KR200322026Y1 KR20-2003-0013961U KR20030013961U KR200322026Y1 KR 200322026 Y1 KR200322026 Y1 KR 200322026Y1 KR 20030013961 U KR20030013961 U KR 20030013961U KR 200322026 Y1 KR200322026 Y1 KR 200322026Y1
Authority
KR
South Korea
Prior art keywords
bolt
flat tie
formwork
block structure
block
Prior art date
Application number
KR20-2003-0013961U
Other languages
Korean (ko)
Inventor
김창윤
Original Assignee
김창윤
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김창윤 filed Critical 김창윤
Priority to KR20-2003-0013961U priority Critical patent/KR200322026Y1/en
Application granted granted Critical
Publication of KR200322026Y1 publication Critical patent/KR200322026Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/86Walls made by casting, pouring, or tamping in situ made in permanent forms
    • E04B2/8611Walls made by casting, pouring, or tamping in situ made in permanent forms with spacers being embedded in at least one form leaf
    • E04B2/8617Walls made by casting, pouring, or tamping in situ made in permanent forms with spacers being embedded in at least one form leaf with spacers being embedded in both form leaves

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

본 고안은 골조 공사용 무해체 구조 거푸집에 관한 것으로, 블록구조체를 적조하여 거푸집을 제작함에 있어 헤드부에 암나사가 형성되어 반복 체결이 가능한 볼트를 적조되는 각 블록구조체 내에 삽입하여 체결하는 구조임을 특징으로 하며, 이를 위해, 대면하도록 개별적으로 적조된 각 블록구조체를 플랫타이로 결속하고 각 플랫타이는 상기 볼트를 사용하여 높이방향을 따라 결속하며 동일높이상의 플랫타이는 내부연결봉을 체결되는 각 볼트 사이에 개재 결합함으로써, 배근을 이루는 구조이다. 본 고안은 건물의 압력이나 벽체의 용도에 따라 배근 일체형 무해체 거푸집, 배근 없는 무해체 거푸집, 벽체와 창호를 위한 무해체 거푸집 및 독립된 외벽에 대한 구조를 제시한다.The present invention relates to a non-destructive formwork for frame construction, in the manufacture of formwork by red tiling the block structure is characterized in that the female thread is formed in the head to insert the bolts that can be repeatedly tightened in each block structure to be tightened. To this end, each block structure adapted to face each other is bound with a flat tie, and each flat tie is bound along the height direction using the bolt, and a flat tie of equal height or more is interposed between each bolt to which the inner connecting rod is fastened. By interposing, it is a structure which forms a back muscle. The present invention proposes a structure for integrating non-dismantle formwork, reinforcement without dismantling formwork, intact formwork for walls and windows, and independent exterior walls depending on the pressure of the building or the use of the wall.

Description

무해체 구조의 거푸집{A Dismonuting Structure Form}Formation of A Dismonuting Structure Form

본 고안은 거푸집에 관한 것으로, 보다 상세하게는 블록 구조의 판넬을 반복 연결형 볼트로 조립하여 거푸집을 만들고 볼트와 플랫타이 및 내부 연결봉에 의한 배근을 한 후 콘크리트를 타설하여 골조 공사를 시행하며 공사 완료 후는 거푸집은 해체하지 않고 마감재로 활용하도록 함으로써, 별도의 배근 공사가 필요없는 무해체 구조의 거푸집에 관한 것이다.The present invention relates to a formwork, and more specifically, to form a formwork by assembling a block-structured panel with a repetitive connection type bolt, and after the reinforcement by bolts, flat ties and internal connecting rods, the concrete is poured to perform the frame construction work is completed Afterwards the formwork is to be used as a finishing material without dismantling, it relates to the formwork of the demolition structure does not require a separate reinforcement work.

일반적으로 건축 시공 현장에서의 거푸집 시공과정을 보면, 바닥면에 철근을 배근하고 그위에 기초 콘크리트를 타설한 후에 상기 철근에 연결하여 수직 수평 철근을 격자형으로 배치하고, 가는 철사로 상기 철근을 교차하는 지점에서 결속한 다음 거푸집을 설치한다. 상기 거푸집은 배근된 철근과 약 3cm 정도의 간격을 유지해야 하며, 거푸집이 타설되는 콘크리트의 횡압력을 견디도록 지지대가 소정 간격으로 설치된다.In general, in the formwork process at the construction site, reinforcing bars on the floor and placing the foundation concrete on them, connected to the reinforcing bars to arrange the vertical horizontal rebar in a grid, and cross the rebars with thin wires Bind at the point of installation, then install the formwork. The formwork should maintain a spacing of about 3 cm from the reinforcing bar, and the support is installed at predetermined intervals to withstand the lateral pressure of the concrete on which the formwork is placed.

이러한 종래의 거푸집을 대표하는 품목이 유로폼이다. 유로폼은 여러 종류의 부속자재(플랫타이, 웨치, 웨지판, 강관파이프 등)에 의해 조립되며, 콘크리트 타설에 의한 골조공사 완료 후는 거푸집을 해체해야 한다.The item representing such a conventional formwork is a Eurofoam. Euroforms are assembled by various types of accessories (flat ties, wedges, wedge plates, steel pipes, etc.), and the formwork must be dismantled after the completion of the framing work.

또한 플랫타이가 골조면에 돌출되는 단점이 있어 플랫타이의 절단 작업이 필요하며 작업시 생기는 골조면의 흠집을 제거하는 모르타르 작업을 병행해야 한다.In addition, there is a disadvantage in that the flat tie protrudes into the frame surface, so a flat tie cutting operation is required, and a mortar work to remove scratches on the frame surface during the work must be performed in parallel.

그리고 철근 배근 구조와 거푸집은 서로 연관되지 않고 분리된 구조로 되어 있어 거푸집과 철근과의 적정한 간격을 유지하여 고정시켜야 하는 등의 별도의 노력이 요구되고 있다.In addition, since the reinforcing bar structure and the formwork are not related to each other and are separated from each other, separate efforts such as fixing and maintaining the proper spacing between the formwork and the reinforcing bar are required.

따라서 종래의 거푸집 및 그 제작방법에 의하면, 철근의 배근시 복잡성, 거푸집과 배근 사이의 일정한 간격을 유지해야 하는 시공의 난이성, 거푸집의 지지대의 설치로 인해 작업환경이 복잡해지고, 안전사고의 위험이 있다는 문제점과 거푸집 제거 작업과 흠집 제거 작업 및 플랫타이 돌출부 제거 작업으로 인해 인건비 상승과 공기가 연장되는 문제점이 있었다.Therefore, according to the conventional formwork and its manufacturing method, the work environment is complicated by the complexity of the reinforcement of the rebar, the difficulty of construction to maintain a constant distance between the formwork and the reinforcement, the installation of the support of the formwork, the risk of safety accident Due to the problem of removing the formwork, removing the scratch, and removing the flat tie protrusion, there was a problem in that the labor cost was increased and the air was extended.

본 고안은 상기와 같은 문제점을 해결하기 위하여 안출된 것으로써, 본 고안의 제 1 목적은, 거푸집을 벽체 완성후에도 제거할 필요가 없는 무해체 구조의 거푸집을 제공하는 것이다.The present invention has been made to solve the above problems, the first object of the present invention is to provide a form of a non-destructive structure that does not need to remove the form even after the completion of the wall.

그리고 본 고안의 제 2 목적은, 거푸집과 배근을 일체로 설치하여 별도의 배근 작업과 거푸집 지지대의 설치 작업을 생략할 수 있도록 하여 시공이 매우 용이한 무해체 구조의 거푸집을 제공하는 것이다.And the second object of the present invention, by installing the formwork and the back muscles integrally so that the separate reinforcement work and the installation work of the formwork support can be omitted It is to provide a form of a destructive structure that is very easy to construct.

아울러 본 고안의 제 3 목적은, 공장 생산의 규격화된 블록 구조체를 거푸집의 자재로 활용하여 벽체 완성후 별도의 마감작업이 불필요한 무해체 구조의 거푸집을 제공하는 것이다.together The third object of the present invention is to use a standardized block structure of the factory production as the material of the formwork to provide a form of a destructive structure that does not require a separate finishing work after completion of the wall.

