KR200270240Y1 - Drain ditch used as stairs constructed on a slope of roadside - Google Patents

Drain ditch used as stairs constructed on a slope of roadside Download PDF

Info

Publication number
KR200270240Y1
KR200270240Y1 KR2020010041031U KR20010041031U KR200270240Y1 KR 200270240 Y1 KR200270240 Y1 KR 200270240Y1 KR 2020010041031 U KR2020010041031 U KR 2020010041031U KR 20010041031 U KR20010041031 U KR 20010041031U KR 200270240 Y1 KR200270240 Y1 KR 200270240Y1
Authority
KR
South Korea
Prior art keywords
drainage
slope
shaped
staircase
roadside
Prior art date
Application number
KR2020010041031U
Other languages
Korean (ko)
Inventor
고명재
Original Assignee
주식회사 만영엔지니어링
(주)아름드리엔지니어링
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 만영엔지니어링, (주)아름드리엔지니어링 filed Critical 주식회사 만영엔지니어링
Priority to KR2020010041031U priority Critical patent/KR200270240Y1/en
Application granted granted Critical
Publication of KR200270240Y1 publication Critical patent/KR200270240Y1/en

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

본 고안은 도로변 비탈면에 설치되는 배수로에 관한 것으로, 더욱 상세하게는 배수로, 비탈면, 교량 등 도로 시설물의 점검 및 보수 시 이용할 수 있는 계단이 설치된 계단 겸용 배수로에 관한 것이다.The present invention relates to a drainage path installed on the slope side of the road, and more particularly, to a staircase combined drainage with a stairway that can be used for the inspection and repair of road facilities such as drainage, slopes, bridges.

본 고안은 우수가 배수될 수 있도록 배수로 홈과 측벽으로 구성되어 도로변의 경사진 비탈면에 설치된 배수로에 있어서, 상기 배수로 홈을 따라 사람이 밟고 오르내릴 수 있도록 콘크리트 몰탈로 만들어진 계단을 설치하여 유수의 흐름을 저하시키고, 상기 배수로 측벽에는 철재 난간을 설치하여 상기 계단을 이용하여 작업자들이 편리하게 오르내릴 수 있도록 한 것을 특징으로 한다.The present invention consists of a drainage groove and a side wall so that rainwater can be drained, and in a drainage path installed on an inclined slope of a roadside, a flow of running water is installed by installing a stair made of concrete mortar so that a person can step on and descend along the drainage groove. Lowering the installation, it is characterized in that by installing the iron railings on the side wall side of the drain so that workers can move up and down conveniently.

Description

도로변 비탈면에 설치되는 계단 겸용 배수로{Drain ditch used as stairs constructed on a slope of roadside}Drain ditch used as stairs constructed on a slope of roadside}

본 고안은 도로변 비탈면에 설치되는 배수로에 관한 것으로, 더욱 상세하게는 배수로, 비탈면, 교량 등 각종 시설물의 점검 및 보수 시 작업자들이 편리하게 이용할 수 있는 계단이 설치된 계단 겸용 배수로에 관한 것이다.The present invention relates to a drainage path installed on the slope side of the road, and more particularly, to a staircase combined drainage path is provided with a staircase that can be conveniently used by workers when checking and repairing various facilities such as drainage, slopes, bridges.

