KR200337975Y1 - Drain pipe structure of two-arch tunnel - Google Patents

Drain pipe structure of two-arch tunnel Download PDF

Info

Publication number
KR200337975Y1
KR200337975Y1 KR20-2003-0027802U KR20030027802U KR200337975Y1 KR 200337975 Y1 KR200337975 Y1 KR 200337975Y1 KR 20030027802 U KR20030027802 U KR 20030027802U KR 200337975 Y1 KR200337975 Y1 KR 200337975Y1
Authority
KR
South Korea
Prior art keywords
tunnel
central wall
pipe
tee
drainage
Prior art date
Application number
KR20-2003-0027802U
Other languages
Korean (ko)
Inventor
김윤식
홍봉선
한경근
Original Assignee
금강종합건설 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 금강종합건설 주식회사 filed Critical 금강종합건설 주식회사
Priority to KR20-2003-0027802U priority Critical patent/KR200337975Y1/en
Application granted granted Critical
Publication of KR200337975Y1 publication Critical patent/KR200337975Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • E21D11/381Setting apparatus or devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • E21D11/383Waterproofing; Heat insulating; Soundproofing; Electric insulating by applying waterproof flexible sheets; Means for fixing the sheets to the tunnel or cavity wall
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

본 고안은 터널의 중앙 벽체 티형관 구조에 관한 것으로서, 더욱 상세하게는 투-아치(TWO-ARCH) 형 터널에서 중앙 벽체와 라이닝 콘크리트 구간의 방수막 설치 및 티형관을 이용한 배수처리를 확실히하여 터널 구조물의 누수를 방지함과 아울러 터널 구조물의 내구성 향상을 도모하고자 하는 투-아치형 터널의 중앙 벽체 상부의 배수처리용 배수관 설치 구조에 관한 것이다.The present invention relates to the structure of the central wall tee tube of the tunnel, and more particularly, in the TWO-ARCH type tunnel, the tunnel is installed to ensure the waterproofing of the central wall and the lining concrete section and the drainage treatment using the tee tube. The present invention relates to a drainage pipe installation structure for drainage treatment on the upper side of the central wall of a two-arch tunnel to prevent leakage of the structure and to improve durability of the tunnel structure.

본 고안은, 숏크리트와 라이닝 콘크리트를 포함하는 투-아치형 도로 터널의 중앙 벽체 상부 배수관 구조에 있어서, 상기 투-아치형 터널의 중앙 벽체에는, 숏크리트와 라이닝 콘크리트의 사이에 방수막이 설치되고, 그 중앙 벽체의 오목한 상부에 다수개의 배수홀을 가지는 유공관 구조로 종배수관과 티형 유공관이 설치되어 필터 콘크리트를 통한 지하수를 배수관으로 배출처리하는 한편, 상기 중앙 벽체에는 길이를 따라 다수개의 티형 유공관이 설치되고 그 사이에 종배수관이 연결되며, 상기 티형 유공관이 방수막의 유공관 삽입홀을 관통할 시, 그 방수막의 상, 하부에 각각 피.브이.씨 원형판과 고무판 개스켓이 형성되고, 하부의 피.브이.씨 원형판의 내측에 방수 쉬트가 삽입밀착된 상태에서 체결 볼트와 너트로 체결되는 구조인 것을 특징으로 하는 투-아치형 터널의 중앙 벽체 상부의 배수처리용 배수관 설치 구조를 제공한다.The present invention, in the upper wall of the central wall of the two-arch tunnel of the two-arch tunnel including shotcrete and lining concrete, the waterproof wall is provided between the shotcrete and the lining concrete, the central wall Perforated pipe structure having a plurality of drainage holes in the concave upper portion of the vertical drainage pipe and the tee-type hole pipe is installed to discharge the groundwater through the filter concrete to the drain pipe, while the central wall is provided with a plurality of tee hole pipe along the length between When the vertical drainage pipe is connected to the tee type hole, the P-type hole is passed through the insertion hole of the waterproof membrane, and the P. C. circular plate and the rubber plate gasket are formed on the upper and lower portions of the waterproof membrane, respectively. It is characterized in that the structure is fastened with a fastening bolt and nut in a state where the waterproof sheet is inserted close to the inside of the circular plate To-provide a drain structure for installation of the central top wall of the arcuate tunnel drainage treatment.

