KR200208844Y1 - Beam for fixing of a soundprofing panel type in a body plastic - Google Patents

Beam for fixing of a soundprofing panel type in a body plastic Download PDF

Info

Publication number
KR200208844Y1
KR200208844Y1 KR2020000022268U KR20000022268U KR200208844Y1 KR 200208844 Y1 KR200208844 Y1 KR 200208844Y1 KR 2020000022268 U KR2020000022268 U KR 2020000022268U KR 20000022268 U KR20000022268 U KR 20000022268U KR 200208844 Y1 KR200208844 Y1 KR 200208844Y1
Authority
KR
South Korea
Prior art keywords
soundproof wall
construction
fixed
mortar
soundproof
Prior art date
Application number
KR2020000022268U
Other languages
Korean (ko)
Inventor
이원우
Original Assignee
이원우
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이원우 filed Critical 이원우
Priority to KR2020000022268U priority Critical patent/KR200208844Y1/en
Application granted granted Critical
Publication of KR200208844Y1 publication Critical patent/KR200208844Y1/en

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

본 고안은 합성수지재 일체형 방음판넬의 고정빔에 관한것으로, 더욱 상세하게는 방음벽을 보다 간편용이하게 설치할수 있고, 방음벽의 설치장소에 구애받지 않으며, 구조가 간단하여 염가제공과 작업성 및 생산성을 향상시킴과 동시에 고정빔이 외부로 노출되지 않아 방음판넬의 연속성을 구가함으로서 외관을 미려하게 하면서 견고하여 그 사용수명을 장구히 유지시킬수 있게한 것에 그 특징이 있다.The present invention relates to a fixed beam of a synthetic resin-integrated soundproof panel, more specifically, it is possible to install the soundproof wall more easily, regardless of the installation place of the soundproof wall, the structure is simple, providing a low cost, workability and productivity At the same time, the fixed beam is not exposed to the outside, which makes the soundproof panel continuity beautiful and solid, so that the service life can be maintained for a long time.

Description

합성수지재 일체형 방음판넬의 고정빔{BEAM FOR FIXING OF A SOUNDPROFING PANEL TYPE IN A BODY PLASTIC}BEAM FOR FIXING OF A SOUNDPROFING PANEL TYPE IN A BODY PLASTIC}

본 고안은 합성수지재 일체형 방음판넬의 고정빔에 관한것으로, 더욱 상세하게는 방음벽을 보다 간편용이하게 설치할수 있고, 방음벽의 설치장소에 구애받지 않으며, 구조가 간단하여 염가제공과 작업성 및 생산성을 향상시킴과 동시에 고정빔이 외부로 노출되지 않아 방음판넬의 연속성을 구가함으로서 외관을 미려하게 하면서 견고하여 그 사용수명을 장구히 유지시킬수 있게한 합성수지재 일체형 방음판넬의 고정빔에 관한것이다.The present invention relates to a fixed beam of a synthetic resin-integrated soundproof panel, more specifically, it is possible to install the soundproof wall more easily, regardless of the installation place of the soundproof wall, the structure is simple, providing a low cost, workability and productivity The present invention relates to a fixed beam of a synthetic resin integrated soundproof panel that improves and maintains the service life of the soundproof panel by enhancing the continuity of the soundproof panel because the fixed beam is not exposed to the outside.

소음은 산업발달에 따른 부산물인 시끄러운 소리로서 각종 차량의 증가와 기계류의 수적인 증가로 인하여 소음발생의 양적증가와 소음노출지역의 확대는 피할수 없는 현실이 되어왔다.Noise is a loud noise that is a by-product of industrial development. The quantitative increase in noise generation and the expansion of the noise exposure area have become unavoidable due to the increase of various vehicles and the number of machinery.

이에따라 각종 소음으로 인하여 발생되는 환경문제가 크게 대두되게 되었고, 이 목적에 부합되는 최적의 방음벽 개발에 대한 요구가 절실한 실정이다.Accordingly, environmental problems caused by various noises have emerged, and there is an urgent need for the development of an optimal soundproof wall for this purpose.

또한 인간 개개인의 쾌적한 생활에 영향을 미치는 소음을 막고 주변환경과 조화를 이루어 미적으로 우수한 방음벽, 즉 자연친화적인 방음벽에 대한 요구가 지속되었다.In addition, the demand for aesthetically sound sound barriers, ie, nature-friendly sound barriers, has been sustained by preventing noise that affects the pleasant life of each individual and harmonizing with the surrounding environment.

