KR102649072B1 - Multi-rotation penetration pile according to depth and manufacturing method therefor - Google Patents

Multi-rotation penetration pile according to depth and manufacturing method therefor Download PDF

Info

Publication number
KR102649072B1
KR102649072B1 KR1020230061063A KR20230061063A KR102649072B1 KR 102649072 B1 KR102649072 B1 KR 102649072B1 KR 1020230061063 A KR1020230061063 A KR 1020230061063A KR 20230061063 A KR20230061063 A KR 20230061063A KR 102649072 B1 KR102649072 B1 KR 102649072B1
Authority
KR
South Korea
Prior art keywords
steel pipe
pipe body
fixed
ground
excavation
Prior art date
Application number
KR1020230061063A
Other languages
Korean (ko)
Inventor
김선홍
서한수
백광식
Original Assignee
김선홍
서한수
백광식
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김선홍, 서한수, 백광식 filed Critical 김선홍
Priority to KR1020230061063A priority Critical patent/KR102649072B1/en
Application granted granted Critical
Publication of KR102649072B1 publication Critical patent/KR102649072B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/28Prefabricated piles made of steel or other metals
    • E02D5/285Prefabricated piles made of steel or other metals tubular, e.g. prefabricated from sheet pile elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/56Screw piles
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0038Production methods using an auger, i.e. continuous flight type
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Business, Economics & Management (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

본 발명은 심도에 따른 다중 회전관입 파일 및 그 제조방법에 관한 것으로서, 보다 상세하게는 지반에 관입되는 회전관입 파일의 제조방법으로서, 상기 지반에 관입되도록 중공의 강관본체를 형성시키는 강관본체 형성단계와, 상기 강관본체를 거치장치에 연결하여 고정시키는 강관본체 거치장치 배치단계와, 상기 강관본체의 하단부에 비트유닛들로 이루어진 비트날부를 형성시키는 강관본체 비트유닛 연결단계와, 상기 비트날부가 형성된 강관본체에 상기 비트날부의 상측에 배치되도록 굴삭날개들로 이루어진 굴삭부를 형성하는 강관본체 굴삭부 고정단계와, 상기 강관본체의 외면에 미들날개들을 연결하여 고정시키는 회전관입 파일 형성단계와, 상기 회전관입 파일의 표면을 다듬는 회전관입 파일 표면가공 마감단계로 이루어지며, 상기 거치장치는, 베이스패널과 상기 베이스패널의 상면에 형성되며, 상기 강관본체의 상단부가 연결되어 고정되는 거치부로 이루어지고, 상기 강관본체 거치장치 배치단계에서는 파일모니터링안전안내수단에 의해 현장의 작업상황을 파악하고, 위급상황발생시 위험신호를 송출하도록 파일모니터링안전안내단계가 더 포함되어, 지면을 비트유닛으로 천공후 굴삭날개를 통해 지반을 굴삭하도록 함으로써, 굴삭효율이 향상되고 관입시간을 줄일 수 있게 되며, 강관본체의 외면에 미들날개들을 마련하여 굴삭날개와 함께 지반을 굴삭하도록 함으로써, 재차 굴삭효율 및 관입시간을 현저히 줄일 수 있게 되는 효과가 있다.The present invention relates to a multiple rotary penetration pile depending on the depth and a method of manufacturing the same. More specifically, it relates to a method of manufacturing a rotary penetration pile that penetrates the ground. The present invention relates to a steel pipe body forming step of forming a hollow steel pipe body to penetrate the ground. and a steel pipe body mounting device arrangement step of connecting and fixing the steel pipe body to the mounting device, a steel pipe body bit unit connecting step of forming a bit blade portion made of bit units at the lower end of the steel pipe body, and the bit blade portion being formed. A step of fixing the excavation part of the steel pipe main body to form an excavation part made of excavating blades so as to be disposed on the upper side of the bit blade part of the steel pipe main body, a step of forming a rotary penetration pile of connecting and fixing the middle wings to the outer surface of the steel pipe main body, and the rotation It consists of a rotational penetration pile surface processing finishing step of refining the surface of the penetration pile, and the mounting device is formed on a base panel and an upper surface of the base panel, and consists of a mounting portion to which the upper end of the steel pipe body is connected and fixed, In the stage of placing the steel pipe body mounting device, a pile monitoring safety guidance stage is further included to identify the work situation on site by means of pile monitoring safety guidance means and to transmit a danger signal in the event of an emergency. After drilling the ground with a bit unit, the excavation blades are By excavating the ground through excavation, excavation efficiency is improved and penetration time can be reduced. By providing middle wings on the outer surface of the steel pipe body and excavating the ground together with the excavation wings, excavation efficiency and penetration time can be significantly reduced again. There is an effect.

Description

심도에 따른 다중 회전관입 파일 및 그 제조방법{Multi-rotation penetration pile according to depth and manufacturing method therefor}Multi-rotation penetration pile according to depth and manufacturing method therefor}

본 발명은 심도에 따른 다중 회전관입 파일 및 그 제조방법에 관한 것으로서, 보다 상세하게는 지반을 굴삭하는 강관본체의 하단부에 비트유닛을 형성하여, 지면을 비트유닛으로 천공후 굴삭날개를 통해 지반을 굴삭하도록 함으로써, 굴삭효율이 향상되고 관입시간을 줄일 수 있게 되며, 강관본체의 외면에 미들날개들을 마련하여 굴삭날개와 함께 지반을 굴삭하도록 함으로써, 재차 굴삭효율 및 관입시간을 현저히 줄일 수 있게 되는 심도에 따른 다중 회전관입 파일 및 그 제조방법에 관한 것이다. The present invention relates to a multi-rotation penetration pile depending on the depth and a method of manufacturing the same. More specifically, a bit unit is formed at the lower end of a steel pipe body for excavating the ground, and the ground is drilled with the bit unit and then the ground is excavated through an excavating blade. By excavating, excavation efficiency is improved and penetration time can be reduced. By providing middle wings on the outer surface of the steel pipe body and excavating the ground together with the excavation wings, the depth can significantly reduce excavation efficiency and penetration time. It relates to multiple rotational penetration piles and their manufacturing method according to.

일반적으로 강관 말뚝은 연약지반에 건설되는 대형 구조물이나 교량 등의 지지력 확보를 위하여 시공되는 것으로서, 흙막이 토류공사나 부력앵커공사, 건물기초공사, 사면보강공사 등에도 적용된다. 즉, 강관 말뚝은 지중에 타격하여 일정깊이 압입됨으로써, 시공건축물의 지반에 대한 구조적인 안정성 및 토류압으로부터의 지지를 수행하는 등의 역할을 하게 된다.In general, steel pipe piles are constructed to secure the bearing capacity of large structures or bridges built on soft ground, and are also applied to earth retaining construction, buoyancy anchor construction, building foundation construction, and slope reinforcement construction. In other words, the steel pipe pile is struck into the ground and pressed into the ground to a certain depth, thereby providing structural stability to the ground of the building and providing support from earth pressure.

이러한 강관 말뚝을 지중에 설치하는 통상적인 방법으로는, 항타기(파일드라이버)를 이용하여 드라이버로 목적하는 지반에 일정깊이 천공한 다음 파일을 상단부로부터 항타하여 지중에 설치하는 방법과, 별도의 파일공을 천공하지 않은 상태에서 목적한 지반에 강관 말뚝을 직접 회전시켜 근입시키는 방법이 있다.A typical method of installing such steel pipe piles in the ground is to use a pile driver (pile driver) to drill a hole into the target ground with a driver to a certain depth and then drive the pile from the upper part to install it in the ground, and a separate pile hole is used to install it in the ground. There is a method of directly rotating and inserting a steel pipe pile into the target ground without drilling.

후자와 같이 강관 말뚝을 직접 회전시켜 근입시키는 방법을 적용하는 경우 강관 말뚝의 최하부단에는 나선 날개를 갖고 있게 된다. 따라서 강관 말뚝을 정회전시키면 나선 날개의 선회 전진 이동으로 강관 말뚝이 근입된다.When applying the method of directly rotating and inserting a steel pipe pile as in the latter, the steel pipe pile has a spiral wing at the lowest end. Therefore, when the steel pipe pile is rotated forward, the steel pipe pile is driven in by the rotating forward movement of the spiral blade.

또한 근입된 강관 말뚝을 인발해내고자 할 경우 역회전시키면 나선 날개의 선회 후퇴 이동으로 강관 말뚝의 인발이 이루어진다.In addition, when it is desired to pull out an embedded steel pipe pile, if it is rotated in reverse, the steel pipe pile is pulled out by the rotating and retreating movement of the spiral blade.

