KR200420332Y1 - A Retaining wall block for prevention of falling rock network establishment - Google Patents

A Retaining wall block for prevention of falling rock network establishment Download PDF

Info

Publication number
KR200420332Y1
KR200420332Y1 KR2020060006111U KR20060006111U KR200420332Y1 KR 200420332 Y1 KR200420332 Y1 KR 200420332Y1 KR 2020060006111 U KR2020060006111 U KR 2020060006111U KR 20060006111 U KR20060006111 U KR 20060006111U KR 200420332 Y1 KR200420332 Y1 KR 200420332Y1
Authority
KR
South Korea
Prior art keywords
block
retaining wall
wall block
assembled
side block
Prior art date
Application number
KR2020060006111U
Other languages
Korean (ko)
Inventor
박윤희
Original Assignee
주식회사 제일에코텍
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 제일에코텍 filed Critical 주식회사 제일에코텍
Priority to KR2020060006111U priority Critical patent/KR200420332Y1/en
Application granted granted Critical
Publication of KR200420332Y1 publication Critical patent/KR200420332Y1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F7/00Devices affording protection against snow, sand drifts, side-wind effects, snowslides, avalanches or falling rocks; Anti-dazzle arrangements ; Sight-screens for roads, e.g. to mask accident site
    • E01F7/04Devices affording protection against snowslides, avalanches or falling rocks, e.g. avalanche preventing structures, galleries
    • E01F7/045Devices specially adapted for protecting against falling rocks, e.g. galleries, nets, rock traps
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/025Retaining or protecting walls made up of similar modular elements stacked without mortar
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0266Retaining or protecting walls characterised by constructional features made up of preformed elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

본 고안의 시멘트 콘크트물로 양생 현장에서 블록과 측구블록을 성형 양생시켜 시공현장으로 운반하여 소수의 인력으로 측구블록과 옹벽블록을 연결조립하여 소정의 높이로 축조하고 그 상면에 낙석방지망 설치용 지주는 앵커 보울트로 입설 고정하여 주되 상기 측구블록과 옹벼블록은 서로 연결조립이 용이하도록 “

Figure 112006016144118-utm00001
”자형의 연결부와 재치턱을 가지는 측구블록과 이 측구블록상에 역시 전후면판이 결합부에 의해 공간부를 가지고 일체로 성형되고 옹벽블록의 좌우 양측면에 “
Figure 112006016144118-utm00002
”자형의 조립부로 이루어진 구성의 옹벽블록과 측구블록을 함께 제공하여 낙석방지망의 설치를 용이하게 함과 동시에 옹벽 상면의 공간부로 식물을 식수하여 친화적인 환경의 조경화는 물론 옹벽 자체만을 필요로 할 때는 축조된 블록의 최 상면에 마감판을 덮어 마무리 할 수 있도록 한 구성의 낙석방지망 설치용 조립식 옹벽블록에 관한 고안이다.The cement concrete of the present invention is molded and cured block and side block at the curing site and transported to the construction site, and the side block and retaining wall block are assembled and assembled with a small number of manpower to build a predetermined height. The anchor bolt is fixed in the vertical position, but the side block and the ong block are easily connected and assembled together.
Figure 112006016144118-utm00001
"A side block with a male connection and a mounting jaw and a front and back face plate on this side block are also integrally formed with a space by means of a joining part, and on both left and right sides of the retaining wall block.
Figure 112006016144118-utm00002
”The retaining wall block and the side block block of the shape of the assembly are provided together to facilitate the installation of the rockfall prevention network, and the plant is planted by the space part of the retaining wall so that the environment of the friendly environment and only the retaining wall itself are needed. It is a design of a prefabricated retaining wall block for installing a rockfall prevention net that can be finished by covering the finishing plate on the top of the constructed block.

옹벽블록, 걸림턱, 걸림돌기, 결합홈, 조립부, 전면판, 후면판, 공간부, 결합부, 측구블복, 재치턱, 연결부 Retaining wall block, locking jaw, locking projection, coupling groove, assembly part, front panel, back panel, space part, coupling part, side bubbling, mounting jaw, connection part

Description

낙석방지망 설치용 조립식 옹벽블록{A Retaining wall block for prevention of falling rock network establishment} Retaining wall block for prevention of falling rock network establishment

도1은 본 고안에 의한 블록의 전체 사시도.1 is an overall perspective view of a block according to the present invention.

도2는 본 고안에 적용되는 측구블록(側口 Block)의 전체사시도.Figure 2 is a perspective view of the side block (側 口 Block) applied to the present invention.

도3은 본 고안에 의해 옹벽(擁壁)이 조립축조되는 상태의 사시도.3 is a perspective view of a state in which the retaining wall is assembled and constructed by the present invention;

도4는 본 고안 도3에 의해 조립축조된 옹벽의 상면으로 마감판을 덮어보인 Figure 4 shows the closing plate with the top surface of the retaining wall assembled and constructed by the present invention Figure 3

일부사시도.       Some perspective view.