Description

투-아치형 터널의 중앙 벽체 상부의 배수처리용 배수관 설치 구조{DRAIN PIPE STRUCTURE OF TWO-ARCH TUNNEL}DRAIN PIPE STRUCTURE OF TWO-ARCH TUNNEL}

본 고안은 터널의 중앙 벽체 티형관 구조에 관한 것으로서, 더욱 상세하게는 투-아치(TWO-ARCH) 형 터널에서 중앙 벽체와 라이닝 콘크리트 구간의 방수막 설치 및 티형관을 이용한 배수처리를 확실히하여 터널 구조물의 누수를 방지함과 아울러 터널 구조물의 내구성 향상을 도모하고자 하는 투-아치형 터널의 중앙 벽체 상부의 배수 티형관 구조에 관한 것이다.The present invention relates to the structure of the central wall tee tube of the tunnel, and more particularly, in the TWO-ARCH type tunnel, the tunnel is installed to ensure the waterproofing of the central wall and the lining concrete section and the drainage treatment using the tee tube. The present invention relates to a drainage tee tube structure on the top of the central wall of a two-arch tunnel to prevent leakage of the structure and to improve durability of the tunnel structure.

도심을 지나는 터널이 시공된 경우, 투-아치형 터널은, 중앙 벽체의 상부에 배수 처리용의 배수관이 설치되어 배수처리를 하게 되고, 이때 대부분 방수막을 설치하지 않고 직접 배수처리용의 배수관만을 입설하여 사용하는 경우가 많다.In the case of a tunnel passing through the city center, the two-arch tunnel is provided with a drainage pipe for drainage treatment at the upper part of the central wall, and in most cases, a drainage pipe for drainage treatment is directly installed without installing a waterproof membrane. Often used.

그러한 연유로, 투-아치형 터널에서는, 중앙 벽체와 라이닝 콘크리트의 연결부에서 누수 현상이 발생되어 터널 구조물의 하자를 발생시키게 되는 문제점을 제공하게 된다.For this reason, in the two-arch tunnel, a leakage phenomenon occurs at the connection portion between the central wall and the lining concrete, thereby providing a problem of causing a defect in the tunnel structure.

본 고안은 상술한 문제점을 해결하기 위해, 본 고안은, 투-아치형 터널의 중앙 벽체에 방수막과 배수 티형관을 설치하여 배수처리를 완벽하게 하여 중앙 벽체와 라이닝 콘크리트의 연결부의 누수를 방지할 수 있고, 그로 인하여 투-아치형 터널의 구조물의 내구성을 향상할 수 있도록 하는 투-아치형 터널의 중앙 벽체 상부의 배수 티형관 구조를 제공함을 그 목적으로 한다.The present invention to solve the above problems, the present invention, by installing the waterproof membrane and the drainage tee pipe on the central wall of the two-arch tunnel to complete the drainage to prevent leakage of the connection of the central wall and the lining concrete It is an object of the present invention to provide a drainage tee structure on top of the central wall of a two-arch tunnel, thereby enabling to improve the durability of the structure of the two-arch tunnel.

도 1은 본 고안의 투-아치형 터널의 중앙 벽체 상부의 배수처리용 배수관이 설치되는 상태를 나타내는 개략도.1 is a schematic view showing a state in which the drain pipe for drainage treatment is installed on the upper portion of the central wall of the two-arch tunnel of the present invention.

도 2는 도 1의 "A"부 상세도.FIG. 2 is a detail view of the portion “A” of FIG. 1. FIG.

도 3은 본 고안의 투-아치형 터널의 중앙 벽체 상부의 배수처리용 배수관이 설치된 상태를 상세하게 나타내는 도면.Figure 3 is a view showing in detail the state in which the drain pipe for drainage treatment is installed on the upper top of the central wall of the two-arch tunnel of the present invention.

