이 용이하게 이루어짐으로써 종래와 같이 세트 앵커를 체결하거나 하지 않고도 쉽게 배관 지지장치를 천장에 용이하게 설치할 수 있어 작업효율성이 크게 향상될 뿐만 아니라, 견고한 체결력에 의해 배관클램프의 배관이 작은 충격이나 또는 지진 발생시에 유동되거나 떨어지는 현상을 방지할 수 있다는 효과가 기대된다.According to the pipe support apparatus according to an embodiment of the present invention as described above, the guide bracket is further fitted to the upper side of the vertical channel for supporting the horizontal channel in which the pipe clamp is installed on both sides, and is fastened to the insert plate, Since the guide groove is formed inside the guide bracket and the bolt hole is formed in both sides of the guide bracket in a rectangular shape, the coupling with the insert plate is made easy, so that piping can be easily performed without fastening the set anchor as in the related art. Since the support device can be easily installed on the ceiling, the work efficiency is greatly improved, and the tight clamping force is expected to prevent the pipe clamping of the pipe clamp from flowing or falling when a small impact or an earthquake occurs.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2020070007616U KR200444900Y1 (en) | 2007-05-09 | 2007-05-09 | Pipe-line supporting apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2020070007616U KR200444900Y1 (en) | 2007-05-09 | 2007-05-09 | Pipe-line supporting apparatus |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20070000647U KR20070000647U (en) | 2007-06-04 |
KR200444900Y1 true KR200444900Y1 (en) | 2009-06-12 |
Family
ID=41349647
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2020070007616U KR200444900Y1 (en) | 2007-05-09 | 2007-05-09 | Pipe-line supporting apparatus |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR200444900Y1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200473612Y1 (en) | 2011-12-16 | 2014-07-14 | 성화시스템챤넬(주) | deck plate with channel connection part |
CN103953796A (en) * | 2014-04-25 | 2014-07-30 | 安徽博泰氟材料科技有限公司 | Multifunctional pipeline fixing frame |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200459446Y1 (en) * | 2009-11-20 | 2012-03-27 | 김대식 | Improvement assembly type pipe supporting tool |
KR101341057B1 (en) * | 2011-11-25 | 2013-12-13 | 성화시스템챤넬(주) | Non-slip part with assembly type pipe support tool |
CN108361252B (en) * | 2018-05-04 | 2023-08-08 | 安维车件(厦门)有限公司 | Improved connecting pipe sleeve |
-
2007
- 2007-05-09 KR KR2020070007616U patent/KR200444900Y1/en not_active IP Right Cessation
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200473612Y1 (en) | 2011-12-16 | 2014-07-14 | 성화시스템챤넬(주) | deck plate with channel connection part |
CN103953796A (en) * | 2014-04-25 | 2014-07-30 | 安徽博泰氟材料科技有限公司 | Multifunctional pipeline fixing frame |
Also Published As
Publication number | Publication date |
---|---|
KR20070000647U (en) | 2007-06-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR200388694Y1 (en) | frame for pipelines with shock absorbing function | |
KR101117546B1 (en) | Structure for connecting and jointing square still supporting beam in temporary soil sheathing and reinforcing members for the same | |
KR200444900Y1 (en) | Pipe-line supporting apparatus | |
KR101759163B1 (en) | Vibration endurable cable tray structure | |
KR100400406B1 (en) | pipe line supporting device by non-welding assembly | |
KR101711614B1 (en) | Connection structure of steel column and steel beam | |
KR101414242B1 (en) | Reinforcement apparatus for H-beam column and reinforcement method using that | |
KR102230427B1 (en) | Power Distribution Reinforcement Device | |
KR200459446Y1 (en) | Improvement assembly type pipe supporting tool | |
JP2018127826A (en) | Joining method of column and beam | |
CN109707044B (en) | Anti-vibration type connecting structure for steel structure house | |
KR20100035640A (en) | Insert plate of assembly type pipe support tool | |
KR200449246Y1 (en) | Pipe supporting frame for earthquake-proof construction | |
JP2019173451A (en) | Joint structure of column and beam | |
KR101017894B1 (en) | A post for temporary soundproofing walls | |
KR200473612Y1 (en) | deck plate with channel connection part | |
KR100915075B1 (en) | Assembly type pipe supporting tool | |
KR101919348B1 (en) | Install structures of bridges exterior pannel | |
KR200456971Y1 (en) | Assembly type pipe supporting tool with up and down control part | |
CN215596567U (en) | Force transmission fixing device for large-diameter pipeline | |
KR20070000793U (en) | Pipe supporting structure with ring shape type union tool | |
KR102515172B1 (en) | Non-Piece connection bracket | |
CN220849072U (en) | Construction fence capable of installing temporary hydropower pipeline | |
CN218817265U (en) | Pump unit damping chassis with thrust device | |
KR200385720Y1 (en) | Apparatus of assembly style's external wall panel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
REGI | Registration of establishment | ||
FPAY | Annual fee payment |
Payment date: 20131206 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20140715 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20141216 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20151211 Year of fee payment: 8 |
|
EXPY | Expiration of term |