KR20030054582A - Pc cable insertion device of lng tank - Google Patents
Pc cable insertion device of lng tank Download PDFInfo
- Publication number
- KR20030054582A KR20030054582A KR1020010084759A KR20010084759A KR20030054582A KR 20030054582 A KR20030054582 A KR 20030054582A KR 1020010084759 A KR1020010084759 A KR 1020010084759A KR 20010084759 A KR20010084759 A KR 20010084759A KR 20030054582 A KR20030054582 A KR 20030054582A
- Authority
- KR
- South Korea
- Prior art keywords
- winch
- sheath
- tank
- strand
- guide
- Prior art date
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G13/00—Roller-ways
- B65G13/11—Roller frames
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G39/00—Rollers, e.g. drive rollers, or arrangements thereof incorporated in roller-ways or other types of mechanical conveyors
- B65G39/10—Arrangements of rollers
- B65G39/12—Arrangements of rollers mounted on framework
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66D—CAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
- B66D1/00—Rope, cable, or chain winding mechanisms; Capstans
- B66D1/28—Other constructional details
- B66D1/36—Guiding, or otherwise ensuring winding in an orderly manner, of ropes, cables, or chains
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
Description
본 발명은 엘엔지 탱크의 강연선 이송장치에 관한 것이다.The present invention relates to a strand feeder of an LENG tank.
일반적으로 알려진 바와 같이 엘엔지(Liquefied Natural Gas: LNG(액화천연가스))는 액화공정 전에 탈황·탈습되기 때문에 그 성질이 천연가스보다 뛰어나고 더욱이 청결하며 황분이 없고 해가 없으며 고칼로리라는 점 등의 장점이 많다. 천연가스의 주성분인 메탄은 1atm하에서 -161.5℃ 이하로 온도를 내리면 액체가 되는데, 액화된 메탄의 부피는 표준상태인 기체상태의 메탄 부피의 1/600 정도이고 비중은 0.42로 원유비중의 약 1/2 이 된다. 이 때문에 천연가스를 액화함으로써 수송·저장이 수월해지는 이점이 있다. 천연가스를 액화하는 목적은 첫째, 가스 산지와 멀리 떨어진 지역으로 수송하기 위해 액화하여 선적하기 위한 것이다. 둘째 목적은 도시가스 등의 계절적 수요 변동을 조절하기 위해 천연가스를 액화해서 저장하기 위한 것이다.As is commonly known, LENGFIED Natural Gas (LNG) is desulfurized and dehumidified before liquefaction, so its properties are superior to natural gas, more clean, free from sulfur, harmless and high-calorie. There are many. Methane, the main component of natural gas, becomes liquid when the temperature is lowered below -161.5 ℃ under 1 atm. The volume of liquefied methane is about 1/600 of the volume of gaseous methane in the standard state, and the specific gravity is 0.42, which is about 1 of the crude oil. / 2 For this reason, there is an advantage that transportation and storage are easy by liquefying natural gas. The purpose of liquefying natural gas is firstly to liquefy and ship it for transportation to areas far from the gas fields. The second purpose is to liquefy and store natural gas to control seasonal demand fluctuations such as city gas.
