KR20020005891A - Method for reinforcement of reclamation land filling up waste material and its apparatus - Google Patents

Method for reinforcement of reclamation land filling up waste material and its apparatus Download PDF

Info

Publication number
KR20020005891A
KR20020005891A KR1020000039392A KR20000039392A KR20020005891A KR 20020005891 A KR20020005891 A KR 20020005891A KR 1020000039392 A KR1020000039392 A KR 1020000039392A KR 20000039392 A KR20000039392 A KR 20000039392A KR 20020005891 A KR20020005891 A KR 20020005891A
Authority
KR
South Korea
Prior art keywords
filling
landfill
injection
bag
ground
Prior art date
Application number
KR1020000039392A
Other languages
Korean (ko)
Other versions
KR100377839B1 (en
Inventor
최춘식
천병식
Original Assignee
최춘식
천병식
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 최춘식, 천병식 filed Critical 최춘식
Priority to KR10-2000-0039392A priority Critical patent/KR100377839B1/en
Publication of KR20020005891A publication Critical patent/KR20020005891A/en
Application granted granted Critical
Publication of KR100377839B1 publication Critical patent/KR100377839B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/08Improving by compacting by inserting stones or lost bodies, e.g. compaction piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/36Concrete or concrete-like piles cast in position ; Apparatus for making same making without use of mouldpipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/62Compacting the soil at the footing or in or along a casing by forcing cement or like material through tubes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

PURPOSE: A device and a method for reinforcing the buried layer of a waste landfill are provided to increase the strength of a soft ground of a landfill at a lost cost. CONSTITUTION: A plurality of injecting tubes(3) are put into a filling bag(1) made with compound fabric or hemp cloth. The mouth part of the filling bag using a band(5), and the injecting tubes are fixed. The middle portions of the filling bag is bound with fine wires(2) to form multi-layer filling portions(1a). A hook(4a) is formed in the lower end of a measuring tape exposed on the ground(4) and wound on the lower portion of the filling portion. The filling bag is placed in a vertical tunnel. Gel type filler material constituted of fly ash 60-70wt%, cement 30-40wt%, water and a blending agent is injected to the injecting tubes. After the filler material is cured, the upper ends of the filling bag and the injecting tubes are finished.

Description

쓰레기 매립지의 매립층 보강공법 및 그 장치{Method for reinforcement of reclamation land filling up waste material and its apparatus}Method for reinforcement of reclamation land filling up waste material and its apparatus}

본 발명은 쓰레기 매립장처럼 매립층이 연약한 지반의 강도를 높여 도로와 같은 시설물을 설치하기 위하여 안정기반을 조성하기 위한 보강공법 및 그 장치에 관한 것이다.The present invention relates to a reinforcement method and a device for creating a stable base for installing facilities such as roads by increasing the strength of the ground where the buried layer is soft like a landfill.

쓰레기로 매립된 매립지반은 일반 연약지반처럼 지내력이 워낙 약하고 탄성이 커서 도로, 건조물 등의 기초지반으로 부적합하기 때문에 어떤 방법과 수단을 강구해서라도 지반을 보강해야 한다.Landfills that are reclaimed with trash, like general soft grounds, have very low internal strength and elasticity, which makes them unsuitable for foundations such as roads and buildings.

쓰레기 매립지에 대한 지내력 보강도 일반 연약지반을 대상으로 개발된 말뚝 공법과 쇄석-파일공법, 시멘트 소일 주입공법 등을 적용할 수 있다. 일반 연약지반보강공법은 PC제 기초 말뚝과 마찬가지로 상재하중을 말뚝에 실어 지중의 경질지반에 전달함으로서 지지력을 높이고 지반침하현상을 억제하는 것으로서, 구체적인 적용성과 구조적인 차이를 기준으로 파일 슬래브공법과 파일 캡공법 및 파일 네트공법으로 나눌 수 있다.The bearing strength reinforcement for waste landfill can be applied to pile method, crushed-pile method and cement soil injection method developed for general soft ground. The general soft ground reinforcement method, like the foundation piles made of PC, increases the bearing capacity and suppresses the ground subsidence by transferring the load to the hard ground of the pile, and based on the specific applicability and structural differences, the pile slab method and pile It can be divided into cap method and pile net method.

