KR19980012036U - Safety rope hanger of steel structure - Google Patents

Safety rope hanger of steel structure Download PDF

Info

Publication number
KR19980012036U
KR19980012036U KR2019960025575U KR19960025575U KR19980012036U KR 19980012036 U KR19980012036 U KR 19980012036U KR 2019960025575 U KR2019960025575 U KR 2019960025575U KR 19960025575 U KR19960025575 U KR 19960025575U KR 19980012036 U KR19980012036 U KR 19980012036U
Authority
KR
South Korea
Prior art keywords
rope
steel
safety rope
support rod
safety
Prior art date
Application number
KR2019960025575U
Other languages
Korean (ko)
Other versions
KR200145486Y1 (en
Inventor
왕인수
Original Assignee
최훈
삼성물산주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 최훈, 삼성물산주식회사 filed Critical 최훈
Priority to KR2019960025575U priority Critical patent/KR200145486Y1/en
Publication of KR19980012036U publication Critical patent/KR19980012036U/en
Application granted granted Critical
Publication of KR200145486Y1 publication Critical patent/KR200145486Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3204Safety or protective measures for persons during the construction of buildings against falling down
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3261Safety-nets; Safety mattresses; Arrangements on buildings for connecting safety-lines
    • E04G21/3295Guide tracks for safety lines

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Emergency Lowering Means (AREA)

Abstract

본 고안은 철골구조로 시공되는 고층건축물의 철골기둥 최상부에 철골보 설치시 작업자의 안전설비로서의 역할을 수행하면서 용이하게 설치 및 제거할 수 있는 철골구조물의 안전로프걸이에 관한 것으로, 철골기둥(7)의 최상부에 그 하부 끝부분이 부착되고 그 상부는 상기 철골기둥(7)의 상부 끝단부보다 소정의 높이만큼 수직하게 상부로 연장되는 지지봉(8)과, 상기 지지봉(8)의 상부 끝부분에 부착되며 로프연결구멍(9)이 뚫리는 고정편(10)과, 상기 고정편(10)의 로프연결구멍(9)을 통하여 지지봉(8)들간의 서로 연결하는 연결로프(11)로 구성되어, 상기 연결로프(11)에 작업자의 신체에 연결되는 안전로프(15)를 걸어서 안전하게 최상부 철골보(14) 설치작업을 수행할 수 있도록 하는 것이다.The present invention relates to a safety rope hook of a steel structure that can be easily installed and removed while serving as a safety facility for an operator when installing a steel beam on the top of a steel pillar of a high-rise building constructed of steel structures. The lower end is attached to the uppermost portion of the upper end of the support rod 8 extending vertically upward by a predetermined height than the upper end of the steel column (7), and the upper end of the support rod (8) It is composed of a fixing piece 10 is attached and the rope connecting hole (9) is drilled, and a connecting rope (11) connecting the support rods (8) to each other through the rope connecting hole (9) of the fixing piece (10), The safety rope 15 connected to the body of the worker to the connection rope 11 is to be able to safely carry out the installation of the top cheolgolbo 14.

Description

[고안의 명칭][Designation name]

철골구조물의 안전로프걸이Safety rope hanger of steel structure

[도면의 간단한 설명][Brief Description of Drawings]

제1도는 종래 안전로프걸이 실시예를 나타내는 일부 사시도1 is a partial perspective view showing an embodiment of a conventional safety rope hook

제2도는 본 고안 안전로프걸이 실시예를 나타내는 일부 사시도2 is a partial perspective view showing an embodiment of the present invention safety rope hook

제3도는 본 고안 안전로프걸이 실시예를 나타내는 일부 정면도3 is a partial front view showing an embodiment of the present invention safety rope hook

제4도는 본 고안 안전로프걸이 다른 실시예를 나타내는 일부 정면도4 is a partial front view showing another embodiment of the present invention safety rope hook

제5도는 본 고안 안전로프걸이가 철골기둥들의 최상부에 설치된 실시예를 나타내는 정면도5 is a front view showing an embodiment of the present invention safety rope hook is installed on top of the steel pillars

*도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on main parts of drawing

7 : 철골기둥7a : 체결구멍8 : 지지봉7 steel column pillar 7a fastening hole 8: support rod

9 : 로프연결구멍10 : 고정편11 : 연결로프9 rope connection hole 10 fixing piece 11 connecting rope

