KR20030056743A - Block manufacturing process by using euipments - Google Patents

Block manufacturing process by using euipments Download PDF

Info

Publication number
KR20030056743A
KR20030056743A KR1020010087027A KR20010087027A KR20030056743A KR 20030056743 A KR20030056743 A KR 20030056743A KR 1020010087027 A KR1020010087027 A KR 1020010087027A KR 20010087027 A KR20010087027 A KR 20010087027A KR 20030056743 A KR20030056743 A KR 20030056743A
Authority
KR
South Korea
Prior art keywords
mold
curing
coating
rail
mortar
Prior art date
Application number
KR1020010087027A
Other languages
Korean (ko)
Inventor
최한욱
Original Assignee
최한욱
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 최한욱 filed Critical 최한욱
Priority to KR1020010087027A priority Critical patent/KR20030056743A/en
Publication of KR20030056743A publication Critical patent/KR20030056743A/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0088Moulds in which at least one surface of the moulded article serves as mould surface, e.g. moulding articles on or against a previously shaped article, between previously shaped articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/14Producing shaped prefabricated articles from the material by simple casting, the material being neither forcibly fed nor positively compacted
    • B28B1/16Producing shaped prefabricated articles from the material by simple casting, the material being neither forcibly fed nor positively compacted for producing layered articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B11/00Apparatus or processes for treating or working the shaped or preshaped articles
    • B28B11/04Apparatus or processes for treating or working the shaped or preshaped articles for coating or applying engobing layers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B13/00Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
    • B28B13/02Feeding the unshaped material to moulds or apparatus for producing shaped articles
    • B28B13/0215Feeding the moulding material in measured quantities from a container or silo
    • B28B13/022Feeding several successive layers, optionally of different materials
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B13/00Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
    • B28B13/02Feeding the unshaped material to moulds or apparatus for producing shaped articles
    • B28B13/0295Treating the surface of the fed layer, e.g. removing material or equalization of the surface
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C1/00Building elements of block or other shape for the construction of parts of buildings
    • E04C1/24Elements for building-up floors, ceilings, roofs, arches, or beams
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B5/00Producing shaped articles from the material in moulds or on moulding surfaces, carried or formed by, in or on conveyors irrespective of the manner of shaping
    • B28B5/04Producing shaped articles from the material in moulds or on moulding surfaces, carried or formed by, in or on conveyors irrespective of the manner of shaping in moulds moved in succession past one or more shaping stations
    • B28B2005/048Producing shaped articles from the material in moulds or on moulding surfaces, carried or formed by, in or on conveyors irrespective of the manner of shaping in moulds moved in succession past one or more shaping stations in moulds carried on a conveyor of the endless-belt type

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)

Abstract

PURPOSE: A method for preparing blocks is provided by using facilities to carry out automation of respective processes comprising automatically transporting blocks from one process to another process without labor of workers and to greatly reduce curing time of the blocks. CONSTITUTION: The method comprises a plurality of processes including: a step(S100) for positioning a metallic mold and for arranging native rocks in the mold and filling sands to a desired level of the rocks; a step(S110) for introducing concrete mortar into the sands in the mold; a step(S120) for arranging again native rocks on the concrete mortar; a step(S130) for coating part of the concrete mortar with a first coating solution; a step(S140) for curing the first coating solution and the concrete mortar; a step(S150) for second-coating the cured mortar with a mixed cement; a second curing step(S160) for the second coating cement; and a step(S170) for removing the metallic mold after the second curing step to separate the blocks.

Description

설비를 이용하여 블록을 제조하는 방법{BLOCK MANUFACTURING PROCESS BY USING EUIPMENTS}BLOCK MANUFACTURING PROCESS BY USING EUIPMENTS

본 발명은 설비를 이용하여 블록을 제조하는 방법에 관한 것으로, 좀더 상세하게는 설비를 이용하여 블록 제조를 위한 각 공정들을 자동화할 수 있도록 하여 생산성을 향상할 수 있도록 한 설비를 이용하여 블록을 제조하는 방법에 관한 것이다.The present invention relates to a method for manufacturing a block using a facility, and more particularly, to manufacture a block using a facility that can improve productivity by automating each process for manufacturing a block using a facility. It is about how to.

종래로부터 사용되는 블록의 제조방법을 살펴보면, 주조틀의 다이(Die)에 철판을 깔고 그 위에 칸막이를 맞춘 후 테두리를 씌우며 콘크리트 양면 블록의 양측면이 되는 칸막이와 테두리의 측부에 반원통형 반달 P.V.C를 볼트로 조여주어 고정함으로써 블록의 주조를 위한 주조틀을 완성한다.In the conventional method of manufacturing a block, a semi-cylindrical half-moon PVC is placed on the sides of the partition and the edges of both sides of the concrete double-sided block by placing an iron plate on the die of the casting mold, placing a partition thereon and covering the edges. Tightening with bolts secures the casting mold for casting the block.