말뚝공법은 원주형 철근 콘크리트 말뚝을 지중에 항타하거나 매설하는 방식으로 기초를 다지는 것인데, 연약지반중 지중에 균열이 없는 점성토나 사질토 지반에 대한 보강효과가 있지만, 지중에 균열이 있는 균열토질에는 부적합하다. 그래서 최근에는 주변에 복수의 통공이 천공된 유공관을 천공갱에 건입하고 유공관 속에 쇄석, 자갈 등의 골재를 넣고 시멘트와 물유리가 혼합된 충전재를 강제로 주입하면 그 충전재가 유공관의 통공으로 빠져나가 지중의 균열된 틈으로 스며 들어가서 메꾸는 충전재 주입법이 선을 뵈게 된 것이다.The piling method is to lay the foundation by ruddering or embedding columnar reinforced concrete piles in the ground, but it has reinforcement effect on the cohesive or sandy soil without crack in the soft ground, but it is not suitable for cracked soil with cracks in the ground. Do. So, recently, when the perforated hole with a plurality of perforated holes is entered into the perforated shaft, aggregates such as crushed stone and gravel are put into the perforated pipe, and the filler is forced into the perforated hole of the perforated pipe. Filling of filling material that penetrates into cracks of cracks is broken.

충전재 주입공법은 지반의 천공갱에 단일 유공관 또는 2 이상의 유공관을 건입하는 이른바 단관 로드공법 또는 이중관 더블 패커주입공법이 있는데, 어느 것이나 유공관의 제조비가 만만치 않고 제조설비비 또한 막대한데다 보강공사가 느리게 진행되는 까닭에 공기지연에 따른 비용손실도 크다.Filler injection method is the so-called single-tube rod method or double-tube double packer injection method in which a single perforated pipe or two or more perforated pipes are built into the ground drill cavities, and the manufacturing cost of the perforated pipes is not great, the manufacturing equipment cost is enormous, and the reinforcing work is slow. Therefore, the cost loss due to air delay is also large.

그리고 일반적인 충전재 주입공법은 일반 연약지반과는 달리 매립층의 탄성이 크고 지중에 미세공간이 발달되어 있기 때문에 종전의 충전재 주입공법만으로 그 지반을 보강하려해도 물유리와 시멘트가 과량 소모되어 공사비의 증액이 불가피하고, 내부에 찬 가스의 압력과 높은 수압 때문에 유공관 주위로 빠져나간 충전재가 매립층의 틈으로 효과적으로 침투하지 못하는 까닭에 지반보강공사의 신뢰도가 낮았다.And, unlike general soft ground, general filling material injection method has large elasticity of buried layer and microcavity is developed in the ground. Therefore, even if it is tried to reinforce the ground with only filling material injection method, water glass and cement are consumed excessively, which increases the construction cost. In addition, the reliability of the ground reinforcement work was low because the filling material that escaped around the perforated pipe did not effectively penetrate into the gap of the buried layer due to the pressure of the cold gas and the high water pressure.

본 발명의 목적은 쓰레기 매립지에 있어서의 충분한 지내력 확보에 따른 도로, 건조물의 안전도 증대, 보강공사비의 절감 및 공기단축효과가 우수한 쓰레기 매립지의 매립층 보강공법 및 이 방법에 특히 적합한 간단한 구조의 보강장치를 제공하는 것이다.It is an object of the present invention to increase the safety of roads and constructions according to securing sufficient bearing capacity in landfills, to reduce reinforcement work costs, and to reinforce the landfill layer of waste landfills with excellent air shortening effect, and a simple structure reinforcement device particularly suitable for this method. To provide.

본 발명은 쓰레기 매립지의 매립층 보강설계에 맞게 천공할 수직갱의 구경 심도에 맞춰 작성한 질기고 값싼 장척 직물제 충전자루의 하단을 끈 같은 결속수단으로 묶어 봉하고, 상기 충전자루 속에는 지상에서 각 단의 충전부에 이르는 충전재 주입관을 삽입하고 충전자루의 상단을 밴드로 둘러 묶어서 주입관을 고정시키며, 충전자루의 중간중간에는 가느다란 철사로 허리띠를 두르듯이 느슨하게 둘러 묶어 종방향으로 다단의 충전부를 확보하고, 각 충전부의 밑둥치에는 지상 노출길이가 긴 가늠줄의 하단에 주어진 올가미를 씌워 걸친 쓰레기 매립지용 매립층 보강장치를 제공한다.According to the present invention, the lower end of the rugged and cheap long-length textile filling bag made according to the diameter of the vertical shaft to be drilled in accordance with the reinforcement design of the landfill layer of the waste landfill is bundled and sealed with the same binding means, and in the filling bag at the filling part of each stage in the ground. Insert the filler injection tube leading to the top of the filler sack enclosed with a band to fix the infusion tube, and in the middle of the filler sack is loosely wrapped around the belt like a belt around to secure a multi-stage filling part in the longitudinal direction, each The underside of the live parts is provided with a landfill layer reinforcement for landfills covering a given noose at the bottom of a long strip of ground.