도5a 도는 본 고안 도4의 A-A선 횡단면도.Figure 5a is a cross-sectional view taken along the line A-A of Figure 4 of the present invention.

도5b 도는 본 고안 도4의 B-B선 종단면도.5B is a longitudinal cross-sectional view taken along line B-B of the present invention FIG.

도6은 본 고안에 의해 축조된 옹벽블록에 방지망지주(防止網支柱)를 설치하 Figure 6 is installed in the retaining wall block built in accordance with the present invention

여 보인 일부사시도.Some of the perspective views.

도7은 본 고안을 도로측면(道路側面)에 설치한 상태의 단면 구성도.Figure 7 is a cross-sectional configuration of the present invention installed on the road side (道路 道 面) state.

도8은 본 고안에 의해 축조된 옹벽블록의 상면으로 식수(植樹)를 실시하여 8 is a drinking water to the upper surface of the retaining wall block constructed by the present invention

보인 다른 실시 예시도.Another embodiment shown.

※ 도면의 주요부분에 대한 부호의 설명 *※ Explanation of symbols for main parts of drawing *

10 - 옹벽블록 12 - 측구블록 14 - 돌출무늬 16 - 하단걸림턱 10-retaining wall block 12-side block 14-protrusion 16-lower jaw

18. 58‘ - 결합돌기 및 결합홈 20. 20’ - “

Figure 112006016144118-utm00003
”자형 조립부 18. 58 '-Coupling projection and groove 20. 20'-“
Figure 112006016144118-utm00003
Shaped assembly

22. 22‘ - 전면판 및 후면판 24 - 걸림홈 24’ - 공간부 22. 22 '-Front and rear panels 24-Hanging grooves 24'-Space

26 - 결합부 28 - “

Figure 112006016144118-utm00004
”자형 연결부 30 - 재치턱 26-coupling 28-“
Figure 112006016144118-utm00004
'' Male connector 30-mounting jaw

32 - 걸림돌기32-Jamming

본 고안은 낙석지역(落石地域)의 도로측면(道路側面)으로 설치되는 블록(Block)에 관한 것으로서 좀더 상세하게는 도로를 따라 그 측면으로 연결조립되는 배수로의 측구블록(側口 Block)과 이 측구블록 상의 전면에 돌출무늬를 배한 전면판과 사이에 공간부를 두고 후면판이 결합부에 의해 일체로 결합 성형되는 상기의 전면판에는 그 양측면으로 상하에 돌출된 결합돌기와 이 결합돌기가 끼움 조립되는 결합홈이 전체로 종설(縱設)된 “

Figure 112006016144118-utm00005
” 자형의 조립부로 형성하되 상기 후면판의 조립부는 돌기와 결합홈이 없이 연결조립시 약간의 유격(有隔)을 유지하기 위하여 전면판 보다는 블록의 횡방향(橫方向)으로 그 길이를 다소 짧게한 형태로 성형함과 동시에 상기 전면판의 횡단부는 블록의 횡방향으로 측구블록의 재치턱에 용이하게 안착재치 될 수 있도록 돌출무늬에 의해 이루어진 하단 걸림턱과 상기 후면판 의 외측 하단 좌우로 고정홈에 측구블록의 고정돌기가 걸려지게한 상태로 측구블록 상에 블록을 연결조립시켜 주고 그 위로 다시 동일한 방법으로 블록을 축조 할 때에는 “
Figure 112006016144118-utm00006
”자형의 조립부가 서로 엇갈려지는 상태로 적층 축조하여 조립시공되는 낙석방지망 설치용 조립식 옹벽블록(落石防止網 說置用 組立式 擁壁 Block)에 관한 것이다.The present invention relates to a block installed as a road side of a rockfall area, and more specifically, to a side block of a drainage channel which is assembled and connected to the side along a road. The front plate, which has a space between the front plate and the front plate on the side block is formed integrally coupled by the coupling portion, the front plate is formed by the coupling portion and the coupling protrusion protruding up and down on both sides and the coupling protrusion is assembled The groove is entirely closed,
Figure 112006016144118-utm00005
It is formed in the shape of an assembly, but the assembly of the rear plate has a shorter length in the transverse direction of the block than the front plate in order to maintain some clearance when assembling without protrusions and coupling grooves. At the same time, the cross section of the front plate is formed into a lower locking jaw formed by a protruding pattern so as to be easily seated on the mounting jaw of the side block in the transverse direction of the block, and the fixing grooves on the outer lower left and right sides of the rear plate. When assembling the block on the side block with the fixing projections of the side block being blocked, and then building the block in the same way again,
Figure 112006016144118-utm00006
The present invention relates to a prefabricated retaining wall block for installing a rockfall prevention net, which is constructed by laminating and constructing the assembled parts in a staggered state.