그리고 상기 철판의 상부에 1차로 자연석을 임의로 배치하며, 그 위에 순모래를 약 30mm 채움으로써 자연석 두께의 반 정도가 순모래로 채워질 수 있도록 하고, 레미콘을 테두리의 상한선인 레미콘 채움의 폭까지 채우며, 그 위에 2차로 자연석을 꽂아 배치한 후, 2차 자연석과 레미콘 상부에 희석된 혼합시멘트액으로 약 7mm 방수 도포하고 양생시키며, 양생이 완료되면 주조틀을 180도 뒤집어 철판과 순모래를 제거하고 희석된 혼합시맨트액으로 한 번더 약 7mm 방수 도포하여 양생시킴으로써, 콘크리트 양면 블록을 제조한다.And the natural stone is randomly placed on the upper part of the iron plate, and fills about 30mm of pure sand so that about half of the thickness of natural stone is filled with pure sand, and the ready-mixed concrete is filled up to the width of the ready-mixed concrete, the upper limit of the edge. After placing and placing natural stone on the secondary, it is applied to the secondary natural stone and mixed cement solution diluted on top of ready-mixed concrete for about 7mm and cured. After curing, the casting mold is turned 180 degrees to remove iron plate and pure sand and diluted. A concrete double-sided block is produced by curing by applying about 7 mm waterproofing once more with the mixed cement solution.

또한, 상기의 반달 P.V.C에 의해 완성된 콘크리트 양면 블록의 양측부에는 반달형의 시멘트몰탈 투입공간이 형성되며, 여러개의 블록을 합쳐 줌으로써 원형의 시멘트몰탈 투입공간이 형성된다.In addition, both sides of the concrete double-sided block completed by the vandal P.V.C is formed with a half-moon-type cement mortar input space, a circular cement mortar input space is formed by combining several blocks.

그러나 종래의 블록 제조는 작업자가 각 작업들을 일일이 수작업으로만 행하게 되어 있으므로 블록 제조의 생산성이 크게 떨어지게 됨과 아울러 블록의 제조가 불균일하게 되는 문제점이 있다.However, the conventional block manufacturing has a problem that the production of the block is greatly reduced and the manufacturing of the block is uneven because the operator is to perform each operation only by hand manually.

특히, 블록들은 상당한 중량을 갖고 있으므로 이들을 다른 공정으로 이동할 때 작업자가 일일이 들어서 이동하기 때문에 작업자에게 많은 부담을 주게 됨과 아울러 이동 작업이 상당히 곤란하게 되는 문제점도 있다.In particular, since the blocks have a considerable weight, when the workers move one by one when moving to another process, the burden is placed on the worker and there is a problem that the moving operation becomes quite difficult.

또한, 종래의 양생 작업은 상온에서 자연상태로 이루어지게 되어 있으므로 그 만큼 양생 작업에 많은 시간이 소요됨과 아울러 한쪽면을 양생한 후 작업자가일일이 뒤집어서 반대쪽면을 양생해야 하므로 양생 작업이 번거롭게 되는 문제점도 있다.In addition, since the conventional curing work is made in a natural state at room temperature, it takes a lot of time for curing work, and after curing one side, the worker has to work upside down to cure the opposite side, which makes the curing work cumbersome. have.

따라서 본 발명은 상기한 문제점을 해결하기 위하여 제안된 것으로서, 본 발명의 목적은 설비를 이용하여 블록 제조를 위한 각 공정들을 자동화할 수 있도록 하여 생산성을 향상할 수 있음과 아울러 블록의 제조가 균일하게 되는 설비를 이용하여 블록을 제조하는 방법을 제공하는데 있다.Therefore, the present invention has been proposed to solve the above problems, and an object of the present invention is to enable the automation of the respective processes for block manufacturing using equipment, thereby improving productivity and uniformly manufacturing blocks. It is to provide a method for manufacturing a block using the equipment.

또한, 본 발명의 다른 목적은, 블록들을 한 공정에서 다른 공정에 자동으로 이송할 수 있도록 하여 작업자에게 전혀 부담을 주지 않으면서 이동작업이 간편하게 되는 설비를 이용하여 블록을 제조하는 방법을 제공하는데 있다.In addition, another object of the present invention is to provide a method for manufacturing a block using a facility that can be automatically transferred from one process to another process to simplify the operation without burdening the operator at all. .

본 발명의 또 다른 목적은, 블록들의 양생을 양생실에서 이루어질 수 있도록 하여 양생 시간을 최소한으로 단축함과 아울러 작업자가 편리하게 양생할 수 있도록 한 설비를 이용하여 블록을 제조하는 방법을 제공하는데 있다.Still another object of the present invention is to provide a method of manufacturing a block using a facility that allows curing of blocks in a curing room to minimize curing time and to allow the worker to cure conveniently. .