그리하여 최근에는 도로나 철로소음, 공장소음, 건설소음등 각종 소음이 많은곳에 각 제조회사의 규격별로 다양한 여러 형태의 방음벽이 구축되어 소음제거에 상당한 잇점을 제공하고 있다.Therefore, in recent years, various types of noise barriers have been constructed in various places, such as road, railroad noise, factory noise, construction noise, and so on, to provide significant advantages in noise reduction.

상기에서의 종래 소음방지용 방음벽의 구축상태를 간략히 살펴보면 알루미늄재로된 방음벽이 주를 이루고 있고, 그 구축 상태를 살펴보면 일정면적을 갖는 특정형상의 방음벽을 다수개 구비하고 콘크리트양생법에 의해 양생된 기초 구축물상에 H형강을 고정한후 상기의 H형강의 각 개구부를 통해 상기의 방음벽을 순차적으로 적층하여 이룬 것이 주종을 이루고 있다.Looking briefly at the construction state of the conventional noise-proof soundproof wall in the above, the soundproof wall made of aluminum is the main, and when looking at the construction state is provided with a plurality of specific-shaped soundproof walls having a certain area and the foundation construction cured by the concrete curing method After the H-beams are fixed on the water, the soundproof walls are sequentially stacked through the openings of the H-beams.

상기에서의 H형강을 이용한 방음벽의 고정상태를 살펴보면 일정 길이와 형태를 갖는 콘크리트재 기초구축물을 양생할때 일정길이를 선정하여 H형강을 고정하기위한 고정수단인 앵커볼트를 등간격으로 고착시키고 경화건조시켜 상기의 구축물을 방음벽 설치장소에 이동시킨후 굴착하여 일정길이로 매립설치한다.Looking at the fixed state of the soundproof wall using the H-beams in the above, when curing the foundation of concrete materials having a certain length and shape, by selecting a certain length to fix the anchor bolt, which is a fixing means for fixing the H-beams at equal intervals and hardened After drying, move the construct to the soundproof wall installation place, excavate and install it in a certain length.

상기에서의 기초구축물 매립작업이 완료되면 콘크리트 양생시 기 고착되어 있는 앵커볼트에 H형강을 입설하여 하단을 각각 체결하는 상태로 고정하고 H형강의 각 양측에 기 구비되어 있는 일정형태의 방음벽 개체, 즉 방음벽판넬을 끼워 적층시킨후 고정한다.When the construction of the foundation construction is completed, the H-steel is placed in the anchor bolt fixed to the concrete during curing, and fixed at the state of fastening the lower ends, respectively, and a predetermined soundproof wall object is provided on both sides of the H-beam, In other words, the soundproof wall panel is sandwiched and fixed.

이러한 상기의 방음벽 구축작업에 있어 콘크리트재로된 기초구축물의 양생작업시 앵커볼트를 'H'형강의 하단에 용착된 체결판의 체결공과 일치될수 있도록 먼저 고정한후 콘크리트를 투입한후 경화 건조시켜야만 하는데, 상기에서의 앵커볼트를 개별적으로 고정하거나 다수개를 한조로 이루어 고정한후 투입되는 콘크리트 양생물과 함께 투입하여 상부로 일정 길이만큼 돌출시킨상태로 고착하여야만 하기 때문에 그 작업의 난이도가 상당하고 숙련공의 전문적 기술이 필수적으로 요구되어야만 하여 작업성 및 생산성이 저하되는등의 문제를 내포하고 있었다.In the above-mentioned soundproof wall construction work, anchor bolts should be fixed first so that they can be matched with the fastening holes of the fastening plate welded to the bottom of the 'H' steel when concrete is being cured. Since the anchor bolts in the above are fixed individually or a plurality of sets are fixed and put together with the concrete nutrients that are put in, they must be fixed in a state of protruding upward by a certain length. Professional skills must be required to impose problems such as deterioration of workability and productivity.

