KR200267736Y1 - Structures of concrete girder and steel crossbeam in concrete girder bridge - Google Patents

Structures of concrete girder and steel crossbeam in concrete girder bridge Download PDF

Info

Publication number
KR200267736Y1
KR200267736Y1 KR2020010016422U KR20010016422U KR200267736Y1 KR 200267736 Y1 KR200267736 Y1 KR 200267736Y1 KR 2020010016422 U KR2020010016422 U KR 2020010016422U KR 20010016422 U KR20010016422 U KR 20010016422U KR 200267736 Y1 KR200267736 Y1 KR 200267736Y1
Authority
KR
South Korea
Prior art keywords
concrete
girder
steel
girders
cross beam
Prior art date
Application number
KR2020010016422U
Other languages
Korean (ko)
Inventor
박창렬
Original Assignee
주식회사 일승
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 일승 filed Critical 주식회사 일승
Priority to KR2020010016422U priority Critical patent/KR200267736Y1/en
Application granted granted Critical
Publication of KR200267736Y1 publication Critical patent/KR200267736Y1/en

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

본 고안은 교량의 교각위에 설치되는 철근콘크리트거더,프리스트레스 콘크리트 거더 및 프리플렉스 거더 등과 같이 주 거더가 콘크리트 재질인 경우, 교량의 횡방향 강성(剛性)을 증가시키고 하중의 횡방향 분포를 돕기 위하여 인접하는 주 거더간을 연결하기 위해 가로보를 설치하는 바, 이 가로보를 강재로 제작하여 볼트 및 용접 등 간편한 방법으로 콘크리트 주 거더와 강재 가로보를 일체화 하는 것을 특징으로 하는 것으로, 철근 콘크리트 구조의 가로빔을 현장 타설에 의해 주 거더와 연결하는 기존의 공법에 비하여 시공성과 경제성을 월등히 개선한 콘크리트 주 거더와 강재 가로보의 시공법 및 구조에 관한 것이다.The present invention is designed to increase the stiffness of the bridge and to help the lateral distribution of the load when the main girder is made of concrete, such as reinforced concrete girder, prestressed concrete girder and preflex girder installed on the bridge pier. The cross beam is installed to connect the main girder to the bar. The cross beam is made of steel, and the concrete beam girder and the steel cross beam are integrated by a simple method such as bolts and welding. The present invention relates to the construction method and structure of concrete girders and steel cross beams, which have improved construction and economics significantly compared to the existing construction methods connected with main girders by site casting.

Description

콘크리트 거더교에서 콘크리트 주 거더와 강재 가로보의 그 구조{omitted}Structures of Concrete Main Girder and Steel Crossbeams in Concrete Girder Bridges

본 고안은 콘크리트 거더교에 있어서 콘크리트 주 거더와 강재 가로보의 구조에 관한 것으로, 기존의 철근 콘크리트 구조의 가로보보다 교량의 횡방향 강성(剛性)과 시공성을 크게 향상시킨 강재 가로보에 관한 것이다.The present invention relates to the structure of the concrete girder and the steel cross beam in the concrete girder bridge, and to the steel cross beam which greatly improved the lateral stiffness and workability of the bridge than the cross beam of the conventional reinforced concrete structure.

일반적으로 가로보는 교량의 횡방향 강성을 증가시키고 윤하중 재하시 거더에 작용하는 단면력을 인접한 거더로 분배하며 비틀림의 영향에 따른 바닥판 또는 지점부의 유해한 영향을 최소화하기 위하여 설치하는 것으로, 주 거더에 직각방향 또는 교좌장치와 나란한 방향으로 설치하고 있다.In general, the cross beam is installed to increase the lateral stiffness of the bridge, distribute the cross-sectional force acting on the girder during lubrication loads to adjacent girders, and install it to minimize the harmful effects of the bottom plate or the point of the torsion. It is installed in the direction or parallel to the device.

