KR200235115Y1 - Prefab retaining wall - Google Patents

Prefab retaining wall Download PDF

Info

Publication number
KR200235115Y1
KR200235115Y1 KR2020010008962U KR20010008962U KR200235115Y1 KR 200235115 Y1 KR200235115 Y1 KR 200235115Y1 KR 2020010008962 U KR2020010008962 U KR 2020010008962U KR 20010008962 U KR20010008962 U KR 20010008962U KR 200235115 Y1 KR200235115 Y1 KR 200235115Y1
Authority
KR
South Korea
Prior art keywords
retaining wall
block
hole
adjacent
groove
Prior art date
Application number
KR2020010008962U
Other languages
Korean (ko)
Inventor
심재금
Original Assignee
주식회사 한국항만기술단
(주)동이엔지니어링건축사사무소
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 한국항만기술단, (주)동이엔지니어링건축사사무소 filed Critical 주식회사 한국항만기술단
Priority to KR2020010008962U priority Critical patent/KR200235115Y1/en
Application granted granted Critical
Publication of KR200235115Y1 publication Critical patent/KR200235115Y1/en

Links

Landscapes

  • Retaining Walls (AREA)

Abstract

1. 청구범위에 기재된 고안이 속한 기술분야1. TECHNICAL FIELD OF THE INVENTION

본 고안은 조립식 옹벽에 관한 것이다.The present invention relates to a prefabricated retaining wall.

2. 고안이 해결하려고 하는 기술적 과제2. The technical problem the invention is trying to solve

블록 상호간의 결합력이 약화되지 않으면서도 설치가 용이한 조립식 옹벽을 제공함에 있다.It is to provide a prefabricated retaining wall that is easy to install without weakening the coupling force between the blocks.

3. 고안의 해결방법의 요지3. Summary of solution of design

본 고안의 요지는 인접한 기초블록(100) 및 옹벽블록(200) 상호간의 연결이 볼트(310)에 의해 이루어지고, 기초블록(100)과 옹벽블록(200)의 연결은 콘크리트에 의해 이루어지기 때문에 설치가 용이하고, 각각의 옹벽블록(200) 및 기초블록(200)이 상호 연결되어 있고, 기초블록(100)과 옹벽블록(200)을 절반씩 물려 상호 교차되도록 설치함으로써, 설치가 용이하면서도 측압이나 부동 침하에 따른 옹벽의 벌어짐을 예방할 수 있다.The gist of the present invention is because the connection between the adjacent base block 100 and the retaining wall block 200 is made by the bolt 310, and the connection of the base block 100 and the retaining wall block 200 is made of concrete Installation is easy, and each retaining wall block 200 and the foundation block 200 are interconnected, and by installing the foundation block 100 and the retaining wall block 200 so as to cross each other, the installation is easy, while the side pressure However, it is possible to prevent the opening of the retaining wall due to the floating settlement.

4. 고안의 중요한 용도4. Important uses of the devise

옹벽에 이용된다.Used for retaining walls.

Description

반습식 조립식 옹벽{PREFAB RETAINING WALL}Semi-prefabricated retaining wall {PREFAB RETAINING WALL}

본 고안은 조립식 옹벽에 관한 것으로 특히, 옹벽의 배면으로부터의 측압과바닥의 부동 침하에 대응할 수 있는 조립식 옹벽에 관한 것이다.The present invention relates to a prefabricated retaining wall, and more particularly, to a prefabricated retaining wall that can cope with lateral pressure from the back surface of the retaining wall and floating settlement of the bottom.

일반적으로 절개지의 흙이 무너지는 것을 방지하기 위하여 옹벽을 설치하게되는데, 현장타설로 옹벽을 구축하게되면 공기가 늘어나기 때문에 기 제조된 조립식 옹벽을 설치하는 방법이 널리 사용되고 있다.In general, the retaining wall is installed in order to prevent the soil of the incisions from collapsing, and when the retaining wall is built by site casting, the air increases, and thus, a method of installing the prefabricated retaining wall manufactured in advance is widely used.

