KR200420659Y1 - Cassion assembly of constructing external wall of steel pipe pile protect against salt injuries - Google Patents

Cassion assembly of constructing external wall of steel pipe pile protect against salt injuries Download PDF

Info

Publication number
KR200420659Y1
KR200420659Y1 KR2020060008554U KR20060008554U KR200420659Y1 KR 200420659 Y1 KR200420659 Y1 KR 200420659Y1 KR 2020060008554 U KR2020060008554 U KR 2020060008554U KR 20060008554 U KR20060008554 U KR 20060008554U KR 200420659 Y1 KR200420659 Y1 KR 200420659Y1
Authority
KR
South Korea
Prior art keywords
steel pipe
pipe pile
caisson
semi
salt
Prior art date
Application number
KR2020060008554U
Other languages
Korean (ko)
Inventor
전호건
전미선
전호천
천혜경
홍현민
Original Assignee
명보산공 주식회사
전호건
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 명보산공 주식회사, 전호건 filed Critical 명보산공 주식회사
Priority to KR2020060008554U priority Critical patent/KR200420659Y1/en
Application granted granted Critical
Publication of KR200420659Y1 publication Critical patent/KR200420659Y1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D37/00Repair of damaged foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/226Protecting piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0061Production methods for working underwater

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Revetment (AREA)

Abstract

본 고안은 강관파일의 염해 방식용 외벽 설치에 사용되는 케이슨 조립체에 관한 것으로, 강관파일의 염해 방식용 외벽 설치에 사용되는 케이슨 조립체는, 수직으로 설치된 강관파일의 외측에 설치되는 염해 방식용 외벽 설치에 사용되는 케이슨 조립체에 있어서, 강관파일의 외주면에 감싸도록 설치되는 복수개의 반원형 본체와, 복수개의 반원형 본체의 상단을 막도록 설치되고, 중심부에는 강관파일이 관통하는 관통공이 형성되고, 복수개의 반원형 본체의 하단을 막도록 설치되고, 배수용 집수정이 형성된 하판부재와, 스터드 볼트를 매개로 하여 상기 강관파일의 외면에 설치된 와이어메쉬와, 상기 와이어메쉬의 외측에 설치된 타설용 거푸집으로 이루어지는 것을 특징으로 한다.The present invention relates to a caisson assembly used for the installation of salt pipes of the steel pipe piles, and the caisson assembly used for the installation of salt pipes of the steel pipe piles is installed on the outside of the steel pipe piles installed vertically In the caisson assembly used in the present invention, a plurality of semi-circular bodies provided to surround the outer circumferential surface of the steel pipe pile and a plurality of semi-circular bodies are formed to block the upper ends of the plurality of semi-circular bodies, and the through-holes through which the steel pipe piles penetrate are formed. It is installed to block the lower end of the main body, the bottom plate member is formed with a drainage collector, a wire mesh installed on the outer surface of the steel pipe pile via a stud bolt, and the casting form installed on the outside of the wire mesh It is done.

강관, 파일, 염해, 방식, 외벽, 케이슨 Steel pipe, pile, salt sea, way, curtain wall, caisson

Description

강관파일의 염해 방식용 외벽 설치에 사용되는 케이슨 조립체{CASSION ASSEMBLY OF CONSTRUCTING EXTERNAL WALL OF STEEL PIPE PILE PROTECT AGAINST SALT INJURIES}CASEION ASSEMBLY OF CONSTRUCTING EXTERNAL WALL OF STEEL PIPE PILE PROTECT AGAINST SALT INJURIES}

도 1은 본 고안의 실시 예에 따른 케이슨 조립체를 사용한 강관파일의 염해 방식용 외벽 설치를 설명하기 위한 공정도이다.1 is a process chart for explaining the installation of the salt-walled outer wall of the steel pipe pile using a caisson assembly according to an embodiment of the present invention.

도 2 내지 도 7은 본 고안의 실시 예에 따른 강관파일의 염해 방식용 외벽 설치에 적용되는 케이슨 조립체 및 이를 시공하는 각 공정을 개략적으로 나타낸 도면이다.2 to 7 is a view schematically showing a caisson assembly and each process for constructing the caisson assembly applied to the installation of the outer wall of the steel pipe pile according to an embodiment of the present invention.

도 8은 도 5에서 'B'에 대한 확대 도면이다.FIG. 8 is an enlarged view of 'B' in FIG. 5.