기존의 교량 주 거더로는 강재 상자형 거더(STEEL BOX GIRDER) 및 플레이트 거더(STEEL PLATE GIRDER)와 같은 강재 거더와 철근콘크리트 거더, 프리스트레스 콘크리트 거더 및 프리플렉스 거더와 같은 콘크리트 거더로 대별할 수 있다. 이 중 기존 공법에 있어서 콘크리트 주 거더에 설치되는 가로보는 철근 콘크리트 구조로 주 거더와 연결 설치는 다음과 같은 과정을 거친다.Conventional bridge main girders can be divided into steel girders such as steel box girders and steel plate girders and concrete girders such as reinforced concrete girders, prestressed concrete girders and preflex girders. In the existing construction method, the horizontal beam is installed in the concrete girder, which is a reinforced concrete structure.

단계 1 : 주 거더를 가로보가 설치될 위치에 미리 철근을 약간 노출시킨 상태에서 제작한 뒤,Step 1: After making the main girder with the bar slightly exposed to the place where the cross beam will be installed,

단계 2 : 주 거더를 교각 상부에 거치시킨 후 가로보를 철근 콘크리트 구조로 현장 타설하되 주 거더에 노출시킨 철근을 이용 가로보의 철근 배근하여 거푸집을 설치한 후,Step 2: After mounting the main girders on the top of the piers, place the cross beams in the reinforced concrete structure, but install the formwork by reinforcing the cross beams using rebar exposed to the main girder.

단계 3 : 콘크리트를 타설하고 타설된 콘크리트가 충분히 양생되면 거푸집을제거한다.Step 3: Place the concrete and remove the formwork when the poured concrete is fully cured.

즉, 기 제작된 거더가 교각 상단의 교좌장치에 거치된 후 공중에 매달린 상태에서 시공되므로 시공성, 품질관리에 있어서 많은 어려움이 발생하고 있으며 안전사고에 각별한 주의가 필요하다. 또한 현장에서 타설되므로 상부 슬래브의 시공과 관련한 후속공정의 진행 중 주형의 횡비틀림좌굴(Lateral Torsional Buckling)을 방지하기 위해서는 콘크리트가 소정의 압축강도를 발현할 수 있을 정도의 충분한 양생시간이 필요하고, 또한 가로보의 콘크리트 타설 시 기후의 영향을 받기 쉬운 점 등 작업과정에서 많은 어려움이 발생하고 있을 뿐만 아니라 경제성에도 큰 문제점을 지니고 있는 실정이다.That is, since the pre-made girders are mounted in the suspension device at the top of the piers and are suspended in the air, there are many difficulties in constructability and quality control, and special attention is required for safety accidents. In addition, since it is cast in the field, in order to prevent the lateral torsional buckling of the mold during the subsequent process related to the construction of the upper slab, sufficient curing time is necessary to express the concrete compressive strength. In addition, there are many difficulties in the process of work, such as being susceptible to climate influences when placing concrete beams, and also have great problems in economic efficiency.

이와 같은 기존의 결점을 해소시키기 위한 본 고안의 강재 가로보 역시 가로보에 발생되는 전단력 및 휨모멘트 등 구조적인 측면과 사용성 측면을 종합적으로 감안하여 부재의 크기를 결정한다는 점에 있어서 기존의 철근콘크리트 가로보 구조의 설계 방법과 큰 차이점은 없다 하겠으나, 본 고안은 철근 콘크리트 거더, PS 콘크리트 거더 또는 프리플렉스 거더교에서 현장 타설되는 철근 콘크리트 가로보 구조가 갖는 시공 및 품질관리상의 문제점을 크게 개선할 수 있는 강재 가로보 개발에 목적을 두고 수행한 것으로 엄격한 품질관리와 시공의 용이성 및 시공의 안전성을 확보하여 기존의 공법에서 나타난 문제점을 크게 개선하고자 하였다.The steel cross beams of the present invention to solve the above-mentioned shortcomings also have a conventional reinforced concrete crossbeam structure in that the size of the member is determined in consideration of structural and usability aspects such as shear force and bending moment generated in the crossbeams. Although the design method is not very different from the design method of the present invention, the present invention is to develop a steel crossbeam that can greatly improve the construction and quality control problems of the reinforced concrete crossbeam structure cast in the field in reinforced concrete girder, PS concrete girder or preflex girder bridge. The purpose of this study was to improve strict quality control, ease of construction, and safety of construction.

