KR20000012925A - Revetment tree-planting construction method of river bank - Google Patents

Revetment tree-planting construction method of river bank Download PDF

Info

Publication number
KR20000012925A
KR20000012925A KR1019980031511A KR19980031511A KR20000012925A KR 20000012925 A KR20000012925 A KR 20000012925A KR 1019980031511 A KR1019980031511 A KR 1019980031511A KR 19980031511 A KR19980031511 A KR 19980031511A KR 20000012925 A KR20000012925 A KR 20000012925A
Authority
KR
South Korea
Prior art keywords
planting
small
revetment
tree
construction method
Prior art date
Application number
KR1019980031511A
Other languages
Korean (ko)
Other versions
KR100294272B1 (en
Inventor
이영렬
Original Assignee
이영렬
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이영렬 filed Critical 이영렬
Priority to KR19980031511A priority Critical patent/KR100294272B1/en
Publication of KR20000012925A publication Critical patent/KR20000012925A/en
Application granted granted Critical
Publication of KR100294272B1 publication Critical patent/KR100294272B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/129Polyhedrons, tetrapods or similar bodies, whether or not threaded on strings
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G2/00Vegetative propagation

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Ocean & Marine Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Inorganic Chemistry (AREA)
  • Chemical & Material Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Botany (AREA)
  • Developmental Biology & Embryology (AREA)
  • Environmental Sciences (AREA)
  • Revetment (AREA)

Abstract

PURPOSE: A revetment tree-planting construction method is provided to realize a perfect tree-planting, an early tree-planting of a river bank by constituting a safe planting condition such as safe growing after planting and an early rooting of plants in a rapid current, to have a stable mason state and also easily mason. CONSTITUTION: A revetment tree-planting construction method has the steps of: reconstructing a tetra port which is for easily securing flat space and also having an earthing stability and a construction property as a small tetra port(1a) having a hole(4) on a horn(2,3) or a small tetra port(1); arranging at a shore protection in order; filling soil(6) between small tetra ports(1) and hardening; and planting a plant(7) which is appropriate for the shore protection on the soil(6).

Description

하안의 호안녹화시공방법Construction method of river bank recording

본 발명은 소형 테트라를 이용하여 신속 수월하고 튼튼하게 호안시공을 할 수 있고, 식생한 식물의 조기활착과 식생 후의 안전한 성장에 기여할 수 있는 하안의 호안녹화시공방법에 관한 것이다.The present invention relates to a method for revetment of the riverbank, which can be easily and robustly constructed using small tetra, and can contribute to premature swelling of plants and safe growth after planting.

도시내 하천이나 도시 주변의 하천에 대한 정비작업은 홍수피해를 예방하기 위하여 하천의 유수구조를 변경시키기 위한 것인데, 주로 석축이나 돌망테, 시켄트제 호안블럭으로 축조하여 호안하거나 혹은 콘크리트 옹벽을 구축하는 것으로 일관돼 왔다.The maintenance work on rivers in and around the city is to change the flow structure of the rivers to prevent flood damage. It is mainly built with stone slabs, gabions, secant lakes, or sheltered concrete walls. Has been consistent.

그러나 호안블럭이나 돌망테, 콘크리트 옹벽으로 하안을 정비하는 것은 강우로 인한 세굴방지기능의 신뢰성과 안정성과 시공의 간편성, 편리한 제작성, 경제성면에서는 일응 유리한 점이 있는 반면에 이들의 양산은 결과적으로 하천 생태계의 단절과 고수부지의 생태환경의 파괴현상의 심화, 하천의 자연미 훼손, 하수정화에 이로운 미생물의 괴사와 같은 환경부작용이 컸다.However, the maintenance of river banks with raft blocks, gabions, and concrete retaining walls has some advantages in terms of reliability and stability of the scour prevention function due to rainfall, simplicity of construction, convenient manufacturing, and economics, while their mass production results in rivers. The environmental effects such as the disruption of the ecosystem, the deepening of the ecological environment of the coriander site, the deterioration of the natural beauty of the river, and the necrosis of microorganisms that are beneficial for the purification of the sewage were great.

이같은 폐단이 날이갈수록 도를 더해감에 따라 그 심각성을 뒤늦게 깨닫게 된 이래로 환경친화적인 호안시공방법에 대한 관심이 부쩍 늘고 있는 추세다. 이른바 하안의 녹화공법이다. 이들 호안녹화공법은 야자섬유, 흙포대와 나무말뚝 등의 자재로 호안하고 거기다 초본류의 종자를 파종하거나 초목을 심어 친수적이고 녹화적으로 하안을 보강하는 것이다.As such a disintegration gradually increases, interest in environmentally friendly revetment construction methods has been increasing since the late severity of the problem was delayed. It is the so-called greening process. These shore reclamation methods rely on materials such as palm fiber, earthen bags and wooden piles, and sowing seeds or planting plants of herbaceous plants to reinforce hydrophilic and green fields.

