KR200258611Y1 - An flange structure for found part and ground part of built-up type steel electric pole - Google Patents

An flange structure for found part and ground part of built-up type steel electric pole Download PDF

Info

Publication number
KR200258611Y1
KR200258611Y1 KR2020010030762U KR20010030762U KR200258611Y1 KR 200258611 Y1 KR200258611 Y1 KR 200258611Y1 KR 2020010030762 U KR2020010030762 U KR 2020010030762U KR 20010030762 U KR20010030762 U KR 20010030762U KR 200258611 Y1 KR200258611 Y1 KR 200258611Y1
Authority
KR
South Korea
Prior art keywords
steel pipe
pipe pole
flange
pole
ground
Prior art date
Application number
KR2020010030762U
Other languages
Korean (ko)
Inventor
진형식
Original Assignee
한국전력공사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국전력공사 filed Critical 한국전력공사
Priority to KR2020010030762U priority Critical patent/KR200258611Y1/en
Application granted granted Critical
Publication of KR200258611Y1 publication Critical patent/KR200258611Y1/en

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

본 고안은 조립식 강관 전주용 기초부와 지상부의 플랜지 구조에 관한 것으로서, 특히 기초부(10)의 상측에 지상부(12)가 적층되게 세워짐과 동시에 서로 접하는 상하 한쌍의 플랜지(14)가 다수의 볼트(16)와 너트(18)에 의해 조립되는 14M강관 전주와, 기초부(20)의 상측에 지상부(22)가 적층되게 세워짐과 동시에 서로 접하는 상하 한쌍의 플랜지(24)가 다수의 볼트(16)와 너트(18)에 의해 조립되는 11M강관 전주를 구비한 조립식 강관 전주용 기초부와 지상부의 플랜지 구조에 있어서, 상기 14M강관 전주용 기초부(10)에 14M강관 전주용 지상부(12)나 또는 11M강관 전주용 지상부(22)를 선택적으로 결합할 수 있도록 14M강관 전주용 기초부(10)의 플랜지(14)에 14M강관 전주용 지상부(12) 플랜지(14)측 관통홀(14a)의 갯수 및 간격과 대응되는 관통홀(14a)을 다수개 형성함과 동시에 11M강관 전주용 지상부(22)의 플랜지(24)측 관통홀(24a)의 갯수 및 간격과 대응되는 관통홀(14b)을 다수개 형성하도록 구성되어 있으므로, 전주 교체시 기존 14M강관 전주용 기초부(10)의 굴착작업을 생략할 수 있다. 이에 따라 교체시공시간 및 교체시공비를 현저히 줄일 수 있고, 교체시공을 간편화시킴과 동시에 환경오염을 줄일 수 있는 것이다.The present invention relates to the flange structure of the prefabricated steel pipe pole base and the ground portion, in particular, the upper and lower pairs of flanges 14 which are in contact with each other while the ground portion 12 is stacked on the upper side of the foundation portion 10 is a plurality of bolts The 14M steel pipe pole assembled by the 16 and the nut 18, and the upper and lower pairs of flanges 24, which are erected so as to be stacked on the upper side of the base 20, and in contact with each other, are provided with a plurality of bolts 16. In the flange structure of the prefabricated steel pipe pole base and ground section having 11M steel pipe pole assembled by the nut and nut (18), the 14M steel pipe pole foundation ground portion (12) Alternatively, the through hole 14a of the flange 14 side of the 14M steel pipe pole ground part 12 and the flange 14 of the 14M steel pipe pole foundation 10 may be selectively coupled to the 11M steel pipe pole ground part 22. While forming a plurality of through holes 14a corresponding to the number and spacing Since 11M steel pipes are configured to form a plurality of through holes 14b corresponding to the number and spacing of the through-holes 24a on the flange 24 of the ground portion 22, the base portion for existing 14M steel pipe poles is replaced when the pole is replaced. Excavation work in (10) can be omitted. Accordingly, it is possible to significantly reduce the replacement construction time and the replacement construction cost, simplify the replacement construction and reduce the environmental pollution.