그러나, 종래의 강관말뚝은 지반을 굴삭하기 위한 나선의 날개가 외면 하측에만 마련되어 있어, 굴삭효율이 떨어지는 문제점이 있으며, 최초 지반을 천공시키기 위해 별도의 천공장비를 사용해야하는 불편한 문제점이 상존하게 된다.However, the conventional steel pipe pile has spiral wings for excavating the ground provided only on the lower side of the outer surface, so there is a problem in that the excavation efficiency is low, and there is the inconvenient problem of having to use a separate drilling equipment to drill the initial ground.

전술한 발명은 본 발명이 속하는 기술분야의 배경기술을 의미하며, 종래 기술을 의미하는 것은 아니다.The above-described invention refers to the background art of the technical field to which the present invention pertains, and does not mean prior art.

대한민국 특허 등록번호 제10-0550359호(강관과 PC 말뚝을 이용한 지반 보강공법)Republic of Korea Patent Registration No. 10-0550359 (Ground reinforcement method using steel pipes and PC piles) 대한민국 특허 공개번호 제10-2013-0076070호(강관 소켓 및 이를 이용한 강관 말뚝과 강관 기둥의 연결 방법)Republic of Korea Patent Publication No. 10-2013-0076070 (Steel pipe socket and method of connecting steel pipe piles and steel pipe columns using the same)

본 발명은 상기한 종래의 문제점을 해결하기 위해 안출된 것으로써, 본 발명의 목적은 지반을 굴삭하는 강관본체의 하단부에 비트유닛을 형성하여, 지면을 비트유닛으로 천공후 굴삭날개를 통해 지반을 굴삭하도록 함으로써, 굴삭효율이 향상되고 관입시간을 줄일 수 있게 되며, 강관본체의 외면에 미들날개들을 마련하여 굴삭날개와 함께 지반을 굴삭하도록 함으로써, 재차 굴삭효율 및 관입시간을 현저히 줄일 수 있게 되는 심도에 따른 다중 회전관입 파일 및 그 제조방법을 제공하는데 그 목적이 있다. The present invention was devised to solve the above-described conventional problems. The purpose of the present invention is to form a bit unit at the lower end of the steel pipe body for excavating the ground, drill the ground with the bit unit, and then drill the ground through the excavating blade. By excavating, excavation efficiency is improved and penetration time can be reduced. By providing middle wings on the outer surface of the steel pipe body and excavating the ground together with the excavation wings, the depth of excavation efficiency and penetration time can be significantly reduced again. The purpose is to provide a multi-rotation penetration pile and its manufacturing method according to.

지반에 관입되는 회전관입 파일의 제조방법으로서, 상기 지반에 관입되도록 중공의 강관본체를 형성시키는 강관본체 형성단계와, 상기 강관본체를 거치장치에 연결하여 고정시키는 강관본체 거치장치 배치단계와, 상기 강관본체의 하단부에 비트유닛들로 이루어진 비트날부를 형성시키는 강관본체 비트유닛 연결단계와, 상기 비트날부가 형성된 강관본체에 상기 비트날부의 상측에 배치되도록 굴삭날개들로 이루어진 굴삭부를 형성하는 강관본체 굴삭부 고정단계와, 상기 강관본체의 외면에 미들날개들을 연결하여 고정시키는 회전관입 파일 형성단계와, 상기 회전관입 파일의 표면을 다듬는 회전관입 파일 표면가공 마감단계로 이루어지며, 상기 거치장치는, 베이스패널과 상기 베이스패널의 상면에 형성되며, 상기 강관본체의 상단부가 연결되어 고정되는 거치부로 이루어지고, 상기 강관본체 거치장치 배치단계에서는 파일모니터링안전안내수단에 의해 현장의 작업상황을 파악하고, 위급상황발생시 위험신호를 송출하도록 파일모니터링안전안내단계가 더 포함되는 것을 특징으로 한다. A method of manufacturing a rotary penetration pile that penetrates the ground, comprising: a steel pipe body forming step of forming a hollow steel pipe body to penetrate the ground; a steel pipe body mounting device arrangement step of connecting and fixing the steel pipe body to a mounting device; A steel pipe body bit unit connecting step of forming a bit blade portion made of bit units at the lower end of the steel pipe body, and forming an excavation portion made of excavating blades to be disposed on the upper side of the bit blade portion on the steel pipe body on which the bit blade portion is formed. It consists of an excavation part fixing step, a rotary penetration pile forming step of connecting and fixing the middle wings to the outer surface of the steel pipe body, and a rotary penetration pile surface processing finishing step of trimming the surface of the rotary penetration pile. The mounting device includes, It is formed on a base panel and an upper surface of the base panel, and consists of a mounting portion to which the upper end of the steel pipe body is connected and fixed. In the stage of arranging the steel pipe body mounting device, the work situation on site is identified by a file monitoring safety guidance means, It is characterized by further including a file monitoring safety guidance step to transmit a danger signal in the event of an emergency.

또한, 상기 거치장치의 거치부는, 상기 베이스패널의 상면에 하단부가 연결되어 고정되는 고정가이드지주와, 상기 고정가이드지주의 외면에 연결되어 고정되는 연결브라켓과, 상기 고정가이드지주에 연결된 상기 연결브라켓에 연결되어 고정되는 승강실린더와, 상기 승강실린더의 승강축에 일단이 연결되어 고정되며, 상기 승강실린더의 구동에 의해 승강되는 승강패널과, 상기 승강패널의 저면에 상단부가 연결되어 고정되며, 상기 승강패널과 함께 승강되고, 상기 강관본체의 상부가 끼움되어 고정되는 고정관부와, 상기 고정관부의 외면에 형성되는 나사공과, 상기 고정관부의 상기 나사공에 체결되며, 상기 고정관부에 끼움된 상기 강관본체를 가압하여 고정시키는 가압볼트로 이루어져, 상기 고정관부에 상기 강관본체의 상단부를 끼운 수 상기 나사공에 상기 가압볼트를 체결하여 상기 고정관부에 끼움된 상기 강관본체를 고정시키게 됨과 아울러 상기 강관본체가 세워진 상태로 배치되도록 하고, 상기 승강실린더의 구동에 의해 상기 승강패널에 고정된 고정관부와 상기 고정관부에 연결된 강관본체가 승강되도록 하는 것을 특징으로 한다. In addition, the mounting portion of the mounting device includes a fixed guide strut whose lower end is connected and fixed to the upper surface of the base panel, a connection bracket connected to and fixed to an outer surface of the fixed guide strut, and the connection bracket connected to the fixed guide strut. A lifting cylinder that is connected to and fixed to, one end of which is connected to and fixed to the lifting shaft of the lifting cylinder, a lifting panel that is lifted and lowered by driving the lifting cylinder, and an upper end that is connected to and fixed to the bottom of the lifting panel, A fixing pipe part that is raised and lowered together with the lifting panel and is fixed by inserting the upper part of the steel pipe body, a screw hole formed on the outer surface of the fixing pipe part, and the screw hole of the fixing pipe part, which is fastened to the screw hole of the fixing pipe part and is inserted into the fixing pipe part. It consists of a pressurizing bolt that pressurizes and fixes the steel pipe main body, and the upper end of the steel pipe main body is inserted into the fixing pipe part. The pressurizing bolt is fastened to the threaded hole to fix the steel pipe main body inserted in the fixing pipe part, and the steel pipe The main body is arranged in an erect state, and the fixing pipe part fixed to the lifting panel and the steel pipe main body connected to the fixing pipe part are raised and lowered by driving the lifting cylinder.