그러나 상술한 조립식 옹벽의 경우 각각의 부재가 상호 독립되어 있기 때문에 옹벽 배면의 측압이나 지반의 부동 침하에 의해 부재가 벌어져 옹벽이 무너지는 등의 문제점이 있었다.However, in the case of the above-described prefabricated retaining wall, since the respective members are independent of each other, there is a problem such that the retaining wall collapses due to side pressure or floating subsidence of the retaining wall.

도 1은 국내 등록실용신안공보 제20-0203448호에 개시된 조립식 옹벽의 사시도이다.1 is a perspective view of a prefabricated retaining wall disclosed in Korea Utility Model Model No. 20-0203448.

도1에 개시된 조립식 옹벽은 상술한 문제점을 해결하기 위하여 부재 상호간을 연결하는 방법이 개시되어 있다.In order to solve the above-mentioned problem, the prefabricated retaining wall disclosed in FIG. 1 discloses a method of connecting members.

국내 등록실용신안공보 제20-0203448호에 개시된 조립식 옹벽은 수직벽(1)과 수평벽(2) 및 이들을 연결하는 코너부(3)로 구성되고 수직벽(1)의 중간높이와 코너부(3)의 중간부 및 수평벽(2)의 단부측에는 PC 강선이 관통하는 요홈(4)이 측방향으로 형성되며 각각의 요홈(4)의 중간위치에는 PC강선을 연결시키는 연결개구(5)가 형성되고 양측면에는 그라우팅 홈(6)이 형성되며 수직벽(1)의 그라우팅 홈과 수평벽(2)의 그라우팅 홈에는 일정 간격으로 아이볼트(7)가 다수개 설치되며 수평벽(2)의 그라우팅 홈(6)의 단부에는 강봉 삽입홈(8)이 연결되고 수직벽(1)의 연결개구(5) 하부에는 배수구(14)가 형성되며 수직벽(1)의 외부에는 후크가 설치되고 후크에는 집수를 목적으로 하는 유공 관다발이 설치되어 배수구(14)의 외측에위치되게 구성되며, 수평벽(2)에는 원형 또는 각형 관통구(13)가 형성되어 있다.The prefabricated retaining wall disclosed in Korean Utility Model Registration No. 20-0203448 is composed of a vertical wall 1, a horizontal wall 2, and a corner portion 3 connecting them, and the middle height and corner portions of the vertical wall 1 ( In the middle part of 3) and the end side of the horizontal wall 2, the groove 4 through which PC steel wire passes is formed in the lateral direction, and the connection opening 5 which connects PC steel wire in the intermediate position of each groove 4 is provided. Grouting grooves 6 are formed on both sides, and the grouting grooves of the vertical wall 1 and the grouting grooves of the horizontal wall 2 are provided with a plurality of eye bolts 7 at regular intervals, and the grouting of the horizontal wall 2 is performed. A steel rod insertion groove 8 is connected to the end of the groove 6, and a drain hole 14 is formed below the connection opening 5 of the vertical wall 1, and a hook is installed outside the vertical wall 1, Perforated pipe bundles for the purpose of collecting water are installed to be located on the outside of the drain 14, the horizontal wall (2) circular or angle A mold through hole 13 is formed.

그런데, 상술한 조립식 옹벽은 하기와 같은 문제점이 있다.However, the prefabricated retaining wall described above has the following problems.

첫째, 측방향 요홈(4)에 PC 강선을 삽입 설치해야 하는데, 두 개의 옹벽블록이 좌우로 설치된 다음, 좌우 옹벽블록을 연결하기 위하여 측방향 요홈(4)에 강선을 삽입하는 것은 결코 용이하지 않을 뿐 아니라, 이를 위하여 별도의 인장기가 필요한 문제점이 있다.First, it is necessary to insert and install a PC steel wire in the lateral groove (4), it is never easy to insert the steel wire in the lateral groove (4) in order to connect the left and right retaining wall blocks after the two retaining wall blocks are installed left and right. In addition, there is a problem that requires a separate tensioner for this purpose.

