KR200213564Y1 - Fabricated pier - Google Patents

Fabricated pier Download PDF

Info

Publication number
KR200213564Y1
KR200213564Y1 KR2020000022191U KR20000022191U KR200213564Y1 KR 200213564 Y1 KR200213564 Y1 KR 200213564Y1 KR 2020000022191 U KR2020000022191 U KR 2020000022191U KR 20000022191 U KR20000022191 U KR 20000022191U KR 200213564 Y1 KR200213564 Y1 KR 200213564Y1
Authority
KR
South Korea
Prior art keywords
bridge
foundation
pier
concrete
concrete block
Prior art date
Application number
KR2020000022191U
Other languages
Korean (ko)
Inventor
김희
이진섭
Original Assignee
현대피씨엔지니어링주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 현대피씨엔지니어링주식회사 filed Critical 현대피씨엔지니어링주식회사
Priority to KR2020000022191U priority Critical patent/KR200213564Y1/en
Application granted granted Critical
Publication of KR200213564Y1 publication Critical patent/KR200213564Y1/en

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

본 고안은 교량의 기초가 되는 교각을 조립식으로 시공토록 하는 조립식 교각에 관한 것이다.The present invention relates to a prefabricated bridge for prefabricated construction of the bridge piers that are the basis of the bridge.

종래 교량의 공사에 사용되는 교각의 구축방법은 교각의 기초가 되는 토대위에 형틀(거푸집)을 조립 설치하고, 그 내측의 철근 배근에 콘크리트를 부어 굳힌 후, 형틀을 제거하는 과정을 통해 교각을 완성하게 되나, 이와 같은 현장 타설에 의한 교각 구축방법은 콘크리트 양생시간에 많은 시일이 요구되므로 장시간의 기일을 요구하여 단시간에 교량을 구축할 수 없게 되는 것을 볼 수 있다.The method of constructing a bridge used in the construction of a conventional bridge is assembling and installing a mold (form) on the foundation that is the foundation of the bridge, pouring concrete to the reinforcement of the inner part of the bridge, and then removing the mold to complete the bridge. However, since the bridge construction method by placing the site is required a lot of time in the concrete curing time, it can be seen that the bridge can not be built in a short time by requiring a long period of time.

그러나, 본 고안은 해당 지반에 기초 토대를 구축한 다음, 공장에서 미리 제작된 콘크리트 블럭을 다단으로 적층하여 단시간에 교량용 교각을 구축할 수 있도록 한 것으로, 다단으로 적층되는 콘크리트 블럭 내측에는 서로 일체로 연결되는 다수개의 수직파이프를 삽치하고, 서로 연결된 수직파이프 내측에 강봉을 삽치하고, 강봉의 끝의 나사산을 기초토대에 매설한 앵커볼트에 미리 고정한 연결구에 체결토록 하며, 강봉의 상방에는 플레이트 및 너트로 강봉을 조여줄 때 적층된 다수개의 교각용 콘크리트 블럭이 일체로 연결 고정되어 단시간에 교량용 교각을 구축할 수 있도록 한 조립식 교각에 관한 것이다.However, the present invention is to build a foundation foundation on the ground, and then to pre-fabricated concrete blocks in a multi-stage to build a bridge piers in a short time, it is integral with each other inside the multi-layered concrete block Insert a plurality of vertical pipes connected to each other, insert the steel rods inside the vertical pipes connected to each other, and fasten the threads of the ends of the steel rods to the connectors previously fixed to the anchor bolts embedded in the foundation, and the plate and the upper part of the steel rods. The present invention relates to a prefabricated bridge where a plurality of stacked concrete blocks for fastening steel bars with nuts are integrally connected and fixed so that bridge bridges can be built in a short time.

Description

조립식 교각{Fabricated pier}Prefabricated Piers {Fabricated pier}

본 고안은 교량을 구성하는 교각을 조립식으로 구축토록 하는 조립식 교각에 관한 것이다.The present invention relates to a prefabricated pier to prefabricate the pier constituting the bridge.