본 발명은 지반에 관입되는 회전관입 파일로서, 중공의 강관본체와, 상기 강관본체의 하단부에 형성되어 지면을 천공하는 비트유닛들로 이루어진 비트날부와, 상기 비트날부의 상측에 배치되도록 상기 강관본체의 외면에 형성되어, 천공된 지면을 굴삭하는 굴삭날개들로 이루어진 굴삭부와, 상기 강관본체의 외면에 연결되어 고정되는 미들날개로 이루어지며, 상기 비트유닛은, 상기 강관본체의 저면에 상단부가 연결되어 고정되며, 상기 비트유닛의 저면에는 천공홈이 더 형성되고, 상기 강관본체에 연결된 상기 비트유닛의 저면에 형성되는 상기 천공홈은 " ∧ " 형상으로 형성되며, 상기 미들날개는, 상기 굴삭부의 상측에 배치되며, 상기 강관본체의 외면에 연결되어 고정되고, 상기 미들날개는 한쌍이 상기 강관본체에 연결되어 고정되는 것을 특징으로 한다. The present invention is a rotary penetration pile that penetrates the ground, comprising a hollow steel pipe main body, a bit blade portion consisting of bit units formed at the lower end of the steel pipe main body and boring the ground, and the steel pipe main body to be disposed on the upper side of the bit blade portion. It is formed on the outer surface of the excavation part, which consists of excavating wings that excavate the perforated ground, and a middle wing that is connected to and fixed to the outer surface of the steel pipe body. The bit unit has an upper end on the bottom surface of the steel pipe body. It is connected and fixed, and a perforated groove is further formed on the bottom of the bit unit. The perforated groove formed on the bottom of the bit unit connected to the steel pipe body is formed in a "∧" shape, and the middle wing is used in the excavation. It is disposed on the upper side of the unit and is connected to and fixed to the outer surface of the steel pipe body, and a pair of middle wings are connected to and fixed to the steel pipe body.

본 발명인 심도에 따른 다중 회전관입 파일 및 그 제조방법은 지반을 굴삭하는 강관본체의 하단부에 비트유닛을 형성하여, 지면을 비트유닛으로 천공후 굴삭날개를 통해 지반을 굴삭하도록 함으로써, 굴삭효율이 향상되고 관입시간을 줄일 수 있게 되며, 강관본체의 외면에 미들날개들을 마련하여 굴삭날개와 함께 지반을 굴삭하도록 함으로써, 재차 굴삭효율 및 관입시간을 현저히 줄일 수 있게 되는 효과가 있다. The present inventor's multi-rotation penetration pile according to depth and its manufacturing method form a bit unit at the lower part of the steel pipe body for excavating the ground, drill the ground with the bit unit and then excavate the ground through the excavating blade, thereby improving excavation efficiency. It is possible to reduce penetration time, and by providing middle wings on the outer surface of the steel pipe body to excavate the ground together with the excavation wings, there is an effect of significantly reducing excavation efficiency and penetration time.

도 1은 본 발명에 따른 심도에 따른 다중 회전관입 파일을 나타낸 정면도이다.
도 2는 본 발명에 따른 심도에 따른 다중 회전관입 파일을 나타낸 저면도이다.
도 3은 본 발명에 따른 심도에 따른 다중 회전관입 파일을 나타낸 측면도이다.
도 4는 본 발명에 따른 심도에 따른 다중 회전관입 파일의 다른 실시예를 나타낸 정면도이다.
도 5는 본 발명에 따른 거치장치를 나타낸 도면이다.
도 6은 본 발명에 따른 거치장치를 나타낸 부분확대 단면도이다.
도 7은 본 발명에 따른 파일모니터링안전안내수단을 나타낸 도면이다.
도 8은 본 발명에 따른 파일모니터링안전안내수단의 다른 실시예를 나타낸 도면이다.
도 9는 본 발명에 따른 파일모니터링안전안내수단을 나타낸 개념도이다.
Figure 1 is a front view showing a multi-rotation penetration pile according to depth according to the present invention.
Figure 2 is a bottom view showing a multi-rotation penetration pile according to depth according to the present invention.
Figure 3 is a side view showing a multi-rotation penetration pile according to depth according to the present invention.
Figure 4 is a front view showing another embodiment of a multi-rotation penetration pile according to depth according to the present invention.
Figure 5 is a diagram showing a mounting device according to the present invention.
Figure 6 is a partially enlarged cross-sectional view showing the mounting device according to the present invention.
Figure 7 is a diagram showing the file monitoring safety guidance means according to the present invention.
Figure 8 is a diagram showing another embodiment of the file monitoring safety guidance means according to the present invention.
Figure 9 is a conceptual diagram showing the file monitoring safety guidance means according to the present invention.

본 발명에 관한 설명은 구조적 내지 기능적 설명을 위한 실시예에 불과하므로, 본 발명의 권리범위는 본문에 설명된 실시예에 의하여 제한되는 것으로 해석되어서는 아니 된다. 즉, 실시예는 다양한 변경이 가능하고 여러 가지 형태를 가질 수 있으므로 본 발명의 권리범위는 기술적 사상을 실현할 수 있는 균등물들을 포함하는 것으로 이해되어야 한다.Since the description of the present invention is only an example for structural or functional explanation, the scope of the present invention should not be construed as limited by the examples described in the text. In other words, since the embodiments can be modified in various ways and can have various forms, the scope of rights of the present invention should be understood to include equivalents that can realize the technical idea.

한편, 본 발명에서 서술되는 용어의 의미는 다음과 같이 이해되어야 할 것이다.Meanwhile, the meaning of the terms described in the present invention should be understood as follows.

"제1", "제2" 등의 용어는 하나의 구성요소를 다른 구성요소로부터 구별하기 위한 것으로, 이들 용어들에 의해 권리범위가 한정되어서는 아니 된다. 예를 들어, 제1 구성요소는 제2 구성요소로 명명될 수 있고, 유사하게 제2구성요소도 제1 구성요소로 명명될 수 있다.Terms such as “first” and “second” are used to distinguish one component from another component, and the scope of rights should not be limited by these terms. For example, a first component may be named a second component, and similarly, the second component may also be named a first component.

어떤 구성요소가 다른 구성요소에 "연결되어"있다고 언급된 때에는, 그 다른 구성요소에 직접적으로 연결될 수 도 있지만, 중간에 다른 구성요소가 존재할 수도 있다고 이해되어야 할 것이다. 반면에, 어떤 구성요소가 다른 구성요소에 "직접 연결되어"있다고 언급된 때에는 중간에 다른 구성요소가 존재하지 않는 것으로 이해되어야 할 것이다. 한편, 구성요소들 간의 관계를 설명하는 다른 표현들, 즉 "~사이에"와 "바로 ~사이에" 또는 "~에 이웃하는"과 "~에 직접 이웃하는" 등도 마찬가지로 해석되어야 한다. When a component is said to be “connected” to another component, it should be understood that it may be directly connected to the other component, but that other components may also exist in between. On the other hand, when a component is referred to as being “directly connected” to another component, it should be understood that there are no other components in between. Meanwhile, other expressions that describe the relationship between components, such as "between" and "immediately between" or "neighboring" and "directly neighboring" should be interpreted similarly.

단수의 표현은 문맥상 명백하게 다르게 뜻하지 않는 한 복수의 표현을 포함하는 것으로 이해되어야 하고, "포함하다"또는 "가지다" 등의 용어는 실시된 특징, 숫자, 단계, 동작, 구성요소, 부분품 또는 이들을 조합한 것이 존재함을 지정하려는 것이며, 하나 또는 그 이상의 다른 특징이나 숫자, 단계, 동작, 구성요소, 부분품 또는 이들을 조합한 것들의 존재 또는 부가 가능성을 미리 배제하지 않는 것으로 이해되어야 한다. Singular expressions should be understood to include plural expressions unless the context clearly indicates otherwise, and terms such as “comprise” or “have” refer to implemented features, numbers, steps, operations, components, parts, or them. It is intended to specify the existence of a combination, and should be understood as not excluding in advance the possibility of the presence or addition of one or more other features, numbers, steps, operations, components, parts, or combinations thereof.

각 단계들에 있어 식별부호(예를 들어, a, b, c 등)는 설명의 편의를 위하여 사용되는 것으로 식별부호는 각 단계들의 순서를 설명하는 것이 아니며, 각 단계들은 문맥상 명백하게 특정 순서를 기재하지 않는 이상 명기된 순서와 다르게 일어날 수 있다. 즉, 각 단계들은 명기된 순서와 동일하게 일어날 수도 있고 실질적으로 동시에 수행될 수도 있으며 반대의 순서대로 수행될 수도 있다. For each step, identification codes (e.g., a, b, c, etc.) are used for convenience of explanation. The identification codes do not explain the order of each step, and each step clearly follows a specific order in context. Unless specified, events may occur differently from the specified order. That is, each step may occur in the same order as specified, may be performed substantially simultaneously, or may be performed in the opposite order.

여기서 사용되는 모든 용어들은 다르게 정의되지 않는 한, 본 발명이 속하는 분야에서 통상의 지식을 가진 자에 의해 일반적으로 이해되는 것과 동일한 의미를 가진다. 일반적으로 사용되는 사전에 정의되어 있는 용어들은 관련 기술의 문맥상 가지는 의미와 일치하는 것으로 해석되어야 하며, 본 발명에서 명백하게 정의하지 않는 한 이상적이거나 과도하게 형식적인 의미를 지니는 것으로 해석될 수 없다. All terms used herein, unless otherwise defined, have the same meaning as commonly understood by a person of ordinary skill in the field to which the present invention pertains. Terms defined in commonly used dictionaries should be interpreted as consistent with the meaning they have in the context of the related technology, and cannot be interpreted as having an ideal or excessively formal meaning unless clearly defined in the present invention.