또한 본 고안의 제 4 목적은, 규격화된 구성요소들의 조합에 의해 거푸집 및 배근 구조를 완성함으로써 작업의 효율성 제고 및 공사기간의 단축이 가능한 무해체 구조의 거푸집을 제공하는 것이다.Also A fourth object of the present invention is to provide a form of a non-destructive structure that can improve work efficiency and shorten the construction period by completing the formwork and reinforcement structure by a combination of standardized components.

상기와 같은 본 고안의 목적들은, 기초 콘크리트에 소정 깊이로 일정간격을 두고 병렬 배치되어 천공된 볼팅구의 각 열별 형성위치에 대응하여 서로 대면하도록 일정거리를 두고 적조되는 다수의 블록구조체;Objects of the present invention as described above, a plurality of block structures are arranged at a predetermined distance so as to face each other corresponding to the formed position of each column of the perforated bolting is arranged in parallel at a predetermined depth to the foundation concrete;

헤드부에 축선방향을 따라 암나사가 형성되어 상기 볼팅구 및 인접한 볼록 구조체와, 상기 적조된 각 블록구조체 내에 높이방향을 따라 삽입되어 서로 체결되는 볼트; 및A female screw formed along the axial direction of the head part such that the bolt and the convex structure adjacent to each other are inserted in the height of each block structure and fastened to each other; And

동일높이로 대면하는 상기 각 블록구조체의 하부를 양측이 관통하여 상기 각 볼트의 수나사에 결합되며 높이방향을 따라 일정간격을 두고 배치되는 플랫타이;를 포함하는 무해체 거푸집 구조에 의하여 달성될 수 있다.It can be achieved by a non-destructive form structure, including; a flat tie disposed on both sides through the lower portion of each block structure facing the same height and coupled to the male screw of each bolt and disposed at a predetermined interval along the height direction. .

그리고, 상기 블록구조체는 상기 블록구조체 내의 하부에 상기 헤드부가 안치되도록 상기 헤드부의 외경에 대응하여 형성되고, 상부는 대응하는 볼트의 수나사가 상부를 통해 삽입되어 상기 헤드부의 암나사에 체결되도록 상기 수나사의 외경에 대응하는 장착구가 높이 방향을 따라 형성된 구조인 것이 바람직하다.And, the block structure is formed corresponding to the outer diameter of the head portion so that the head portion is settled in the lower portion of the block structure, the upper portion of the male screw so that the male screw of the corresponding bolt is inserted through the upper portion and fastened to the female screw of the head portion. It is preferable that the mounting opening corresponding to an outer diameter is a structure formed along the height direction.

또한, 대면하는 상기 블록구조체의 하부에는 상기 플랫타이의 양측이 삽입되도록 상기 장착구에 상통하는 타이삽입구가 형성되는 것이 바람직하다.In addition, it is preferable that a tie insertion hole communicating with the mounting hole is formed at the lower portion of the block structure facing each other so that both sides of the flat tie are inserted therein.

아울러, 높이방향을 따라 배치되는 상기 각 플랫타이는 상기 각 플랫타이별로 관통되는 볼트의 연속 체결로 서로 결합되며, 상기 각 볼트의 체결부위 사이에 개재되어 연속되는 다수의 내부결합봉으로 서로 결합되는 구조인 것이 바람직하다.In addition, the flat ties disposed along the height direction are coupled to each other by continuous fastening of bolts penetrated by the respective flat ties, and are coupled to each other by a plurality of internal coupling rods interposed between the fastening portions of the respective bolts. It is preferable that it is a structure.

본 고안의 다른 목적들, 분명한 장점들 및 신규한 특징들은 이하의 상세한설명 및 첨부된 도면들에 따른 바람직한 실시예들로 부터 더 분명해 질것이다.Other objects, obvious advantages, and novel features of the present invention will become more apparent from the following detailed description and the preferred embodiments according to the accompanying drawings.

도 1은 본 고안에 따른 거푸집(1000)의 사시도,1 is a perspective view of a formwork 1000 according to the present invention,

도 2은 도 1의 A-A선에 따른 단면도,2 is a cross-sectional view taken along the line A-A of FIG.

도 3는 도 1의 B-B선에 따른 단면도,3 is a cross-sectional view taken along the line B-B of FIG.

도 4는 본 고안의 플랫타이와 블럭 구조체의 결합관계를 도시한 부분단면도,4 is a partial cross-sectional view showing a coupling relationship between the flat tie and the block structure of the present invention,

도 5은 본 고안의 플랫타이와 내부연결봉의 결합관계를 도시한 부분단면도,5 is a partial cross-sectional view showing a coupling relationship between the flat tie and the inner connecting rod of the present invention,

도 6은 본 고안의 다른 실시예에 따른 플랫타이의 배치관계를 도시한 부분단면도,6 is a partial cross-sectional view showing the arrangement of the flat tie according to another embodiment of the present invention,

도 7은 본 고안에 따른 거푸집의 사용상태도,7 is a state of use of the formwork according to the present invention,

도 8는 본 고안에 따른 거푸집 제작방법의 시공순서도이다.8 is a construction sequence diagram of the formwork manufacturing method according to the present invention.

< 도면의 주요부분에 대한 부호의 설명 ><Description of Symbols for Major Parts of Drawings>

100 : 기초 콘크리트층 110 : 볼팅구100: foundation concrete layer 110: bolting ball

200 : 블록 구조체 210 : 장착구200: block structure 210: mounting hole

220 : 타이삽입구 230 : 토막 블록 구조체220: tie insertion opening 230: chip block structure

240 : 'ㄴ'형태의 블록 구조체 300 : 볼트240: block structure of the form of 'b' 300: bolt

300a : 볼트의 수나사부 300b : 볼트의 헤드부300a: male thread portion of the bolt 300b: head portion of the bolt

400 : 플랫타이 410 : 모서리용 플랫타이400: flat tie 410: flat tie for the corner

500 : 내부 연결봉 1000: 거푸집500: internal connecting rod 1000: formwork

이하에서는 본 고안에 따른 무해체 구조의 거푸집에 관하여 첨부되어진 도면과 더불어 상세히 설명하기로 한다.Hereinafter will be described in detail with the accompanying drawings with respect to the form of the non-destructive structure according to the present invention.

도 1은 본 고안에 따른 거푸집(1000)의 사시도이다. 도 1에 도시된 바와 같이, 상기 거푸집(1000)은 적조되는 블록구조체(200)에 암나사가 헤드부에 형성된 볼트(300)를 삽입하고 연속 체결하는 구조를 갖는다. 또한 대면하도록 적조된 각 블록구조체(200)가 플랫타이(400)로 연결되고 상기 각 플랫타이(400)는 높이방향을 따라 상기 볼트(300)가 삽입되어 연속 체결됨으로써 배근으로서 기능하도록 한 구조이다. 이 때 대면하도록 적조된 블록구조체(200) 사이에 콘크리트를 타설하고 양생할 경우 벽체로서 사용이 가능하다.1 is a perspective view of a formwork 1000 according to the present invention. As shown in FIG. 1, the formwork 1000 has a structure in which a female screw inserts a bolt 300 formed in a head part and continuously tightens the block structure 200 to be reddened. In addition, each block structure 200, which has been adjusted to face each other, is connected to the flat tie 400, and the flat tie 400 is a structure in which the bolt 300 is inserted along the height direction to be continuously fastened to function as a back muscle. . At this time, when the concrete is poured between the block structure 200 that is red tide to face and curing can be used as a wall.

이러한 상기 거푸집(1000)은, 소정거리를 두고 적조되어 병렬배치 관계를 갖는 다수의 블록구조체(200)와, 상기 블록구조체(200)의 내부에 높이방향을 따라 삽입되고 연속체결되어 적조되는 각 블록구조체(200)를 결속하기 위한 볼트(300) 및 대면하는 각 블록구조체(200)를 연결하여 배근으로서 기능하는 플랫타이(400)를 포함하여 구성된다.The formwork 1000 is a plurality of block structures 200 having a predetermined distance and a parallel arrangement relationship, and each block inserted into the block structure 200 along the height direction and continuously fastened to each other. A bolt 300 for binding the structure 200 and a flat tie 400 for connecting each block structure 200 facing each other and functioning as a back muscle are configured.

하부에 콘크리트를 소정두께로 타설하여 형성한 것이 기초콘크리트층(100)이다. 상기 기초콘크리트층(100)에는 병렬로 볼트(300)의 체결이 가능하도록 볼팅구(110)가 형성된다.The foundation concrete layer 100 is formed by pouring concrete to a predetermined thickness in the lower portion. A bolting hole 110 is formed in the foundation concrete layer 100 so that the bolt 300 can be fastened in parallel.