본 발명은 또 쓰레기 매립지의 매립층에 지반보강설계에 따라 적당한 간격을 두고 소정의 공경과 심도로 수직갱을 천공하는 수직갱 천공공정과, 상기 수직갱에 충전자루를 건입하는 제1 공정과, 상기 충전자루에 개개의 주입관을 이용하여 충전재를 주입, 최대한 팽출시키는 제2 공정과, 상기 충전재 양생 후 지상으로 노출된 충전자루의 상단부를 마무리 손질하는 제3 공정으로 이뤄지는 것을 특징으로 하는 쓰레기 매립지의 지반처리 공법으로 파일의 선단지지 효과와 파일 팽창에 의한 주변지반의 개량을 복합적으로 기대할 수 있는 폐기물 매립지반의 지내력 증대용 보강공법을 제공한다.The present invention also provides a vertical shaft drilling step of drilling a vertical shaft with a predetermined pore size and depth at a suitable interval according to the ground reinforcement design in a landfill layer of a waste landfill, a first step of building a filling bag into the vertical shaft, and the filling bag. Ground treatment method of landfill, characterized in that the second step of injecting and bulging the filling material by using the individual injection tube, and the third step of finishing the upper end of the filling bag exposed to the ground after curing the filling material Therefore, it provides a reinforcement method for increasing the bearing capacity of waste landfills that can be expected to combine the improvement of the surrounding ground by the pile support and pile expansion.

또한, 본 공법은 파일 타설시 슬라임(slime)이 전혀 없고, 저소음, 무진동공법이기 때문에 환경친화적이며, PG 파일의 주재료로서 산업폐기물(fly ash)를 사용하기 때문에 폐기물의 재활용 면에서 적용이 기대된다.In addition, this method is environmentally friendly because there is no slime at the time of pile laying, low noise and no vibration method, and it is expected to be applied in terms of recycling waste because it uses industrial ash as the main material of PG pile. .

도 1 은 본 발명에 의한 쓰레기 매립지의 매립층 보강장치의 사시도1 is a perspective view of a landfill layer reinforcement device of a landfill according to the present invention

도 2 는 충전자루의 종단면도2 is a longitudinal sectional view of a bag

도 3 은 본 발명의 다른 실시예에 의한 충전자루의 종단면도Figure 3 is a longitudinal cross-sectional view of the filling bag according to another embodiment of the present invention

도 4 는 마디조립형 유공관의 부분절개 정면도4 is a partial cutaway front view of the knurled tube

도 5 는 쓰레기 매립층의 바닥이 강화된 수직갱에 충전자루를 건입한 경우의 단면도5 is a cross-sectional view of the case where the filling bag is inserted into the vertical shaft in which the bottom of the waste landfill layer is reinforced.

도 6은 쓰레기 매립층에 대한 보강공사 후의 충전자루 두부의 정리단면도Figure 6 is a cross-sectional view of the filling bag tofu after reinforcement for the landfill layer

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

a : 쓰레기 매립층 b : 수직갱a: landfill layer b: vertical shaft

1 : 충전자루 2 : 중간묶음 철사1: Charging bag 2: Middle bundle wire

3 : 주입관 3a : 단일형 유공관3: injection tube 3a: unitary perforated tube

3b : 마디조립형 유공관 3c : 유출공3b: Node-assembled perforated tube 3c: Outflow hole

3' : 장척의 단일 주입관 3" : 보조주입관3 ': long single injection tube 3 ": auxiliary injection tube

4 : 가늠줄 4a : 올가미4: bar 4a: noose

5 : 밑봉함용 결착수단 6 : 윗봉함용 밴드5: fastening means for the bottom seal 6: upper band

7 : 캡 8 : 마개7: cap 8: stopper

[충전자루의 구조][Structure of charge base]

도 1과 도 2에서, 쓰레기 매립지의 매립층 보강장치는 장척의 충전자루(1)와중간묶음 철사(2), 주입관(3), 가늠줄(4), 밑봉함용 결속수단(5), 및 윗봉함용 밴드(6)로 구성된다.1 and 2, the landfill layer reinforcement device of the landfill is a long filling bag (1) and the middle bundle wire (2), the injection pipe (3), the scale line (4), the bottom binding unit (5), And an upper band 6.

충전자루(1)는 합섬, 마 등의 직물제이며, 길이는 쓰레기 매립층에 천공할 수직갱의 천공깊이보다도 길고, 펼쳤을 때의 평면적은 상기 수직갱의 평균 횡단면보다도 넓어서 충전재를 채우면 수직갱의 갱벽을 방사방향으로 압력을 가하여 지중 조직이 치밀해지도록 다질 수 있게 한다.The filling sack 1 is made of fabric such as a synthetic fiber or hemp, and its length is longer than the depth of drilling of the vertical shaft to be drilled in the landfill layer, and when it is unfolded, the planar area is wider than the average cross section of the vertical shaft. Pressure to allow compaction of the subterranean tissue.

