KR102671025B1 - Pier and Construction Method using Centrifugal High-Strength PHC Piles - Google Patents

Pier and Construction Method using Centrifugal High-Strength PHC Piles Download PDF

Info

Publication number
KR102671025B1
KR102671025B1 KR1020230124743A KR20230124743A KR102671025B1 KR 102671025 B1 KR102671025 B1 KR 102671025B1 KR 1020230124743 A KR1020230124743 A KR 1020230124743A KR 20230124743 A KR20230124743 A KR 20230124743A KR 102671025 B1 KR102671025 B1 KR 102671025B1
Authority
KR
South Korea
Prior art keywords
pier
phc
girder
predetermined
pillar
Prior art date
Application number
KR1020230124743A
Other languages
Korean (ko)
Inventor
김성혁
김기현
Original Assignee
(주) 대현이엔씨
컨텍이앤씨 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주) 대현이엔씨, 컨텍이앤씨 주식회사 filed Critical (주) 대현이엔씨
Priority to KR1020230124743A priority Critical patent/KR102671025B1/en
Application granted granted Critical
Publication of KR102671025B1 publication Critical patent/KR102671025B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D15/00Movable or portable bridges; Floating bridges
    • E01D15/14Floating bridges, e.g. pontoon bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D15/00Movable or portable bridges; Floating bridges
    • E01D15/24Bridges or similar structures, based on land or on a fixed structure and designed to give access to ships or other floating structures
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/06Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
    • E02B3/068Landing stages for vessels
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed
    • E01D2101/285Composite prestressed concrete-metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

본 발명은 바닥판용 거더를 따로 제작하지 않고도 구조적인 강성이 우수한 잔교를 시공할 수 있고, 이를 통해 잔교의 시공비용과 시공에 소요되는 시간을 줄일 수 있는 원심력 고강도 PHC파일을 이용한 잔교 및 그 가설방법에 관한 것이다.
상기의 과제를 해결하기 위한 본 발명에 따른 원심력 고강도 PHC파일을 이용한 잔교는, 수직으로 소정 길이를 가지면서 소정 간격을 두고 복수 열로 설치되는 복수 개의 기둥; 상기 기둥의 상부에 설치되는 브래킷; 상기 브래킷에 안착되면서 잔교의 폭 방향으로 2개의 상기 기둥을 연결하는 소정 길이의 횡거더; 잔교의 길이 방향으로 인접하는 한 쌍의 상기 횡거더를 연결하도록 설치되면서, 단면 모양이 소정 지름을 가지는 원형으로 형성되는 복수 개의 PHC파일; 및 상기 복수 개의 PHC파일의 상부에 타설되어 형성되는 소정 두께의 바닥판을 포함하는 것을 특징으로 한다.
The present invention is a pier and its construction method using centrifugal high-strength PHC piles that can construct a pier with excellent structural rigidity without separately manufacturing a deck girder, and thereby reduce the construction cost and construction time of the pier. It's about.
A pier using centrifugal high-strength PHC piles according to the present invention to solve the above problems includes a plurality of vertical pillars having a predetermined length and installed in multiple rows at predetermined intervals; A bracket installed on the top of the pillar; A transverse girder of a predetermined length that is seated on the bracket and connects the two pillars in the width direction of the pier; A plurality of PHC piles installed to connect a pair of adjacent transverse girders in the longitudinal direction of the pier and having a circular cross-sectional shape with a predetermined diameter; and a bottom plate of a predetermined thickness formed by pouring on top of the plurality of PHC piles.

Description

원심력 고강도 PHC파일을 이용한 잔교 및 그 가설방법{Pier and Construction Method using Centrifugal High-Strength PHC Piles}Pier and Construction Method using Centrifugal High-Strength PHC Piles}

본 발명은 원심력 고강도 PHC파일을 이용한 잔교 및 그 가설방법에 관한 것으로, 더욱 상세하게는 해안가의 접안 시설로 강재나 콘크리트 말뚝 위에 거더로 PHC파일이 설치되어 구성되는 잔교 및 그 가설방법에 관한 것이다.The present invention relates to a pier using centrifugal high-strength PHC piles and its construction method. More specifically, it relates to a pier constructed by installing PHC piles as girders on steel or concrete piles as a coastal berthing facility, and to its construction method.

일반적으로 해안 등의 접안 시설로 설치되는 잔교의 경우 PC 말뚝 위에 콘크리트 거더 또는 데크로된 상판이 설치되는 구조로 이루어지는데, 근래에는 잔교의 구조적인 강성을 높일 수 있으면서도 시공이 간편한 다양한 방법이 개발되고 있다.In general, piers installed as berthing facilities on the coast, etc. are structured with concrete girders or deck tops installed on PC piles. Recently, various methods have been developed that can increase the structural rigidity of piers and are easy to construct. there is.

상기와 같은 목적의 종래기술로는 등록특허공보 제2254229호의 결합력이 향상된 조립식 잔교 구조물 및 이의 시공 방법(이하 '특허문헌'이라 한다)이 개시되어 있다.As a prior art for the above purpose, Patent Publication No. 2254229 discloses a prefabricated pier structure with improved bonding force and its construction method (hereinafter referred to as 'patent document').

상기 특허문헌은 수역 지반에 기초 말뚝을 시공하는 단계; 이웃하는 기초 말뚝의 시공 높이 편차를 보정하여 상기 기초 말뚝이 수평을 유지하도록 하는 PC 말뚝캡을 시공하는 단계; 상기 PC 말뚝캡의 상단에 안착 지지되고, 단부에 거더홈이 형성되어 상기 기초 말뚝의 외측으로 노출되어 있는 속채움철근이 배근되도록 하는 PC 거더를 시공하는 단계; 상기 PC 거더 가장자리부에 양단이 안착 지지되고, 상기 PC 거더와 대응하는 위치에 사이공간을 형성하도록 구비되는 PC 슬래브를 시공하는 단계; 상기 PC 말뚝캡의 관통홀, 거더홈, 사이공간 및 상기 PC 슬래브 상부에 일체로 타설되어 잔교바닥면을 형성하는 토핑콘크리트층을 시공하는 단계를 포함하는 것으로 이루어진다.The patent document includes the steps of constructing foundation piles in the ground of a water body; Constructing a PC pile cap to correct the construction height deviation of neighboring foundation piles to keep the foundation piles horizontal; Constructing a PC girder that is seated and supported on the upper end of the PC pile cap and has a girder groove formed at the end so that the filling reinforcement bar exposed to the outside of the foundation pile is reinforced; Constructing a PC slab where both ends are seated and supported on an edge of the PC girder and provided to form a space between the PC girders at a position corresponding to the PC girder; It consists of constructing a topping concrete layer that is integrally poured into the through hole, girder groove, space between the PC pile cap and the upper part of the PC slab to form the bottom surface of the pier.