도 1은 본 발명에 따른 심도에 따른 다중 회전관입 파일을 나타낸 정면도이다. 도 2는 본 발명에 따른 심도에 따른 다중 회전관입 파일을 나타낸 저면도이다. 도 3은 본 발명에 따른 심도에 따른 다중 회전관입 파일을 나타낸 측면도이다. 도 4는 본 발명에 따른 심도에 따른 다중 회전관입 파일의 다른 실시예를 나타낸 정면도이다. 도 5는 본 발명에 따른 거치장치를 나타낸 도면이다. 도 6은 본 발명에 따른 거치장치를 나타낸 부분확대 단면도이다. 도 7은 본 발명에 따른 파일모니터링안전안내수단을 나타낸 도면이다. 도 8은 본 발명에 따른 파일모니터링안전안내수단의 다른 실시예를 나타낸 도면이다. 도 9는 본 발명에 따른 파일모니터링안전안내수단을 나타낸 개념도이다. Figure 1 is a front view showing a multi-rotation penetration pile according to depth according to the present invention. Figure 2 is a bottom view showing a multi-rotation penetration pile according to depth according to the present invention. Figure 3 is a side view showing a multi-rotation penetration pile according to depth according to the present invention. Figure 4 is a front view showing another embodiment of a multi-rotation penetration pile according to depth according to the present invention. Figure 5 is a diagram showing a mounting device according to the present invention. Figure 6 is a partially enlarged cross-sectional view showing the mounting device according to the present invention. Figure 7 is a diagram showing the file monitoring safety guidance means according to the present invention. Figure 8 is a diagram showing another embodiment of the file monitoring safety guidance means according to the present invention. Figure 9 is a conceptual diagram showing the file monitoring safety guidance means according to the present invention.

도면에 도시된 바와 같이 본 발명인 심도에 따른 다중 회전관입 파일의 제조방법(10)(이하에서는 설명의 편의상 회전관입 파일의 제조방법이라 명명함)는 지반의 지지력을 강화하거나 구조물을 지지하기 위해 지반에 관입되는 파일(10)의 제조방법으로서, 이에 이와같은 파일(10)의 제조방법은 강관본체 형성 1단계(S1)와 강관본체 비트유닛 연결 2단계(S2)와 강관본체 굴삭부 고정 3단계(S3)와 강관본체 표면가공 마감 4단계(S4)로 이루어진다.As shown in the drawing, the present inventor's method (10) for manufacturing multiple rotational penetration piles according to depth (hereinafter referred to as the manufacturing method of rotational penetration piles for convenience of explanation) is to strengthen the bearing capacity of the ground or support the structure. As a method of manufacturing the pile 10 that penetrates the It consists of four stages (S3) and surface processing and finishing of the steel pipe body (S4).

상기 강관본체 형성단계(S1)는 상기 지반에 관입되도록 중공의 강관본체(20)를 형성시키는 단계이다.The steel pipe body forming step (S1) is a step of forming a hollow steel pipe body 20 to penetrate the ground.

상기 강관본체 형성단계(S1)에서는 금속재로 이루어진 중공의 강관본체(20)를 형성시키게 되며, 주조를 통해 관형상으로 형성시킬 수 있으며, 패널을 말아 단부를 상호 용접하여 상기 강관본체(20)를 형성시킬 수 있다.In the steel pipe body forming step (S1), a hollow steel pipe body 20 made of a metal material is formed. It can be formed into a tubular shape through casting, and the steel pipe body 20 is formed by rolling the panels and welding the ends to each other. It can be formed.

다르게는, 압출공법에 의해 강관을 형성시키는 것도 가능하다.Alternatively, it is also possible to form a steel pipe by an extrusion method.

상기 강관본체(20)는 굴삭기에 체결되어 상기 굴삭기의 구동에 의해 회전하게 된다.The steel pipe body 20 is fastened to an excavator and rotates by driving the excavator.

여기서, 상기 강관본체(20)의 내면에는 나선의 파쇄홈을 더 형성하여, 지반에 관입되는 과정에서 상기 강관본체의 내부로 내입되는 덩어리 형태의 흙이 상기 파쇄홈에 마찰되어 파쇄되도록 함과 아울러 안내되어, 덩어리 형태의 흙에 의해 강관본체가 막히는 것을 방지하는 것이 바람직하다.Here, a spiral crushing groove is further formed on the inner surface of the steel pipe body 20, so that lump-shaped soil that enters the interior of the steel pipe body during the process of penetrating into the ground is crushed by friction against the crushing groove. It is desirable to prevent the steel pipe body from being blocked by dirt in the form of lumps.

또한, 상기 강관본체(20)의 내면에는 파쇄진동기를 더 나사체결하여 상기 파쇄진동기의 진동이 상기 강관본체의 내부에 내입된 덩어리 형태의 흙에 전달되어 파쇄되도록 함으로써, 강관본체가 막히는 것을 방지하는 것이 바람직하다.In addition, a crushing vibrator is further screwed onto the inner surface of the steel pipe body 20 so that the vibration of the crushing vibrator is transmitted to the lump-shaped soil embedded inside the steel pipe body and crushes it, thereby preventing the steel pipe body from clogging. It is desirable.

또한, 상기 강관본체(20)의 내면에는 파쇄핀의 일단을 더 용접하거나 부착하여 고정시킴으로써, 상기 파쇄핀과 내입된 덩어리 형태의 흙이 마찰되어 파쇄되도록 함과 아울러 상기 파쇄진동기의 진동이 덩어리 형태의 흙에 전달되어 파쇄되도록 하는 것이 바람직하다.In addition, by further fixing one end of the crushing pin to the inner surface of the steel pipe body 20 by welding or attaching it, the crushing pin and the embedded lump-shaped soil are frictioned and crushed, and the vibration of the crushing vibrator causes the lump-shaped soil to be crushed. It is desirable to deliver it to the soil and crush it.

상기 강관본체 거치장치 배치단계(S2)는 상기 강관본체(20)를 거치장치(80)에 연결하여 고정시키는 단계이다.The steel pipe body mounting device arrangement step (S2) is a step of connecting and fixing the steel pipe body 20 to the mounting device 80.

상기 거치장치(80)는, 베이스패널(81)과, 상기 베이스패널(81)의 상면에 형성되며, 상기 강관본체(20)의 상단부가 연결되어 고정되는 거치부(82)로 이루어진다.The mounting device 80 includes a base panel 81 and a mounting portion 82 formed on the upper surface of the base panel 81 and connected to and fixed to the upper end of the steel pipe body 20.

상기 거치부(82)는, 상기 베이스패널(81)의 상면에 하단부가 연결되어 고정되는 고정가이드지주(821)와, 상기 고정가이드지주(821)의 외면에 연결되어 고정되는 연결브라켓(822)과, 상기 고정가이드지주(821)에 연결된 상기 연결브라켓(822)에 연결되어 고정되는 승강실린더(823)와, 상기 승강실린더(823)의 승강축에 일단이 연결되어 고정되며, 상기 승강실린더(823)의 구동에 의해 승강되는 승강패널(824)과, 상기 승강패널(824)의 저면에 상단부가 연결되어 고정되며, 상기 승강패널(824)과 함께 승강되고, 상기 강관본체(20)의 상부가 끼움되어 고정되는 고정관부(825)와, 상기 고정관부(825)의 외면에 형성되는 나사공(825)과, 상기 고정관부(825)의 상기 나사공에 체결되며, 상기 고정관부(825)에 끼움된 상기 강관본체(20)를 가압하여 고정시키는 가압볼트(827)로 이루어져, 상기 고정관부에 상기 강관본체(20)의 상단부를 끼운 수 상기 나사공에 상기 가압볼트를 체결하여 상기 고정관부에 끼움된 상기 강관본체(20)를 고정시키게 됨과 아울러 상기 강관본체(20)가 세워진 상태로 배치되도록 하고, 상기 승강실린더(823)의 구동에 의해 상기 승강패널에 고정된 고정관부와 상기 고정관부에 연결된 강관본체(20)가 승강되도록 한다.The mounting portion 82 includes a fixed guide post 821 whose lower end is connected and fixed to the upper surface of the base panel 81, and a connection bracket 822 connected to and fixed to the outer surface of the fixed guide post 821. And, a lifting cylinder 823 connected to and fixed to the connection bracket 822 connected to the fixed guide support 821, one end of which is connected to and fixed to the lifting shaft of the lifting cylinder 823, and the lifting cylinder (823) A lifting panel 824 that is raised and lowered by the driving of 823) is connected to and fixed to an upper end of the bottom of the lifting panel 824, and is raised and lowered together with the lifting panel 824, and the upper part of the steel pipe body 20 A fixation tube part 825 is fitted and fixed, a screw hole 825 formed on the outer surface of the fixation tube part 825, and is fastened to the screw hole of the fixation tube part 825, and the fixation tube part 825 It consists of a pressurizing bolt 827 that pressurizes and fixes the steel pipe body 20 inserted into the fixing pipe part, and the upper end of the steel pipe main body 20 can be inserted into the fixing pipe part by fastening the pressurizing bolt to the screw hole. In addition to fixing the steel pipe body 20 inserted into the steel pipe body 20, the steel pipe body 20 is arranged in an erect state, and the fixed pipe part and the fixed pipe part fixed to the lifting panel by driving the lifting cylinder 823. The steel pipe body 20 connected to is raised and lowered.