상기 충전자루(1) 속에는 상단은 충전자루(1) 위로 노출되고 하단은 개개의 충전부(1a)에 이르는 길이가 각기 다른 복수의 주입관(3)을 삽입하여 지상에서 주입되는 충전재가 개별 주입관(3)을 통하여 모든 충전부(1a)에 골고루 채워지도록 하고, 충전자루(1)의 상단부는 밴드(5)로 동여 매어 모든 주입관(3)을 한꺼번에 고정한다.In the filling bag (1), the filling material injected from the ground by inserting a plurality of injection pipes 3 having different lengths from the upper end to the filling bag (1) and the lower end to the individual filling parts (1a) are inserted. (3) through the filling part (1a) to be evenly filled, the upper end of the filling bag (1) is tied to the band (5) to fix all the injection pipe (3) at once.

주입관(3)은 충전부(1a)가 깊이 위치할수록 길어진다. 특히 가장 긴 주입관은 충전자루(1)를 건입할 때 그 하단이 수직갱의 바닥에 닿을 수 있도록 한다.The injection tube 3 is lengthened as the charging section 1a is positioned deeply. In particular, the longest injection tube allows the bottom of the vertical shaft to reach the bottom of the vertical shaft when entering the filling bag (1).

상기 충전자루(1)의 겉에는 중간중간 가느다란 중간묶음 철사(2)를 허리띠 매듯이 느슨하게 둘러 묶어서 허리가 잘록한 다단식 충전부(1a)를 형성한다. 중간묶음 철사(2)는 충전부별로 씌운 올가미가 벗겨지지 않고 충전자루(1)가 수직갱의 갱벽에 되도록 닿지 않고 순탄하게 삽입될 수 있게 돕기 위한 것이다.On the outside of the filling bag 1, the middle middle thin wire bundle 2 is loosely wrapped like a belt to form a multistage filling part 1a having a narrow waist. The middle bundle wire (2) is to help the snares covered by the charging section is peeled off and the filling bag (1) can be inserted smoothly without touching the gang wall of the vertical shaft.

또 가늠줄(4)은 여러 단의 충전부(1a)를 형성하여 두른 가늠줄의 올가미가 확경됨에 따라 수직갱 속으로 딸려들어간 길이를 측정하여 수직갱의 심도별 충전량을 가늠할 수 있게 하고, 또한 충전부별로 올가미를 걸친 채로 안전하게 수직갱에 삽입한 후 충전재가 충전자루(1)에 충전되면서 그 충전압력이 일정수준을 넘으면 중간묶음 철사(2)를 끊어지게 하여 충전이 원활히 이루어지도록 한다.In addition, the scale line (4) forms a multi-stage charging part (1a) to measure the length of the vertical line enclosed in the vertical shaft as the noose of the scale wrapped around it, and to determine the filling amount of each vertical section by the depth of the vertical shaft After inserting safely into the vertical shaft while the filling material is charged in the filling bag (1) and the filling pressure exceeds a certain level to break the middle bundle wire (2) to ensure that the filling is made smoothly.

쓰레기 매립층은 심도별로 강도가 다를 가능성이 있고, 약한 층일수록 충전재(c)의 충전량이 많고, 따라서 충전부(1a)의 팽출폭도 커진다. 그런데 지상에서는 충전부별 충전재(c)의 충전량이 얼마나 되는지를 파악하기 곤란하다. 상기 가늠줄(4)은 이러한 고민을 덜어준다.The waste landfill layer may have different strengths for different depths, and the weaker the layer is, the larger the filling amount of the filler c is, and therefore the swelling width of the filling unit 1a is also increased. By the way, it is difficult to grasp how much the amount of filling of the filler (c) for each charging section. The scale line 4 relieves this problem.

즉, 어느 충전부(1a)이든 충전재(c)의 주입량에 비례적으로 확경된다. 이같이 충전부(1a)가 확경될 때 올가미(4a)는 늘어나고, 올가미(4a)가 늘어나는 길이에 상응하여 가늠줄(4)이 딸려 들어가므로 지상에 남는 부분의 길이가 점차 짧아진다. 지상에서는 딸려 들어가기 전 가늠줄(4)의 길이를 확인해 뒀다가 충전재가 완벽하게 채워진 후 지상에 남은 부분의 줄 길이와 비교하면 충전부별 충전재의 양이 얼마나 되고 그 굵기는 또 얼마쯤 될런지 가늠할 수가 있다.That is, any filling part 1a is expanded in proportion to the injection amount of the filler c. In this way, when the charging part 1a is expanded, the noose 4a is increased, and the length of the portion remaining on the ground is gradually shortened because the scale 4 is enclosed in accordance with the length of the noose 4a. Check the length of the scale (4) before entering the ground, and compared with the length of the remaining portion on the ground after the filling is completely filled, it is possible to determine how much the filling amount per filling part and how thick it will be.