그러나 상기 특허문헌은 현장에 시공된 말뚝 위에 별도로 제작된 PC거더가안착된 다음, 콘크리트가 타설되어 바닥이 형성되는 것으로, 이 때문에 시공 조건에 맞는 PC거더를 따로 제작해야 하는 번거로움이 있고, 또한 PC거더를 제작하기 위한 시간과 비용이 발생하여 전체적으로 시공비용이 증가되는 문제가 있다.However, the patent document states that a separately manufactured PC girder is placed on a pile constructed on site, and then concrete is poured to form the floor. Because of this, there is the inconvenience of having to separately manufacture a PC girder that meets the construction conditions. There is a problem that the overall construction cost increases due to the time and cost required to manufacture the PC girder.

따라서 별도로 PC거더를 제작하지 않고도 구조적인 강성이 우수하게 잔교를 시공할 수 있도록 개선된 잔교 및 그 가설방법의 개발이 요구된다.Therefore, there is a need for the development of improved piers and construction methods so that piers with excellent structural rigidity can be constructed without separately manufacturing PC girders.

KR 10-2254229 B1 (2021. 05. 13.)KR 10-2254229 B1 (2021. 05. 13.) KR 10-2232112 B1 (2021. 03. 19.)KR 10-2232112 B1 (2021. 03. 19.) KR 10-2254227 B1 (2021. 05. 13.)KR 10-2254227 B1 (2021. 05. 13.) KR 10-2162125 B1 (2020. 09. 25.)KR 10-2162125 B1 (2020. 09. 25.)

본 발명은 상기와 같은 종래의 잔교 및 잔교의 가설방법이 가지는 문제점을 해결하기 위해 안출된 것으로, 본 발명이 해결하고자 하는 과제는 바닥판용 거더를 따로 제작하지 않고도 구조적인 강성이 우수한 잔교를 시공할 수 있고, 이를 통해 잔교의 시공비용과 시공에 소요되는 시간을 줄일 수 있는 원심력 고강도 PHC파일을 이용한 잔교 및 그 가설방법을 제공하는 것이다.The present invention was developed to solve the problems of the conventional piers and pier construction methods as described above. The problem that the present invention aims to solve is to construct a pier with excellent structural rigidity without separately manufacturing a girder for the floor plate. This provides a pier and its construction method using centrifugal high-strength PHC piles, which can reduce the construction cost and time required for pier construction.

상기의 과제를 해결하기 위한 본 발명에 따른 원심력 고강도 PHC파일을 이용한 잔교는, 수직으로 소정 길이를 가지면서 소정 간격을 두고 복수 열로 설치되는 복수 개의 기둥; 상기 기둥의 상부에 설치되는 브래킷; 상기 브래킷에 안착되면서 잔교의 폭 방향으로 2개의 상기 기둥을 연결하는 소정 길이의 횡거더; 잔교의 길이 방향으로 인접하는 한 쌍의 상기 횡거더를 연결하도록 설치되면서, 단면 모양이 소정 지름을 가지는 원형으로 형성되는 복수 개의 PHC파일; 및 상기 복수 개의 PHC파일의 상부에 타설되어 형성되는 소정 두께의 바닥판을 포함하는 것을 특징으로 한다.A pier using centrifugal high-strength PHC piles according to the present invention to solve the above problems includes a plurality of vertical pillars having a predetermined length and installed in multiple rows at predetermined intervals; A bracket installed on the top of the pillar; A transverse girder of a predetermined length that is seated on the bracket and connects the two pillars in the width direction of the pier; A plurality of PHC piles installed to connect a pair of adjacent transverse girders in the longitudinal direction of the pier and having a circular cross-sectional shape with a predetermined diameter; and a bottom plate of a predetermined thickness formed by pouring on top of the plurality of PHC piles.

그리고 본 발명의 상기 횡거더는 상기 기둥이 관통 삽입되는 소정 지름의 관통공; 및 상면으로 소정 높이 돌출되도록 설치되는 복수 개의 전단철근을 포함하는 것을 또 다른 특징으로 한다.And the transverse girder of the present invention includes a through hole of a predetermined diameter through which the column is inserted; And another feature is that it includes a plurality of shear reinforcement bars installed to protrude from the upper surface at a predetermined height.

또한, 본 발명은 상기 PHC파일의 양단에 "U"자 모양으로 소정 길이 돌출되는 관통철근이 설치되는 것을 또 다른 특징으로 한다.In addition, the present invention has another feature in that penetrating reinforcing bars protruding a predetermined length in a "U" shape are installed at both ends of the PHC pile.