일반적으로 콘크리트 거더교에 있어서 가로보는 15m이하 간격으로 설치함을 원칙으로 하되, 지간이 20m이하일 경우 지점부 2개소 중간부 1개소 총 3개소, 지간이 20m에서 30m 이하일 경우 지점부 2개소 중간부 2개소 총 4개소, 지간이 30m에서 40m이하일 경우 지점부 2개소 중간부 3개소 총 5개소, 지간이 40m에서 50m이하일 경우 지점부 2개소 중간부 4개소 총 6개소를 설치토록 규정하고 있다. 또한 가로보의 설치 방향은, 프리스트레스 콘크리트 거더교에서는 사각이 45°를 기준하여 45°이상일 경우 주 거더의 직각 방향으로 45°이하일 경우에는 사각과 같은 방향으로 배치하며, 프리플렉스 거더교에서는 사각이 70°를 기준하여 70°이상일 경우 주 거더의 직각방향으로 70°이하일 경우에는 사각과 같은 방향으로 배치하도록 규정하고 있다.In general, in concrete girder bridges, the horizontal cross should be installed at intervals of 15m or less, but if the distance is 20m or less, two points in the middle of one point and a total of three places; if the distance is 20m to 30m or less, two points in the middle of the place It is required to install a total of six locations in four locations and two branches in the middle of 30m to less than 40m, and five locations in three middle areas of the two branches, and four locations in the middle of two branches and two locations of 40m to 50m. In addition, the installation direction of the cross beam is arranged in the same direction as the square when the square is 45 ° or more in the right angle direction of the main girder in the prestressed concrete girder bridge and the angle is 45 ° or more, and the square is 70 ° in the preflex girder bridge. If it is 70 ° or more, it is specified to be arranged in the same direction as the square when it is 70 ° or less in the direction perpendicular to the main girder.

최근에 건설되는 교량은 광폭화, 장지간화 되는 것을 감안할 때 예를 들어 지간 50m 주 거더가 10열인 콘크리트 거더교에 있어서 1지간에 50여개 이상의 가로보가 설치되어야 하고, 특히 주 거더가 사각으로 설치될 경우 기존 공법으로 콘크리트 가로보를 시공하는 데는 여러 가지 문제점을 지니고 있는 실정이다.Considering the wider and longer span of bridges recently constructed, for example, in a concrete girder bridge with 10 rows of 50m main girder, more than 50 crossbeams should be installed at each site, especially when the main girder is installed in a square. Construction of concrete crossbeams with the construction method has a number of problems.

따라서 본 고안은 미리 제작한 강재 가로보를 콘크리트 주 거더와 현장에서 볼트등을 이용하여 간편한 방법으로 조립 완성하게됨으로서 공기, 시공성 및 경제성을 개선하고자 하는데 그 목적이 있다.Therefore, the present invention aims to improve the air, workability and economics by prefabricating the steel crossbeams prepared in a simple manner using concrete girder and bolts in the field.

도1은 기존 공법에서의 콘크리트 주 거더와 철근 콘크리트 가로보의 실시 예를 나타낸 사시도 및 단면도들1 is a perspective view and a cross-sectional view showing an embodiment of a concrete girder and reinforced concrete crossbeam in the existing construction method

도2는 본 고안의 콘크리트 주 거더와 강재 가로보 기본 구성을 나타낸 사시도 및 단면도들Figure 2 is a perspective view and a cross-sectional view showing the basic configuration of the concrete main girders and steel crossbeam of the present invention

도3, 도4 및 도5는 본 고안의 다른 실시 예를 나타낸 단면도들.3, 4 and 5 are cross-sectional views showing another embodiment of the present invention.

<도면의 주요 부분에 대한 부호의 설명><Description of the code | symbol about the principal part of drawing>

1 : 콘크리트 주 거더 2 : 콘크리트 가로보1: concrete girder 2: concrete crossbeam

3 : 교각 4 : 강재 가로보3: pier 4: steel crossbeam

11 : 임베디드 슬리브(EMBEDED SLEEVE)11: Embedded Sleeve (EMBEDED SLEEVE)

12 : 앙카 볼트(ANCHOR BOLT)12: anchor bolt

13 : 타이 볼트용 슬리브(SLEEVE FOR TIE-BOLT)13: SLEEVE FOR TIE-BOLT

14 : 스틸 브라켓트(STEEL BRACKET)14: STEEL BRACKET

15 : 스플라이스 플레이트(SPLICE PLATE)15: splice plate

16 : 볼트16: bolt

17 : 타이 볼트 (TIE-BOLT)17: tie bolt (TIE-BOLT)

이러한 목적을 달성하기 위한 본 고안의 기술적 구성을 살펴보기로 한다.To look at the technical configuration of the present invention to achieve this purpose.