12 : 체결볼트13 : 체결너트14 : 철골보12: fastening bolt 13: fastening nut 14: steel ball

15 : 안전로프15: safety rope

[고안의 상세한 설명][Detailed Description of Design]

(산업상 이용 분야)(Industrial use)

본 고안은 철골구조로 시공되는 고층건축물의 철골기둥 최상부에 철골보 설치시 작업자의 안전설비로서의 역할을 수행하면서 용이하게 설치 및 제거할 수 있는 철골구조물의 안전로프걸이에 관한 것이다.The present invention relates to a safety rope hanger of the steel structure that can be easily installed and removed while serving as a safety facility of the worker when installing the cheolgolbo on the top of the steel column pillar of the high-rise building constructed of steel structure.

최근들어 신축되는 건축물은 고층화 및 대형화되는 추세에 있으며, 이러한 고층건축물은 최하층에 전달되는 하중이 크기 때문에, H형강 등으로 만들어지는 철골기둥들과, 그 기둥들을 상호 연결하는 철골보들로서 골격을 이루는 철골구조로서 시공되는 것이 일반적이라 할 수 있다.In recent years, new buildings have become taller and larger in size, and since such high-rise buildings have a high load transmitted to the lower floors, steel pillars made of H-beams and steel beams that connect the pillars to each other form a steel frame. It is common to be constructed as a structure.

이와 같은 철골구조의 고층건축물은 철근콘크리트구조의 건축물과는 달리 철골보들로 구획되는 공간에 바닥구조부가 설치되지 않은 상태에서 폭이 좁은 철골보의 상부에서 폭이 좁은 철골보의 상부에서 각종의 시설작업을 진행하게 된다.Unlike the reinforced concrete structure, such high-rise buildings have various facilities work in the upper part of the narrow steel beam beams in the upper part of the narrow steel beam beams without the floor structure part installed in the space divided by the steel beam beams. Will proceed.

따라서, 작업자가 항시 추락사고의 위험부담을 안고 시설작업을 수행하기 때문에 작업도중에 안전사고가 빈번하게 발생되었다.Therefore, safety accidents were frequently generated during the work because the worker always carried out the facility work with the risk of falling accident.

(종래기술 및 문제점)(Prior technology and problem)

상기 문제점을 해결하기 위하여 본 출원인은 이미 실용신안등록출원 제94-31783호에서 안전로프걸이를 출원한 바가 있다.In order to solve the above problems, the present applicant has already filed a safety rope hanger in Utility Model Registration Application No. 94-31783.

즉, 본 출원인이 선출원한 안전로프걸이는 제1도에서 도시되는 바와 같이, 수직으로 세워지는 철골기둥(1)들의 측단부 양측에 설치되어지는 철골보들의 수직방향의 조립위치로부터 소정의 높이로서 연결구멍(2)이 형성되는 고정판(3)들을 상호 대향되도록 부착 고정하고, 상기 고정판(3)들의 연결구멍(2)에 결합 분리가 가능한 결착수단(4)을 각각 설치하며, 상기 결착수단(4)을 통하여 생명줄의 양측단에 형성된 고리부(6)가 걸어지도록 하여서 상기 철골기둥(1)과 철골기둥(1) 사이에서 생명줄(5)이 설치되는 것이다.In other words, the applicant's first safety rope hook is shown in Figure 1, connected as a predetermined height from the vertical assembly position of the cheolgolbo which is installed on both sides of the side end of the steel pillars (1) standing vertically Attaching and fixing the fixing plates 3 formed with the holes 2 so as to face each other, and each of the fixing means (4) capable of coupling and separating in the connection hole (2) of the fixing plates (3), respectively, Lifeline (5) is installed between the steel column (1) and the steel frame (1) to walk through the ring portion (6) formed at both ends of the life line through the).