일반적으로 도로공사나 택지 개발공사와 같은 토목공사에서는 그 경계부에 비탈면이 발생되게 되고 그 비탈면에는 우천시 우수가 잘 배수될 수 있도록 소정의 배수로가 형성된다. 도1은 도로변 절개지의 비탈면에 설치된 배수로를 대략적으로 도시한 것이다. 도시된 바와 같이, 절개지의 비탈면에는 상부 경계를 따라 설치된 상부 배수로(3)와 도로변을 따라 설치된 하부 배수로(5) 및 상부 배수로(3)와 하부 배수로(5)를 연통시키는 다수의 수직 배수로(7)로 이루어진다. 그런데 종래 기술에 따른 절개지 비탈면에서는 상기 수직 배수로(7)와 별도로 철재 계단(10)을 더 설치하여 절개지나 배수로 또는 각종 시설물을 점검하거나 보수할 때 작업자들이 이용할 수 있도록 하고 있다.In general, in civil engineering works such as road construction and land development, slopes are generated at the boundary, and predetermined slopes are formed on the slopes so that rainwater can be well drained during rainy weather. 1 schematically shows a drainage path installed on the slope of a roadside incision. As shown, the slope of the incision site has a plurality of vertical drainage passages 7 connecting the upper drainage passage 3 along the upper boundary, the lower drainage passage 5 installed along the roadside, and the upper drainage passage 3 and the lower drainage passage 5. ) By the way, in the inclined slope slope according to the prior art by installing a steel staircase (10) separately from the vertical drainage (7) to allow workers to use when checking or repairing the incision or drainage or various facilities.

즉, 도2에 도시된 바와 같이, 도로, 철도, 택지조성지 등(이하 '도로 등'이라 한다)에서는 절개나 성토에 의해 상부 또는 하부로 비탈면이 형성되고 이러한 비탈면의 상부나 하부에 설치된 배수로나 시설물 예를 들어, 교량이나 터널, 또는 담장이나 방음벽 등과 같은 시설물을 점검 및 보수하기 위해서는 작업자가 비탈면을 오르거나 내려가야 하는데, 일반적으로 도로변 등의 비탈면은 경사가 급하기 때문에 오르내리는 것이 용이하지 않을 뿐만 아니라 잘못하여 미끄러지면 큰 부상을 당할 염려가 있다.That is, as shown in Figure 2, in roads, railroads, residential land composition sites (hereinafter referred to as 'roads,' etc.) slopes are formed in the upper or lower portion by incision or fill, and the drainage channel installed on the upper or lower portion of the slope In order to inspect and repair facilities such as bridges, tunnels, fences, and soundproof walls, for example, workers must climb or descend slopes. In general, slopes such as roadsides are not easy to climb up and down. In addition, accidental slipping can cause serious injuries.

이에 따라 종래에는 비달면에 수직하게 철재 계단(10)을 더 설치하여 작업자가 편리하고 안전하게 작업할 수 있게 하였으나, 이러한 철재 계단은 파이프나 패널을 조립하여 임시적으로 제작한 것이므로 시간이 흐름에 따라 파이프와 패널이 녹슬게 되고 비탈면의 지반이 단단하지 못하므로 쉽게 무너져서 실질적으로 사용할 수 없게 되는 문제가 있었다. 또한 철재 파이프 및 패널을 사용하기 때문에 설치비용이 비교적 많이 소요되고 주기적으로 교체하거나 보수하여야 하므로 유지관리비가 많이 소요되는 문제가 있었다. 이에 따라 작업자가 안전하고 편리하게 이용할 수 있으면서도 설치비용이 저렴하고 유지관리비가 적게 드는 작업자 통행용 계단이 요구되고 있다.Accordingly, in the related art, the steel staircase 10 is installed perpendicularly to the vial surface so that the worker can work conveniently and safely. However, since the steel staircase is manufactured temporarily by assembling pipes or panels, the pipes may be manufactured over time. And panels are rusted and the slope of the slope of the ground is not so hard that there was a problem that can not be used practically. In addition, because the use of steel pipes and panels, the installation cost is relatively high, and the maintenance cost is high because it needs to be replaced or repaired periodically. Accordingly, there is a need for a worker traffic stairs that can be safely and conveniently used by workers, but which has low installation costs and low maintenance costs.

본 고안은 이러한 종래의 문제점을 해결하기 위해 이루어진 것으로서, 본 고안의 주된 목적은 도로변 등에 형성된 비탈면에 작업자가 안전하고 편리하게 이용할 수 있는 작업자 전용 계단을 설치하되 이러한 작업자 전용 계단을 비탈면에 설치되는 배수로에 일체로 설치함으로써 설치비용과 유지관리비용을 획기적으로 절감하는 것이다.The present invention is made to solve such a conventional problem, the main purpose of the present invention is to install a worker-only stairs that can be safely and conveniently used by the worker on the slope formed on the roadside, such a drain that is installed on the slope By installing it in a single installation, the installation cost and maintenance cost are greatly reduced.