둘째, 옹벽이 설치된 다음 아이볼트(7) 사이에 강선을 'L'자로 삽입하여야 하는데, 직선으로 관통된 것도 아니고, 'L'자로 굽어 설치된 아이볼트(7)에 강선을 삽입하는 것은 매우 난해한 문제점이 있다.Second, the steel wire must be inserted between the eye bolts 7 after the retaining wall is installed, but it is not difficult to penetrate straight lines, and it is very difficult to insert the steel wires in the eye bolts 7 which are bent by the letter L. There is this.

셋째, 아이볼트(7)에 강선을 삽입한 다음에도 그라우팅홈(6)에 모르타르를 넣어 양생해야 한다. 그러나, 아이볼트(7)와 강선이 설치된 그라우팅홈(6)에 일반 모르타르는 삽입할 수 없기 때문에, 그라우팅 주입기를 통해 초 고유동 모르타르를 사용해야 하는 문제점이 있다.Third, even after inserting the steel wire in the eye bolt (7) should put the mortar in the grouting groove (6) to cure. However, since the general mortar cannot be inserted into the grouting groove 6 in which the eye bolt 7 and the steel wire are installed, there is a problem in that ultra high flow mortar must be used through the grouting injector.

상술한 문제점을 해결하기 위하여 본 고안의 목적은 설치가 용이하면서도 옹벽의 배면 측압이나 부동 침하에 따른 옹벽의 벌어짐을 예방할 수 있는 조립식 옹벽을 제공함에 있다.In order to solve the above problems, an object of the present invention is to provide a prefabricated retaining wall that is easy to install and can prevent the opening of the retaining wall due to the back side pressure or floating settlement of the retaining wall.

도 1은 국내 등록실용신안공보 제20-0203448호에 개시된 조립식 옹벽의 사시도이다.1 is a perspective view of a prefabricated retaining wall disclosed in Korea Utility Model Model No. 20-0203448.

도 2는 본 고안의 실시예에 따른 기초블록의 사시도이다.2 is a perspective view of a base block according to an embodiment of the present invention.

도 3은 도2의 A-A' 단면도이다.3 is a cross-sectional view taken along line AA ′ of FIG. 2.

도 4는 본 고안의 실시예에 따른 옹벽블록의 사시도이다.4 is a perspective view of a retaining wall block according to an embodiment of the present invention.

도 5는 본 고안의 실시예에 따른 조립식 옹벽의 설치 사시도이다.5 is a perspective view of a prefabricated retaining wall according to an embodiment of the present invention.

도 6은 도5의 B-B' 단면도이다.FIG. 6 is a cross-sectional view taken along line BB ′ of FIG. 5.

* 도면의 주요 부분에 대한 부호의 설명* Explanation of symbols for the main parts of the drawings

