KR200205920Y1 - A post joint for install of absorbing wall - Google Patents

A post joint for install of absorbing wall Download PDF

Info

Publication number
KR200205920Y1
KR200205920Y1 KR2020000019340U KR20000019340U KR200205920Y1 KR 200205920 Y1 KR200205920 Y1 KR 200205920Y1 KR 2020000019340 U KR2020000019340 U KR 2020000019340U KR 20000019340 U KR20000019340 U KR 20000019340U KR 200205920 Y1 KR200205920 Y1 KR 200205920Y1
Authority
KR
South Korea
Prior art keywords
post
joint
temporary
fixing
pipe
Prior art date
Application number
KR2020000019340U
Other languages
Korean (ko)
Inventor
임충현
Original Assignee
안홍식
삼성공업주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 안홍식, 삼성공업주식회사 filed Critical 안홍식
Priority to KR2020000019340U priority Critical patent/KR200205920Y1/en
Application granted granted Critical
Publication of KR200205920Y1 publication Critical patent/KR200205920Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/02Connections between parts of the scaffold with separate coupling elements
    • E04G7/06Stiff scaffolding clamps for connecting scaffold members of common shape
    • E04G7/12Clamps or clips for crossing members

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
  • Building Environments (AREA)

Abstract

본 고안은 가설 방음판을 고정하는 포스트를 연결하는 조인트에 관한 것으로서, 상세히는 수직으로 세워져 가설 방음판(5)을 연결하는 포스트(1)의 중간부위에 상하로 자유롭게 이동할 수 있는 이동부재(2)를 결합하여, 이 이동부재(2)의 일측면에 조인트(3c)를 부착함으로써 수평 방향으로 연결되는 비계 파이프(4)의 설치가 용이하도록 한 것을 특징으로 한다.The present invention relates to a joint for connecting the posts for fixing the temporary soundproofing plate, and in detail, the movable member (2) which can be freely moved up and down in the middle of the post (1) that is vertically erected to connect the temporary soundproofing plate (5). By combining, by attaching the joint (3c) to one side of the movable member 2, it is characterized in that the installation of the scaffold pipe (4) connected in the horizontal direction is easy.

Description

가설 방음벽 설치용 포스트 조인트{A Post Joint for Install of Absorbing Wall}Post Joint for Absorbing Wall

본 고안은 가설 방음판을 고정하는 포스트의 중간에 장착되는 조인트에 관한 것으로서, 상세히는 단간비계 상에 수직으로 세워져 가설 방음판을 연결하는 포스트의 중간으로 수평 방향으로 뻗어가는 비계 파이프를 연결할 때, 상기 비계 파이프를 지지하기 위해 연결되는 중간부위의 조인트가 상기 포스트 상에서 자유롭게 이동할 수 있도록 구성한 것을 특징으로 하는 가설 방음판 고정용 포스트 조인트에 관한 것이다.The present invention relates to a joint mounted in the middle of a post for fixing the temporary soundproofing plate, and in detail, when connecting the scaffolding pipe which is vertically erected on the gangan scaffold and extends horizontally to the middle of the post connecting the temporary soundproofing plate, It relates to a hypothetical sound insulation board fixing post joint, characterized in that the joint of the intermediate portion connected to support the pipe is configured to move freely on the post.

건물이나 그 밖의 공사 현장같은 곳에서는 대부분 공사 기간동안 주위의 시선이나 현장의 소음을 차단하기 위해 상기 공사 현장의 사방으로 가설 방음벽을 설치하게 되는데, 이러한 가설 방음벽은 보통 일정한 크기의 가설 방음판을 상하좌우로 연결하여 원하는 만큼의 길이와 높이로 설치하게 된다.Most buildings, such as buildings and other construction sites, install temporary noise barriers on all sides of the construction site in order to block the eyes of the surroundings or the noise during the construction period. Connect it to your desired length and height.

그런데, 상기한 바와 같이 가설 방음판들을 서로 연결하여 가설 방음벽을 설치하기 위해서는, 지면에서 일정 간격을 두고 수직으로 세워지는 비계 파이프에 수평으로 또 다른 비계 파이프를 연결하여 그물 모양의 단간비계를 설치하고, 수평으로 연결되는 상기 단간비계의 비계 파이프에 걸쳐서 수직으로 세워지는 포스트를 설치하여, 이 포스트에 부착된 조인트로 상기 수평의 비계 파이프와 포스트를 고정한 후, 상기 포스트의 사이 사이마다 가설 방음판을 연결하여 고정하는 방식을 많이 채택하고 있다.However, in order to install the temporary soundproof walls by connecting the temporary sound insulation boards as described above, another scaffold pipe is horizontally connected to a scaffold pipe that is vertically erected at a predetermined distance from the ground, and a net-shaped short scaffold is installed. A post is set up vertically across the scaffolding pipe of the scaffold connected horizontally, the horizontal scaffolding pipe and the post are fixed with a joint attached to the post, and then a temporary sound insulation board is connected between the posts. Many methods of fixing are adopted.