또한 상기의 기초구축물에 앵커볼트가 고착되어 설치장소에 이동된후 그 각 상부에 H형강을 고정하는 작업과정을 살펴보면 일정 길이를 갖는 'H'형강의 하부에 상기의 앵커볼트와 일치되는 체결공이 형성된 별도의 체결판을 각각 용착하거나 체결하여 고정한후, 기중기와 같은 중장비를 이용하여 상기의 'H'형강을 입설시킨 다음,상기의 앵커볼트에 'H'형강의 하단에 형성되어 있는 체결공을 일치시켜 각각 체결하여야만 함으로서 그에 따른 작업시간의 지연과 작업공정의 복잡화를 야기하고, 그 구축 및 시공작업에 따른 소요되는 인력 및 소요비용이 가중되게 되는 문제가 야기되어 채산성에도 문제가 되는등 개선해야될 문제를 함께 안고 있다.In addition, when the anchor bolt is fixed to the foundation structure and moved to the installation place, the operation process of fixing the H-beams on each upper part of the H-shaped steel having a certain length is matched with the above anchor bolts. After welding or fastening the formed separate fastening plate, respectively, and placing the 'H' steel using heavy equipment such as a crane, the fastening hole formed at the bottom of the 'H' steel on the anchor bolt. It must be tightened in the same way, which leads to delay in working time and complexity of work process, and increases the manpower and cost required for the construction and construction work. I have a problem together.

특히, 상기의 작업방식을 이용하여 구축한 방음벽은 각 공법에 따라 소음이 차단되거나 흡음되어 소멸되는형태로 사용되기 때문에 방음벽으로서의 기능에는 별다른 문제제기를 하지않기로 하겠다.In particular, the soundproof wall constructed using the above working method is used in a form in which noise is blocked or absorbed and extinguished according to each construction method, so that the function as a soundproof wall will not pose any problem.

다만, 상기의 방법에 의해 구축된 방음벽은 기초구축물의 상부에 등간격으로 입설되어 있는 다수개의 'H'형강 양측으로 방음벽이 끼워져 고정되는 상태로 연결설치되기 때문에 상기의 'H'형강이 외부로 노출될수 밖에 없어 상기 형강에 의한 외관의 둔탁함을 면할수 없고, 이로인한 자연친화적 도시설계에도 반하며, 도로를 통행하는 차량승객들이나 대상지역 주민들에게 위압감을 주는 또다른 위협적존재로서의 구축물로취급될수 밖에 없다.However, the soundproof wall constructed by the above method is connected to both sides of the plurality of 'H' steels which are installed at equal intervals on the upper part of the foundation structure so that the soundproof walls are fitted and fixed so that the 'H' steel steel is moved to the outside. It can only be exposed to the dull appearance of the section, and thus against the nature-friendly urban design, it can be treated as a construct as another threat to the passengers who pass through the road or to intimidate people in the target area. none.

그리하여 본 출원인은 본 고안과 동일자로 폐플라스틱을 이용한 단일사출성형방식으로 방음벽을 성형제조하여 폐자원의 활용을 가능하게함과 동시에 각종 소음을 보다 효율적으로 제거할수 있게하면서 그 시공작업을 더욱 간편 용이하게하고 그로인해 얻어질수 있는 시공후 보수 및 사후관리의 용이성과 다양한 색상의 채택과 자연친화적 설계물로 도시환경의 미려함을 배가시키고자하는 기술이 제시되고 있다.Therefore, the applicant can manufacture the soundproof wall by the single injection molding method using the waste plastic as the same as the present invention, making it possible to utilize the waste resources and at the same time to remove various noises more easily. In order to improve the beauty of the urban environment with the ease of post-construction maintenance and post-management, the adoption of various colors, and the design of nature-friendly design.

따라서 본 고안은 본 고안과 동일자 출원되는 방음벽의 시공작업을 더욱 구체화하고 그 시공작업의 용이성 및 외관의 미려함을 동시에 얻을수 있게하면서 작업성 및 생산성의 향상효과를 도모하여 그 시공작업에 소요되는 비용을 저렴하게 유지시키고자 하는데 이를 제공하는 주 목적이 있다.Therefore, the present invention further embodies the construction work of the soundproof wall filed with the same designation as the present invention, and at the same time obtains the ease of construction and the beauty of the appearance, while improving the workability and productivity, thereby improving the cost required for the construction work. We want to keep it cheap, but its main purpose is to provide it.