종래 교량 공사에 사용되는 교각의 구축방법으로는 교각의 토대가 되는 기초를 구축한 다음 그 위에 수직 및 수평 철근 배근을 하고, 배근된 철근 주위에 교각 및 교대의 형틀(거푸집)을 조립 설치한 다음, 형틀 안에 콘크리트를 부어 콘크리트가 굳은 후 형틀을 제거하는 과정을 통해 교각을 구축하게 된다.As a method of construction of bridges used in conventional bridge construction, the foundation that is the foundation of the bridges is constructed, vertical and horizontal reinforcement is laid on the bridges, and the pier and the formwork of the bridges are assembled around the reinforcement bars. The bridge is built by pouring concrete into the mold and removing the mold after the concrete is hardened.

이와 같은 교각 구축방법을 현장 타설 교각 구축방법이라고 통칭하게 된다.Such a bridge construction method will be referred to collectively as a site casting bridge construction method.

현장 타설 교각 구축공법은 기초 위에 철근 배근 작업과정, 형틀조립 작업과정 및 특히 콘크리트 경화기간에 따른 기일이 과다하게 소요되어 전체 교각의 구축에 많은 기일이 소요되어지게 된다.On-site pier piling method requires excessive time due to rebar reinforcement work, mold assembly work, and especially concrete hardening period on the foundation.

본 고안은 교량의 건설에 있어 교각의 구축기간이 길어짐으로 인해 전체 교량의 건설기간이 길어지는 것을 감안하여 교각을 조립식으로 구축토록 하여 단시간에 교각을 구축토록 하므로 말미암아 교량의 건설기간을 줄여 줄 수 있도록 한 조립식 교각 및 이에 대한 시공방법에 관한 것이다.The present invention can shorten the construction period of the bridge by constructing the bridge prefabricated in a short time in consideration of the longer construction period of the bridge due to the longer construction period of the bridge. The present invention relates to a prefabricated bridge and a construction method thereof.

교량의 기초가 되는 교각은 통상 철근 콘크리트 구조물로 구성되며, 콘크리트의 경화기일에 따른 공사기간의 장기화를 볼 수 있다.The bridge piers, which are the foundation of the bridge, are usually composed of reinforced concrete structures, and can be seen to prolong the construction period depending on the hardening date of the concrete.

본 고안은 교각 구축을 현장 타설에 의한 콘크리트 구축공법이 아닌 공장에서 블럭형태로 콘크리트 교각을 조립식으로 미리 제작하고 이를 현장에서 조립 설치토록 하여 교각의 구축시간을 단축하므로 말미암아 교량의 전체 공사기간을 단축할 수 있도록 한 것이다.This design shortens the entire construction period of bridges by shortening the construction time of the bridges by prefabricating the concrete bridges in the form of blocks in the factory instead of the concrete construction method by placing the bridges. It is to be done.

즉, 교각을 여러 조각의 콘크리트 블럭으로 조성하고 이를 미리 조성한 교각의 기초 위로 운반 조립 설치하여 교각의 구축을 단시간에 행할 수 있도록 한 것이다.In other words, the bridge was constructed by several pieces of concrete blocks and transported and installed on the foundation of the bridge in advance so that the construction of the bridge could be performed in a short time.

도1 - 본 고안의 부분분해사시도.1-partially exploded perspective view of the present invention.

도2 - 본 고안의 단면도.2-a cross-sectional view of the present invention.

도3 - 본 고안의 부분단면도.3-partial cross-sectional view of the present invention;