100 : 옹벽블록 200 : 기초블록100: retaining wall block 200: foundation block

상기 목적을 달성하기 위한 본 고안은 조립식 옹벽에 있어서, 기초블록(100)의 상면에는 소정 깊이를 가지는 두 개의 홈(120)이 형성되어 있고, 상기 홈(120)에 위치하여 일측이 매립 고정된 고정철근(121)이 상향으로 돌출 형성되어 있으며, 상면 일측에는 상향으로 돌출된 제1 돌출부(110)가 형성되어 있고, 좌우측면은 상호 인접한 기초블록(100)이 상호 교차하여 조립될 수 있도록 제1 단턱부(130, 140)가 형성되어 있으며, 일측 단턱부(140)에는 다수의 제1 홀(141)이 형성되어 있고, 타측 단턱부(130)에는 상기 제1 홀(141)에 대응하는 위치에 나사선을 가지는 너트가 매립 고정되어 다수의 중공홈(131)이 형성되어 있으며, 옹벽블록(200)은 바닥판(220)과 상기 바닥판(220)의 일측에서 상향으로 연장 형성된 측판(210)으로 이루어지고, 상기 바닥판(220)에는 상기 기초블록(100)의 홈(120)에 대응하여 두 개의 관통홀(221)이 형성되어 있으며, 상기 측판(210)의 좌우측에는 상호 인접한 옹벽블록이 상호 교차하여 조립될 수 있도록 제2 단턱부(211, 212)가 형성되어 있으며, 일측 및 타측 단턱부(211, 212)에는 상호 대응하여 다수의 제2 홀(213)이 형성되어 있고, 상기 측판(210)의 배면에는 상기 기초블록(100)의 제1 돌출부(110)에 올려지도록 가로방향으로 제2 돌출부(214)가 형성되어 있으며, 인접한 기초블록(100)의 일측 단턱부(140)에 형성된 홀(141)을 관통하여 상기 기초블록(100)의 중공홈(131)에 볼트(310)가 내삽 됨으로써 상기 인접한 기초블록(100)과 연결되고, 상기 옹벽블록(200)의 절반이 상기 기초블록(100)에 물려 올려지고, 나머지 절반은 상기 연결된 인접한 기초블록(100)에 올려지며, 상기 관통홀(221)과 상기 홈(120)에 경화제(300)가 충진되어 상기 옹벽블록(200)과 기초블록(100)을 고정하고, 상기 옹벽블록(200)의 제2 단턱부(211)에 형성된 제2홀(213)과 인접한 옹벽블록(200)의 타측 단턱부(212)에 형성된 제2홀(213)에 볼트(310)가 내삽되어 너트(311)에 의해 조여짐을 특징으로 한다.The present invention for achieving the above object is a prefabricated retaining wall, the upper surface of the base block 100 is formed with two grooves 120 having a predetermined depth, located in the groove 120 is fixed to one side The fixed reinforcing bar 121 is formed to protrude upward, and the first protrusion 110 protruding upward is formed on one side of the upper surface, and the left and right sides are formed so that the adjacent base blocks 100 can be assembled to cross each other. The first step portions 130 and 140 are formed, and a plurality of first holes 141 are formed in one step portion 140, and the other step portions 130 correspond to the first holes 141. A plurality of hollow grooves 131 are formed by embedding a nut having a screw thread at a position, and the retaining wall block 200 extends upward from one side of the bottom plate 220 and the bottom plate 220. ), The bottom plate 220 is the foundation block 100 Two through holes 221 are formed corresponding to the grooves 120, and second stepped portions 211 and 212 are formed at left and right sides of the side plate 210 so that adjacent retaining wall blocks can be assembled to cross each other. The second and second holes 213 are formed in one side and the other stepped portions 211 and 212, respectively, and the first protrusion 110 of the base block 100 is formed on the rear surface of the side plate 210. The second protrusion 214 is formed in the horizontal direction so as to be mounted on the through hole, and the hollow groove of the base block 100 passes through the hole 141 formed in one step 140 of the adjacent base block 100. The bolt 310 is interposed into the base block 100 by interpolation, and half of the retaining wall block 200 is held up by the base block 100, and the other half is connected to the adjacent base block 100. 100, the hardener 300 is filled in the through hole 221 and the groove 120 The retaining wall block 200 and the base block 100 are fixed, and the other step 212 of the retaining wall block 200 adjacent to the second hole 213 formed in the second stepped portion 211 of the retaining wall block 200. The bolt 310 is inserted into the second hole 213 formed in the) and is tightened by the nut 311.

이하, 첨부된 도면을 참조하여 본 고안의 바람직한 실시예를 상세히 설명한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 2는 본 고안의 실시예에 따른 기초블록의 사시도이고, 도 3은 도2의 A-A' 단면도이며, 도 4는 본 고안의 실시예에 따른 기초블록의 사시도이며, 도 5는 본 고안의 실시예에 따른 조립식 옹벽의 설치 사시도이며, 도 6은 도5의 B-B' 단면도이다.Figure 2 is a perspective view of a foundation block according to an embodiment of the present invention, Figure 3 is a cross-sectional view AA 'of Figure 2, Figure 4 is a perspective view of the foundation block according to an embodiment of the present invention, Figure 5 is an embodiment of the present invention Fig. 6 is a perspective view of the assembled retaining wall according to the example, and Fig. 6 is a sectional view taken along line BB 'of Fig. 5.

