KR200404318Y1 - Structure of slope reinforced of environment - Google Patents

Structure of slope reinforced of environment Download PDF

Info

Publication number
KR200404318Y1
KR200404318Y1 KR20-2005-0022017U KR20050022017U KR200404318Y1 KR 200404318 Y1 KR200404318 Y1 KR 200404318Y1 KR 20050022017 U KR20050022017 U KR 20050022017U KR 200404318 Y1 KR200404318 Y1 KR 200404318Y1
Authority
KR
South Korea
Prior art keywords
slope
block
fixed
reinforcement
collapse
Prior art date
Application number
KR20-2005-0022017U
Other languages
Korean (ko)
Inventor
박희익
윤영숙
Original Assignee
윤영숙
박희익
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 윤영숙, 박희익 filed Critical 윤영숙
Priority to KR20-2005-0022017U priority Critical patent/KR200404318Y1/en
Application granted granted Critical
Publication of KR200404318Y1 publication Critical patent/KR200404318Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/202Securing of slopes or inclines with flexible securing means
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G22/00Cultivation of specific crops or plants not otherwise provided for
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/207Securing of slopes or inclines with means incorporating sheet piles or piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Botany (AREA)
  • Environmental Sciences (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

본 고안은 토목공사시 현장에서 발생하는 토사를 이용하여 절취된 표면의 붕괴 및 암반 붕괴를 방지하기 위한 친환경적인 사면보강구조에 관한 것으로서, 더욱 상세하게는 절취된 사면의 붕괴 및 암반 붕괴를 방지하기 위한 친환경적인 사면보강구조에 있어서, 시공전 정리된 사면의 상부에 다수의 부직포(10)가 포설되어 고정핀(101)으로 고정되게 되며, 상기 부직포(10)의 상부에 능형망(20)이 설치되어 결착앵커(201)로 고정되게 되고, 상기 능형망(20)의 상부에 사각형상의 블럭형틀(30)과 철근(31)이 배근되고 결속선(32)을 이용하여 움직이지 않도록 연결고정되게 되는 한편, 상기 블럭형틀(30)내에 고압의 몰탈이 타설되어 형성되는 보강블럭(70)을 포함하는 구조로, 상기 보강블럭(70)의 내부에는 녹화자재(60)가 고압분사되어 형성된 식생구간(33)이 구비되게 되며, 보강블럭(70)의 교차부의 천공홀에 영구앵커(80)가 삽입고정되는 것을 특징으로 한다.The present invention relates to an environment-friendly slope reinforcement structure for preventing the collapse of the cut surface and rock collapse by using soil generated in the field during civil engineering, more specifically to prevent the collapse of the cut slope and rock collapse In an environment-friendly slope reinforcement structure, a plurality of nonwoven fabric 10 is installed on the top of the slope arranged before construction is fixed with a fixing pin 101, the rhomboid net 20 on the top of the nonwoven fabric 10 It is installed and fixed to the binding anchor 201, the rectangular block-shaped frame 30 and the reinforcing bar 31 is arranged on the upper portion of the ridge network 20 is fixed so as not to move by using the binding line 32 On the other hand, the block-shaped frame 30 has a structure including a reinforcement block 70 is formed by pouring high-pressure mortar, the vegetation section formed by the high-pressure injection of the greening material 60 in the reinforcement block 70 33 is provided It is characterized in that the permanent anchor 80 is inserted and fixed in the drilling hole of the intersection of the reinforcing block 70.

Description

친환경적인 사면보강구조{Structure of slope reinforced of environment}Environment of slope reinforced of environment

본 고안은 공사현장이나 일반사면에서의 토사나 암반의 붕괴를 방지하고 자연환경의 친화성을 높이기 위한 사면보강구조에 관한 것으로, 특히 사면의 붕괴를 효율적로 방지하며 또한 식생이 용이한 친환경적인 사면보강구조에 관한 것이다. The present invention relates to a slope reinforcement structure for preventing the collapse of soil or rock on the construction site or general slope and improving the affinity of the natural environment. In particular, an eco-friendly slope that effectively prevents the collapse of slopes and facilitates vegetation. It relates to a reinforcement structure.