상기 강관본체 비트유닛 연결단계(S3)는 상기 강관본체(20)의 하단부에 비트유닛(30)들로 이루어진 비트날부(30)를 형성시키는 단계이다.The steel pipe body bit unit connecting step (S3) is a step of forming a bit blade portion 30 made of bit units 30 at the lower end of the steel pipe body 20.

상기 강관본체 비트유닛 연결단계(S3)에서는 금속재로 이루어진 비트유닛(31)을 상기 강관본체(20)의 하단부에 용접하여 고정시키게 되며, 도면에서와 같이 상기 비트유닛(30)의 하단부가 외측으로 돌출되게 형성되어, 상기 강관본체(20)의 회전에 의해 지반을 천공하게 된다.In the steel pipe body bit unit connection step (S3), the bit unit 31 made of metal is welded and fixed to the lower end of the steel pipe body 20, and as shown in the drawing, the lower end of the bit unit 30 is turned outward. It is formed to protrude and perforates the ground by rotation of the steel pipe body 20.

이때, 상기 강관본체(20)의 하측 내면에는 작동실린더를 더 나사체결하여 고정하고, 상기 작동실린더의 작동축에 상기 비트유닛(30)을 나사체결하여 고정시키는 것이 바람직하다. At this time, it is preferable to further screw and secure the operating cylinder to the lower inner surface of the steel pipe body 20, and to screw and secure the bit unit 30 to the operating axis of the operating cylinder.

즉, 상기 작동실린더의 구동에 의해 상기 강관본체(20)에서 상기 비트유닛(31)이 돌출되게 이동시켜 지반상태에 따라 돌출되는 길이를 달리할 수 있으며, 지반상황(연약지반 또는 돌,자갈지반 등)에 따라 돌출되는 비트유닛(31)의 길이를 변경하여 천공효율을 높이도록 하는 것이 바람직하다.That is, by driving the operating cylinder, the bit unit 31 is moved to protrude from the steel pipe body 20, so that the protruding length can be varied depending on the ground condition, and the ground condition (soft ground or stone or gravel ground) It is desirable to increase drilling efficiency by changing the length of the protruding bit unit 31.

상기 강관본체 굴삭부 고정단계(S4)는 상기 비트날부가 형성된 강관본체(20)에 상기 비트날부의 상측에 배치되도록 굴삭날개(41)들로 이루어진 굴삭부(40)를 형성하는 단계이다.The step of fixing the excavated part of the steel pipe body (S4) is a step of forming the excavated part 40 made of excavating blades 41 to be disposed on the upper side of the bit blade part in the steel pipe main body 20 on which the bit blade part is formed.

상기 강관본체 굴삭부 고정단계(S4)에서는 상기 굴삭날개(41)를 상기 강관본체(20)의 하부 외면에 용접하여 고정시키게 된다. In the steel pipe body excavation fixing step (S4), the excavation blades 41 are welded and fixed to the lower outer surface of the steel pipe body 20.

상기 굴삭날개(41)는 금속재로 이루어지며 한쌍이 상기 강관본체(20)에 용접 고정된다.The excavation blades 41 are made of metal, and a pair is welded and fixed to the steel pipe body 20.

즉, 상기 비트유닛(30)에 의해 전공된 지반을 상기 굴삭날개(41)로 굴삭하면서 관입하게 된다.That is, the ground drilled by the bit unit 30 is penetrated while excavating with the excavating blade 41.

상기 굴삭날개(41)는 일단에서 타단으로 갈수록 경사지게 형성되며, 곡선진 상기 강관본체(20)의 외면에 용접되어 고정된다. 상기 굴삭날개(41)는 부채꼴 형상으로 형성시키게 된다.The excavation blades 41 are formed to be inclined from one end to the other end, and are welded and fixed to the curved outer surface of the steel pipe body 20. The digging blades 41 are formed in a fan shape.

여기서, 상기 굴삭날개(41)의 상면과 저면에는 마찰돌기들을 일체로 더 형성하여, 지반과 마찰되도록 함으로써, 굴삭효율을 높이도록 하는 것이 바람직하다.Here, it is preferable to further form friction protrusions on the upper and lower surfaces of the excavation blades 41 so as to cause friction with the ground to increase excavation efficiency.

상기 회전관입 파일 형성단계(S5)는 상기 강관본체(20)의 중간부분 외면에 미들날개(50)들을 연결하여 고정시키는 단계이다.The rotary penetration pile forming step (S5) is a step of connecting and fixing the middle wings 50 to the outer surface of the middle portion of the steel pipe body 20.

상기 미들날개(50)들은 상기 굴삭날개(41)의 상측에 배치되어, 상기 굴삭날개(41)에 의해 굴삭된 지반을 재차 굴삭함으로써, 굴삭효율을 향상시킬 수 있게 된다.The middle wings 50 are disposed on the upper side of the excavating blades 41, and re-excavate the ground excavated by the excavating blades 41, thereby improving excavation efficiency.

상기 미들날개(50)들은 서로 마주보도록 상기 강관본체(20)에 형성시키게 된다.The middle wings 50 are formed on the steel pipe body 20 to face each other.

상기 미들날개(50)는 일단에서 타단으로 갈수록 경사지게 형성되며, 곡선진 상기 강관본체의 외면에 용접되어 고정된다. 상기 미들날개(50)는 부채꼴 형상으로 형성시키게 된다.The middle wing 50 is formed to be inclined from one end to the other end, and is welded and fixed to the curved outer surface of the steel pipe body. The middle wing 50 is formed in a fan shape.

상기 강관본체 표면가공 마감단계(S6)는 상기 비트날부 및 상기 굴삭날개(41)들이 형성된 상기 강관본체(20)의 표면을 다듬는 단계이다.The steel pipe body surface processing finishing step (S6) is a step of trimming the surface of the steel pipe body 20 on which the bit blade portion and the excavation blades 41 are formed.

상기 강관본체 표면가공 마감단계(S6)에서는 상기 비트유닛(30)과 상기 굴삭날개(41)를 상기 강관본체(20)에 형성시키는 과정에서 발생되어 상기 강관본체(20)에 달라붙은 이물질이나 용접부산물을 절삭기를 이용하여 강관본체(20)에서 분리시키게 된다.In the steel pipe body surface processing finishing step (S6), foreign substances or welds generated in the process of forming the bit unit 30 and the excavation blade 41 on the steel pipe body 20 and sticking to the steel pipe body 20 are removed. By-products are separated from the steel pipe body 20 using a cutting machine.

상기 강관본체(20)의 외면에 달라붙은 이물질을 제거한 후에는 상기 강관본체(20)를 물세척한 후 건조시키게 된다.After removing foreign substances adhering to the outer surface of the steel pipe body 20, the steel pipe body 20 is washed with water and dried.

상기 강관본체 표면가공 마감단계(S6) 이후에는 상기 강관본체(20)의 외면과 내면에 방수도료를 도포한 후 건조시켜 방수층을 형성시키는 방수층형성단계를 더 추가하여 관입된 상기 강관본체(20)가 부식되는 것을 방지하는 것이 바람직하다.After the steel pipe body surface processing finishing step (S6), a waterproofing layer forming step is further added to form a waterproof layer by applying waterproofing paint to the outer and inner surfaces of the steel pipe body 20 and then drying it to form a waterproofing layer. It is desirable to prevent corrosion.