순수한 호안용 식생공법은 하안의 자연형태에 가장 적합하기는 하지만 하천의 특성과 토양의 특성에 부합되는 식물종의 선정이 어렵고, 치수안정성면서 홍수시 불어난 하천수가 소통할 단면적의 감소와 소수력에 의한 식물 및 호안의 여전한 유실가능성, 조도계수의 증가에 대한 대책이 미흡하다.Pure lakeside vegetation is the most suitable for the natural form of the riverbank, but it is difficult to select plant species that meet the characteristics of the river and the soil. There is a lack of countermeasures against the possibility of still loss of plants and lakes and the increase of roughness coefficient.

통나무를 이용한 호안시공방법은 자연도는 높으나 충격에 약하고, 낮은 시공경제성에다 필수적으로 부식억제용 방부처리를 선행해야하는 것이 문제다.The method of constructing a lake using log is high, but it is weak to impact, low construction economics, and corrosion preservative treatment is essential.

석재를 이용하 호안녹화공법은 높은 자연도에 풍부한 공간이 확보되므로서 하펀 어류와 생물의 훌륭한 서식처가 제공되는 반면 막대한 양의 자연석이 소요되는 까닭에 시공현장 부근에서 석재의 조달에 어려움이 따르고 자연석의 채취로 인한 2차적 자연환경의 파괴문제가 대두된다.The stone reclamation process provides abundant space at high natural levels, providing excellent habitats for fish and living creatures, while enormous amounts of natural stone are required, making it difficult to procure stone near construction sites. The problem of the destruction of the secondary natural environment caused by the harvest is raised.

그리고 야자수 껍질, 연약지반구축용 섬유매트 등을 이용한 호안녹화공법은 유수에 대한 저항력과 인장강도가 낮아 홍수에 취약한 단점이 있는가하면 국내생산이 되지않는 야자수 껍질의 경우 부족한 양과 고가의 수입비용 때문에 특히 대형호안공사에는 애로가 크다.In addition, the lake reclamation method using palm bark, soft ground fiber mat, etc. has the disadvantage of being vulnerable to flooding due to its low resistance to water and tensile strength, and especially for palm bark that is not domestically produced due to insufficient amount and expensive import cost. There is a lot of trouble for large-scale protection projects.

이런 점에서, 튼튼한 호안공사는 말할 것도 없고 거기에 더하여 호안시공후 거기에 식생한 식물의 조기생장과 왕성한 성장에 도움이 되고, 호안공사용 블록이나 이와 유사한 목적을 가진 자재의 조적이 간편하며, 공기단축과 비용절감에 기여할 수 있는 방안을 시급히 마련해야 될 것으로 본다.In this regard, not only the strong revetment work, but also the early renovation and vigorous growth of vegetation plants after the revetment construction, and the convenient construction of blocks for revetment or similar purposes, We need to urgently devise ways to contribute to cost savings.

본 발명은 조적이 용이하고, 조적상태가 안정되며, 빠른 유속에도 초목의 조기활착과 식생 후의 안전한 성장등 안전한 식생여건을 조성하여 하안의 조기녹화, 완벽한 녹화를 구현하는 것이 목표이며 목적이다.The present invention aims to realize early vegetation and perfect greening of the riverbed by creating safe vegetation conditions such as easy tacking, stable throttling state, and early cultivation of vegetation and safe growth after vegetation even at high flow rates.

본 발명은 해안의 연약지대, 방파제, 방조제보호용으로 개발된 테트라포트를하안의 특성에 맞게 소형으로 제작하여 운반과 시공작업의 편의를 도모하고 튼튼한 하안을 구축할 수 있게 하며, 테트라포트 사이의 공간으로 초목을 식생하여 복토하므로서 하안 표토의 유실방지에 아주 효과적이고 초목의 생장에 호적한 토양조건을 조성하여 충분한 용존산소를 확보하므로서 하안의 조기녹화를 구현하며, 이로써 왕성하게 자라는 초목에 의하여 하천의 자정능력배양, 풍부한 생태적 서식처의 제공에 따른 하천 생물의 번식촉진, 친수공간의 확대로 환경친화적인 하천으로 가꿀 수 있는 하안을 호안녹화시공하는 방법을 제공한다.The present invention makes the tetraport developed for the protection of coastal soft zones, breakwaters and seawalls in a small size according to the characteristics of the river, to facilitate the transportation and construction work, and to build a strong river, the space between the tetraports By planting vegetation and covering the vegetation, it is very effective in preventing the loss of topsoil from the river and by creating soil conditions suitable for vegetation growth, it secures sufficient dissolved oxygen to realize early greening of the river. It provides a method of constructing lake banks that can be converted into environmentally friendly rivers by promoting self-cultivation, promoting the growth of river organisms by providing abundant ecological habitats, and expanding the hydrophilic space.