교량의 교각 위에 설치되는 주 거더의 재질이 콘크리트로 된 거더교에 있어서, 인접하는 주 거더끼리 가로보를 이용해서 연결하기 위하여, 강재로 가로보를 제작하고, 콘크리트 주 거더를 제작할 때 강재 가로보를 연결할 수 있도록 슬리브를 내설하여, 주 거더에 강재 가로보를 볼트나 용접으로 간편하게 연결 고정하는 것을 특징으로 하고 있다.In the concrete girder bridge, the main girders installed on the bridge piers are made of concrete, in order to connect adjacent main girders using cross beams, so that the cross beams are made of steel, and the steel cross beams can be connected when making the concrete main girders. The sleeve is installed internally, and the steel cross beam is easily connected and fixed to the main girder by bolts or welding.

본 고안의 실시 예를 첨부한 도면에 따라서 상세히 설명하면 다음과 같다.An embodiment of the present invention will be described in detail with reference to the accompanying drawings.

도1의 (가)는 기존 공법에서의 콘크리트 주 거더와 철근 콘크리트 가로보가 설치된 예를 나타낸 사시도이며, (나)는 A-A면 단면도, (다)는 B-B면 단면도 즉, 가로보가 설치된 부분의 단면도이다. 기존 공법에서는 교각(3)위에 콘크리트 주 거더(1)을 거치한 뒤 철근 콘크리트 가로보(2)가 설치되어야 할 부분에 철근 배근과 거푸집을 설치하고 콘크리트를 현장 타설하게 된다. 이러한 기존 공법은 지상으로부터 높은 곳에서 작업해야 하는데 따르는 작업의 어려움과 안전사고 등의 위험이 따르며 콘크리트 주 거더를 제작할 때 가로보가 설치될 부분에 철근을 뽑아 놓아야 하므로 작업이 번거로울 뿐만 아니라, 콘크리트 주 거더의 모양이형으로 유지하다가 가로보가 설치되는 부분마다형으로 되어 (도1의 5) 콘크리트 주 거더 제작시 작업이 매우 복잡한 실정이다.Figure 1 (a) is a perspective view showing an example of the concrete girders and reinforced concrete cross beams installed in the existing construction method, (b) is a cross-sectional view of the AA plane, (c) is a cross-sectional view of the BB plane cross-section, that is, the cross section is installed. . In the existing construction method, the concrete main girders (1) are mounted on the pier (3), and then reinforcement and formwork are installed on the part where the reinforced concrete cross beams (2) are to be installed and concrete is placed on site. This existing construction method requires working from a high place on the ground, which is difficult due to the difficulty of work and safety accidents, and when reinforcing the concrete beam girders, the rebar should be pulled out where the cross beams will be installed. Shape of While maintaining the shape, each part where the cross beam is installed In the form of (5 in Figure 1) is a very complicated work in the production of concrete master girders.

도2는 본 고안의 콘크리트 주 거더와 강재 가로보의 실시예를 나타낸 도면들이다. 도2의 (가)에서 보듯이 임베디드 슬리브(EMBEDED SLEEVE,11)를 콘크리트 주 거더(1)을 제작시 가로보가 설치될 부분에 매설한다.(도2의 (나) 참조) 콘크리트 주 거더(1)를 교각(3)위에 설치할 때 미리 제작한 강재 가로보(4)를 볼트(16)를 이용하여 매설된 임베디드 슬리브(11)에 체결하면 구조가 완성된다.Figure 2 is a view showing an embodiment of the concrete master girder and steel cross beam of the present invention. As shown in (a) of FIG. 2, the embedded sleeve (EMBEDED SLEEVE) 11 is embedded in the part where the cross beam is to be installed when manufacturing the concrete main girder 1 (refer to (b) of FIG. 2). ) Is installed on the pier (3) by fastening the steel crossbeams (4) made in advance to the embedded sleeve (11) embedded using the bolt (16) to complete the structure.