경제개발과 더불어 이루어지는 사회자본의 개발, 도로, 댐, 택지조성등으로 인하여 다량의 토사가 이동하고 절토,성토에 의하여 법면이 생성되며, 상기 법면을 그대로 방치하여 두면 침식이나 붕괴의 원인이 되곤한다.Due to the development of social capital, along with economic development, roads, dams, and the creation of residential land, large amounts of earth and sand are moved and cuts and embankments are created, and if left unattended, they can cause erosion or collapse. .

또한, 단순한 법면의 안정유지만이 아닌 자연환경의 유지와, 주변경관과의 조화등을 고려하여 법면의 보강작업을 하여야 한다.In addition, the reinforcement of the surface should be done in consideration of the maintenance of the natural environment and harmony with the surrounding landscape.

그러나 우리나라의 현실은 법면안정에 관한 인식이 부족하고 공법 역시 초보단계를 벗어나지 못하고 그대로 방치하고 있는 경우가 많다.However, the reality of our country is that there is a lack of awareness of legal stability, and public methods are often left untouched.

또한, 법면의 안정에 비중을 두어 공사를 하게 되면 경관이 미흡하고 경관에 비중을 두어 공사를 하게되면 불안정한 법면이 되는 경우가 많다.In addition, when the construction is placed on the stabilization of the law, the landscape is inadequate, and when the construction is done on the landscape, the unstable law is often used.

일반적으로 사면의 토사 및 암반의 붕괴를 예방하기 위한 목적으로 사면에 숏크리트만을 도포하는 방법이 있으나, 상기 방법은 시공방법이 환경친화적이지 못해 녹화공법을 선호하는 현대의 추세에 바람직하지 못할 뿐만아니라, 자연현상에 의해 쉽게 파손되는 문제점이 있었다.In general, there is a method of applying only shotcrete to the slope for the purpose of preventing the soil and rock collapse of the slope, but the method is not preferable to the modern trend that the greening method is preferred because the construction method is not environmentally friendly, There was a problem that is easily broken by natural phenomena.

상기와 같은 문제점들로 인해 근래에는 녹화공법이 많이 시행되고 있는바, 각종 토목공사나 조경공사시 발생되는 절토면이나 성토면의 사면지역은 초목의 자연생장여건이 불리하기 때문에, 공사 후 사면의 토사에 대한 유실 방지와 주변의 초목과의 조경을 도모하기 위해 인공으로 그 절토면 또는 성토면에 각종 식생재가 혼합된 인공토양을 취부하여 사면에 대해 녹화를 하는 인공녹화공법이 이용되고 있다.Due to the above problems, many greening methods are being used in recent years. Since the slopes of cut and fill surfaces generated during various civil works and landscaping are disadvantageous, the natural growth conditions of vegetation are affected. In order to prevent the loss of land and to plan the landscaping with the surrounding vegetation, artificial greening is used to green the slope by installing artificial soil mixed with various vegetation materials on the cut surface or the fill surface.

종래에 이용되고 있는 절토면 또는 성토면의 사면에 대한 녹화공법으로는 시드 스프레이(Seed spray)공법이나 각종 네트(Coir net, 거적 등)를 이용한 방법이 사용되고 있으며, 이들 방법에 대한 다양한 실시예가 종래에 다수 안출된 바 있다.As a greening method for the cut surface or the slope surface of the conventionally used, a seed spray method or a method using various nets (Coir nets, giants, etc.) is used, and various embodiments of these methods are conventionally used. Many have been created.