상술한 목적에 의해서 액화된 액화천연가스는 저장탱크에 저장되는 것으로서, 상기 저장탱크는 지상탱크와 토양동결식 지하탱크 및 PS콘크리트 지하탱크 등이 있으며, 상기 지상탱크는 내각과 외각이 이중으로 되어 있는데 내각은 액화천연가스에 접하여 액중량에 견디고 외각은 내각과의 사이에 열차폐층을 만들어 비활성기체나 단열재를 유지하거나 2차적 방호벽의 구실을 하고 있고, 상기 토양동결식 지하탱크는 지면을 동결시키면서 큰 원통형 구멍을 파고 그 속에 액화천연가스를 저장한 다음 그위에 지붕을 덮는 탱크이며, 상기 PS콘크리트 지하탱크는 PS콘크리트로 탱크 측벽을 구축하는 것이다.The liquefied natural gas liquefied by the above-mentioned purposes is stored in a storage tank, and the storage tank includes a ground tank, a soil freezing underground tank, and a PS concrete underground tank. The cabinet is in contact with the liquefied natural gas to withstand the weight of the liquid and the outer shell creates a thermal barrier between the cabinet and maintains inert gas or insulation, or serves as a secondary barrier, while the soil freezing underground tank freezes the ground. It is a tank that digs a large cylindrical hole and stores liquefied natural gas therein and then covers the roof thereon, and the PS concrete underground tank is to build the sidewall of the tank with PS concrete.
상기와 같은 저장탱크 중 2차적 방호벽이 형성되는 엘엔지 탱크는 지상에 형성되는 것으로서, 상기 엘엔지 탱크의 방호벽은 구조물 내부에 가로방향 및 세로방향으로 강연선이 등간격으로 삽입됨으로써 구조물의 보강이 완벽하게 이루어지는 것이다.The LNG tank in which the secondary barrier is formed among the storage tanks is formed on the ground, and the barrier of the LENG tank is inserted into the structure in the horizontal and vertical directions at equal intervals so that the reinforcement of the structure is completed. will be.
종래의 엘엔지 탱크 강연선 이송은 도 1 및 도 2에 도시한 바와 같이, 엘엔지 탱크(1)의 주위 지면에 레일(2)을 설치함과 아울러 상기 레일(2)상에 턴테이블(3)과 윈치(w(4)) 등을 설치하고, 상기 엘엔지 탱크(1)의 유(U)자형 시스(유도홀)(5)에 공압력으로 안내끈(미도시)을 삽입하며, 상기 시스(5)에 삽입되어 배출된 안내끈의 단부에 윈치 와이어(6)를 연결함과 아울러 안내끈을 역방향으로 당김으로써 시스(5)에 윈치 와이어(6)가 삽입되어 배출되게 하고, 상기 윈치 와이어(6)의 단부에 강연선(7)을 연결함과 아울러 윈치 와이어(6)를 역방향으로 당김으로써 시스(5)에 강연선(7)이 삽입되어 배출되게 하며, 상기 시스(5)의 입출구에 존재하는 강연선(7)의 길이를 조정하여 절단하고, 상기 시스(5)에 위치된 강연선(7)을 인장하여 세팅완료하는 것이다.As shown in FIGS. 1 and 2, a conventional LG engine tank strand transfer is provided with a turntable 3 and a winch on the rail 2 as well as a rail 2 installed on a circumferential surface of the LG engine tank 1. w (4)) and the like, and a guide string (not shown) is inserted into the sheath (U) -shaped sheath (guide hole) 5 of the LNG tank 1 at pneumatic pressure, and the sheath 5 is inserted into the sheath 5. The winch wire 6 is inserted into and discharged from the sheath 5 by connecting the winch wire 6 to the end of the guide string inserted and discharged, and pulling the guide string in the reverse direction. By connecting the strand 7 to the end and pulling the winch wire 6 in the reverse direction, the strand 7 is inserted into and discharged from the sheath 5, and the strand 7 existing at the inlet and outlet of the sheath 5. The length of the cut) is adjusted to cut the wire, and the stranded wire 7 positioned on the sheath 5 is pulled to complete the setting.
상기 레일(2)은 엘엔지 탱크(1)의 원주방향으로 설치되는 것으로서, 상기 레일(2)을 따라 턴테이블(3)과 윈치(4)가 위치이동하면서 시스(5)로 강연선(7)을 공급함과 아울러 시스(5)로 공급되는 강연선(7)을 적정 인장력으로 당기게 되는 것이다.The rail 2 is installed in the circumferential direction of the LENG tank 1, and supplies the strand 7 to the sheath 5 while the turntable 3 and the winch 4 move along the rail 2. In addition, the stranded wire (7) supplied to the sheath (5) is to be pulled with an appropriate tensile force.