한편, 본 발명에 따른 원심력 고강도 PHC파일을 이용한 잔교 가설방법은, 복수 개의 기둥을 소정 간격을 두고 설치하는 기둥 설치 단계; 상기 기둥 설치 단계를 통해 설치된 상기 복수 개의 기둥 상부에 브래킷을 설치하는 브래킷 설치 단계; 상기 브래킷 설치 단계 후, 상기 브래킷 위에 소정 길이를 가지는 횡거더를 안착시키는 횡거더 안착 단계; 상기 횡거더 안착 단계 후, 상기 기둥과 상기 횡거더를 상호 고정시키는 횡거더 고정 단계; 상기 횡거더 고정 단계 후, 양측의 횡거더 위에 종방향으로 연결하는 복수 개의 PHC파일을 안착하는 PHC파일 안착 단계; 상기 PHC파일 안착 단계 후, 상기 복수 개의 PHC파일 사이를 실링 처리하는 실링 단계; 및 상기 실링 단계 후, 상기 횡거더 및 상기 PHC파일 위로 콘크리트를 타설하여 바닥판을 형성하는 바닥 형성 단계로 이루어지는 것을 특징으로 한다.Meanwhile, the pier construction method using centrifugal high-strength PHC piles according to the present invention includes a pillar installation step of installing a plurality of pillars at predetermined intervals; A bracket installation step of installing brackets on top of the plurality of pillars installed through the pillar installation step; After the bracket installation step, a transverse girder seating step of seating a transverse girder having a predetermined length on the bracket; After the transverse girder seating step, a transverse girder fixing step of mutually fixing the pillar and the transverse girder; After the horizontal girder fixing step, a PHC pile seating step of seating a plurality of PHC piles connected in the longitudinal direction on the horizontal girders on both sides; After the PHC file seating step, a sealing step of sealing between the plurality of PHC files; And after the sealing step, it is characterized in that it consists of a floor forming step of forming a floor plate by pouring concrete on the transverse girder and the PHC pile.

본 발명에 따르면, 기둥(PC파일, 강관파일)을 연결하도록 PHC파일이 설치된 다음, PHC파일 위로 콘크리트가 타설되어 바닥이 형성되게 되므로 시공이 간편하면서도 PC거더를 제작하는 시간과 비용을 줄일 수 있는 장점이 있다.According to the present invention, PHC piles are installed to connect pillars (PC piles, steel pipe piles), and then concrete is poured over the PHC piles to form a floor, making construction simple and reducing the time and cost of manufacturing PC girders. There is an advantage.

또한, 기성 제품인 PHC파일이 사용되므로 제품의 수급이 쉽고 빠른 장점이 있다.In addition, since PHC files, which are off-the-shelf products, are used, the product has the advantage of being easy and fast to supply.

도 1은 본 발명에 따른 원심력 고강도 PHC파일을 이용한 잔교 가설방법의 예를 보인 공정 순서도.
도 2는 본 발명에 따른 원심력 고강도 PHC파일을 이용한 잔교의 예를 보인 도면.
도 3은 본 발명에 따른 횡거더와 PHC파일의 연결 부위를 보인 도면.
도 4는 도 3의 A-A선 단면도.
도 5는 도 3의 B-B선 단면도.
도 6 및 도 7은 본 발명에 따른 기둥의 다른 실시예를 보인 도면.
도 8은 본 발명에 따른 횡거더의 예를 보인 도면.
도 9는 본 발명에 따른 횡거더의 다른 실시예를 보인 도면.
도 10은 본 발명에 따른 PHC파일의 예를 보인 도면.
Figure 1 is a process flow chart showing an example of a pier construction method using centrifugal high-strength PHC piles according to the present invention.
Figure 2 is a diagram showing an example of a pier using a centrifugal high-strength PHC pile according to the present invention.
Figure 3 is a diagram showing the connection portion between the horizontal girder and the PHC pile according to the present invention.
Figure 4 is a cross-sectional view taken along line AA of Figure 3.
Figure 5 is a cross-sectional view taken along line BB of Figure 3.
Figures 6 and 7 are views showing another embodiment of a pillar according to the present invention.
Figure 8 is a diagram showing an example of a transverse girder according to the present invention.
Figure 9 is a view showing another embodiment of a transverse girder according to the present invention.
Figure 10 is a diagram showing an example of a PHC file according to the present invention.

이하에서는 본 발명의 바람직한 실시예를 도시한 첨부도면에 따라 상세하게 설명한다.Hereinafter, the present invention will be described in detail according to the accompanying drawings showing preferred embodiments.

본 발명은 바닥판용 거더를 따로 제작하지 않고도 구조적인 강성이 우수한 잔교를 시공할 수 있고, 이를 통해 잔교의 시공비용과 시공에 소요되는 시간을 줄일 수 있는 원심력 고강도 PHC파일을 이용한 잔교 및 그 가설방법을 제공하고자 하는 것으로, 이러한 본 발명은 도 1에 도시된 바와 같이 기둥 설치 단계(S10), 브래킷 설치 단계(S20), 횡거더 안착 단계(S30), 횡거더 고정 단계(S40), PHC파일 안착 단계(S50), 실링 단계(S60) 및 바닥 형성 단계(S70)로 이루어진다.The present invention is a pier and its construction method using centrifugal high-strength PHC piles that can construct a pier with excellent structural rigidity without separately manufacturing a deck girder, and thereby reduce the construction cost and construction time of the pier. The purpose of the present invention is to provide a pillar installation step (S10), a bracket installation step (S20), a transverse girder seating step (S30), a transverse girder fixing step (S40), and a PHC pile seating process, as shown in FIG. It consists of a step (S50), a sealing step (S60), and a floor forming step (S70).

이하에서는 설명의 편의를 위해 도 2를 기준으로 X축 방향을 "횡방향", "폭 방향" 또는 "좌우측 방향"으로 지칭하여 설명하고, Y축 방향으로 "종방향", "길이 방향" 또는 "전후 방향"으로 지칭하여 설명한다.Hereinafter, for convenience of explanation, the This is explained by referring to the “forward-backward direction.”

(1) 기둥 설치 단계(S10)(1) Column installation step (S10)

이 단계는 잔교가 설치될 위치에 좌우로 소정 간격을 두고 잔교의 길이 방향으로 복수 개의 기둥(10)을 항타기 등을 통해 수직으로 설치하는 것이다.In this step, a plurality of pillars 10 are installed vertically in the length direction of the pier at a predetermined distance to the left and right at the location where the pier is to be installed, using a pile driver, etc.