Description

조립식 강관 전주용 기초부와 지상부의 플랜지 구조{AN FLANGE STRUCTURE FOR FOUND PART AND GROUND PART OF BUILT-UP TYPE STEEL ELECTRIC POLE}FLANGE STRUCTURE FOR FOUND PART AND GROUND PART OF BUILT-UP TYPE STEEL ELECTRIC POLE}

본 고안은 조립식 강관 전주용 기초부와 지상부의 플랜지 구조에 관한 것으로서, 더욱 상세하게는 차량출입이 불가능한 골목나 도로가 없는 지역에 설치되는 조립식 강관 전주용 기초부와 지상부의 플랜지 구조에 관한 것이다.The present invention relates to a flange structure of prefabricated steel pipe pole base and ground portion, and more particularly to a flange structure of a prefabricated steel pipe pole foundation and ground portion installed in an area where there is no alley or road where vehicle access is impossible.

일반적으로 조립식 강관 전주는 규격별로 14M와 11M로 각각 나누어져 제작 및 각각 시공되어 왔었다.In general, prefabricated steel pipe poles have been manufactured and constructed by dividing them into 14M and 11M, respectively.

즉, 14M강관 전주는 도 1a와 같이 14M강관 전주용 기초부(10)의 하측이 지하(地下)의 소정깊이에 먼저 매설되고, 이 기초부(10)의 상측에는 적어도 4개이상의 14M강관 전주용 지상부(12)가 적층되게 세워짐과 동시에 서로 접하는 상하 한쌍의 플랜지(14)가 도시하지 않은 다수의 볼트와 너트에 의해 결합되어 시공되도록 구성되어 있다.That is, as shown in FIG. 1A, the 14M steel pipe pole is first buried at a predetermined depth in the basement 10 below the base portion 10 for the 14M steel pipe pole, and at least four 14M steel pipe poles are disposed above the base portion 10. At the same time, the upper and lower pairs of flanges 14, which are erected to be stacked, are in contact with each other, and are configured to be coupled and constructed by a plurality of bolts and nuts (not shown).

한편, 11M강관 전주는 도 1b와 같이 11M강관 전주용 기초부(20)의 하측이 지하(地下)의 소정깊이에 먼저 매설되고, 이 기초부(20)의 상측에는 적어도 3개이상의 11M강관 전주용 지상부(22)가 적층되게 세워짐과 동시에 서로 접하는 상하 한쌍의 플랜지(24)가 도시하지 않은 다수의 볼트와 너트에 의해 결합되어 시공되도록 구성되어 있다.Meanwhile, as shown in FIG. 1B, the 11M steel pipe pole is first buried at a predetermined depth in the basement portion below the base of the 11M steel pipe pole, and at least three 11M steel pipe poles are disposed above the base portion 20. The upper and lower parts of the ground 22 are stacked so that the upper and lower pairs of flanges 24 which are in contact with each other are configured to be coupled and constructed by a plurality of bolts and nuts (not shown).

이때, 상기 14M강관 전주용 기초부(10)와 지상부(12)의 플랜지(14)는 도 2a와 같이 그 평면 가장자리에 다수의 볼트(미도시)가 삽입되도록 서로 일정간격을 두고 예를 들어 12개의 관통홀(14a)이 형성되어 있다.At this time, the 14M steel pipe pole base 10 and the flange 14 of the ground portion 12 is spaced apart from each other such that a plurality of bolts (not shown) are inserted into the flat edge as shown in Figure 2a, for example 12 Four through holes 14a are formed.

상기 11M강관 전주용 기초부(20)와 지상부(22)의 플랜지(24)는 도 2b와 같이 그 평면 가장자리에 다수의 볼트(미도시)가 삽입되도록 서로 일정간격을 두고 예를 들어 10개의 관통홀(24a)이 형성되어 있다.The flanges 24 of the 11M steel pipe pole base 20 and the ground portion 22 are spaced apart from each other such that a plurality of bolts (not shown) are inserted into the flat edges thereof, as shown in FIG. The hole 24a is formed.