본 고안의 다른목적은 상기의 고정빔을 제공함으로서 도로변과 같은 직선형태의 시공지는 물론, 다양한 형태의 구획라인을 모두 수용가능하게 함으로서 설치장소에 전혀 구애됨이 없이 발생되는소음을 모두 차단 내지 흡음할수 있도록하여 그 사용의 폭을 대폭 확장시키려는데 있다.Another object of the present invention is to provide a fixed beam of the above-described construction, as well as the construction of a straight line, such as the road side, can accommodate all the various types of partition lines to block all the noise generated without any concern to the installation site to sound absorption It is trying to expand the scope of its use significantly.

본 고안의 또 다른 목적은 그 구조가 간단하여 그 제조작업에 소요되는 비용을 줄여 염가 제공이 가능하게 하고, 그 시공작업의 간편용이함을 얻을수 있도록 하려는데 있다.Another object of the present invention is to simplify the structure and to provide a low cost by reducing the cost of the manufacturing work, it is possible to obtain the ease of use of the construction work.

도 1 은 본 고안의 일 요부를 확대 발췌하여 보여주는 분해사시도,1 is an exploded perspective view showing an enlarged excerpt of the main part of the present invention,

도 2 는 도 1 의 결합된 상태를 보여주는 단면도,2 is a cross-sectional view showing a combined state of FIG.

도 3 은 본 고안의 분해 사시도,3 is an exploded perspective view of the present invention,

도 4 는 도 3 의 결합된 상태를 보여주는 단면구성도,4 is a cross-sectional view showing a combined state of FIG.

도 5 및 도 6 은 본 고안의 사용상태를 보여주는 정면도 및 평면도.5 and 6 are a front view and a plan view showing a use state of the present invention.

<도면의 주요 부부에 대한 부호의 설명><Explanation of symbols for main couples in drawings>

1 : 몰탈 2 : 연결용 파이프체1: mortar 2: pipe for connection

3 : 지주용 파이프체 4 : 방음벽 판넬3: holding pipe body 4: soundproof wall panel

21, 31 : 나사부 41 : 결합공21, 31: threaded portion 41: coupling hole

상기한 목적을 달성하기 위해 본 고안을 첨부된 도면에 의거 좀더 상세히 설명하면 더욱 명백 해 질것이다.DETAILED DESCRIPTION OF THE INVENTION In order to achieve the above object, the present invention will be more clearly described in detail with reference to the accompanying drawings.

즉, 본 고안은 첨부된 도면 도 1 내지 도 5 에 도시된 바와같이,That is, the present invention is as shown in the accompanying drawings 1 to 5,

방음벽(100)을 설치하기 위한 기초구조물로서, 일정길이와 형태를 갖는콘크리트몰탈(1, 이하 몰탈이라 약칭함)의 내부에는 상부측 외면에 나사(21)가 형성되고 일정길이를 갖는 연결용 봉체 또는 파이프체(2)가 길이방향으로 다수개 입설된 상태로 고정되되,As a basic structure for installing the soundproof wall 100, a connecting rod having a predetermined length and a screw 21 is formed on the outer surface of the inside of the concrete mortar having a predetermined length and shape (hereinafter, referred to as mortar) Or the pipe body (2) is fixed in the state in which a plurality of standing in the longitudinal direction,

상기의 나사부(21)는 몰탈(1)의 상부측 외면으로 일정 높이를 유지하여 각각 돌출되고,The screw portion 21 is projected by maintaining a constant height to the upper outer surface of the mortar (1),

상기 나사부(21)에는 하부측 내면에 나사부(31)가 형성되고 일정 길이를 갖는 지주용 파이프체(3)가 각각 결합되어 이루어진다.The screw portion 21 is formed with a screw portion 31 is formed on the inner surface of the lower side and the holding pipe body (3) having a predetermined length are respectively coupled.

미설명부호로서, 4 는 방음벽판넬, 41 은 방음벽판넬(4)에 형성된 결합공, 42 는 흡음공, 43 은 공명관을 각각 나타낸다.As the reference numerals, 4 denotes a soundproof wall panel, 41 denotes a coupling hole formed in the soundproof wall panel 4, 42 denotes a sound absorbing hole, and 43 denotes a resonance tube.