일반적으로 낙석지역에 낙석방지망을 설치하기 위해서는 우선 도로측면에 배수로를 콘크리트로 형성하고 이것이 안전한 상태로 양생(養生)된 후, 이 배수로의 측면에 커푸집을 대고 콘크리트를 주입 타설하여 일정한 높이와 두께를 가지고 단면이 “

Figure 112006016144118-utm00007
”형태로 이루어 지는 콘크리트 옹벽(Concrete 擁壁)을 필요한 지역에 일정한 길이로 시공 양생시킨 후, 다시 이와 연결되는 콘크리트 옹벽설치 작업을 반복적으로 시공하였기 때문에 공기(工期)가 길어지고 시공비도 상승하는 문제됨이 있어 왔다.In general, in order to install a rockfall prevention network in a rockfall area, first, a drainage channel is formed of concrete on the side of the road, and it is cured in a safe state. Have a cross section “
Figure 112006016144118-utm00007
The concrete retaining wall (concrete) of the form is cured to a certain length in the required area, and then the concrete retaining wall installation work is repeatedly connected to it, resulting in a long air and a high construction cost. There has been.

더욱이 이렇게 시공된 콘크리트 옹벽에는 다시 그 상면에 낙석방지망(落石防止網)을 설치하기 위한 다수개의 지주(支柱)를 소정의 간격(間隔)을 두고 옹벽을 시공할 때 지주의 하단일부를 매설(埋設)한 상태로 양생시켜 입설고정하여 주거나 또는 옹벽상면에 앵커 보울트(Anchor Bolt)로 조임 고정하여 설치한후 이 지주를 이용하여 방지망을 설치하고 있어서 그 작업이 매우 번거럽고 복잡하였을 뿐만 아니라, 특히 대형의 낙석사고(落石事故)에서는 방지망과 지주는 물론 콘크리트옹벽 자체 까지도 파손붕괴(破損崩壞)되는 경우가 허다하여 이를 보수시공(補修施工)하는 데는 많은시간과 각종 장비 및 자재의 동원은 물론 다수의 인력을 필요로 하고 있어서 복구작업에 따른 제반 비용을 높이는 결과를 초래하여 왔다.Furthermore, in the concrete retaining wall thus constructed, a plurality of struts for installing a rockfall prevention net on the upper surface thereof is buried at a lower part of the strut when the retaining wall is constructed at predetermined intervals. It is not only very cumbersome and complicated, but it is very cumbersome and complicated because the guard net is installed by using the anchor bolt after it is fixed and cured in the state of standing and fastened with anchor bolt on the retaining wall. In many cases of rockfall accidents, not only the protection nets and pillars, but also the concrete retaining walls themselves are damaged and collapsed, so it takes a lot of time and mobilization of various equipment and materials to repair and repair them. The need for human resources has resulted in higher costs associated with recovery.

본 고안에서는 상기와 같은 문제점을 해소하기 위하여 낙석지역(落石地域)에 설치할 수 있는 옹벽블록(擁壁 Block)과 배수로 위에 덮을 수 있는 측구블록(測口Block)을 단위별로 양생시켜 이들을 시공현장으로 운반하여 소수의 인력으로 먼저 도로의 측면으로 형성된 배수로상에 측구블록을 조립연결하여 덮어주고 그 측면에 상기 측구블록의 재치턱에 재치되어 안착될 수 있도록 옹벽블록의 전면판으로 형성된 돌출무늬에 의해 이루어진 하단 걸림턱이 걸리는 상태로 “

Figure 112006016144118-utm00008
”자형 조립부의 양측면에 상하로 돌출된 걸림돌기와 전체에 결합홈이 요설되고 이 전면판 보다는 다소 짧고 역시 “
Figure 112006016144118-utm00009
” 자형의 조립부를 가지는 후면판과 사이로 공간부를 가지고 결합부에 의해 일체로 연결 성형된 옹벽블록을 측구블록 상에 소정의 높이로 조립연결하여 축조하고 그 상면에 입설되는 방지망의 설치용 지주는 결합부상에 앵커볼트(Anchor Bolt)로 조립하여 고정시켜주는 한편 공간부에는 흙을 채워넣고 각종식물의 식수작업(植樹作業)도 동시에 실시 할 수 있도록 함으로서 친화적인 환경의 조경에 의하여 미려감을 주고, 특히 옹벽의 축조만을 필요로 할때는 축조된 옹벽블록의 최 상면에 마감판을 덮어주는 간단한 작업으로 인하여 낙석방지망 설치 용 옹벽블록을 조립식으로 시공설치할 수 있도록 하는데 그 목적을 두고 있다.In the present invention, in order to solve the above problems, the retaining wall block that can be installed in the rockfall area and the side block that can be covered on the drainage passage are cured by unit, and these are converted into construction sites. It is carried by a small number of maneuvers and covers and connects the side block on the drainage channel formed on the side of the road first, and the protruding pattern formed by the front plate of the retaining wall block so that the side block can be placed and seated on the side jaw of the side block. With the lower jaw made
Figure 112006016144118-utm00008
"Hanging projections projecting up and down on both sides of the self-assembling part and engaging grooves in the whole are required.
Figure 112006016144118-utm00009
The retaining wall block, which is formed by connecting the retaining wall block, which is integrally connected and formed by the coupling part with the space part between the back plate having the self-assembly part at a predetermined height, is constructed and connected to the upper surface, It is assembled with anchor bolts and fixed in place, and the soil is filled with spaces and drinking water works of various plants can be carried out at the same time. When only the construction is needed, the purpose is to allow the installation of the retaining wall block for the installation of rockfall prevention net by the simple operation of covering the finishing plate on the top surface of the constructed retaining wall block.