그러나, 이와 같이 구성된 종래의 14M강관 전주용 플랜지(14)는 예를 들어 456mmm의 외경에 12개의 관통홀(14a)이 형성됨과 동시에 서로 대향하는 관통홀(14a)이 예를 들어 398mm의 간격으로 떨어진 규격인 반면에, 11M강관 전주용 플랜지(24)는 예를 들어 408mmm의 외경에 10개의 관통홀(24a)이 형성됨과 동시에 서로 대향하는 관통홀(24a)이 예를 들어 348mm의 간격으로 떨어진 규격으로 제작되어 있기 때문에 14M강관 전주에서 11M강관 전주로 교체시 14M강관 전주용 기초부(10)까지 전량 교체하여야 하므로 교체시공시간 및 교체시공비가 과다하게 소요될 뿐만 아니라 교체시공이 복잡하고 환경오염을 가중시킨다는 문제점이 있었다.However, in the conventional 14M steel pipe pole flange 14 configured as described above, for example, 12 through holes 14a are formed at an outer diameter of 456 mm, and at the same time, the through holes 14a facing each other are spaced at, for example, 398 mm. On the other hand, the 11M steel pipe pole flange 24 has 10 through holes 24a formed at an outer diameter of, for example, 408 mmm, while the through holes 24a facing each other are separated by, for example, 348 mm apart. Since it is manufactured to the standard, when replacing from 14M steel pipe pole to 11M steel pipe pole, it is necessary to replace all the parts up to 14M steel pipe pole foundation (10). It takes not only excessive construction time and replacement construction cost but also complicated replacement construction and environmental pollution. There was a problem of weighting.

따라서, 본 고안은 상기 문제점을 해결하기 위하여 안출된 것으로서, 본 고안의 목적은 14M강관 전주용 기초부에 11M강관 전주용 지상부를 결합할 수 있도록 제작함으로써 전주 교체시 기존 14M강관 전주용 기초부의 굴착작업을 생략할 수 있어 교체시공시간 및 교체시공비를 현저히 줄일 수 있고, 교체시공을 간편화시킴과동시에 환경오염을 줄일 수 있도록 한 조립식 강관 전주용 기초부와 지상부의 플랜지 구조를 제공하는데 있다.Therefore, the present invention has been devised to solve the above problems, the purpose of the present invention is to make the 11M steel pipe pole pole ground part to 14M steel pipe pole pole foundation to replace the existing pole 14M steel pipe pole pole foundation when replacing It is possible to omit the work, which can significantly reduce the replacement construction time and replacement construction cost, simplify the replacement construction and at the same time provide the flange structure of the prefabricated steel pipe pole base and ground to reduce the environmental pollution.

상기 목적을 달성하기 위하여 이루어진 본 고안에 의한 조립식 강관 전주용 기초부와 지상부의 플랜지 구조는 기초부의 상측에 지상부가 적층되게 세워짐과 동시에 서로 접하는 상하 한쌍의 플랜지가 다수의 볼트와 너트에 의해 조립되는 14M강관 전주와, 기초부의 상측에 지상부가 적층되게 세워짐과 동시에 서로 접하는 상하 한쌍의 플랜지가 다수의 볼트와 너트에 의해 조립되는 11M강관 전주를 구비한 조립식 강관 전주용 기초부와 지상부의 플랜지 구조에 있어서, 상기 14M강관 전주용 기초부에 14M강관 전주용 지상부나 또는 11M강관 전주용 지상부를 선택적으로 결합할 수 있도록 14M강관 전주용 기초부의 플랜지에 14M강관 전주용 지상부 플랜지측 관통홀의 갯수 및 간격과 대응되는 관통홀을 다수개 형성함과 동시에 11M강관 전주용 지상부의 플랜지측 관통홀의 갯수 및 간격과 대응되는 관통홀을 다수개 형성한 것을 특징으로 한다.The flange structure of the prefabricated steel pipe pole base and the ground portion according to the present invention made to achieve the above object is a pair of upper and lower pairs of flanges contacting each other while the ground portion is stacked on top of the foundation and assembled by a plurality of bolts and nuts. In the flange structure of the prefabricated steel pipe pole base and the ground part having a 14M steel pipe pole and an 11M steel pipe pole where a pair of upper and lower flanges, which are erected on the upper side of the foundation part, and in contact with each other, are assembled by a plurality of bolts and nuts. In the 14M steel pipe pole foundation ground portion or 14M steel pipe pole pole ground portion for the selective coupling of the 14M steel pipe pole pole ground portion or the number of 14M steel pipe pole pole ground portion flange side through hole and the number and spacing At the same time, a plurality of through holes are formed, and at the flange side of the ground for 11M steel pipe pole. A plurality of through holes corresponding to the number and spacing of the through holes may be formed.