이때 기둥(10)은 소정 지름과 길이를 가지는 프리캐스트파일(Precast Pile, 또는 PC파일)로 구성될 수 있고, 또 다르게는 강관파일로 구성될 수 있으며, 이러한 기둥(10)의 상단 부분에는 복수 개의 철근(11)이 수직으로 돌출되어 후술되는 횡거더(30)가 조립된 다음, 콘크리트가 타설되어 구조적으로 일체되도록 한다.At this time, the pillar 10 may be composed of a precast pile (or PC pile) having a predetermined diameter and length, or alternatively, it may be composed of a steel pipe pile, and the upper part of the pillar 10 has a plurality of Two reinforcing bars 11 protrude vertically to assemble a transverse girder 30, which will be described later, and then concrete is poured to ensure structural integrity.

(2) 브래킷 설치 단계(S20)(2) Bracket installation step (S20)

이 단계는 위 기둥 설치 단계(S10)를 통해 소정 간격을 두고 복수 개의 기둥(10)이 설치되고 나면, 상기 기둥(10)의 상부 둘레에 브래킷(20)을 설치하는 것이다.In this step, after a plurality of pillars 10 are installed at predetermined intervals through the above pillar installation step (S10), a bracket 20 is installed around the upper part of the pillars 10.

이때 브래킷(20)은 후술되는 횡거더(30)의 저면을 지지하기 위한 것으로, 용접 등을 통해 기둥(10)에 강건하게 일체로 고정되고, 또한 브래킷(20)의 형태에 따라 다양하게 변경되어 실시될 수 있다.At this time, the bracket 20 is intended to support the bottom of the transverse girder 30, which will be described later, and is firmly and integrally fixed to the pillar 10 through welding, etc., and can also be changed in various ways depending on the shape of the bracket 20. It can be implemented.

이러한 브래킷(20)의 실시예로는 도 2 및 도 4에 도시된 바와 같이 기둥(10)의 상부 둘레를 따라 방사상으로 복수 개의 브래킷(20)이 설치되는 것으로 실시될 수 있다.In an embodiment of the bracket 20, a plurality of brackets 20 may be installed radially along the upper circumference of the pillar 10, as shown in FIGS. 2 and 4.

또 다르게는 도 5에 도시된 바와 같이 기둥(10)의 상부에 상부 지름이 상대적으로 하부 지름에 비해 크게 형성된 경사진 원통 모양의 브래킷(20')으로 실시될 수 있고, 또 다르게는 도 6에 도시된 바와 같이 기둥(10)의 상부 외측면을 감싸는 링 모양의 브래킷(20")으로 실시될 수 있다.Alternatively, as shown in FIG. 5, it may be implemented as an inclined cylindrical bracket 20' formed on the upper part of the pillar 10 with an upper diameter relatively larger than the lower diameter, or alternatively, as shown in FIG. 6. As shown, it can be implemented as a ring-shaped bracket (20") surrounding the upper outer surface of the pillar (10).

또한, 브래킷(20)의 상부에는 후술되는 횡거더(30)가 직접 안착될 수 있고, 또 다르게는 도 7에 도시된 바와 같이 기둥(10)의 상단 부분에 브래킷(20)이 설치된 다음, 그 위에 소정 크기의 기둥캡(C)이 설치되고, 상기 기둥캡(C) 위에 횡거더(30)가 안착되는 것으로 변경되어 실시될 수 있다.In addition, the horizontal girder 30, which will be described later, can be directly mounted on the upper part of the bracket 20. Alternatively, as shown in FIG. 7, the bracket 20 is installed on the upper part of the column 10, and then It may be implemented by installing a column cap (C) of a predetermined size on top, and transverse girder (30) being seated on the column cap (C).

한편, 위에서는 기둥(10)의 상부에 브래킷(20, 20', 20")이 용접 등에 의해 일체로 고정되는 것으로만 설명되었으나, 이와 달리 기둥(10)의 상부 둘레에 상대적으로 지름이 큰 단턱(도시하지 않음)이 일체로 형성되어 브래킷(20, 20', 20")의 기능을 대신하도록 변경되어 실시될 수 있다.Meanwhile, it has been described above that the brackets 20, 20', 20" are integrally fixed to the upper part of the pillar 10 by welding, etc.; however, unlike this, there is a step with a relatively large diameter around the upper part of the pillar 10. (not shown) may be integrally formed and changed to replace the function of the brackets 20, 20', and 20".

(3) 횡거더 안착 단계(S30)(3) Transverse girder seating step (S30)

이 단계는 위 브래킷 설치 단계(S20)를 통해 기둥(10)에 브래킷(20)이 설치되고 나면, 잔교의 폭 방향으로 인접한 한 쌍의 기둥(10)을 수평으로 연결하도록 소정 길이의 횡거더(30)를 안착시키는 것이다.In this step, after the bracket 20 is installed on the column 10 through the above bracket installation step (S20), a transverse girder ( 30) is to be settled.

이러한 횡거더(30)는 도 8에 도시된 바와 같이 소정 길이를 가지는 직사각형 모양으로 형성되어 기둥(10)의 지름보다 상대적으로 큰 지름의 한 쌍의 관통공(31)이 소정 간격 이격되어 형성되고, 상면에는 복수 개의 전단철근(32)이 소정 간격을 두고 소정 높이 돌출되는 것으로 구성될 수 있다.This horizontal girder 30 is formed in a rectangular shape with a predetermined length, as shown in FIG. 8, and a pair of through holes 31 with a diameter relatively larger than the diameter of the column 10 are formed at a predetermined distance apart. , the upper surface may be configured to have a plurality of shear reinforcement bars 32 protruding at a predetermined height at predetermined intervals.

이때 관통공(31)이 형성되는 횡거더(30)의 부분은 기둥(10)과 일체될 수 있도록 충분한 높이가 형성될 필요가 있고, 이를 위해 관통공(31)이 형성되는 횡거더(30)의 상면 부분이 사각 또는 원형 블록 모양으로 소정 높이 돌출 형성될 수 있는데, 이러한 블록은 횡거더(30)의 제작시 함께 제작되거나, 또는 시공환경에 맞추어 적절한 크기와 모양으로 현장 타설을 통해 형성될 수 있다.At this time, the portion of the transverse girder 30 in which the through hole 31 is formed needs to be formed at a sufficient height so that it can be integrated with the column 10, and for this purpose, the transverse girder 30 in which the through hole 31 is formed needs to be formed. The upper part of the can be formed to protrude at a predetermined height in the shape of a square or circular block. These blocks can be manufactured together when manufacturing the transverse girder 30, or formed through on-site casting in an appropriate size and shape to suit the construction environment. there is.