이상과 같은 구조로 이루어진 본 고안의 작용을 설명하명 다음과 같다.To explain the operation of the present invention made of a structure as described above is as follows.

먼저, 몰탈(1)의 성형제조작업은 종래의 기술을 이용할수 있다.First, the molding manufacturing operation of the mortar 1 can use a conventional technique.

다만 상기에서의 연결용파이프체(2)는 몰탈(1)의 양생작업시 정위치를 정해 고정되는 상태로 양생하면 되므로 이를 위한 별도의 기술은 특별히 요구되지 않는다.However, the connection pipe body 2 in the above is to be cured in a fixed state to set a fixed position during the curing operation of the mortar (1) is not specifically required for this.

특히 상기에서의 연결용파이프체(2)는 종래 몰탈 양생시 앵커볼트를 고정하는 작업에 비해 더욱 간편하고 그 작업이 간단하여 양산이 가능하고 갖업에 소요되는시간을 대폭 절감 할 수 있다.In particular, the connection pipe body 2 in the above is simpler than the operation of fixing the anchor bolt during the conventional mortar curing, its operation is possible to mass production and can significantly reduce the time required for the manufactory.

상기에서의 몰탈(1) 양생작업이 계속되어 기초구조물이 양산되면 이를 통상의 이동수단을 이용하여 시공지로 이동시킨다음, 굴착하여 일정깊이로 매립하는 상태를 유지하여 견고히 고정한다.If the mortar (1) curing operation in the above is continued to mass-produce the foundation structure is moved to the construction site by using the usual moving means, then excavated to maintain a state of being buried to a certain depth to be firmly fixed.

물론, 상기에서의 몰탈(1)은 시공지의 지형적 특성에 따라 굴곡 시공하거나, 또는 몰탈(1)의 양생작업시 라운드형태를 갖도록 제조할수 있다.Of course, the mortar (1) in the above may be bent in accordance with the topographical characteristics of the construction site, or may be manufactured to have a round shape when curing the mortar (1).

상기와 같은 작업에 의해 몰탈(1)의 매립, 고정작업이 완료되면 몰탈(1)의 각 상면에 돌출된 상태를 유지하고 있는 연결용파이프체(2)의 나사부(21)에 일정길이를 갖는 지주용 파이프체(3)를 끼워 각각 고정 하기만 하면 되므로 지주, 즉 고정빔의 설치작업은 매우 간단 용이하고 그 작업에 소요되는 시간 및 인력이 대폭 줄어들게 되어 작업에 소요되는 비용 또한 절감 할수 있게되는 큰 잇점이 있다.When the embedding and fixing of the mortar 1 is completed by the above-described operation, the screw portion 21 of the connecting pipe body 2 which maintains the protruding state on the upper surface of the mortar 1 has a predetermined length. Since it is only necessary to fix each of the prop pipes (3), the installation of the prop, that is, the fixed beam, is very simple and easy, and the time and manpower required for the work are greatly reduced, thereby reducing the cost of the work. There is a big advantage.

상기와같은 연결용파이프체(2)와 지주용파이프체(3)의 결합작업이 반복되어 완료되면 각 파이프(3)와 파이프(3)사이에 방음판넬(4)을 각각 순차적으로 끼워 고정하여주기만 하면 소음이 흡음공(42)으로 흡음되어 공명관(43) 내에서 상쇄되어 제거되는 우수한 방음벽(100)이 완성되게 되는데,When the coupling work of the connecting pipe body 2 and the holding pipe body 3 is repeated as described above, the sound insulation panel 4 is sequentially inserted and fixed between each pipe 3 and the pipe 3. If only the cycle is absorbed by the sound absorbing hole 42, the excellent soundproof wall 100 is canceled and canceled in the resonance tube 43 is completed,

이때 상기의 지주용파이프체(3)에는 양측에 상하로 상호 대향되는 한쌍의 결합공(41)이 형성되고, 흡음공(42)이 연통형성된 공명관(43)이 수직상 상호 교호를 이루어 조립가능하게 형성된 방음벽판넬(4)의 상기 결합공(41)이 하부에서 부터 상부로 연속하여 적층되는 상태로 시공되게 된다.At this time, a pair of coupling holes 41 are formed on both sides of the holding pipe body 3 so as to face each other in a vertical direction, and the resonance tube 43 in which the sound absorbing holes 42 communicate with each other is vertically alternated to be assembled. The coupling hole 41 of the soundproof wall panel 4 is formed so as to be continuously stacked from the bottom to the top.