상기 볼팅구(110)의 각 열에 맞추어 적조되어 있는 것이 블록구조체(200)이다. 이에 따라 대면하는 상기 블록구조체(200) 양단간의 폭은 3열을 기준으로 했을 때 0.32m 정도가 될 것이나, 건물의 규모나 벽체의 기능에 따라 다양한 치수의 폭으로도 사용 가능하다. 또한, 블록구조체(200)의 높이와 길이는 건물의 규모나 벽체의 기능에 따라 알맞게 정해질 수 있으나, 바람직하게는 높이 0.4m, 길이 0.6m이다.The block structure 200 is suitably tuned to each row of the bolting holes 110. Accordingly, the width between both ends of the block structure 200 facing each other will be about 0.32 m based on three rows, but it can be used in various dimensions depending on the size of the building and the function of the wall. In addition, the height and length of the block structure 200 may be appropriately determined according to the size of the building or the function of the wall, preferably 0.4m in height, 0.6m in length.

상기 블록구조체(200)에는 높이방향을 따라 다수의 장착구(210)가 병렬 형성되어 있다. 상기 장착구(210)는 상부의 내경이 하부의 외경보다 상대적으로 작도록 형성되어 있다.A plurality of mounting holes 210 are formed in parallel in the block structure 200 along the height direction. The mounting hole 210 is formed such that the inner diameter of the upper portion is relatively smaller than the outer diameter of the lower portion.

물론 일반 블록과 마찬가지로 높이방향으로 일정한 직경을 가진 원통형의 장착구를 가질 수도 있다. 그러나 본 고안에서 상기와 같이 볼트의 형상대로 장착구(210)를 형성한 것은, 블록 구조체는 압축력을 견디고 배근(볼트)은 인장력을 받는다고 하는 일반원칙에서 건축물의 압력이나 횡압에 대해 벽체가 견고함을 유지하기 위해 볼트의 헤드부가 벽체와 일체를 이루게 되는 구조를 상정한 것이다.Of course, like a general block may have a cylindrical mounting hole having a constant diameter in the height direction. However, in the present invention, the mounting holes 210 are formed in the shape of the bolt as described above. In the general principle that the block structure withstands the compressive force and the reinforcement (bolt) receives the tensile force, the wall is firm against the pressure or the lateral pressure of the building. It is assumed that the head portion of the bolt is integral with the wall to maintain the box.

또한 상기 장착구(210)는 건물의 규모나 벽체의 기능에 따라 필요한 수만큼 형성될 수 있으나, 상기 블록구조체(200)의 길이가 0.6m라 하면, 상기 장착구(210)는 0.15m의 간격으로 배치하는 것이 바람직하다. 그리고 상기 블록구조체(200)의 양측부에는 동일높이에서 각 블록구조체(200)가 밀착될 경우 하나의 장착구(210)로서 기능하도록 장착구의 반절에 해당되는 형상으로 파여져 있다. 따라서 통상 장착구(210) 4개가 형성되는데 1개는 반절로 절단된 형태로 블록구조체(200)의 길이 방향으로 양단에 배치된다.In addition, the mounting holes 210 may be formed as many as necessary according to the size of the building or the function of the wall, if the length of the block structure 200 is 0.6m, the mounting holes 210 is 0.15m interval It is preferable to arrange. And both sides of the block structure 200 is dug into a shape corresponding to half of the mounting hole to function as one mounting hole 210 when each block structure 200 is in close contact at the same height. Therefore, four mounting holes 210 are generally formed, one of which is disposed at both ends in the longitudinal direction of the block structure 200 in a form cut in half.

그리고 상기 볼트(300)는 수나사의 축선방향을 따라 헤드부에 암나사가 형성되는 구조이다. 이에 따라 각 볼트(300)는 축선방향을 따라 연속 체결이 가능하다. 이러한 볼트(300)는 장착구(210)에 삽입되어 블록구조체(200)의 적조시 서로 체결됨으로 블록구조체(200)간 결속을 가능하게 한다. 또한, 각 볼트의 헤드부(300b)는 현장 시공시 작업의 편리함을 주기 위해 6각 형상의 구조이다.The bolt 300 has a structure in which a female screw is formed in the head portion along the axial direction of the male screw. Accordingly, each bolt 300 can be continuously fastened along the axial direction. The bolt 300 is inserted into the mounting hole 210 is coupled to each other when the block structure 200 is reddened to enable the binding between the block structure 200. In addition, the head portion (300b) of each bolt has a hexagonal structure in order to give the convenience of work in the field construction.

전술한 장착구(210)의 형상은 볼트(300)의 삽입 및 연속체결이 가능하도록 형성된 것이다. 볼트의 헤드부(300b)는 상대적으로 큰 내경의 하부에 삽입되고, 상대적으로 작은 내경의 상부에는 위에 적조된 블록구조체(200) 내의 볼트 수나사(300a)가 유입되기 위한 통로로서 기능한다.The shape of the mounting holes 210 described above is formed to enable insertion and continuous fastening of the bolt 300. The head portion 300b of the bolt is inserted at the lower portion of the relatively large inner diameter, and functions as a passage for introducing the bolt male screw 300a in the block structure 200 that has been applied to the upper portion of the relatively small inner diameter.

또한 기초콘크리트층(100) 바로 위에 적조된 블록구조체(200) 내의 볼트(300)는 상기 기초콘크리트층의 볼팅구(110)에 체결됨으로써, 적조되는 블록구조체(200)와 상기 기초콘크리트층(100)을 결속한다.In addition, the bolts 300 in the block structure 200 that are directly stacked on the base concrete layer 100 are fastened to the bolting holes 110 of the base concrete layer, whereby the block structure 200 and the base concrete layer 100 that are reddish. Unite).

상기 적조로 인해 형성되는 일종의 독립된 외벽구조가 형성되는데, 상기 각 외벽구조에서 동일높이에 위치하여 대면하는 각 블록구조체(200)에 양단이 삽입되어 있는 것이 플랫타이(400)이다. 상기 플랫타이(400)는 폭보다 긴 길이의 길쭉한 부재로서, 원형으로된 상기 블록구조체의 장착구(210)에 플랫타이(400)가 밀착 결속되도록 상기 플랫타이(400)의 양단부는 호의 형태를 취하고 있고, 양단이 상기 각 블록구조체(200)의 하단을 타이 삽입구(220)를 통해 관통하여 그 안에서 서로 체결된 각 볼트 사이에 개재되어 있다. 이에 따라 적조됨에 따라 병렬배치되는 각 블록구조체 간의 결속이 가능하다.A type of independent outer wall structure formed by the red tide is formed, and both ends are inserted into each block structure 200 facing and located at the same height in each outer wall structure. The flat tie 400 is an elongated member having a length longer than the width, and both ends of the flat tie 400 are formed in an arc shape so that the flat tie 400 is tightly coupled to the mounting hole 210 of the block structure having a circular shape. Both ends are interposed between the bolts which penetrate the lower ends of the respective block structures 200 through the tie insertion holes 220 and are fastened to each other therein. As a result, it is possible to bind each block structure arranged in parallel as it is red.

아울러 상기 각 플랫타이(400)가 적조에 따라 단을 이루는 각 블록구조체(200)에 결합될 경우 높이방향을 따라 상기 각 블록구조체(200)의 높이만큼의 간격으로 배치된다. 이 때 각 플랫타이(400)의 높이방향을 볼트(300)가 연속체결된 구조를 갖음으로써 높이방향을 따라 배치된 플랫타이(400)는 서로 결속된다. 상기 볼트(300)는 상기 플랫타이(400)의 중앙을 높이방향을 따라 관통하여 위치되고 그 위와 아래에 위치하는 볼트(300)와 서로 체결됨으로 상기 결속구조가 가능하다.In addition, when the flat tie 400 is coupled to each block structure 200 forming a stage in accordance with the red tide is disposed at intervals as high as the height of each block structure 200 in the height direction. At this time, by having a structure in which the bolt 300 is continuously fastened in the height direction of each flat tie 400, the flat tie 400 disposed along the height direction is bound to each other. The bolt 300 is positioned through the center of the flat tie 400 along the height direction and is fastened to each other with the bolt 300 positioned above and below the binding structure is possible.