이때, 상기 강관본체 거치장치 배치단계(S2)에서는 파일모니터링안전안내수단(90)에 의해 현장의 작업상황을 파악하고, 상기 베이스패널(81)에 거치부(82)를 설치하거나 상기 거치장치(80)에 강관본체(20)를 고정시키는 과정 및 강관본체(20)에 비트날부(30)와 굴삭부(40) 및 미들날개(50)를 형성시키는 과정에서 위급상황발생시 위험신호를 송출하도록 파일모니터링안전안내단계(S2-1)가 더 포함된다.At this time, in the steel pipe body mounting device arrangement step (S2), the work situation on site is determined by the file monitoring safety guidance means (90), and the mounting portion (82) is installed on the base panel (81) or the mounting device ( In the process of fixing the steel pipe body 20 to the steel pipe body 20 and forming the bit blade portion 30, the excavation portion 40, and the middle wing 50 in the steel pipe body 20, a file is installed to transmit a danger signal in the event of an emergency. A monitoring safety guidance step (S2-1) is further included.

상기 파일모니터링안전안내수단(90)은, 상기 베이스패널(81)의 상면에 나사체결되어 고정되는 연결고정모듈유닛(91)과, 상기 연결고정모듈유닛(91)의 상면부에 하단부가 연결되어 고정되는 한쌍의 가이드샤프트(92)와, 상기 가이드샤프트(92)에 관통되게 끼움됨과 아울러 상기 가이드샤프트(92)를 따라 안내되는 제1패널이송모듈(931)과 제2패널이송모듈(932)과 제3패널이송모듈(933)로 이루어진 이송모듈부(93)와, 상기 연결고정모듈유닛(91)의 상면에 하단부가 나사체결되어 고정되고, 승강축이 상기 제1패널이송모듈(931)의 저면에 나사체결되어 고정되는 제1승강안내유닛(941)과, 제1패널이송모듈(931)의 상면에 하단부가 나사체결되어 고정되고, 승강축이 상기 제2패널이송모듈(932)의 저면에 나사체결되어 고정되는 제2승강안내유닛(942)과, 상기 제2패널이송모듈(932)의 상면에 하단부가 나사체결되어 고정되고, 승강축이 상기 제3패널이송모듈(933)의 저면에 나사체결되어 고정되는 제3승강안내유닛(943)으로 이루어진 승강안내부(94)와, 상기 제1패널이송모듈(931)의 저면에 나사체결되어 고정되고, 회전축에 제1회전모듈유닛(951-1)이 나사체결된 제1회전안내유닛(951)들과, 제2패널이송모듈(932)의 저면에 나사체결되어 고정되고 회전축에 제2회전모듈유닛(952-1)이 나사체결된 제2회전안내유닛(952)들과, 제3패널이송모듈(933)의 저면에 나사체결되어 고정되고 회전축에 제3회전모듈유닛(953-1)이 나사체결된 제3회전안내유닛(953)들로 이루어진 회전안내부(95)와, 상기 제1회전모듈유닛(951-1)의 저면에 나사체결되어 고정되는 제1상황촬영유닛(961)들과, 상기 제2회전모듈유닛(952-1)의 저면에 나사체결되어 고정되는 제2상황촬영유닛(962)들과, 상기 제3회전모듈유닛(953-1)의 저면에 나사체결되어 고정되는 제3상황촬영유닛(963)들로 이루어진 상황촬영부(96)와, 상기 연결고정모듈유닛(91)에 나사체결되어 고정되며, 상기 승강안내부(94) 및 상기 회전안내부(95)와 전기적으로 연결되어 제어하며, 제1상황촬영유닛(961)들과 제2상황촬영유닛(962)들과 제3상황촬영유닛(963)들의 촬영정보를 전달받는 제어부(97)와, 상기 제3패널이송모듈(933)에 나사체결되어 고정되며, 상기 제어부(97)에서 전달되는 제1상황촬영유닛(961)들과 제2상황촬영유닛(962)들과 제3상황촬영유닛(963)들의 촬영정보를 송신하는 송,수신부(98)와, 상기 제3패널이송모듈(933)에 나사체결되어 고정되며, 상기 제어부(97)의 신호를 전달받아 음성을 안내하거나 알람을 발생시키는 상태안내스피커(99)로 이루어진다.The file monitoring safety guide means 90 includes a connection fixing module unit 91 that is screwed and fixed to the upper surface of the base panel 81, and a lower end connected to the upper surface of the connection fixing module unit 91. A pair of fixed guide shafts 92, and a first panel transfer module 931 and a second panel transfer module 932 that are inserted through the guide shaft 92 and guided along the guide shaft 92. and a transfer module unit 93 consisting of a third panel transfer module 933, the lower end of which is screwed and fixed to the upper surface of the connection fixing module unit 91, and the lifting shaft is connected to the first panel transfer module 931. A first lifting guide unit 941 is screwed and fixed to the bottom of the first panel transfer module 931, and the lower part is screwed and fixed to the upper surface of the first panel transfer module 931, and the lift shaft is of the second panel transfer module 932. A second lifting guide unit 942 is screwed and fixed to the bottom, a lower end is screwed and fixed to the upper surface of the second panel transfer module 932, and the lift shaft is of the third panel transfer module 933. A lifting guide unit 94 consisting of a third lifting guide unit 943 screwed and fixed to the bottom, screwed and fixed to the bottom of the first panel transfer module 931, and a first rotation module unit on the rotation axis. (951-1) is screwed and fixed to the bottom of the first rotation guide units (951) and the second panel transfer module (932), and the second rotation module unit (952-1) is screwed to the rotation axis. The second rotation guide units 952 are fastened to each other, and the third rotation guide unit is screwed and fixed to the bottom of the third panel transfer module 933 and the third rotation module unit 953-1 is screwed to the rotation axis. A rotation guide unit 95 consisting of (953), first situation photography units 961 screwed and fixed to the bottom of the first rotation module unit 951-1, and the second rotation module unit The second situation photography units 962 are screwed and fixed to the bottom of the third rotation module unit 953-1, and the third situation photography unit 963 is screwed and fixed to the bottom of the third rotation module unit 953-1. ) is screwed and fixed to the connection fixing module unit 91, and is electrically connected to and controlled by the lifting guide part 94 and the rotation guide part 95, A control unit 97 that receives shooting information of the first situation photography unit 961, the second situation photography unit 962, and the third situation photography unit 963, and the third panel transfer module 933. A transmission that is screwed and fixed and transmits shooting information of the first situation photography units 961, second situation photography units 962, and third situation photography units 963 transmitted from the control unit 97, It consists of a receiver 98 and a status information speaker 99 that is screwed and fixed to the third panel transfer module 933 and receives a signal from the control unit 97 to guide a voice or generate an alarm.

상기 연결고정모듈유닛(91)은 금속재로 형성된 패널구조로 이루어지며, 지면에 배치된다. The connection fixing module unit 91 is made of a panel structure made of metal and is placed on the ground.

상기 제1패널이송모듈(931)과 상기 제2패널이송모듈(932)과 상기 제3패널이송모듈(933)은 금속재 또는 합성수지재 패널로 형성되며, 상기 가이드샤프트(92)에 관통되게 끼움되도록 이송공이 형성된다. The first panel transfer module 931, the second panel transfer module 932, and the third panel transfer module 933 are formed of metal or synthetic resin panels and are inserted into the guide shaft 92. A transfer hole is formed.

상기 제1승강안내유닛(941)과 상기 제2승강안내유닛(942)과 상기 제3승강안내유닛(943)은 실린더이며, 상기 제1회전안내유닛(951)과 상기 제2회전안내유닛(952)과 제3회전안내유닛(953)은 모터이며, 상기 제1상황촬영유닛(961)들과 상기 제2상황촬영유닛(962)들과 상기 제3상황촬영유닛(963)은 카메라이다. The first lifting guide unit 941, the second lifting guiding unit 942, and the third lifting guiding unit 943 are cylinders, and the first rotating guiding unit 951 and the second rotating guiding unit ( 952) and the third rotation guide unit 953 are motors, and the first situation photography units 961, the second situation photography units 962, and the third situation photography unit 963 are cameras.

또한, 상기 제1회전모듈유닛(951-1)과 상기 제2회전모듈유닛(952-1)과 제3회전모듈유닛(953-1)은 원형 또는 사각의 패널구조로 형성된다. Additionally, the first rotation module unit 951-1, the second rotation module unit 952-1, and the third rotation module unit 953-1 are formed in a circular or square panel structure.