도 1은 호안재로서의 소형 테트라포트의 사시도1 is a perspective view of a small tetrapot as a relief material

도 2는 소형 테트라포트의 다른 실시예시도2 shows another embodiment of a small tetrapot

도 3은 소형 테트라포트의 평면조적예시도3 is an exemplary plan view of a small tetrapot

도 4는 하안을 본 발명으로 호안공사한 경우의 단면도Figure 4 is a cross-sectional view when the revetment construction of the lower bank according to the present invention

도 5는 도 4의 A부 상세도5 is a detailed view of portion A of FIG.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

1 : 소형 테트라포트 2,3 : 뿔1: small tetrapot 2,3: horn

4 : 구멍 5 : 공간4: hole 5: space

6 : 복토 7 : 식물6: cover 7: plants

도 1에서, 본 발명에서 사용하는 호안재는 소형 테트라포트(1)이다. 테트라포트는 지면에 접지되는 동일규격의 뿔(2)이 120°로 방사상으로 내뻗은 가운데 이들이 만난 점의 중심에도 상기와 같은 형의 뿔(3)이 하나 더붙은 것이다. 해안,방조제, 방파제용 테트라포트가 콘크리트제품이듯 소형 테트라포트(1)도 콘크리트제이다. 그러나 하천은 해안의 가혹한 환경에 비해 호조건이어서 하수에 의한 저항이 작고 경제성, 운반성, 작업성, 공장이나 현장에서의 제작성 등을 두루 고려할 때 바다용 대형 테트라포트를 그대로 적용하는 것은 불비합리하다. 이런 이유에서 테트라포트를 하안의 조건에 맞게 소형으로 제작하는 것이 유리하다.In Fig. 1, the relief material used in the present invention is a small tetrapot (1). Tetrapot is a horn (3) of the same standard that is grounded to the ground radially extended to 120 ° while one of the same type of horn (3) is attached to the center of the meeting point. The small tetrapots (1) are also made of concrete, just as the tetraports for coastal, seawall, and breakwater are concrete products. However, rivers are more favorable than the harsh environment on the coast, so the resistance of the sewage is small, and considering the economicality, transportability, workability, and plantability in the factory or the field, it is unreasonable to apply the large tetrapots for the sea. Do. For this reason, it is advantageous to make the tetrapot small in accordance with the conditions of the riverbank.

도 2에서, 변형된 소형 테트라포트(1a)는 뿔(2,3)에 구멍(4)을 형성한 것이다. 이 구멍(4)은 포크레인 등의 장비에 와이어 로우프를 꿰어 옮길 때 아주 편하다. 구멍(4)을 형성하면 철근이나 강선으로 별도의 걸이용 고리를 구비하지 않아도되는 편리함이 더있고, 수중에 잠기면 하천 어류의 훌륭한 서식공간(인공어초)을 제공하게 되는 부수효과도 곁들여진다.In Fig. 2, the modified small tetrapot 1a forms a hole 4 in the horns 2,3. This hole (4) is very convenient when threading wire rope to equipment such as fork cranes. Forming the hole (4) is more convenient that does not have to have a separate hook for the reinforcement or steel wire, and when submerged underwater also has the side effect that provides a good habitat (river artificial fish) of river fish.