이 때 동일높이별로 배치되는 상기 각 플랫타이(400)에 걸쳐 양단이 결합된 것이 내부연결봉(500)이다. 상기 내부연결봉(500)의 길쭉한 판형 금속체이다. 상기 각 내부연결봉(500)의 양단은 전후로 위치한 각 플랫타이(400)에서 결합된 볼트의 헤드부(500b)에 끼워짐으로써 각 플랫타이(400)를 연결한다. 이러한 연결구조에 따라 앞에 위치한 내부연결봉(500a)의 타단과 뒤의 내부연결봉(500b)의 일단은 서로 적층 밀착되는 배치구조를 갖게 된다.At this time, the both ends are coupled to each of the flat tie 400 disposed by the same height is the inner connecting rod (500). The elongated plate-shaped metal body of the inner connecting rod 500. Both ends of each of the internal connecting rods 500 connect each flat tie 400 by being fitted to the head portion 500b of the bolt coupled from each of the flat tie 400 positioned forward and backward. According to this connection structure, the other end of the inner connecting rod 500a positioned at the front and one end of the inner connecting rod 500b at the rear have an arrangement structure in which the laminate is in close contact with each other.

상기와 같은 높이방향별 볼트(300)의 연속 체결구조 및 동일높이별 내부연결봉(500)의 결합으로 플랫타이(400)는 높이방향 및 동일높이별 결속됨으로 양측으로 위치한 외벽구조 사이에서 콘크리트의 타설 및 양생으로 벽체로서 사용할 경우 배근으로 기능할 수 있다. 타이 삽입구(220)는 대면하는 블록구조체(200)의 일단에 상기 장착구(210)에 상통하여 형성되어 있다.With the combination of the continuous fastening structure of the bolt 300 by the height direction as described above and the inner connecting rod 500 by the same height flat tie 400 is bound between the height direction and the same height by placing the concrete between the outer wall structure located on both sides And when used as a wall for curing, it can function as a back muscle. The tie insertion hole 220 is formed to be in communication with the mounting hole 210 at one end of the block structure 200 to face.

도 2은 도 1의 A-A선에 따른 단면도이다. 도 2에 도시된 바와 같이, 적조되어 독립된 외벽구조를 이루는 각 블록구조체(200)는 내부의 장착구(210)에 삽입되는 볼트(300)의 연속체결에 따라 서로 결속되는 구조를 갖는다.2 is a cross-sectional view taken along the line A-A of FIG. As shown in FIG. 2, each block structure 200 that is red tide and forms an independent outer wall structure has a structure that is bound to each other according to the continuous fastening of the bolt 300 inserted into the mounting hole 210 therein.

장착구(210)는 앞에서 언급한 바와 같이 상부의 내경은 작고 하부의 내경은 상대적으로 큰데 하부에는 볼트의 헤드부(300b)가 삽입된다. 그러면 볼트의 수나사(300a)는 블록구조체(200)의 하부로 돌출된다. 이와 같이 돌출된 수나사(300a)는 그 아래에 위치한 블록구조체 장착구(210)의 상부로 삽입되어 하부에 있는 헤드부(300b)의 암나사에 체결된다.As mentioned above, the mounting hole 210 has a small inner diameter at the upper portion and a relatively large inner diameter at the lower portion thereof, in which the head portion 300b of the bolt is inserted. Then, the male screw 300a of the bolt protrudes to the bottom of the block structure 200. The male screw 300a protruding in this way is inserted into the upper portion of the block structure mounting hole 210 positioned below and fastened to the female screw of the head portion 300b.

이러한 체결구조는 블록구조체(200)의 적조에 따라 연속되며 결국 블록구조체(200)의 공고한 결속이 가능하다. 또한 기초콘크리트층(100)의 바로 위에 위치한 볼록구조체의 장착구(210)에서 하부를 통해 볼트의 수나사(300a)가 돌출될 경우 수나사(300a)는 기초콘크리트층의 볼팅구(110)에 체결된다. 따라서 적조된 블록구조체(200)와 기초콘크리트층(100)의 결합이 가능하다.This fastening structure is continuous in accordance with the red tide of the block structure 200, and eventually solid bonding of the block structure 200 is possible. In addition, when the male screw 300a of the bolt protrudes through the lower portion of the mounting hole 210 of the convex structure located immediately above the basic concrete layer 100, the male screw 300a is fastened to the bolting hole 110 of the basic concrete layer. . Therefore, it is possible to combine the red block structure 200 and the base concrete layer 100.

도 3는 도 1의 B-B선에 따른 단면도이다. 도 3에 도시된 바와 같이, 외벽구조를 이루는 각 블록구조체(200)의 사이로 플랫타이(400)가 높이방향을 따라 배치되면서 대등한 높이의 각 블록구조체(200)를 결속하도록 구비된다.3 is a cross-sectional view taken along line B-B of FIG. 1. As shown in FIG. 3, the flat tie 400 is disposed along the height direction between the respective block structures 200 constituting the outer wall structure to bind the block structures 200 having the same height.

상기 대면하는 각 블록구조체(200)에서, 내부의 장착구(210)에는 볼트(300)가 삽입되어 서로 체결된 구조를 갖는다. 이 때 플랫타이(400)의 양단이 상기 각 블록구조체(200)의 하단을 관통하여 각 볼트(300)의 체결부위에 개재되어 체결에 따라 압착되는 구조가 마련된다. 따라서 상기 대면하는 각 블록구조체(200)는 상기 장착구(210)의 개수에 따라 플랫타이(400)가 구비되어 삽입 결합되는 구조를 갖는다.In each of the block structures 200 facing each other, a bolt 300 is inserted into the mounting hole 210 therein to have a structure coupled to each other. At this time, both ends of the flat tie 400 penetrate the lower ends of the respective block structures 200 to be interposed at the fastening portions of the respective bolts 300 to be crimped according to the fastening. Accordingly, each of the facing block structures 200 has a structure in which a flat tie 400 is provided and inserted and coupled according to the number of the mounting holes 210.

아울러 높이방향을 따라 배치되는 플랫타이(400)는 그 중앙에 볼트(300)가 관통 삽입되어 있다. 이 때 걸리는 부분이 헤드부(300b)의 하단이다. 상기 헤드부(300b)의 하단은 수나사(300a)에 비해 상대적으로 외경이 커서 볼트(300)가 플랫타이(400)에 위에서 아래로 관통 삽입될 경우 상기 하단부위가 걸리게 마련이다. 이와 같은 결합관계에 따라 높이방향을 따라 배치된 각 플랫타이(400)는 상기 볼트(300)가 체결되면서 압착된다.In addition, the flat tie 400 disposed along the height direction is inserted through the bolt 300 in the center thereof. The portion caught at this time is the lower end of the head portion 300b. The lower end of the head portion 300b has a larger outer diameter than the external thread 300a so that the lower portion is caught when the bolt 300 is inserted through the flat tie 400 from the top to the bottom. The flat tie 400 disposed along the height direction according to the coupling relationship is compressed while the bolt 300 is fastened.

그리고 동일높이에 배치되는 각 플랫타이(400)를 결속하기 위한 것이 내부연결봉(500)이다. 내부연결봉(500)의 일단은 그 앞에 위치한 플랫타이(400)에서 볼트의 헤드부(300b)에 끼워진다.And it is the inner connecting rod 500 to bind each flat tie 400 disposed at the same height. One end of the inner connecting rod 500 is fitted to the head portion 300b of the bolt in the flat tie 400 located in front of it.

이 때 그 앞의 내부연결봉(500)의 타단 또한 상기 헤드부(300b)에 끼워짐으로 하나의 내부체결봉(500a)의 일단은 인접한 다른 하나의 내부체결봉(500b)의 타단과 적층 배치되는 구조로 대등한 높이에 배치되는 각 플랫타이(400)를 연결하는 구조를 이룬다.At this time, the other end of the inner connecting rod 500 in front of it is also fitted to the head portion 300b so that one end of one of the inner fastening rods 500a is stacked with the other end of another adjacent inner fastening rod 500b. The structure forms a structure for connecting each flat tie 400 disposed at equal heights.