본 고안에는 상기와 같은 목적달성과 작용효과를 현저히 구현하기 위하여 양생 현장에서 콘크리트 성형물로 전면판의 돌출무늬와 그 하단에 이 돌출무늬에 의해 형성되는 걸림턱을 갖고 양측면의 “

Figure 112006016144118-utm00010
”자형 조립부로 결합돌기와 결합홈이 요설되고 상기의 전면판과 공간부를 두고 결합부로 연결되는 The present invention has a projecting pattern of the front plate with a concrete molding at the curing site and a locking step formed by the projecting pattern at the bottom thereof in order to realize the above object and effect.
Figure 112006016144118-utm00010
”Shaped assembly, the coupling protrusion and the coupling groove are contemplated and connected to the coupling part with the front plate and the space part.

Figure 112006016144118-utm00011
” 자형의 조립부를 가지는 후면판은 전면판보다 약간 짧게 연결되는 옹벽블록과 상기 옹벽블록의 하단 걸림턱이 걸려 안착되는 재치턱을 구비하고 소정길이로 양측면이 “
Figure 112006016144118-utm00012
” 자형의 연결부로 이루어진 측구블록과 상기 측구블록의 후측면에 일정거리를 두고 돌출된 걸림돌기가 상기 후면판의 양측으로 요설된 걸림홈에 걸려 결합될 수 있도록 구성된 낙석방지망 설치용 조립식 옹벽블록을 특징으로 한다.“
Figure 112006016144118-utm00011
The rear plate having the assembly of the shape of a retaining wall has a retaining wall block that is connected slightly shorter than the front plate and a mounting jaw that is caught by the lower end of the retaining wall block.
Figure 112006016144118-utm00012
”Characterized by a prefabricated retaining wall block for installing a rockfall prevention network that is configured to be coupled to a side block made of a connecting portion and a locking protrusion protruding at a certain distance from the rear side of the side block is caught by a locking groove recessed to both sides of the rear plate. do.

이하 본 고안을 첨부한 도면을 참조하여 상세히 설명한다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

도1은 본 고안에 적용되는 옹벽블록(10)의 전체사시도이고 도 2는 상기 블록(10)과 같이 조립시공되는 측구블록(12)의 연결상태를 보고 일부사시도 이다.1 is an overall perspective view of the retaining wall block 10 applied to the present invention and Figure 2 is a partial perspective view of the connection state of the side block block 12 is assembled as the block 10.

상기의 옹벽블록(10)은 돌출무늬(14)를 갖고 이 돌출무늬((14)에 의해 이루어진 하단 거림턱(16)과 그 양측으로 상하에 걸림돌기(18)와 결합홈(18‘)이 전체로 요설 되는 “

Figure 112006016144118-utm00013
”자형의 조립부(20)를 가지는 전면판(22)과 역시 “
Figure 112006016144118-utm00014
”자형의 조립부(20’)와 배면 하단에 걸림홈(24)이 일정거리에 양측으로 요설된 후면판(22‘)이 전면판(22)보다는 약간 짧은 형태로 공간부(24‘)를 갖고 결합부(26)로 결합구성됨과 동시에 상기의 옹벽블록(10)이 연결 조립되어 안착될 수 있도록 양측으로 ”
Figure 112006016144118-utm00015
“자형의 연결부(28)와 상기 옹벽블록(10)의 하단 결림턱(16)이 걸려 안착될 수 있는 재치턱(30)과 상기의 걸림홈(24)에 걸림될 수 있는 걸림돌기(32)가 후측면으로 돌출된 측구블록(12)으로 이루어진 구성으로 미 설명 부호 34는 지주. 36은 낙석방지망. 36‘은 앵거 볼트. 38은 마감판. 38’는 흙. 38“는 식물. 40은 배수공. 40‘는 도로를 각각 표시하고 A는 낙석지역을 나타낸다.The retaining wall block 10 has a protruding pattern 14 and a lower projection jaw 16 formed by the protruding pattern 14 and the engaging protrusion 18 and the coupling groove 18 'above and below on both sides thereof. Narrated as a whole
Figure 112006016144118-utm00013
Front panel
22 having a shaped assembly 20 and also
Figure 112006016144118-utm00014
”Shaped assembly (20 ') and rear panel (22') with recessed grooves (24) on both sides at a certain distance at the bottom of the rear side have a space (24 ') slightly shorter than the front panel (22). It is coupled to the coupling portion 26 and at the same time the retaining wall block 10 is connected to both sides so as to be assembled and seated ”
Figure 112006016144118-utm00015
“The connecting portion 28 and the lower stiffening jaw 16 of the retaining wall block 10 may be caught by the mounting jaw 30 and the locking protrusion 32 that may be caught by the locking groove 24. In the configuration consisting of a side block 12 protruding to the rear side, reference numeral 34 is a post. 36 is a rockfall protection net. 36 'is an anchor bolt. 38 is the finish plate. 38 'is dirt. 38 “is a plant. 40 is a drain. 40 'marks each road and A represents a rockfall area.