* 도면의 주요 부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

2 : 케이슨 4 : 고정용 브라켓2: caisson 4: fixing bracket

6 : 수평브라켓 8 : 작업대6: horizontal bracket 8: working table

22a,22b : 반원형 본체 24 : 밸러스트 탱크22a, 22b: semi-circular body 24: ballast tank

26 : 하판부재26: lower plate member

본 고안은 강관파일의 염해 방식용 외벽 설치에 사용되는 케이슨 조립체에 관한 것으로, 더욱 상세하게는 강관파일의 외부에 차수용 케이슨을 설치하고, 그 내부를 건상태로 한 후 강관파일 외부에 콘크리트몰탈에 의한 커버를 설치함으로써 해수의 염분으로부터 강관파일의 부식을 방지할 수 있도록 한 강관파일의 염해 방식용 외벽 설치에 사용되는 케이슨 조립체에 관한 것이다.The present invention relates to a caisson assembly used for the installation of the salt-walled outer wall of the steel pipe piles, and more specifically, to install the order caisson on the outside of the steel pipe pile, the interior of the steel pipe pile, and then to the concrete mortar outside the steel pipe pile The present invention relates to a caisson assembly for use in the installation of the outer wall for the salt corrosion protection method of the steel pipe pile to prevent corrosion of the steel pipe pile from salt of sea water.

일반적으로 하천, 강, 바다에 시공되어 있는 교량의 교각과 우물통기초는 장기간 수중에 있게 되므로 대부분은 노후화되어 보수작업이 요구된다.Generally, the bridge piers and well foundations of bridges in rivers, rivers, and seas are in the water for a long time, so most of them are obsolete and require repair work.

이러한, 보수작업에 앞서 잠수부 또는 수중촬영 장비를 이용하여 교각과 우물통기초 부위의 보수범위를 조사하고 이를 근거로 설계를 실시하게 된다. 이와 같은 보수작업은 수중공사를 하거나 또는 시트 파일(sheet pile)을 설치하여 교각과 우 물통기초 부위를 건식상태로 만든 후에 보수작업을 하는 것이 보통이다.Prior to the repair work, a diver or underwater photographing equipment is used to investigate the repair range of the piers and the well well base and perform the design based on this. Such repair work is usually carried out by underwater construction or by installing sheet piles to dry the piers and the foundation of the wells and dry them.

하지만, 수중공사를 해야하는 경우 작업자의 안정성과 공사의 품질관리가 용이하지 않고, 시트파일 공법은 기초지반이 암반인 경우 지반을 특수장비를 이용하여 천공하여 시트파일을 설치해야하므로 공사비가 많이 들고 공사기간도 많이 소요되는 등 기존공법으로는 많은 어려움이 따르고 있다.However, in case of underwater construction, worker's stability and quality control of the construction are not easy, and the sheet pile method requires a lot of construction cost because the foundation pile should be installed by using special equipment when the foundation ground is rock. It takes a lot of time, and there are many difficulties with the existing method.

상기와 같은 이유로 인해, 적은 비용으로 전문성과 신뢰성을 부여할 수 있는 보수공사 방법으로 교각의 우물통 주위에 설치하고 그 내부에 물을 제거한 후 보수공사를 할 수 있는 케이슨(caisson)과, 상기 케이슨의 하단에 설치되며 외부의 물이 유입되는 것을 방지하는 수밀 케이슨이 개발되었다.For this reason, caisson and caisson, which can be installed around the well of the pier and remove water in the pier by a repair method that can provide expertise and reliability at a low cost, and the caisson Watertight caissons have been developed to be installed at the bottom of the unit and to prevent external water from entering.

종래의 교각 보수용으로 사용되는 케이슨의 일예로서, 팽창되는 튜브를 갖는 수밀 케이슨의 하단에 하측에 튜브가 위치되는 절곡부를 형성하고 이 절곡부의 내,외측에 각각 높이 조절이 가능하도록 볼트에 의해 체결되는 가이드구멍을 갖는 수평유지편을 설치하여 강바닥의 암반이 평탄하지 않은 경우에도 수평유지편을 조절하여 케이슨을 수평으로 유지시키도록 할 수 있는 케이슨 구조가 대한민국 등록특허공보 제368604호에 제시되어 있다.As an example of a conventional caisson used for repairing a pier, a bent part in which a tube is positioned at the bottom of a watertight caisson having an expanding tube is formed, and fastened by bolts to allow height adjustments inside and outside of the bent part, respectively. A caisson structure is provided in Korean Patent Publication No. 368604 that allows the horizontal holding piece having a guide hole to be installed to maintain the caisson horizontally even when the rock bottom of the river is not flat. .

