KR200403204Y1 - the railing fixed of reclamation anchor bolt - Google Patents

the railing fixed of reclamation anchor bolt Download PDF

Info

Publication number
KR200403204Y1
KR200403204Y1 KR20-2005-0026339U KR20050026339U KR200403204Y1 KR 200403204 Y1 KR200403204 Y1 KR 200403204Y1 KR 20050026339 U KR20050026339 U KR 20050026339U KR 200403204 Y1 KR200403204 Y1 KR 200403204Y1
Authority
KR
South Korea
Prior art keywords
anchor bolt
support
hole
disc
fixed
Prior art date
Application number
KR20-2005-0026339U
Other languages
Korean (ko)
Inventor
양재성
Original Assignee
양재성
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 양재성 filed Critical 양재성
Priority to KR20-2005-0026339U priority Critical patent/KR200403204Y1/en
Application granted granted Critical
Publication of KR200403204Y1 publication Critical patent/KR200403204Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3204Safety or protective measures for persons during the construction of buildings against falling down
    • E04G21/3223Means supported by building floors or flat roofs, e.g. safety railings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

본 고안은 건축공사 작업장에서 작업자의 추락을 방지하기 위해 난간대를 설치할 때 난간대를 지지하는 앙카볼트를 배관 철근에 고정하고 콘크리트를 타설하여 상기 앙카볼트가 콘크리트에 고정되어 노출되도록 하고 앙카볼트와 결합할 수 있도록 나사산이 형성된 구멍이 소정의 크기로 형성된 스틸원판에 상기 구멍을 충분히 수용하는 파이프형 지주를 용접으로 고정하여 원판과 지주가 일체로 된 상태에서 상기 앙카볼트를 원판의 구멍에 회전하는 방법으로 끼워 결합하고 파이프를 지주와 연속으로 연결하여 구성되는 난간대를 제공하는 것이다.The present invention is to fix the anchor bolts to support the railings to the pipe reinforcement when installing the handrails to prevent the fall of the worker in the construction work place and to cast the concrete so that the anchor bolts are fixed to the concrete exposed and combined with the anchor bolts. By welding a pipe-shaped support which sufficiently accommodates the hole to a steel disk formed with a threaded hole having a predetermined size so as to rotate the anchor bolt in the hole of the disk while the disk and the support are integrated. It is to provide a railing that is fitted by fitting and connecting the pipe in series with the strut.

Description

매립 앙카볼트 고정용 난간대{the railing fixed of reclamation anchor bolt}Railing fixed of reclamation anchor bolt}

본 고안은 건축공사에서 작업자의 추락을 방지하기 위해 난간대에 관한 것으로, 상세하게는 난간대의 지주를 지지하는 지지대를 앙카볼트로 형성하고 상기 앙카볼트를 배관 철근에 고정한 상태로 콘크리트를 타설하여 앙카볼트가 콘크리트에 고정되고 노출된 볼트 부분이 나사산이 형성되며, 그 중앙에 구멍이 형성되고 그 상면에 용접되어 지주가 직립 고정된 스틸원판을 앙카볼트와 결합하고 회전시켜 원판과 슬라브가 견고하게 밀착하도록 구성되는 난간대에 관한 것이다.The present invention relates to a handrail to prevent the fall of the worker in the construction work, and in detail, the support for supporting the holding of the handrail of the anchor bolt is formed by anchoring the anchor bolt to the pipe reinforcement concrete to anchor the anchor bolt The fixed bolt is exposed to the concrete, and the exposed bolt part is threaded, and a hole is formed in the center and welded to the upper surface so that the anchor and the upright fixed steel disk are combined with the anchor bolt and rotated so that the disk and the slab are tightly adhered to each other. It is about the railing which is comprised.

종래의 난간대는 소정의 크기의 슬리브(22)를 고정한 소정의 크기로 형성된 고정판(21)을 철근(16) 배관에 고정한 후 콘크리트를 타설하여 상기 슬리브(22)가 슬라브(15) 바닥 면에 노출되게 하고 상기 슬리브(22)에 파이프로 형성된 지주(12)를 삽입하여 비계파이프(14)를 결속하도록 구성되어 있다.Conventional balustrade is fixed to the fixed plate 21 formed in the predetermined size to secure the sleeve 22 of the predetermined size to the reinforcing bar 16 pipe, and then cast concrete to expose the sleeve 22 to the bottom surface of the slab (15). And insert a scaffold 12 formed by a pipe into the sleeve 22 to bind the scaffolding pipe 14.