그리고 상기 안내끈 삽입은 컴프레서 등을 이용하는 것으로서, 시스(5)의 입구에 안내끈의 안내봉을 삽입시킴과 아울러 상기 안내봉 후측에서 컴프레서의 공기를 투입시켜 시스(5) 출구로 안내봉이 위치되도록 하는 것이다.The guide string is inserted into the guide rod by inserting the guide rod of the guide string into the inlet of the sheath 5 and injecting air from the compressor from the rear of the guide rod so that the guide rod is located at the outlet of the sheath 5. It is.
또한 상기 안내끈을 당김으로써 윈치 와이어(6)의 시스(5) 관통이 이루어지는 것이고, 상기 강연선(7)은 지지 롤러(8)에 지지된 윈치 와이어(6)가 윈치(4)의 당김에 의해서 위치이동하면서 강연선(7)을 당기는 것이다. 상기 강연선(7)은 다수개의 개별 강연선(7)이 결합되는 것으로서, 상기 강연선(7)은 보통 15-25개의 강연선(7)이 결합되는 것이며, 턴테이블(3)에서 권회된 강연선(7)이 윈치(4)의 인장력에 의해서 가이드 롤러(9) 및 시스(5)의 입구로 유입되는 것이고, 상기 시스(5) 내부로 유입된 강연선(7)은 윈치(4)의 인장력에 의해서 시스(5) 하측으로 이동함과 아울러 하측의 만곡지점을 경유하여 시스(5) 출구인 상측으로 이동하는 것이며, 상기 시스(5)의 출구로 배출됨과 동시에 윈치(4)의 작동을 정지시키는 것이고, 상기 윈치(4)의 작동을 정지시킴과 동시에 시스(5)의 입출구에 존재하는 강연선(7)의 길이를 조정하여 매듭진 후 절단하는 것이다.In addition, the sheath 5 is penetrated by the winch wire 6 by pulling the guide string, and the strand 7 is formed by the winch wire 6 supported by the support roller 8 being pulled by the winch 4. Pull the strand 7 while moving the position. The strand 7 is a combination of a plurality of individual strands (7), the strand 7 is usually 15-25 strands (7) are combined, the strands (7) wound on the turntable (3) It is introduced into the inlet of the guide roller 9 and the sheath 5 by the tension of the winch 4, the strand 7 introduced into the sheath 5 is the sheath (5) by the tension of the winch (4). ) Is moved to the lower side and through the lower curved point to move to the upper side of the sheath (5) exit, the outlet of the sheath (5) and at the same time stop the operation of the winch (4), the winch It stops the operation of (4) and at the same time adjusts the length of the strand 7 which exists in the inlet and outlet of the sheath 5, and cuts after knotting.
상기 강연선(7)의 길이 조정 및 절단 작업이 완료된 후 엘엔지 탱크(1)의 구조물이 적절하게 보강되도록 하기 위하여 시스(5)에 끼워진 강연선(7)을 적절하게 인장시키는 것이고, 상기 엘엔지 탱크(1)의 원주방향으로 형성된 각각의 시스(5)에 동일한 방법으로 강연선(7)을 삽입시켜 구조물 보강이 완료되도록 하는 것이며, 상기 엘엔지 탱크(1)의 상하방향으로 강연선(7)을 삽입 시공함과 아울러 엘엔지 탱크(1)의 측방향으로 강연선(7)을 시공하여 완전한 구조물 보강이 이루어지도록 하는 것이다.After the length adjustment and cutting operation of the strand (7) is completed is to properly tension the strand (7) fitted to the sheath (5) in order to properly reinforce the structure of the L tank (1), Inserting the strand 7 in the same way to each of the sheath (5) formed in the circumferential direction to complete the reinforcement of the structure, and inserting the strand (7) in the vertical direction of the LG tank (1) In addition, the construction of the strand 7 in the lateral direction of the tank L (1) to complete the reinforcement of the structure.