도 3 에서, 상기 주입관(3a)은 금속제 수직갱의 깊이에 버금가는 기장을 갖고 지표에 가까운 부위까지 충전재가 유출될 수 있도록 층층이 충전재 유출공(3c)이 천공된 장척의 금속제 또는 수지제 단일 유공관(3a)으로 대체할 수도 있다. 이렇게 하면 길고 짧은 여러 개의 주입관(3)을 한꺼번에 내장하는 것에 비해 한개의 주입관으로 작업을 할 수 있으므로 주입관의 수량 감축에 따른 비용절감과 작업편의가 따른다.In FIG. 3, the injection pipe 3a has a length comparable to that of the metal vertical shaft and a long metal or resin single hole tube having a layered layer having a perforated filler outlet hole 3c so that the filler can be discharged to a portion close to the surface. It may be replaced by (3a). In this way, the work can be done with one injection tube compared to embedding several long and short injection tubes (3) at once, thus reducing the cost and convenience of work due to the reduction of the quantity of the injection tubes.

또는 도 4 와 같이, 상기 주입관(3)을 마디마디 연결하여 사용할 수 있도록 유출공(3c)이 있는 조립식 철제 유공관(3b)으로 하면 수직갱의 심도에 맞춰 하나로조립된 유공 주입관으로 유효적절히 사용할 수 있다. 이때, 조립식 철제 유공관(3b)의 상부에는 충전자루(1)의 바닥에 이를 정도로 긴 단일 주입관(3')과, 상기 장척의 주입관(3')을 이용하여 충전재를 주입하는 과정에서는 충전자루(1)의 공기가 수직갱 밖으로 원할히 배출되고 필요에 따라서는 낮은 깊이에서의 충전재 충전용으로도 활용할 수 있는 단관 형태의 기역자형 보조주입관(3")을 동시에 삽입할 수 있는 캡(7)을 씌워서 충전자루(1)의 상단부를 밴드(6)로 묶어서 봉한다. 또한 유공관(3b)의 하단과 충전자루(1)가 접촉되더라도 충전자루(1)가 손상되는 것을 방지하기 위하여 유공관의 하단부에 마개(8)를 씌운다.Or, as shown in Figure 4, if the prefabricated steel perforated tube (3b) having an outlet hole (3c) so that the connection pipe 3 can be used to connect nodes can be effectively used as a single hole injection tube assembled in accordance with the depth of the vertical shaft have. At this time, the upper part of the prefabricated steel perforated pipe (3b) is filled in the process of injecting the filling material using a single injection pipe (3 ') long enough to reach the bottom of the filling bag (1), and the long injection pipe (3'). Cap (7) capable of simultaneously inserting a short pipe type auxiliary auxiliary injection pipe (3 "), which allows air of the bag (1) to be smoothly discharged out of the vertical shaft and, if necessary, also used for filling the filler at a low depth. Cover and seal the upper end of the filling bag 1 with the band 6. Also, in order to prevent the filling bag 1 from being damaged even when the bottom of the hole pipe 3b and the filling bag 1 come into contact with each other, the lower part of the filling bag 1 is sealed. Cover the stopper (8).

[충전자루와 충전재를 이용한 쓰레기 매립층의 보강공법][Reinforcement Method of Garbage Landfill Layer Using Charger Column and Filler]

제1 공정1st process

도 5에서, 보강이 요구되는 쓰레기 매립층(a)의 해당 지점에 수직갱(b)을 천공한다. 이 수직갱(b)의 심도와 공경 및 갱간 거리는 사전에 기초조사를 실시하고 그 조사결과를 토대로 작성한 설계에 의거 천공장비로 천공한다.In FIG. 5, the vertical shaft b is drilled at the corresponding point of the landfill layer a that requires reinforcement. The depth, pore size, and gap distance of the vertical shaft (b) are preliminarily investigated in advance and drilled with a drilling tool based on the design created based on the findings.

제2 공정2nd process

상기 수직갱(a)의 바닥에 충전재로 그라우팅(d)한 후 그 심도와 공경에 맞게 미리 만든 충전자루(1)를 건입한다.After grouting (d) the filler on the bottom of the vertical shaft (a), the filling sack (1) made in advance according to the depth and pore size is inserted.

제3 공정3rd process

플라이 애쉬 60∼70무게%, 시멘트 30∼40무게%의 비율로 혼합하고, 물과 팽창제 등의 혼화제를 혼합한 겔상 충전재를 조성하여 주입관(3)으로 주입한다. 충전재의 바람직한 주입압력은 2∼7㎏/㎠이다.60 to 70 weight% of fly ash and 30 to 40 weight% of cement are mixed, and the gel filler which mixed admixtures, such as water and an expansion agent, is formed, and it inject | pours into the injection pipe 3. The preferred injection pressure of the filler is 2-7 kg / cm 2.