상기와 같은 종래의 난간대는 지주(12)가 슬리브(22)에 삽입되는 구조이므로 지주(12)를 슬리브(22)에 밀접한 상태로 삽입시킬 수 없는 문제점이 있고, 때문에 지주(12)의 유격거리로 인하여 지주(12)가 흔들거리게 되고 고의가 아니더라도 슬리브(22)에서 지주가 쉽게 분리되는 문제점이 있다.The conventional handrail as described above has a problem in that the support 12 is not inserted into the sleeve 22 in close contact with the sleeve 22 since the support 12 is inserted into the sleeve 22, and thus the play distance of the support 12 is reduced. Due to the shaking of the support 12 and even if not intentionally there is a problem that the support is easily separated from the sleeve (22).

본 고안은 난간대의 지주를 지지하는 지지대를 앙카볼트로 형성하고 상기 앙카볼트를 배관 철근에 고정한 상태로 콘크리트를 타설하여 앙카볼트가 콘크리트에 고정되고 볼트 부분이 노출되도록 하여 나사산이 형성된 구멍을 포용하는 지주가 수직으로 용접된 스틸원판을 회전시켜 앙카볼트와 결합하여 견고한 지주로 구성된 난간대를 제공하는데 그 목적이 있다.The present invention forms a support for supporting the props of the railings with anchor bolts and casts concrete with the anchor bolts fixed to the pipe reinforcement so that the anchor bolts are fixed to the concrete and the bolts are exposed to embrace the threaded holes. The purpose is to provide a handrail made of rigid struts in combination with an anchor bolts by rotating a steel disc in which the strut is vertically welded.

원판이 앙카볼트에 결합될 때 앙카볼트가 수직상태가 아니면 원판의 저면이 균일하게 슬라브에 밀착하지 않으므로 콘크리트 타설시 앙카볼트가 수직을 유지하기 위한 주의가 필요하다.When the disc is coupled to the anchor bolt, if the anchor bolt is not vertical, care must be taken to maintain the anchor bolt vertical when concrete is laid because the bottom of the disc is not evenly adhered to the slab.

본 고안은 철근(16)에 고정되고 슬라브(15)에 매립되어 수직으로 노출된 앙카볼트(11)와 중앙에 나사산(18)이 형성된 구멍(17b)이 형성되고 구멍(17b) 주위에 장력을 크게 하기 위한 강화부재(19)가 배치 고정되며 상기 구멍(17b)과 강화부재(19)를 포용하고 직립되어 용접으로 지주(12)를 고정한 원판(13)으로 구성되는 특징이 있다.The present invention is formed in the anchor bolt 11 is fixed to the reinforcing bar 16, embedded in the slab (15) vertically exposed and a hole (17b) formed with a thread (18) in the center and tension around the hole (17b) The reinforcing member 19 for enlargement is arranged and fixed, and is characterized by consisting of a disc 13 which embraces the hole 17b and the reinforcing member 19 and is upright to fix the support 12 by welding.

도 1은 본 고안에 의한 난간대의 설치 상태를 도시한 것이고, 도 2는 본 고안에 의한 난간대의 설치 구조를 도시하기 위한 것이며, 도 3은 본 고안에 의한 난간대의 구성을 도시하기 위한 것이고, 도 4는 종래의 난간대의 구조를 도시하기 위한 것이다.Figure 1 shows the installation of the handrail according to the present invention, Figure 2 is for showing the installation structure of the handrail according to the present invention, Figure 3 is for showing the configuration of the handrail according to the present invention, Figure 4 is for showing the structure of the conventional handrail.

본 고안에 의한 난간대의 앙카볼트(11)는 거푸집 위에 철근(16)이 배관된 후 철근(16)에 고정되는 구성이다.The anchor bolt 11 of the railing according to the present invention is configured to be fixed to the rebar 16 after the rebar 16 is piped on the formwork.