도 1은 종래 기술에 따라 계단과 배수로가 각각 분리되어 설치된 도로변 비탈면을 보여주기 위한 개념도이고,1 is a conceptual diagram illustrating a roadside slope provided separately from the stairs and the drainage channels according to the prior art,

도 2는 종래 기술에 따라 설치된 배수로를 보여주기 위한 단면도이며,2 is a cross-sectional view showing a drainage path installed in accordance with the prior art,

도 3은 본 고안에 따라 설치된 계단 겸용 배수로를 보여주기 위한 사시도이고,3 is a perspective view for showing a combined use of drainage staircase installed in accordance with the present invention,

도 4는 본 고안의 다른 실시예에 따라 배수로에 설치되는 계단 부재를 보여주는 분해 사시도이며,Figure 4 is an exploded perspective view showing a stair member installed in the drainage in accordance with another embodiment of the present invention,

도 5는 본 고안의 다른 실시예에 따라 계단과 난간을 설치하는 것을 보여주는 부분 단면도이고,5 is a partial cross-sectional view showing the installation of stairs and railings according to another embodiment of the present invention,

도 6은 본 고안의 다른 실시예에 따라 설치된 계단 겸용 배수로를 보여주는 사시도이다.Figure 6 is a perspective view showing a combined drainage stairs installed in accordance with another embodiment of the present invention.

*** 도면의 주요 부분에 대한 부호의 설명 ****** Explanation of symbols for the main parts of the drawing ***

3 : 상부 배수로 5 : 하부 배수로3: upper drainage passage 5: lower drainage passage

7 : 수직 배수로 10 : 작업자용 계단7 vertical drainage 10 worker stairs

13 : 배수로 홈 15 : 배수로 측벽13: drainage groove 15: drainage sidewall

33 : 콘크리트 몰탈 계단 35 : 철재 난간33: concrete mortar staircase 35: steel railing

60 : 조립식 난간 및 계단 63 : T형 난간 기둥60: prefabricated handrails and stairs 63: T-shaped handrail pillar

65 : 봉 형상 계단 66 : L형 앵커65: rod-shaped stairs 66: L-shaped anchor

67 : 연결관67 connector

상술한 목적을 달성하기 위해 본 고안은 우수가 배수될 수 있도록 배수로 홈과 측벽으로 이루어져 도로변의 경사진 비탈면에 설치된 배수로에 있어서, 상기 배수로 홈을 따라 사람이 밟고 오르내릴 수 있도록 콘크리트 몰탈로 만들어진 계단을 설치하여 유수의 흐름을 저하시키고, 상기 배수로 측벽에는 철재 난간을 설치하여 상기 계단을 이용하여 작업자가 편리하게 오르내릴 수 있도록 하는 것을 특징으로 한다.In order to achieve the above object, the present invention consists of a drainage groove and a side wall so that rainwater can be drained, and in a drainage path installed on an inclined slope of a roadside, a step made of concrete mortar so that a person can step on and descend along the drainage groove It is characterized in that to reduce the flow of running water, and to install the iron railings on the side wall of the drainage so that the operator can easily move up and down using the stairs.

또한 우수가 배수될 수 있도록 배수로 홈과 측벽으로 이루어져 도로변의 경사진 비탈면에 설치된 배수로에 있어서, 상기 배수로 홈을 따라 사람이 밟고 오르내릴 수 있도록 설치된 봉 형상의 계단과; 상기 배수로 측벽의 상부에 설치된 T형상의 난간 기둥과; 상기 봉 형상의 계단과 상기 T형상의 난간 기둥을 고정시킬 수 있도록 상기 배수로 측벽에 매립되어 있는 L형상의 앵커로 구성된 것을 특징으로 한다.In addition, the drainage is formed on the inclined slope of the road side consisting of a drainage groove and the side wall so that the rainwater can be drained, rod-shaped staircase installed so that people can step on and down along the drainage groove; A T-shaped railing column provided on an upper portion of the side wall of the drain passage; And an L-shaped anchor embedded in the side wall of the drainage passage so as to fix the rod-shaped staircase and the T-shaped railing pillar.