또한, 등록특허공보 제384520호에서는 일측이 개방된 긴 띠형태로 되고 상단은 케이슨의 하단에 볼트 등으로 체결되며 하단은 우물통의 외주연에 수밀 와이어에 의해 결합되도록 형성한 수밀러버와, 케이슨의 하단과 수밀 러버의 상단에 설치되는 보호판를 구비함으로써 시공이 쉽고 경사비가 절감되도록 하는 교각 보수용 케이슨이 제시되어 있다.In addition, Korean Patent No. 384520 discloses a watertight rubber and a caisson, one side of which is formed in an open long band shape, the upper end of which is fastened with a bolt or the like on the lower end of the caisson, and the lower end is joined by a watertight wire to the outer circumference of the well. The caisson for pier repair is proposed to have a protection plate installed at the bottom of the watertight rubber and the top of the watertight rubber so that the construction is easy and the slope ratio is reduced.

한편, 등록실용신안공보 제318437호에서는 복수개의 패널 하부에 수밀재가 설치된 케이슨에 있어서 압착부와 체결 단턱이 형성된 수밀재를 패널에 볼트를 결합하여 수밀재가 볼트로써 간단하게 패널에 결합 분리될 수 있는 구조가 제시되어 있다.On the other hand, in Korean Utility Model Publication No. 318437, in a caisson in which watertight materials are installed at the bottom of a plurality of panels, a watertight material having a crimping portion and a fastening step is coupled to a panel so that the watertight material can be easily separated from the panel by bolts. The structure is shown.

그러나, 상기한 종래의 교각 보수용 케이슨 구조는 케이슨의 수밀을 유지하기 위하여 에어컴프레서 등으로 수밀튜브에 공기를 넣어 팽창시켜야함은 물론 수밀튜브의 공기압력 저하시 케이슨 내부의 수밀이 유지되지 못하므로 교각의 시공이나 보수작업이 종료될 때까지 수밀튜브에 압축공기를 계속하여 공급하여야 하는 등 케이슨의 설치작업 및 설치 후 유지작업이 어려웠을 뿐만 아니라 수밀튜브의 부피가 크기 때문에 케이슨의 크기도 커질 수 밖에 없으므로 케이슨의 제작비용이 증가되고 운반 및 보관에도 어려움이 따랐던 문제가 있었다.However, the conventional pier repair caisson structure should be expanded by putting air into the watertight tube with an air compressor or the like in order to maintain the watertight of the caisson, as well as the watertight inside the caisson is not maintained when the air pressure of the watertight tube is lowered The installation and maintenance of caissons were difficult, such as the continued supply of compressed air to the watertight tube until the construction of the bridge was completed or repaired, and the size of the caisson could be increased due to the large volume of the watertight tube. There was a problem that the manufacturing cost of the caisson was increased and difficult to carry and store because there is only.

또한, 케이슨의 수밀튜브에 일정한 압력으로 유지하는 것이 용이하지 않게 되는데, 예컨대, 수밀튜브에 작은 압력이 걸릴경우 차수 후에 케이슨 내부로 물이 유입되고, 반대로, 수밀튜브에 과도한 압력이 걸리는 경우 튜브가 손상되어 케이슨의 물막이 기능을 상실하게 되며 유지 보수비용이 많이 들게 되는 문제점이 생긴다.In addition, it is not easy to maintain a constant pressure on the watertight tube of the caisson, for example, if a small pressure is applied to the watertight tube, water is introduced into the caisson after the order, on the contrary, if the watertight tube is subjected to excessive pressure Damage to the caisson loses its function and causes a lot of maintenance costs.

또한, 이러한 수밀튜브내 공기나 물 주입은 수중에서 행하는 것이 아니라 수상에서 행하여야 안전하게 되는데, 수밀튜브 내 압력유지를 수상에서 수행하게 되면 이를 제어하기 어렵고 작업자의 시행착오로 인한 기술적 노하우가 있어야 하기 때문에 비용 및 공기가 많이 소요되는 문제점이 있었다.In addition, the injection of air or water in the watertight tube should be performed safely in the water phase rather than in the water. When the pressure maintenance in the watertight tube is performed in the water phase, it is difficult to control it and there must be technical know-how due to the trial and error of the operator. There was a problem that the cost and air consumption.