이와 같이, 선출원 기술은 생명줄(5)이 상부로 연장되는 철골기둥(1)에 직접 지지력을 받게 되어 보다 견고한 상태로서 안전사고에 적극 대응할 수 있으며, 철골기둥(1)에 이미 부착되어 있는 고정판(3)에 결착수단(4)을 통하여 생명줄(5)이 결착되어지도록 하여 생명줄(5)의 설치가 용이하며, 필요한 위치에 생명줄(5)을 선택적으로 결착하여 설치할 수 있는 융통성을 가지게 되는 등의 장점을 가지는 것이 사실이다.As such, the prior application technology is directly supported by the steel column (1), the lifeline (5) extending to the top is more robust state can actively respond to safety accidents, and the fixed plate (attached to the steel column (1) ( 3) the lifeline 5 is fastened through the binding means 4 so that the lifeline 5 can be easily installed, and the lifeline 5 can be selectively attached and installed at the required position. It is true to have an advantage.

그러나, 이러한 선출원된 것은 최상층 철골보를 제외한 그 하부층들에는 유용하게 적용될 수 있는 것이지만, 최상층 철골보를 설치할 때는 적용이 불가능하게 되었다.However, such a pre-applied thing can be usefully applied to the lower layers except for the uppermost cheolgolbo, but it is not applicable when installing the uppermost cheolgolbo.

왜냐하면, 철골기둥의 최상부 끝부분에서 철골보가 연결되기 때문에 생멸줄을 결착할 철골기둥이 더이상 상부로 연장되지 않고 끝나기 때문이다. 그러므로 철골기둥의 최상부에서 철골보 설치작업시에는 작업자의 추락위험을 안고 보설치작업을 진행할 수 밖에 없었다.Because, because the cheolgolbo is connected at the top end of the steel pillars, the steel pillars to bind the live extinction line is no longer extended to the upper end. Therefore, the steel beam beam installation work at the top of the steel column had no choice but to carry out the beam installation work with the risk of falling.

더구나, 철골기둥의 최상부에서 철골보를 설치작업시에 추락을 방지할 수 있는 안전장치가 마련되어 있지 않는 상태에서 보설치작업을 진행하다보니, 즉 심리적으로 불안한 상태에서 보설치작업을 진행하다 보니 체결상태등 시공이 불량한 점이 있으며, 전반적으로 작업성이 저하되는 문제점이 있었다.Moreover, when the beam installation work is performed at the top of the steel column without the safety device to prevent the fall during installation, the beam installation work is conducted in a psychologically unstable state. There is a poor construction, such as, there was a problem that overall workability is reduced.

[고안의 목적][Purpose of designation]

본 고안의 목적은 철골기둥 최상부에 철골보 설치작업시 작업자의 안전사고를 방지하면서 심리적으로 안정된 상태에서 철골보 설치작업을 수행하게 함으로서 작업성을 증대하는 철골구조물의 안전포프걸이를 제공하는데 있다.The object of the present invention is to provide a safety pop hook of steel structure to increase the workability by performing the steel cheolgolbo installation work in a psychologically stable state while preventing the safety accident of the worker when installing the steel cheongbo on top of the steel column.

[고안의 구성][Composition of design]

이하, 본 고안의 기술적 구성을 상세히 설명하면 다음과 같다.Hereinafter, the technical configuration of the present invention in detail.

본 고안 철골구조물의 안전로프걸이는 제2도 및 제3도에서 도시되는 바와 같이, 철골기둥(7)의 최상부에 그 하부 끝부분이 부착되고 그 상부는 상기 철골기둥(7)의 상부 끝단부보다 소정의 높이만큼 수직하게 상부로 연장되는 지지봉(8)과, 상기 지지봉(8)의 상부 끝부분에 부착되며 그 가운데 로프연결구멍(9)이 뚫리고 고정편(10)과, 상기 고정편(10)을 통하여 지지봉(8)들간의 서로 연결하는 연결로프(11)로 구성되어, 상기 연결로프(11)에 작업자의 신체에 연결되는 안전로프(15)를 걸어서 안전하게 최상부 철골보(14) 설치작업을 하도록 함을 특징으로 하는 것이다.The safety rope hook of the steel structure of the present invention, as shown in Figure 2 and 3, the lower end is attached to the top of the steel column (7) and the upper end of the upper end of the steel column (7) A support rod 8 vertically extending upwardly by a predetermined height, attached to the upper end of the support rod 8, and a rope connecting hole 9 is drilled therein, the fixing piece 10 and the fixing piece ( It is composed of a connecting rope (11) connecting each other between the support rods (8) through the 10, the safety rope (15) connected to the body of the worker to the connecting rope 11 to install the uppermost cheolgolbo (14) It is characterized by that.