그러나 상기한 엘엔지 탱크의 강연선 이송장치는, 시스(5)에 강연선(7)을 삽입시켜 시공작업할 때 엘엔지 탱크(1) 주위에 레일(2)을 설치함과 아울러 상기 레일(2)상에 턴테이블(3)과 윈치(4) 등을 설치하여야 하기 때문에 작업 시간이 과다하게 소요됨과 아울러 작업 공간 확보가 요구되는 문제점이 있었다.However, the above-described strand feeder of the LNG tank is provided with a rail 2 around the LENG tank 1 when the stranded wire 7 is inserted into the sheath 5 and installed on the rail 2. Since the turntable 3 and the winch 4, etc. have to be installed, there is a problem that excessive work time is required and work space is required.
본 발명은 상기한 문제점을 시정하여, 시스에 강연선을 삽입시켜 시공작업할 때 작업 효율이 향상되도록 한 엘엔지 탱크의 강연선 이송장치를 제공하는 것을 목적으로 한다.It is an object of the present invention to correct the above problems, and to provide a stranded wire transfer device of the LENG tank to improve the working efficiency when inserting the stranded wire into the sheath.
상기한 목적을 달성하기 위하여, 본 발명은 엘엔지 탱크의 상부에 위치되어 이동 가능하게 형성되는 이동바퀴와, 상기 이동바퀴의 상측 프레임에 설치되어 윈치 와이어를 권회하는 권회롤러와, 상기 권회롤러를 정역방향으로 회전시키는 작동부로 구성된 윈치 본체; 상기 윈치 본체의 윈치 와이어 당김으로 인해 공급되는 강연선이 시스로 삽입되도록 안내하는 복수개의 롤러와, 상기 롤러가 지지된 프레임의 하측에 회전가능하게 형성되는 이동바퀴로 구성된 가이드 롤러 본체로 이루어진 것이다.In order to achieve the above object, the present invention is a moving wheel which is located on the upper portion of the L-engine tank and is formed to be movable, a winding roller which is installed on the upper frame of the moving wheel to wind the winch wire, and the winding roller A winch body composed of an operating part rotating in a direction; It consists of a guide roller body consisting of a plurality of rollers for guiding the strand provided by the winch wire pull of the winch body to be inserted into the sheath, and a moving wheel rotatably formed on the lower side of the frame on which the roller is supported.
도 1은 종래의 것의 시공 상태도,1 is a construction state diagram of a conventional one,
도 2는 종래의 것의 시공 상태 평면도,2 is a plan view of a construction state of a conventional one;
도 3은 본 발명의 실시예의 시공 상태 평면도,3 is a construction state plan view of an embodiment of the present invention,
도 4는 본 발명의 실시예의 사용 상태도,4 is a use state diagram of an embodiment of the present invention;
도 5는 본 발명의 실시예의 윈치를 나타낸 정면도,5 is a front view showing a winch of the embodiment of the present invention;
도 6은 본 발명의 실시예의 가이드 롤러를 나타낸 정면도이다.6 is a front view showing the guide roller of the embodiment of the present invention.