도2의 (다)는 강재 가로보(4)를 매설된 임베디드 슬리브(11)에 체결하는 것을 나타낸 사시도이며2 (c) is a perspective view showing the fastening of the steel cross beam 4 to the embedded embedded sleeve 11;

도2의 (라)는 콘크리트 주 거더(1)가 3열로 된 거더교에서 강재 가로보(4)로 연결된 모습을 나타낸 단면도이다.Figure 2 (D) is a cross-sectional view showing a state in which the concrete girder (1) is connected to the steel cross beam (4) in the girder bridge in three rows.

본 고안은 앞에서 언급한 기존 공법에서와 달리 콘크리트 주 거더(1)의모양이형으로 일정하게 되므로 콘크리트 주 거더(1)의 제작 또한 용이하다.The design of the present invention is different from that of the conventional construction mentioned above. Since the mold is constant, the production of the concrete master girder 1 is also easy.

도3, 도4 및 도5는 본 고안의 콘크리트 주 거더(1)와 강재 가로보(4)의 다른 실시예를 나타낸 도면들로서,3, 4 and 5 are views showing another embodiment of the concrete master girder 1 and the steel cross beam 4 of the present invention,

도3은 도2에서 콘크리트 주 거더(1) 제작시 임베디드 슬리브(11)를 매설하는 대신 앙카볼트(12)를 매설 하는 것을 나타낸 사시도와 단면도이며,FIG. 3 is a perspective view and a cross-sectional view illustrating embedding an anchor bolt 12 instead of embedding the embedded sleeve 11 when manufacturing the concrete master girder 1 in FIG.

도4는 콘크리트 주 거더(1) 제작시 거더 복부를 관통하는 타이 볼트용 슬리브(SLEEVE FOR TIE-BOLT,13)을 매설하고 강재 가로보(4)를 타이 볼트(TIE-BOLT,17)을 이용하여 연결 고정하는 것을 나타낸 도면들이다.Fig. 4 is a sleeve for tie bolt (SLEEVE FOR TIE-BOLT, 13) penetrating the girder abdomen when manufacturing the concrete main girder (1) and the steel cross beam (4) using the tie bolt (TIE-BOLT, 17) Figures showing fixing the connection.

도5는 콘크리트 주 거더(1) 제작시 스틸 브라켓트(STEEL BRAKET,14)를 매설하여 제작된 강재 가로보(4)를 스플라이스 플레이트(SPLICE PLATE,15)와 볼트(16)을 이용하여 연결 고정토록 하는 것을 나타낸 도면들이다.5 is a steel beam (4) made by embedding a steel bracket (STEEL BRAKET, 14) when manufacturing a concrete main girder (1) by using a splice plate (15) and bolts (16) Figures showing what to do.

본 고안에서의 강재 가로보(4)의 구조는 그 기능을 충분히 담당할 수 있도록 구조 계산을 통하여 설계하여 제작토록하며 강재인 점을 감안할 때 다양한 모양으로 자유롭게, 경제적으로 제작할 수 있으며 콘크리트 주 거더와 연결부 엔드 플레이트(END PLATE)등도 여건에 따라 자유롭게 제작 설치할 수 있다는 점 또한 본 고안의 장점이라 하겠다.The structure of the steel cross beam 4 in the present design is designed to be manufactured through structural calculation so as to be fully responsible for its function, and considering the steel, it can be freely and economically produced in various shapes. It is also an advantage of the present invention that the end plate can be freely manufactured and installed according to conditions.

상기와 같은 본 고안에 의하면 콘크리트 주 거더교에 있어서 콘크리트 주 거더와 강재 가로보를 현장에서 볼트 및 용접을 이용하여 간편한 방법으로 조립 설치할 수 있게 됨에 따라 기존의 콘크리트 주 거더와 철근 콘크리트 가로보의 현장 타설 연결 구조보다 작업이 간단하고 기후의 영향을 받지 않는 등 공사기간이 단축될 뿐만 아니라, 기존의 철근 콘크리트 형식의 가로보 구조는 대부분의 공정이 현장에서 이루어지나 본 고안의 공법은 현장에서 이루어지는 공정이 최소화된 상태이므로 품질관리가 용이하며, 특히 작업원의 추락 등과 관련된 안전사고의 발생을 현저히 줄일 수 있을 것으로 기대된다.According to the present invention as described above, in the concrete main girder bridge, the concrete main girder and the steel cross beams can be assembled and installed in a simple manner using bolts and welding in the field, so that the existing concrete main girder and the reinforced concrete cross beams are placed in place In addition to shortening the construction period, such as simpler operation and unaffected by the weather, the existing reinforced beam-type crossbeam structure is mostly carried out on-site, but the method of the present invention is minimized. Therefore, it is easy to control the quality, and it is expected that the occurrence of safety accidents related to the fall of the worker can be significantly reduced.