플라이 애쉬는 화력 발전소, 제철소 등에서 발생하는 폐기물인 석탄회로서, 폐기물인 플라이 애쉬 또는 바틈 애쉬(Bottom ash)를 체질하여 일정수준의 입도를 선별한 것을 사용한다.Fly ash is coal ash, which is a waste generated from thermal power plants, steel mills, etc., and is used to sift waste fly ash or bottom ash to select a certain level of particle size.

충전부(1a)중 가장 깊이 위치한 곳의 주입관(3)을 시작으로 가장 낮은 충전부용 주입관에 이르기까지 차례차례 충전재(c)를 주입한다. 이를테면, 최하단 충전부에 중간묶음 철사(2)가 터지도록 채운 다음에 그 바로 위 충전부에 같은 요령으로 충전재(c)를 최대한 가득 채우는 방법으로 최상단 충전부까지 충전재를 채운다.Filling material (c) is sequentially injected from the injection pipe (3) of the deepest part of the charging section (1a) to the lowest charging section injection tube. For example, the filling material is filled to the uppermost charging part by filling the lowermost charging part so that the middle bundle wire 2 bursts, and then filling the filling material c as much as possible with the same tips.

마디조립형 유공관(3b)의 경우에는 먼저 주입관(3')을 이용하여 바닥에서부터 상부를 향하여 충전재를 채우며 인발하다가 지상으로 인발된 길이가 기어서 조작이 곤란하거나 쓰레기 매립층의 표층부 강도나 더욱 낮아서 충전재가 더많이 요구될 적에는 보조주입관(3")을 이용하여 충전재를 채워 넣는다. 주입관(3')로 충전재를 주입할 때 그 주입 충전재의 위쪽 충전자루(1)에 들어 있던 공기는 충전량에 밀려 보조주입관(3")으로 배출시켜 충전작업이 효율적으로 이루어지게 한다.In the case of the node-assembled perforated tube 3b, the filler is first drawn from the bottom to the top by using the injection tube 3 ', and then drawn to the ground, which is difficult to operate due to the length of the ground, which is difficult to operate, or the strength of the surface of the landfill layer is lower. When more demand is required, the filler is filled using the auxiliary injection tube (3 "). When filling the filler into the injection tube (3 '), the air in the upper filler bag (1) of the injection filler is filled with the filling amount. It is pushed out and discharged into the auxiliary injection pipe (3 ") so that the filling operation can be efficiently performed.

충전자루(1)의 중간묶음 철사(2)는 충전재의 충만도에 따라 팽창될 때 받는 압력이 어느 수준에 이르면 더 이상 버티지 못하고 끊어지고 올가미(4a)는 벌어진다. 올가미(4a)가 벌어지면서 가늠줄(4)을 끌어당긴다. 그러다가 가늠줄(4)이 더 이상 움직이지 않으면 그 충전부에는 그 이상 충전재가 들어갈 수 없을 정도로 충만상태에 도달했음을 알 수 있다.The middle bundle wire 2 of the filler bag 1 is no longer held and breaks and the snare 4a opens when the pressure received when it expands according to the filling level of the filler reaches a certain level. As the noose 4a opens, it pulls the scale 4. Then, when the scale 4 is no longer moved, it can be seen that the filling part has reached a full state so that no filler can be inserted into it.

제4 공정4th process

충전재가 완전 충전되고 양생되기를 기다렸다가 충전자루(1)와 주입관(3)의 지상 노출부분을 절단하거나 팽이와 같은 형상의 거푸집(f)을 지상과 지하에 걸쳐 설치하고 충전자루(1)의 상부 노출부위를 콘크리트 몰탈(e)로 매설하는 등의 방법으로 마무리한다.Wait for the filling material to be fully filled and cured, and then cut off the exposed part of the filling bag (1) and the injection pipe (3), or install a die (f) shaped like a top over the ground and the base, and the upper part of the filling bag (1). The exposed part is finished by embedding with concrete mortar (e).

이 말뚝은 쓰레기의 종류별 강도, 성상, 침출수의 과소, 가스압 등의 변수가 항존한다는 전제하에서 보면 대체로 비정형 말뚝의 형상으로 나타나게 될 것이다.These piles will appear in the shape of atypical piles generally on the premise that variables such as the strength, properties, leachate underflow, and gas pressure of each type of waste exist.

이상 설명한 바와 같이 본 발명은 다단의 충전부 겉에 가늠줄의 올가미를 두르고 층별 충전부에 이르는 복수의 주입관을 삽입하여 고정한 긴 직물제 충전자루를 쓰레기로 매립되어 여러 가지 이유로 연약한 매립층에 천공한 수직갱에 건입하고 상기 주입관을 통하여 플라이 애쉬와 시멘트 혼합물을 주입하여 기초지반강화용 말뚝을 구축하는 것으로서 구근이 확실하고 강건한 지중 말뚝을 저가의 원자재를 사용하여 염가시공할 수 있고 플라이 애쉬 또는 바틈 애쉬를 말뚝 구축재로 활용함으로서 공해문제 해결에도 일조한다.As described above, the present invention has a long fabric filling bag, which is fixed by inserting a plurality of injection tubes leading to a layer filling section by enclosing a noose of a scale on the surface of a multistage filling section, is embedded in garbage in a vertical shaft which is perforated in a soft landfill layer for various reasons. It builds piles for foundation foundation by injecting fly ash and cement mixture through the injection pipe, and it is possible to cheaply construct strong and robust underground piles using low-cost raw materials and pile fly ash or pile ash. It is also used as a building material to help solve pollution problems.