본 고안은 상기한 종래 기술의 문제점을 해소하기 위해 안출된 것으로, 강관파일의 외부에 차수용 케이슨을 설치하고, 그 내부를 배수시켜 건조한 상태로 한 후 강관파일 외부에 거푸집을 설치하고, 콘크리트몰탈을 타설하여 콘크리트 외벽을 설치함으로써 케이슨을 해체한 후에도 염해(鹽害)으로부터 강관파일의 부식을 방지할 수 있도록 한 강관파일의 염해 방식용 외벽설치에 사용되는 케이슨 조립체를 제공하는데 그 목적이 있다.The present invention was devised to solve the above-mentioned problems of the prior art, install the order caisson on the outside of the steel pipe pile, drain the inside to dry and install the formwork outside the steel pipe pile, concrete mortar It is an object of the present invention to provide a caisson assembly for use in the installation of the salt wall protection method of the steel pipe pile to prevent corrosion of the steel pipe pile from salt damage even after dismantling the caisson by installing concrete outer wall.

상기한 목적을 달성하기 위해 본 고안의 강관파일의 염해 방식용 외벽 설치 에 사용되는 케이슨 조립체는, 수직으로 설치된 강관파일의 외측에 설치되는 염해 방식용 외벽 설치에 사용되는 케이슨 조립체에 있어서,In order to achieve the above object, the caisson assembly used for the salt wall installation of the steel pipe pile of the present invention, the caisson assembly used for the salt wall installation of the salt pipe is installed on the outside of the vertically installed steel pipe pile,

강관파일의 외주면에 감싸도록 설치되는 복수개의 반원형 본체와, 복수개의 반원형 본체의 상단을 막도록 설치되고, 중심부에는 강관파일이 관통하는 관통공이 형성되고, 복수개의 반원형 본체의 하단을 막도록 설치되고, 배수용 집수정이 형성된 하판부재와, 스터드 볼트를 매개로 하여 상기 강관파일의 외면에 설치된 와이어메쉬와, 상기 와이어메쉬의 외측에 설치된 타설용 거푸집으로 이루어지는 것을 특징으로 한다.A plurality of semi-circular body is installed to surround the outer circumferential surface of the steel pipe pile, and is installed to block the upper end of the plurality of semi-circular body, the through-hole is formed in the center of the steel pipe pile, and is installed to block the bottom of the plurality of semi-circular body , A lower plate member having a drainage collecting well formed thereon, a wire mesh installed on an outer surface of the steel pipe pile through a stud bolt, and a formwork for pouring placed on an outer side of the wire mesh.

또한, 본 고안의 강관파일의 염해 방식용 외벽 설치에 사용되는 케이슨 조립체에 있어서, 상기 반원형 본체의 외측에는 복수개의 밸러스트 탱크가 더 설치된 것을 특징으로 한다.In addition, in the caisson assembly used for the salt-walled outer wall installation of the steel pipe pile of the present invention, a plurality of ballast tanks are further provided on the outside of the semi-circular body.

이하 본 고안의 바람직한 실시예를 첨부된 도면을 토대로 상세하게 설명하면 다음과 같다.Hereinafter, a preferred embodiment of the present invention will be described in detail with reference to the accompanying drawings.

첨부된 도 1은 본 고안의 실시 예에 따른 강관파일의 염해 방식용 외벽 설치를 설명하기 위한 흐름도이고, 도 2 내지 도 7은 본 고안의 강관파일의 염해 방식용 외벽 설치에서 케이슨 조립체를 사용한 시공의 각 공정을 개략적으로 나타낸 도면이다. 도 8은 도 5에서 'B'에 대한 확대 도면이다.Attached Figure 1 is a flow chart illustrating the installation of the salt pipe method of the steel pipe pile according to an embodiment of the present invention, Figure 2 to Figure 7 is a construction using a caisson assembly in the salt wall installation of the steel pipe pile of the present invention It is a figure which shows each process of Schematically. FIG. 8 is an enlarged view of 'B' in FIG. 5.

본 고안의 실시 예에 따른 케이슨 조립체는 도 2 내지 도 7과 같이, 강관파일의 외주면에 감싸도록 설치되는 복수개의 반원형 본체(22a,22b)와, 복수개의 반원형 본체(22a,22b)의 상단을 막도록 설치되고, 중심부에는 강관파일(100)이 관통 하는 관통공이 형성되고, 복수개의 반원형 본체(22a,22b)의 하단을 막도록 설치되고, 배수용 집수정(262)이 형성된 하판부재(26)와, 스터드 볼트(12)를 매개로 하여 상기 강관파일(100)의 외면에 설치된 와이어메쉬(14)와, 상기 와이어메쉬(14)의 외측에 설치된 타설용 거푸집(16)으로 이루어진다.The caisson assembly according to the embodiment of the present invention, as shown in Figure 2 to 7, a plurality of semi-circular body (22a, 22b) and the upper end of the plurality of semi-circular body (22a, 22b) is installed to surround the outer circumferential surface of the steel pipe pile The lower plate member 26 is installed to block, a through hole through which the steel pipe pile 100 penetrates, is formed to block the lower ends of the plurality of semi-circular bodies 22a and 22b, and the water collecting well 262 for drainage is formed. ), And a wire mesh 14 provided on the outer surface of the steel pipe pile 100 via the stud bolt 12, and a casting form 16 disposed on the outside of the wire mesh 14.