상기에서의 방음벽시공작업은 파이프체(2),(3) 즉, 본 고안에 의한 고정빔에 의해 그 시공작업이 메우 간단용이하면서 신속히 이루어져 그 작업에 소요되는시간 및 경비를 대폭 줄일수 있게되고, 그 외면에 끼워져 결합되는 방음벽판넬(4)에 의해 흡음 및 차음의 효과가 지대한데, 이는 상기의 고정빔이 파이프체(2),(3)로 형성되어 있고, 방음벽판넬(4)의 결합공(41) 역시 원형의 형태를 유지하고 있기 때문에 첨부된 도면 도 6 에서 보여주는바와같이 시공지의 지형에 영향받지 않고 시공될수 있어, 그 사용의 폭이 대폭 넓어지는 부수적 잇점을 함께 얻을수 있다.The soundproof wall construction work in the above is made of pipes (2), (3), that is, the fixed beam according to the present invention, the construction work is very simple and quickly made it is possible to significantly reduce the time and cost required for the work The soundproofing and soundproofing effect is great by the soundproof wall panel 4 which is fitted to the outer surface and is coupled, which is the fixed beam is formed of the pipe bodies 2 and 3, and the soundproof wall panel 4 is combined. Since the ball 41 also maintains a circular shape, it can be constructed without being affected by the topography of the construction site, as shown in FIG. 6, so that the use of the ball can be obtained with an additional advantage.

이러한 본 고안을 이용한 방음벽(100)의 시공후 보수작업에 있어서도 방음벽판넬(4)을 끼워 조립하는 형태로 구축되어있기 때문에 부분적인 보수작업이 가능하여 유지관리가 용이하고 그에따라 사용수명을 길게 연장시킬수 있다.In the maintenance work after the construction of the soundproof wall 100 using the present invention, since the soundproof wall panel 4 is built in a form of assembly, it is possible to perform partial repair work so that it is easy to maintain and extend the service life accordingly. You can.

이와같은 본 고안에 의하면 방음벽의 시공작업을 간단용이하게 하면서 및 외관의 미려함을 함께 얻을수 있게되었고, 그에따라 작업성 및 생산성의 향상효과를 도모하여 그 시공작업에 소요되는 비용을 저렴하게 유지시킬수 있게 되었으며, 도로변과 같은 직선형태의 시공지는 물론, 다양한 형태의 구획라인을 모두 수용가능하게 함으로서 설치장소에 전혀 구애됨이 없이 발생되는 소음을 모두 차단 내지 흡음할수 있도록하여 그 사용의 폭을 대폭 확장시킬수 있게 되었을뿐만 아니라 그 구조가 간단하여 그 제조작업에 소요되는 비용을 줄여 염가 제공이 가능하게 하고, 시공후 유지관리 및 보수작업이 간단하여 그 사용수명을 대폭 연장시키는등의 여러 유용한 효과를 동시에 얻을수 있는 매우 유익한 고안임이 명백하다.According to the present invention, the construction of the soundproof wall can be easily performed and the beauty of the appearance can be obtained together. Accordingly, the workability and productivity can be improved and the cost of the construction work can be kept at a low cost. In addition to the construction of a straight line, such as a roadside, it is possible to accommodate all the various types of partition lines, so that the noise can be blocked or absorbed without any concern for the installation site, thereby greatly expanding the range of its use. Not only that, but its structure is simple, so it is possible to provide low cost by reducing the cost of the manufacturing work, and it is possible to obtain various useful effects at the same time by greatly simplifying maintenance and repair work after construction. It is obvious that this is a very informative design.