플랫타이(400) 사이, 내부 연결봉(500)과 블록 구조체(200) 사이는 약 0.15m의 간격으로 배치되나, 이러한 열과 행간 간격은 적정한 철근 콘크리트 비율을 만족하는 간격으로 더 넓어지거나 좁아지는 식으로 조정될 수 있다.Between the flat tie 400, the inner connecting rod 500 and the block structure 200 is arranged at intervals of about 0.15m, but the row and line spacing is wider or narrower at intervals satisfying an appropriate ratio of reinforced concrete. Can be adjusted.

도 4는 본 고안의 플랫타이(400)와 블럭 구조체(200)의 결합관계를 도시한 부분단면도이다. 도 4에 도시된 바와 같이, 플랫타이(400)는 대면하도록 적조된 각 블록 구조체(200)에서, 대등한 높이의 블록 구조체(200)에 양단이 삽입되고 이 때 블록 구조체(200)의 결속을 위해 내부에 구비된 각 볼트(300)의 체결부위에 개재압착된다.4 is a partial cross-sectional view showing a coupling relationship between the flat tie 400 and the block structure 200 of the present invention. As shown in FIG. 4, the flat tie 400 is inserted at both ends of the block structure 200 of equal height in each of the block structures 200 that are red tipped so as to face each other. In order to interpose and crimp the fastening portion of each bolt 300 provided therein.

그럼으로써 상기 대면하는 각 블록 구조체(200) 또한 서로간의 결속구조가 이루어질 수 있다. 이 때 플랫타이(400)의 중앙에도 볼트(300)가 관통 삽입되고 높이방향을 따라 서로 체결됨으로써, 높이방향을 따라 배치된 플랫타이(400)간 결속이 가능하다.As a result, each of the facing block structures 200 may also have a binding structure with each other. At this time, the bolt 300 is inserted through the center of the flat tie 400 and fastened to each other along the height direction, thereby allowing binding between the flat tie 400 disposed along the height direction.

아울러 대등한 높이로 배치된 각 플랫타이(400)는 상기 볼트의 헤드부(300b)에 내부연결봉(500)이 끼워지고 이러한 끼움결합이 연속됨으로 상기 각 플랫타이(400)의 연결구조가 마련된다.In addition, each flat tie 400 disposed at an equal height has an internal connecting rod 500 fitted to the head portion 300b of the bolt, and the fitting structure is continuous so that the connection structure of each flat tie 400 is provided. .

도 5은 본 고안의 플랫타이(400)와 내부연결봉(500a,500b)의 결합관계를 도시한 부분단면도이다. 도 5에 도시된 바와 같이, 높이방향을 따라 배치되는 각 플랫타이(400)에는 그 중앙으로 높이방향을 따라 관통 삽입되는 다수의 볼트(300)가 구비된다.5 is a partial cross-sectional view showing a coupling relationship between the flat tie 400 and the inner connecting rod (500a, 500b) of the present invention. As shown in FIG. 5, each of the flat ties 400 disposed along the height direction is provided with a plurality of bolts 300 inserted through the height in the center thereof.

이러한 각 볼트에서 헤드부(300b)의 암나사 입구와 대응하는 수나사(300a) 사이에 상기 플랫타이(400)의 중앙부위가 개재된다. 즉 플랫타이(400)의 중앙을 상기 수나사부위(300a)가 관통하여 끼워지고 상기 각 볼트(300)가 높이방향을 따라 연속체결됨으로 결국 체결부위에 상기 각 플랫타이(400)의 중앙부위이 압착되는 구조이다.In each of these bolts, a central portion of the flat tie 400 is interposed between the female thread inlet of the head portion 300b and the corresponding male thread 300a. That is, the male screw portion 300a penetrates the center of the flat tie 400 and the bolts 300 are continuously fastened along the height direction, so that the central portion of each flat tie 400 is squeezed to the fastening portion. Structure.

이 때 상기 각 볼트의 헤드부(300b)에는 내부연결봉(500)이 끼워진다. 즉 볼트(300) 또한 대등한 높이로 배치된 플랫타이(400)를 따라 배치됨으로 동일높이별로 위치한 각 볼트의 헤드부(300b)에 내부연결봉(500)이 끼워지게 된다.At this time, the inner connecting rod 500 is fitted to the head portion 300b of each bolt. That is, since the bolt 300 is also disposed along the flat tie 400 disposed at an equal height, the inner connecting rod 500 is fitted to the head 300b of each bolt positioned at the same height.

앞에 위치한 헤드부(300b)에 내부연결봉(500)의 일단이 끼워지면, 타단은 뒤에 위치한 헤드부(300b)에 끼워진다. 동일높이별로 이러한 연결구조가 반복되면 하나의 내부연결봉(500a)의 일단과 인접한 다른 하나의 내부연결봉(500b)의 타단은 서로 적층되는 배치구조를 이룬다. 이에 따라 동일높이별로 배치된 상기 각 플랫타이(400)가 서로 연결된다.When one end of the inner connecting rod 500 is fitted to the head portion 300b positioned in front, the other end is fitted to the head portion 300b positioned behind. When the connection structure is repeated by the same height, one end of one internal connection bar 500a and the other end of the other internal connection bar 500b adjacent to each other form an arrangement structure in which they are stacked on each other. Accordingly, the flat tie 400 disposed by the same height is connected to each other.

도 6은 본 고안의 다른 실시예에 따른 플랫타이(400)의 배치관계를 도시한 부분단면도이다. 도 6에 도시된 바와 같이, 건물의 벽, 특히 모서리 부분에 대한 구조를 설명하기 위한 것으로서, 모서리부에서는 'ㄴ'모양의 별도의 블록구조체(240)와 모서리의 양단의 볼트 상호간을 체결하기 위한 플랫타이(410)를 사용하고 있다.6 is a partial cross-sectional view showing the arrangement of the flat tie 400 according to another embodiment of the present invention. As shown in Figure 6, to explain the structure of the wall, in particular the corner portion of the building, the corner portion for fastening the bolts at both ends of the separate block structure 240 of the 'b' shape Flat tie 410 is used.

상기 'ㄴ'모양의 블록 구조체(240)는 본 고안의 블록 구조체(200)를 'ㄴ'형태로 구부린 정도의 길이를 가지고 있고, 바람직하게는 0.3 ×0.3m정도의 길이이다. 또한 거푸집의 모서리에서 상기 'ㄴ'모양의 블록 구조체(240)와 블록 구조체(200) 사이에 남는 공간을 형성하기 위해 상기 블록 구조체(200)보다 길이가 짧은 블록 구조체(230)가 필요할 수 있다. 이것은 블록 구조체(200)를 토막으로 하여 사용할 수 있는데, 벽돌 공사시에 사용되는 이오토막, 칠오토막과 같은 개념이다. 모서리에 사용되는 플랫타이(410)는 모서리 상의 볼트 상호간을 연결될 수 있을 정도로 본 고안의 플랫타이(400)보다 긴 구조를 가지고 있다.The 'b' shaped block structure 240 has a length that is about to bend the block structure 200 of the present invention in the 'b' form, and preferably has a length of about 0.3 × 0.3m. In addition, a block structure 230 having a shorter length than the block structure 200 may be required to form a space remaining between the 'b' shaped block structure 240 and the block structure 200 at a corner of the formwork. This can be used as the block structure 200 as a piece, the same concept as the Iomak, Chilohmak used in the brick construction. The flat tie 410 used for the corner has a structure longer than the flat tie 400 of the present invention so that the bolts on the corner can be connected to each other.

도 7은 본 고안에 따른 거푸집의 사용상태도이다. 도 7에 도시된 바와 같이, 상기 거푸집에서, 대면하도록 적조된 블록구조체(200)의 사이에 콘크리트 반죽을부어 양생시킬 경우 상기 거푸집은 무해제 구조의 독립벽체로서 사용될 수 있다.7 is a state diagram used in the form according to the present invention. As shown in FIG. 7, in the formwork, when the concrete dough is poured and cured between the block structures 200 adapted to face the formwork, the formwork may be used as an independent wall of a non-destructive structure.

이 때 상기 콘크리트 반죽이 굳어지는 각 블록구조체(200) 사이에는 플랫타이(400), 볼트(300) 및 내부연결봉(500)으로 이루어진 프레임 구조가 구비되어 있다. 상기 프레임 구조는 상기 콘크리트 반죽이 굳어져 벽체로서 기능할 경우 배근으로서 기능하게 된다. 따라서 상기 거푸집은 콘크리트의 투입 및 양생 후 별도의 해체작업이 필요없게 된다.At this time, between the block structure 200, the concrete dough is hardened is provided with a frame structure consisting of a flat tie 400, a bolt 300 and the internal connecting rod 500. The frame structure functions as a back muscle when the concrete dough solidifies and functions as a wall. Therefore, the formwork does not need a separate dismantling work after the input and curing of concrete.