교량의 기초가 되는 교각을 구축함에 있어서, 먼저, 대상 지반 위에 다수개의 앵카볼트(12)를 돌출한 철근 콘크리트 기초 토대(11)를 조성하고, 상기 다수개의 앵카볼트(12)에 각각의 연결구(13)를 삽치 고정하며, 그 위에 내측에 다수개의 파이프(16)를 수직으로 삽치한 교각용 콘크리트 블럭(15)을 다단으로 쌓아 기둥을 형성하며, 적층된 다단의 교각용 콘크리트 블럭(15) 맨 위에 역시 내측에 다수개의 파이프(19)를 수직으로 삽치한 교각 상부용 콘크리트 블럭(18)을 얹어 놓은 다음, 교각 상부용 콘크리트 블럭(18)의 내측에 삽치한 수직파이프(19) 및 교각을 구성하는 다단의 콘크리트 블럭(15) 내측의 수직파이프(16)를 관통하는 강봉(20)을 삽치하고, 상기 강봉(20)의 하단부의 나사산(21)을 상기 앵카볼트(12)에 체결한 연결구(13)에 체결 결합하며, 강봉(20)의 상단부의 나사산(22)에 플레이트(24)를 삽치하고, 너트(25)로 강봉(20)을 조여 기초 토대(11) 및 그 위에 다단으로 적층된 교각을 일체로 연결 구성토록 하는 것이다.In constructing the bridge pi which is the foundation of the bridge, first, a reinforced concrete foundation foundation 11 protruding from the plurality of anchor bolts 12 is formed on the target ground, and each of the connectors is connected to the plurality of anchor bolts 12. 13) is inserted and fixed on top of the pier concrete blocks (15) in which a plurality of pipes (16) vertically inserted therein stacked in multiple stages to form a column, and stacked multi-tiered pier concrete blocks (15) top On top of that, a plurality of pipes 19 are vertically inserted with the pier upper concrete block 18 inserted therein, and then the vertical pipes 19 and the pier inserted inside the pier upper concrete block 18 are constructed. Inserting the steel bar 20 penetrating the vertical pipe 16 inside the multi-stage concrete block 15, and the threaded portion 21 of the lower end of the steel bar 20 to the anchor bolt 12 ( 13) is coupled to the upper end of the steel bar (20) The plate 24 is inserted into the thread 22, and the steel rod 20 is tightened with the nut 25 so that the foundation base 11 and the piers stacked in multiple stages are integrally connected to each other.

또한, 상기에 있어 기초 토대(11)와 콘크리트 블럭(15)사이, 콘크리트 블럭(15)과 블럭(15) 사이 및 콘크리트 블럭(15)과 교각 상부용 콘크리트 블럭(18) 사이에 모르타르 또는 에폭시수지 등의 그라우트층(31)을 형성토록 한 것이다.Further, in the above, mortar or epoxy resin between the base foundation 11 and the concrete block 15, between the concrete block 15 and the block 15, and between the concrete block 15 and the concrete block 18 for the pier upper part. The grout layer 31, etc. is formed.

이와 같이 현장의 지반에 교량의 초석이 되는 기초토대(11) 구축 당시 다수개의 앵카볼트(12)를 돌출되게 매립하며, 상기 돌출된 다수개의 앵카볼트(12) 내측에 나사산이 형성된 연결구(13)를 체결 조립하거나, 앵카볼트(12) 대신에 기초 토대(11)에 앵카너트를 삽치 고정할 수도 있다.In this way, at the time of construction of the foundation foundation 11, which becomes the cornerstone of the bridge on the ground of the site, a plurality of anchor bolts 12 are embedded to protrude, and the connector 13 having a thread formed inside the projected plurality of anchor bolts 12. It is also possible to fasten and assemble, or to anchor the anchor nut to the foundation base 11 instead of the anchor bolt 12.

이와 같이 기초토대(11) 위에 결합 체결수단으로 앵카볼트(12) 또는 앵카너트 등을 돌출 형성하고, 그 위에 내측에 다수개의 파이프(16)를 수직으로 매립한 콘크리트 블럭(15)을 임의 단수로 다단으로 적층하여 교각용 기둥을 조성할 때 콘크리트 블럭(15)과 블럭(15) 사이 또는 기초 토대(11) 사이에 모르타르 또는 에폭시수지 등의 그라우트층(31)을 형성하여 접합부위로 물이나 기타 이물질이 침투되지 못하도록 밀봉됨과 동시 접합력이 강화되어지게 된다.As described above, the anchor block 12 or the anchor nut is formed to protrude on the foundation base 11, and the concrete block 15 having a plurality of pipes 16 vertically embedded therein is formed in multiple stages. When forming a pillar for piers by stacking them, a grout layer 31, such as mortar or epoxy resin, is formed between the concrete block 15 and the block 15 or between the foundation base 11 so that water or other foreign substances are formed at the junction. It is sealed against penetration and strengthened at the same time.