상기 제1상황촬영유닛(961)들과 상기 제2상황촬영유닛(962)들과 상기 제3상황촬영유닛(963)들은 상기 제1승강안내유닛(941)과 상기 제2승강안내유닛(942)과 상기 제3승강안내유닛(943)의 구동에 의해 높이를 변경할 수 있으며, 지면이나 지상의 현장상황이나 위험요소를 촬영할 수 있게 된다. The first situation photography units 961, the second situation photography units 962, and the third situation photography units 963 include the first lifting and lowering guidance unit 941 and the second lifting and lowering guidance unit 942. ) and the driving of the third lifting guide unit 943, the height can be changed, and it is possible to take pictures of field conditions or risk factors on the ground or ground.

상기 제어부(97)는 관리자 단말기를 통해 상기 송,수신부(98)로 수신된 신호를 전달받아 상기 상태안내스피커(99)를 제어하여 음성을 송출시키거나 알람을 발생시키게 된다. The control unit 97 receives the signal received from the transmitter and receiver 98 through the administrator terminal and controls the status guide speaker 99 to transmit a voice or generate an alarm.

즉, 상기 촬영정보를 통해 현상의 위험상황을 인지한 후 상기 상태안내스피커(99)를 통해 위험신호를 송출하여 현장의 안전사고를 방지할 수 있게 된다.In other words, after recognizing the dangerous situation of the phenomenon through the shooting information, it is possible to prevent safety accidents in the field by transmitting a dangerous signal through the status information speaker 99.

또한, 상기 제어부(97)는 관리자 단말기를 통해 상기 송,수신부(98)로 수신된 신호를 전달받아 상기 승강안내부(94) 및 상기 회전안내부(95)의 구동을 제어하여, 상기 제1상황촬영유닛(961)들과 상기 제2상황촬영유닛(962)들과 상기 제3상황촬영유닛(963)의 위치를 변경할 수 있게 된다.In addition, the control unit 97 receives the signal received from the transmitting and receiving unit 98 through the administrator terminal and controls the operation of the lifting guide unit 94 and the rotation guiding unit 95, The positions of the situation photography units 961, the second situation photography units 962, and the third situation photography unit 963 can be changed.

상기 강관본체 형성단계(S1) 이후에는 상기 강관본체(20)의 하측 외면에 하향으로 갈수록 외경이 작아지도록 테이퍼면(21)을 형성시키는 강관본체 테이퍼면 형성단계(S1-1)가 더 추가된다.After the steel pipe body forming step (S1), a steel pipe body tapered surface forming step (S1-1) is added to form a tapered surface 21 on the lower outer surface of the steel pipe main body 20 so that the outer diameter becomes smaller as it goes downward. .

상기 테이퍼면(21)은 원뿔형상으로 형성되어, 지반을 굴삭하는 과정에서 상기 강관본체(20)의 외면이 걸림되거나 마찰되는 것을 줄일 수 있게 됨으로써, 동력손실을 줄이고 굴삭효율을 향상시킬 수 있게 된다.The tapered surface 21 is formed in a cone shape, which reduces the possibility of the outer surface of the steel pipe body 20 being caught or rubbed during the process of excavating the ground, thereby reducing power loss and improving excavation efficiency. .

상기 강관본체 형성단계(S1) 이후에는 상기 강관본체(20)의 길이방향을 따라 외면에 나선의 걸림나선홈(22)을 더 형성하는 강관본체 걸림나선홈 형성단계(S1-2) 가 더 추가된다.After the steel pipe body forming step (S1), a steel pipe body engaging spiral groove forming step (S1-2) is further added to form a spiral engaging spiral groove 22 on the outer surface along the longitudinal direction of the steel pipe body 20. do.

상기 걸림나선홈(22)에 의해 지반을 굴삭하는 과정에서 지반과 마찰 및 걸림되어 굴삭효율을 향상시키게 되고, 굴삭 후 관입된 상태에서 지반이 상기 걸림나선홈(22)에 인입됨으로써, 지지력을 향상시킬 수 있게 된다.In the process of excavating the ground by the locking spiral groove 22, the excavation efficiency is improved by friction and engagement with the ground, and the ground enters the locking spiral groove 22 in a penetrating state after excavation, thereby improving the bearing capacity. You can do it.

상기 회전관입 파일(10)은 중공의 강관본체(20)와, 상기 강관본체(20)의 하단부에 형성되어 지면을 천공하는 비트유닛(31)들로 이루어진 비트날부(30)와, 상기 비트날부(30)의 상측에 배치되도록 상기 강관본체(20)의 외면에 형성되어, 천공된 지면을 굴삭하는 굴삭날개(41)들로 이루어진 굴삭부(40)와, 상기 강관본체의 외면에 연결되어 고정되는 미들날개로 이루어진다.The rotary penetration pile 10 includes a hollow steel pipe body 20, a bit blade portion 30 consisting of bit units 31 formed at the lower end of the steel pipe body 20 and boring the ground, and the bit blade portion. (30) is formed on the outer surface of the steel pipe body 20, and is connected to and fixed to the outer surface of the steel pipe body and consists of excavating blades 41 that excavate the perforated ground. It consists of a middle wing.

상기 비트유닛(31)은, 직사각형의 패널구조로 형성되고 상기 강관본체(20)의 저면에 상단부가 용접되어 고정되며, 상기 비트유닛의 저면에는 천공홈(60)이 더 형성되고,The bit unit 31 is formed in a rectangular panel structure and the upper end is welded and fixed to the bottom of the steel pipe body 20, and a perforated groove 60 is further formed on the bottom of the bit unit,

상기 강관본체(20)에 연결된 상기 비트유닛(31)의 저면에 형성되는 상기 천공홈(60)은 " ∧ " 형상으로 형성되도록 함으로써, 상기 천공홈(60)에 지면 및 지반이 걸림되도록 함과 아울러 상기 천공홈에 의해 도면에서와 같이 상기 비트유닛의 하부에 역직각삼각형 구조로 한쌍의 돌기가 형성되어, 천공 및 굴착효율을 높일 수 있게 된다.The perforated groove 60 formed on the bottom of the bit unit 31 connected to the steel pipe body 20 is formed in a "∧" shape, so that the ground and the ground are caught in the perforated groove 60. In addition, the drilling groove forms a pair of protrusions in an inverted right triangle structure at the bottom of the bit unit as shown in the drawing, thereby improving drilling and excavation efficiency.

상기 미들날개(50)는, 상기 굴삭부(40)의 상측에 배치되며, 상기 강관본체(20)의 외면에 연결되어 고정되고, 상기 미들날개(50)는 한쌍이 상기 강관본체(10)에 연결되어 고정된다.The middle wings 50 are disposed on the upper side of the excavation part 40, are connected to and fixed to the outer surface of the steel pipe body 20, and a pair of the middle wings 50 are attached to the steel pipe body 10. connected and fixed.

지금까지 본 발명에 대해서 상세히 설명하였으나, 그 과정에서 언급한 실시예는 예시적인 것일 뿐이며, 한정적인 것이 아님을 분명히 하고, 본 발명은 이하의 특허청구범위에 의해 제공되는 본 발명의 기술적 사상이나 분야를 벗어나지 않는 범위내에서, 균등하게 대처될 수 있는 정도의 구성요소 변경은 본 발명의 범위에 속한다 할 것이다.Although the present invention has been described in detail so far, it is clear that the embodiments mentioned in the process are only illustrative and not limiting, and that the present invention is limited to the technical idea or field of the present invention provided by the following patent claims. Changes in components to the extent that they can be handled equally, within the scope of the above, will fall within the scope of the present invention.