그리고 횡거더(30)는 기둥(10)의 상단이 양측의 관통공(31)에 소정 깊이 삽입되어 횡거더(30)의 저면이 브래킷(20)을 통해 지지되도록 설치되게 된다.And the horizontal girder 30 is installed so that the top of the column 10 is inserted into the through-holes 31 on both sides to a predetermined depth and the bottom of the horizontal girder 30 is supported through the bracket 20.

또한, 전단철근(32)은 "ㅁ"자 모양 또는 "ㄷ"자 모양으로 된 철근으로 이루어질 수 있고, 이와 동시에 잔교의 폭 방향으로 길이를 가지도록 설치될 수 있으며, 이를 통해 후술되는 바닥 형성 단계(S70)에서 횡거더(30)의 상부로 콘크리트가 타설되어 바닥판(50)이 형성될 때, 횡거더(30)와 바닥판(50)이 전단철근(32)을 통해 상호 강건하게 결합되게 되며, 그 결과 잔교의 길이 방향으로 바닥판(50)에 전단력이 작용하더라도 전단철근(32)을 통해 바닥판(50)과 횡거더(30) 및 후술되는 PHC파일(40) 사이에 슬립이 발생하지 않도록 결합력이 유지되게 된다.In addition, the shear reinforcing bar 32 may be made of a "ㅁ"-shaped or "ㄷ"-shaped reinforcing bar, and may be installed to have a length in the width direction of the pier at the same time, through which the floor forming step described later will be performed. When concrete is poured onto the upper part of the transverse girder (30) in (S70) to form the floor plate (50), the transverse girder (30) and the floor plate (50) are strongly coupled to each other through the shear reinforcement (32). As a result, even if a shear force acts on the deck 50 in the longitudinal direction of the pier, slip occurs between the deck 50 and the transverse girder 30 and the PHC pile 40, which will be described later, through the shear reinforcement 32. The bonding force is maintained to prevent this from happening.

이때 전단철근(32)은 잔교의 길이 방향으로 소정 길이를 가지도록 더 설치될 수 있고, 이를 통해 잔교의 폭과 길이 방향으로 작용하는 전단력이 복수 개의 전단철근(32)을 통해 확실하게 저지되어 장기간 사용에도 횡거더(30), PHC파일(40) 및 바닥판(50)의 결합부위가 들뜨거나 분리되지 않고 더욱 강건하게 결합된 상태로 유지될 수 있게 된다.At this time, the shear reinforcing bars 32 can be further installed to have a predetermined length in the longitudinal direction of the pier, and through this, the shear force acting in the width and length directions of the pier is reliably prevented through the plurality of shear reinforcing bars 32, thereby maintaining the stability for a long period of time. Even during use, the joint portions of the transverse girder 30, PHC pile 40, and floor plate 50 are not lifted or separated and can be maintained in a more strongly coupled state.

(4) 횡거더 고정 단계(S40)(4) Transverse girder fixing step (S40)

이 단계는 위 횡거더 안착 단계(S30)를 통해 잔교의 폭 방향으로 한 쌍의 기둥(10)을 연결하도록 복수 개의 횡거더(30)가 설치되고 나면, 횡거더(30)의 관통공(31)에 콘크리트를 타설하여 관통공(31)에 삽입된 기둥(10)의 상단과 횡거더(30)를 강건하게 결합하여 일체시키는 것이다.In this step, after a plurality of horizontal girders 30 are installed to connect a pair of columns 10 in the width direction of the pier through the above horizontal girder seating step (S30), the through hole 31 of the horizontal girder 30 ) by pouring concrete into the through hole (31) to firmly couple and integrate the top of the column (10) inserted into the through hole (31) and the transverse girder (30).

이를 위해 관통공(31)은 기둥(10)의 상단 지름보다 상대적으로 크게 형성될 수 있고, 이를 통해 관통공(31)의 내부로 콘크리트의 타설시 자연스럽게 기둥(10)의 상단 둘레 부분을 감싸도록 콘크리트가 주입되게 되며, 그 결과 콘크리트 양생 후 기둥(10)과 횡거더(30)가 강건하게 일체되게 된다.For this purpose, the through hole 31 may be formed to be relatively larger than the upper diameter of the column 10, and through this, when concrete is poured into the through hole 31, it can naturally surround the upper circumference of the column 10. Concrete is injected, and as a result, after curing the concrete, the column 10 and the transverse girder 30 are firmly integrated.

이때 기둥(10) 상단의 철근(11)은 관통공(31)을 관통하여 횡거더(30)의 상부로 소정 길이 돌출되도록 설치된 상태에서 관통공(31)의 내부로 콘크리트가 타설되어 고정되게 된다.At this time, the reinforcing bar 11 at the top of the column 10 is installed to protrude a predetermined length through the through hole 31 to the upper part of the horizontal girder 30, and concrete is poured into the through hole 31 and fixed. .

(5) PHC파일 안착 단계(S50)(5) PHC file placement step (S50)

이 단계는 위 횡거더 고정 단계(S40)를 통해 횡거더(30)의 관통공(31)에 콘크리트가 타설되어 양생되고 나면, 잔교의 길이 방향으로 횡거더(30)를 연결하도록 복수 개의 PHC파일(40)을 설치(안착)하는 것이다.In this step, after concrete is poured and cured into the through hole 31 of the transverse girder 30 through the above transverse girder fixing step (S40), a plurality of PHC piles are installed to connect the transverse girder 30 in the longitudinal direction of the pier. (40) is installed (seated).