이와 같이 구성된 본 고안의 작용을 첨부도면 도 3과 도4 및 도6과 도8을 참조하여 설명한다. The operation of the present invention configured as described above will be described with reference to FIGS. 3 and 4 and 6 and 8.

한편 도5a 도5b와 도7은 본 고안에 의한 옹벽블록(10)을 적층 축조하여 조립시공한 상태의 내부 구성을 나타낸 단면도이다.Meanwhile, FIGS. 5A, 5B, and 7 are cross-sectional views illustrating the internal configuration of the retaining wall block 10 according to the present invention in a laminated construction.

이제 상기 본 고안에 의한 옹벽블록(10)을 낙석지역(A)에 설치할 때는 먼저 도로(40‘) 측면에 형성된 배수로(부호생략)상에 “

Figure 112006016144118-utm00016
”자형의 연결부(28)를 이용하여 측구블록(12)을 연결 시공하고 이 측구블록(12)의 상부로 돌출무늬(14)를 가지는 전면판(22)의 하단 걸림턱(16)이 상기 측구블록(12)의 재치턱(30)에 안착되 는 상태로 옹벽블록(10)을 측구블록(12)상에 올려놓게 되면 후면판(22’)의 배면 하단의 걸림홈(24)중 1개는 측구블록(12)의 후측면으로 돌출된 1개의 걸림돌기(32)에 걸려 옹벽블록(10)이 측구블록(12)상에 안정적으로 안착된다.Now, when the retaining wall block 10 according to the present invention is installed in the rockfall area A, first, on the drainage path (not shown) formed on the side of the road 40 ',
Figure 112006016144118-utm00016
The lower engaging jaw 16 of the front plate 22 having the protruding pattern 14 on the top of the side block 12 is constructed by connecting the side block 12 using the 'shaped connector 28'. When the retaining wall block 10 is placed on the side block 12 in a state of being seated on the mounting jaw 30 of the block 12, one of the locking grooves 24 at the bottom of the rear surface of the rear plate 22 ′ is provided. Retains the retaining wall block 10 is securely seated on the side block 12 is caught by one locking projection 32 protruding to the rear side of the side block (12).

그후 다시 상기 옹벽블록(10)의 결합돌기(18)가 “

Figure 112006016144118-utm00017
”자형의 조립부(20)로 요설된 전면판(22) “
Figure 112006016144118-utm00018
”자형의 조립부(20)에 전체적으로 요설된 결합홈(18)으로 결합조립 된다.Then, the coupling protrusion 18 of the retaining wall block 10 is “
Figure 112006016144118-utm00017
”Front plate (22) contemplated by shaped assembly (20)”
Figure 112006016144118-utm00018
It is assembled to the coupling groove (18) concave as a whole in the assembly of the '20'.

이렇게 측구블록(12) 상으로 결합 조립되는 옹벽블록(10)은 모두 상기와 같이 전면판(22)에 “

Figure 112006016144118-utm00019
”자형의 조립부(20)로 돌출된 결합돌기(18)가 결합홈(18’)에 결합되는 상태로 순차 연결되고 다시 그 위로 연결조립되는 옹벽블록(10)도 이러한 시공작업을 반복하여 필요한 높이로 적층 축조되는 것이다.The retaining wall block 10 coupled to the side block 12 is assembled to the front plate 22 as described above.
Figure 112006016144118-utm00019
The retaining wall block 10, which is sequentially connected to the coupling protrusion 18 protruding into the 'shaped assembly 20' and coupled to the coupling groove 18 ', is assembled again and again, is necessary to repeat this construction work. It is laminated construction to a height.

이때 적층 축조되는 옹벽블록(10)의 “

Figure 112006016144118-utm00020
”자형의 조립부(20) (20‘)는 각각 서로 엇갈려 지는 상태로 연결 조립시켜 줌을 원측으로 한다.At this time, the laminated wall of the retaining wall block 10
Figure 112006016144118-utm00020
”Shaped assembly 20 (20 ′) is connected to each other in a state in which they are staggered from each other, and the zoom is made into the original side.