본 고안에 따른 조립식 옹벽은 기초블록(100)과 옹벽블록(200)으로 나뉘어 지며, 이를 하기에 구체적으로 설명한다.The prefabricated retaining wall according to the present invention is divided into a foundation block 100 and a retaining wall block 200, which will be described in detail below.

기초블록(100)은 도2에 도시된 바와 같이 상면에는 소정 깊이를 가지는 두 개의 홈(120)이 형성되어 있다. 홈(120)에는 옹벽블록(200)과의 연결을 위하여 일측이 매립 고정된 고정철근(121)이 상향으로 돌출 형성되어 있다(도3 참조). 이때, 고정철근(121)은 도시된 바와 같이 기초블록의 상면보다 높이 돌출되되, 설치 완료시에 옹벽블록의 상면보다는 아래에 위치하도록 돌출된다. 또한, 상면 일측에는 상향으로 돌출된 제1 돌출부(110)가 형성되어 있다. 좌우측면은 상호 인접한 기초블록(100)이 상호 교차하여 조립될 수 있도록 제1 단턱부(130, 140)가 상호 대응하여 형성되어 있으며, 일측 단턱부(140)에는 다수의 제1 홀(141)이 형성되어 있다. 타측 단턱부(130)에는 제1 홀(141)에 대응하는 위치에 나사선을 가지는 너트가 매립고정되어 다수의 중공홈(131)이 형성되어 있다.As shown in FIG. 2, the basic block 100 has two grooves 120 having a predetermined depth. The groove 120 has a fixed reinforcing bar 121 protruding upward from one side to be buried for connection with the retaining wall block 200 (see FIG. 3). At this time, the fixed reinforcing bar 121 protrudes higher than the upper surface of the foundation block, as shown, when the installation is completed to protrude below the upper surface of the retaining wall block. In addition, a first protrusion 110 protruding upward is formed at one side of the upper surface. The left and right side surfaces are formed such that the first step parts 130 and 140 correspond to each other so that the adjacent base blocks 100 may be assembled to cross each other, and the first step parts 140 may include a plurality of first holes 141. Is formed. The other stepped portion 130 has a plurality of hollow grooves 131 formed with a nut having a screw thread embedded in a position corresponding to the first hole 141.

옹벽블록(200)은 도4에 도시된 바와 같이 바닥판(220)과 바닥판(220)의 일측에서 상향으로 측판(210)이 연장 형성되어 단면이 'L'자 모양을 가진다. 바닥판(220)에는 기초블록(100)의 홈(120)에 대응하여 두 개의 관통홀(221)이 형성되어 있다. 측판(210)의 좌우측에는 상호 인접한 옹벽블록(200)이 상호 교차하여 조립될 수 있도록 제2 단턱부(211, 212)가 형성되어 있고, 일측 및 타측 단턱부(211, 212)에는 상호 대응하여 다수의 제2 홀(213)이 형성되어 있다. 측판(210)의 배면에는 기초블록(100)의 제1 돌출부(110)에 올려지도록 가로방향으로 제2 돌출부(214)가 형성되어 있다.As shown in FIG. 4, the retaining wall block 200 has a side plate 210 extending upward from one side of the bottom plate 220 and the bottom plate 220 to have an 'L' shape. Two through holes 221 are formed in the bottom plate 220 to correspond to the grooves 120 of the base block 100. Second step portions 211 and 212 are formed at left and right sides of the side plate 210 so that adjacent retaining wall blocks 200 may be assembled to cross each other, and one side and the other step portions 211 and 212 may correspond to each other. A plurality of second holes 213 are formed. On the rear surface of the side plate 210, a second protrusion 214 is formed in the horizontal direction so as to be placed on the first protrusion 110 of the base block 100.

이하 도2 내지 도6을 참조하여 본 고안에 따른 반습식 조립식 옹벽의 설치 순서를 설명한다.Hereinafter, the installation procedure of the semi-wet prefabricated retaining wall according to the present invention will be described with reference to FIGS. 2 to 6.