<도면의 주요부분에 사용된 부호의 설명><Description of the code used in the main part of the drawing>
1: 엘엔지 탱크5: 시스(유도홀)1: L & G Tank 5: Sheath (Induction Hall)
6: 윈치 와이어7: 강연선6: winch wire 7: stranded wire
10: 윈치 본체11: 이동바퀴10: winch main body 11: moving wheel
15: 지지볼트20: 가이드 롤러 본체15: Support Bolt 20: Guide Roller Body
22: 이동바퀴24: 지지볼트22: wheel 24: support bolt
본 발명은 도 3 내지 도 6에 도시한 바와 같이, 엘엔지 탱크(1)의 상부에 위치되어 전후방향 및 좌우방향으로 이동 가능하게 형성되는 이동바퀴(11)와, 상기 이동바퀴(11)가 고정된 상측 프레임(13)의 일측에 설치되어 윈치 와이어(6)를 적정 길이 권회하는 권회롤러(12)와, 상기 권회롤러(12)를 정역방향으로 회전시킬 수 있도록 권회롤러(12)와 연결 설치되는 작동부(14)로 구성된 윈치 본체(10); 상기 윈치 본체(10)의 전방인 시스(유도홀)(5) 입구에 위치됨과 아울러 상기 윈치 본체(10)의 윈치 와이어(6) 당김으로 인해 공급되는 강연선(7)이 시스(5) 입구로삽입되도록 안내하는 복수개의 롤러(21)와, 상기 롤러(21)가 다수개 배치되어 지지된 프레임(23)의 하측에 회전가능하게 형성되는 이동바퀴(22)로 구성된 가이드 롤러 본체(20)로 이루어진 것이다.3 to 6, the moving wheel 11 is located on the upper portion of the L-engine tank 1 and is formed to be movable in the front-back direction and the left-right direction and the moving wheel 11 is fixed. It is installed on one side of the upper frame 13, the winding roller 12 for winding the winch wire 6 to an appropriate length, and is connected to the winding roller 12 so as to rotate the winding roller 12 in the forward and reverse directions. A winch body 10 composed of an actuating portion 14; The strand 7 which is located at the inlet of the sheath (induction hole) 5 in front of the winch body 10 and is pulled by the winch wire 6 of the winch body 10 is connected to the inlet of the sheath 5. A guide roller body 20 composed of a plurality of rollers 21 for guiding insertion and a moving wheel 22 rotatably formed under the frame 23 in which a plurality of rollers 21 are disposed and supported. It is done.
상기 엘엔지 탱크(1)의 상부는 시스(5)의 입구와 출구가 등간격으로 형성되는 것으로서, 상기 시스(5)의 입구와 출구에 대향되도록 가이드 롤러 본체(20)와 윈치 본체(10) 등을 설치하는 것이고, 상기 윈치 본체(10)의 윈치 와이어(6)와 연결되는 강연선(7)은 턴테이블(미도시)에 적정 길이로 권회된 상태로 위치되어 엘엔지 탱크(1) 상부에 설치되는 것이다.The upper portion of the LENG tank 1 is formed at equal intervals of the inlet and the outlet of the sheath 5, the guide roller body 20 and the winch body 10 and the like so as to face the inlet and outlet of the sheath (5). The stranded wire 7 connected to the winch wire 6 of the winch body 10 is positioned in a state wound in a proper length on a turntable (not shown) and is installed on the upper portion of the LG tank 1. .
상기한 시스(5)의 입구와 출구에 대향되는 가이드 롤러 본체(20)와 윈치 본체(10)는 프레임(13,23) 하측에 각각 이동바퀴(11,22)를 형성함으로써 위치 이동이 신속하고 정확하게 이루어지는 것으로서, 상기 가이드 롤러 본체(20)와 윈치 본체(10)의 프레임(13,23)에 각각 지지볼트(15,24)를 형성하는 것이며, 상기 지지볼트(15,24)는 이동바퀴(11,22)의 측부에 설치됨으로써 위치 이동이 선택적으로 정지되도록 하는 것이다. 상기 지지볼트(15,24)는 조임시에 엘엔지 탱크(1)의 상부면에 지지됨으로써 가이드 롤러 본체(20) 및 윈치 본체(10)의 이동을 저지시키는 것이고, 상기 지지볼트(15,24)는 풀림시에 엘엔지 탱크(1)의 상부면과 접촉되지 않으므로써 가이드 롤러 본체(20) 및 윈치 본체(10)의 이동을 자유롭게 하는 것이다.The guide roller main body 20 and the winch main body 10 opposed to the inlet and the outlet of the sheath 5 are provided with moving wheels 11 and 22 respectively below the frames 13 and 23, so that the positional movement is quick. As it is made accurately, the support bolts 15 and 24 are formed on the frames 13 and 23 of the guide roller body 20 and the winch body 10, respectively, and the support bolts 15 and 24 are movable wheels ( 11 and 22, the position movement is to be selectively stopped. The support bolts 15 and 24 are supported by the upper surface of the L & G tank 1 when tightened to prevent the movement of the guide roller body 20 and the winch body 10, and the support bolts 15 and 24. Is to freely move the guide roller body 20 and the winch body 10 by not contacting the upper surface of the L engine tank 1 at the time of release.