또한, 반원형 본체(22a,22b)의 외측에는 복수개의 밸러스트 탱크(24)가 더 설치되어 이루어질 수 있다.In addition, a plurality of ballast tanks 24 may be further provided outside the semi-circular bodies 22a and 22b.

이하 본 고안의 실시 예를 설명하는데 있어서 강관파일의 염해 방식용 외벽 설치에 사용되는 케이슨 조립체를 공법과 병행하여 설명하면 다음과 같다.Hereinafter, the caisson assembly used for the installation of the outer wall for the salt-proof method of the steel pipe pile will be described in parallel with the construction method as follows.

본 고안의 실시 예에 따른 강관파일의 염해 방식용 외벽 설치에 케이슨 조립체를 통한 시공 공정은, 도 1과 같이, 강관파일(100)을 수중에 매입하는 1단계(S1)와, 강관파일(100)의 외측에 케이슨(2)을 설치하는 2단계(S2)와, 케이슨(2) 내부의 해수를 배수하여 내부를 건조한 상태로 형성하는 3단계(S3)와, 강관파일(100)의 외면 및 케이슨(2)의 내면을 담수로 세척하는 4단계(S4)와, 강관파일(100)의 외면에 다수개의 스터드볼트(12)를 용착하고, 상기 스터드볼트(12)에 와이어메쉬(14)를 설치하되 강관파일(100)의 외주면을 감싸도록 설치하는 5단계(S5)와, 상기 와이어메쉬(14)의 외측에 타설용 거푸집(16)을 설치하는 6단계(S6)와, 상기 타설용 거푸집(16)에 콘크리트를 콘크리트 외벽(200)을 형성하는 7단계(S7)와, 상기 케이슨(2)을 해체하는 8단계(S8)를 포함하여 시공될 수 있다.The construction process through the caisson assembly to the salt-walled outer wall of the steel pipe pile according to an embodiment of the present invention, as shown in Figure 1, the first step (S1) to purchase the steel pipe pile 100, and the steel pipe pile 100 Step 2 of installing the caisson 2 on the outside of the (S2), and the third step (S3) of draining the seawater inside the caisson (2) to form a dry inside, and the outer surface of the steel pipe pile and Step 4 (S4) of washing the inner surface of the caisson (2) with fresh water, and a plurality of stud bolts 12 are welded to the outer surface of the steel pipe pile 100, the wire mesh 14 to the stud bolt 12 5 steps (S5) to be installed to cover the outer circumferential surface of the steel pipe pile 100, and 6 steps (S6) for installing the pouring formwork 16 on the outside of the wire mesh 14, and the pouring formwork Concrete may be constructed including a seventh step (S7) to form a concrete outer wall (200) (16), and an eight step (S8) to dismantle the caisson (2).

상기 1단계(S1)는 소정 길이로 된 강관파일을 수심 깊이 박아서 바닷속 지반에 수직되게 매입하는 단계이며, 타격에 의해 강관파일을 박아넣는 항타장치를 이 용하거나, 또는 코어비트로서 지반을 굴착한 후 강관파일을 박아넣는 회전식 천공장치를 이용하게 된다. The first step (S1) is a step of embedding a steel pipe pile having a predetermined length deeply and buried vertically to the ground in the sea, by using a driving device for embedding the steel pipe pile by the blow, or by using the ground as a core bit After the excavation, a rotary cloth mill is inserted into the steel pipe pile.

상기 2단계(S2)는, 도 2에 나타낸 바와 같이, 강관파일(100)의 외측에 케이슨(2)을 설치하는 것으로, 원통형으로 된 케이슨(2)을 강관파일(100)의 외면을 감싸도록 설치한다.The second step (S2), as shown in Figure 2, by installing the caisson 2 on the outside of the steel pipe pile 100, so that the cylindrical caisson 2 to surround the outer surface of the steel pipe pile (100) Install.