먼저, 옹벽을 설치하고자하는 지면을 바닥정리하고, 다짐공사를 한 후에 기초블록(100)을 배열한다. 이때, 배열되는 기초블록(100)의 상호 연결은 도5에 도시된 바와 같이 인접한 기초블록(100)의 일측 단턱부(140)에 형성된 홀(141)을 관통하여 기초블록(100)의 중공홈(131)에 볼트(310)를 내삽시켜 이루어진다.First, after arranging the ground to be installed in the retaining wall, and compaction construction, the foundation block 100 is arranged. At this time, the interconnection of the foundation block 100 is arranged as shown in Figure 5 through the hole 141 formed in one side step 140 of the adjacent foundation block 100 through the hollow groove of the foundation block 100 The bolt 310 is inserted into the 131.

기초블록(100)의 설치가 완료되면 옹벽블록(200)을 설치하게 되는데, 옹벽블록(200)이 두 개의 기초블록(100)에 절반씩 물려 올려지도록 한다. 옹벽블록(200)의 상호 연결은 제2 단턱부(211)에 형성된 제2홀(213)과 인접한 옹벽블록(200)의 타측 단턱부(212)에 형성된 제2홀(213)에 볼트(310)가 내삽되어 너트(311)에 의해 조여짐으로써 이루어진다(도6 참조).When the installation of the basic block 100 is completed, the retaining wall block 200 is installed, so that the retaining wall block 200 is lifted up by half to the two basic blocks 100. The interconnection of the retaining wall block 200 is a bolt 310 in the second hole 213 formed in the other step 212 of the retaining wall block 200 adjacent to the second hole 213 formed in the second stepped portion 211. ) Is interpolated and tightened by the nut 311 (see Fig. 6).

다음으로, 옹벽블록(200)의 관통홀(221)과 기초블록(100)의 홈(120)에 콘크리트 등의 경화제(300)를 충진하여 양생함으로써, 옹벽블록(200)과 기초블록(100)을 상호 연결 고정시킨다.Next, by filling and curing the curing agent 300 such as concrete in the through-hole 221 of the retaining wall block 200 and the groove 120 of the foundation block 100, the retaining wall block 200 and the foundation block 100 Secure the interconnects.

이상에서 살펴본 바와 같이 본 고안에 따른 반습식 조립식 옹벽은 기초블록(100)과 인접한 기초블록(100)의 연결 및 옹벽블록(200)과 인접한 옹벽블록(200)의 연결이 볼트(310)에 의해 이루어지고, 기초블록(100)과 옹벽블록(200)의 연결은 콘크리트에 의해 이루어지기 때문에 설치가 용이하고, 각각의 옹벽블록(200) 및 기초블록(200)이 상호 연결되어 있고, 기초블록(100)과 옹벽블록(200)을 절반씩 물려 상호 교차되도록 설치함으로써, 측압이나 부동침하에 의한 블록의 벌어짐을 방지할 수 있다.As described above, the semi-wetting prefabricated retaining wall according to the present invention has a connection between the foundation block 100 and the foundation block 100 adjacent thereto and the connection of the retaining wall block 200 adjacent to the retaining wall block 200 by bolts 310. The base block 100 and the retaining wall block 200 are easily connected to each other because they are made of concrete, and the retaining wall block 200 and the base block 200 are connected to each other, and the base block ( By installing the 100 and the retaining wall block 200 so as to cross each other, it is possible to prevent the block from being opened due to side pressure or floating settling.

상기와 같이 본 고안은 인접한 기초블록(100) 및 옹벽블록(200) 상호간의 연결이 볼트(310)에 의해 이루어지고, 기초블록(100)과 옹벽블록(200)의 연결은 콘크리트에 의해 이루어지기 때문에 설치가 용이하고, 각각의 옹벽블록(200) 및 기초블록(200)이 상호 연결되어 있고, 기초블록(100)과 옹벽블록(200)을 절반씩 물려 상호 교차되도록 설치함으로써, 설치가 용이하면서도 측압이나 부동 침하에 따른 옹벽의 벌어짐을 예방할 수 있다.As described above, the present invention is the connection between the adjacent base block 100 and the retaining wall block 200 is made by the bolt 310, the connection of the base block 100 and the retaining wall block 200 is made by concrete Therefore, the installation is easy, and each retaining wall block 200 and the foundation block 200 are interconnected, and by installing the foundation block 100 and the retaining wall block 200 so as to cross each other by half, installation is easy It is possible to prevent the opening of the retaining wall due to side pressure or floating settlement.