상기의 목적을 달성하기 위하여 본 발명은, 레일을 따라 이동 가능하게 설치된 이송판에 금형틀을 설치하고, 상기한 금형틀의 일면부에 일차적으로 자연석을 배치한 후 순모래로 자연석의 일부 높이까지 채워주는 1차 자연석 설치단계와; 상기한 금형틀의 내부에 순모래가 채워진 후 때 금형틀의 상부로 스크류 호퍼가 위치하도록 금형틀을 이동시킨 상태에서 콘크리트 몰탈을 금형틀 내부의 순모래에 투입하는 몰탈 투입단계와; 상기한 콘크리트 몰탈이 양생되기 전에 콘크리트 몰탈의 일단면을 평탄하게 고르기 작업을 한 후 자연석이 콘크리트 몰탈의 일단면으로 돌출하는 상태로 되게 2차적으로 자연석을 설치하는 2차 자연석 설치단계와; 상기한 콘크리트 몰탈의 일면부에 코팅액으로 1차 코팅하는 1차 코팅단계와; 상기한 1차 코팅단계에서 코팅 작업을 행한 후 제1오토로더가 승강하면서 이송판을 1차 양생실로 이송시켜 1차 코팅된 코팅액과 콘크리트 몰탈을 양생시켜 주는 1차 양생단계와; 상기한 1차 양생단계에서 1차 양생 작업을 행한 후 제1언로더가 승강하면서 이송판을 자동으로 레일로 이송시켜 주고 금형틀에서 순모래를 제거하고, 콘크리트 몰탈의 다른 일면부에 코팅액으로 2차 코팅하는 2차 코팅단계와; 상기한 2차 코팅단계에서 코팅 작업을 행한 후 제2오토로더가 승강하면서 이송판을 2차 양생실로 이송시켜 2차 코팅된 코팅액을 양생시켜 주는 2차 양생단계와; 상기한 2차 양생단계에서 양생 작업을 행한 후 제2언로더가 승강하면서 이송판을 레일로 이송시켜 주고, 각 블록들이 서로 분리되게 금형틀을 해체하는 금형틀 해체단계를 포함한다.In order to achieve the above object, the present invention, the mold frame is installed on the transfer plate installed to be movable along the rail, and the natural stone is firstly disposed on one side of the mold frame to the height of the natural stone to a part of natural stone Primary natural stone installation step of filling; A mortar input step of injecting concrete mortar into the pure sand in the mold mold while the mold mold is moved so that the screw hopper is positioned above the mold mold after the pure sand is filled in the mold mold; A second natural stone installation step of installing natural stones secondarily such that natural stone protrudes to one end surface of the concrete mortar after the work of leveling one end surface of the concrete mortar before the concrete mortar is cured; A first coating step of first coating the surface of the concrete mortar with a coating liquid; A first curing step of curing the first coated coating liquid and concrete mortar by transferring the transfer plate to the primary curing chamber while the first autoloader is elevated after the coating operation in the primary coating step; After the first curing operation in the first curing step described above, the first unloader automatically moves the transfer plate to the rails while lifting and removing the net sand from the mold, and the coating solution on the other side of the concrete mortar. Secondary coating step of secondary coating; A secondary curing step of curing the coated coating liquid by transferring the transfer plate to the secondary curing chamber while the second autoloader is lifted up after performing the coating operation in the secondary coating step; After performing the curing operation in the secondary curing step, the second unloader is transferred to the conveying plate to the rail while lifting, the mold frame disassembly step of dismantling the mold to separate each block.

도 1은 본 발명에 따른 설비를 이용하여 블록을 제조하는 방법을 도시한 블록도.1 is a block diagram illustrating a method of manufacturing a block using a facility according to the invention.

도 2는 본 발명에 따른 설비를 이용하여 블록을 제조하는 장치를 도시한 평면도.Figure 2 is a plan view showing an apparatus for manufacturing a block using a facility according to the present invention.

도 3은 본 발명에 따른 설비를 이용하여 블록을 제조하는 장치를 도시한 측면도이다.Figure 3 is a side view showing an apparatus for manufacturing a block using a facility according to the invention.

이하, 첨부 도면을 참조하여 본 발명의 바람직한 실시예를 상세하게 설명하면 다음과 같다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1 내지 도 3을 참조하면, 본 발명에 따른 설비를 이용하여 블록을 제조하는 방법은 작업라인의 레일(1)을 따라 이동 가능하게 설치된 이송판(3)에 금형틀(5)을 설치하고, 상기한 금형틀(5)의 일면부에 일차적으로 자연석(7)을 배치한 후 순모래로 자연석의 일부 높이까지 채워주는 1차 자연석 설치단계(S100)와;1 to 3, a method for manufacturing a block using the equipment according to the present invention is to install the mold frame (5) on the transfer plate (3) installed to be movable along the rail (1) of the work line A primary natural stone installation step (S100) of first placing natural stone 7 on one side of the mold frame 5 and then filling up to a certain height of the natural stone with pure sand;

상기한 금형틀(5)의 내부에 순모래가 채워진 후 금형틀(5)의 상부로 스크류 호퍼(9)가 위치하도록 금형틀(5)을 이동시킨 상태에서 콘크리트 몰탈을 금형틀(5)내부의 순모래로 투입하는 몰탈 투입단계(S110)와;After the net sand is filled in the mold 5, the concrete mortar is moved into the mold 5 while the mold mold 5 is moved so that the screw hopper 9 is positioned above the mold mold 5. Mortar input step (S110) and the input into the net sand of;