상기 케이슨(2)은 반원형 본체(22a,22b)가 맞대어져 일측은 힌지결합되고, 타측은 체결용 고정장치(미도시)가 설치되며, 외주면에는 다수개의 밸러스트 탱크(ballast tank)(24)가 설치되어 구성된다.The caisson (2) is semi-circular body (22a, 22b) is joined to one side is hinged, the other side is provided with a fastening device (not shown), a plurality of ballast tanks (ballast tank) (24) on the outer peripheral surface Installed and configured.

상기 케이슨(2)은 바다에 설치될 경우 밀물과 썰물의 해수면 차이를 고려하여 저수위(L)와 고수위(H)를 모두 커버할 수 있을 정도의 높이를 갖도록 형성된다.The caisson 2 is formed to have a height enough to cover both the low water level (L) and high water level (H) in consideration of the difference between the sea level of the high and low tide when installed in the sea.

상기 밸러스트 탱크(ballast tank)(24)는 수중에서 케이슨(2)의 균형을 잡기위해 설치된다.The ballast tank 24 is installed to balance the caisson 2 in water.

이후, 상기 케이슨(2)의 저면에는 중심부에는 강관파일(100)이 관통되는 관통공이 형성되고, 다수개의 배수용 집수정(262)이 마련된 하판부재(26)를 설치한다.Subsequently, the bottom surface of the caisson 2 has a through hole through which the steel pipe pile 100 penetrates, and a lower plate member 26 provided with a plurality of drainage collection wells 262 is installed.

도 8에 도시된 바와 같이, 상기 하판부재(26)의 중심에 형성된 관통공에는 강관파일(100)의 외주면과 밀폐될 수 있도록 소정의 수밀용 패킹(264)이 더 게재된다.As shown in FIG. 8, a predetermined watertight packing 264 is further placed in the through hole formed at the center of the lower plate member 26 to be sealed with the outer circumferential surface of the steel pipe pile 100.

상기 케이슨(2)의 상부에는 중심부에 강관파일(100)의 외주면에 지지되는 고정용 브라켓(4)이 설치되고, 상기 고정용 브라켓(4)과 케이슨(2)을 연결하는 다수 개의 수평브라켓(6)이 방사상으로 설치된다.The upper portion of the caisson (2) is provided with a fixing bracket (4) is supported on the outer peripheral surface of the steel pipe pile 100 in the center, a plurality of horizontal brackets connecting the fixing bracket (4) and caisson (2) 6) is installed radially.

그리고, 상기 수평브라켓(6) 및 케이슨(2)의 상단부 외주면에는 작업대(8)가 설치된다. Then, the worktable 8 is installed on the outer circumferential surface of the upper end of the horizontal bracket (6) and caisson (2).

상기 3단계(S3)는, 도 3에 나타낸 바와 같이, 케이슨(2) 내부의 해수(海水)를 펌핑작업에 의해 배수하여 케이슨(2) 내부를 건조한 상태(dry station)로 만드는 단계이다.The third step (S3), as shown in Figure 3, is the step of draining the sea water (sea water) inside the caisson 2 by the pumping operation to make the inside of the caisson 2 into a dry station (dry station).

상기 4단계(S4)는, 도 4에 나타낸 바와 같이, 케이슨(2) 내부의 강관파일(100)의 표면 및 반원형 본체(22a,22b)의 내주면에 대해 워터제트(water jet)를 이용하여 담수를 분사함으로써 표면의 불순물을 제거하고, 염분을 세척하는 공정이다.As shown in FIG. 4, the fourth step S4 uses fresh water jet on the surface of the steel pipe pile 100 inside the caisson 2 and the inner circumferential surfaces of the semi-circular bodies 22a and 22b. It is a step of removing impurities on the surface by spraying and washing the salt.

상기 4단계(S4)를 통해 강관파일(100)의 표면을 세척한 후 발생된 세척오수는 하부판재(26)의 배수용 집수정(262)으로 집중되고, 이 배수용 집수정(262)에 배수펌프(300)를 설치하여 세척오수를 외부로 배수시킨다(도 3 참조).The washing sewage generated after washing the surface of the steel pipe pile 100 through the fourth step (S4) is concentrated to the sump 262 for drainage of the lower plate 26, and to the sump 262 for the drainage. Install a drain pump 300 to drain the washing sewage to the outside (see Figure 3).

따라서, 케이슨(2)의 내부는 완전히 건조된 상태가 되나, 케이슨(2)의 외부는 수중에 잠긴 상태가 된다.Accordingly, the inside of the caisson 2 is completely dried, but the outside of the caisson 2 is locked in water.