도 1a는 종래의 14M강관 전주의 조립상태를 도시한 측면도,Figure 1a is a side view showing the assembly state of a conventional 14M steel pipe pole;

도 1b는 종래의 11M강관 전주의 조립상태를 도시한 측면도,Figure 1b is a side view showing the assembled state of a conventional 11M steel pipe pole;

도 2a는 종래의 14M강관 전주용 기초부와 지상부 플랜지를 도시한 평면(저면)도,Figure 2a is a plan view (bottom) showing a conventional base and ground flange for 14M steel pipe pole;

도 2b는 종래의 11M강관 전주용 기초부와 지상부 플랜지를 도시한 평면(저면)도,Figure 2b is a plan view (base) showing a conventional 11M steel pipe pole base and ground flanges,

도 3은 본 고안의 14M 겸용 11M강관 전주용 기초부 플랜지를 도시한 평면도,Figure 3 is a plan view showing a base flange for 14M dual 11M steel pipe pole of the present invention,

도 4는 본 고안의 14M 겸용 11M강관 전주용 기초부 플랜지에 14M강관 전주용 지상부 플랜지를 조립한 상태를 도시한 개략적인 측면도,Figure 4 is a schematic side view showing a state of assembling the ground flange for 14M steel pipe pole pole 14M dual 11M steel pipe pole pole foundation of the present invention,

도 5는 본 고안의 14M 겸용 11M강관 전주용 기초부 플랜지에 11M강관 전주용 지상부 플랜지를 조립한 상태를 도시한 개략적인 측면도이다.Figure 5 is a schematic side view showing a state of assembling the 11M steel pipe pole ground flange for the 14M combined 11M steel pipe pole base flange of the present invention.

* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

10 : 14M강관 전주용 기초부 12 : 14M강관 전주용 지상부10: 14M steel pipe pole pole foundation part 12: 14M steel pipe pole pole ground part

14 : 플랜지 14a, 14b : 관통홀14 flange 14a, 14b through hole

16 : 볼트 18 : 너트16: bolt 18: nut

20 : 11M강관 전주용 기초부 22 : 11M강관 전주용 지상부20: 11M steel pipe pole pole foundation part 22: 11M steel pipe pole pole ground part

24 : 플랜지 24a : 관통홀24: flange 24a: through hole

이하, 본 고안의 일실시예에 관하여 첨부 도면을 참조하면서 상세히 설명한다.Hereinafter, an embodiment of the present invention will be described in detail with reference to the accompanying drawings.

참고로, 도면에서 종래의 구성과 동일한 구성에 대해서는 동일명칭 및 동일부호를 부여하고, 그에 대한 상세한 설명은 생략한다.For reference, the same components and the same reference numerals are assigned to the same components as the conventional components in the drawings, and detailed description thereof will be omitted.

본 고안에 의한 조립식 강관 전주용 기초부와 지상부의 플랜지 구조는 도 3 내지 도 5에 도시한 바와 같이 14M강관 전주용 기초부(10)에 14M강관 전주용 지상부(12)나 또는 11M강관 전주용 지상부(22)를 선택적으로 결합할 수 있도록 14M강관 전주용 기초부(10)의 플랜지(14)에 14M강관 전주용 지상부(12) 플랜지(14)측 관통홀(14a)의 갯수 및 간격과 대응되는 관통홀(14a)을 다수개 형성함과 동시에 11M강관 전주용 지상부(22)의 플랜지(24)측 관통홀(24a)의 갯수 및 간격과 대응되는 관통홀(14b)을 다수개 형성하도록 구성되어 있다.The flange structure of the prefabricated steel pipe pole foundation and the ground portion according to the present invention is 14M steel pipe pole ground portion 12 or 14M steel pipe pole as shown in Figures 3 to 5 or 11M steel pipe pole for Corresponding to the number and spacing of the through holes 14a on the flange portion 14 of the 14M steel pipe pole ground part 12 and the flange 14 of the 14M steel pipe pole foundation 10 so as to selectively engage the ground portion 22. It is configured to form a plurality of through-holes 14a to be formed and to form a plurality of through-holes 14b corresponding to the number and spacing of the through-holes 24a on the flange 24 side of the ground portion 22 for 11M steel pipe pole. It is.