Claims (1)

조립식 옹벽에 있어서,In the prefabricated retaining wall, 기초블록(100)의 상면에는 소정 깊이를 가지는 두 개의 홈(120)이 형성되어 있고, 상기 홈(120)에 위치하여 일측이 매립 고정된 고정철근(121)이 상향으로 돌출 형성되어 있으며, 상면 일측에는 상향으로 돌출된 제1 돌출부(110)가 형성되어 있고, 좌우측면은 상호 인접한 기초블록(100)이 상호 교차하여 조립될 수 있도록 제1 단턱부(130, 140)가 형성되어 있으며, 일측 단턱부(140)에는 다수의 제1 홀(141)이 형성되어 있고, 타측 단턱부(130)에는 상기 제1 홀(141)에 대응하는 위치에 나사선을 가지는 너트가 매립 고정되어 다수의 중공홈(131)이 형성되어 있으며,Two grooves 120 having a predetermined depth are formed on an upper surface of the foundation block 100, and the fixed reinforcing bars 121 located at one side of the groove 120 are buried and protrude upward. The first protrusion 110 protruding upward is formed on one side, and the first stepped parts 130 and 140 are formed on the left and right side surfaces so that the adjacent base blocks 100 may be assembled to cross each other. A plurality of first holes 141 are formed in the stepped part 140, and a nut having a screw line is embedded in the other stepped part 130 at a position corresponding to the first hole 141. 131 is formed, 옹벽블록(200)은 바닥판(220)과 상기 바닥판(220)의 일측에서 상향으로 연장 형성된 측판(210)으로 이루어지고, 상기 바닥판(220)에는 상기 기초블록(100)의 홈(120)에 대응하여 두 개의 관통홀(221)이 형성되어 있으며, 상기 측판(210)의 좌우측에는 상호 인접한 옹벽블록이 상호 교차하여 조립될 수 있도록 제2 단턱부(211, 212)가 형성되어 있으며, 일측 및 타측 단턱부(211, 212)에는 상호 대응하여 다수의 제2 홀(213)이 형성되어 있고, 상기 측판(210)의 배면에는 상기 기초블록(100)의 제1 돌출부(110)에 올려지도록 가로방향으로 제2 돌출부(214)가 형성되어 있으며,The retaining wall block 200 includes a bottom plate 220 and a side plate 210 extending upward from one side of the bottom plate 220, and the bottom plate 220 has a groove 120 of the base block 100. Two through holes 221 are formed in correspondence with the second through holes 221, and second stepped parts 211 and 212 are formed at left and right sides of the side plate 210 so that adjacent retaining wall blocks can be assembled to cross each other. A plurality of second holes 213 are formed in one side and the other stepped portions 211 and 212, and the back plate of the side plate 210 is placed on the first protrusion 110 of the base block 100. The second protrusion 214 is formed in the horizontal direction so that 인접한 기초블록(100)의 일측 단턱부(140)에 형성된 홀(141)을 관통하여 상기 기초블록(100)의 중공홈(131)에 볼트(310)가 내삽 됨으로써 상기 인접한 기초블록(100)과 연결되고,The bolt 310 is inserted into the hollow groove 131 of the base block 100 by penetrating the hole 141 formed in the one side step 140 of the adjacent base block 100 and the adjacent base block 100. Connected, 상기 옹벽블록(200)의 절반이 상기 기초블록(100)에 물려 올려지고, 나머지 절반은 상기 연결된 인접한 기초블록(100)에 올려지며, 상기 관통홀(221)과 상기 홈(120)에 경화제(300)가 충진되어 상기 옹벽블록(200)과 기초블록(100)을 고정하고, 상기 옹벽블록(200)의 제2 단턱부(211)에 형성된 제2홀(213)과 인접한 옹벽블록(200)의 타측 단턱부(212)에 형성된 제2홀(213)에 볼트(310)가 내삽되어 너트(311)에 의해 조여짐을 특징으로 하는 반습식 조립식 옹벽.Half of the retaining wall block 200 is raised by the foundation block 100, the other half is mounted on the connected adjacent foundation block 100, and a hardener (in the through-hole 221 and the groove 120). 300 is filled to fix the retaining wall block 200 and the foundation block 100, and the retaining wall block 200 adjacent to the second hole 213 formed in the second step portion 211 of the retaining wall block 200. Semi-wet prefabricated retaining wall, characterized in that the bolt 310 is inserted into the second hole 213 formed in the other stepped portion 212 of the other side of the stepped portion 212 and tightened by the nut 311.
KR2020010008962U 2001-03-30 2001-03-30 Prefab retaining wall KR200235115Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020010008962U KR200235115Y1 (en) 2001-03-30 2001-03-30 Prefab retaining wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020010008962U KR200235115Y1 (en) 2001-03-30 2001-03-30 Prefab retaining wall