이와 같이 다단으로 적층시킨 교각용 콘크리트 블럭(15)의 맨 상단의 교각 상부용 콘크리트 블럭(18) 내측에 삽치한 수직파이프(19) 및 교각용 콘크리트 블럭(15) 내측의 파이프(16)를 관통하는 각각의 강봉(20)을 삽치시킨 후, 강봉(20) 하단부의 나사산(21)을 앵카볼트(12)에 미리 체결한 연결구(13)에 체결하여 강봉(20)의 하단부를 고정토록 하며, 강봉(20)의 상단부의 나사산(22)에 플레이트(24) 및 너트(25)로 체결할 때 기초 토대(11)에 다단의 교각용 콘크리트 블럭(15) 및 교각 상부용 콘크리트 블럭(18)이 일체로 되어지게 되는 것이다. 그 후, 교각 상부 위에 슬리브나 보등을 조립하여 교량을 완성하게 되는 것이다.The vertical pipe 19 inserted into the pier upper concrete block 18 at the top of the pier concrete block 15 laminated in multiple stages as described above and the pipe 16 inside the pier concrete block 15 penetrated. After inserting each of the steel rods 20 to be fastened, the threaded portion 21 of the lower end of the steel rod 20 is fastened to the connector 13 previously fastened to the anchor bolt 12 to fix the lower end of the steel rod 20, When fastening with the plate 24 and the nut 25 to the thread 22 of the upper end of the steel bar 20, the foundation base 11 has a multi-column pier concrete block 15 and a pier upper concrete block 18 It will be united. After that, a sleeve or beam is assembled on the top of the bridge to complete the bridge.

종래에 있어 교량용 교각은 형틀(거푸집)을 조성하고 이에 콘크리트를 부어 굳히는 현장 타설 콘크리트 공법을 사용하므로 말미암아 형틀 조립 및 해체시간, 보강용 철근 배근작업 및 이에 소비되는 시간 및 콘크리트 경화시간을 거쳐야만 비로서 교각이 완성되므로 인해 교각의 구축에 많은 기일이 소요되어 교량의 건설에 많은 기간이 소요됨을 볼 수 있으나, 본 고안에서와 같이 현장에서는 기초토대만 조성한 후, 그 위에 미리 공장에서 규격으로 제조된 내측에 파이프를 매립한 콘크리트 블럭을 규격 생산하고, 이를 현장으로 운반 설치함으로 인해 빠른시간내에 교각을 조립구축이 가능하게 되어 교량 건설기간을 단축하여 공사비를 절감할 수 있으며, 종래의 현장 타설에 의한 교각에 비해 강도 및 응력이 뒤떨어지지 않는 교각을 완성할 수 있는 아주 유용한 고안인 것이다.Conventionally, bridge piers use the site-cast concrete method of forming molds and pouring concrete to solidify them. As the pier is completed, it can be seen that it takes a lot of time to construct the bridge due to the completion of the construction of the bridge. Standard production of concrete blocks with pipes embedded inside and transporting them to the site enables assembly and construction of bridge piers within a short time, which can shorten the construction period of the bridge and reduce construction costs. The bridge can be completed with less strength and stress than the bridge It will share the valuable devised.