상기 시드 스프레이 공법의 경우, 녹화를 하고자 하는 사면이 안정화된 경우에 식물의 씨앗을 사면에 살포하여 살포된 씨앗으로부터 발아된 식물초본을 통해 녹화가 이루어지도록 하는 방법이나, 이러한 공법을 통해 녹화를 하는 경우 살포된 씨앗이 사면에 뿌리를 내리기 전에 강우에 의해 살포된 씨앗이 유실되거나 사면의 침식 등을 통해 사면 녹화의 효과가 얻기 어려운 면이 있었으며, 또한 식물의 씨앗이나 사면의 토양이 유실되지 않은 경우에도 사면의 토양에 수분유지가 어려워 초기 식물의 발아에 지장을 초래하여 녹화의 목적을 달성하기 어려운 문제점이 있었다.In the seed spraying method, when the slope to be greened is stabilized, the seed of the plant is sprayed onto the slope so that the greening is made through the plant herb germinated from the sprayed seed, or the greening is performed through such a method. In some cases, the seeds sprayed by rainfall before the roots were rooted on the slopes were lost or the slopes were ineffective due to erosion of the slopes. Also, when the seeds or slopes of the plants were not lost. Edo hard to maintain moisture in the soil of Edo caused problems in the early germination of plants had a problem that is difficult to achieve the purpose of greening.

본 고안은 상기 기술한 문제점을 해결하기 위하여, 환경친화적인 사면보강구조를 제공하는 것이 목적이다.An object of the present invention is to provide an environment-friendly slope reinforcing structure in order to solve the above problems.

상기 기술한 목적을 달성하기 위하여, 절취된 사면의 붕괴 및 암반 붕괴를 방지하기 위한 친환경적인 사면보강구조에 있어서, 시공전 정리된 사면의 상부에 다수의 부직포가 포설되어 고정핀으로 고정되게 되며, 상기 부직포의 상부에 능형망이 설치되어 결착앵커로 고정되게 되고, 상기 능형망의 상부에 사각형상의 블럭형틀과 철근이 배근되고 결속선을 이용하여 움직이지 않도록 연결고정되게 되는 한편, 상기 블럭형틀내에 고압의 몰탈이 타설되어 형성되는 보강블럭을 포함하는 구조로, 상기 보강블럭의 내부에는 녹화자재가 고압분사되어 형성된 식생구간이 구비되게 되며, 보강블럭의 교차부의 천공홀에 영구앵커가 삽입고정되는 것을 특징으로 하는 친환경적인 사면보강구조를 제공한다.In order to achieve the above object, in the environment-friendly slope reinforcement structure to prevent the collapse of the cut slope and rock collapse, a plurality of non-woven fabric is installed on the top of the slope arranged before construction is fixed to the fixing pin, A ridge net is installed on the upper portion of the nonwoven fabric and is fixed by a binding anchor. A rectangular block-shaped frame and reinforcing bar are arranged on the upper portion of the ridge net and fixed to be connected so as not to move using a binding line. The structure includes a reinforcement block formed by pouring high-pressure mortar, and the vegetation section formed by high-pressure injection of greening material is provided inside the reinforcement block, and the permanent anchor is inserted and fixed in the perforation hole of the intersection of the reinforcement block. It provides an environment-friendly slope reinforcement structure characterized in that.

이하 본 고안에 대한 바람직한 실시예를 상세히 설명하면 다음과 같다.Hereinafter, preferred embodiments of the present invention will be described in detail.

우선 첨부된 도면을 살펴보면, 도1은 본 고안의 적용을 위한 시공전 사면을 개략적으로 도시한 도면이고, 도2는 사면에 부직포를 포설한 형상을 도시한 도면이며, 도3은 부직포가 포설된 사면에 능형망이 설치된 구성을 도시한 도면이고, 도4는 사면에 철근이 배근된 작업상태를 도시한 도면이며, 도5는 사면에 블럭을 형성시키기 위한 형틀이 설치된 구성을 도시한 도면이고, 도6은 몰탈을 타설하기 전에 식생구간에 시트를 포설하는 것을 도시한 도면이며, 도7은 고압분사구를 이용하여 몰탈을 타설하는 것으로 도시한 작업상태도이고, 도8은 시공이 완성된 보강블럭을 도시한 도면이며, 도9는 시공이 완성된 보강블럭의 교차부에 영구앵커를 설치한 상태를 도시한 도면이다.Referring first to the accompanying drawings, Figure 1 is a schematic diagram showing the pre-construction slope for the application of the present invention, Figure 2 is a view showing the shape of the non-woven fabric on the slope, Figure 3 is a non-woven fabric 4 is a view illustrating a configuration in which a ridge net is installed on a slope, and FIG. 4 is a view illustrating a working state in which rebars are arranged on a slope, and FIG. 5 is a diagram illustrating a configuration in which a form for forming a block is installed on a slope. FIG. 6 is a view illustrating laying a sheet in a vegetation section before placing mortar, and FIG. 7 is a working state diagram in which mortar is poured using a high-pressure jet, and FIG. 8 is a reinforcement block having completed construction. 9 is a view showing a state in which a permanent anchor is installed at the intersection of the reinforcement block completed construction.