그런데, 주로 강한 바람에 의한 영향을 받게 되면 쓰러질 우려가 있는 가설 방음벽을 보다 튼튼하게 보강하기 위해서, 필요할 때마다 포스트의 중간에 또 다른 조인트를 용접으로 고정하여, 상기 포스트와 포스트 사이에서 수평으로 연결되는 비계 파이프를 설치하되, 공사 현장의 주위 환경에 따라서는 수평으로 연결되는 또 다른 비계 파이프를 계속해서 연결하여 더욱더 가설 방음벽을 보강하고 있다.By the way, in order to reinforce the hypothetical sound insulation wall, which is likely to fall when it is mainly affected by strong wind, another joint is fixed by welding in the middle of the post whenever necessary, horizontally between the post and the post. Although the scaffold pipes are connected, another scaffold pipe connected horizontally is continuously reinforced depending on the surrounding environment of the construction site to further reinforce the temporary sound insulation wall.

그러나, 수직으로 세워지는 포스트의 중간에서 수평으로 연결되는 비계 파이프를 설치하기 위한 조인트가 상기 수직으로 세워지는 포스트 상의 중간 부위에서 용접으로 고정되기 때문에, 조금 강한 충격을 받게 되면 상기 조인트가 포스트에서 분리되는 문제가 있을 뿐만 아니라, 용접에 의한 조인트의 고정을 위해 수시로 작업인원 및 작업시간이 투입되어야 하는 문제가 있었다.However, since the joints for installing the scaffolding pipes connected horizontally in the middle of the vertically erecting posts are fixed by welding at the intermediate portions on the vertically erecting posts, the joints are separated from the posts when subjected to a slight impact. In addition to being a problem, there was a problem that the working staff and working time should be put in place for fixing the joint by welding.

더욱이, 중간부위의 조인트가 용접으로 고정되어 있기 때문에 수평으로 비계 파이프를 연결하고자 할 때, 상기 비계 파이프는 기장이 긴 상태에서 보관되기 때문에 거의 휘어져 있는 경우가 많으나, 용접으로 고정된 포스트와 포스트 사이의 조인트는 수평을 유지하고 있기 때문에, 이와 같은 조인트와 조인트 사이에서 휘어진 비계 파이프를 연결한다는 것은 상당히 어려운 문제가 되고 있었다.Furthermore, when the scaffold pipe is horizontally connected because the intermediate joint is fixed by welding, the scaffold pipe is often bent because it is stored in a long state, but between the post and the post fixed by welding Since the joints are horizontal, connecting a curved scaffold pipe between such joints and joints has become a very difficult problem.

본 고안은 상기한 바와 같은 종래 포스트의 문제점을 개선하기 위해 안출한 것으로서, 어떠한 설치 조건하에서도 즉, 아무리 수평으로 연결되는 비계 파이프가 휘어져 있다 하더라도 수직으로 세워지는 포스트의 중간 부위에 고정된 포스트 조인트가 항상 상기 휘어진 비계 파이프에 대응할 수 있도록, 상기 중간 부위의 포스트 조인트가 상하로 자유롭게 유동할 수 있는 포스트 조인트를 제공함에 그 목적이 있다.The present invention is devised to improve the problems of the conventional posts as described above, and post joints fixed in the middle of the posts which are standing vertically under any installation conditions, ie no matter how horizontally connected scaffold pipes are bent. It is an object of the present invention to provide a post joint in which the post joint of the intermediate portion can flow freely up and down, so that can always correspond to the curved scaffold pipe.

도 1은 본 고안에 따른 조인트가 설치된 포스트의 사시도,1 is a perspective view of a post is installed, according to the present invention;

도 2는 본 고안에 따른 포스트 조인트의 사용상태도.Figure 2 is a state of use of the post joint according to the present invention.

(도면 부호의 설명)(Explanation of reference numerals)

1...포스트, 2...이동부재,1 post, 2 moving member,

3a,3b,3c...조인트, 4...비계 파이프,3a, 3b, 3c ... joint, 4 ... scaffolding pipe,

5...가설 방음판.5. Hypothesis soundproof board.

상기한 바와 같은 목적을 달성하기 위해, 본 고안은 수직으로 세워지는 가설 방음판 연결용 포스트의 중간 부위에 설치되는 조인트를 상기 포스트의 상하로 자유롭게 이동할 수 있도록 연결된 이동부재에 부착한 것을 특징으로 한다.In order to achieve the object as described above, the present invention is characterized in that the joint is installed in the middle portion of the post for installing the temporary soundproof plate is installed vertically attached to the moving member connected to be freely moved up and down of the post.