Claims (1)

교량의 기초가 되는 교각에 있어서, 다수개의 앵카볼트(12)가 돌출된 철근 콘크리트 기초 토대(11)를 형성하고, 상기 다수개의 앵카볼트(12)에 각각의 연결구(13)가 삽치 고정되며, 그 위에는 내측에 다수개의 파이프(16)를 수직으로 삽치한 교각용 콘크리트 블럭(15)을 다단으로 쌓은 기둥이 형성되며, 적층된 다단의 기둥 맨 위에도 역시 내측에 다수개의 파이프(19)를 수직으로 삽치한 교각 상부용 콘크리트 블럭(18)이 얹어지며, 상기 교각 상부용 콘크리트 블럭(18)의 내측에 삽치한 수직파이프(19) 및 교각을 구성하는 다단의 콘크리트 블럭(15) 내측의 수직파이프(16)에는 강봉(20)이 관통 삽치되어지되, 상기 강봉(20) 하단부의 나사산(21)은 상기 앵카볼트(12)에 체결한 연결구(13)에 체결 결합되고, 강봉(20)의 상단부 나사산(22)에는 플레이트(24) 및 너트(25)가 체결되어 기초 토대(11) 및 그 위에 적층된 다단의 교각용 콘크리트 블럭(15) 및 교각 상부용 콘크리트 블럭(18)이 일체로 연결 고정되며, 상기 기초 토대(11), 교각용 콘크리트 블럭(15), 교각 상부용 콘크리트 블럭(18) 사이의 접합부위에는 모르타르 또는 에폭시수지 등의 그라우트층(31)이 형성된 것을 특징으로 하는 조립식 교각.In the piers that are the foundation of the bridge, a plurality of anchor bolts 12 form a reinforced concrete foundation base 11, and each of the connectors 13 is fixedly inserted into the plurality of anchor bolts 12. On top of that, a column is formed in which the pier concrete blocks 15 having a plurality of pipes 16 vertically inserted therein are stacked in multiple stages, and a plurality of pipes 19 are also vertically stacked on top of the stacked multi-stage pillars. The inserted concrete block 18 for the pier upper part is mounted, and the vertical pipe 19 inserted inside the pier concrete block 18 and the vertical pipe inside the multi-level concrete block 15 constituting the pier ( 16, the steel rod 20 is inserted through, the lower end of the steel rod 20, the thread 21 is coupled to the connector 13 is fastened to the anchor bolt 12, the upper end of the steel rod 20 Plate 22 and nut 25 are fastened to 22. The air foundation base 11 and the multi-stage pier concrete block 15 and the pier upper concrete block 18 are integrally connected and fixed, and the foundation foundation 11, the pier concrete block 15 Prefabricated piers, characterized in that the grout layer 31, such as mortar or epoxy resin is formed at the joint between the concrete block 18 for the upper portion of the piers.
KR2020000022191U 2000-08-04 2000-08-04 Fabricated pier KR200213564Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020000022191U KR200213564Y1 (en) 2000-08-04 2000-08-04 Fabricated pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020000022191U KR200213564Y1 (en) 2000-08-04 2000-08-04 Fabricated pier

Publications (1)

Publication Number Publication Date
KR200213564Y1 true KR200213564Y1 (en) 2001-02-15

Family

ID=73086843

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020000022191U KR200213564Y1 (en) 2000-08-04 2000-08-04 Fabricated pier

Country Status (1)

Country Link
KR (1) KR200213564Y1 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020065413A (en) * 2002-06-15 2002-08-13 김태균 Pier omitted
KR100499977B1 (en) * 2002-10-24 2005-07-07 노윤근 Reinforced concrete unit pier block using prestressed concrete steel wire assembly and H-beam, and constructing method of fabricated reinforced concrete pier using the unit pier block
KR100804149B1 (en) 2006-11-24 2008-02-19 전영총 The PC structure pier and manufacturing method thereof
KR100860591B1 (en) 2007-06-19 2008-09-26 삼성물산 주식회사 Vertical structure building method using precast concreat block
KR101734127B1 (en) * 2016-09-27 2017-05-24 마인엔지니어링건축사사무소 주식회사 Precast reinforced concrete slab structure
KR20190037833A (en) * 2017-09-29 2019-04-08 한국전력공사 Prefabricated tower foundation
KR102088761B1 (en) * 2018-11-21 2020-04-08 주식회사 티에스토건 Plate system for SCW Construction method
KR102664955B1 (en) * 2023-06-22 2024-05-10 (주)렉스코 Steel composite precast piers in which concrete is synthesized on box-shaped steel coping and circular steel pipe columns, and their construction methods