도 3에서, 소형 테트라포트(1)를 배치하는 방법은 하상과의 경계로 부터 제1열의 소형 테트라포트(1-1)는 접지되는 뿔(2)이 평면상 삼각형을 이루도록 옆으로 잇대어 배열하고 제2열 소형 테트라포트(1-2)는 제1열 소형 테트라포트(1-1)의 사이사이에 접지 뿔(2) 하나가 끼임으로써 모든 접지 뿔(2)이 평면상 역삼각형으로 보이게 배열한다. 또, 제3열 소형 테트라포트(1-3)는 제2열 소형 테트라포트(1-2)의 사이사이에 제1열 테트라포트(1-1)와 같은 요령으로 배열하고, 제4열 소형 테트라포트(1-4)는 제3열 소형 테트라포트(1-3) 사이사이에 제2열 소형 테트라포트(1-2)와 동일한 요령으로 배열한다. 이런 식으로 호안시공종점까지 후속 홀수열은 홀수열대로 짝수열은 짝수열대로 소형 테트라포트를 배열하면 저절로 호안공사가 이뤄지며, 개개의 소형 테트라포트(1) 접지 뿔(2) 사이에는 공간(5)이 남는다. 이들 공간(5)은 나중에 그 하안의 토양에 적합한 식물을 심는 식재공간으로 활용된다.In Fig. 3, the method of arranging the small tetrapots 1 shows that the small tetrapots 1-1 of the first row are arranged side by side so that the horns 2 which are grounded form a triangle in plan view from the boundary with the lower bed. In the second row of small tetrapots 1-2, one ground horn 2 is sandwiched between the first row of small tetrapots 1-1 so that all of the ground horns 2 appear in inverted triangles in plan view. do. Further, the third row small tetrapots 1-3 are arranged in the same manner as the first row tetrapots 1-1 between the second row small tetrapots 1-2, and the fourth row small tetrapots 1-3 are arranged. The tetrapots 1-4 are arranged in the same manner as the second row small tetrapots 1-2 between the third row small tetrapots 1-3. In this way, when the small tetrapots are arranged in odd rows with even rows and even rows with even columns to the raft construction end point, the revetment works by itself, and the space between the individual small tetraports (1) and the ground horns (2) ) Remains. These spaces 5 are later used as planting spaces for planting plants suitable for the soil of the riverbank.

도 4 및 도 5에서, 수면하 하상을 포함한 하안에 시공한 소형 테트라포트(1)의 사이에 남는 공간(5)에는 그 하안에서 채취한 토양, 부식토, 인공토양 또는 이들이 혼합된 복토(6)를 채우고 다진다. 마지막으로 상기 복토(6), 되도록 공간(5)쪽 복토(6)에 그 하안에 적합한 식물(7)을 식재하든가 초본류 종자를 파종하여 생장토록 한다. 구멍(4)이 뚫린 소형 테트라포트(1a)도 이같은 요령으로 호안시공을 한다. 하안의 법면도 이같은 방법으로 호안녹화할 수 있다.4 and 5, the space (5) remaining between the small tetrapots (1) constructed in the lower surface including the subsurface water bed is soil, humus, artificial soil or cover soil (6) mixed with the lower water (5). Fill and chop. Finally, the cover (6), the cover (6) toward the cover (6) to plant the plant (7) suitable for the bottom, or to plant the herbaceous seeds to grow. The small tetrapot 1a in which the hole 4 is drilled also performs a relief construction by the same method. The law of the river bank can be recorded in this way.

이상과 같은 본 발명의 호안 식생녹화시공방법은 접지안정성과 시공성 및 평면적인 공간을 확보하기가 용이한 소형 테트라포트로 호안하고 복토한 후 개개의 소형 테트라포트 사이에 하안에 적합한 식물을 식생하여 녹화하는 것으로, 복구한 하안의 유실방지와 침식방지효과가 종전의 여타 호안녹화시공방법에 비해 월등히 우수하고, 소형 테트라포트 사이에 용존산소량이 풍부해져서 복토는 물론 하안의 표토가 부패되는 것을 막아 호안녹화시공 이후의 자연생태계 복원 및 녹화유지가 가능하다.As described above, the revetment vegetation greening method of the present invention is a small tetrapot that is easy to secure grounding stability, workability, and planar space, and is covered with vegetation. This prevents loss and erosion effect of the recovered riverbank, which is much better than other methods of revetment, and the amount of dissolved oxygen is enriched between small tetrapots. It is possible to restore natural ecosystem and maintain greening after construction.

또, 호안블럭이나 석재에 비해 접지안정성이 우수하므로 한층 강력한 호안효과를 기대할 수 있고, 거기에 심어진 초목에 대한 지지력이 확고하므로 폭우나 홍수시 하천수가 불어나더라도 물살에 휩쓸려 쓰러지거나 뽑혀나갈 우려가 희박하다.In addition, the earthing stability is better than that of raft blocks or stones, so you can expect a stronger raft effect. It is rare.

뿔에 구멍이 형성된 소형 테트라포트는 수중에서 인공어초의 기능을 발휘하여 하안에 서식하는 어류의 번식에 도움이 되고, 시공시에는 와이어 로우프나 후크를 걸어 나르기도 쉽다.The small tetrapots with holes in the horns have the function of artificial reefs in the water, which is helpful for breeding fishes in the bottom, and it is easy to carry wire ropes or hooks during construction.