상기한 콘크리트 몰탈이 건조되기 전에 콘크리트 몰탈의 일단면을 평탄하게 고르기 작업을 한 후 자연석(7)이 콘크리트 몰탈의 일단면으로 돌출하는 상태로 되게 2차적으로 자연석을 설치하는 2차 자연석 설치단계(S120)와;Secondary natural stone installation step of installing the natural stone secondary to the state that the natural stone (7) protrudes to the one end surface of the concrete mortar before the concrete mortar is dried to evenly flatten one end surface ( S120);

상기한 콘크리트 몰탈의 일면부에 희석된 혼합 시멘트액과 같은 각종 코팅액으로 1차 코팅하는 1차 코팅단계(S130)와;A primary coating step (S130) for primary coating with various coating liquids such as mixed cement liquid diluted on one surface of the concrete mortar;

상기한 1차 코팅단계에서 코팅 작업을 행한 후 제1오토로더(11)가 승강하면서 이송판(3)을 1차 양생실(13)로 이송시켜 1차 코팅된 코팅액과 콘크리트 몰탈을 양생시켜 주는 1차 양생단계(S140)와;After performing the coating operation in the first coating step described above, the first autoloader 11 moves up and down to transfer the transfer plate 3 to the primary curing chamber 13 to cure the first coated coating liquid and concrete mortar. Tea curing step (S140) and;

상기한 1차 양생단계에서 1차 양생 작업을 행한 후 제1언로더(15)가 승강하면서 이송판(3)을 레일(1)로 이송시켜 주고 에어노즐로 공기를 임의의 압력 이상으로 분사시켜 금형틀(5)에서 순모래를 제거하고, 콘크리트 몰탈의 다른 일면부에 희석된 혼합 시멘트액과 같은 각종 코팅액으로 2차 코팅하는 2차 코팅단계(S150)와;After performing the first curing operation in the first curing step described above, the first unloader 15 moves up and down to transfer the transfer plate 3 to the rails 1 and injects the air above an arbitrary pressure with an air nozzle. A second coating step (S150) of removing the pure sand from the mold frame 5 and second coating with various coating liquids such as mixed cement liquid diluted on the other surface of the concrete mortar;

상기한 2차 코팅단계에서 코팅 작업을 행한 후 제2오토로더(17)가 승강하면서 이송판(3)을 2차 양생실(19)로 이송시켜 2차 코팅된 코팅액을 양생시켜 주는 2차 양생단계(S160)와;After performing the coating operation in the secondary coating step described above, the second autoloader 17 moves up and down to transfer the transfer plate 3 to the secondary curing chamber 19 to cure the secondary coated coating liquid. (S160);

상기한 2차 양생단계에서 양생 작업을 행한 후 제2언로더(21)가 승강하면서 이송판(3)을 레일(1)로 이송시켜 주고, 각 블록들이 서로 분리되게 금형틀(5)을 해체하는 금형틀 해체단계(S170)를 포함한다.After performing the curing operation in the second curing step, the second unloader 21 moves up and down to transfer the transfer plate 3 to the rails 1, and the mold frame 5 is dismantled so that each block is separated from each other. Mold mold dismantling step (S170) to include.

상기한 몰탈 투입단계 이전에는 자갈, 모래와 시멘트를 컨베이어로 각각 이송하여 혼합기(23)로 공급한 후 이 혼합기(23)로 공급되는 물과 배합하여 콘크리트 몰탈을 형성하여 이 콘크리트 몰탈을 스크류 호퍼(9)에 일정량씩 공급하는 몰탈 공급단계(S200)가 제공된다.Prior to the mortar feeding step, gravel, sand and cement are respectively transferred to a conveyor and supplied to the mixer 23, and then mixed with water supplied to the mixer 23 to form concrete mortar to form the concrete mortar by using a screw hopper ( 9) there is provided a mortar supply step (S200) for supplying a predetermined amount.

상기한 1차 자연석 설치단계(S100)와 몰탈 투입단계(S110) 사이에는 상기한 블록의 제조가 완료될 때 금형틀(5)로부터 블록을 용이하게 분리할 수 있도록 금형틀(5)의 내측 일면부 테두리쪽으로 고무가대를 설치하는 고무가대 설치단계(S180)가 제공된다.Between the first natural stone installation step (S100) and the mortar input step (S110) of the inner surface of the mold frame 5 so that the block can be easily separated from the mold frame 5 when the manufacturing of the block is completed Rubber frame installation step (S180) for installing the rubber frame toward the side border is provided.

상기한 몰탈 투입단계(S110)와 1차 양생단계(S140)의 사이에는 제1이송대차 및 퓨셔(25)가 이송판(3)을 이 레일(1)과 다른 레일(1)쪽으로 제1연결레일(27)을 따라 이송시켜 준 후 다른 레일(1)로 밀어주기 위한 제1이송 및 퓨셔단계(S300)가 제공된다.Between the mortar input step (S110) and the first curing step (S140), the first transfer cart and the pusher 25 is connected to the transfer plate 3 to the rail (1) and the other rail (1) first After moving along the rails 27, a first feed and pusher step S300 for pushing the other rails 1 is provided.