Publications (1)

Publication Number Publication Date
KR200235115Y1 true KR200235115Y1 (en) 2001-10-10

Family

ID=73098658

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020010008962U KR200235115Y1 (en) 2001-03-30 2001-03-30 Prefab retaining wall

Country Status (1)

Country Link
KR (1) KR200235115Y1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100774020B1 (en) * 2006-09-30 2007-11-08 김근수 Open concrete wall
KR100776773B1 (en) 2006-09-01 2007-11-16 신우산업개발 주식회사 Base panel for revetment structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100776773B1 (en) 2006-09-01 2007-11-16 신우산업개발 주식회사 Base panel for revetment structure
KR100774020B1 (en) * 2006-09-30 2007-11-08 김근수 Open concrete wall

Similar Documents

Publication Publication Date Title
KR100640716B1 (en) Precast concrete block for cantilever retaining wall and construction method using the same
KR101973565B1 (en) Sheathing method for constructing both sheathing wall and cutoff collar by welding cutoff plate to phc pile with longitudinal plate
KR101126666B1 (en) Vertical drain induction type retaining wall reinforced by nailing
KR20080061580A (en) Precast concrete file and method for constructing thereof
KR101675441B1 (en) Integrated wall structure, form and manufacturing method for integrated wall structure
KR200235115Y1 (en) Prefab retaining wall
KR100563787B1 (en) Retaining wall structure composed of retaining-wall panel unit prestressed under interconnecting high intensity reinforcing rod installed in the panel unit with couplers so as to resist section strength and constructing method thereof
KR200387408Y1 (en) Knockdown basic-block
KR200203448Y1 (en) A pre-cast retaining wall
KR200420394Y1 (en) Precast concrete block for cantilever retaining wall
KR100417487B1 (en) Filling crushed stone type retainingwall
KR100823348B1 (en) Installation method of a retaining wall
KR100696910B1 (en) The method of making the temporary retaining wall block using a temporary retaining wall block type and this
KR100626718B1 (en) Reinforced retainaing wall and construction method thereof
KR102316592B1 (en) Retaining Wall Connection Structure
KR200205807Y1 (en) Precast structure easy to install a street lamp
JP2515227B2 (en) Installation method of cast-in-place concrete foundation and precast concrete wall slab
KR200253362Y1 (en) Filling crushed stone type retainingwall
KR100859294B1 (en) Composite a breast wall and construction method using thereby
KR200404058Y1 (en) Combined Retaining Wall
JP7416438B2 (en) Flood prevention wall, construction method of flood prevention wall, and precast concrete wall
KR20090064710A (en) Modifying method of basement slurry wall from one to two way resisting with using wire tensioning
KR200371613Y1 (en) A river waterway using concrete walltype-panel connected by wire
JP2919243B2 (en) Precast concrete foundation and method of manufacturing the same
KR200224760Y1 (en) Culvert assembly

Legal Events

Date Code Title Description
REGI Registration of establishment
T701 Written decision to grant on technology evaluation
FPAY Annual fee payment

Payment date: 20100607

Year of fee payment: 10

EXPY Expiration of term