도 4는 본 고안의 투-아치형 터널의 중앙 벽체 상부의 배수처리용 배수관의 분해 상태를 나타내는 도면.Figure 4 is a view showing an exploded state of the drain pipe for drainage treatment on the upper top of the central wall of the two-arch tunnel of the present invention.

< 도면의 주요 부분에 대한 부호의 설명 ><Description of Symbols for Main Parts of Drawings>

100: 숏크리트 150: 필터 콘크리트100: shotcrete 150: filter concrete

200: 방수막 210: 유공관 삽입홀200: waterproof membrane 210: hole hole insertion hole

220: 피.브이.씨 원형판 240: 고무판 개스켓220: P.C circular plate 240: rubber sheet gasket

250: 원형홀 252: 볼트홀250: round hole 252: bolt hole

260: 방수 쉬트 300: 라이닝 콘크리트260: waterproof sheet 300: lining concrete

330: 체결 볼트 340: 너트330: fastening bolt 340: nut

400: 중앙 벽체 500: 티형 유공관400: central wall 500: tee hole

520: 배수홀 540: 수직관520: drainage hole 540: vertical pipe

542: 연결부 600: 배수관542: connection 600: drain pipe

800: 종배수관 900: 투-아치형 터널800: vertical drain pipe 900: two-arch tunnel

본 고안은, 숏크리트와 라이닝 콘크리트를 포함하는 투-아치형 도로 터널의 중앙 벽체 상부 배수관 구조에 있어서, 상기 투-아치형 터널의 중앙 벽체에는, 숏크리트와 라이닝 콘크리트의 사이에 방수막이 설치되고, 그 중앙 벽체의 오목한 상부에 다수개의 배수홀을 가지는 유공관 구조로 종배수관과 티형 유공관이 설치되어 필터 콘크리트를 통한 지하수를 배수관으로 배출처리하는 한편, 상기 중앙 벽체에는 길이를 따라 다수개의 티형 유공관이 설치되고 그 사이에 종배수관이 연결되며, 상기 티형 유공관이 방수막의 유공관 삽입홀을 관통할 시, 그 방수막의 상, 하부에 각각 피.브이.씨 원형판과 고무판 개스켓이 형성되고, 하부의 피.브이.씨 원형판의 내측에 방수 쉬트가 삽입밀착된 상태에서 체결 볼트와 너트로 체결되는 구조인 것을 특징으로 하는 투-아치형 터널의 중앙 벽체 상부의 배수처리용 배수관 설치 구조를 제공한다.The present invention, in the upper wall of the central wall of the two-arch tunnel of the two-arch tunnel including shotcrete and lining concrete, the waterproof wall is provided between the shotcrete and the lining concrete, the central wall Perforated pipe structure having a plurality of drainage holes in the concave upper portion of the vertical drainage pipe and the tee-type hole pipe is installed to discharge the groundwater through the filter concrete to the drain pipe, while the central wall is provided with a plurality of tee hole pipe along the length between When the vertical drainage pipe is connected to the tee type hole, the P-type hole is passed through the insertion hole of the waterproof membrane, and the P. C. circular plate and the rubber plate gasket are formed on the upper and lower portions of the waterproof membrane, respectively. It is characterized in that the structure is fastened with a fastening bolt and nut in a state where the waterproof sheet is inserted close to the inside of the circular plate To-provide a drain structure for installation of the central top wall of the arcuate tunnel drainage treatment.

이하, 첨부 도면을 참조하여 본 고안의 구성을 설명한다.Hereinafter, with reference to the accompanying drawings will be described the configuration of the present invention.

도 1은 본 고안의 투-아치형 터널의 중앙 벽체 상부의 배수처리용 배수관이 설치되는 상태를 나타내는 개략도이고, 도 2는 도 1의 "A"부 상세도이다.1 is a schematic view showing a state in which the drainage pipe for drainage treatment is installed on the upper portion of the central wall of the two-arch tunnel of the present invention, and FIG. 2 is a detail view of part "A" of FIG.