콘크리트 타설로 슬라브(15)가 양생이 된 후에는 앙카볼트(11)가 소정의 길이로 슬라브(15)에 수직으로 세워지며 슬라브(15)에 노출되는 구성이다.After the slab 15 is cured by concrete pouring, the anchor bolt 11 is vertically erected to the slab 15 to a predetermined length and is exposed to the slab 15.

슬라브(15)에 노출된 앙카볼트(11)는 전 길이에 걸쳐 나사산(18)이 형성되는 구성이다. The anchor bolt 11 exposed to the slab 15 is a configuration in which the threads 18 are formed over the entire length.

소정의 두께와 직경을 갖는 스틸원판(13)이 준비된다.A steel disc 13 having a predetermined thickness and diameter is prepared.

상기 원판(13) 중심에는 내벽에 나사산(18)이 형성되는 구멍(17b)이 형성된다.In the center of the disc 13, a hole 17b is formed in which an internal thread 18 is formed.

상기 구멍(17b)에서 방사형으로 다수개의 강화부재(19)가 원판(13)에 고정된다.A plurality of reinforcing members 19 are fixed to the disc 13 radially in the hole 17b.

상기 강화부재(19)는 원판(13)의 강도를 높이기 위한 것이다.The reinforcing member 19 is to increase the strength of the disc (13).

예;원판(13)의 구멍(17b)에 결합되어 수직으로 세워진 지주(12)에 측압이 크게 발생할 경우 지주(12)에 측압이 발생하기도 하지만 원판(13)의 구멍(17b) 외주 면에 측압이 동시에 발생하여 원판(13)이 휘게 되어 지주(12)가 넘어지게 된다.For example, when the side pressure is generated in the strut 12 vertically coupled to the hole 17b of the disc 13, the side pressure may occur in the strut 12, but the side pressure is formed on the outer circumferential surface of the hole 17b of the disc 13. At the same time, the disc 13 is bent and the support 12 falls over.

상기 스틸원판(13)에 용접되어지는 파이프형 지주(12)가 준비된다. A pipe pillar 12 to be welded to the steel disc 13 is prepared.

상기 지주(12)에는 비계파이프(14)를 연결 고정할 수 있는 구멍과 지주(12)의 회전을 용이하게 하기 위해 손잡이대(도시되지않음)를 끼울 수 있는 구멍(17b)이 형성된다.The support 12 is provided with a hole 17b through which a handle (not shown) can be inserted to facilitate rotation of the support 12 and a hole for connecting and fixing the scaffolding pipe 14.

파이프형 지주(12)는 외부 측압에 영향을 받기 때문에 내진성의 재질로 구성되는 것이 바람직하다.Since the pipe-shaped support 12 is influenced by external side pressure, it is preferable that it is made of a shockproof material.

지주(12) 하단부가 스틸원판(13)의 상면 가장자리에 용접된다. The lower end of the support 12 is welded to the upper edge of the steel disc 13.

상기와 같이 지주(12)가 스틸원판(13)에 용접되면 도 2에 도시된 것과 같이 지주(12)와 스틸원판(13)은 일체로 형성된다.When the support 12 is welded to the steel disc 13 as described above, the support 12 and the steel disc 13 are integrally formed as shown in FIG. 2.

상기와 같이 지주(12)가 원판(13)에 용접되면 구멍(17b)에 손잡이대(23)를 끼우고 이동하여 앙카볼트(11)를 나사산(18)이 형성된 원판(13)의 구멍(17a)에 끼운다.When the support 12 is welded to the disc 13 as described above, the handle 17 is inserted into the hole 17b and moved to move the anchor bolt 11 to the hole 17a of the disc 13 on which the thread 18 is formed. )

원판(13) 구멍(17a)에 앙카볼트(11)가 끼워지면 손잡이대(23)를 이용하여 지주(12)를 회전시키면 원판(13)이 하강하게 되어 슬라브(15) 바닥과 밀착하게 된다.When the anchor bolt 11 is inserted into the hole 17a of the disc 13, when the support 12 is rotated using the handle 23, the disc 13 is lowered to be in close contact with the bottom of the slab 15.