상기한 1차 양생단계(S140)와 2차 코팅단계(S150)의 사이에는 제1언로더(15)가 이송판(3)을 레일(1)로 이송시켜 줄 때 금형틀(5)에서 순모래를 용이하게 제거할 수 있도록 디바이스(29)가 금형틀(5)을 잡은 상태에서 임의의 각도로 회전시켜 주는 금형틀 회전단계(S400)가 제공된다.Between the first curing step (S140) and the second coating step (S150), when the first unloader 15 transfers the transfer plate (3) to the rail (1) in order from the mold frame (5) Mold mold rotation step (S400) is provided for rotating the device at an arbitrary angle while holding the mold 5, so that the sand can be easily removed.

상기한 금형틀 회전단계(S400)와 2차 코팅단계(S150)의 사이에는 금형틀(5)이 회전된 상태에서 금형틀(5)에서 고무가대를 제거하는 고무가대 제거단계(S190)가 제공된다.Rubber frame removal step (S190) between the mold frame rotation step (S400) and the secondary coating step (S150) to remove the rubber frame from the mold frame 5 in the state that the mold frame 5 is rotated (S190) Is provided.

상기한 제1 양생단계(S140)와 2차 양생단계(S160)의 사이에는 제2이송대차 및 퓨셔(31)가 이송판(3)을 다른 레일(1)에서 일 레일(1)쪽으로 제2연결레일(33)을따라 이송시켜 준 후 일 레일(1)로 밀어주기 위한 제2이송 및 퓨셔단계(S500)가 제공된다.Between the first curing step (S140) and the second curing step (S160), the second transport cart and the pusher (31) move the transport plate (3) from the other rail (1) toward the one rail (1). A second feed and pusher step S500 is provided for pushing along the connection rail 33 and then pushing it to the one rail 1.

상기한 제1양생실(13)과 제2양생실(19)은 다수의 금형틀(5)을 보다 효과적으로 양생할 수 있도록 다단으로 형성되는 것이 바람직하다.The first curing chamber 13 and the second curing chamber 19 is preferably formed in multiple stages to more effectively cure a plurality of mold frame (5).

이에 따라 작업장에는 일 레일(1)과 다른 레일(1)을 일정한 간격을 두고 설치함과 아울러 일 레일(1)과 다른 레일(1)의 양끝단부에는 이들을 서로 연결하기 위한 제1,제2연결레일(27)(33)이 설치된다.Accordingly, one rail (1) and the other rail (1) is installed at regular intervals in the workplace, and the first and second connections for connecting them to both ends of the one rail (1) and the other rail (1). Rails 27 and 33 are installed.

이러한 상태에서 일 레일(1)상에 설치된 이송판(3)에 금형틀(5)을 설치하고, 상기한 금형틀(5)의 일면부에 일차적으로 자연석(7)들을 배치한 후 이 금형틀(5)의 내측 테두리쪽으로 고무가대를 설치하고, 금형틀(5)의 내부에 순모래로 자연석(7)의 일부 높이까지 채워준다.In this state, the mold frame 5 is installed on the conveying plate 3 provided on the rail 1, and the natural molds 7 are primarily disposed on one surface of the mold frame 5, and then the mold frame is placed. The rubber frame is installed toward the inner edge of (5), and the inside of the mold frame 5 is filled up to a part of the height of the natural stone 7 with pure sand.

이때, 상기한 스크류 호퍼(9)에는 혼합기(23)에서 형성된 콘크리트 몰탈이 일정량 공급되어 있으며, 작업자가 이송판(3)을 레일(1)을 따라 스크류 호퍼(9)의 하부로 이송시켜 준 후 스크류 호퍼(9)를 금형틀(5)의 직하부로 이송하고 금형틀(5)의 내부에 콘크리트 몰탈을 임의량씩 투입한다.At this time, the predetermined amount of concrete mortar formed in the mixer 23 is supplied to the screw hopper 9, and after the worker transfers the transfer plate 3 along the rail 1 to the lower portion of the screw hopper 9. The screw hopper 9 is transferred to the lower part of the mold 5, and concrete mortar is introduced into the mold 5 at random amounts.

그리고 상기한 콘크리트 몰탈의 일면을 평탄하게 고르기 작업을 한 후 제1이송대차 및 퓨셔(25)를 작동하여 이송판(3)이 제1연결레일(27)을 따라 이송한 후 일 레일(1)에서 다른 레일(1)로 자동 이송되게 하고, 상기한 콘크리트 몰탈의 일단면에 2차적으로 자연석(7)을 끼워주고, 콘크리트 몰탈의 일단면에 코팅액으로 1차 코팅을 행한다.After the flat surface of the concrete mortar is evenly operated, the first transport cart and the pusher 25 are operated to transfer the conveying plate 3 along the first connecting rails 27, and then to the rail 1. In order to be automatically transferred to the other rail (1), the natural stone (7) is secondarily fitted to one end surface of the concrete mortar, and the first coating is performed on the one surface of the concrete mortar with a coating liquid.