본 고안은 공사현장이나 일반사면에서의 토사나 암반의 붕괴를 방지하고 자연환경의 친화성을 높이기 위한 사면보강구조에 관한 것으로, 특히 사면의 붕괴를 효율적로 방지하며 또한 식생이 용이한 친환경적인 사면보강구조에 관한 것임은 상술한 바와 같다. The present invention relates to a slope reinforcement structure for preventing the collapse of soil or rock on the construction site or general slope and improving the affinity of the natural environment. In particular, an eco-friendly slope that effectively prevents the collapse of slopes and facilitates vegetation. Regarding the reinforcing structure is as described above.

즉, 본 고안의 친환경적인 사면보강구조를 도면을 참조하여 설명하면 다음과 같다.That is, the eco-friendly slope reinforcement structure of the present invention will be described with reference to the drawings.

절취된 사면의 붕괴 및 암반 붕괴를 방지하기 위한 친환경적인 사면보강구조에 있어서, 시공전 정리된 사면의 상부에 다수의 부직포(10)가 포설되어 고정핀(101)으로 고정되게 된다.In an environment-friendly slope reinforcement structure for preventing the collapse of the cut slope and rock collapse, a plurality of non-woven fabric 10 is installed on the top of the slope arranged before construction is fixed to the fixing pin 101.

그리고, 상기 부직포(10)의 상부에 능형망(20)이 설치되어 결착앵커(201)로 고정되게 되고, 상기 능형망(20)의 상부에 사각형상의 블럭형틀(30)과 철근(31)이 배근되고 결속선(32)을 이용하여 움직이지 않도록 연결고정되게 되게 되는 것이다.Then, the ridge net 20 is installed on the upper portion of the nonwoven fabric 10 is fixed to the binding anchor 201, the rectangular block-shaped frame 30 and the reinforcement 31 is formed on the top of the ridge net 20 It is to be connected to be fixed so as not to move by using the binding line (32).

또한, 상기 블럭형틀(30)내에 고압의 몰탈이 타설되어 형성되는 보강블럭(70)을 포함하는 구조로, 상기 보강블럭(70)의 내부에는 녹화자재(60)가 고압분사되어 형성된 식생구간(33)이 구비되게 되는 구조이다.In addition, the block-type frame 30 has a structure including a reinforcement block 70 is formed by pouring high-pressure mortar, the vegetation section formed by the high-pressure spraying green material 60 inside the reinforcement block 70 ( 33) is provided.

한편, 보강블럭(70)의 교차부의 천공홀에는 영구앵커(80)가 삽입고정되는 것을 특징으로 하게 되는 구조이다.On the other hand, the perforated hole of the intersection of the reinforcing block 70 is a structure characterized in that the permanent anchor 80 is inserted and fixed.

이하에서는 본 고안의 친환경적인 사면보강구조의 시공순서를 설명하면 다음과 같다.Hereinafter will be described the construction sequence of the environment-friendly slope reinforcement structure of the present invention.

부석 및 잡목을 제거하기 위한 시공전의 법면정리공정이 수행되게 된다.Before the construction process to remove pumice and rubble will be performed.

그후에 지표면에서 유입되는 물과 지하에서 용출되는 물을 유도처리하기 위하여 사면에 부직포(10)를 포설하고 고정핀(101)으로 고정하는 용출수 및 지표수처리공정이 수행되게 된다.Thereafter, in order to induce the water flowing from the ground surface and the water eluted from the basement, the elution water and surface water treatment process of installing the nonwoven fabric 10 on the slope and fixing it with the fixing pin 101 is performed.