도 8은 본 고안에 따른 거푸집 제작방법의 순서도이다. 도 8에 도시된 바와 같이, 본 고안에 따른 거푸집의 제작방법은, 블록구조체 간 체결방식을 통해 블록구조체를 적조하면서 결속시키고, 플랫타이 및 내부연결봉을 사용하여 배근을 형성하는 공법이다.8 is a flow chart of the formwork manufacturing method according to the present invention. As shown in Figure 8, the manufacturing method of the form according to the present invention is a method of binding the block structure by red tide through the fastening method between the block structure, a method of forming the reinforcement using a flat tie and the inner connecting rod.

우선 콘크리트 반죽을 바닥에 소정두께로 타설하여 기초콘크리트층(100)을 형성한다. 기초콘크리트층(100)이 형성되면 소정깊이의 볼팅구(110)를 병렬로 형성한다(S1000). 볼팅구(110)는 일실시예로 2줄로 길게 형성하여 볼팅구(110) 밖으로 위치할 블록구조체(200)의 두께를 감안하여 형성한다.First, the concrete dough is poured on the floor to a predetermined thickness to form a foundation concrete layer 100. When the basic concrete layer 100 is formed, the bolting holes 110 having a predetermined depth are formed in parallel (S1000). Bolting port 110 is formed in consideration of the thickness of the block structure 200 to be located outside the bolting port 110 in one embodiment formed in two lines.

그리고 볼팅구(110)별로 헤드부에 암나사가 형성된 볼트(300)를 체결한다. 이 때 마주보는 각 볼팅구(110)에 체결될 2개의 볼트(300)에서 수나사(300a)에 플랫타이(400)의 양단을 관통하여 결합시킨다. 따라서 플랫타이(400)는 기초콘크리트층(100)의 표면에 인접하면서 마주하는 각 볼팅구(110) 및 해당 볼트(300)에 걸쳐 배치된다. 이러한 플랫타이(400)의 결합으로 2줄로 볼팅구(110) 및 볼트(300)로 체결되면 각 줄에 걸쳐 병렬로 플랫타이(400)가 배치된다.And bolts (300) formed with female threads in the head portion for each bolting (110). At this time, the two bolts 300 to be fastened to the opposite bolting holes 110 are coupled to the male screw 300a by penetrating both ends of the flat tie 400. Therefore, the flat tie 400 is disposed over each bolting hole 110 and the bolt 300 adjacent to and adjacent to the surface of the base concrete layer (100). When the flat tie 400 is fastened to the bolting hole 110 and the bolt 300 in two lines by the combination of the flat tie 400 is arranged in parallel over each line.

볼팅구(110)에 대한 볼트(300)의 체결이 끝나면, 블록구조체(200)를 그 위에 올리는데, 이 때 블록구조체의 장착구(210)에 헤드부(300b)가 삽입되도록 하면서 적조한다(S2000).After the fastening of the bolt 300 to the bolting hole 110 is finished, the block structure 200 is raised thereon, and at this time, the head portion 300b is inserted into the mounting hole 210 of the block structure, and red tide (S2000). ).

하나의 단이 적조되면, 상기 장착구(210)의 상부를 통해 다른 볼트의 수나사(300a)를 삽입하는데, 이 때 상기 수나사(300a)에는 플랫타이(400)를 관통 결합시킨 뒤, 장착구(210) 내의 헤드부의 암나사에 수나사(300a)를 체결한다.When one end is red, inserting the external thread (300a) of the other bolt through the upper portion of the mounting hole 210, at this time, through the flat tie 400 through the external thread (300a), the mounting holes ( The external thread 300a is fastened to the internal thread of the head portion 210.

이에 따라 상기 플랫타이(400)는 각 단이 형성될 때마다 이에 대응하여 마주하는 블록구조체(200)에 걸쳐 결합된다. 그리고 상기 각 블록구조체의 장착구(210) 및 삽입되는 볼트(300)의 개수에 따라 동일높이별로 수평으로 반복 배치되는 것과 동시에 높이방향을 따라 블록구조체(200)의 높이 즉 하나의 단의 높이별로 수직으로 반복 배치된다.(S3000)Accordingly, the flat tie 400 is coupled over the block structure 200 facing each other when each end is formed. In addition, according to the number of mounting holes 210 and the number of bolts 300 to be inserted into the block structure, the blocks are repeatedly arranged horizontally by the same height and the height of the block structure 200 along the height direction, i.e. It is repeatedly arranged vertically. (S3000)

이러한 플랫타이(400)의 배치가 끝나면, 높이방향을 따라 배치된 상기 플랫타이(400)의 중앙에 상기 볼트(300)를 관통결합시킨다. 그러면 각 볼트(300)는 연속체결될 수 있는 구조가 마련된다. 볼트(300)의 구비는 높이방향별로 구분될 수 있는 각 플랫타이(400)의 열별로 반복되는데, 이 때 각 볼트(300)의 체결 이전에 각 볼트(300)간 체결부위에 내부연결봉(500)을 개재한다. 이는 동일높이별로 배치된 플랫타이(400)에 걸쳐 이루어지며 이에 따라 인접한 내부연결봉(500)끼리는 각 끝단이 서로 적층 밀착된다. 그리고 볼트(300)를 연속체결한다(S4000, S4100).When the arrangement of the flat tie 400 is completed, the bolt 300 is coupled through the center of the flat tie 400 disposed along the height direction. Then each bolt 300 is provided with a structure that can be fastened continuously. The provision of the bolt 300 is repeated for each row of the flat tie 400, which can be divided by the height direction, at this time, the inner connecting rod 500 in the fastening portion between each bolt 300 before the fastening of each bolt (300) Intervene). This is made over the flat tie 400 is arranged by the same height, so that the adjacent inner connecting rods 500 are in close contact with each other end of the stack. Then, the bolt 300 is continuously fastened (S4000, S4100).

따라서 각 플랫타이(400)는 높이방향을 따라 볼트(300)의 체결로 결속되면서 동일높이별로 내부연결봉(500)에 의해 연결되어 결속되며 이에 따라 각 외벽구조사이의 배근구조가 마련된다.Therefore, each flat tie 400 is bound by the fastening of the bolt 300 along the height direction is connected and bound by the inner connecting bar 500 by the same height, thereby providing a reinforcement structure between each outer wall structure.

그리고 외벽구조를 이루는 마주하는 각 블록구조체(200)의 사이에 콘크리트 반죽을 투입하고 양생한다. 그러면 콘크리트 반죽은 상기 블록구조체(200)와 더불어 고착화되어 하나의 벽체로서 완성됨으로 상기 블록구조체(200)로 이루어진 거푸집 구조의 해체가 불필요하다.And the concrete dough is put and cured between each block structure 200 facing the outer wall structure. Then, the concrete dough is fixed together with the block structure 200 and completed as a wall, so that the disassembly of the form structure consisting of the block structure 200 is unnecessary.

상기와 같은 본 고안에 따른 무해체 구조의 거푸집에서, 본 고안은 배근 구조 없이 거푸집만을 형성하는 구조 및 그 제작방법, 벽체에 창호틀을 설치하는 구조의 거푸집 및 그 제작방법, 독립의 외벽 구조 및 그 제작방법으로도 사용가능하다.In the form of a non-destructive structure according to the present invention as described above, the present invention is a structure and a manufacturing method of forming only the formwork without the reinforcement structure, the formwork and its manufacturing method of installing the window frame on the wall, independent outer wall structure and It can also be used as a production method.

먼저, 본 고안에 의한 배근 구조 없이 거푸집만을 형성하는 구조 및 그 제작방법은, 타설한 기초 콘크리트(100)에 천공하는 볼팅구(110)를 2열로 배치하고 그 위에 블록 구조체(200)를 적조하는데, 대면하는 상기 블록 구조체(200)는 플랫타이(400)에 의해 연결되고 상기 플랫타이 상호간을 연결하는 내부 연결봉이 없는 구조이다. 따라서, 더욱 견고한 벽체의 형성을 위해서는 블록 구조체 사이에 철근에 의한 배근을 필요로 하게 된다.First, the structure and the manufacturing method of forming only the formwork without the reinforcement structure according to the present invention, to arrange the bolting holes 110 to be drilled in the cast-in-place concrete 100 in two rows and to redden the block structure 200 thereon The facing block structure 200 is connected by a flat tie 400 and has no internal connecting rods connecting the flat ties to each other. Therefore, reinforcement by reinforcing bars is required between the block structures in order to form a stronger wall.