또한, 상기한 이송판(3)과 금형틀(5)을 제1오토로더(11)를 이용하여 제1양생실(13)의 내부에 넣어주고, 제1양생실(13)을 작동시켜 콘크리트 몰탈과 1차 코팅액을 임의의 시간(10시간 내지 30시간) 동안 양생시켜 준 후 이송판(3)과 금형틀(5)이 제1언로더(15)에 의하여 레일(1)로 이송된다.In addition, the transfer plate 3 and the mold frame 5 are put into the first curing chamber 13 using the first autoloader 11, and the first curing chamber 13 is operated to mortar concrete. After curing the primary coating solution for a predetermined time (10 hours to 30 hours), the transfer plate 3 and the mold 5 are transferred to the rail 1 by the first unloader 15.

이와 아울러 상기한 레일(1)상에 이송판(3)이 이송되면, 디바이스(29)가 금형틀(5)을 잡아준 상태에서 예컨대, 180도 회전시켜 주는데, 이때 상기한 금형틀(5)의 내부에 에어노즐을 이용하여 공기를 임의의 압력 이상으로 분사하여 순모래를 제거함과 아울러 고무가대를 제거한다.In addition, when the transfer plate 3 is transferred on the rail 1, the device 29 rotates, for example, 180 degrees while the mold 29 holds the mold 5. Air nozzle is used inside to inject air above a certain pressure to remove pure sand and remove the rubber mount.

그리고 상기한 디바이스(29)가 금형틀(5)을 계속하여 예컨대, 180도 더 회전시켜 주면 금형틀(5)의 다른 일면부가 상부로 위치하게 되는데, 이때 상기한 제2이송대차 및 퓨셔(31)를 이용하여 이송판(3)이 제2연결레일(33)을 따라 이송한 후 다른 레일(1)에서 일 레일(1)로 이송되게 한다.If the device 29 continues to rotate the mold 5, for example, another 180 degrees, the other side of the mold 5 is positioned upward, and the second feed cart and the pusher 31 are positioned at the top. The transfer plate 3 is transported along the second connecting rail 33 and then transferred from the other rail 1 to the one rail 1 by using a).

또한, 상기한 이송판(3)이 일 레일(1)로 이송되면, 상기한 콘크리트 몰탈의 다른 일면부에 코팅액을 2차적으로 코팅하고, 상기한 이송판(3)과 금형틀(5)을 제2오토로더(17)를 이용하여 제2양생실(19)의 내부에 넣어주고, 제2양생실(19)을 작동시켜 콘크리트 몰탈과 2차 코팅액을 임의의 시간(10시간 내지 30시간) 동안 양생시켜 준 후 이송판(3)과 금형틀(5)이 제2언로더(21)에 의하여 레일로 이송된다.In addition, when the transfer plate 3 is transferred to one rail 1, the coating liquid is secondarily coated on the other surface of the concrete mortar, and the transfer plate 3 and the mold frame 5 are The second autoloader 17 is used to put the inside of the second curing chamber 19, and the second curing chamber 19 is operated to provide the concrete mortar and the secondary coating liquid for an arbitrary time (10 to 30 hours). After curing, the transfer plate 3 and the mold frame 5 are transferred to the rail by the second unloader 21.

그리고 상기한 이송판(3)이 레일(1)로 이송되면, 금형틀(5)을 해체하여 각 블록들을 분리하면 블록들의 제조가 완료되며, 이렇게 제조된 블록들은 제품 출하를 위하여 파렛트에 임의의 크기별로 일정량씩 포장하게 되는 것이다.When the transfer plate 3 is transferred to the rail 1, the mold mold 5 is dismantled to separate the blocks, and thus the manufacture of the blocks is completed. Each size will be packed in a certain amount.

이와 같이 본 발명은 설비를 이용하여 블록 제조를 위한 각 공정들을 자동화할 수 있도록 하여 생산성을 향상할 수 있으며, 블록들을 한 공정에서 다른 공정에 자동으로 이송할 수 있도록 하여 작업자에게 전혀 부담을 주지 않으면서 이동작업이 간편하게 되고, 블록들의 양생을 양생실에서 이루어질 수 있도록 하여 양생 시간을 최소한으로 단축함과 아울러 작업자가 편리하게 양생할 수 있는 효과가 있는 것이다.As such, the present invention can improve productivity by automating each process for manufacturing a block using a facility, and can automatically transfer blocks from one process to another process without burdening the worker at all. It is easy to move the work, and the curing of the blocks can be made in the curing room to reduce the curing time to a minimum, as well as the effect that the worker can conveniently cure.