상기의 공정 후 부직포(10)가 포설된 사면의 상부에 능형망(20)을 펼친 후 결착앵커(201)로 상기 능형망(20)을 사면에 고정시키는 공정이 진행되게 된다.After the above process, the process of fixing the ridge net 20 to the slope with the binding anchor 201 is performed after the ridge net 20 is spread on the upper surface of the nonwoven fabric 10 installed.

이어서 블럭형틀(30)과 철근(31)을 결속선(32)을 이용하여 움직이지 않도록 연결고정하는 블럭형틀조립공정이 수행되게 된다.Subsequently, a block-type frame assembly process of connecting and fixing the block-type frame 30 and the reinforcing bar 31 so as not to move by using the binding line 32 is performed.

즉, 설계내용에 따라 줄을 이용하여 철근배근의 위치와 간격을 표시하게 되고 철근을 배근 한 후 블럭형틀(30)이 상기 철근(31)과 단단히 결합되도록 결속선(32)으로 고정하게 된다.That is, the position and spacing of the reinforcement bar is displayed by using a line according to the design content, and after the reinforcement is reinforced, the block frame 30 is fixed with the binding line 32 so as to be firmly coupled with the reinforcement 31.

한편, 상기공정 후 식생구간(33)에 몰탈부착방지를 위한 시트(40)를 포설한 후 블럭형틀(30)내에 시멘트와 모래의 비율을 1:4로 하는 고압의 몰탈(50)을 분사하는 몰탈뿜기공정이 수행되게 되는 바, 급결제는 사용하지 않으며 몰탈의 타설직 후 흙손을 이용하여 삼면을 마감하게 된다.On the other hand, after installing the sheet 40 for preventing mortar adhesion in the vegetation section 33 after the above process and spraying the high-pressure mortar (50) with a ratio of cement and sand 1: 4 in the block mold 30 As the mortar blowing process is performed, no fastener is used and the three sides are finished using a trowel after pouring mortar.

그리고 상기 공정에 이어서 식생구간(33)에 완효성비료와 침식방지제 및 토양보조제와 종자를 혼합한 녹화자재(60)를 고압분사하여 타설하는 공정이 순차적으로 진행되어 완성되는 것을 특징으로 하게 되는 것이다.Subsequently, the process of high-pressure spraying the greening material 60 mixed with a slow-fertilizing fertilizer, an erosion inhibitor, a soil auxiliary agent, and seeds in the vegetation section 33 is carried out sequentially to be completed.

한편, 본 고안의 사면보강구조는 상기 공정외에도 사면보강블럭(70)의 교차부에 천공홀을 형성시킨 후 영구앵커(80)를 삽입고정하는 공정을 포함할 수 도 있게 된다.Meanwhile, the slope reinforcement structure of the present invention may include a process of inserting and fixing the permanent anchor 80 after forming the perforation hole at the intersection of the slope reinforcement block 70 in addition to the above process.

상술한 바와 같이,본 고안에 의한 사면보강구조는 종래의 사면보강구조보다 안정적이며, 내구성이 뛰어나며, 공정이 간단하여 공기가 단축되어 경제적인 사면안정시공이 가능한 효과가 있다.As described above, the slope reinforcement structure according to the present invention is more stable than the conventional slope reinforcement structure, has excellent durability, and the process is simple, so that the air is shortened and economically stable slope construction is possible.

또한, 본 고안의 구조는 원 지반에 직접 몰탈, 콘크리트를 타설함으로 내구성, 내진성이 탁월한 효과가 있으며, 요철이 심한 사면 또는 급경사가 형성된 사면에도 시공이 가능한 효과가 있다.In addition, the structure of the present invention has an excellent effect of durability and seismic resistance by pouring mortar and concrete directly on the original ground, and has an effect that can be applied to slopes with severe unevenness or steep slopes.

도1은 본 고안의 적용을 위한 시공전 사면의 상태를 도시한 도면.1 is a view showing a state of the slope before construction for the application of the present invention.