상기와 같이 시스(5)의 입출구에 가이드 롤러 본체(20) 및 윈치 본체(10)를 배치시킴으로써 시스(5)로 삽입되는 강연선(7)이 엘엔지 탱크(1) 상부로 위치됨에 따라 시스(5)로의 투입이 신속하게 이루어지는 것이고, 상기 시스(5)의 만곡지점에도달된 강연선(7)은 시스(5)의 출구 근방에 위치된 윈치 본체(10)의 인장력에 의해서 신속하게 이동되는 것이다.By arranging the guide roller body 20 and the winch body 10 at the inlet and outlet of the sheath 5 as described above, the strand 7 inserted into the sheath 5 is positioned above the L & G tank 1 and thus the sheath 5. ) Is rapidly made, and the strand 7 reaching the curved point of the sheath 5 is quickly moved by the tension of the winch body 10 located near the outlet of the sheath 5.
이상과 같은 본 발명은 시스에 강연선을 삽입시켜 시공작업할 때 작업 효율이 향상되도록 하는 것으로서, 엘엔지 탱크(1) 상부에 가이드 롤러 본체(20)와 윈치 본체(10) 및 턴테이블을 위치시킴과 아울러 시스(5)의 입구와 대향되도록 가이드 롤러 본체(20)를 위치 이동시키는 것이고, 상기 시스(5)의 출구와 대향되도록 윈치 본체(10)를 위치 이동시키는 것이다. 상기한 위치 이동은 이동바퀴(11,22)를 통해 이루어지는 것이며, 상기 시스(5)의 입출구에 가이드 롤러 본체(20)와 윈치 본체(10)를 배치시킨 후 지지볼트(15,24)를 조임하여 엘엔지 탱크(1)와의 일체화가 이루어지도록 하는 것이다.The present invention as described above is to insert a stranded wire into the sheath to improve the work efficiency when the construction work, while positioning the guide roller body 20 and the winch body 10 and the turntable on the upper L tank (1) The guide roller body 20 is positioned to face the inlet of the sheath 5, and the winch body 10 is positioned to face the outlet of the sheath 5. The movement of the position is performed through the moving wheels 11 and 22, and the support rollers 15 and 24 are tightened after the guide roller body 20 and the winch body 10 are disposed at the inlet and outlet of the sheath 5. It is to be integrated with the LENG tank (1).