또한 기존의 철근 콘크리트 형식의 가로보 구조는 거더 설치 후 상부 슬래브 시공시 주 거더의 추락 및 횡비틀림 좌굴을 방지하기 위한 별도의 보강이 필요하나 본 고안의 공법에서는 빠른 시간에 기 제작된 강재 가로보에 의해 거더가 연결되는 구조이므로 시공 중 이러한 구조적인 문제점은 발생하지 않을 것으로 판단된다.따라서 교량을 안전하고 경제적으로 설계 및 시공할 수 있는 유용한 고안인 것이다.In addition, the conventional reinforced concrete crossbeam structure requires additional reinforcement to prevent the fall of the main girder and the lateral torsional buckling during the construction of the upper slab after the girder is installed. It is considered that such structural problems will not occur during construction because the girder is connected, which is a useful design for safely and economically designing and constructing bridges.

Claims (4)

교량의 교각 위에 설치되는 주 거더의 재질이 콘크리트로 된 거더교에 있어서, 인접하는 주 거더끼리 연결하기 위해 설치하는 가로보를 강재로 제작하고, 이 강재 가로보와 콘크리트 주 거더의 체결 수단을 통하여 일체화 시킬 수 있도록 하는 콘크리트 주 거더와 강재 가로보의 구조.In the concrete girder bridge, the main girders installed on the bridge piers are made of steel, and the cross beams installed to connect adjacent main girders can be made of steel, and the steel girders can be integrated through the fastening means of the steel girders. To make the structure of concrete girder and steel beams 제 1 항에 있어서, 강재 가로보와 콘크리트 주 거더를 체결키 위하여 콘크리트 주 거더에 볼트 체결용 슬리브를 내설하고, 강재 가로보에 볼트 체결용 연결판을 부착하여 볼트 체결을 통하여 두 부재를 연결 고정하거나 콘크리트 주 거더에 용접 체결용 슬리브를 내설하고 강재 가로보에 용접 체결용 연결판을 부착하여 용접에 의하는 등 부재를 연결 고정하는 것을 특징으로 하는 콘크리트 주 거더와 강재 가로보의 구조.According to claim 1, In order to fasten the steel cross beam and the concrete main girder, the bolt fastening sleeve is installed in the concrete main girder, and the bolt connecting connector is attached to the steel cross beam to connect and fix the two members through the bolt fastening or concrete A structure of a concrete main girder and a steel cross beam, which includes a welding fastening sleeve in a main girder and attaches a connecting plate for welding fastening to a steel cross beam to fix the member by welding. 삭제delete 삭제delete
KR2020010016422U 2001-06-01 2001-06-01 Structures of concrete girder and steel crossbeam in concrete girder bridge KR200267736Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020010016422U KR200267736Y1 (en) 2001-06-01 2001-06-01 Structures of concrete girder and steel crossbeam in concrete girder bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020010016422U KR200267736Y1 (en) 2001-06-01 2001-06-01 Structures of concrete girder and steel crossbeam in concrete girder bridge

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020010029526A Division KR20010070632A (en) 2001-05-28 2001-05-28 Construction method of concrete girder and steel cross beam in concrete girder bridge and its structure

Publications (1)

Publication Number Publication Date
KR200267736Y1 true KR200267736Y1 (en) 2002-03-13

Family

ID=73102615

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020010016422U KR200267736Y1 (en) 2001-06-01 2001-06-01 Structures of concrete girder and steel crossbeam in concrete girder bridge

Country Status (1)