도2는 사면에 부직포를 포설한 형상을 도시한 도면.2 is a view showing a shape in which a nonwoven fabric is installed on a slope;

도3은 부직포가 포설된 사면에 능형망이 설치된 구성을 도시한 도면.Figure 3 is a view showing a configuration in which the ridge net is installed on the slope where the nonwoven fabric is installed.

도4는 사면에 철근이 배근된 작업상태를 도시한 도면.4 is a view showing a working state in which rebars are arranged on a slope.

도5는 사면에 블럭을 형성시키기 위한 형틀이 설치된 구성을 도시한 도면.5 is a diagram showing a configuration in which a form for forming a block is provided on a slope;

도6은 몰탈을 타설하기 전에 식생구간에 시트를 포설하는 것을 도시한 도면.Figure 6 shows laying sheets in vegetation sections before placing mortar.

도7은 고압분사구를 이용하여 몰탈을 타설하는 것으로 도시한 작업상태도.FIG. 7 is a working state diagram showing that mortar is poured using a high pressure jet. FIG.

도8은 시공이 완성된 보강블럭을 도시한 도면.8 is a view showing a reinforcement block in which construction is completed.

도9는 시공이 완성된 보강블럭의 교차부에 영구앵커를 설치한 상태를 도시한 도면.9 is a view showing a state in which a permanent anchor is installed at the intersection of the reinforcement block completed construction.

<도면의 주요부분에 대한 부호설명><Code Description of Main Parts of Drawing>

10 : 부직포 20 : 능형망 10: nonwoven fabric 20: ridged net

30 : 형틀 31 : 철근30: mold 31: rebar

32 : 결속선 33 : 식생구간32: Binding line 33: vegetation section

40 : 시트 50 : 몰탈40: sheet 50: mortar

60 : 녹화자재 70 : 보강블럭60: recording material 70: reinforcement block

80 : 영구앵커 81 : 전면판80: permanent anchor 81: front panel

82 : 방수캡 100 : 사면 82: waterproof cap 100: slope

101 : 고정핀 200 : 고압분사구 101: fixed pin 200: high-pressure injection port

201 : 결착앵커 201: binding anchor

Claims (1)

절취된 사면의 붕괴 및 암반 붕괴를 방지하기 위한 친환경적인 사면보강구조에 있어서, 시공전 정리된 사면의 상부에 다수의 부직포(10)가 포설되어 고정핀(101)으로 고정되게 되며, 상기 부직포(10)의 상부에 능형망(20)이 설치되어 결착앵커(201)로 고정되게 되고, 상기 능형망(20)의 상부에 사각형상의 블럭형틀(30)과 철근(31)이 배근되고 결속선(32)을 이용하여 움직이지 않도록 연결고정되게 되는 한편, 상기 블럭형틀(30)내에 고압의 몰탈이 타설되어 형성되는 보강블럭(70)을 포함하는 구조로, 상기 보강블럭(70)의 내부에는 녹화자재(60)가 고압분사되어 형성된 식생구간(33)이 구비되게 되며, 보강블럭(70)의 교차부의 천공홀에 영구앵커(80)가 삽입고정되고 방수캡(82)이 부착된 것을 특징으로 하는 친환경적인 사면보강구조.In the environment-friendly slope reinforcement structure for preventing the collapse of the cut slope and rock collapse, a plurality of non-woven fabric 10 is installed on the top of the slope arranged before construction is fixed to the fixing pin 101, the non-woven fabric ( 10, the ridge net 20 is installed on the upper portion of the ridge net 20 to be fixed by the anchoring block 201, and the rectangular block-shaped frame 30 and the reinforcing bar 31 are arranged on the upper portion of the ridge net 20 and the binding line ( While the connection is fixed so as not to move using the 32, the block-type frame 30 has a structure including a reinforcement block 70 formed by pouring high-pressure mortar, the greening inside the reinforcement block 70 The vegetation section 33 formed by the high-pressure injection of the material 60 is provided, and the permanent anchor 80 is inserted and fixed in the drilling hole of the intersection of the reinforcing block 70 and the waterproof cap 82 is attached. Eco-friendly slope reinforcement structure.
KR20-2005-0022017U 2005-07-28 2005-07-28 Structure of slope reinforced of environment KR200404318Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20-2005-0022017U KR200404318Y1 (en) 2005-07-28 2005-07-28 Structure of slope reinforced of environment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20-2005-0022017U KR200404318Y1 (en) 2005-07-28 2005-07-28 Structure of slope reinforced of environment