Claims (6)

레일을 따라 이동 가능하게 설치된 이송판에 금형틀을 설치하고, 상기한 금형틀의 일면부에 일차적으로 자연석을 배치한 후 순모래로 자연석의 일부 높이까지 채워주는 1차 자연석 설치단계와;A first natural stone installation step of installing a mold frame on a transfer plate installed to be movable along the rail, and firstly placing a natural stone on one side of the mold frame and filling up to a certain height of the natural stone with pure sand; 상기한 금형틀의 내부에 순모래가 채워진 후 때 금형틀의 상부로 스크류 호퍼가 위치하도록 금형틀을 이동시킨 상태에서 콘크리트 몰탈을 금형틀 내부의 순모래에 투입하는 몰탈 투입단계와;A mortar input step of injecting concrete mortar into the pure sand in the mold mold while the mold mold is moved so that the screw hopper is positioned above the mold mold after the pure sand is filled in the mold mold; 상기한 콘크리트 몰탈이 양생되기 전에 콘크리트 몰탈의 일단면을 평탄하게 고르기 작업을 한 후 자연석이 콘크리트 몰탈의 일단면으로 돌출하는 상태로 되게 2차적으로 자연석을 설치하는 2차 자연석 설치단계와;A second natural stone installation step of installing natural stones secondarily such that natural stone protrudes to one end surface of the concrete mortar after the work of leveling one end surface of the concrete mortar before the concrete mortar is cured; 상기한 콘크리트 몰탈의 일면부에 코팅액으로 1차 코팅하는 1차 코팅단계와;A first coating step of first coating the surface of the concrete mortar with a coating liquid; 상기한 1차 코팅단계에서 코팅 작업을 행한 후 제1오토로더가 승강하면서 이송판을 1차 양생실로 이송시켜 1차 코팅된 코팅액과 콘크리트 몰탈을 양생시켜 주는 1차 양생단계와;A first curing step of curing the first coated coating liquid and concrete mortar by transferring the transfer plate to the primary curing chamber while the first autoloader is elevated after the coating operation in the primary coating step; 상기한 1차 양생단계에서 1차 양생 작업을 행한 후 제1언로더가 승강하면서 이송판을 자동으로 레일로 이송시켜 주고 금형틀에서 순모래를 제거하고, 콘크리트 몰탈의 다른 일면부에 코팅액으로 2차 코팅하는 2차 코팅단계와;After the first curing operation in the first curing step described above, the first unloader automatically moves the transfer plate to the rails while lifting and removing the net sand from the mold, and the coating solution on the other side of the concrete mortar. Secondary coating step of secondary coating; 상기한 2차 코팅단계에서 코팅 작업을 행한 후 제2오토로더가 승강하면서 이송판을 2차 양생실로 이송시켜 2차 코팅된 코팅액을 양생시켜 주는 2차 양생단계와;A secondary curing step of curing the coated coating liquid by transferring the transfer plate to the secondary curing chamber while the second autoloader is lifted up after performing the coating operation in the secondary coating step; 상기한 2차 양생단계에서 양생 작업을 행한 후 제2언로더가 승강하면서 이송판을 레일로 이송시켜 주고, 각 블록들이 서로 분리되게 금형틀을 해체하는 금형틀 해체단계를 포함하는 설비를 이용하여 블록을 제조하는 방법.After performing the curing operation in the secondary curing step, the second unloader moves the transfer plate to the rail ascending, using a facility including a mold dismantling step of dismantling the mold to separate the blocks from each other How to make a block. 제1항에 있어서, 상기한 몰탈 투입단계 이전에 자갈, 모래와 시멘트를 컨베이어로 각각 이송하여 혼합기로 공급한 후 이 혼합기로 공급되는 물과 배합하여 콘크리트 몰탈을 형성하여 이 콘크리트 몰탈을 스크류 호퍼에 일정량씩 자동으로 공급하는 몰탈 공급단계가 제공되는 설비를 이용하여 블록을 제조하는 방법.The method according to claim 1, wherein before the mortar input step, gravel, sand and cement are respectively transferred to a conveyor and fed to a mixer, and then mixed with water supplied to the mixer to form concrete mortar, thereby providing the concrete mortar to the screw hopper. Method of manufacturing a block using a facility provided with a mortar supply step of automatically supplying a predetermined amount. 제1항에 있어서, 상기한 1차 자연석 설치단계와 몰탈 투입단계 사이에는 상기한 블록의 제조가 완료될 때 금형틀로부터 블록을 용이하게 분리할 수 있도록 금형틀의 내측 일면부 테두리쪽으로 고무가대를 설치하는 고무가대 설치단계가 제공되는 설비를 이용하여 블록을 제조하는 방법.According to claim 1, Between the primary natural stone installation step and the mortar input step, the rubber frame toward the inner surface of one side of the mold frame so that the block can be easily separated from the mold frame when the manufacturing of the block is completed Method of manufacturing a block using the equipment provided with rubber rack installation step to install the. 제1항에 있어서, 상기한 1차 양생단계와 2차 코팅단계의 사이에는 제1언로더가 이송판을 자동으로 레일로 이송시켜 줄 때 금형틀에서 디바이스가 금형틀을 잡은 상태에서 임의의 각도로 회전시켜 주는 금형틀 회전단계가 제공되는 설비를 이용하여 블록을 제조하는 방법.The method according to claim 1, wherein the angle between the first curing step and the second coating step in the state in which the device holds the mold in the mold when the first unloader automatically transfers the transfer plate to the rail. Method of manufacturing a block by using a device provided with a mold rotating step to rotate the furnace. 제1항에 있어서, 상기한 몰탈 투입단계와 1차 양생단계의 사이에는 제1이송대차 및 퓨셔가 이송판을 이 레일과 다른 레일쪽으로 제1연결레일을 따라 이송시켜 준 후 다른 레일로 밀어주기 위한 제1이송 및 퓨셔단계가 제공되는 설비를 이용하여 블록을 제조하는 방법.The method according to claim 1, wherein the first transport cart and the pusher transfer the transport plate along the first connecting rail to the other rail and the other rail between the mortar input step and the first curing step. A method for manufacturing a block using a facility provided with a first feed and a pusher step for. 제1항에 있어서, 상기한 제1 양생단계와 2차 양생단계의 사이에는 제2이송대차 및 퓨셔가 이송판을 다른 레일에서 일 레일쪽으로 제2연결레일을 따라 이송시켜 준 후 일 레일로 밀어주기 위한 제2이송 및 퓨셔단계가 제공되는 설비를 이용하여 블록을 제조하는 방법.According to claim 1, Between the first curing step and the second curing step, the second conveying bogie and the pusher transfers the conveying plate along the second connecting rail from one rail to one rail and then pushes to one rail A method of manufacturing a block using equipment provided with a second feed and pusher step for giving.
KR1020010087027A 2001-12-28 2001-12-28 Block manufacturing process by using euipments KR20030056743A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020010087027A KR20030056743A (en) 2001-12-28 2001-12-28 Block manufacturing process by using euipments