지주(12)가 회전할 수 없을 정도로 손잡이대(도시되지않음)를 작동하여 원판(13)과 슬라브(15)가 긴밀하게 밀착되면 지주(12)와 지주(12) 사이에 비계(14)를 연결하여 난간을 완성하게 된다.When the disc 13 and the slab 15 are closely adhered to each other by operating a handle (not shown) such that the support 12 cannot rotate, the scaffold 14 is placed between the support 12 and the support 12. Connect to complete the railing.

실시 예를 참조하여 본 고안의 구성과 작용을 설명한다. With reference to the embodiment will be described the configuration and operation of the subject innovation.

종래의 난간대는 소정의 길이로 형성된 슬리브(22)를 중앙에 고정한 고정판(21)을 철근(16)에 고정하고 콘크리트를 타설하게 되면 상기 슬리브(22)의 일부가 슬라브(15)표면에서 노출된다.Conventional handrail is fixed to the reinforcing bar 16 fixed to the fixing plate 21 in the center of the sleeve 22 formed in a predetermined length and when the concrete is poured a portion of the sleeve 22 is exposed on the surface of the slab 15 .

상기 슬리브(22)에 지주(12)를 삽입시킴으로써 난간대 지주(12)를 형성하게 되고 연속하여 상기와 같은 지주(12)를 연속하여 형성하고 비계(14)를 연결함으로써 난간대를 형성하게 된다.By inserting the support 12 into the sleeve 22, the handrail 12 is formed, and the support 12 is continuously formed as described above, and the railing 14 is connected to form the handrail.

상기와 같은 종래의 난간대에서 지주(12)를 슬리브(22)에 삽입시키기 위해서는 지주(12)의 외경이 슬리브(22)의 내경 보다 적어야하고 현실적으로는 유격이 커야 지주(12)를 슬리브(22)에 삽입시키기가 용이하므로 슬리브(22)에 삽입된 지주(12)는 쉽게 삽입되는 동시에 쉽게 분리되는 문제점이 있고 지주(12)가 흔들리는 유격이 크므로 난간대 역시 흔들리는 유격이 커서 안전성이 떨어지는 문제점이 있다.In order to insert the strut 12 into the sleeve 22 in the conventional handrail as described above, the outer diameter of the strut 12 should be smaller than the inner diameter of the sleeve 22, and in reality, the play must be large so that the strut 12 can be inserted into the sleeve 22. Since the post 12 inserted in the sleeve 22 is easily inserted into the sleeve 22, the insert 12 is easily inserted into the sleeve 22, and there is a problem in that the support 12 is largely shaken. .

소정의 길이로 형성된 앙카볼트(11)를 거푸집 위의 배관된 철근(16)에 고정하고 콘크리트 타설시 외압에도 수직을 유지할 수 있도록 구성하며 슬라브(15)가 양성된 후, 슬라브(15)에 직립하도록 한다.The anchor bolt 11 formed to a predetermined length is fixed to the pipe reinforcement 16 formed on the formwork so that it can be maintained perpendicular to the external pressure when the concrete is placed, and after the slab 15 is nurtured, it is erected to the slab 15. Do it.

중앙에 구멍(17a)이 형성되고 그 구멍(17a)에 나사산(18)이 형성된 스틸원판(13)은 구멍(17a)의 원주를 따라 방사형으로 도 2에 도시된 것과 같이 강화부재(19)를 용접으로 고정한다. A steel disc 13 having a hole 17a formed in the center and a thread 18 formed in the hole 17a radially along the circumference of the hole 17a so as to radially reinforce the member 19 as shown in FIG. Fix by welding.

상기와 같이 형성된 스틸원판(13) 상면에 강화부재(19)를 포용하는 파이프형 지주(12)를 세우고 지주(12) 하단부 원주를 용접하여 스틸원판(13)과 지주(12)가 일체가 되도록 한다.A pipe-shaped support 12 for embracing the reinforcing member 19 is erected on the upper surface of the steel disc 13 formed as described above, and the circumference of the lower end of the support 12 is welded so that the steel disc 13 and the support 12 are integrated. do.

스틸원판(13)과 일체가된 지주(12)의 구멍(17b)에 손잡이대(도시되지않음)를 끼우고 스틸원판(13)을 이동하여 스틸원판(13)의 구멍(17a)과 앙카볼트(11)를 결합한다.A hole (not shown) is inserted into the hole 17b of the support 12 integrated with the steel disc 13, and the steel disc 13 is moved so that the hole 17a and the anchor bolt of the steel disc 13 are moved. Join (11).