상기 상태후 안내끈(미도시)의 안내봉(미도시)을 삽입시킨 후 안내봉 후측에서 컴프레서로 공기를 투입시켜 시스(5) 출구로 안내봉이 위치되도록 하는 것이고, 상기 시스(5) 출구로 유도된 안내끈과 윈치 와이어(6)를 결합한 후 시스(5) 입구에서 안내끈을 당기는 것이다. 상기 안내끈을 당기어 시스(5) 입구로 윈치 와이어(6)가 배출되면 윈치 와이어(6)와 턴테이블의 강연선(7)을 결합시키는 것이고, 상기 강연선(7)이 결합된 윈치 와이어(6)를 시스(5) 출구에서 당기는 것이다. 상기 강연선(7)의 당김은 윈치 본체(10)에 의해서 이루어지는 것이고, 상기 윈치 본체(10)가 엘엔지 탱크(1) 상부인 시스(5) 출구에 존재하므로서 최소 인장력으로 강연선(7) 인장이 가능한 것이다.After inserting the guide rods (not shown) of the guide string (not shown) after the state, the air is introduced into the compressor from the rear of the guide rods so that the guide rods are positioned at the outlet of the sheath 5, and the outlet of the sheath 5 is discharged. After guiding the guide rope and the winch wire (6) is to pull the guide string at the inlet of the sheath (5). When the winch wire 6 is discharged to the inlet of the sheath 5 by pulling the guide strap, the winch wire 6 is coupled to the strand 7 of the turntable, and the winch wire 6 to which the strand 7 is coupled. Is pulled from the sheath 5 outlet. Pulling of the strand (7) is made by the winch body 10, the winch body 10 is present at the outlet of the sheath (5), the upper part of the L-engine tank (1), so that the strand (7) can be tensioned with a minimum tensile force will be.
상기 턴테이블에서 권회된 강연선(7)이 윈치 본체(10)의 인장력에 의해서 가이드 롤러 본체(20) 및 시스(5)의 입구로 유입되는 것이고, 상기 시스(5) 내부로 유입된 강연선(7)은 윈치 본체(10)의 인장력에 의해서 시스(5) 하측으로 이동함과 아울러 하측의 만곡지점을 경유하여 시스(5) 출구인 상측으로 이동하는 것이며, 상기 시스(5)의 출구로 배출됨과 동시에 윈치 본체(10)의 작동을 정지시키는 것이고, 상기 윈치 본체(10)의 작동을 정지시킴과 동시에 시스(5)의 입출구에 존재하는 강연선(7)의 길이를 조정하여 매듭진 후 절단하는 것이다.The stranded wire 7 wound on the turntable is introduced into the inlet of the guide roller body 20 and the sheath 5 by the tension of the winch body 10, and the stranded wire 7 introduced into the sheath 5. Is moved to the lower side of the sheath (5) by the tension force of the winch body 10, and to the upper side of the sheath (5) exit via the lower curved point, and discharged to the outlet of the sheath (5) The operation of the winch main body 10 is stopped, and the operation of the winch main body 10 is stopped and at the same time, the length of the stranded wire 7 existing at the inlet and the exit of the sheath 5 is adjusted and knotted and cut.
상기 강연선(7)의 길이 조정 및 절단 작업이 완료된 후 엘엔지 탱크(1)의 구조물이 적절하게 보강되도록 하기 위하여 시스(5)에 끼워진 강연선(7)을 적절하게 인장시키는 것이다. 상기 강연선(7)의 길이 조정 및 절단 작업 전후에 가이드 롤러 본체(20)와 윈치 본체(10)를 다른 지점으로 위치 이동시키는 것으로서, 상기 가이드 롤러 본체(20)와 윈치 본체(10)의 지지볼트(15,24)를 풀림시켜 엘엔지 탱크(1)의 상부면과 분리되도록 한 후 가이드 롤러 본체(20)와 윈치 본체(10)를 적정 위치로 이동시켜서 재차 작업이 진행되도록 하는 것이다.After the length adjustment and cutting operation of the strand 7 is completed, the strand 7 inserted in the sheath 5 is properly tensioned in order to properly reinforce the structure of the LNG tank 1. Support bolts of the guide roller main body 20 and the winch main body 10 by moving the guide roller main body 20 and the winch main body 10 to different points before and after the length adjustment and cutting operation of the strand wire 7. After releasing the (15, 24) to be separated from the upper surface of the L engine tank 1 is to move the guide roller main body 20 and the winch main body 10 to an appropriate position to allow the work to proceed again.