그러나 블록 구조체(200) 내부에는 높이 방향으로 연속하여 볼트(300)가 체결되고 대면하는 블록 구조체 상호 간은 동일 높이에서 볼트의 수나사부(300a)와 연결되는 플랫타이(400)로 결속되어 있기 때문에, 기본적인 배근 구조는 갖추어져 있는 것이므로 적은 하중을 받는 벽에는 상기의 거푸집 구조도 별도의 배근없이 충분히 사용 가능하다.However, since the bolts 300 are continuously fastened in the height direction in the block structure 200, and the block structures facing each other are bound by the flat tie 400 connected to the male screw portion 300a of the bolt at the same height. In addition, since the basic reinforcement structure is provided, the formwork described above can be used sufficiently without a separate reinforcement on a wall subjected to a small load.

또한, 본 고안에 의한 벽체에 창호를 설치하는 구조 및 제작방법은, 창호틀을 지지하는 볼트와 지지부재만이 차이가 있을 뿐 다른 구성요소 및 제작방법은 제 1 실시예와 동일하다.In addition, the structure and manufacturing method for installing the window to the wall according to the present invention, the only difference between the bolt and the support member for supporting the window frame, the other components and the manufacturing method is the same as the first embodiment.

먼저 창호틀의 지지 볼트는 본 고안의 볼트(300)와는 달리 하부의 볼트는 일반 볼트이고, 상부의 볼트는 헤드에 축선방향으로 암나사가 형성되어 있으나 수나사부가 상대적으로 짧게 형성되어 있다. 즉 상기 창호틀의 상부와 하부에 장착되는 볼트는 블록 구조체(200)에 창호틀을 고정하기 위한 구조로 형성된다. 그리고, 창호틀을 높이 방향으로 지지하는 창호 지지부재는 본 고안의 거푸집을 형성할 때 창호부가 받는 상부의 압력을 견디기 위한 구조로서 상기 거푸집에 콘크리트가 타설되고 양생이 되어 거푸집과 콘크리트로 이루어진 벽체가 완성되면 창호틀에서 철거되는 임시적인 구조물이다.First, the support bolt of the window frame, unlike the bolt 300 of the present invention, the lower bolt is a general bolt, the upper bolt is a female thread formed in the axial direction in the head, but the male thread is formed relatively short. That is, the bolts mounted on the upper and lower portions of the window frame are formed in a structure for fixing the window frame to the block structure 200. In addition, the window support member for supporting the window frame in the height direction is a structure for withstanding the pressure of the upper portion received by the window when forming the form of the present invention, the concrete is poured into the form and curing, the wall made of formwork and concrete When completed, it is a temporary structure that is removed from the window frame.

아울러 본 고안에 의한 내부에 콘크리트가 타설되는 거푸집 형태가 아닌 독립된 외벽구조로서 차단벽 또는 울타리 기능을 하는 구조 및 제작방법은, 타설된 기초 콘크리트(100), 볼트(300) 및 블록 구조체(200)의 결합으로 이루어 지는데, 본 고안의 거푸집 구조에서와 달리 블록 구조체(200)가 대면하여 적조되는 것이 아니라, 단일의 열로 연속되어 적조되고, 또 대면하는 블록구조체(200)를 동일 높이에서 볼트의 수나사에 결합되는 플랫타이(400)를 사용하지 않는다. 물론 상기의 구조로서 울타리 등을 형성하는데는 블록구조체(200)를 대면하도록 붙여서 적조하여 더욱 견고한 울타리를 필요에 따라 시공할 수 있다. 요컨데, 본 고안에 따른 거푸집은 건축물의 벽체, 옹벽, 방음벽, 울타리 등에 다양하게 사용될 수 있다.In addition, a structure and a manufacturing method of a barrier wall or a fence function as an independent exterior wall structure in which concrete is poured into the interior according to the present invention are installed, the foundation concrete 100, the bolt 300, and the block structure 200. Unlike the formwork of the present invention, the block structure 200 is not reddened to face each other, but is continuously reddened in a single row, and faces the block structure 200 which face each other at the same height. Do not use a flat tie 400 coupled to. Of course, to form a fence, etc. as the above structure can be applied to the block structure 200 to face the red tide to construct a more robust fence as needed. In short, the formwork according to the present invention can be used in various ways, such as walls, retaining walls, soundproof walls, fences of buildings.

또한 벽체의 두께 및 요청 강도의 크기에 따라 플랫타이(400)와/또는 내부 연결봉(500)의 열의 수를 늘릴 수 있어 다양한 구조체의 구축에 신축적으로 대응할 수 있다. 그리고, 플랫타이(400)와 내부 연결봉(500)의 행과 열의 간격은 적정한 철근 콘크리트 비율에 만족하는 간격으로 조정되어 질 수 있다.In addition, the number of columns of the flat tie 400 and / or the inner connecting rod 500 may be increased according to the thickness of the wall and the size of the required strength, thereby flexibly responding to the construction of various structures. In addition, the interval between the rows and columns of the flat tie 400 and the inner connecting rod 500 may be adjusted to an interval satisfying an appropriate ratio of reinforced concrete.

아울러 벽체의 외장에 대리석, 타일 등의 마감재를 별도로 쓰기 위해서 플랫타이(400)를 벽체 외부로 일정 길이만큼 확장하여 상기 확장부위에 마감재를 설치하여, 벽체 완성 후 마감재를 위한 핀을 박는 작업을 생략할 수 있다.In addition, in order to separately write finishing materials such as marble and tiles on the exterior of the wall, the flat tie 400 is extended to the outside of the wall by a predetermined length to install the finishing material on the extension part, thus eliminating the work of pinning the finishing material after the completion of the wall. can do.

상기와 같은 본 고안에 따른 무해체 구조의 거푸집에 의하면, 공장제작이 가능한 블록 구조체와 볼트 등을 통해 간편하게 시공할 수 있고, 배근 작업을 내부 연결봉과 볼트, 플랫타이의 결합으로 해결할 수 있으므로 기존의 거푸집과 배근 사이의 간격을 일정하게 유지하기 위한 시공의 난이성을 감소시킬 수 있으며, 그에 따라 인력을 상대적으로 줄일 수 있고 콘크리트 양생 후 거푸집을 해체할 필요가 없어 작업의 효율은 물론이고 공기의 단축과 공사비의 절감을 달성할 수 있다.According to the formless structure according to the present invention as described above, it can be easily installed through a block structure and bolts that can be manufactured in the factory, and the reinforcement work can be solved by the combination of the internal connecting rods and bolts, flat tie, etc. It is possible to reduce the difficulty of construction to keep the gap between the formwork and the reinforcement constant. Therefore, it is possible to reduce the manpower relatively, and it is not necessary to dismantle the form after curing the concrete. Reduction of construction cost can be achieved.

또한, 본 고안에 따른 거푸집은 건축물의 공작 제작화하는 현시점에 구성요소의 공장 생산, 비교적 간편한 운반 및 편리한 시공을 통해 바람직한 건축환경을 제공할 수 있다. 그리고, 본 고안은 볼트, 블록 구조체, 플랫타이, 내부 연결봉의 기본 재료를 가지고 다양한 구조를 형성할 수 있다. 즉 필요에 따라 배근을 선택적으로 할 수 있고, 블록 구조체를 1열 또는 2열로 선택할 수 있다.In addition, the formwork according to the present invention can provide a desirable building environment through the factory production of components, relatively easy transportation and convenient construction at the present time to manufacture the work of the building. In addition, the present invention can form a variety of structures with the base material of the bolt, block structure, flat tie, internal connecting rod. That is, the back muscles can be selectively selected as needed, and the block structure can be selected in one or two rows.

특히 대면하는 블록 구조체를 형성할 시에, 본 고안의 거푸집은 별도의 배근작업 및 거푸집 지지장치가 필요 없게 된다. 즉 블록 구조체에 삽입된 볼트와 연결되는 플랫타이 및 내부 연결봉의 인장력을 통해 상기 블록 구조체 상호간이 별도의 배근이나 지지장치 없이도 고정될 수 있는 것이다.Particularly, when forming the facing block structure, the formwork of the present invention does not require a separate reinforcement work and formwork support device. That is, through the tension of the flat tie and the inner connecting rod connected to the bolt inserted into the block structure can be fixed to each other without a separate reinforcement or support device.