이때 상기 L형 앵커는 나사산이 형성된 양 단부가 배수로 측벽의 상면과 내측면으로 노출되도록 설치되고 그 상면에는 T형 난간 기둥이 결합되고 내측면에는 봉 형상의 계단이 결합되며 상기 T형상의 난간 기둥 사이에는 결합봉이 나사 체결된다.At this time, the L-shaped anchor is installed so that both ends of the threaded thread is exposed to the upper surface and the inner surface of the side wall of the drainage passage, the T-shaped railing column is coupled to the upper surface and the rod-shaped staircase is coupled to the inner surface of the T-shaped railing pillar The coupling rod is screwed in between.

이하 첨부도면을 참조하여 본 고안에 따른 도로변 비탈면에 설치되는 계단 겸용 배수로에 대해 설명한다. 먼저 도3은 비탈면에 설치된 배수로에 계단과 난간을 설치한 본 고안에 따른 계단 겸용 배수로의 일예를 보여주는 사시도이다. 즉, 도시된 바와 같이, 상기 계단 겸용 배수로(30)는 콘크리트 몰탈과 거푸집을 이용하여 배수로 홈(13)과 배수로 측벽(15)을 형성할 때, 배수로 홈(13) 내에 다수의 계단(33)을 형성하고, 배수로의 측벽(15)에 난간(35)을 설치한다. 이와 같이, 본 고안에 따른 계단 겸용 배수로(30)는 배수로 홈(13) 내에 계단(33)이 형성되므로 유수가 낙차하여 흐르기 때문에 유속이 감소되어 배수로의 침식이 방지되고 배수로 측벽(15)에 난간(35)이 설치되어 있으므로 작업자가 잡고 편리하게 통행할 수 있게 된다.Hereinafter, with reference to the accompanying drawings will be described for the staircase combined drainage is installed on the roadside slope. First, Figure 3 is a perspective view showing an example of a staircase combined drainage system according to the present invention in which the staircase and railings are installed in the drainage channel installed on the slope. That is, as shown, when the staircase combined drainage path 30 forms the drainage groove 13 and the drainage sidewall 15 using concrete mortar and formwork, the plurality of stairs 33 in the drainage groove 13 are formed. The handrail 35 is formed in the side wall 15 of the drainage path. As such, the staircase combined drainage path 30 according to the present invention has a staircase 33 formed in the drainage groove 13 so that the flowing water flows freely, so that the flow rate is reduced to prevent erosion of the drainage path and the railings on the drainage side wall 15. Since 35 is installed, the worker can grab and pass conveniently.

한편 도4 내지 도6은 고안에 따른 도로변 비탈면에 설치되는 계단 겸용 배수로의 다른 실시예를 보여주기 위한 것으로서, 도4는 본 고안에 따른 조립식 난간 및 계단의 분해사시도이고, 도5는 상기 조립식 난간과 계단이 설치된 배수로를 보여주는 부분 단면도이며, 도6은 본 고안에 따른 계단 겸용 배수로가 설치된 비탈면을 보여주는 사시도이다.On the other hand Figure 4 to Figure 6 is to show another embodiment of the combined use of the stairway drainage is installed on the slope side of the road according to the invention, Figure 4 is an exploded perspective view of the prefabricated handrail and stairs according to the present invention, Figure 5 is the prefabricated handrail And is a partial cross-sectional view showing a drainage passage is installed, Figure 6 is a perspective view showing a slope with a staircase combined drainage in accordance with the present invention.