상기와 같이 적층 축조된 옹벽블록(10)의 상면은 공간부(24‘)을 갖고 결합부(26)로 전면판(22)과 후면판(22’)이 결합되어 있어서 옹벽블록(10)을 1단계식 적층할 때 상기의 공간부(24‘)로 흙(38’)을 채워넣어 축조상태를 튼튼하게 하는 한편 상기의 결합부(26)에는 필요한 간격으로 공지한 낙석방지망(36)의 설치용 지주(34)를 앵커 보울트(36‘)로 조임 고정하여 입설할 수 있음으로 방지망(36)의 설치작업을 용이하게 한다.The upper surface of the retaining wall block 10 laminated and constructed as described above has a space portion 24 'and the front plate 22 and the rear plate 22' are coupled to the coupling portion 26 to form the retaining wall block 10. In the one-stage lamination, the space 38 'is filled with the soil 38' to strengthen the construction, while the coupling part 26 is installed at a predetermined interval for the installation of the rockfall prevention net 36. Since the support 34 can be tightened and fixed by the anchor bolt 36 ', installation of the protection net 36 is facilitated.

또한 지주(34)를 세울 필요가 없이 단순히 옹벽블록(10) 만을 축조 시공하고저 할때는 시공된 블록(10)의 상면에 마감판(38)을 순차적으로 덮어서 축조된 블록(10)의 공간부(24‘)를 통해 우기중 빗물의 침식(浸食)으로 인한 옹벽의 붕괴사고를 사전에 방지 할 수 있다.In addition, when only the retaining wall block 10 is constructed without having to set up the strut 34, the space portion of the block 10 constructed by sequentially covering the finishing plate 38 on the upper surface of the constructed block 10 ( 24 ') can prevent the collapse of the retaining wall due to the erosion of rainwater during the rainy season.

한편 도8의 도시에서 보는바와 같이 마감판(38)이나 낙석방지망(36) 지주(34)의 설치를 필요로 하지 않을때는 적층 축조된 옹벽블록(10)의 상면으로 형성된 공간부(24‘)로 채워 넣어진 흙(38’)을 이용하여 여기에 친화적인 환경을 도모할 수 있는 각종 식물(38“)을 식수(植樹)하여 주위의 환경과 조화를 이를 수 있고 또한 옹벽블록(10)으로 통하는 배수는 여기에 간단히 형성된 배수공(40)을 통하여 측구블록(12)으로 흘러 배수로로 유입된다.Meanwhile, as shown in FIG. 8, when the closing plate 38 or the rockfall prevention net 36 strut 34 is not required to be installed, the space portion 24 ′ formed by the top surface of the laminated retaining wall block 10 is formed. By using the soil (38 ') filled with water, various plants (38') can be planted to create a friendly environment therein and harmonize with the surrounding environment. The drainage flows to the side block 12 through the drain hole 40 simply formed therein and flows into the drainage path.

뿐만아니라 도로(40‘) 상으로 흐르는 물(빗물)도 모든 측구블록(12) 상으로 흐르기 때문에 주행하는 차량들의 미끄럼 사고도 미연에 예방할 수 있다In addition, since water (rainwater) flowing on the road 40 'flows on all of the side blocks 12, it is possible to prevent sliding accidents of the driving vehicles.

특히 옹벽블록(10)의 후면판(22‘)은 저면판(22) 보다 그 길이가 다소 짧기 때문에 낙석지역(A)의 설치형태가 다소 굴곡을 이를 경우 직선 상으로 연결조립되는 옹벽블록(10)을 다소 유연하게 굴곡된 상태에 맞추어 축조 연결하기에도 용이하도록 하였다.In particular, since the back plate 22 'of the retaining wall block 10 is slightly shorter than the bottom plate 22, the retaining wall block 10 is assembled in a straight line when the installation form of the rockfall area A is slightly curved. ) To be flexible, so that it is easy to connect the construction.

본 고안에서 최초 “

Figure 112006016144118-utm00021
”자형의 연결부(28)로 연결 조립된 측구블록 (12)의 재치턱(30)에는 옹벽블록(10)의 하단 걸림턱(16)이 걸리게 되고 상기 블록(10)의 후면판(22‘)의 배면 하단에 요설된 걸림홈(24)에는 측구블록((12)의 후측면으로 돌출된 걸림돌기(32)가 각1개식 걸리게 되면서 이 블록(10)에 다시 “
Figure 112006016144118-utm00022
”자형의 조립부(20) (20‘)로 조립되는 블록(10)의 걸림홈(24)에 걸림돌기(32)가 걸려지기 때문에 낙석지역(A)으로부터 흘러내리는 낙석압력에도 옹벽블록(10)이 붕괴되는 일이 없이 축조상태를 안전하고 견고한 상태로 유지 할 수 있게 되는 것이다.First time in this design
Figure 112006016144118-utm00021
The lower jaw 16 of the retaining wall block 10 is caught by the mounting jaw 30 of the side block 12 assembled by the 'shaped connection portion 28' and the back plate 22 'of the block 10 is attached. Hanging grooves 24 arranged on the bottom of the back of the hanger block (12) protruding to the rear side of the side block (12) is caught by each one type while the block 10 again "
Figure 112006016144118-utm00022
The retaining wall block 10 is prevented from falling rock pressure from the rockfall area A because the locking projection 32 is caught in the locking groove 24 of the block 10 assembled by the shaped assembly 20 or 20 '. It is possible to maintain the construction state in a safe and solid state without the collapse of).