상기 5단계(S5)는, 도 5 및 도 8에 나타낸 바와 같이, 케이슨(2) 내부의 강관파일(100)의 표면에 다수개의 스터드볼트(12)를 수평되게 용접시킨 후 강관파일(100)을 감싸도록 상기 스터드볼트(12)의 외측에 와이어메쉬(14)를 설치한다.5 and 8, the plurality of stud bolts 12 are horizontally welded to the surface of the steel pipe pile 100 inside the caisson 2 and then the steel pipe pile 100. The wire mesh 14 is installed on the outside of the stud bolt 12 so as to surround the stud bolt 12.

상기 6단계(S6)는, 와이어메쉬(14)의 외측에 대략 원통형으로 된 타설용 거푸집(16)을 설치한다. In the sixth step (S6), the casting mold 16 is formed in a substantially cylindrical shape on the outside of the wire mesh 14.

상기 타설용 거푸집(16)의 높이는 밀물 및 썰물시 해수면의 높이차를 모두 커버할 수 있을 정도로 형성됨이 바람직하다.The height of the pouring form 16 is preferably formed to cover all of the height difference of the sea level during high tide and low tide.

이는 타설용 거푸집(16)에 의해 형성된 콘크리트 외벽(200)이 실질적으로 강관파일(100)의 외면에 해수가 직접 접촉하지 못하도록 하는 역할을 하기 때문이다.This is because the concrete outer wall 200 formed by the pouring formwork 16 substantially prevents seawater from directly contacting the outer surface of the steel pipe pile 100.

상기 7단계(S7)는 타설용 거푸집(16)에 콘크리트(c)를 타설하여 양생시켜 콘크리트 외벽(200)을 형성하는 단계이며, 상기 8단계(S8)는 전술한 케이슨(2)을 해체하는 단계이다(도 7 참조).The seventh step (S7) is a step of forming the concrete outer wall 200 by pouring concrete (c) in the casting form 16 for pouring, and the eighth step (S8) to dismantle the caisson (2) described above Step (see FIG. 7).

따라서, 강관파일(100)의 외면에 원통형의 콘크리트 외벽(200)을 설치함으로써 해수의 밀물시 또는 썰물시의 수위 변동에 상관없이 항상 강관파일(100)에 직접 해수가 접촉되지 못하도록 막음으로써 염해(鹽害)로부터 강관파일(100)의 부식을 방지할 수 있게 된다.Therefore, by installing a cylindrical concrete outer wall 200 on the outer surface of the steel pipe pile 100, regardless of the water level fluctuations during high tide or low tide of the sea pipe always prevents the sea water directly contact the steel pipe pile (100) I) to prevent corrosion of the steel pipe pile (100).

이상에서 설명한 바와 같이, 강관파일의 염해 방식용 외벽 설치에 있어서 본 고안에 따른 케이슨 조립체를 사용하여 시공하면, 해수면의 높이 변화에 제약 없이 콘크리트 외벽에 의해 해수가 강관파일에 직접 접촉하지 못하도록 할 수 있고, 콘크리트의 알칼리성이 염해로부터 강관파일을 보호할 수 있어 부식을 방지할 수 있는 효과를 얻을 수 있다.As described above, when using the caisson assembly according to the present invention in the installation of the salt pipe method of the outer wall of the steel pipe pile, it is possible to prevent the sea water directly contact the steel pipe pile by the concrete outer wall without restriction on the height change of the sea surface. In addition, the alkalinity of the concrete can protect the steel pipe pile from salt damage, thereby obtaining an effect of preventing corrosion.

Claims (2)