이하, 첨부된 도면을 참조하여 본 고안에 따른 가설 방음벽 설치용 포스트 조인트의 구성을 상세히 설명한다.Hereinafter, with reference to the accompanying drawings will be described in detail the configuration of the post joint for installing the temporary soundproof wall according to the present invention.

도 1은 본 고안에 따른 포스트 조인트의 사시도, 도 2는 본 고안에 따른 포스트 조인트의 사용상태도를 도시한 것으로서, 도시한 바와 같이,1 is a perspective view of a post joint according to the present invention, Figure 2 is a view showing a state of use of the post joint according to the present invention, as shown,

가설 방음판을 연결하여 고정하기 위한 H빔 형상의 포스트에 부착된 조인트에 있어서,In the joint attached to the H-beam-shaped post for connecting and fixing the temporary sound insulation board,

수직으로 세워지는 포스트(1)의 일측면 양측에는 이동부재(2)의 양측을 맞물려서 연결시켜, 상기 포스트(1)의 상단 및 하단에 고정된 조인트(3a)(3b)의 사이에 상하로 자유롭게 유동할 수 있도록 상기 이동부재(2)를 결합하되, 이 이동부재(2)의 일측면에는 상기 포스트(1)의 수평 방향으로 연결되는 비계 파이프(4)를 고정하기 위한 조인트(3c)가 부착된 것을 특징으로 한다.Both sides of the movable member 2 are connected to both sides of one side of the post 1 standing vertically, freely up and down between the joints 3a and 3b fixed to the upper and lower ends of the post 1. The moving member 2 is coupled to flow, but one side of the moving member 2 is attached with a joint 3c for fixing the scaffold pipe 4 connected in the horizontal direction of the post 1. It is characterized by.

여기서, 상기 이동부재(2) 및 이에 부착되는 조인트(3)는 필요에 따라 1개 이상의 다수개로 상기 포스트(1)의 중간에 장착할 수도 있다.Here, the movable member 2 and the joint 3 attached thereto may be mounted in the middle of the post 1 as one or more as necessary.

따라서, 가설 방음벽을 보강하기 위해 포스트(1)의 중간에 추가적으로 비계 파이프(4)를 연결하여 고정하고자 할 때, 도 2에 도시한 바와 같이, 우선 포스트(1)를 단간비계의 상단 및 하단의 비계 파이프에 걸쳐서 수직으로 세워 상기 포스트(1)의 상단 및 하단 부위에 부착된 조인트(3a)(3b)로 연결하여 고정하고, 포스트(1)의 중간 부위에서 수평 방향으로 연결되는 비계 파이프(4)는 조인트(3c)가 부착된 이동부재(2)의 높이를 상하로 조정하면서 상기 비계 파이프(4)의 휘어진 상태에 맞추어 자유롭게 연결할 수 있게 된다.Therefore, when connecting and fixing the scaffolding pipe 4 additionally in the middle of the post 1 to reinforce the temporary soundproof wall, as shown in FIG. The scaffold pipe (4) connected vertically across the scaffold pipe and connected and fixed by joints (3a) (3b) attached to the upper and lower portions of the post (1), and connected in the horizontal direction at the middle of the post (1). ) Can be freely connected in accordance with the bent state of the scaffolding pipe 4 while adjusting the height of the movable member 2 to which the joint 3c is attached.

이때, 수직으로 세워지는 포스트(1)에 수평 방향으로 비계 파이프(4)를 연결하고 난 후, 상기 이동부재(2)는 H빔 형상의 포스트(1) 양쪽 홈에 삽입되어 타이트하게 끼워지는 가설 방음판(5)에 의해 일차적으로 고정되고, 이렇게 포스트(1)에 가설 방음판(5)이 설치되면 상기 포스트(1)가 가설 방음판(5)이 넘어지지 않도록 고정하고 있기 때문에, 상기 이동부재(2)는 이에 부착된 조인트(3c) 방향으로 힘을 받게 되어 더욱 확실하게 포스트(1)에 고정되게 된다.At this time, after connecting the scaffolding pipe 4 in the horizontal direction to the post (1) standing vertically, the movable member 2 is inserted into both grooves of the H-beam-shaped post (1) hypothesis that is tightly fitted The movable member 2 is fixed by the sound insulation board 5 primarily, and when the temporary sound insulation board 5 is installed in the post 1, the post 1 is fixed so that the temporary sound insulation board 5 does not fall. ) Is forced in the direction of the joint 3c attached thereto so as to be more securely fixed to the post 1.