투-아치형 터널(900)은, 터널 내측을 기준으로 제일 외측에 숏크리트(100)가 타설되고, 그 숏크리트(100)에 연접되게 방수막(200)이 형성되며, 그 방수막(200)에 연접되게 터널 내측으로 라이닝 콘크리트(300)가 타설되어, 양측으로 차량이 주행할 수 있도록 시공된다.In the two-arch tunnel 900, a shotcrete 100 is poured on the outermost side of the tunnel, and a waterproof film 200 is formed to be connected to the shotcrete 100, and connected to the waterproof film 200. The lining concrete 300 is poured into the tunnel so that the vehicle can run on both sides.

상기 투-아치형 터널(900)은, 중앙 벽체(400)의 상부에서 지하수 유출에 따른 배수 처리를 위해 P.V.C로 제작된 종배수관이 설치되고, 그 종배수관과 결합되고 폴리에틸렌 재질로 제작된 티형 유공관(500)이 설치되며, 그 티형 유공관(500)에 배수관(600)이 연결되어 지하수를 처리하게 된다.The two-arch tunnel 900 has a vertical drainage pipe made of PVC for drainage treatment according to the groundwater outflow at the upper part of the central wall 400, and is coupled with the longitudinal drainage pipe and made of polyethylene material. 500 is installed, and the drain pipe 600 is connected to the tee-type perforated pipe 500 to treat groundwater.

도 3은 본 고안의 투-아치형 터널의 중앙 벽체 상부의 배수처리용 배수관이 설치된 상태를 상세하게 나타내는 도면으로, 방수막(200)은, 중앙 벽체(400)의 상부에 절곡되는 형태로 설치되는 바, 상기 방수막(200)에는 숏크리트(100)가 타설된 측에 필터 콘크리트(150)가 형성되고, 그 필터 콘크리트(150)의 내측에 티형 유공관(500)이 방수막(200)을 관통되도록 설치된다.3 is a view showing in detail the state in which the drainage pipe for drainage treatment is installed in the upper part of the central wall of the two-arch tunnel of the present invention, the waterproof membrane 200 is installed in a form bent on the upper part of the central wall 400. Bar, the filter film 150 is formed on the side on which the shotcrete 100 is poured, and the tee-type perforated pipe 500 penetrates the waterproof membrane 200 inside the filter concrete 150. Is installed.

이때, 상기 중앙 벽체(400)에는 일정거리마다 다수개의 티형 유공관(500)이 설치되고, 그 중앙 벽체(400)의 상부에 설치된 각각의 티형 유공관(500)에는 그 사이에 삽입이 가능하도록 설치된 종배수관이 연결되어 배수관 구조를 구성하게 된다.In this case, a plurality of tee-type perforated pipes 500 are installed at predetermined distances on the central wall 400, and each tee-shaped perforated pipe 500 installed on an upper portion of the central wall 400 is inserted to be inserted therebetween. The drain pipe is connected to form a drain pipe structure.

상기 티형 유공관(500)이 방수막(200)을 관통시, 그 방수막(200)에는 그 밀착되는 위치의 상,하부에 각각 피.브이.씨 원형판(220)과 고무판 개스켓(240)이 밀착된 상태에서, 볼트와 너트에 의해 방수막(200)의 상,하부에 고정되고, 상기 방수막(200)의 하부 절곡 위치에는 누수를 차단하기 위해 방수 쉬트(260)가 설치되며, 한편, 티형 유공관(500)의 하부에 배수관(600)이 연결되어 중앙 벽체 상부에서 발생되는 지하수를 배수 처리하게 된다.When the tee-type perforated pipe 500 penetrates the waterproof membrane 200, the P. V. circular plate 220 and the rubber plate gasket 240 are respectively provided on the upper and lower portions of the watertight membrane 200. In a state of being in close contact, the upper and lower portions of the waterproof membrane 200 are fixed by bolts and nuts, and a waterproof sheet 260 is installed at a lower bending position of the waterproof membrane 200 to block leakage. A drain pipe 600 is connected to the lower portion of the tee hole tube 500 to drain the groundwater generated from the upper portion of the central wall.