스틸원판(13)의 구멍(17a)이 앙카볼트(11)와 결합되면 손잡이대(도시되지않음)를 회전시켜 스틸원판(13)이 하강하여 슬라브(15)와 밀착될 때까지 회전시킨다.When the hole 17a of the steel disc 13 is coupled with the anchor bolt 11, the handle (not shown) is rotated to rotate the steel disc 13 until it comes in close contact with the slab 15.

지주(12)를 흔들어 보고 유격이 없을 때까지 손잡이대(도시되지않음)를 회전시킨다.Shake the support 12 and rotate the handle (not shown) until there is no play.

상기와 같이 스틸원판(13)이 슬라브(15)바닥에 고정되면 같은 방법으로 연속하여 지주(12)를 세우고 지주(12)와 지주(12) 사이에 비계파이프(14)를 고정하고 연속하여 연결함으로써 난간대가 형성된다.As described above, when the steel disc 13 is fixed to the floor of the slab 15, the strut 12 is continuously set up in the same manner, and the scaffold pipe 14 is fixed between the strut 12 and the strut 12 and connected in series. As a result, a handrail is formed.

본 고안에 의한 난간대는 앙카볼트를 배관된 철근에 고정시키고 콘크리트 타설 후에는 앙카볼트만이 노출되고 노출된 앙카볼트와 원판의 구멍이 볼트로 결합되기 때문에 견고하게 결합되는 효과가 있고, 원판의 구멍 원주를 따라 방사형으로 강화부재를 고정하여 원판의 강도를 강화하였으므로 지주의 측압에 의해 원판의 훼손이 방지되는 효과가 있으며, 고의로 지주를 용이하게 분리할 수 없으므로 난간대의 기능이 쉽게 훼손되지 않는 효과가 있고, 난간대를 철거할 때는 노출된 앙카볼트는 직경이 적으므로 쉽게 제거할 수 있는 효과가 있다.Balustrade according to the present invention secures the anchor bolt to the pipe reinforcement, and after concrete placement, only the anchor bolt is exposed, and the hole of the disc and the exposed anchor bolt are combined with bolts, and the hole of the disc Since the reinforcing member is fixed radially along the circumference, the strength of the original plate is strengthened. Therefore, the damage of the original plate is prevented by the side pressure of the column, and since the column cannot be easily intentionally removed, the function of the handrail is not easily damaged. And, when dismantling the balustrade, the exposed anchor bolt has a small diameter, so it can be easily removed.

도 1은 본 고안에 의한 난간대의 설치 상태도1 is an installation state diagram of the handrail according to the present invention

도 2는 본 고안에 의한 난간대 지주 단면도Figure 2 is a cross section of the handrail strut according to the present invention

도 3은 종래의 난간대 구조도3 is a conventional balustrade structure diagram

*** 도면의 주요부분에 대한 부호의 설명 ****** Explanation of symbols for main parts of drawing ***

11 : 매립용 앙카볼트 12 : 지주11: landfill anchor bolt 12: prop

13 : 원판 14 : 비계파이프 13: disc 14: scaffolding pipe

15 : 슬라브 16 : 철근15: slab 16: rebar

17 : 구멍(a,b) 18 : 나사산17 hole (a, b) 18: thread

19 : 강화부재 21 : 고정판19: reinforcing member 21: fixed plate

22 : 슬리브 22: sleeve

Claims (3)