이와 같이 구성되는 본 고안은 그 상부 끝부분에 로프연결구멍(9)이 뚫린 고정편(10)을 일체로 용접한 앵글형 지지봉(8)을 제5도에서와 같이 철골기둥(7) 최상부 끝부분에 부착된다.The present invention constructed as described above has an angled support rod 8 integrally welded to the fixing piece 10 in which the rope connecting hole 9 is drilled at the upper end thereof, as shown in FIG. Is attached to.

이때, 지지붕(8)은 미리 지상에서 최상부 철골기둥(7)에 부착한 후에, 크레인으로 양중하여 조립된다. 그리고 지지봉(8)과 지지봉(8)간에 연결로프(11)를 연결함으로써 설치되는 것이다.At this time, the support shelf 8 is attached to the uppermost steel column 7 on the ground in advance, and then assembled by lifting a crane. And it is installed by connecting the connecting rope 11 between the support rod (8) and the support rod (8).

여기에서, 지지봉(8) 상부 끝부분에 부착되는 고정편(10)은 작업현장에서 용접으로 간단히 부착할 수 있지만, 고정편(10)에 뚫려지는 로프연결구멍(9) 및 철골기둥(7) 상부 끝부분에 뚫려지는 체결구멍(미도시)들은 공장에서 미리 소정의 규격으로 일정하게 뚫는 것이 바람직하다.Here, the fixing piece 10 attached to the upper end of the support rod 8 can be easily attached by welding at the work site, but the rope connecting hole 9 and the steel column 7 drilled in the fixing piece 10. Fastening holes (not shown) to be drilled in the upper end is preferably drilled to a predetermined size in advance at the factory.

이와 같이 설치되는 본 고안은 제3도에서 도시되는 바와 같이, 연결로프(11)에 작업자의 신체에 연결된 안전로프(15)를 걸어서 철골보(14) 설치작업 등을 안전하게 수행할 수 있는 것이다.As the present invention is installed in this way, as shown in Figure 3, the safety rope 15 connected to the body of the worker can be safely connected to the connection rope 11 to perform the installation work, such as cheolgolbo (14).

따라서, 작업자의 신체에 연결된 안전로프(15)가 연결로프(11)에 연결된 상태로 철골보 설치작업을 수행하기 때문에 추락사고를 미연에 방지할 수 있을 뿐만 아니라, 심리적으로 안정된 상태에서 작업을 진행하기 때문에 작업성이 증대되는 것이다.Therefore, since the safety rope 15 connected to the body of the worker performs the steel cheolgolbo installation work in the state connected to the connecting rope 11, not only can prevent the accident in advance, but also proceed to work in a psychologically stable state This increases workability.

상기 지지봉(8)의 하부 끝부분은 철골기둥(7) 용접 등으로 일체로 부착할 수도 있으나, 제1도 및 제2도에서 도시되는 바와 같이, 철골기둥(7)의 최상부에 체결볼트(12) 및 체결너트(13)로 견고하게 체결되도록 하는 것이 바람직하다.The lower end of the support rod 8 may be integrally attached by welding the steel column 7, etc., but as shown in FIGS. 1 and 2, the fastening bolt 12 is formed on the top of the steel column 7. ) And fastening nuts 13 are preferably fastened.

이때, 지지봉(8)은 철골기둥에 견고하게 체결되기 위해 제4도에서 도시되는 바와 같이, 체결볼트(12) 및 체결너트(13)가 복수개로 체결되는 것이 좋다.At this time, the support rod 8 is fastened to the steel pillars, as shown in Figure 4, it is preferable that a plurality of fastening bolts 12 and the fastening nut 13 is fastened.

이러한 지지봉(8)이 체결볼트(12) 및 체결너트(13)로 철골기둥(7)에 체결되는 이유는 안전로프걸이를 이용하여 철골보(14) 설치작업을 완료한 후에 안전로프걸이를 제거해야 하므로 제거작업을 용이하게 하기 위함이다.The reason why the support rod 8 is fastened to the steel frame pillar 7 by the fastening bolt 12 and the fastening nut 13 is to remove the safety rope hook after completing the installation of the steel frame beam 14 using the safety rope hook. Therefore, to facilitate the removal work.