도 4는 본 고안의 투-아치형 터널의 중앙 벽체 상부의 배수처리용 배수관의 분해 상태를 나타내는 도면으로, 상기 티형 유공관(500)은, 상부의 수평한 유공관에 다수개의 배수홀(520)이 형성되고, 하부에 연결부(542)를 가지는 수직관(540)이 접착제에 의해 결합된다.4 is a view showing the disassembled state of the drainage pipe for drainage treatment on the upper part of the central wall of the two-arch tunnel of the present invention. And, the vertical pipe 540 having a connecting portion 542 at the bottom is joined by the adhesive.

상기 피.브이.씨 원형판(220)과 고무판 개스켓(240)은, 동일한 형태로, 중앙에 티형 유공관(500)의 수직관(540)이 관통되도록 원형홀(250)이 대구경으로 형성되고, 그 원형홀(250)의 외측에 다수개의 볼트홀(252)이 형성된다.The P. C. seed circular plate 220 and the rubber plate gasket 240, the same shape, the circular hole 250 is formed in a large diameter so that the vertical tube 540 of the tee-type perforated tube 500 penetrates in the center, A plurality of bolt holes 252 are formed outside the circular hole 250.

상기 피.브이.씨 원형판(220)과 고무판 개스켓(240)은, 방수막(200)의 유공관 삽입홀(210)의 상,하부에 각각 연접되어 체결 볼트와 너트에 의해 방수막에 고정되는 한편, 상기 방수막(200)의 하부에 피.브이.씨 원형판(220)과 고무판 개스켓(240)이 밀착시 그 사이에 방수 쉬트(260)가 밀착된 상태에서 방수 쉬트(260)의 하면에서 피.브이.씨 원형판(220)과 고무판 개스켓(240)이 고정된다.The P. C. seed circular plate 220 and the rubber plate gasket 240 is connected to the upper and lower portions of the perforated tube insertion hole 210 of the waterproof membrane 200 and fixed to the waterproof membrane by fastening bolts and nuts. On the other hand, when the V. C. circular plate 220 and the rubber plate gasket 240 is in close contact with the lower portion of the waterproof film 200, the lower surface of the waterproof sheet 260 in a state in which the waterproof sheet 260 is in close contact therebetween. In the P. C. circular plate 220 and rubber plate gasket 240 is fixed.

상기 티형 유공관(500)의 수직관(540)에는, 연결부(542)의 하부에 배수관(600)이 연결되어 상부에서 발생되는 지하수를 배수 처리하게 된다.The drain pipe 600 is connected to the lower part of the connection part 542 in the vertical pipe 540 of the tee-type perforated pipe 500 to drain the groundwater generated from the upper part.

상술한 구성에서 알 수 있듯이, 상기 투-아치형 터널(900)은, 중앙 벽체(400)의 오목한 위치에 지하수가 집수되는 관계로, 그 중앙 벽체(400)의 상부에 티형 유공관(500)을 설치하여 집수된 지하수를 배수 처리하는 구조로 구성된다.As can be seen from the above-described configuration, the two-arch tunnel 900 is provided with a tee-type perforated pipe 500 on top of the central wall 400 because the groundwater is collected in a concave position of the central wall 400. It is composed of a structure for draining the groundwater collected.

상기 티형 유공관(500)은, 그 상부 및 하부에 필터 콘크리트(150)가 적층된 사이에 설치되는 관계로, 배수홀(520)을 통해 유입된 지하수가 수직관(540)을 통해배수관(600)에 배출되어 배수처리하게 된다.The tee-type perforated pipe 500 is installed between the upper and lower filter concrete 150 is stacked, the groundwater introduced through the drain hole 520 through the vertical pipe 540 drain pipe 600 It is discharged to the wastewater to be treated.

상기 티형 유공관(500)은, 방수막(200)을 관통시, 그 밀착면에서 발생되는 누수를 차단하기 위해, 방수막(200)의 상부에 피.브이.씨 원형판(220)과 고무판 개스켓(240)이 밀착되고, 방수막(200)의 하부에 방수 쉬트(260)가 밀착된 그 외측면에 다른 피.브이.씨 원형판(220)과 고무판 개스켓(240)이 밀착된 상태에서, 체결 볼트(330)와 너트(340)로 체결고정하게 되어 이음부에 대한 누수를 차단하게 된다.The tee type perforated pipe 500 penetrates the P.C. circular plate 220 and a rubber plate gasket on the upper portion of the waterproof membrane 200 to block leakage caused by the close contact surface when penetrating the waterproof membrane 200. In a state in which the 240 is in close contact and the other P.C. circular plate 220 and the rubber plate gasket 240 are in close contact with the outer surface of the waterproof sheet 200 in close contact with the bottom of the waterproof film 200, The fastening bolt 330 and the nut 340 are fastened to lock the leakage of the joint.