Country Link
KR (1) KR200267736Y1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100894650B1 (en) 2008-12-08 2009-04-24 (주)아이브릿지코리아 Rahmen bridge with preflexion load and manufacturing method the same
KR101489352B1 (en) * 2013-04-10 2015-02-06 주식회사 비엔지컨설턴트 Torsion Reinforcing Structure and Bridge Girders having such reinforcing structure
KR20160144689A (en) * 2015-06-09 2016-12-19 씨엔에스이엔지주식회사 Structure for Preventing Lateral Buckling of H-beam
KR101717976B1 (en) * 2016-08-24 2017-04-05 주식회사 대련건설 Upper structure of bridge and method of constructing the same with easy installation of traverse beam

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100894650B1 (en) 2008-12-08 2009-04-24 (주)아이브릿지코리아 Rahmen bridge with preflexion load and manufacturing method the same
KR101489352B1 (en) * 2013-04-10 2015-02-06 주식회사 비엔지컨설턴트 Torsion Reinforcing Structure and Bridge Girders having such reinforcing structure
KR20160144689A (en) * 2015-06-09 2016-12-19 씨엔에스이엔지주식회사 Structure for Preventing Lateral Buckling of H-beam
KR101689008B1 (en) * 2015-06-09 2016-12-22 씨엔에스이엔지주식회사 Structure for Preventing Lateral Buckling of H-beam
KR101717976B1 (en) * 2016-08-24 2017-04-05 주식회사 대련건설 Upper structure of bridge and method of constructing the same with easy installation of traverse beam

Similar Documents

Publication Publication Date Title
KR100423757B1 (en) Prestressed composite truss girder and construction method of the same
KR100536489B1 (en) Manufacturing method for prestressed steel composite girder and prestressed steel composite girder thereby
KR100820299B1 (en) Temporary structure and precast concrete beam of pylon setting method using the bracket
KR100770574B1 (en) Rhamen bridge having prestressed steel-reinforced concrete composite girder and construction method there of
KR20130083410A (en) Slab-type box girder of a varying longitudinal section made by prestressed precast concrete and method constructing the bridge therewith
KR100982974B1 (en) Method for manufacturing multi-span continuous re-prestressed preflex composite bridge
KR20100025162A (en) Precast psc t-type girder bridge and its construction method
KR100988074B1 (en) Girder bridge connected to abutment and the construction method thereof
KR100318565B1 (en) Reinforcing Method Of PC Beam Bridge With Box Structure And PC Beam Bridge Having Box Reinforced Structure
JP3737475B2 (en) Box girder bridge structure and construction method
KR200267736Y1 (en) Structures of concrete girder and steel crossbeam in concrete girder bridge
JP3877995B2 (en) How to build a string string bridge
KR100522298B1 (en) Improved prestressed steel reinforced concrete beam and bridge construction method using the same beam
KR100565384B1 (en) Structure of continuous PSC beam with connection member and steel cross beam and bridge construction method using the same
KR101157607B1 (en) Prestressed steel composite girder with prestressed non-introducing portions provided at both ends of lower flange casing concrete, manufacturing method thereof, and Rahmen structure and construction method thereof
KR20080099061A (en) Psc beam for connection steel width step of psc bridges
KR100583671B1 (en) Prestressed concrete beam manufactured by installing steel anchorage devices to various positions and reinforcing member to the upper and lower flanges, and construction method of bridge using the concrete beam
KR20070001410A (en) Mounting structure of steel cross-beam in multi-girder concrete bridge and its construction method
KR20060017949A (en) Field-fabricated prestressing steel-composed girder and construction method of continuous bridge using the girder
KR20090048054A (en) Long-span prestressed concrete girder bridge construction method by post-tensioning
KR20010070632A (en) Construction method of concrete girder and steel cross beam in concrete girder bridge and its structure
KR19980025917A (en) Multi-span prestressed steel composite continuous member and its construction method
KR200395572Y1 (en) Precast concrete panel
KR101342894B1 (en) Trust type prestressed concrete girder, manufacturing method for the same and constructing method of continuation bridge using the same
KR100650444B1 (en) Cantilever part construction method of bridge

Legal Events

Date Code Title Description
U107 Dual application of utility model
REGI Registration of establishment
T601 Decision to invalidate utility model after technical evaluation
LAPS Lapse due to unpaid annual fee