또, 치밀한 조직의 충전자루는 충전재의 충전압에 의하여 수직갱 전반에 걸쳐 밀착되므로 일반 연약지반보다도 더욱 열악한 조건의 쓰레기 매립층내에서 매립층의 틈새로 흘러 들어가 박혀서 메우는 형세를 취하므로 수직갱벽에 대한 주면마찰력과 지내력이 높아 쓰레기 매립층에도 건조물과 도로와 같은 시설물설치를 위한 안정지반을 조성하는데 사용할 수 있다.In addition, since the packed bag of dense structure adheres to the entire vertical shaft by the filling pressure of the filling material, the surface of the main shaft friction against the vertical shaft wall is taken into the gap of the landfill layer in the landfill layer under the worse conditions than the general soft ground. Due to its high overload capacity, it can be used to build stable ground for installation of facilities such as buildings and roads.

게다가 가늠줄로 육안 확인이 곤란한 수직갱 내의 위치별 충전재 충전량의눈대중으로 말뚝 생김새의 추정과 보강공사의 성공여부를 시굴하지 않고도 어렵지 않게 추정할 수 있다.In addition, it is easy to estimate the pile appearance and the success of reinforcement work with the eye mass of the filling amount of each position in the vertical shaft, which is difficult to check with the naked eye.

Claims (8)

합섬직물 또는 마직물제 충전자루(1)내에 복수의 주입관(3)을 넣고 입 주위를 밴드(5)로 동여 매서 주입관(3)을 고정하며, 상기 충전자루(1)의 겉에는 중간중간 가느다란 철사(2)로 묶어서 다단 충전부(1a)를 형성하고, 상시 지상 노출형 가늠줄(4)의 하단에 올가미(4a)를 형성하여 각 충전부(1a)의 밑둥치에 둘러 걸친 것을 특징으로 하는 쓰레기 매립지의 매립층 보강장치.A plurality of injection pipes 3 are placed in the synthetic fiber or hemp filling bag 1, and the injection pipe 3 is fixed by bundling the band around the mouth 5 with the middle of the outer surface of the filling bag 1. It is characterized by being tied with a thin wire (2) to form a multi-stage charging section (1a), and forming a noose (4a) at the bottom of the ever-exposed ground (4) to surround the bottom of each charging section (1a) Landfill layer reinforcement of landfills. 제1항에 있어서, 상기 주입관(3)은 장척관으로서 하단에서 상단 부근까지 충전재 유출공이 천공된 유공관(3a)으로 하는 쓰레기 매립지의 매립층 보강장치.2. The landfill layer reinforcement device for a landfill of claim 1, wherein the injection pipe (3) is a long pipe and has a perforated pipe (3a) in which filler outlet holes are drilled from the lower end to the upper end. 제2항에 있어서, 상기 유공관(3a)은 여러 마디로 이뤄지고 이들 마디를 갱의 심도에 맞게 연결하여 사용하는 마디조립형 유공관(3b)으로 하는 쓰레기 매립지의 매립층 보강장치.3. The landfill layer reinforcement apparatus of claim 2, wherein the perforated pipe (3a) is composed of several nodes, and the knot-assembled perforated pipe (3b) is used by connecting these nodes to the depth of the gang. 제3항에 있어서, 상기 마디조립형 유공관(3b)은 상부에 유공관 하단 가까이 내려오는 주입관(3')과 측면에 단관의 기역자형 주입관(3")을 삽입하는 삽입구를 설치한 캡(7)을 씌우고 최하단 마디의 하단부는 충전자루와의 간격유지용 마개(8)를 씌운 쓰레기 매립지용 매립층 보강장치.[4] The cap assembly type hole tube (3b) is a cap having an injection hole (3 ') that is lowered near the lower end of the hole tube in the upper portion and an insertion hole for inserting the manipulator-type injection tube (3 ") of the short tube at the side ( 7) Landfill layer reinforcement device for landfills covered with caps (8) covering the lower end of the lowermost section with a covering bag. 보강공사가 요구되는 쓰레기 매립층의 해당 지점에 수직갱을 천공하는 제1 공정과; 상기 수직갱에 그 심도와 공경에 맞게 미리 만든 충전자루를 건입하는 제2 공정과; 플라이 애쉬 60∼70무게%, 시멘트 30∼40무게%에 물과 혼화제를 첨가한 겔상 충전재를 충전자루의 주입관으로 주입하여 굳히는 제3 공정과; 상기 충전제가 양생된 후 지상으로 노출된 충전자루 및 주입관의 각 상단을 마감정리하는 제4 공정으로 이뤄지는 것을 특징으로 하는 쓰레기 매립지용 매립층 보강공법.A first step of drilling a vertical shaft at a corresponding point of a landfill layer requiring reinforcement work; A second step of filling in the vertical shaft a filling bag made beforehand according to its depth and pore size; A third step of injecting and solidifying a gel filler containing water and a admixture added to 60 to 70% by weight of fly ash and 30 to 40% by weight of cement into an injection tube of a packing bag; After the filler is cured, landfill layer reinforcement method for a landfill layer, characterized in that the fourth step of finishing the top of each of the filling sack and the injection tube exposed to the ground. 제5항에 있어서, 상기 수직갱의 바닥에 충전재료로 그라우팅을 하여 지반을 강화하는 쓰레기 매립지용 매립층 보강공법.6. The method of reclaiming landfill layers for landfills according to claim 5, wherein the bottom of the vertical shaft is grouted with a filling material to reinforce the ground. 제5항에 있어서, 상기 충전재료는 석탄회인 플라이 애쉬 또는 바틈 애쉬를 주재료로 하는 쓰레기 매립지용 매립층 보강공법.The landfill layer reinforcing method for landfills according to claim 5, wherein the filling material is fly ash or coal ash which is coal ash. 제5항에 있어서, 상기 충전재료는 시멘트를 주재료로 하는 쓰레기 매립지용 매립층 보강공법.The method of claim 5, wherein the filling material is cement.
KR10-2000-0039392A 2000-07-10 2000-07-10 Method for reinforcement of reclamation land filling up waste material and its apparatus KR100377839B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2000-0039392A KR100377839B1 (en) 2000-07-10 2000-07-10 Method for reinforcement of reclamation land filling up waste material and its apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2000-0039392A KR100377839B1 (en) 2000-07-10 2000-07-10 Method for reinforcement of reclamation land filling up waste material and its apparatus

Publications (2)

Publication Number Publication Date
KR20020005891A true KR20020005891A (en) 2002-01-18
KR100377839B1 KR100377839B1 (en) 2003-03-26

Family

ID=19677211

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2000-0039392A KR100377839B1 (en) 2000-07-10 2000-07-10 Method for reinforcement of reclamation land filling up waste material and its apparatus

Country Status (1)

Country Link
KR (1) KR100377839B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107542469A (en) * 2017-03-29 2018-01-05 清华海峡研究院(厦门) A kind of underground mould bag stake method for protecting support

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107542469A (en) * 2017-03-29 2018-01-05 清华海峡研究院(厦门) A kind of underground mould bag stake method for protecting support

Also Published As

Publication number Publication date
KR100377839B1 (en) 2003-03-26

Similar Documents

Publication Publication Date Title
CN105887837B (en) A kind of construction method of field ground stirring concrete earth pile
KR100762991B1 (en) Precast piling method injected with high-strength mortar
CN102733378A (en) Construction method of concrete pile
CN111794216A (en) Construction method of uplift carrier pile
CN106192999A (en) The construction method of uplift pile
CN113653032A (en) Construction method of uplift carrier pile
CN104762957B (en) A kind of spiral pore-forming rams the construction method that expands CFG stake
RU2344230C2 (en) Method of ground anchor installation and associated device
KR101141526B1 (en) Pressure Grouting Method
CN107034894A (en) Post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile and preparation method thereof and construction method
CN113565144A (en) Surface water infiltration drainage guide and integral reinforcement structure for abandoned dreg site and construction method
KR101081343B1 (en) Compaction grouting system
KR100603140B1 (en) The structure construction method of having used geogrid reinforced stone column and this
CN105484270B (en) Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit
CN210315518U (en) Steel pipe micro pile
KR100377839B1 (en) Method for reinforcement of reclamation land filling up waste material and its apparatus
KR100991248B1 (en) Foundation construction method of micro pile using pack and pile used in the same
CN110670579A (en) Hoop pile for pile foundation engineering and foundation treatment and construction process thereof
KR20050118318A (en) Soil reinforcement method
CN211036960U (en) Electroosmosis gravel grouting pile
CN113106969A (en) Stiff carrier pile and construction process
KR200431272Y1 (en) The foundation fixing anchor and this which consisted of fixing supporter
RU2333318C1 (en) Method for reinforcing basement soil
KR20070079197A (en) Pulse discharged pile method using precast pile
KR100379989B1 (en) Method for improvement of the bearing power of the soil for the soft soil and its device

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20080107

Year of fee payment: 6

LAPS Lapse due to unpaid annual fee