슬라브(15)에 고정되어 연속으로 세워진 지주에 비계를 연결하여 형성되는 난간대에 있어서,In the handrail fixed to the slab 15 is formed by connecting the scaffold to the continuous strut, 슬라브를 형성하기 위해 배관된 철근에 수직으로 고정되고 나사산이 형성된 앙카볼트와 상기 앙카볼트 나사산과 결합을 용이하게 하기 위해 내경에 나사산이 형성된 구멍이 천공된 스틸원판과 스틸원판의 상면에 하단부가 용접되어 수직으로 고정되는 지주로 구성되는 것을 특징으로 하는 매립 앙카볼트 고정용 난간대.The lower end is welded to the upper surface of the steel disc and the steel plate, which are vertically fixed to the pipe reinforced to form the slab, and formed with a threaded anchor bolt and a threaded hole in the inner diameter to facilitate engagement with the anchor bolt. A buried anchor bolt fixing handrail, characterized in that it is composed of struts fixed vertically. 제1항에 있어서, 스틸원판은 그 중앙에 형성된 구멍의 원주에서 환상으로 다수개의 강화부재가 고정되어 원판의 강도를 강화시키는 것을 특징으로 하는 매립 앙카볼트 고정용 난간대.The handrail for embedding anchor bolts according to claim 1, wherein the steel disc has a plurality of reinforcing members fixed in a ring at the circumference of the hole formed in the center thereof to strengthen the disc. 제1항에 있어서, 지주에는 손잡이를 끼울 수 있도록 구멍이 형성되어 지주와 일체로 형성된 원판을 앙카볼트에 용이하게 결합시키도록 구성되는 것을 특징으로 하는 매립 앙카볼트 고정용 난간대.The buried anchor bolt fixing handrail according to claim 1, wherein a hole is formed in the support so that a disc integrally formed with the support can be easily coupled to the anchor bolt.
KR20-2005-0026339U 2005-09-13 2005-09-13 the railing fixed of reclamation anchor bolt KR200403204Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20-2005-0026339U KR200403204Y1 (en) 2005-09-13 2005-09-13 the railing fixed of reclamation anchor bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20-2005-0026339U KR200403204Y1 (en) 2005-09-13 2005-09-13 the railing fixed of reclamation anchor bolt

Publications (1)

Publication Number Publication Date
KR200403204Y1 true KR200403204Y1 (en) 2005-12-09

Family

ID=43704159

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20-2005-0026339U KR200403204Y1 (en) 2005-09-13 2005-09-13 the railing fixed of reclamation anchor bolt

Country Status (1)

Country Link
KR (1) KR200403204Y1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101985957B1 (en) 2018-08-06 2019-06-04 유한회사 덕성 Pillar fixing structure of design fence
CN110924581A (en) * 2019-12-16 2020-03-27 中冶京诚工程技术有限公司 Hoisting hole

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101985957B1 (en) 2018-08-06 2019-06-04 유한회사 덕성 Pillar fixing structure of design fence
CN110924581A (en) * 2019-12-16 2020-03-27 中冶京诚工程技术有限公司 Hoisting hole

Similar Documents

Publication Publication Date Title
JPH08170340A (en) Pedestal structure and method of pedestal construction
US20160201350A1 (en) Tower and method for assembling tower
KR102181972B1 (en) Bridge inspection facility construction method and bridge inspection facility constructed thereby
KR200403204Y1 (en) the railing fixed of reclamation anchor bolt
CN113860190B (en) Cantilever crane turnover-free beam rest bracket and installation method
KR100688149B1 (en) Supporting structure of parapet for steel bridge
KR102268423B1 (en) Precaste Bridge
JP6632290B2 (en) Steel column leg structure and steel column leg construction method
KR0141463B1 (en) Method of prefabricating stairway
KR20040019501A (en) divided supporter structure for supporting a mould for forming a concrete united wall and method of forming a concrete united wall using the divided supporter structure
CN109812001A (en) A kind of construction method of Super High bilayer I-steel overhanging support system
KR102332145B1 (en) Ramp construction structure of warehouse using precast concrete construction method
JPS639622Y2 (en)
JP2005240426A (en) Erection structure for steel-pipe column
JP3044459B2 (en) Tower structure construction method
KR200233599Y1 (en) Installation structure for reinforcing rod of bent
JPH0657956A (en) Construction of concrete structure
JP5746984B2 (en) Handrail repair method
KR100458323B1 (en) The upper part reinforcement structure of a steel pipe for base construction
KR20060016371A (en) Bridge inspection equipment fixed by laid nut
KR200209007Y1 (en) Handrail temporary support
CN216920057U (en) Assembled pier stud reinforcing bar construction platform
CN112921960B (en) Supporting pile, foundation pit retaining wall, pile splicing structure, guide frame and construction method of guide frame
JP2600531B2 (en) Foundation structure for steel column and its construction method
KR100600697B1 (en) The assembly ladder

Legal Events

Date Code Title Description
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20061122

Year of fee payment: 3

LAPS Lapse due to unpaid annual fee