그러나 간혹 낙석압력에 못이겨 옹벽블록(10)의 일부가 붕괴파손되더라도 그 부분만을 새로운 블록으로 간단한 보수작업에 의해 연결조립시공이 가능하기 때문에 낙석사고로 인한 차량통행의 불편과 모든 작업의 번거로움도 해소하는 이점을 제공한다.However, even if a part of the retaining wall block 10 is collapsed and damaged due to falling rock pressure, it is possible to connect and construct only a part of the retaining wall block by a simple repairing operation. It also provides the advantage of eliminating.

이상에서 설명한 본 고안은 그에 관한 최선의 실시예를 열거하였으나 이에 한정되는 것은 아니며 첨부된 청구범위에 극한되어 본 고안의 범위를 벗어나지 않고 실시될 수 있다면 지금까지 설명된 실시예의 변경을 고려하여 볼수 도 있다.The present invention described above lists the best embodiments thereof, but is not limited thereto, and may be viewed without departing from the scope of the present invention if limited to the appended claims without departing from the scope of the present invention. have.

예를 들면 본 고안에 의한 옹벽블록의 전면판으로 배한 돌출무늬의 모양을 다양한 모양으로 변경하거나 또는 옹벽블록 자체를 담장(담벽)도 쌓을 수 있고 특히 축조되었던 옹벽블록이 붕괴 파손되어 보수공사를 할때는 크게 손상되지 않고 원형을 그대로 유지하는 블록은 재 사용도 가능하다는 것이다.For example, the projecting pattern distributed by the front plate of the retaining wall block according to the present invention can be changed into various shapes, or the retaining wall block itself can be built with a fence, especially when repairing the retained wall block collapsed and broken. Blocks that remain intact and remain intact can be reused.

이상에서 설명한바와 같이 본 고안은 양생 현장에서 양생 성형된 옹벽블록과 측구블록을 다량으로 간편하게 운반하여 시공현장에서 소수의 인력으로 손쉽게 조립하여 축조시공할 수 있도록 먼저 측구블록을 도로측면에 연결부를 이용하여 정열히 깔아주고 그 위에 블록의 양측 연결부를 서로 결합 연결하여 필요한 높이로 상하블록의 조립부가 서로 엇갈리는 상태로 조립 축조하고 그 위에 낙석방지망 지주를 앵커 보울트로 고정 입설하여 줌으로서 낙석지역에 대한 방지망의 설치를 간단한 시공작업으로 짧은 공기에 마무리 할 수 있어서 시공비와 인건비 및 작업의 용이성에 이루기 까지 제반적인 편의성을 제공하는 실용적인 부가 가치를 높이게 하는 경제적 효과를 얻을 수 있다As described above, the present design uses a side block to the side of the road so that the retaining wall block and the side block formed by curing at the curing site can be easily transported in a large amount and easily assembled and constructed by a small number of workers at the construction site. And lay the joints of the upper and lower blocks to the required height so that the assembling parts of the upper and lower blocks are staggered to each other. The installation can be completed in short air by simple construction work, and economical effect can be increased to increase the practical added value that provides all the conveniences to the construction cost, labor cost and ease of operation.

Claims (3)