Claims (2)

접지안정성과 시공성 및 평면적인 공간확보가 용이한 테트라포트를 소형 테트라포트(1)로 개조하여 하안에 정연하게 배열시공하고, 개개의 소형 테트라포트(1) 사이에 복토(6)를 채워 다진 다음에 그 복토(6)에다 그 하안에 적합한 식물(7)을 식재하여 호안과 함께 녹화하는 것을 특징으로 하는 하안의 호안녹화시공방법.Tetraports, which are easy to ground stability, workability, and planar space, are converted into small tetrapots (1) and arranged in a row, and compacted with covering soil (6) between individual small tetrapots (1). A revetment method for reclamation of a reel, characterized by planting a plant (7) suitable for the rehabilitation in its cover (6) and planting it together with the revetment. 제1항에 있어서, 상기 소형 테트라포트(1)가 뿔(2,3)에 구멍(4)을 뚫은 소형테트라포트(1a)로 하는 하안의 호안녹화시공방법.The method of claim 1, wherein the small tetrapot (1) is a small tetrapot (1a) having a hole (4) formed in the horn (2,3).
KR19980031511A 1998-08-03 1998-08-03 Riverside lake revetment Tetraport KR100294272B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR19980031511A KR100294272B1 (en) 1998-08-03 1998-08-03 Riverside lake revetment Tetraport

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR19980031511A KR100294272B1 (en) 1998-08-03 1998-08-03 Riverside lake revetment Tetraport

Publications (2)

Publication Number Publication Date
KR20000012925A true KR20000012925A (en) 2000-03-06
KR100294272B1 KR100294272B1 (en) 2001-09-17

Family

ID=19546242

Family Applications (1)

Application Number Title Priority Date Filing Date
KR19980031511A KR100294272B1 (en) 1998-08-03 1998-08-03 Riverside lake revetment Tetraport

Country Status (1)

Country Link
KR (1) KR100294272B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111501670A (en) * 2020-05-27 2020-08-07 中国十七冶集团有限公司 Waterfront river course slope protection structure and construction method thereof

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100903395B1 (en) * 2008-07-14 2009-06-18 범아건설 주식회사 Tetrapod for safety, coastal structures using that and method of construction thereof

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS481143Y1 (en) * 1970-04-30 1973-01-12
JPH0750409Y2 (en) * 1993-03-30 1995-11-15 共和コンクリート工業株式会社 Vegetation slope

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111501670A (en) * 2020-05-27 2020-08-07 中国十七冶集团有限公司 Waterfront river course slope protection structure and construction method thereof

Also Published As

Publication number Publication date
KR100294272B1 (en) 2001-09-17

Similar Documents

Publication Publication Date Title
KR200382114Y1 (en) mat for landscape architecture
CN111052974B (en) Method for building reef shoal near-natural mangrove forest
CN103898870B (en) A kind of gabion net Ecotypic Stone Mesh-box river course slope protection construction method
WO2020220671A1 (en) Mangrove afforestation method and structure for coastal rocky beach
CN102051867A (en) Green ecological flexible channel revetment structure
CN202012066U (en) Flexible green ecological channel revetment structure
JP5460778B2 (en) Artificial Yoshihara
CN112359775A (en) Ecological zone construction method for reducing waves and sandy beach argillization
KR0147725B1 (en) Revetment method for making the sand bed of natural type watercourse
JP5153977B2 (en) Artificial reed field and its construction method
KR100487405B1 (en) A construction and a carrying out method for plants a self-generation of a cover stone
KR100294272B1 (en) Riverside lake revetment Tetraport
KR100656939B1 (en) Water purifying system of river bank based on ecologicalengineering
CN115928648A (en) Ecological restoration system and restoration method for erosion coastal zone
Hengchaovanich Vetiver system for slope stabilization
KR100381254B1 (en) Methode for construction of vegetative streambank of stream using trench
KR200303587Y1 (en) Embankment block
KR200306402Y1 (en) Stone net bag for plants
WO2019204970A1 (en) Novel coastal wetland erosion protection structure and construction method therefor
KR100479439B1 (en) A embankment of a triangle barrier and a carrying out method for river
KR200163470Y1 (en) Block for naturally protecting an inclined plane
KR100905416B1 (en) Wood crib for fishing banks and their use for riverbanks
KR200356111Y1 (en) Embankment block
CN218842990U (en) Ecological restoration system for erosion coastal zone
KR100478158B1 (en) Embankment block

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20110513

Year of fee payment: 11

LAPS Lapse due to unpaid annual fee