이때 PHC파일(40, Pretensioned Spun High Strength Concrete Piles)은 고강도 프리캐스트 파일로 원심력을 응용해 콘크리트의 휨과 인장력을 보완하여 제조되는 고강도 콘크리트 기성(旣成) 말뚝이다.At this time, PHC piles (40, Pretensioned Spun High Strength Concrete Piles) are high-strength precast piles that are manufactured by applying centrifugal force to supplement the bending and tensile strength of concrete.

상기와 같은 PHC파일(40)의 양단에 형성되는 관통공에는 도 10에 도시된 바와 같이 소정량의 콘크리트가 주입되어 소정 길이의 채움콘크리트부(41A)가 형성되고, 이러한 채움콘크리트부(41A)에는 "U"자 모양의 관통철근(41)이 PHC파일(40)의 양단으로 소정 길이 돌출되도록 설치되게 된다.As shown in FIG. 10, a predetermined amount of concrete is injected into the through hole formed at both ends of the PHC pile 40 as described above to form a filled concrete portion 41A of a predetermined length, and this filled concrete portion 41A In, “U” shaped penetrating reinforcing bars 41 are installed to protrude a predetermined length from both ends of the PHC pile 40.

그리고 PHC파일(40)의 양단이 횡거더(30)의 상면에 지지되도록 안착되고 나면, PCH파일(40)의 관통철근(41)을 관통하도록 수평 방향으로 연결철근(42)이 설치되고, 이러한 연결철근(42)은 횡거더(30)의 전단철근(32)과 결속되어 고정되게 된다.And after both ends of the PHC pile 40 are seated so as to be supported on the upper surface of the transverse girder 30, connecting reinforcing bars 42 are installed in the horizontal direction to penetrate the through reinforcing bars 41 of the PCH pile 40. The connecting reinforcing bar 42 is fixed by being bound to the shear reinforcing bar 32 of the transverse girder 30.

(6) 실링 단계(S60)(6) Sealing step (S60)

이 단계는 위 PHC파일 안착 단계(S50)를 통해 PHC파일(40)이 횡거더(30)에 고정되고 나면, 배치된 PHC파일(40)의 길이를 따라 PHC파일(40) 사이로 실링재를 주입하여 바닥 형성 단계(S70)를 통해 타설되는 콘크리트가 PHC파일(40) 사이로 누출되지 않도록 실링 처리하는 것이다.In this step, after the PHC pile (40) is fixed to the horizontal girder (30) through the above PHC pile seating step (S50), the sealing material is injected between the PHC piles (40) along the length of the placed PHC pile (40). The concrete poured through the floor forming step (S70) is sealed to prevent it from leaking between the PHC piles (40).

이때 실링재는 경화 시간, 점도 등을 고려하여 공지된 다양한 실링재 중에서 적절하게 선택되어 실시될 수 있다.At this time, the sealing material may be appropriately selected from among various known sealing materials in consideration of curing time, viscosity, etc.

(7) 바닥 형성 단계(S70)(7) Bottom formation step (S70)

이 단계는 위 실링 단계(S60)를 통해 PHC파일(40) 사이의 틈이 실링 처리되고 나면, 횡거더(30) 및 PHC파일(40) 위로 콘크리트를 타설하여 소정 두께의 바닥판(50)을 형성하는 것이다.In this step, after the gap between the PHC piles 40 is sealed through the above sealing step (S60), concrete is poured onto the horizontal girder 30 and the PHC pile 40 to create a floor plate 50 of a predetermined thickness. It is to form.

이때 잔교의 길이 방향으로 횡거더(30)와 PHC파일(40)의 양측에 소정 높이의 거푸집이 설치될 수 있고, 이를 통해 타설되는 콘크리트가 소정 두께로 채워져 바닥핀(50)을 형성하게 된다.At this time, forms of a predetermined height may be installed on both sides of the transverse girder 30 and the PHC pile 40 in the longitudinal direction of the pier, and the concrete poured through this is filled to a predetermined thickness to form the bottom fin 50.

이상 설명한 바와 같이 기둥(PC말뚝)을 연결하도록 기성 PHC파일이 설치된 다음, PHC파일 위로 콘크리트가 타설되어 바닥이 형성되게 되므로 시공이 간편하면서도 PC거더를 제작하는 시간과 비용을 줄일 수 있게 된다.As described above, ready-made PHC piles are installed to connect pillars (PC piles), and then concrete is poured on top of the PHC piles to form a floor, making construction simple and reducing the time and cost of manufacturing PC girders.

위에서는 설명의 편의를 위해 바람직한 실시예를 도시한 도면과 도면에 나타난 구성에 도면부호와 명칭을 부여하여 설명하였으나, 이는 본 발명에 따른 하나의 실시예로서 도면상에 나타난 형상과 부여된 명칭에 국한되어 그 권리범위가 해석되어서는 안 될 것이며, 발명의 설명으로부터 예측 가능한 다양한 형상으로의 변경과 동일한 작용을 하는 구성으로의 단순 치환은 통상의 기술자가 용이하게 실시하기 위해 변경 가능한 범위 내에 있음은 지극히 자명하다고 볼 것이다.Above, for convenience of explanation, reference numerals and names have been given to the drawings showing preferred embodiments and the configurations shown in the drawings. However, this is an embodiment according to the present invention, and the shapes shown in the drawings and the names given are The scope of the rights should not be construed as limited, and changes to various shapes that can be predicted from the description of the invention and simple substitution to a configuration that performs the same function are within the scope of changes that can be easily carried out by a person skilled in the art. You will see this as extremely self-evident.