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020065413A (en) * 2002-06-15 2002-08-13 김태균 Pier omitted
KR100499977B1 (en) * 2002-10-24 2005-07-07 노윤근 Reinforced concrete unit pier block using prestressed concrete steel wire assembly and H-beam, and constructing method of fabricated reinforced concrete pier using the unit pier block
KR100804149B1 (en) 2006-11-24 2008-02-19 전영총 The PC structure pier and manufacturing method thereof
KR100860591B1 (en) 2007-06-19 2008-09-26 삼성물산 주식회사 Vertical structure building method using precast concreat block
KR101734127B1 (en) * 2016-09-27 2017-05-24 마인엔지니어링건축사사무소 주식회사 Precast reinforced concrete slab structure
KR20190037833A (en) * 2017-09-29 2019-04-08 한국전력공사 Prefabricated tower foundation
KR102081637B1 (en) * 2017-09-29 2020-02-26 한국전력공사 Prefabricated tower foundation
KR102088761B1 (en) * 2018-11-21 2020-04-08 주식회사 티에스토건 Plate system for SCW Construction method
KR102664955B1 (en) * 2023-06-22 2024-05-10 (주)렉스코 Steel composite precast piers in which concrete is synthesized on box-shaped steel coping and circular steel pipe columns, and their construction methods

Similar Documents

Publication Publication Date Title
KR20020011706A (en) Fabricated pier and Fabricated pier construction method
KR100713692B1 (en) A prestresed connection set bridge post using unit filled concrete with internally confined hollow and a method for construction
KR101020865B1 (en) Dry Beam-Column Connection of Precast Concrete Members within the Extended Limitation of Construction Tolerances
CN106284655B (en) Precast concrete beam stud connects connecting node and connection method
KR101034185B1 (en) Bridge for bike-lane and construction method thereof
CN108166620B (en) Assembled concrete beam-column, post-column connected node
KR101478131B1 (en) Construction Method of Precast Pier
KR101339946B1 (en) Precast bridge post
KR101263370B1 (en) Precast end-block with girder connection member and bridge construction method using ths same
US20110239581A1 (en) Precast Concrete to Foundation Connection
KR200213564Y1 (en) Fabricated pier
KR100713690B1 (en) A set bridge post using unit filled concrete with internally confined hollow and a method for construction
CN108265823A (en) Assembly concrete-filled steel tube column-isolated footing-concrete collar tie beam L-shaped connecting node
JP3660647B2 (en) Girder construction method using concrete receiving beams
KR100865133B1 (en) A fixing device, a pre-fabricating forms for concrete-structure and the construction method thereof
KR20070023274A (en) PC Integrating Construction Method of an Underground Parking Lot and PC Column-Beam Joint System for Long Span PC Beam therein
KR101036177B1 (en) Method for constructing building using PRC integrating method
CN208023735U (en) Assembly concrete-filled steel tube column-isolated footing-concrete collar tie beam T shape connecting nodes
CN108301562A (en) Assembly concrete-filled steel tube column-isolated footing-concrete collar tie beam cross connecting node
KR100860592B1 (en) Temporary system for vertical structure using precast concreat block
CN208023734U (en) Assembly concrete-filled steel tube column-isolated footing-concrete collar tie beam linear type connecting node
KR100695491B1 (en) A fixing device, a pre-fabricating forms for concrete-structure and the construction method thereof
KR20020017571A (en) connection structure of fixing and connecting steel girder in reinforcement concrete column and construction method
KR100383800B1 (en) connetion structure of fixing and connecting steel girder in reinforcement concrete column and construction method
KR101826246B1 (en) Method for constructing concrete wall using precast concrete structure body having T-shaped section

Legal Events

Date Code Title Description
REGI Registration of establishment
LAPS Lapse due to unpaid annual fee
T601 Decision to invalidate utility model after technical evaluation