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020050069109 Division 2005-07-28

Publications (1)

Publication Number Publication Date
KR200404318Y1 true KR200404318Y1 (en) 2005-12-21

Family

ID=43705246

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20-2005-0022017U KR200404318Y1 (en) 2005-07-28 2005-07-28 Structure of slope reinforced of environment

Country Status (1)

Country Link
KR (1) KR200404318Y1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100785743B1 (en) 2007-08-30 2007-12-18 주식회사 한국종합기술 A composite and method of tree planting
KR100793985B1 (en) 2007-08-30 2008-01-16 주식회사 한국종합기술 Method and structure of slope reinforce
KR101493760B1 (en) * 2012-09-14 2015-02-23 (주)양광엔지니어링 shotcrete slope protection and construction method using sacks
KR102051838B1 (en) * 2019-03-27 2019-12-05 주식회사 바이디 Slope Vegetation Method using Embossing

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100785743B1 (en) 2007-08-30 2007-12-18 주식회사 한국종합기술 A composite and method of tree planting
KR100793985B1 (en) 2007-08-30 2008-01-16 주식회사 한국종합기술 Method and structure of slope reinforce
KR101493760B1 (en) * 2012-09-14 2015-02-23 (주)양광엔지니어링 shotcrete slope protection and construction method using sacks
KR102051838B1 (en) * 2019-03-27 2019-12-05 주식회사 바이디 Slope Vegetation Method using Embossing

Similar Documents

Publication Publication Date Title
CN104878767B (en) Rock slope concrete for plant growth is combined the construction method of ecoscape protection with moulding stone
CN106759104B (en) Ecological slope protection structure and construction method
CN106638634A (en) Road rock slope vine ecological protection structure and construction method
CN204780949U (en) Rock slope is planted living concrete and is moulded stone and combines ecological landscape protective structure
CN206736931U (en) Highway Lithological Slope liana ecological safeguard structure
CN108716219A (en) side slope ecological protection structure and its construction method
CN101622931A (en) Greening sloping surface for rock side slope facing wall and construction method thereof
KR100514576B1 (en) Slope stable construction method
KR200404318Y1 (en) Structure of slope reinforced of environment
CN207700203U (en) A kind of pile plate wall supporting construction with ecological protective functions
WO2007043760A1 (en) Method of constructing levee with ecological environment
CN108575649A (en) A method of planting heartsease on slope of rock mass
CN108265729A (en) A kind of expressway rock slope greening structure
JP2007224507A (en) Slope greening method
CN206736930U (en) Ecological revetment brick and ecological revetment
CN113737722A (en) Have concurrently stone concrete barricade shore protection of view nature suitable for city river course
KR100592402B1 (en) Tree-planting construction method and it&#39;s structure
KR100496118B1 (en) Method to keep a green slope surface
KR20070039017A (en) Nature-friendly bank protection engineering method
CN108411851A (en) The construction method of area&#39;s sloping breakwater concrete slab pavement structure is enclosed and cultivated in a kind of river sea
KR20070108464A (en) Nature-friendly bank protection engineering method
CN114481953B (en) Ecological slope protection without damaging integrity of hard slope protection of established embankment and construction method thereof
CN216040979U (en) Concrete retaining wall revetment with buried stone
CN108934972A (en) A kind of plant watering device and its implementation based on cast-in-place ecological slope protection
CN220486494U (en) Civil engineering slope protection structure

Legal Events

Date Code Title Description
U107 Dual application of utility model
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20061213

Year of fee payment: 3

LAPS Lapse due to unpaid annual fee