10: 기둥 11: 철근
20, 20', 20": 브래킷 30: 횡거더
31: 관통공 32: 전단철근
40: PHC파일 41: 관통철근
41A: 채움콘크리트부 42: 연결철근
50: 바닥판 C: 기둥캡
10: Column 11: Rebar
20, 20', 20": Bracket 30: Transverse girder
31: Through hole 32: Shear rebar
40: PHC file 41: Penetrating rebar
41A: Filled concrete part 42: Connecting rebar
50: Bottom plate C: Column cap

Claims (4)

해안의 접안시설로 시공되는 잔교에 있어서,
상기 잔교는,
수직으로 소정 길이를 가지면서 소정 간격을 두고 복수 열로 설치되는 복수 개의 기둥(10);
상기 기둥(10)의 상부에 설치되는 브래킷(20);
상기 브래킷(20)에 안착되면서 잔교의 폭 방향으로 2개의 상기 기둥(10)을 연결하는 소정 길이의 횡거더(30);
잔교의 길이 방향으로 인접하는 한 쌍의 상기 횡거더(30)를 연결하도록 설치되면서, 단면 모양이 소정 지름을 가지는 원형으로 형성되는 복수 개의 PHC파일(40, Pretensioned Spun High Strength Concrete Piles); 및
상기 복수 개의 PHC파일(40)의 상부에 타설되어 형성되는 소정 두께의 바닥판(50);
을 포함하고,
상기 횡거더(30)는,
상기 기둥(10)이 관통 삽입되는 소정 지름의 관통공(31); 및
상면으로 소정 높이 돌출되도록 설치되는 복수 개의 전단철근(32);
을 포함하며,
상기 관통공(31)이 형성되는 상기 횡거더(30)의 부분은,
상기 기둥(10)과 일체될 수 있도록 상기 관통공(31)이 형성되는 횡거더(30)의 상면 부분이 사각 또는 원형 블록 모양으로 소정 높이 돌출 형성되고,
상기 복수 개의 전단철근(32)은,
"ㅁ"자 또는 "ㄷ"자 모양으로 된 철근으로 이루어지면서 상기 잔교의 폭과 길이 방향으로 소정 길이를 가지도록 설치되어, 상기 잔교의 폭과 길이 방향으로 작용하는 전단력이 저지되도록 구성되며,
상기 관통공(31)은,
상기 기둥(10)의 상단 지름보다 상대적으로 크게 형성되고, 상기 관통공(31)의 내부로 콘크리트 타설시 상기 기둥(10)의 상단 둘레 부분을 감싸도록 콘크리트가 주입되어, 콘크리트 양생후 상기 기둥(10)과 상기 횡거더(30)가 일체되도록 하고,
상기 PHC파일(40)의 양단에는,
관통공이 형성되어 "U"자 모양으로 소정 길이 돌출되는 관통철근(41)이 설치된 다음, 콘크리트가 주입되어 소정 길이의 채움콘크리트부(41A)가 형성되는 것을 특징으로 하는 원심력 고강도 PHC파일을 이용한 잔교.
In the pier constructed as a coastal berthing facility,
The pier,
A plurality of pillars (10) having a predetermined length vertically and installed in multiple rows at predetermined intervals;
A bracket (20) installed on the top of the pillar (10);
A transverse girder (30) of a predetermined length that is seated on the bracket (20) and connects the two pillars (10) in the width direction of the pier;
A plurality of PHC piles (40, Pretensioned Spun High Strength Concrete Piles) installed to connect a pair of adjacent transverse girders 30 in the longitudinal direction of the pier and having a circular cross-sectional shape with a predetermined diameter; and
A bottom plate (50) of a predetermined thickness formed by pouring on top of the plurality of PHC piles (40);
Including,
The transverse girder 30 is,
a through hole 31 of a predetermined diameter through which the pillar 10 is inserted; and
A plurality of shear reinforcement bars (32) installed to protrude from the upper surface at a predetermined height;
Includes,
The portion of the transverse girder 30 where the through hole 31 is formed is,
The upper surface portion of the transverse girder 30 where the through hole 31 is formed is formed to protrude at a predetermined height in the shape of a square or circular block so that it can be integrated with the pillar 10,
The plurality of shear reinforcement bars (32) are,
It is made of reinforcing bars in the shape of "ㅁ" or "ㄷ" and is installed to have a predetermined length in the width and length directions of the pier, so that shear forces acting in the width and length directions of the pier are prevented,
The through hole 31 is,
It is formed to be relatively larger than the upper diameter of the pillar 10, and when pouring concrete into the through hole 31, concrete is injected to surround the upper circumference of the pillar 10, and after curing the concrete, the pillar ( 10) and the transverse girder 30 are integrated,
At both ends of the PHC file 40,
A pier using centrifugal high-strength PHC piles, characterized in that a through hole is formed and a through-reinforcing bar (41) protruding a predetermined length in a "U" shape is installed, and then concrete is injected to form a filled concrete portion (41A) of a predetermined length. .
삭제delete 삭제delete 청구항 1에 따른 잔교의 가설방법에 있어서,
복수 개의 기둥(10)을 소정 간격을 두고 설치하는 기둥 설치 단계(S10);
상기 기둥 설치 단계(S10)를 통해 설치된 상기 복수 개의 기둥(10) 상부에 브래킷(20)을 설치하는 브래킷 설치 단계(S30);
상기 브래킷 설치 단계(S30) 후, 상기 브래킷(20) 위에 소정 길이를 가지는 횡거더(30)를 안착시키는 횡거더 안착 단계(S40);
상기 횡거더 안착 단계(S40) 후, 상기 기둥(10)과 상기 횡거더(30)를 상호 고정시키는 횡거더 고정 단계(S50);
상기 횡거더 고정 단계(S50) 후, 양측의 횡거더(30) 위에 종방향으로 연결하는 복수 개의 PHC파일(40)을 안착하는 PHC파일 안착 단계(S60);
상기 PHC파일 안착 단계(S60) 후, 상기 복수 개의 PHC파일(40) 사이를 실링 처리하는 실링 단계(S70); 및
상기 실링 단계(S70) 후, 상기 횡거더(30) 및 상기 PHC파일(40) 위로 콘크리트를 타설하여 바닥판(50)을 형성하는 바닥 형성 단계(S80);
로 이루어지는 것을 특징으로 하는 원심력 고강도 PHC파일을 이용한 잔교 가설방법.
In the method of constructing a pier according to claim 1,
A pillar installation step (S10) of installing a plurality of pillars 10 at predetermined intervals;
A bracket installation step (S30) of installing brackets 20 on top of the plurality of pillars 10 installed through the pillar installation step (S10);
After the bracket installation step (S30), a transverse girder seating step (S40) of seating a transverse girder (30) having a predetermined length on the bracket (20);
After the horizontal girder seating step (S40), a horizontal girder fixing step (S50) of mutually fixing the column 10 and the horizontal girder 30;
After the horizontal girder fixing step (S50), a PHC pile seating step (S60) of seating a plurality of PHC piles (40) connected in the longitudinal direction on the horizontal girders (30) on both sides;
After the PHC file seating step (S60), a sealing step (S70) of sealing between the plurality of PHC files (40); and
After the sealing step (S70), a floor forming step (S80) of forming a floor plate (50) by pouring concrete onto the transverse girder (30) and the PHC pile (40);
A pier construction method using centrifugal high-strength PHC piles, characterized in that it consists of.
KR1020230124743A 2023-09-19 2023-09-19 Pier and Construction Method using Centrifugal High-Strength PHC Piles KR102671025B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020230124743A KR102671025B1 (en) 2023-09-19 2023-09-19 Pier and Construction Method using Centrifugal High-Strength PHC Piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020230124743A KR102671025B1 (en) 2023-09-19 2023-09-19 Pier and Construction Method using Centrifugal High-Strength PHC Piles