따라서, 지지봉(8)의 하부 끝부분이 철골기둥(7)의 최상부에 체결볼트(12) 및 체결너트(13)로 체결됨으로써, 안전로프걸이를 이용하여 철골보(14) 설치작업을 끝낸 후에, 체결볼트(12) 및 체결너트(13)를 단순히 풀기만 하면 되기 때문에 간단하게 철골기둥(7)으로부터 안전로프걸이를 제거할 수 있는 장점이 있다.Therefore, the lower end of the support rod 8 is fastened to the top of the steel column (7) by the fastening bolt 12 and the fastening nut (13), after completing the installation of the cheolgolbo 14 using the safety rope hook, Since simply fastening the fastening bolt 12 and the fastening nut 13 has the advantage that it is possible to simply remove the safety rope hook from the steel pillar (7).

또한, 상기 지지봉은 제1도에서 도시되는 바와 같이, 단면상 앵글형상을 가지도록 함이 바람직하다. 이는 단면형상이 앵글이기 때문에 구조적 강도가 증대되면서도 체결볼트(12) 및 체결너트(13)를 철골기둥(7)에 용이하게 체결할 수 있는 장점이 있다.In addition, the support rod is preferably to have a cross-sectional angle shape, as shown in FIG. Since the cross-sectional shape is an angle, there is an advantage that the fastening bolt 12 and the fastening nut 13 can be easily fastened to the steel column 7 while increasing the structural strength.

한편, 상기 지지봉(8)이 철골기둥(7)에 부착되는 위치는 철골보(14)를 철골기둥(7)에 부착시킬 때 방해가 되지 않는 위치에 부착되는 것이 바람직하다.On the other hand, the support rod 8 is preferably attached to a position where it does not interfere when the steel poles 14 are attached to the steel frame (7).

즉, 철골기둥 H형강일 때는 본 고안의 실시예에서와 같이 외측플랜지에 부착 될 수도 있으며, 경우에 따라서 웨브에 부착될 수도 있음을 밝혀둔다.In other words, when the steel column H-shaped steel may be attached to the outer flange, as in the embodiment of the present invention, it may be attached to the web in some cases.

또, 사각박스기둥일 때는 지지봉이 박스기둥 내부에 부착되는 것이 바람직하다.In addition, when the rectangular box pillar, the support rod is preferably attached to the inside of the box pillar.

상기 고정편(10)은 제2도 및 제3도에서 도시되는 바와 같이, 지지봉(8)의 일측방향으로 돌출될 수도 있으며, 제4도에서 도시되는 바와 같이, 지지봉(8)의 좌,우측방향으로 연장되어 그 좌,우연장부에 각각 로프연결구멍(9)이 뚫릴 수도 있다.As shown in FIGS. 2 and 3, the fixing piece 10 may protrude in one direction of the support rod 8, and as shown in FIG. 4, the left and right sides of the support rod 8 are shown. Extending in the direction, the rope connecting hole 9 may be drilled in the left and right extension portions, respectively.

상기 고정편(10)이 지지봉(8)의 일측방향으로만 돌출된 것은 제5도에서 도시되는 바와 같이, 철골기둥(7) 양측 끝부분에 사용되는 것이 바람직하고, 고정편(10)이 지지봉(8)의 좌,우측방향으로 돌출되는 것은 제5도에서 도시되는 바와 같이, 중간 중간에 위치되는 철골기둥(7)에 사용되는 것이 바람직하다.It is preferable that the fixing piece 10 protrudes only in one direction of the supporting rod 8, as shown in FIG. 5, and is used at both ends of the steel column 7, and the fixing piece 10 is a supporting rod. Protruding in the left and right directions of (8) is preferably used for the steel column (7) located in the middle, as shown in FIG.