상기 티형 유공관(500)은, 중앙 벽체(400)의 상부에 일정 거리를 두고 설치되는데, 이때 투-아치형 터널(900)에서 발생되는 지하수의 양을 고려하여 그 거리가 계산되고, 그 거리마다 티형 유공관(500)이 설치되며, 한편, 각각의 티형 유공관(500)의 사이에는 다수개의 배수홀이 형성된 종배수관(800)이 연결되어 배수처리하게 됨과 아울러, 그 티형 유공관(500)과 종배수관(800)은, 일정 구배(기울기)를 갖게 되어 자연적으로 흘러가 배수관(600)을 통해 배수처리되어 외부 처리되게 된다.The tee-type perforated pipe 500 is installed at a predetermined distance on the upper portion of the central wall 400, in which the distance is calculated in consideration of the amount of groundwater generated in the two-arch tunnel 900, and the tee-type per distance Perforated pipe 500 is installed, on the other hand, between each of the tee-shaped pipe 500, the longitudinal drainage pipe 800 is formed with a plurality of drainage holes are connected and drained, and the tee-shaped hole 500 and the longitudinal drainage pipe ( 800 has a constant gradient (tilt), flows naturally, and is drained through the drain pipe 600 to be externally treated.

상술한 본 고안의 구성에 의한 효과를 설명한다.The effect by the structure of this invention mentioned above is demonstrated.

본 고안의 투-아치형 터널에 방수막 보호판과 배수 티형관이 설치되는 관계로, 투-아치형 터널의 중앙 벽체와 라이닝 콘크리트의 연결부에서 발생되던 누수를 미연에 방지할 수 있게 되어, 누수로 인한 터널 구조물의 하자를 미연에 방지할 수 있는 효과를 갖는다.As the waterproof membrane protection plate and the drain tee tube are installed in the two-arch tunnel of the present invention, it is possible to prevent the leakage occurring at the connection between the central wall of the two-arch tunnel and the lining concrete in advance. It has the effect of preventing the defect of the structure in advance.

또한, 상기의 방수막 보호판과 배수 티형관이 설치되는 관계로, 배수가 원활하게 이루어지게 되어 터널 구조물의 내구성을 향상시킬 수 있는 효과를 갖는다.In addition, since the waterproof membrane protective plate and the drain tee tube are installed, the drainage is smoothly performed, thereby improving the durability of the tunnel structure.

Claims (1)

숏크리트와 라이닝 콘크리트를 포함하는 투-아치형 도로 터널의 중앙 벽체 상부 배수관 구조에 있어서,In the central wall upper drainage pipe structure of a two-arch road tunnel including shotcrete and lining concrete, 상기 투-아치형 터널의 중앙 벽체에는, 숏크리트와 라이닝 콘크리트의 사이에 방수막이 설치되고, 그 중앙 벽체의 오목한 상부에 다수개의 배수홀을 가지는 유공관 구조로 종배수관과 티형 유공관이 설치되어 필터 콘크리트를 통한 지하수를 배수관으로 배출처리하는 한편,In the central wall of the two-arch tunnel, a waterproof membrane is installed between the shotcrete and the lining concrete, and the vertical drainage pipe and the tee type air hole are installed in the hollow pipe structure having a plurality of drainage holes in the concave upper portion of the central wall. While draining groundwater to drains, 상기 중앙 벽체에는 길이를 따라 다수개의 티형 유공관이 설치되고 그 사이에 종배수관이 연결되며,The central wall is provided with a plurality of tee-type perforated pipes along the length between the longitudinal drainage pipe, 상기 티형 유공관이 방수막의 유공관 삽입홀을 관통할 시, 그 방수막의 상, 하부에 각각 피.브이.씨 원형판과 고무판 개스켓이 형성되고, 하부의 피.브이.씨 원형판의 내측에 방수 쉬트가 삽입밀착된 상태에서 체결 볼트와 너트로 체결되는 구조인 것을 특징으로 하는 투-아치형 터널의 중앙 벽체 상부의 배수처리용 배수관 설치 구조.When the T-shaped perforated pipe passes through the perforated tube insertion hole of the waterproof membrane, a P.C. circular plate and a rubber plate gasket are formed on the upper and lower portions of the waterproof membrane, and a waterproof sheet is provided inside the P.C. circular plate at the bottom. A drainage pipe installation structure for drainage treatment of the upper part of the central wall of the two-arch tunnel, characterized in that the fastening bolt and nut are fastened in a close-insertion state.
KR20-2003-0027802U 2003-08-29 2003-08-29 Drain pipe structure of two-arch tunnel KR200337975Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20-2003-0027802U KR200337975Y1 (en) 2003-08-29 2003-08-29 Drain pipe structure of two-arch tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20-2003-0027802U KR200337975Y1 (en) 2003-08-29 2003-08-29 Drain pipe structure of two-arch tunnel