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020010087027A KR20030056743A (en) 2001-12-28 2001-12-28 Block manufacturing process by using euipments

Publications (1)

Publication Number Publication Date
KR20030056743A true KR20030056743A (en) 2003-07-04

Family

ID=32214912

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020010087027A KR20030056743A (en) 2001-12-28 2001-12-28 Block manufacturing process by using euipments

Country Status (1)

Country Link
KR (1) KR20030056743A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109571734A (en) * 2019-01-17 2019-04-05 长江南京航道工程局 A kind of concrete interlocking block steam curing apparatus

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3982874A (en) * 1975-03-27 1976-09-28 Nobbe Paul J Production line apparatus for producing concrete floors
US4008034A (en) * 1975-10-01 1977-02-15 Kane Joseph F Brick making machine having stripping means
KR940004753A (en) * 1992-08-27 1994-03-15 김광호 Structure of Interlayer Insulation Layer of Multi-layer Wiring Structure and Formation Method thereof
KR0178708B1 (en) * 1998-10-07 1999-04-01 조용현 Manufacturing method of concrete block by using native rock

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3982874A (en) * 1975-03-27 1976-09-28 Nobbe Paul J Production line apparatus for producing concrete floors
US4008034A (en) * 1975-10-01 1977-02-15 Kane Joseph F Brick making machine having stripping means
KR940004753A (en) * 1992-08-27 1994-03-15 김광호 Structure of Interlayer Insulation Layer of Multi-layer Wiring Structure and Formation Method thereof
KR0178708B1 (en) * 1998-10-07 1999-04-01 조용현 Manufacturing method of concrete block by using native rock

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109571734A (en) * 2019-01-17 2019-04-05 长江南京航道工程局 A kind of concrete interlocking block steam curing apparatus

Similar Documents

Publication Publication Date Title
CN112045821B (en) Prefabricated part production equipment and production process
CN104723449A (en) Automatic production line of building industrialization concrete precast members
KR102070960B1 (en) Raw Material Distribution Facility and Manufacturing Method of Artificial Slab Using It
KR20180036061A (en) Manufacturing apparatus for concrete product by the dry method and manufacturing method for concrete product using the same
WO2006009487A1 (en) Processing line for producing multilayer building blocks provided with a decorative face
AU2021104701A4 (en) Apparatus and method for continuously casting a member from a settable material
RU2403149C2 (en) Method of producing thin flat articles and thin flat article produced by said method (versions)
JPH09327816A (en) Apparatus for producing concrete molded building panel
JP3086197B2 (en) Equipment for making decorative pavement blocks
KR20030056743A (en) Block manufacturing process by using euipments
KR101358785B1 (en) Brick's manufacturing system using continuity circulation
CN211517933U (en) Concrete test block manufacturing system
CN103896521A (en) Preparation method of anti-seepage water delivery tank of channel
CN108688186B (en) Method and system for preparing artificial stone slab
CN101214699B (en) Device for feeding and distributing material in producing ceramic tile
US3255866A (en) Kiln for making blocks
CN209408840U (en) A kind of foamed ceramic plate glazing device
KR20200088011A (en) Manufacturing Method and Apparatus of Concrete Tile for Interior and Exterior Material of Building
CN215241550U (en) Pouring device of light porcelain sand pottery for building materials
CN216359655U (en) Equipment that ftractures is prevented in sunning of solid brick embryo of concrete
CN218289285U (en) Concrete material receiving trolley
JPS593250B2 (en) Molding equipment for molded products for buildings
CN218659724U (en) Wet breaking system with pre-curing function for concrete plates or building blocks
RU2089388C1 (en) Installation for continuous manufacture of construction articles
KR102049492B1 (en) brick manufacturing method

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application