한편, 고정편(10)은 2개가 서로 직각방향으로 지지봉(8)에 부착될 수도 있음을 밝혀둔다. 이러한 직각방향의 고정편이 부착된 지지봉은 골조가 직각사각형으로 설치되는 모서리 철골기둥에 유용하게 사용될 수 있다.On the other hand, it is noted that the two fixing pieces 10 may be attached to the supporting rods 8 at right angles to each other. The support bar is attached to the fixed piece in the perpendicular direction can be usefully used in the corner steel column is installed in a rectangular square frame.

[고안의 효과][Effect of design]

이와 같이 본 고안은 철고기둥(7)의 최상부에 소정의 높이를 가지는 지지봉(8)이 볼트체결된다. 그리고 지지봉(8)의 상부 끝부분에 로프연결구멍(9)이 뚫린 고정편(10)이 용접되며, 그 로프연결구멍(9)을 통하여 연결로프(11)가 연결된다.In this way, the present invention is bolted to the support rod 8 having a predetermined height at the top of the iron pillar (7). Then, the fixing piece 10 in which the rope connecting hole 9 is drilled is welded to the upper end of the supporting rod 8, and the connecting rope 11 is connected through the rope connecting hole 9.

따라서, 본 고안은 연결로프(11)에 작업자의 신체에 연결된 안전로프(15)를 걸어서 철골보 설치작업등을 수행하기 때문에 철골기둥 최상부에 철골보 설치작업시 작업자의 안전사고를 미연에 방지하면서 심리적으로 안정된 상태에서 철골보 설치작업 등을 수행하게 됨으로써 작업성을 증대하는 효과가 있다.Therefore, the present invention is a safety rope (15) connected to the body of the worker to the connecting rope (11) to perform the cheolgolbo installation work, etc. When the cheolgolbo installation work on the top of the steel pillar to prevent the safety accident of the worker in advance and psychologically stable By performing the cheolgolbo installation work in the state it is effective to increase the workability.

이상에서 살펴본 바와 같이 본 고안 철골구조물의 안전로프걸이는 철골기둥의 최상부에 철골보 설치작업 등을 안전하게 수행할 수 있을 뿐만 아니라, 지지봉이 철골기둥상부에 체결볼트 및 체결너트로 체결되기 때문에 철골보 설치작업시 완료된 후, 용이하게 제거할 수 있는 매우 유용한 것이다.As described above, the safety rope hook of the steel frame structure of the present invention can safely perform the steel beam installation work on the top of the steel column, and the steel bar beam installation work because the support rod is fastened to the upper part of the steel column with the fastening bolt and the fastening nut. After completion, it is very useful to remove easily.

Claims (4)

철골기둥(7)의 최상부에 그 하부 끝부분이 부착되고 그 상부는 상기 철골기둥(7)의 상부 끝단부보다 소정의 높이만큼 수직하게 상부로 연장되는 지지봉(8)과, 상기 지지봉(8)의 상부 끝부분에 부착되며 로프연결구멍(9)이 뚫리는 고정편(10)과, 상기 고정편(10)의 로프연결구멍(9)을 통하여 지지봉(8)들간의 서로 연결하는 연결로프(11)로 구성되어, 상기 연결로프(11)에 작업자의 신체에 연결되는 안전로프(15)를 걸어서 안전하게 최상부 철골보(14) 설치작업을 하도록 함을 특징으로 하는 철골구조물의 안전로프걸이.The lower end is attached to the uppermost part of the steel column (7) and the upper end of the support rod (8) extending vertically upward by a predetermined height than the upper end of the steel column (7), and the support rod (8) The connecting rope 11 is attached to the upper end of the fixing rod 10 is connected to each other between the fixing rod 10 and the support rods 8 through the rope connecting hole 9 of the fixing piece 10 is drilled. Consists of), the safety rope hanger of the steel structure, characterized in that to securely work on the top of the steel cheolgolbo 14 by hooking the safety rope (15) connected to the body of the worker to the connection rope (11). 제1항에 있어서, 상기 지지봉(8)의 하부 끝부분이 상기 철골기둥(7)의 최상부에 체결볼트(12) 및 체결너트(13)로 체결되도록 함을 특징으로 하는 철골구조물의 안전로프걸이.The safety rope hook according to claim 1, wherein the lower end of the support rod (8) is fastened to the top of the steel column (7) by a fastening bolt (12) and a fastening nut (13). . 제1항에 있어서, 상기 지지봉(8)은 단면상 앵글형상을 가지도록 함을 특징으로 하는 철골구조물의 안전로프걸이.The safety rope hook according to claim 1, wherein the support rod (8) has an angle shape in cross section. 제1항에 있어서, 상기고정편(10)은 지지봉(8)의 상부 좌우측으로 연장되어 그 좌,우 연장부에 각각 로프연결구멍(9)이 뚫리도록 함을 특징으로 하는 철골구조물의 안전로프걸이.The safety rope according to claim 1, wherein the fixing piece (10) extends to the upper left and right sides of the support bar (8) so that the rope connection holes (9) are drilled through the left and right extensions thereof, respectively. Distance.
KR2019960025575U 1996-08-24 1996-08-24 Hanger for safety ropes of steel structure KR200145486Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2019960025575U KR200145486Y1 (en) 1996-08-24 1996-08-24 Hanger for safety ropes of steel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2019960025575U KR200145486Y1 (en) 1996-08-24 1996-08-24 Hanger for safety ropes of steel structure