Publications (1)

Publication Number Publication Date
KR102671025B1 true KR102671025B1 (en) 2024-05-30

Family

ID=91275414

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020230124743A KR102671025B1 (en) 2023-09-19 2023-09-19 Pier and Construction Method using Centrifugal High-Strength PHC Piles

Country Status (1)

Country Link
KR (1) KR102671025B1 (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001220713A (en) * 2000-02-08 2001-08-17 Sumitomo Constr Co Ltd Joining method for precast concrete member
KR20080111686A (en) * 2007-06-19 2008-12-24 (주)청석엔지니어링 Bridge using phc girder and slab-phc complex girder
KR101519086B1 (en) * 2014-11-24 2015-05-12 주식회사 하이드로코리아 Bridg using t-girder with pile supporting apparatus and bridge continuous construction method using the same
KR102162125B1 (en) 2019-12-17 2020-10-06 대영스틸산업주식회사 Pile and Coping for Bridge Construction
KR102166504B1 (en) * 2020-01-20 2020-10-15 한국콘크리트산업 주식회사 Landing pier structure and its construction method
KR102232112B1 (en) 2020-05-14 2021-03-25 한국콘크리트산업 주식회사 Pier structure using pc pile cap and method of constructing the same
KR102254229B1 (en) 2020-05-14 2021-05-21 한국콘크리트산업 주식회사 Assembly bridge structure and method with improved coupling force
KR102254227B1 (en) 2020-05-14 2021-05-21 한국콘크리트산업 주식회사 High-strength concrete pile structure with pc pile cap and construction method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001220713A (en) * 2000-02-08 2001-08-17 Sumitomo Constr Co Ltd Joining method for precast concrete member
KR20080111686A (en) * 2007-06-19 2008-12-24 (주)청석엔지니어링 Bridge using phc girder and slab-phc complex girder
KR101519086B1 (en) * 2014-11-24 2015-05-12 주식회사 하이드로코리아 Bridg using t-girder with pile supporting apparatus and bridge continuous construction method using the same
KR102162125B1 (en) 2019-12-17 2020-10-06 대영스틸산업주식회사 Pile and Coping for Bridge Construction
KR102166504B1 (en) * 2020-01-20 2020-10-15 한국콘크리트산업 주식회사 Landing pier structure and its construction method
KR102232112B1 (en) 2020-05-14 2021-03-25 한국콘크리트산업 주식회사 Pier structure using pc pile cap and method of constructing the same
KR102254229B1 (en) 2020-05-14 2021-05-21 한국콘크리트산업 주식회사 Assembly bridge structure and method with improved coupling force
KR102254227B1 (en) 2020-05-14 2021-05-21 한국콘크리트산업 주식회사 High-strength concrete pile structure with pc pile cap and construction method

Similar Documents

Publication Publication Date Title
JP4812324B2 (en) Retaining wall and its construction method
JP4992042B2 (en) Precast horizontal beam and pier using it
KR20110103000A (en) Precast bridge joint structure with composite hollow concrete filled tube and a construction method for the same
KR102232112B1 (en) Pier structure using pc pile cap and method of constructing the same
CN109339087B (en) Infrastructure system of low-rise building
KR101263370B1 (en) Precast end-block with girder connection member and bridge construction method using ths same
KR102258554B1 (en) Precast coping construction method using anchorage of pile head
KR102162125B1 (en) Pile and Coping for Bridge Construction
KR102254227B1 (en) High-strength concrete pile structure with pc pile cap and construction method
CN203939144U (en) For the device of connecting building structure shear wall and concrete floor
KR102615137B1 (en) Construction of Rahmen Bridge using Centrifugal Casting Square Beam and Construction method
KR102671025B1 (en) Pier and Construction Method using Centrifugal High-Strength PHC Piles
JP7381781B2 (en) pile foundation structure
CN112030720A (en) Prefabricated bent cap and pier stud socket type connecting structure and construction method
JP2021134522A (en) Underground structure construction method
JP2017095915A (en) Junction structure between column-beam joint part and column, rigid-frame viaduct, construction method for junction structure between column-beam joint part and column, and precast concrete member
KR102254229B1 (en) Assembly bridge structure and method with improved coupling force
EA017909B1 (en) Large diameter pillar construction method by layer-built and frame construction method adapting the same
CN213571600U (en) Bridge underpins bearing structure
CN211898496U (en) Pile splicing structure for precast pile and foundation bearing platform
JP6817589B1 (en) How to build pile support structure
KR102235873B1 (en) Fabrication method of partial pier cap, partial pier cap, and construction method of pier using partial pier cap
KR102200400B1 (en) Precast segment, pillar structure including the same and construction method of pillar structure usinging the same
JPH108422A (en) Reinforcement structure of bridge pier
WO1997034053A1 (en) Pre-cast concrete panel wall

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant