KR200184793Y1 - Prefabricated steel pipe scaffold frame - Google Patents

Prefabricated steel pipe scaffold frame Download PDF

Info

Publication number
KR200184793Y1
KR200184793Y1 KR2019980004690U KR19980004690U KR200184793Y1 KR 200184793 Y1 KR200184793 Y1 KR 200184793Y1 KR 2019980004690 U KR2019980004690 U KR 2019980004690U KR 19980004690 U KR19980004690 U KR 19980004690U KR 200184793 Y1 KR200184793 Y1 KR 200184793Y1
Authority
KR
South Korea
Prior art keywords
frame
scaffolding
longitudinal
scaffold
twin
Prior art date
Application number
KR2019980004690U
Other languages
Korean (ko)
Other versions
KR19990038595U (en
Inventor
신재순
Original Assignee
김종우
금강공업주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김종우, 금강공업주식회사 filed Critical 김종우
Priority to KR2019980004690U priority Critical patent/KR200184793Y1/en
Publication of KR19990038595U publication Critical patent/KR19990038595U/en
Application granted granted Critical
Publication of KR200184793Y1 publication Critical patent/KR200184793Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/001Safety or protective measures against falling down relating to scaffoldings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/08Scaffold boards or planks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/10Steps or ladders specially adapted for scaffolds

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Movable Scaffolding (AREA)

Abstract

본 고안은 조립식 강관비계틀에 관한 것으로, 특히 건축공사장의 외관공사 및 고층건물의 철거와 수리시에 작업자들의 작업을 도모할 수 있도록 작업자가 디디고 설 수 있는 패널(발판)을 걸쳐 놓기 위하여 건물의 외부에 설치되는 강관비계에 관한 것이다.The present invention relates to a prefabricated steel pipe scaffolding frame, and in particular, to lay a panel (footplate) on which a worker can stand so that the worker's work can be promoted during the exterior construction of a construction site and the demolition and repair of a high-rise building. It relates to a steel pipe scaffold installed outside.

그 구성은 내,외측의 종비계(20, 21) 사이에 다수의 받침대(10)가 장착되고 상기 내측의 종비계(20)에 한쌍의 버팀대(60)가 보강판(61)에 의해 부착된 다수의 쌍줄 종비계틀(2)과, 상기 쌍줄 종비계틀(2)에서 버팀대(60)를 제외한 상부에는 내측과 외측의 종비계(20, 21)가 통공(22)이 형성된 지지대(23)에 의해 서로 지지되어 있는 또 다른 다수의 쌍줄 종비계틀(3)과, 상기 쌍줄 종비계틀(2)(3)을 이루고 있는 받침대(10)의 상부로 안착되어서 상기 내,외측의 종비계(20, 21)에 부착 형성된 결착판(24)의 통공으로 삽입되는 체결구에 의해 일체로 고정되게 장착되는 다수의 횡비계(30)(31)와, 상기 횡비계(30, 31)에 얹혀져서 고정구에 의해 고정되는 발판(40)과, 상기 쌍줄 종비계틀(2)(3)에 형성된 외측의 종비계(21)에 종간격을 두고 클램프(51)에 의해서 연결되는 손잡이(50)와, 상기 각각의 종, 횡비계(20, 21, 30, 31)를 연결하기 위해 내부공간(90)으로 삽입되어 고정구(101)에 의해 고정되는 연결구(100)를 포함하여 조립되는 하나의 비계틀(1)과, 상기 비계틀(1)을 이루고 있는 한쌍의 버팀대(60) 사이로 결착구(70)가 삽입되어서 건물외부 발코니의 난간이나 돌출부(80)에 연결하여 고정되게 조립할 수 있도록 구성한 것을 특징으로 하는 조립식 강관비계틀을 제공하는 것이다.Its configuration is a plurality of pedestals 10 are mounted between the inner and outer longitudinal scaffolds 20 and 21 and a pair of props 60 are attached to the inner longitudinal scaffold 20 by the reinforcing plate 61. The support 23 having a plurality of twin-row longitudinal scaffolding 2 and the upper and lower longitudinal scaffolds 20 and 21 formed through holes 22 in the upper part except for the support 60 in the twin-row longitudinal scaffolding 2. And a plurality of twin-row longitudinal frame (3) supported by each other and the upper portion of the pedestal (10) forming the twin-row longitudinal frame (2) (3), the inner and outer longitudinal scale ( 20 and 21 are mounted on a plurality of aspect ratios 30 and 31 fixedly mounted integrally by fasteners inserted into the through holes of the binding plate 24 and the aspect ratios 30 and 31. A footrest 40 fixed by a fastener, a handle 50 connected by a clamp 51 at longitudinal intervals on an outer longitudinal scaffold 21 formed in the twin-row scaffold frame 2 and 3, remind One scaffolding frame (1), including a connector (100) inserted into the interior space (90) to connect each longitudinal, aspect ratio (20, 21, 30, 31) and secured by the fixture (101) ), And the binding port 70 is inserted between the pair of braces 60 forming the scaffolding frame 1 so as to be connected to the railings or protrusions 80 of the building exterior balcony and fixed to be assembled. To provide a prefabricated steel pipe scaffolding.

따라서 본 고안은 쌍줄 종비계틀을 건물의 외벽에 다수 설치한후 횡비계, 발판, 손잡이를 조립하여 하나의 비계틀을 형성하였기 때문에, 한 번 건물에 설치된 비계틀을 공사가 끝나면 계속해서 상부로 이동하면서 사용할 수 있으므로 비계설치 공정을 줄일 수 있음은 물론 인건비를 최대로 줄일 수 있는 이점이 있는 것이다.Therefore, the present invention is to install a scaffold frame, scaffolding, handles and then to form a scaffolding frame after installing a number of double-row vertical scaffolding frame on the outer wall of the building, so once the construction is completed, Since it can be used while moving, the scaffolding installation process can be reduced and labor costs can be minimized.

Description

조립식 강관비계틀Prefabricated steel pipe scaffolding

본 고안은 조립식 강관비계틀에 관한 것으로, 특히 건축공사장의 외관공사 및 고층건물의 철거와 수리시에 작업자들의 작업을 도모할 수 있도록 작업자가 디디고 설 수 있는 패널(발판)을 걸쳐 놓기 위하여 건물의 외부에 설치되는 강관비계에 관한 것이다.The present invention relates to a prefabricated steel pipe scaffolding frame, and in particular, to lay a panel (footplate) on which a worker can stand so that the worker's work can be promoted during the exterior construction of a construction site and the demolition and repair of a high-rise building. It relates to a steel pipe scaffold installed outside.

종래에 건축공사장에서 사용되는 통나무 비계는 저층건물에 사용되는 것으로 이를 서로 연결하기 위해서는 철선으로 엮어서 결합한후에 패널을 얹혀서 작업자가 이동하면서 작업할 수 있도록 되어 있었다. 따라서 통나무비계는 저층에는 사용이 가능하였지만 5층이상의 고층건물에는 사용할 수 없음은 물론 오랜사용으로 인하여 부폐되므로 강도가 약해지기 때문에 영구적으로 사용할 수 없다는 문제점도 야기되었던 것이다.Conventionally, the log scaffolding used in the construction site is used in low-rise buildings to connect them to each other, weaving the wires and then combined to put the panel on the worker was able to work while moving. Therefore, the log scaffolding could be used in the lower floors, but it could not be used in high-rise buildings of five or more floors.

그래서 고층건물에도 사용할 수 있고 오래도록 사용할 수 있는 강관비계가 제작되었다. 그러나 상기와 같은 강관비계도 역시 통나무비계와 마찬가지로 강관을 하나 하나 클램프로 연결하여 사용해야 하므로 조립하는데에 시간이 많이 걸리게 되므로 비계설치비가 많이 들고 설치공정도 길다는 폐단이 있었던 것이다.Therefore, steel pipe scaffolding that can be used for high-rise buildings and used for a long time was produced. However, the steel pipe scaffolding as described above, like the log scaffolding, requires the use of connecting steel pipes one by one, so it takes a lot of time to assemble, so the scaffolding installation cost is high and the installation process is long.

또한 고층으로 올라갈수록 강관비계 설치의 강도가 약해져서 강도를 보강하기 위한 보강작업도 쉽지 않을 뿐만아니라 비계설치에 대한 부속품이 많이 들게 되었다. 따라서 이를 운반하는데에도 많은 어려움이 있었고, 또 사용후 철거시에는 자재관리가 잘 이루어지지 않는다는 문제점과 부속품인 클램프들을 잃어버리는 경우가 많아 자재 손실의 낭비가 비일비재하였던 것이다.In addition, the strength of steel pipe scaffold installation is getting weaker as you go up to higher floors, so it is not easy to reinforce the work to reinforce the strength. Therefore, there was a lot of difficulties in transporting them, and the problem of material management is not good at the time of dismantling after use, and there are many cases of losing the clamps as accessories, so waste of material loss was inconvenient.

그 뿐만아니라 고층으로 올라 갈수록 비계설치에 미숙한 초보자는 비계를 타면서 고공 작업을 하기란 매우 위험하기때문에 오랜 경험의 숙련자만이 고공에서 작업할 수 있지만 이 또한 항상 위험성이 내포되었던 것이다.In addition, as the climber to the higher floors, it is very dangerous for beginners who are inexperienced in scaffolding to work on scaffolding, so only experienced workers can work at high altitude, but this has always been dangerous.

본 고안은 상기와 같은 결함을 해결하고자 개량안출한 것으로, 고층건물에 적합한 강관비계를 현장에서 끼워맞춤식으로 하여 하나의 비계틀을 형성한후, 이들 다수의 비계틀을 건축물의 난간이나 돌출부에 조립고정함으로서 빠른시간내에 다수층의 높이로 비계를 조립할 수 있는 비계틀을 제공하고자 함을 목적으로 한 것이다.The present invention has been devised to solve the above-mentioned defects, the steel pipe scaffolding suitable for high-rise building in the field to form a scaffolding, and then assembled a plurality of scaffoldings on the railings or protrusions of the building. The purpose of the present invention is to provide a scaffolding structure for assembling a scaffolding at a height of a plurality of layers in a short time.

또한 비계틀이 설치된 층에서 내, 외부의 마감공사가 끝나면 다시 그 위로 비계틀을 추가로 설치하지 않고 이미 설치된 비계틀을 그대로 상부의 층으로 상승하여 설치 고정한후 반복하여서 사용할 수 있도록 함을 목적으로 하는 것이다.In addition, after finishing the internal and external finishing work on the floor where the scaffolding is installed, it is not necessary to install additional scaffolding on it again. It is.

또한 본 고안은 조립식으로 강관비계틀을 설치할 수 있도록 함으로서 비계설치시간을 단축시킬 수 있고, 설치비에 드는 인건비 및 자재의 손료를 줄일 수 있도록 함을 목적으로 하는 것이다.In addition, the present invention aims to shorten the scaffolding installation time by allowing the installation of steel pipe scaffolding in a prefabricated manner, and to reduce labor costs and material costs for installation.

또한 본 고안은 설치후에도 강도를 계속해서 일정하게 유지할 수 있음은 물론 오랜 경험의 숙련자가 아니더라도 간단하고 쉽게 조립할 수 있도록 하고자 함을 목적으로 하는 것이다.In addition, the present invention is intended to be able to maintain a constant strength even after installation, as well as to be simple and easy to assemble even if you are not skilled in the long experience.

또 다른 본 고안의 목적은 설치후에도 안전사고를 미연에 방지할 수 있음은 물론 외부의 차단막을 손쉽고 빠르게 설치할 수 있도록 하기 위한 것이다.Another object of the present invention is to prevent the safety accident even after installation, as well as to enable easy and quick installation of the external barrier.

도 1은 본 고안의 비계틀을 조립하기 위한 여러 가지의 부품을 나타낸 사시도이다.1 is a perspective view showing various parts for assembling the scaffold of the present invention.

도 2은 본 고안의 쌍줄 종비계에 횡비께, 발판, 손잡이가 장착되어 결합된 상태를 나타낸 참고 사시도이다.Figure 2 is a reference perspective view showing a state in which the aspect ratio, scaffolding, handle is coupled to the twin-row aspect ratio of the subject innovation.

도 3는 본 고안의 버팀대 상부의 결합상태를 나타낸 확대도이다.Figure 3 is an enlarged view showing a coupling state of the upper portion of the prop of the present invention.

도 4은 본 고안의 비계틀이 건물의 외부와 결합한 상태를 나타낸 측면도이다.Figure 4 is a side view showing a state in which the scaffolding frame of the present invention is coupled to the outside of the building.

도 5는 본고안의 비계틀을 이루고 있는 종,횡비계의 내부에 삽입되어 서로 연결할 수 있는 연결구의 결합상태를 나타낸 평면도이다.Figure 5 is a plan view showing a coupling state of the connector that can be inserted into the interior of the longitudinal, horizontal scaffolding to form a scaffold in the present invention to connect to each other.

* 도면의 주요부분에 대한 부호설명* Explanation of symbols on the main parts of the drawings

1. 비게틀 2. 종 비계틀1. Beetle 2. Species Scaffolding

3. 횡 비계틀 10. 받침대3. Lateral Scaffolding 10. Pedestal

20,21. 쌍줄 종비계 30,31. 쌍줄 횡비계20,21. Twin-row longitudinal system 30,31. Double-row aspect ratio

40. 발판 50, 손잡이40.Stool 50, Handle

60. 버팀대 70. 결착구60. Brace 70. Closure

80. 돌출부 90. 내부공간80. Protrusion 90. Interior space

100. 연결구100. End Connection

상기와 같은 목적을 달성하기 위한 본 고안의 구성을 첨부된 도면에 의거하여 설명하면 다음과 같다.Referring to the configuration of the present invention for achieving the above object based on the accompanying drawings as follows.

내,외측의 종비계(20, 21) 사이에 다수의 받침대(10)가 장착되고 상기 내측의 종비계(20)에 한쌍의 버팀대(60)가 보강판(61)에 의해 부착된 다수의 쌍줄 종비계틀(2)과,A plurality of pairs in which a plurality of pedestals 10 are mounted between the inner and outer longitudinal scaffolds 20 and 21 and a pair of braces 60 are attached to the inner longitudinal scaffold 20 by a reinforcing plate 61. With a vertical ratio frame (2),

상기 쌍줄 종비계틀(2)에서 버팀대(60)를 제외한 상부에는 내측과 외측의 종비계(20, 21)가 통공(22)이 형성된 지지대(23)에 의해 서로 지지되어 있는 또 다른 다수의 쌍줄 종비계틀(3)과,A plurality of pairs of pairs in which the upper and lower longitudinal scaffolds 20 and 21 are supported by each other by the support 23 having the through-holes 22 formed in the upper part of the twin-row scaffold 2 except for the brace 60. With a vertical ratio frame (3),

상기 쌍줄 종비계틀(2)(3)을 이루고 있는 받침대(10)의 상부로 안착되어서 상기 내,외측의 종비계(20, 21)에 부착 형성된 결착판(24)의 통공으로 삽입되는 체결구에 의해 일체로 고정되게 장착되는 다수의 횡비계(30)(31)와,Fasteners which are seated in the upper part of the pedestal 10 constituting the twin-row longitudinal frame (2) (3) is inserted into the through hole of the binding plate 24 formed on the inner and outer longitudinal ratio (20, 21) A plurality of aspect ratios (30) (31), which are mounted to be integrally fixed by

상기 횡비계(30, 31)에 얹혀져서 고정구에 의해 고정되는 발판(40)과,A footrest 40 mounted on the aspect ratios 30 and 31 and fixed by a fixture;

상기 쌍줄 종비계틀(2)(3)에 형성된 외측의 종비계(21)에 종간격을 두고 클램프(51)에 의해서 연결되는 손잡이(50)와,A handle 50 connected by the clamp 51 at longitudinal intervals on the outer longitudinal scaffold 21 formed on the twin-row scaffold frame 2 and 3,

상기 각각의 종, 횡비계(20, 21, 30, 31)를 연결하기 위해 내부공간(90)으로 삽입되어 고정구(101)에 의해 고정되는 연결구(100)를 포함하여 조립되는 하나의 비계틀(1)과,One scaffolding frame including a connector 100 inserted into the inner space 90 and fixed by the fixture 101 to connect the respective longitudinal and horizontal scaffolds 20, 21, 30, and 31 ( 1) and,

상기 비계틀(1)을 이루고 있는 한쌍의 버팀대(60) 사이로 결착구(70)가 삽입되어서 건물외부 발코니의 난간이나 돌출부(80)에 연결하여 고정되게 조립할 수 있도록 구성한 것을 특징으로 하는 조립식 강관비계틀을 제공하기 위한 것이다.Prefabricated steel pipe scaffolding, characterized in that the fastening port 70 is inserted between the pair of braces (60) forming the scaffolding frame (1) is connected to the railings or protrusions of the building outside the balcony to be fixed and assembled It is to provide a framework.

또한 상기 조립된 비계틀(1)과 비계틀(1)을 하나씩 크레인에 의해 상부로 이동시 잘못하여 추락하더라도 바닥으로 떨어지지 않게 하기 위해 비계틀(1)의 지지대(23)에 천공된 통공(22)으로 연결고리(4)가 연결되도록 구성한 것을 특징으로 하는 조립식 강관비계틀을 제공하기 위한 것이다.In addition, the perforated hole 22 perforated in the support 23 of the scaffold frame 1 so that the assembled scaffold frame 1 and the scaffold frame 1 do not fall to the bottom even if they fall accidentally when moved upward by a crane one by one. To provide a prefabricated steel pipe scaffolding, characterized in that configured to be connected to the connecting ring (4).

상기와 같이 구성된 본 고안의 조립공정 및 작용효과를 보다 구체적으로 설명하면 다음과 같다.Referring to the assembly process and the effect of the present invention configured as described above in more detail.

도 1에서 나타낸 본 고안의 비계틀을 조립하기 위한 여러 가지의 부품을 살펴보면, 도면 부호 (2)는 버팀대가 장착된 쌍줄 종비계틀이고, 부호(3)은 버팀대가 없는 대신에 상부에 지지대가 장착된 쌍줄 종비계틀이고, 부호(30, 31)은 발판을 얹혀 놓기 위한 횡비계이고, 부호 (40)은 공사중 사람이 다니면서 작업을 할 수 있는 발판이고, 부호(5)는 사람이 이동할 때 안전하게 이동할 수 있는 손잡이를 나타내고 있다.Looking at the various parts for assembling the scaffolding of the present invention shown in Figure 1, the reference numeral (2) is a twin-row longitudinal frame is equipped with a brace, and the reference number (3) has a support on the top instead of the brace It is equipped with a twin-row aspect ratio frame, the sign (30, 31) is a horizontal scaffold for placing the footrest, the sign (40) is a foothold that can be carried out by people under construction, and the sign (5) when the person moves It shows a handle that can be safely moved.

상기와 같은 조립부품에 의해 하나의 비계틀(1)을 형성하려면, 먼저 버팀대(60)와 받침대(10)가 일체로 형성된 쌍줄 종비계틀(2)을 건물의 외벽을 따라 일정한 간격을 두고 다수 설치한다.In order to form one scaffolding frame 1 by the assembly as described above, first, a pair of longitudinal scaffolding frame 2, in which the props 60 and the pedestal 10 are integrally formed, is spaced apart along the outer wall of the building at regular intervals. Install.

상기 쌍줄 종비계틀(2)을 설치하기 위해서는 도 4에 나타내는 바와같이, 버팀대(60)를 건물의 난간이나 돌출부(80)에 밀착한후 버팀대(60)의 사이에 형성된 공간으로 삽입이된 결착구(70)를 이용하여 건물의 난간이나 돌출부(80)에 걸거나 통공에 끼우고 난후 너트(71)를 조여서 일체가 되게 결합하여 고정하면 쌍줄 종비계틀(2)은 고정되게 설치되는 것이다.In order to install the twin-row longitudinal frame 2, as shown in Figure 4, the brace 60 is in close contact with the handrail or protrusion 80 of the building and then inserted into the space formed between the brace 60 Hanging on the railings or protrusions 80 of the building using the sphere 70 or inserted into the through hole after tightening the nut 71 to be integrally coupled to fix the twin-row aspect ratio frame (2) is to be installed to be fixed.

이때 결착구(70)는 상기 비계틀(1)을 이루고 있는 내측의 종비계(20)의 양측에 일체로 고정되게 장착된 버팀대(60) 사이의 공간으로 끼워지게 되어 있으므로 상하로 이동하면서 건물의 외벽인 난간이나 돌출부(80)의 높이에 맞추어 고정되게 설치할 수 있는 것이다.At this time, the fastener 70 is inserted into the space between the brace 60 is fixedly mounted on both sides of the inner side scaffolding 20 forming the scaffolding (1) integrally fixed so as to move up and down the building Can be installed to be fixed in accordance with the height of the outer wall railings or protrusions (80).

그리고 나서 다수 설치된 쌍줄 종비계틀(2)의 받침대(10) 상부로 횡비계(30, 31)를 올려 놓음과 동시에 내, 외측의 종비계(20, 21)에 밀착시키면 종비계(20, 21)에 부착된 결착판(24)과 접촉하게 된다. 상기 결착판(24)에 접촉된 횡비계(30, 31)는 결착판(24)에 천공된 통공을 통해 체결구에 의해 체결이 되는 것이다. 상기 쌍줄 종비계틀(2)에 체결된 횡비계의 상부로는 발판(40)을 얹혀서 고정한다. 그리고 상기 외측 종비계(21)에 종으로 일정한 간격을 두고 손잡이(5)를 크램프(51)에 의해 단단히 체결한다.Then, the horizontal scaffolds 30 and 31 are placed on the pedestal 10 of the double-row vertical scaffolding frame 2 installed at the same time and closely attached to the inner and outer vertical scaffolds 20 and 21. Contact with the binding plate 24 attached thereto. The horizontal scaffolds 30 and 31 in contact with the binding plate 24 are fastened by fasteners through holes drilled in the binding plate 24. The footrest 40 is fixed to the upper portion of the side scaffold fastened to the twin-row scaffold frame (2). Then, the handle 5 is firmly fastened by the clamps 51 at regular intervals to the outer longitudinal scaffold 21.

상기의 버팀대(60)가 형성된 쌍줄 종비계틀(2)에 횡비계(30, 31)와 발판(40) 및 손잡이(5)가 설치되면 그 상부로 버팀대(60)가 없는 쌍줄 종비계틀(3)과 하부의 쌍줄 종비계틀(2)을 서로 연결구(100)에 의해서 연결하여 고정한다. 이때 종비계틀(2)과 종비계틀(3)을 서로 연결하기 위해서는 종비계(20, 21)의 내부에 형성된 내부공간(90)으로 연결구(100)를 삽입하여 서로 맞물리게 한후 고정구(101)로 서로 맞물려 있는 종비계(2)(3) 및 연결구(100)를 고정하면 서로 일체가 되어서 고정이 되는 것이다. 또한 횡비계(30, 31)를 서로 연결할때에도 상기 연결구(100)를 사용하여 연결하면 된다. 그리고 연결구(100)는 건물의 외부 형상에 따라서 비계틀(1)이 서로 여러 각도로 연결될 수 있도록 다양한 형태를 이루고 있음은 물론이다When the lateral scaffold 30, 31, the scaffold 40 and the handle 5 are installed in the twin-row longitudinal frame 2 in which the brace 60 is formed, the twin-row vertical ratio frame without the brace 60 thereon ( 3) and the lower row of two-row frame (2) by connecting to each other by the connector 100 to fix. At this time, in order to connect the sub-framework frame 2 and the sub-framework frame 3 with each other by inserting the connector 100 into the inner space 90 formed in the interior of the sub-meter system (20, 21) to engage with each other and then the fixture 101 By fixing the aspect ratio (2) (3) and the connector (100) that are interlocked with each other will be fixed to be integral with each other. In addition, when connecting the side scaffolding (30, 31) to each other by using the connector (100). And the connector 100 has a variety of forms so that the scaffolding frame 1 can be connected to each other at various angles according to the external shape of the building.

이렇게 버팀대(60)가 형성된 쌍줄 종비계틀(2)의 상부로 버팀대(60)가 없는 쌍줄 종비계틀(3)을 서로 연결구(100)에 연결한후에는 상기와 같이 받침대(10)의 상부로 횡비계(30, 31)를 장착하고 다시 그 위로 발판(40)을 장착한다. 그리고 마지막으로 손잡이(5)를 설치하게 되면 일정한 크기의 비계틀(1)이 형성된다.After connecting the pair line aspect ratio frame 3 without the brace 60 to the connector 100 to the upper portion of the pair line aspect ratio frame 2 in which the brace 60 is formed, the upper portion of the pedestal 10 as described above. Mount the side scaffolds (30, 31) and again mount the scaffold (40) above. And finally, when the handle 5 is installed, a scaffolding frame 1 of a certain size is formed.

그리고 미설명 부호(61)는 버팀대(60)의 상부에 부착된 것으로 버팀대(60)에 장력을 주어 보다 강하게 버팀대(60)가 지지될 수 있도록 한 것이다.And the reference numeral 61 is attached to the upper portion of the brace 60 is to give a tension to the brace 60 so that the brace 60 can be more strongly supported.

상기와 같이 비계틀(1)을 건물의 외벽을 따라 서로 횡으로 연결하게 되면 건물의 외벽에는 쌍줄비계가 설치되는 것이다.As described above, when the scaffolding frame 1 is laterally connected to each other along the outer wall of the building, the twin line scaffold is installed on the outer wall of the building.

쌍줄비계가 다 설치된 후에는 비계틀(1)을 이루고 있는 버팀대(60)가 없는 쌍줄 종비계틀(3)의 상부에 형성된 지지대(23)의 통공(22)으로 연결고리(4)의 일단을 삽입고정하고, 타단은 또다른 비계틀(1)을 이루고 있는 지지대(23)의 통공(22)으로 삽입하여 연결고정한다. 그러면 비계틀(1)과 비계틀(1)은 서로 연결고리(4)에 의해 연결이 된다.After the twin filed scaffolding is installed, one end of the connecting ring 4 is connected to the through hole 22 of the support 23 formed on the upper part of the double filed longitudinal scaffold 3 without the support 60 forming the scaffold frame 1. Insertion and fixation, and the other end is inserted into the through hole 22 of the support 23 forming another scaffolding frame (1) to fix the connection. Then the scaffolding frame 1 and the scaffolding frame 1 are connected to each other by a connecting ring 4.

상기와 같이 건물의 주변에 비계틀(1)이 일정한 형상을 하여 설치되어 있기 때문에 공사장의 미관을 고려하기 위한 차단막(도면에 미도시)을 설치할때에도 아주 정렬되게 설치가 가능한 것이다.Since the scaffolding frame (1) is installed in a predetermined shape around the building as described above, it is possible to install very aligned even when installing a barrier (not shown) to consider the aesthetics of the construction site.

그리고 비계설치작업이 끝나면 비계의 발판(40)위로 작업자가 이동하면서 작업을 할 수 있고, 또한 외측의 종비계(21)에는 손잡이(50)가 장착되어 있어 작업자가 손잡이(50)를 잡고 안전하게 이동하면서 작업 할 수 있기때문에 안전사고를 미연에 방지할 수 있는 것이다.And when the scaffolding installation is finished, the worker can move while working on the scaffold 40 of the scaffold, and the outer side scaffold 21 is equipped with a handle 50, so that the worker grasps the handle 50 and moves safely. Work can be done while working to prevent safety accidents.

또한 본 고안의 쌍줄로 형성된 내측의 종비계(21)에 장착된 도르레 고정구(25)는 고층건물에서 작업할 때 간단한 물건을 올릴 수 있는 도르레를 걸어 사용하기 위한 것이다.In addition, the pulley fixture 25 mounted on the inner longitudinal scaffold 21 formed of the twin line of the present invention is intended to be used to hang a pulley that can lift a simple object when working in a high-rise building.

또한 상기 비계틀(1)의 높이는 몇개층의 높이가 일체로 조립구성되어 있고, 또한 하나의 비계틀(1)이 독립되게 난간이나 돌출부(80)에 각각 부착되어 설치되어 있을뿐만아니라 독립된 각각의 비계틀(1)은 서로 연결고리(4)에 연결되어 있다.In addition, the height of the scaffolding frame (1) is composed of several layers integrally assembled, and one scaffolding frame (1) is independently attached to the handrail or the projection (80), respectively, as well as each independent The scaffolding frame 1 is connected to the connecting ring 4 with each other.

따라서 아파트 공사시에 비계가 설치된 층의 내, 외부 마감공사가 끝나면 다시 골조공사가 상부로 이어지게 되고, 뒤따라서 그 외부로 다시 비계를 설치하여야 하는데 본 고안은 이미 설치된 비계위로 종래와 같이 새로운 비계를 추가로 설치하지 않고, 이미 설치된 비계틀(1)을 그대로 상부로 크레인에 의해 이동하여 사용하면 된다.Therefore, when the interior and exterior finishing work on the floor where the scaffolding is installed in the apartment construction is completed, the frame construction will lead to the upper part, followed by the installation of the scaffolding to the outside again. Instead of additionally installing, the already installed scaffolding frame 1 may be moved and used by a crane to the upper portion as it is.

즉, 한 번 비계틀(1)을 조립하여 건물의 외벽에 설치가 되면 그 비계틀(1)을 그대로 계속해서 상승시키면서 비계틀(1)을 이루고 있는 버팀대(60)가 형성된 쌍줄 종비계틀(2)을 난간이나 돌출부(80)에 결착구(70)로 고정하여서 공사가 끝날때까지 한 번 설치된 비계틀(1)을 계속해서 사용할 수 있는 것이다.In other words, once assembled scaffolding frame (1) is installed on the outer wall of the building, while the scaffold frame (1) continues to rise as it is, the twin-row longitudinal frame (2) is formed a brace 60 forming the scaffold frame (1) 2) is fixed to the railings or protrusions (80) with a fastener (70) will continue to use the scaffolding (1) once installed until the end of construction.

그리고 비계틀(1)과 비계틀(1)이 지지대(23)에 천공된 통공(22)으로 삽입된 연결고리(4)에 의해 연결하고 있는 이유는 조립된 하나의 비계틀(1)을 상부로 이동시 비계틀(1)이 추락하더라도 바닥으로 떨어지지 않고 다른 비계틀(1)에 의해 연결고리(4)에 의해 매달려 있도록 함으로서 바닥에서 공사하는 사람의 안전을 도모할 수 있는 것이다.And the reason that the scaffolding frame (1) and the scaffolding frame (1) is connected by the connecting ring (4) inserted into the through-hole 22 perforated in the support 23 is the upper part of the assembled scaffolding frame (1) Even if the scaffolding frame (1) falls to the floor when it is moved to another by the scaffolding frame (1) by hanging by the connecting ring (4) it is possible to promote the safety of the person working on the floor.

상기에서 설명한 바와같이 본 고안은 일일이 종비계와 횡비계를 하나씩 연결하지 않도록 하기 위해서 일정한 높이와 폭을 갖는 쌍줄 종비계틀을 형성하여 건물의 외벽에 다수 설치한후 횡비계, 발판, 손잡이를 조립하여 하나의 비계틀을 형성함므로서, 한 번 건물에 설치된 비계틀을 공사가 끝나면 계속해서 상부로 이동하면서 사용할 수 있도록 하였기 때문에 비계설치 공정을 줄일 수 있음은 물론 인건비를 최대로 줄일 수 있는 이점이 있는 것이다.As described above, the present invention forms a twin-row aspect ratio frame having a certain height and width so as not to connect the aspect ratio and the aspect ratio one by one, and then installs the aspect ratio, scaffolding, and handles after installing a large number on the outer wall of the building. By forming a scaffold frame, the scaffold frame once installed in the building can be used while continuously moving to the upper part, thus reducing the scaffolding installation process and reducing labor costs to the maximum. Is there.

Claims (2)