Publications (2)

Publication Number Publication Date
KR19980012036U true KR19980012036U (en) 1998-05-25
KR200145486Y1 KR200145486Y1 (en) 1999-06-15

Family

ID=19464598

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2019960025575U KR200145486Y1 (en) 1996-08-24 1996-08-24 Hanger for safety ropes of steel structure

Country Status (1)

Country Link
KR (1) KR200145486Y1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576904A (en) * 2020-06-16 2020-08-25 上海市机械施工集团有限公司 Hoop type connecting structure and safety rope device between rectangular columns
CN115012683A (en) * 2022-07-01 2022-09-06 中核华辰建筑工程有限公司 Can assemble and tear high altitude and face limit operation and articulate protector
KR102639761B1 (en) * 2023-03-15 2024-02-22 다올이엔지 주식회사 Movable Safety Device for Gas Insulated Switchgear

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576904A (en) * 2020-06-16 2020-08-25 上海市机械施工集团有限公司 Hoop type connecting structure and safety rope device between rectangular columns
CN115012683A (en) * 2022-07-01 2022-09-06 中核华辰建筑工程有限公司 Can assemble and tear high altitude and face limit operation and articulate protector
CN115012683B (en) * 2022-07-01 2024-03-15 中核华辰建筑工程有限公司 Detachable hanging protection device for high-altitude edge operation
KR102639761B1 (en) * 2023-03-15 2024-02-22 다올이엔지 주식회사 Movable Safety Device for Gas Insulated Switchgear

Also Published As

Publication number Publication date
KR200145486Y1 (en) 1999-06-15

Similar Documents

Publication Publication Date Title
JP5097313B2 (en) Suspended scaffold and its installation method
US20060243523A1 (en) Scaffolding brackets
US20050066609A1 (en) Preassembled roof and floor deck panel system
KR0140904B1 (en) Scaffolding for an elevator pit
JP2909413B2 (en) Suspension device for building exterior walls
KR200145486Y1 (en) Hanger for safety ropes of steel structure
CN216740047U (en) Overhead tool type steel platform with high altitude and large span
JP6661142B1 (en) Hanging scaffold
JP3049300B2 (en) Construction method of beam truss in building with overhead traveling crane
JP6520533B2 (en) Overhead crane support device and load receiving member
KR0119386Y1 (en) Structure for connecting the sagety rope to steel construction
JPH0513862Y2 (en)
CN220909248U (en) Temporary supporting structure and steel truss system
CN217812263U (en) Scaffold support structure for elevator well
JPH01322064A (en) Scaffold erection method for construction work performing temporary general grounding using scaffolding steel pipe
CN212954014U (en) Interim support frame bottom connection structure based on tower crane standard festival
CN219196841U (en) Special steel corbel support replacing structure
CN211341650U (en) Prevent stand slope and climb frame
JP3172154B2 (en) Tower assembly scaffolding and tower assembly method
JPH037471Y2 (en)
JPS6322269Y2 (en)
JP3060051U (en) Snow shelter panels for construction work
JPS642908Y2 (en)
KR20230161229A (en) Apparatus for fixing of tower crane
JPH0430213Y2 (en)

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20080201

Year of fee payment: 10

LAPS Lapse due to unpaid annual fee