먼저, 도6에서 보는 바와 같이, 본 고안에 따른 계단 겸용 배수로(60)는 배수로(10)의 일 측벽(15)에 조립식 난간과 계단을 설치하는 것이 바람직하나 배수로(10)의 크기나 작업자의 사용 정도 등에 따라 상기 조립식 난간과 계단을 양측 측벽에 동시에 설치할 수 있으며, 상기 계단은 사각이나 타원 등 다양한 형상을 가질 수 있다.First, as shown in Figure 6, the staircase combined drainage path 60 according to the present invention, it is preferable to install a prefabricated handrail and stairs on one side wall 15 of the drainage path 10, but the size of the drainage path 10 or Depending on the degree of use and the like, the prefabricated handrails and stairs can be installed on both side walls at the same time, the stairs can have a variety of shapes, such as square or ellipse.

상기 조립식 난간과 계단은 도4에 도시된 바와 같이, T형 난간 기둥(63)과, 상기 T형 난간 기둥(63)의 하부에 나사 결합되는 L형 앵커(66)와, 상기 L형앵커(66)의 타측에 나사 결합되는 봉 형상의 계단(65)과 상기 T형 난간 기둥(63) 사이에 설치되는 연결관(67)으로 구성된다.The prefabricated handrail and the staircase, as shown in Figure 4, the T-shaped railing column 63, the L-shaped anchor 66 screwed to the lower portion of the T-shaped railing column 63, and the L-type anchor ( 66 is composed of a connecting tube 67 installed between the rod-shaped staircase 65 screwed to the other side and the T-shaped handrail pillar 63.

즉, 도5에 도시된 바와 같이, L형 앵커(66)는 배수로 측벽(15)에 매몰되어 철근과 콘크리트에 의해 고정되며 양 단부만이 상부와 내측벽의 외부로 노출되게 된다. 이때 상기 L형 앵커(66)의 양 단부에는 소정의 나사산이 형성되어 있다. 따라서 상기 T형 난간 기둥(63)은 L형 앵커(66)의 상부에서 수직하게 나사 결합되고 상기 봉 형상의 계단(65)은 상기 L형 앵커(66)에 수평으로 나사 결합된다. 이때 상기 봉 형상의 계단(65)은 일 측에 상기 L형 앵커(66)의 나사산과 나사 결합되는 결합홈(64)이 형성되고 다른 측은 합성수지, 아스팔트 등과 같은 밀봉물질로 충진되어 있다. 또한 상기 봉 형상의 계단(65)의 표면에는 합성수지 등으로 코팅되어 녹슬지 않도록 처리한다.That is, as shown in Figure 5, the L-shaped anchor 66 is buried in the drainage side wall 15 is fixed by the reinforcement and concrete, and only both ends are exposed to the outside of the upper and inner walls. At this time, both ends of the L-shaped anchor 66, a predetermined thread is formed. Accordingly, the T-shaped railing column 63 is vertically screwed on the upper portion of the L-shaped anchor 66 and the rod-shaped staircase 65 is screwed horizontally to the L-shaped anchor 66. At this time, the rod-shaped staircase 65 is formed with a coupling groove 64 screwed to the thread of the L-shaped anchor 66 on one side and the other side is filled with a sealing material such as synthetic resin, asphalt. In addition, the surface of the rod-shaped staircase 65 is coated with a synthetic resin or the like to prevent rust.

그리고 상기 T형 난간 기둥(63) 사이에 결합되는 연결관(67)은 일측에 암나사가 형성되어 상기 T형 난간 기둥의 수평봉(62)에 형성된 나사산에 나사 결합된다. 반면 다른 측에는 나사산이 형성되지 않아 상기 연결관(67)이 슬라이드 가능하게 결합된다. 따라서 이웃하는 T형 난간 기둥의 수평봉(67)을 나사산이 형성되지 않은 쪽으로 삽입한 후 나사산이 형성된 쪽으로 이동하면서 T형 난간 기둥의 수평봉(67)에 나사 결합함으로써 연결관(67)을 간단하게 연결하여 설치할 수 있게 된다.And the connecting pipe 67 is coupled between the T-shaped handrail pillar 63 is a female thread formed on one side is screwed to the thread formed on the horizontal bar 62 of the T-shaped handrail pillar. On the other hand, since the thread is not formed on the other side, the connecting tube 67 is slidably coupled. Therefore, the connecting pipe 67 is simply connected by inserting the horizontal bar 67 of the neighboring T-shaped railing post into the unthreaded side and then screwing the horizontal bar 67 of the T-shaped railing post while moving toward the threaded side. Can be installed.