이때, 상기 다수의 관통홀(14a)은 14M강관 전주용 기초부(10)의 상부측 플랜지(14)의 외경이 456mmm일때 상기 플랜지(14)의 상면 가장자리에 대하여 축중심에서 예를 들어 12방향으로 분할된 부분에 각각 형성됨과 동시에 플랜지(14)의 상면에서 축중심방향을 가로질려 서로 대향하는 거리가 상기 다수의 관통홀(14b)보다 바깥쪽에 위치되도록 예를 들어 398mm로 떨어져 있다.At this time, the plurality of through holes 14a are, for example, 12 directions at an axis center with respect to the top edge of the flange 14 when the outer diameter of the upper flange 14 of the 14M steel pipe pole foundation 10 is 456 mm. At the same time, they are formed in the divided portions, and are separated by, for example, 398 mm so that the distances facing each other across the axial center direction on the upper surface of the flange 14 are located outside the plurality of through holes 14b.

그리고, 상기 다수의 관통홀(14b)은 14M강관 전주용 기초부(10)의 상부측 플랜지(14)의 외경이 456mmm일때 상기 플랜지(14)의 상면 가장자리에 대하여 축중심에서 예를 들어 10방향으로 분할된 부분에 각각 형성됨과 동시에 플랜지(14)의 상면에서 축중심방향을 가로질려 서로 대향하는 거리가 상기 다수의 관통홀(14a)보다 안쪽에 위치되도록 예를 들어 348mm로 떨어져 있다.In addition, the plurality of through holes 14b may have, for example, 10 directions at an axial center with respect to the upper edge of the flange 14 when the outer diameter of the upper flange 14 of the 14M steel pipe pole foundation 10 is 456 mm. At the same time, they are formed in the divided portions, and are separated by, for example, 348 mm so that the distances facing each other across the axial center direction on the upper surface of the flange 14 are located inward from the plurality of through holes 14a.

도면 중 미설 부호 16 및 18은 서로 대응되게 체결되는 다수의 볼트와 너트를 나타낸 것이다.In the drawings, reference numerals 16 and 18 represent a plurality of bolts and nuts fastened correspondingly to each other.

이와 같이 구성된 본 고안은 14M강관 전주용 기초부(10) 플랜지(14)의 상면에 398mm의 지름을 따라 분산된 12개의 관통홀(14a)과 348mm의 지름을 따라 분산된 10개의 관통홀(14b)이 동시 공존하도록 형성되어 있기 때문에 14M강관 전주용 기초부(10)에 14M강관 전주용 지상부(12)를 조립할 경우에는 도 4와 같이 14M강관 전주용 기초부(10)와 지상부(12)측 플랜지(14)에 각각 형성된 12개의 관통홀(14a)을 상하 대응되게 일치킨 후, 상기 다수의 볼트(16)와 너트(18)를 이용하여 체결 조립시키면 되는 것이다.The present invention configured as described above has 12 through holes 14a distributed along a diameter of 398 mm and 10 through holes 14b distributed along a diameter of 348 mm on the upper surface of the flange 14 of the 14M steel pipe pole foundation 10. ) Is formed to coexist at the same time, when assembling the 14M steel pipe pole ground part 12 to the 14M steel pipe pole foundation 10, as shown in Figure 4 14M steel pipe pole foundation base 10 and the ground portion 12 side Twelve through holes 14a respectively formed in the flange 14 are matched up and down, and then fastened and assembled using the plurality of bolts 16 and nuts 18.

한편, 14M강관 전주용 기초부(10)에 11M강관 전주용 지상부(22)를 조립할 경우에는 도 5와 같이 14M강관 전주용 기초부(10)측 플랜지(14)에 형성된 10개의 관통홀(14b)과 11M강관 전주용 지상부(22)측 플랜지(24)에 형성된 10개의 관통홀(24a)을 상하 대응되게 일치킨 후, 상기 다수의 볼트(16)와 너트(18)를 이용하여 체결 조립시키면 되는 것이다.On the other hand, when assembling the 11M steel pipe pole ground ground portion 22 to the 14M steel pipe pole foundation 10, as shown in Fig. 5 10 through holes 14b formed in the flange 14 side 14M steel pipe pole foundation 10 ) And the 10 through holes 24a formed in the flange 24 of the ground portion 22 side for 11M steel pipe poles correspond to each other up and down, and then tighten and assemble using the plurality of bolts 16 and nuts 18. Will be.