또한 상기 블록 구조체는 표면을 평탄하고 매끈하게 제조되므로 별도의 모르타르 마감이나 마감재의 사용없이 깨끗한 벽체를 형성할 수 있고, 만일 특별한 외장재가 필요하다면 플랫타이를 블록 구조체 외부로 연장 시공하여 연장부분에 바로 외장재를 설치할 수 있다.In addition, since the block structure is made of a smooth and smooth surface, it is possible to form a clean wall without the use of a separate mortar finish or finishing material, and if a special exterior material is needed, the flat tie is extended to the outside of the block structure to directly extend the portion. Can install exterior materials.

비록 고안이 상기에서 언급된 바람직한 실시예에 관해 설명되어졌으나, 고안의 요지와 범위를 벗어남이 없이 많은 다른 가능한 수정과 변형이 이루어질 수 있다. 따라서, 첨부된 청구범위는 고안의 진정한 범위내에서 속하는 이러한 수정과 변형을 포함할 것으로 예상된다.Although the invention has been described with respect to the preferred embodiments mentioned above, many other possible modifications and variations can be made without departing from the spirit and scope of the invention. Accordingly, it is intended that the appended claims cover such modifications and variations as fall within the true scope of the invention.

Claims (5)

기초 콘크리트층(100)에 소정 깊이로 일정간격을 두고 병렬 배치되어 천공된 볼팅구(110)의 각 열별 형성위치에 대응하여 서로 대면하도록 일정거리를 두고 적조되는 다수의 블록구조체(200);A plurality of block structures 200 that are reddish at a predetermined distance so as to face each other in correspondence with the formation positions for each column of the bolting holes 110 which are arranged in parallel with a predetermined depth at a predetermined depth in the foundation concrete layer 100; 헤드부에 축선방향을 따라 암나사가 형성되어 상기 볼팅구(110) 및 인접한 볼록구조체(200)와, 상기 적조된 각 블록구조체(200) 내에 높이방향을 따라 삽입되어 서로 체결되는 볼트(300); 및A female screw formed along the axial direction of the head part such that the bolt 300 is inserted into the bolting hole 110 and the adjacent convex structure 200 and the height of each of the block structures 200 and fastened to each other; And 동일높이로 대면하는 상기 각 블록구조체(200)의 하부를 양측이 관통하여 상기 각 볼트의 수나사(300a)에 결합되며 높이방향을 따라 일정간격을 두고 배치되는 플랫타이(400);를 포함하는 것을 특징으로 하는 무해체 구조의 거푸집.It includes; a flat tie 400 is disposed at regular intervals along the height direction coupled to the male screw (300a) of each bolt through the lower side of each block structure 200 facing the same height; The dies of the non-destructive structure characterized by. 제 1 항에 있어서, 상기 블록구조체(200)는 상기 블록구조체 내의 하부에 상기 헤드부(300b)가 안치되도록 상기 헤드부의 외경에 대응하여 형성되고, 상부는 대응하는 볼트의 수나사(300a)가 상부를 통해 삽입되어 상기 헤드부(300b)의 암나사에 체결되도록 상기 수나사(300a)의 외경에 대응하는 장착구(210)가 높이 방향을 따라 형성된 구조인 것을 특징으로 하는 무해체 구조의 거푸집.According to claim 1, wherein the block structure 200 is formed corresponding to the outer diameter of the head portion so that the head portion 300b is placed in the lower portion of the block structure, the upper portion of the male thread 300a of the corresponding bolt is upper portion Formation of the non-dismantled structure, characterized in that the mounting hole 210 corresponding to the outer diameter of the male screw (300a) is formed along the height direction to be inserted through and fastened to the female screw of the head portion (300b). 제 2 항에 있어서, 대면하는 상기 블록구조체(200)의 하부에는 상기 플랫타이(400)의 양측이 삽입되도록 상기 장착구(210)에 상통하는 타이삽입구(220)가 형성되는 것을 특징으로 하는 무해체 구조의 거푸집.3. The tie inserting hole 220 is formed in the lower portion of the block structure 200 facing each other so as to be in communication with the mounting hole 210 so that both sides of the flat tie 400 are inserted therein. Formwork of dismantling structure. 제 1 항 내지 제 3 항 중 어느 한 항에 있어서, 높이방향을 따라 배치되는 상기 각 플랫타이(400)는 상기 각 플랫타이별로 관통되는 볼트(300)의 연속 체결로 서로 결합되는 구조인 것을 특징으로 하는 무해체 구조의 거푸집.According to any one of claims 1 to 3, The flat tie 400 disposed along the height direction is characterized in that the structure is coupled to each other by the continuous fastening of the bolts 300 to be penetrated for each flat tie. Dies of non-dismantled structure made with. 제 4 항에 있어서, 동일 높이별로 배치되는 상기 각 플랫타이(400)는 상기 각 볼트(300)의 체결부위 사이에 개재되어 연속되는 다수의 내부 연결봉(500)으로 서로 결합되는 구조인 것을 특징으로 하는 무해체 구조의 거푸집.According to claim 4, The flat tie 400 is arranged for each of the same height is characterized in that the structure is coupled to each other by a plurality of internal connecting rods 500 which are interposed between the fastening portions of each of the bolts (300). Formwork of non-destructive structure.
KR20-2003-0013961U 2003-05-06 2003-05-06 A Dismonuting Structure Form KR200322026Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20-2003-0013961U KR200322026Y1 (en) 2003-05-06 2003-05-06 A Dismonuting Structure Form

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20-2003-0013961U KR200322026Y1 (en) 2003-05-06 2003-05-06 A Dismonuting Structure Form

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR10-2003-0028499A Division KR100522746B1 (en) 2003-05-06 2003-05-06 A Dismounting Structure Form And Manufacturing Method Thereof

Publications (1)

Publication Number Publication Date
KR200322026Y1 true KR200322026Y1 (en) 2003-07-31

Family

ID=49336682

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20-2003-0013961U KR200322026Y1 (en) 2003-05-06 2003-05-06 A Dismonuting Structure Form

Country Status (1)

Country Link
KR (1) KR200322026Y1 (en)

Similar Documents

Publication Publication Date Title
EP3263795A1 (en) Composite structural wall and method of construction thereof
KR100189216B1 (en) Sectional steel house and the executing method thereof
WO2007061443A2 (en) Bolt-a-blok - a system for unitized, post-tensioned masonry structures
US20070017176A1 (en) Masonry wall system
CN114517551B (en) Full precast concrete floor connected node
KR100557335B1 (en) A Dismonuting Structure Form And Manufacturing Method Thereof
EP1921220A2 (en) A cladding panel
KR100522746B1 (en) A Dismounting Structure Form And Manufacturing Method Thereof
KR20060110468A (en) Wall structure of bolt join type and the method of construction
KR200322026Y1 (en) A Dismonuting Structure Form
JP2005155137A (en) Earthquake resistant reinforced external frame structure of existing building and construction method
US20060185283A1 (en) Interlocking construction panel showing fabrication thereof and the building system
JPH09235801A (en) Beam erect construction method of block laying structure
KR19980019399A (en) Architecture wall formwork assembly
JPH06185111A (en) Precast concrete beam and column and construction method of earthquake-proof wall using them
KR102612981B1 (en) A Construction System for Precast Double Wall Structure and Construction Method Using the Same
KR101320697B1 (en) Concrete mold connector and method for connecting concrete mold using concrete mold connector
KR100557276B1 (en) A Dismonuting Wall And Floor Form
JPH10184028A (en) Earthquake-resisting reinforcing structure of building
KR102530366B1 (en) Permanent form and building wall construction method using the same
KR20050112913A (en) A construction system of the wall/dome and the the method thereof it
KR19990073549A (en) The panel for construction and the method of the above wall frame
JP2005155138A (en) Seismic reinforced external frame construction method of existing building
JP4836565B2 (en) Construction method for wall-type reinforced concrete structures
JPH11323958A (en) Execution method of building and concrete product used therefor

Legal Events

Date Code Title Description
U107 Dual application of utility model
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20030819

Year of fee payment: 3

EXTG Extinguishment