이상과 같은 목적과 구성으로 이루어진 본 고안의 가설 방음벽 고정용 포스트 조인트에 의하면, 수직으로 세워지는 포스트의 중간 부위에 수평 방향으로 연결되는 비계 파이프의 설치가 매우 용이해져 작업강도 및 작업시간을 단축할 수 있는 장점이 있다.According to the hypothetical sound wall fixing post joint of the present invention made of the above object and configuration, it is very easy to install the scaffolding pipe connected in the horizontal direction to the middle portion of the vertical post to reduce the work intensity and working time There are advantages to it.

Claims (1)

가설 방음판을 연결하여 고정하기 위한 H빔 형상의 포스트에 부착된 포스트 조인트에 있어서,In the post joint attached to the H-beam-shaped post for connecting and fixing the temporary sound insulation board, 수직으로 세워지는 포스트(1)의 일측면 양측에는 이동부재(2)의 양측을 맞물려서 연결시켜, 상기 포스트(1)의 상단 및 하단에 고정된 조인트(3a)(3b)의 사이에 상하로 자유롭게 유동할 수 있도록 상기 이동부재(2)를 결합하되, 이 이동부재(2)의 일측면에는 상기 포스트(1)의 수평 방향으로 연결되는 비계 파이프(4)를 고정하기 위한 조인트(3c)가 부착된 것을 특징으로 하는 가설 방음벽 설치용 포스트 조인트.Both sides of the movable member 2 are connected to both sides of one side of the post 1 standing vertically, freely up and down between the joints 3a and 3b fixed to the upper and lower ends of the post 1. The moving member 2 is coupled to flow, but one side of the moving member 2 is attached with a joint 3c for fixing the scaffold pipe 4 connected in the horizontal direction of the post 1. Post joint for temporary sound insulation wall installation characterized in that it became.
KR2020000019340U 2000-07-06 2000-07-06 A post joint for install of absorbing wall KR200205920Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020000019340U KR200205920Y1 (en) 2000-07-06 2000-07-06 A post joint for install of absorbing wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020000019340U KR200205920Y1 (en) 2000-07-06 2000-07-06 A post joint for install of absorbing wall

Publications (1)

Publication Number Publication Date
KR200205920Y1 true KR200205920Y1 (en) 2000-12-01

Family

ID=19663943

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020000019340U KR200205920Y1 (en) 2000-07-06 2000-07-06 A post joint for install of absorbing wall

Country Status (1)

Country Link
KR (1) KR200205920Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102470257B1 (en) 2022-05-10 2022-11-22 박종근 Architectural beam clamp

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102470257B1 (en) 2022-05-10 2022-11-22 박종근 Architectural beam clamp

Similar Documents

Publication Publication Date Title
JP4767881B2 (en) Fence beam mounting structure
RU2000125967A (en) BUILDING METHOD
KR100945461B1 (en) Soundproofing Walls
KR20200107153A (en) Sound and earthquake proofed tunnel with drain-proof function and construction method of the same
JPH10227122A (en) Attaching construction for scaffolding doubling as sound-absorbing member for viaduct
KR200205920Y1 (en) A post joint for install of absorbing wall
KR200339487Y1 (en) Angle supporting object for building stone pannel construction
KR102102214B1 (en) Safety handrail for beam table form
KR101856686B1 (en) A soundproof pannel fixing device of a tunnel soundproof wall using O-beam
KR20060115563A (en) Soundproof structure
JP2007023662A (en) Airtight shelter and method of constructing the same
CN215717070U (en) I-steel subassembly of encorbelmenting of scaffold frame encorbelments
JPH0544202A (en) Scaffold structure for repairing bridge handrail and hanging metal structure therefor
KR101169025B1 (en) Attachable-removeable sound absorption panel
CN209653351U (en) Noise-reduction type construction platform
JP5940293B2 (en) Balconi floor structure
KR200465675Y1 (en) Sound proof wall clamping apparatus
KR101098939B1 (en) Soundproof wall pole fixing structure equipped with slide function for a horizontal displacement adaptation in a protective wall of a bridge
KR200285281Y1 (en) Supporting structure for concrete wall
KR200227450Y1 (en) a dust proof and sound proof panel for the fence to construct around a construction spot
CN218176905U (en) Miniature steel-pipe pile construction sound insulation canopy
JPH11247308A (en) Horizontal joint structure in curtain wall
KR102106418B1 (en) Temporary fence
CN218912205U (en) Protective device, cavity wall and connector
KR100236692B1 (en) Process and structure for installing sound-proof walls

Legal Events

Date Code Title Description
N231 Notification of change of applicant
REGI Registration of establishment
T601 Decision on revocation of utility model registration
LAPS Lapse due to unpaid annual fee