상술한 바와 같이, 본 고안에 따른 계단 겸용 배수로는 상기 배수로 홈을 따라 다수의 계단이 설치되어 유수의 흐름을 저하시키고, 철재 난간을 설치하여 작업자가 편리하게 오르내릴 수 있도록 할 뿐만 아니라 계단을 콘크리트 몰탈로 만들기 때문에 배수로와 동일한 수명을 유지하므로 주기적으로 교체하거나 보수할 필요가 없어지는 효과가 있다.As described above, the staircase combined drainage channel according to the present invention reduces the flow of running water by installing a plurality of stairs along the drainage groove, and installs a steel railing to allow the worker to climb up and down conveniently, as well as concrete stairs. Because it is made of mortar, it maintains the same life as the drain, so there is no need to replace or repair it periodically.

또한 본 고안에 따른 계단 겸용 배수로는 계단과 배수로를 동시에 설치함으로써 시공비와 재료비를 절감할 수 있으며 외관상으로도 보기 좋게 되는 효과가 있다.In addition, the staircase combined drainage according to the present invention can reduce the construction cost and material cost by installing the staircase and the drainage at the same time, there is an effect that looks good in appearance.

Claims (4)

우수가 배수될 수 있도록 배수로 홈과 측벽으로 이루어져 도로변의 경사진 비탈면에 설치된 배수로에 있어서, 상기 배수로 홈을 따라 사람이 밟고 오르내릴 수 있도록 만들어진 계단을 설치하고, 상기 배수로 측벽에는 철재 난간을 설치하여 상기 계단을 이용하여 작업자들이 편리하게 오르내릴 수 있도록 한 것을 특징으로 하는 도로변 비탈면에 설치되는 계단 겸용 배수로.In the drainage path is composed of the drainage groove and the side wall so that rainwater can be drained, installed in the drainage slope slope of the roadside, the staircase is made to be stepped up and down along the drainage groove, and the iron railings are installed on the sidewall Combination stairway drainage is installed on the slope side of the road, characterized in that the worker can be used to move up and down conveniently. 제1항에 있어서, 상기 계단은 콘크리트 몰탈로 이루어지는 것을 특징으로 하는 도로변 비탈면에 설치되는 계단 겸용 배수로.According to claim 1, wherein the staircase is a staircase combined drainage is installed on the roadside slope, characterized in that made of concrete mortar. 우수가 배수될 수 있도록 배수로 홈과 측벽으로 이루어져 도로변의 경사진 비탈면에 설치된 배수로에 있어서, 상기 배수로 홈을 따라 사람이 밟고 오르내릴 수 있도록 설치된 봉 형상의 계단과; 상기 배수로 측벽의 상부에 설치된 T형 난간 기둥과; 상기 봉 형상의 계단과 상기 T형 난간 기둥을 고정시킬 수 있도록 상기 배수로 측벽에 일체로 매립되어 있는 L형상의 앵커와; 상기 T형 난간 기둥 사이에 설치되는 연결관으로 구성된 것을 특징으로 하는 도로변 비탈면에 설치되는 계단 겸용 배수로.A drainage path comprising a drainage groove and a side wall so that rainwater can be drained, the drainage path being provided on an inclined slope of a roadside, comprising: a rod-shaped staircase installed to allow a person to step up and down along the drainage groove; A T-shaped railing column disposed on an upper side of the drainage sidewall; An L-shaped anchor integrally embedded in the side wall of the drainage passage so as to fix the rod-shaped staircase and the T-shaped railing column; The staircase combined drainage is installed on the slope side of the road, characterized in that consisting of a connecting pipe installed between the T-shaped railing pillar. 제3항에 있어서,The method of claim 3, 상기 L형 앵커는 나사산이 형성된 양 단부가 배수로 측벽의 상면과 내측면으로 노출되도록 설치되며 그 상면에는 T형 난간 기둥이 나사 결합되고 내측면에는 봉 형상의 계단이 나사 결합되며, 상기 T형 난간 기둥 사이에는 결합관이 나사 체결되는 것을 특징으로 하는 도로변 비탈면에 설치되는 계단 겸용 배수로.The L-shaped anchor is installed so that both ends of the threaded thread is exposed to the upper surface and the inner surface of the side wall of the drainage passage, the T-shaped railing pillar is screwed on the upper surface and the rod-shaped staircase is screwed on the inner surface, the T-shaped railing Stairway combined drain is installed on the slope side of the road, characterized in that the coupling pipe is screwed between the pillars.
KR2020010041031U 2001-12-31 2001-12-31 Drain ditch used as stairs constructed on a slope of roadside KR200270240Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020010041031U KR200270240Y1 (en) 2001-12-31 2001-12-31 Drain ditch used as stairs constructed on a slope of roadside