Publications (1)

Publication Number Publication Date
KR200337975Y1 true KR200337975Y1 (en) 2004-01-13

Family

ID=49422242

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20-2003-0027802U KR200337975Y1 (en) 2003-08-29 2003-08-29 Drain pipe structure of two-arch tunnel

Country Status (1)

Country Link
KR (1) KR200337975Y1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100823103B1 (en) 2007-02-22 2008-04-18 고려대학교 산학협력단 A method for construting waterproofing system of tunel and pipe
KR20230051904A (en) * 2021-10-12 2023-04-19 전영권 A two-arch tunnel having a dedicate drainage case inside the upper girder of the central wall and its construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100823103B1 (en) 2007-02-22 2008-04-18 고려대학교 산학협력단 A method for construting waterproofing system of tunel and pipe
KR20230051904A (en) * 2021-10-12 2023-04-19 전영권 A two-arch tunnel having a dedicate drainage case inside the upper girder of the central wall and its construction method
KR102593946B1 (en) * 2021-10-12 2023-10-24 전영권 A two-arch tunnel having a dedicate drainage case inside the upper girder of the central wall and its construction method

Similar Documents

Publication Publication Date Title
KR100986157B1 (en) Tunnel with drain bracing and supporting channel
JP2013253444A (en) Multilayer sewerage pipe
JP2007217931A (en) Drainage structure in slope stabilizing construction
KR200337975Y1 (en) Drain pipe structure of two-arch tunnel
KR100510167B1 (en) Drain structure of middle pillar for two arch tunnel
KR101093540B1 (en) Apparatus for preventing leakage watercourse coupling part
KR100635233B1 (en) Manhole of road
KR200314875Y1 (en) Connector for apparatus draining
KR20080030812A (en) Rubber connctor for manhole and form of construction work
KR200271631Y1 (en) pipe of supplying underground water
CN218060790U (en) Basement roof construction joint waterproof construction
KR101653722B1 (en) A structure for drainage and this method using the same
KR102417309B1 (en) Watertight socket for connecting collecting well
KR100538982B1 (en) Anti-settlement reinforcing structure for waterworks pipe
KR200234533Y1 (en) Jacket preventing from escape of tube joint
KR200391844Y1 (en) Structure for culvert
KR200341353Y1 (en) Sewer connecting structure of polyethylene using clip
SU1802148A1 (en) Tunnel lining
KR200257150Y1 (en) drain hole for sewage pipe
KR200310140Y1 (en) Drain pipe having apparatus of protector for corrosion and derailment
KR200262884Y1 (en) Reinforcing apparatus for inclined aqueduct
KR100629157B1 (en) Drainage assembly of a retaining wall in a housing complex
KR20010001551U (en) A raceway pipe
JP2526931Y2 (en) Masu for sewage
KR950009238Y1 (en) Collecting-tank of drainage

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
G701 Publication of correction
FPAY Annual fee payment

Payment date: 20091228

Year of fee payment: 9

LAPS Lapse due to unpaid annual fee