낙석방지망 설치용 옹벽블록(10)을 성형 구성함에 있어서In forming the retaining wall block 10 for installing a rockfall prevention net 상기의 옹벽블록(10)은 돌출무늬(14)를 갖고 이 돌출무늬(14)에 의해 이루어진 하단 걸림턱(16)과 그 양측으로 상하로 돌출된 걸림돌기(18)와 결합홈(18‘)이 전체로 요설되는 “
Figure 112006016144118-utm00023
”자형의 조립부(20)를 가지는 전면판(22)과 역시 “
Figure 112006016144118-utm00024
”자형의 조립부(20’)와 배면 하단에 결합홈(24)이 일정거리에 양측으로 요설된 후면판(22‘)이 공간부(24’)를 갖고 결합부(26)로 결합 구성됨과 동시에 상기의 옹벽블록(10)이 연결 조립되어 안착될 수 있도록 양측으로 “
Figure 112006016144118-utm00025
”자형의 연결부(28)와 상기의 하단 걸림턱(16)이 걸려 안착될 수 있고 재치턱(30)과 상기의 걸림홈(24)에 걸림 될 수 있는 걸림돌기(32)가 후측면으로 돌출된 측구블록(12)으로 이루어진 구성을 특징으로 하는 낙석방지망 설치용 조립식 옹벽블록.
The retaining wall block 10 has a protruding pattern 14 and a lower locking jaw 16 formed by the protruding pattern 14 and a locking projection 18 and a coupling groove 18 'protruding upward and downward on both sides thereof. This is all about
Figure 112006016144118-utm00023
Front panel 22 having a shaped assembly 20 and also
Figure 112006016144118-utm00024
”Shaped assembly portion 20 ′ and rear plate 22 ′ formed at both sides at a predetermined distance at the bottom of the rear surface 22 ′ having a space portion 24 ′ and configured as a coupling portion 26. At the same time, the retaining wall block 10 is connected to both sides so as to be assembled and seated.
Figure 112006016144118-utm00025
'A connecting portion 28 and the lower locking jaw 16 can be caught and seated, and the locking projection 32 which can be caught in the mounting jaw 30 and the locking groove 24 protrudes to the rear side. Prefabricated retaining wall block for installing a rockfall prevention network characterized in that the configuration consisting of a side block 12.
제1항에 있어서 The method of claim 1 상기의 전면판(22)과 공간부(24‘)를 갖고 결합부(22)로 결합 구성되는 후면판(22’)은 전면판(22)보다 약간 짧게 성형됨을 특징으로 하는 낙석방지망 설치용 조립식 옹벽블록.The back plate 22 ′ having the front plate 22 and the space 24 ′ and configured as a coupling part 22 is formed to be slightly shorter than the front plate 22, and the retaining wall for installing a rockfall prevention net is installed. block. 제1항에 있어서 The method of claim 1 상기 “
Figure 112006037722089-utm00026
”자형의 연결부(28)로 연결되는 측구블록(12)상으로 적층 축조되는 옹벽블록(10)의 “
Figure 112006037722089-utm00027
”자형의 조립부(20)(20‘)는 각각 서로 엇갈려진 상태로 조립 연결하여 축조됨을 특징으로 하는 낙석방지망 설치용 조립식 옹벽블록.
remind "
Figure 112006037722089-utm00026
Of the retaining wall block 10 laminated and constructed on the side block 12 that is connected to the female connection 28;
Figure 112006037722089-utm00027
”Shape assembly 20 (20 ') are assembled retaining wall block for installing rockfall prevention nets, characterized in that each is built by connecting and staggered in a staggered state.
KR2020060006111U 2006-03-07 2006-03-07 A Retaining wall block for prevention of falling rock network establishment KR200420332Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020060006111U KR200420332Y1 (en) 2006-03-07 2006-03-07 A Retaining wall block for prevention of falling rock network establishment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020060006111U KR200420332Y1 (en) 2006-03-07 2006-03-07 A Retaining wall block for prevention of falling rock network establishment

Publications (1)

Publication Number Publication Date
KR200420332Y1 true KR200420332Y1 (en) 2006-06-30

Family

ID=41769007

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020060006111U KR200420332Y1 (en) 2006-03-07 2006-03-07 A Retaining wall block for prevention of falling rock network establishment

Country Status (1)

Country Link
KR (1) KR200420332Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101419487B1 (en) * 2013-01-04 2014-07-14 주식회사 이앤앤이 Method for manufacturing hollow block with artificial rock form

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101419487B1 (en) * 2013-01-04 2014-07-14 주식회사 이앤앤이 Method for manufacturing hollow block with artificial rock form

Similar Documents

Publication Publication Date Title
KR101266440B1 (en) A tunnel type soundproofing walls
KR101559751B1 (en) This does not require a retaining wall erected formwork
JP7397062B2 (en) Facade panel system and method for constructing multi-story structures and facades
KR101042982B1 (en) Method for constructing sidewalk enlargement installation
KR101230370B1 (en) The water-storage tank of assembly type and method for constructing thereof
KR200420332Y1 (en) A Retaining wall block for prevention of falling rock network establishment
KR20090008070A (en) A superstructure of a prefabricated bridge
KR102092689B1 (en) Anti-weed block structure, and anti-weed block therefor
KR101518210B1 (en) Precast Segment Concrete Footbridge and the Construction Method
KR100845461B1 (en) Building construction keeping cover truss
JPH0258610A (en) Repair of median strip and fender block used therefor
KR102150402B1 (en) Conduit trench for draining water of the underground building structure
KR100555250B1 (en) Long span temporary bridge by the advance system, and the construction method of this
CN210766867U (en) A template system for retaining wall
KR101576215B1 (en) Prefabricated precast concrete girder for building construction
KR200341018Y1 (en) A mold for drainage
KR101653722B1 (en) A structure for drainage and this method using the same
KR20110050163A (en) Preventive measure in falling rock of a high strength module
KR101202608B1 (en) Method for Installing Sidewalk Enlargement Installation for Slope Way
KR200429852Y1 (en) Culvert drainage pipe assembly
KR101926911B1 (en) Air house easy to replace film
KR200281831Y1 (en) Rockfall prevention fence prefab
JPH0841842A (en) Built-up channel
KR101184802B1 (en) drainage trench grating
JPH03156026A (en) Steep-sloped banking equipped with downspout drain outlet, and wall body and wall surface unit therefor

Legal Events

Date Code Title Description
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20130409

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20140428

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20151124

Year of fee payment: 10

EXPY Expiration of term