Claims (1)

방음벽(100)을 설치하기 위한 기초구조물로서, 일정길이와 형태를 갖는콘크리트몰탈(1, 이하 몰탈이라 약칭함)의 내부에는 상부측 외면에 나사(21)가 형성되고 일정길이를 갖는 연결용 봉체 또는 파이프체(2)가 길이방향으로 다수개 입설된 상태로 고정되되,As a basic structure for installing the soundproof wall 100, a connecting rod having a predetermined length and a screw 21 is formed on the outer surface of the inside of the concrete mortar having a predetermined length and shape (hereinafter, referred to as mortar) Or the pipe body (2) is fixed in the state in which a plurality of standing in the longitudinal direction, 상기의 나사부(21)는 몰탈(1)의 상부측 외면으로 일정 높이를 유지하여 각각 돌출되고,The screw portion 21 is projected by maintaining a constant height to the upper outer surface of the mortar (1), 상기 나사부(21)에는 하부측 내면에 나사부(31)가 형성되고 일정 길이를 갖는 지주용 파이프체(3)가 각각 결합되어 이루어진것을 특징으로하는 합성수지재 일체형 방음판넬의 고정빔.Fixed portion of the synthetic resin integrated soundproof panel, characterized in that the screw portion 21 is formed on the inner surface of the lower threaded portion 31 is coupled to the holding pipe body (3) having a predetermined length.
KR2020000022268U 2000-08-04 2000-08-04 Beam for fixing of a soundprofing panel type in a body plastic KR200208844Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020000022268U KR200208844Y1 (en) 2000-08-04 2000-08-04 Beam for fixing of a soundprofing panel type in a body plastic

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020000022268U KR200208844Y1 (en) 2000-08-04 2000-08-04 Beam for fixing of a soundprofing panel type in a body plastic

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020000045199 Division 2000-08-04

Publications (1)

Publication Number Publication Date
KR200208844Y1 true KR200208844Y1 (en) 2001-01-15

Family

ID=73079663

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020000022268U KR200208844Y1 (en) 2000-08-04 2000-08-04 Beam for fixing of a soundprofing panel type in a body plastic

Country Status (1)

Country Link
KR (1) KR200208844Y1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160125671A (en) * 2015-04-22 2016-11-01 한국철도기술연구원 Precast wall using soil interception pile, underground structure having Precast wall and Method for connecting precast wall
KR102081961B1 (en) 2018-11-07 2020-02-26 주용산업 주식회사 Assembly of noise barriers

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160125671A (en) * 2015-04-22 2016-11-01 한국철도기술연구원 Precast wall using soil interception pile, underground structure having Precast wall and Method for connecting precast wall
KR101696282B1 (en) * 2015-04-22 2017-01-16 한국철도기술연구원 Precast wall using soil interception pile, underground structure having Precast wall and Method for connecting precast wall
KR102081961B1 (en) 2018-11-07 2020-02-26 주용산업 주식회사 Assembly of noise barriers

Similar Documents

Publication Publication Date Title
KR100342057B1 (en) Beam for fixing of a soundproofing panel type in a body plastic
KR20080041476A (en) Plastic soundproof panel
KR200208844Y1 (en) Beam for fixing of a soundprofing panel type in a body plastic
KR20020005348A (en) Sound isolation wall and method for constructing thereof
KR20060115563A (en) Soundproof structure
RU2118432C1 (en) Construction panel
KR100822065B1 (en) Noise barrier
KR102432031B1 (en) Reinforcing structure for earthquake-proof
KR200324444Y1 (en) Double structual soundproof wall or lightweight PC
KR200324443Y1 (en) Prefabricated soundproof wall of lightweight PC
KR101997850B1 (en) Temporary fence
KR100679932B1 (en) Constrution method of plastic purity soundproofed wall and panel structure
CN112814019A (en) Prefabricated formula steel concrete combination looped netowrk cabinet basis
JP3119688U (en) Frame type seismic reinforcement device
KR20020005257A (en) Sound isolation wall
KR20210098162A (en) Under ground structure using column steel pipe wall and construction method thereof
KR200331598Y1 (en) Tunnel type sound insulation facility having hanging ornamental panel
KR960009726B1 (en) Absorbing structure
KR200331602Y1 (en) Sound barrier tunnel having sound proof ceiling having air space
KR200260058Y1 (en) Absorbing noise barrier
KR100505844B1 (en) Soundproof panel
JP3031028U (en) Soundproofing equipment with concrete panels
KR100712171B1 (en) Jointable pipeblock using abandoned tire
KR102285340B1 (en) Support reinforcement system for temporary
KR200331600Y1 (en) Connection system of sound-absorbing panel of noise barrier tunnel

Legal Events

Date Code Title Description
U107 Dual application of utility model
REGI Registration of establishment
LAPS Lapse due to unpaid annual fee