따라서, 14M강관 전주에서 11M강관 전주로 교체시 14M강관 전주용 기초부(10)는 그대로 나두고 11M강관 전주용 지상부(22)를 상술한 조립방법과 마찬가지로 교체할 수 있기 때문에 14M강관 전주용 기초부(10)를 교체하기 위하여 굴착하는 시공시간 및 시공비를 없앨 수 있고, 교체시공을 간편화함은 물론 환경오염을 줄일 수 있는 것이다.Therefore, when replacing from 14M steel pipe pole to 11M steel pipe pole, it is possible to replace the 14M steel pipe pole base 10 as it is, and replace the 11M steel pipe pole pole ground part 22 as described above. (10) to eliminate the construction time and construction cost of the excavation to replace, and to simplify the replacement construction, as well as to reduce the environmental pollution.

이상 설명한 바와 같이, 본 고안에 의한 조립식 강관 전주용 기초부와 지상부의 플랜지 구조는 14M강관 전주용 기초부 플랜지에 14M강관 전주용 지상부나 또는 11M강관 전주용 지상부를 선택적으로 결합할 수 있도록 한 구조로 되어 있기 때문에 전주 교체시 기존 14M강관 전주용 기초부의 굴착작업을 생략할 수 있다. 이에 따라 교체시공시간 및 교체시공비를 현저히 줄일 수 있고, 교체시공을 간편화시킴과 동시에 환경오염을 줄일 수 있는 효과가 있다.As described above, the flange structure of the prefabricated steel pipe pole foundation and the ground portion according to the present invention is a structure that allows the 14M steel pipe pole foundation flange to selectively combine the 14M steel pipe pole ground or 11M steel pipe pole ground. Exchanging the pole can be omitted the excavation work of the existing 14M steel pipe pole base. Accordingly, it is possible to significantly reduce the replacement construction time and the replacement construction cost, simplify the replacement construction and reduce the environmental pollution.

Claims (3)

기초부(10)의 상측에 지상부(12)가 적층되게 세워짐과 동시에 서로 접하는 상하 한쌍의 플랜지(14)가 다수의 볼트(16)와 너트(18)에 의해 조립되는 14M강관 전주와, 기초부(20)의 상측에 지상부(22)가 적층되게 세워짐과 동시에 서로 접하는 상하 한쌍의 플랜지(24)가 다수의 볼트(16)와 너트(18)에 의해 조립되는 11M강관 전주를 구비한 조립식 강관 전주용 기초부와 지상부의 플랜지 구조에 있어서,14M steel pipe pole, in which the upper and lower pairs of flanges 14, which are erected on the upper side of the foundation 10, and which are in contact with each other, are assembled by a plurality of bolts 16 and nuts 18; Prefabricated steel pipe pole with 11M steel pipe pole where upper and lower pairs of flanges 24, which are erected on the upper side of 20, and which are in contact with each other, are assembled by a plurality of bolts 16 and nuts 18. In the flange structure of the dragon base part and the ground part, 상기 14M강관 전주용 기초부(10)에 14M강관 전주용 지상부(12)나 또는 11M강관 전주용 지상부(22)를 선택적으로 결합할 수 있도록 14M강관 전주용 기초부(10)의 플랜지(14)에 14M강관 전주용 지상부(12) 플랜지(14)측 관통홀(14a)의 갯수 및 간격과 대응되는 관통홀(14a)을 다수개 형성함과 동시에 11M강관 전주용 지상부(22)의 플랜지(24)측 관통홀(24a)의 갯수 및 간격과 대응되는 관통홀(14b)을 다수개 형성한 것을 특징으로 하는 조립식 강관 전주용 기초부와 지상부의 플랜지 구조.Flange 14 of 14M steel pipe pole foundation 10 to selectively couple the 14M steel pipe pole pole ground portion 12 or 11M steel pipe pole pole ground portion 22 to the 14M steel pipe pole pole foundation 10 A plurality of through holes 14a corresponding to the number and spacing of the 14M steel pipe pole ground part 12, the flange 14 side through hole 14a are formed in the flange portion 24 of the 11M steel pipe pole ground ground part 22. The flange structure of the base portion and the ground portion for prefabricated steel pipe poles, characterized in that a plurality of through holes (14b) corresponding to the number and spacing of the through hole (24a) side. 제1항에 있어서,The method of claim 1, 상기 다수의 관통홀(14a)은 14M강관 전주용 기초부(10)의 상부측 플랜지(14)의 상면 가장자리에 대하여 축중심에서 12방향으로 분할된 부분에 각각 형성됨과 동시에 플랜지(14)의 상면에서 축중심방향을 가로질려 서로 대향하는 거리가 상기 다수의 관통홀(14b)보다 바깥쪽에 위치되도록 구성된 것을 특징으로 하는 조립식강관 전주용 기초부와 지상부의 플랜지 구조.The plurality of through holes 14a are respectively formed in portions divided in the 12 direction from the axial center with respect to the upper edge of the upper flange 14 of the 14M steel pipe pole foundation 10, and the upper surface of the flange 14 at the same time. The flange structure of the prefabricated steel pipe pole base and the ground portion, characterized in that the transverse axial center in the direction facing each other is configured to be located outward than the plurality of through holes (14b). 제1항에 있어서,The method of claim 1, 상기 다수의 관통홀(14b)은 14M강관 전주용 기초부(10)의 상부측 플랜지(14)의 상면 가장자리에 대하여 축중심에서 10방향으로 분할된 부분에 각각 형성됨과 동시에 플랜지(14)의 상면에서 축중심방향을 가로질려 서로 대향하는 거리가 상기 다수의 관통홀(14a)보다 안쪽에 위치되도록 구성된 것을 특징으로 하는 조립식 강관 전주용 기초부와 지상부의 플랜지 구조.The plurality of through holes 14b are formed in portions divided in the 10 direction from the center of the shaft with respect to the upper edge of the upper flange 14 of the 14M steel pipe pole foundation 10, and at the same time the upper surface of the flange 14 The flange structure of the prefabricated steel pipe pole base and the ground portion, characterized in that the distance across the axis in the axial center facing each other is configured to be located inward than the plurality of through holes (14a).
KR2020010030762U 2001-10-09 2001-10-09 An flange structure for found part and ground part of built-up type steel electric pole KR200258611Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020010030762U KR200258611Y1 (en) 2001-10-09 2001-10-09 An flange structure for found part and ground part of built-up type steel electric pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020010030762U KR200258611Y1 (en) 2001-10-09 2001-10-09 An flange structure for found part and ground part of built-up type steel electric pole