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020010041031U KR200270240Y1 (en) 2001-12-31 2001-12-31 Drain ditch used as stairs constructed on a slope of roadside

Publications (1)

Publication Number Publication Date
KR200270240Y1 true KR200270240Y1 (en) 2002-03-29

Family

ID=73115186

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020010041031U KR200270240Y1 (en) 2001-12-31 2001-12-31 Drain ditch used as stairs constructed on a slope of roadside

Country Status (1)

Country Link
KR (1) KR200270240Y1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403356A (en) * 2018-11-09 2019-03-01 中国电建集团贵阳勘测设计研究院有限公司 Side slope supporting structure
CN115262487A (en) * 2022-06-15 2022-11-01 河南省水利第二工程局 Construction method of water conservancy tunnel connecting section

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403356A (en) * 2018-11-09 2019-03-01 中国电建集团贵阳勘测设计研究院有限公司 Side slope supporting structure
CN109403356B (en) * 2018-11-09 2024-03-19 中国电建集团贵阳勘测设计研究院有限公司 Side slope supporting structure
CN115262487A (en) * 2022-06-15 2022-11-01 河南省水利第二工程局 Construction method of water conservancy tunnel connecting section

Similar Documents

Publication Publication Date Title
KR100998631B1 (en) Sidewalk for bridge
KR102087554B1 (en) Expanded sidewalk embankment easy to install underground obstacle area and method of installing thereof
JP6347088B2 (en) Concrete slab structure and precast concrete slab
KR20150117041A (en) Expandable bridge sidewalk and it's construction method
KR101726725B1 (en) Construction method for a sidewalk enlargement installation
KR101036999B1 (en) Construction method for bridge footway
KR200270240Y1 (en) Drain ditch used as stairs constructed on a slope of roadside
JP2717126B2 (en) Repair method of median strip and protective wall block used for it
KR101179252B1 (en) Pillar cover apparatus for easy adjusting up and down
JP6652755B2 (en) Joint structure and joining method between road deck and PCa wall railing
CN107190658B (en) Steel free frame assembly type railway evacuation rescue platform
KR101037594B1 (en) A block of a wing type
KR200383552Y1 (en) Structure of an assembly prop for a fence
CN210713582U (en) Ultra-long railing structure for corridor
EP3724398B1 (en) Protected functional pavement
KR100508773B1 (en) A Floor of Temporary Bridge for using Seet Pile and It's Constructing Method
KR100540453B1 (en) Drain apparatus for bridge
KR200410085Y1 (en) Prefabricated Concrete Stairs
KR100647210B1 (en) Gutter with boundary stones
CN219287075U (en) Water-proof cable protection groove for passing
KR100350708B1 (en) Handrail of the stairs and method for constructing the same
KR200375145Y1 (en) The Bridge Check Walkway Bracket With Earthquake Resistant
KR101008975B1 (en) A constructed footway
KR100457132B1 (en) Route structures for inspecting the sloping surface of the cut ground using gutter in ridge line
CN110761503B (en) Prefabricated anti-climbing structure for building

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
FPAY Annual fee payment

Payment date: 20090917

Year of fee payment: 8

LAPS Lapse due to unpaid annual fee