이상과 같이 본 발명은 가이드 롤러 본체와 윈치 본체에 이동바퀴를 형성함과 아울러 프레임 하측에 지지볼트를 형성함으로써 종래와 같이 레일을 이용하지 않고서도 간편하게 가이드 롤러 본체와 윈치 본체 등을 이동시킬 수 있는 것으로서, 시스에 강연선을 삽입시켜 시공작업할 때 작업 시간 최소화 및 작업 공정 단순화로 인한 작업 효율이 향상되는 것이다.As described above, the present invention forms a movable wheel on the guide roller body and the winch main body, and forms a support bolt on the lower side of the frame, so that the guide roller main body and the winch main body can be easily moved without using a rail as in the prior art. In this case, the work efficiency is improved by inserting the stranded wire into the sheath, thereby minimizing the work time and simplifying the work process.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2001-0084759A KR100430028B1 (en) | 2001-12-26 | 2001-12-26 | Pc cable insertion device of lng tank |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2001-0084759A KR100430028B1 (en) | 2001-12-26 | 2001-12-26 | Pc cable insertion device of lng tank |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2020010040095U Division KR200268217Y1 (en) | 2001-12-26 | 2001-12-26 | Pc cable insertion device of lng tank |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20030054582A true KR20030054582A (en) | 2003-07-02 |
KR100430028B1 KR100430028B1 (en) | 2004-05-10 |
Family
ID=32213211
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR10-2001-0084759A KR100430028B1 (en) | 2001-12-26 | 2001-12-26 | Pc cable insertion device of lng tank |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100430028B1 (en) |
-
2001
- 2001-12-26 KR KR10-2001-0084759A patent/KR100430028B1/en not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
KR100430028B1 (en) | 2004-05-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
NO177834B (en) | Method and apparatus for laying a flexible pipeline | |
NO344446B1 (en) | System and method for injecting and recovering pipe wires into or out of coiled pipes | |
NO323675B1 (en) | Composite reinforcement and method of manufacture, transport and arrangement of the same | |
US20130161441A1 (en) | Drum unit for a well intervention string | |
US2770950A (en) | Submarine cable installation | |
US4659253A (en) | Deep water cable laying method using buoyancy materials | |
CN107787405A (en) | Erect the method for tying formula wind turbine tower | |
FI79598B (en) | FOERFARANDE OCH ANORDNING FOER STYRNING AV EN BETONGMATNINGSSLANG VID GJUTBULTNING I BERG. | |
KR200268217Y1 (en) | Pc cable insertion device of lng tank | |
KR20200033626A (en) | Mooring apparatus for floating offshore wind power equipment | |
NO172519B (en) | KABELHAANDTERINGSAPPARAT | |
KR100430028B1 (en) | Pc cable insertion device of lng tank | |
JP2652602B2 (en) | Wiring and piping material suspension members and wiring and piping equipment | |
KR100478386B1 (en) | Pc cable insertion operation method of lng tank | |
KR200268218Y1 (en) | Pc cable supply device of lng tank | |
US3713275A (en) | Pipeline bundle laying operations | |
KR102234797B1 (en) | Self propelled reel type hydraulic puller | |
CN111509623B (en) | Conveying device for cable pipe-penetrating laying and cable pipe-penetrating laying method | |
JP4241204B2 (en) | Method and apparatus for compacting concrete at the top of the tunnel | |
US4151888A (en) | Submergible pile driver with extension tube to accommodate tensioned cable string loops | |
US7775175B2 (en) | Mooring pull-in system | |
EP1738447B1 (en) | Method and device for pulling cables and similar through flexible tubes | |
CN112332315A (en) | Cable paying-off device and construction process thereof | |
JP2004289997A (en) | Cable/pipe housing material, laying apparatus, and stringing method | |
KR20240082496A (en) | Strand wire bundle construction device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20110315 Year of fee payment: 8 |
|
LAPS | Lapse due to unpaid annual fee |