수직으로 설치된 강관파일의 외측에 설치되는 염해 방식용 외벽 설치에 사용되는 케이슨 조립체에 있어서,In the caisson assembly used for the installation of the outer wall for the salt sea method installed on the outside of the vertically installed steel pipe pile, 상기 강관파일(100)의 외주면에 감싸도록 설치되는 복수개의 반원형 본체(22a,22b)와, 복수개의 반원형 본체(22a,22b)의 상단을 막도록 설치되고, 중심부에는 강관파일(100)이 관통하는 관통공이 형성되고, 복수개의 반원형 본체(22a,22b)의 하단을 막도록 설치되고, 배수용 집수정(262)이 형성된 하판부재(26)와, 스터드 볼트(12)를 매개로 하여 상기 강관파일(100)의 외면에 설치된 와이어메쉬(14)와, 상기 와이어메쉬(14)의 외측에 설치된 타설용 거푸집(16)으로 이루어지는 것을 특징으로 하는 강관파일의 염해 방식용 외벽 설치에 사용되는 케이슨 조립체.A plurality of semi-circular body (22a, 22b) and a plurality of semi-circular body (22a, 22b) is installed to cover the upper circumferential surface of the steel pipe pile 100, the steel pipe pile 100 is penetrated through the center The through-hole is formed, and the lower pipe member 26, which is installed to block the lower ends of the plurality of semi-circular body (22a, 22b), the drainage collector 262 is formed, and the stud bolt 12 through the steel pipe A caisson assembly for use in the installation of the outer wall for the salt protection method of the steel pipe pile, comprising a wire mesh 14 installed on the outer surface of the pile 100 and a casting form 16 installed on the outside of the wire mesh 14. . 제 1 항에 있어서,The method of claim 1, 상기 반원형 본체(22a,22b)의 외측에는 복수개의 밸러스트 탱크(24)가 더 설치되어 이루어진 것을 특징으로 하는 강관파일의 염해 방식용 외벽 설치에 사용되는 케이슨 조립체.A caisson assembly for use in the installation of the outer wall for salt protection of the steel pipe pile, characterized in that a plurality of ballast tank (24) is further provided on the outside of the semi-circular body (22a, 22b).
KR2020060008554U 2006-03-31 2006-03-31 Cassion assembly of constructing external wall of steel pipe pile protect against salt injuries KR200420659Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020060008554U KR200420659Y1 (en) 2006-03-31 2006-03-31 Cassion assembly of constructing external wall of steel pipe pile protect against salt injuries

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020060008554U KR200420659Y1 (en) 2006-03-31 2006-03-31 Cassion assembly of constructing external wall of steel pipe pile protect against salt injuries

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020060029342 Division 2006-03-31

Publications (1)

Publication Number Publication Date
KR200420659Y1 true KR200420659Y1 (en) 2006-07-05

Family

ID=41769328

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020060008554U KR200420659Y1 (en) 2006-03-31 2006-03-31 Cassion assembly of constructing external wall of steel pipe pile protect against salt injuries

Country Status (1)

Country Link
KR (1) KR200420659Y1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101053139B1 (en) * 2009-07-14 2011-08-02 삼성물산 주식회사 Anti-collision structure of offshore bridge and its construction method
KR101083038B1 (en) 2009-12-01 2011-11-16 삼성물산 주식회사 Marine structure using precast block and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101053139B1 (en) * 2009-07-14 2011-08-02 삼성물산 주식회사 Anti-collision structure of offshore bridge and its construction method
KR101083038B1 (en) 2009-12-01 2011-11-16 삼성물산 주식회사 Marine structure using precast block and construction method thereof

Similar Documents

Publication Publication Date Title
CN110359476B (en) Construction method of construction platform for mounting steel sheet pile cofferdam inner support and bored pile steel casing
KR100665563B1 (en) Apparatus of mending for pier
CN101260674A (en) Hermetic seal process for box body and pile body
KR200420659Y1 (en) Cassion assembly of constructing external wall of steel pipe pile protect against salt injuries
CN112538860A (en) Construction method of high-water-level complex stratum bottom-seal-free concrete lock catch steel pipe pile cofferdam
JP2000265474A (en) Temporary cofferdam constructing method for construction
KR100647091B1 (en) Method of repairing a constructive material in water and device thereof
KR20110006178A (en) Caisson lower-end water cut-off system
KR20000007036A (en) Pier repair for caisson
CN114541439B (en) Construction method of double-wall steel cofferdam structure without bottom sealing
KR100768552B1 (en) steel well foundation construction and equipment
KR200387372Y1 (en) The underwater casing form
KR100525356B1 (en) Construction method for underwater structure caisson assembly
JP3024932B2 (en) Dry work method and work box used for it
JP4863215B2 (en) Underwater steel pipe erection method
TWI645094B (en) Method for constructing underwater foundation by using caisson and
JP4381855B2 (en) Temporary cut-off structure and temporary cut-off method for underwater existing structures
CN218970086U (en) A row of stifled comprehensive treatment system that is used for anti floating of basement structure to stop oozing
JP2005264500A5 (en)
JPH11256609A (en) Uplift prevention method of structure and uplift prevention construction
KR200380083Y1 (en) Caisson assembly for repair a underwater structure
CN117266211B (en) Installation process of isolation protection structure of circular locking embedded part of underground diaphragm wall
CN220266610U (en) Local precipitation structure in foundation ditch
CN214005712U (en) A cement pressure plate subassembly for in sump pit
CN106836247B (en) Combined cofferdam and construction method thereof

Legal Events

Date Code Title Description
U107 Dual application of utility model
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20130610

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20140610

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20150622

Year of fee payment: 10