Publications (1)

Publication Number Publication Date
KR200258611Y1 true KR200258611Y1 (en) 2001-12-29

Family

ID=73110089

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020010030762U KR200258611Y1 (en) 2001-10-09 2001-10-09 An flange structure for found part and ground part of built-up type steel electric pole

Country Status (1)

Country Link
KR (1) KR200258611Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102312602B1 (en) 2020-05-19 2021-10-15 한국전력공사 Structure of ground part for steel electric pole

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102312602B1 (en) 2020-05-19 2021-10-15 한국전력공사 Structure of ground part for steel electric pole
KR20210143139A (en) 2020-05-19 2021-11-26 한국전력공사 Structure of ground part for steel electric pole

Similar Documents

Publication Publication Date Title
KR100684255B1 (en) Combination structure of base plate for a street lamp
CN104428472A (en) Composite structure
KR200258611Y1 (en) An flange structure for found part and ground part of built-up type steel electric pole
US11499528B2 (en) Wind turbine mast section, wind turbine mast and assembly method
KR200163762Y1 (en) A built-up protection wall of the bridge
KR200287859Y1 (en) An install construction of bollard for landscape
KR100646259B1 (en) Apparatus for connecting concrete piles
KR200281572Y1 (en) Stainless-steel grating
KR200390139Y1 (en) fence
KR200272128Y1 (en) A manhole for height adjustment
JP2010229915A (en) Waterproof structure of exhaust pipe penetration part on roof of packaged engine generator
CN216974303U (en) Base module convenient to assemble, base that contains it, trade power station or energy storage station
US20230220647A1 (en) Foundation structural design with cells configured to redirect and distribute stress loads
CN101113595A (en) Prefabricated electrical cable working well basic cell
JP3145951B2 (en) Support column of ball net
KR200347889Y1 (en) Prefabricated fence
KR200472649Y1 (en) Frame for lighting
KR200186040Y1 (en) Assembling type street trees protecter
CN115262800B (en) Assembled building and construction method thereof
JPH08337293A (en) Concrete storage tank
KR101856544B1 (en) Structure constructed by assembly of pre made roof and column
JP2000291118A (en) Ditch cover
KR100491427B1 (en) Skew bridge construction
KR20070067867A (en) Temporary floor construction support system
KR200191920Y1 (en) Assembling type fence structure

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
LAPS Lapse due to unpaid annual fee
T601 Decision on revocation of utility model registration