내,외측의 종비계(20, 21) 사이에 다수의 받침대(10)가 장착되고 상기 내측의 종비계(20)에 한쌍의 버팀대(60)가 보강판(61)에 의해 부착된 다수의 쌍줄 종비계틀(2)과,A plurality of pairs in which a plurality of pedestals 10 are mounted between the inner and outer longitudinal scaffolds 20 and 21 and a pair of braces 60 are attached to the inner longitudinal scaffold 20 by a reinforcing plate 61. With a vertical ratio frame (2), 상기 쌍줄 종비계틀(2)에서 버팀대(60)를 제외한 상부에는 내측과 외측의 종비계(20, 21)가 통공(22)이 형성된 지지대(23)에 의해 서로 지지되어 있는 또 다른 다수의 쌍줄 종비계틀(3)과,A plurality of pairs of pairs in which the upper and lower longitudinal scaffolds 20 and 21 are supported by each other by the support 23 having the through-holes 22 formed in the upper part of the twin-row scaffold 2 except for the brace 60. With a vertical ratio frame (3), 상기 쌍줄 종비계틀(2)(3)을 이루고 있는 받침대(10)의 상부로 안착되어서 상기 내,외측의 종비계(20, 21)에 부착 형성된 결착판(24)의 통공으로 삽입되는 체결구에 의해 일체로 고정되게 장착되는 다수의 횡비계(30)(31)와,Fasteners which are seated in the upper part of the pedestal 10 constituting the twin-row longitudinal frame (2) (3) is inserted into the through hole of the binding plate 24 formed on the inner and outer longitudinal ratio (20, 21) A plurality of aspect ratios (30) (31), which are mounted to be integrally fixed by 상기 횡비계(30, 31)에 얹혀져서 고정구에 의해 고정되는 발판(40)과,A footrest 40 mounted on the aspect ratios 30 and 31 and fixed by a fixture; 상기 쌍줄 종비계틀(2)(3)에 형성된 외측의 종비계(21)에 종간격을 두고 클램프(51)에 의해서 연결되는 손잡이(50)와,A handle 50 connected by the clamp 51 at longitudinal intervals on the outer longitudinal scaffold 21 formed on the twin-row scaffold frame 2 and 3, 상기 각각의 종, 횡비계(20, 21, 30, 31)를 연결하기 위해 내부공간(90)으로 삽입되어 고정구(101)에 의해 고정되는 연결구(100)를 포함하여 조립되는 하나의 비계틀(1)과,One scaffolding frame including a connector 100 inserted into the inner space 90 and fixed by the fixture 101 to connect the respective longitudinal and horizontal scaffolds 20, 21, 30, and 31 ( 1) and, 상기 비계틀(1)을 이루고 있는 한쌍의 버팀대(60) 사이로 결착구(70)가 삽입되어서 건물외부 발코니의 난간이나 돌출부(80)에 연결하여 고정되게 조립할 수 있도록 구성한 것을 특징으로 하는 조립식 강관비계틀.Prefabricated steel pipe scaffolding, characterized in that the fastening port 70 is inserted between the pair of braces (60) forming the scaffolding frame (1) is connected to the railings or protrusions of the building outside the balcony to be fixed and assembled frame. 제 1항에 있어서,The method of claim 1, 상기 조립된 비계틀(1)과 비계틀(1)을 하나씩 크레인에 의해 상부로 이동시 잘못하여 추락하더라도 바닥으로 떨어지지 않게 하기 위해 비계틀(1)의 지지대(23)에 천공된 통공(22)으로 연결고리(4)가 연결되도록 구성한 것을 특징으로 하는 조립식 강관비계틀.The assembled scaffolding frame 1 and the scaffolding frame 1 are moved to the upper by the crane one by one through the hole 22 perforated in the support 23 of the scaffold frame 1 so as not to fall to the floor even if it accidentally falls. Prefabricated steel pipe scaffolding, characterized in that configured to be connected to the connecting ring (4).
KR2019980004690U 1998-03-27 1998-03-27 Prefabricated steel pipe scaffold frame KR200184793Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2019980004690U KR200184793Y1 (en) 1998-03-27 1998-03-27 Prefabricated steel pipe scaffold frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2019980004690U KR200184793Y1 (en) 1998-03-27 1998-03-27 Prefabricated steel pipe scaffold frame

Publications (2)

Publication Number Publication Date
KR19990038595U KR19990038595U (en) 1999-10-25
KR200184793Y1 true KR200184793Y1 (en) 2000-06-01

Family

ID=19533163

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2019980004690U KR200184793Y1 (en) 1998-03-27 1998-03-27 Prefabricated steel pipe scaffold frame

Country Status (1)

Country Link
KR (1) KR200184793Y1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200483165Y1 (en) * 2015-09-21 2017-04-10 (주) 성도정공 Cage for construction of side wall of structure

Also Published As

Publication number Publication date
KR19990038595U (en) 1999-10-25

Similar Documents

Publication Publication Date Title
US8245816B2 (en) Integral safety system which can be used for construction
US20100032235A1 (en) Safety arrangement for use in constructing a wood frame building
KR100559118B1 (en) Working tower for a high place
KR200445310Y1 (en) Clamp for fixing footstool in a climbing typed construction frame
DK167580B1 (en) BEARING CONSTRUCTION FOR TRIBUNES
KR200184793Y1 (en) Prefabricated steel pipe scaffold frame
KR20020047071A (en) Rail railing (scaffolding) clamping device in the construction site.
KR200256398Y1 (en) Builder's workbench
CN2276046Y (en) Divided multistage automatic climbing external scaffold
JPH028993Y2 (en)
KR200209622Y1 (en) A supporting base for a prefabricated double-pole type scaffold frame
JPH0754480A (en) Prefabricated scaffolding and assembling and disassembling method thereof
EP1876315A1 (en) Integral safety system which can be used for construction
CN221236371U (en) High-altitude operation rapid construction platform
KR100636409B1 (en) Scaffold
JPH1072939A (en) Main rope support and main rope erection method in construction of prestressed concrete building using main rope support
JPS641395Y2 (en)
CN211200968U (en) Stair railing rod connector
JPH09137602A (en) Simple scaffold and installation method therefor
JPH02305785A (en) Elevator installation process and working floor device for elevator installation
JP3287816B2 (en) Building interior stairs
KR200367391Y1 (en) Prefab safety balustrade for a temporary of a balcony
JPS637462A (en) Scaffold apparatus for building
JPS624124Y2 (en)
JP2503452Y2 (en) Scaffold structure for construction of industrialized houses

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
E701 Decision to grant or registration of patent right
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20111228

Year of fee payment: 13

EXPY Expiration of term