10 : 회전관입 파일 20 : 강관본체
21 : 테이퍼면 30 : 비트날부
31 : 비트유닛 40 : 굴삭부
41 : 굴삭날개 50 : 미들날개
60 : 천공홈 70 : 걸림나선홈
80 : 거치장치 81 : 베이스패널
82 : 거치부 821 : 고정가이드지주
822 : 연결브라켓 823 : 승강실린더
824 : 승강패널 825 : 고정관부
826 : 나사공 827 : 가압볼트
90 : 파일모니터링안전안내수단 91 : 연결고정모듈유닛
92 : 가이드샤프트 93 : 이송모듈부
931 : 제1패널이송모듈 932 : 제2패널이송모듈
933 : 제3패널이송모듈 94 : 승강안내부
941 : 제1승강안내유닛 942 : 제2승강안내유닛
943 : 제3승강안내유닛 95 : 회전안내부
951 : 제1회전안내유닛 951-1 : 제1회전모듈유닛
952 : 제2회전안내유닛 952-1 : 제2회전모듈유닛
953 : 제3회전안내유닛 953-1 : 제3회전모듈유닛
96 : 상황촬영부 961 : 제1상황촬영유닛
962 : 제2상황촬영유닛 963 : 제3상황촬영유닛
97 : 제어부 98 : 송,수신부
99 : 상태안내스피커 100 : 압입파일
10: Rotating penetration pile 20: Steel pipe body
21: Taper surface 30: Bit blade part
31: bit unit 40: excavation unit
41: Excavation wing 50: Middle wing
60: perforated groove 70: caught spiral groove
80: Holding device 81: Base panel
82: Mounting portion 821: Fixed guide support
822: Connection bracket 823: Elevating cylinder
824: Elevating panel 825: Fixed pipe part
826: Screw hole 827: Pressure bolt
90: File monitoring safety guidance means 91: Connection fixing module unit
92: Guide shaft 93: Transfer module part
931: 1st panel transfer module 932: 2nd panel transfer module
933: Third panel transfer module 94: Elevating guide unit
941: 1st lifting guide unit 942: 2nd lifting guide unit
943: Third lifting guide unit 95: Rotation guide unit
951: 1st rotation guide unit 951-1: 1st rotation module unit
952: 2nd rotation guide unit 952-1: 2nd rotation module unit
953: Third rotation guide unit 953-1: Third rotation module unit
96: situation photography unit 961: first situation photography unit
962: Second situation photography unit 963: Third situation photography unit
97: Control unit 98: Transmitting and receiving unit
99: Status information speaker 100: Press-fit file

Claims (3)

지반에 관입되는 회전관입 파일의 제조방법으로서,
상기 지반에 관입되도록 중공의 강관본체를 형성시키는 강관본체 형성단계;
상기 강관본체를 거치장치에 연결하여 고정시키는 강관본체 거치장치 배치단계;
상기 강관본체의 하단부에 비트유닛들로 이루어진 비트날부를 형성시키는 강관본체 비트유닛 연결단계;
상기 비트날부가 형성된 강관본체에 상기 비트날부의 상측에 배치되도록 굴삭날개들로 이루어진 굴삭부를 형성하는 강관본체 굴삭부 고정단계;
상기 강관본체의 외면에 미들날개들을 연결하여 고정시키는 회전관입 파일 형성단계; 및
상기 회전관입 파일의 표면을 다듬는 회전관입 파일 표면가공 마감단계로 이루어지며,
상기 거치장치는, 베이스패널과
상기 베이스패널의 상면에 형성되며, 상기 강관본체의 상단부가 연결되어 고정되는 거치부로 이루어지고,
상기 강관본체 거치장치 배치단계에서는 파일모니터링안전안내수단에 의해 현장의 작업상황을 파악하고, 위급상황발생시 위험신호를 송출하도록 파일모니터링안전안내단계가 더 포함되는 심도에 따른 다중 회전관입 파일의 제조방법에 있어서,
상기 거치장치의 거치부는,
상기 베이스패널의 상면에 하단부가 연결되어 고정되는 고정가이드지주와,
상기 고정가이드지주의 외면에 연결되어 고정되는 연결브라켓과,
상기 고정가이드지주에 연결된 상기 연결브라켓에 연결되어 고정되는 승강실린더와,
상기 승강실린더의 승강축에 일단이 연결되어 고정되며, 상기 승강실린더의 구동에 의해 승강되는 승강패널과,
상기 승강패널의 저면에 상단부가 연결되어 고정되며, 상기 승강패널과 함께 승강되고, 상기 강관본체의 상부가 끼움되어 고정되는 고정관부와,
상기 고정관부의 외면에 형성되는 나사공과,
상기 고정관부의 상기 나사공에 체결되며, 상기 고정관부에 끼움된 상기 강관본체를 가압하여 고정시키는 가압볼트로 이루어져,
상기 고정관부에 상기 강관본체의 상단부를 끼운 수 상기 나사공에 상기 가압볼트를 체결하여 상기 고정관부에 끼움된 상기 강관본체를 고정시키게 됨과 아울러 상기 강관본체가 세워진 상태로 배치되도록 하고,
상기 승강실린더의 구동에 의해 상기 승강패널에 고정된 고정관부와 상기 고정관부에 연결된 강관본체가 승강되도록 하는 것을 특징으로 하는 심도에 따른 다중 회전관입 파일의 제조방법.
A method of manufacturing a rotational penetration pile that penetrates the ground,
A steel pipe body forming step of forming a hollow steel pipe body to penetrate the ground;
A steel pipe body mounting device arrangement step of connecting and fixing the steel pipe body to the mounting device;
A steel pipe body bit unit connecting step of forming a bit blade portion made of bit units at the lower end of the steel pipe body;
A steel pipe body excavation fixing step of forming an excavation part made of excavation blades to be disposed on an upper side of the bit blade part in the steel pipe main body on which the bit blade part is formed;
A rotary penetration pile forming step of connecting and fixing middle wings to the outer surface of the steel pipe body; and
It consists of a rotational penetration pile surface processing finishing step of refining the surface of the rotational penetration pile,
The mounting device includes a base panel and
It is formed on the upper surface of the base panel and consists of a mounting portion to which the upper end of the steel pipe body is connected and fixed,
In the steel pipe body mounting device arrangement step, the work situation on site is identified by the pile monitoring safety guidance means, and a pile monitoring safety guidance step is further included to transmit a danger signal when an emergency situation occurs. A method of manufacturing a multi-rotation penetration pile according to depth. In
The mounting portion of the mounting device,
A fixed guide support whose lower end is connected to and fixed to the upper surface of the base panel,
A connection bracket connected to and fixed to the outer surface of the fixed guide support,
An elevating cylinder connected to and fixed to the connection bracket connected to the fixed guide support,
an elevating panel, one end of which is connected to and fixed to the elevating shaft of the elevating cylinder, and which is raised and lowered by driving the elevating cylinder;
A fixing pipe part whose upper end is connected to and fixed to the bottom of the lifting panel, is lifted up and down together with the lifting panel, and into which the upper part of the steel pipe body is inserted and fixed;
A screw hole formed on the outer surface of the fixing pipe portion,
It is fastened to the screw hole of the fixing pipe part and consists of a pressurizing bolt that pressurizes and fixes the steel pipe body inserted into the fixing pipe part,
The upper end of the steel pipe body is inserted into the fixing pipe portion, and the pressure bolt is fastened to the screw hole to fix the steel pipe body inserted into the fixing pipe portion, and at the same time, the steel pipe body is placed in an upright position,
A method of manufacturing a multi-rotation penetration pile according to depth, characterized in that the fixed pipe part fixed to the lifting panel and the steel pipe main body connected to the fixed pipe part are lifted up and down by driving the lifting cylinder.
삭제delete 삭제delete
KR1020230061063A 2023-05-11 2023-05-11 Multi-rotation penetration pile according to depth and manufacturing method therefor KR102649072B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020230061063A KR102649072B1 (en) 2023-05-11 2023-05-11 Multi-rotation penetration pile according to depth and manufacturing method therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020230061063A KR102649072B1 (en) 2023-05-11 2023-05-11 Multi-rotation penetration pile according to depth and manufacturing method therefor

Publications (1)

Publication Number Publication Date
KR102649072B1 true KR102649072B1 (en) 2024-03-19

Family

ID=90483069

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020230061063A KR102649072B1 (en) 2023-05-11 2023-05-11 Multi-rotation penetration pile according to depth and manufacturing method therefor

Country Status (1)

Country Link
KR (1) KR102649072B1 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR970058741U (en) * 1996-04-30 1997-11-10 덴버코리아그라우팅주식회사 Underground drilling bits
KR100550359B1 (en) 2003-04-30 2006-02-08 주식회사 제일종합통상 Construction method for reinforcing the ground using steel pipes and prestressed concrete piles
KR20120103824A (en) * 2011-03-11 2012-09-20 김인호 Concrete-filled tube type rotary file
KR20130076070A (en) 2011-12-28 2013-07-08 주식회사 포스코 Steel socket and apparatus connecting steel pile steel column using the same
KR102231581B1 (en) * 2020-08-18 2021-03-24 유민상 Construction method for medium and large rotational penetration pile
KR20210144389A (en) * 2020-05-22 2021-11-30 주식회사 대림 Construction site integrated safety management system and safety management method using the same

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR970058741U (en) * 1996-04-30 1997-11-10 덴버코리아그라우팅주식회사 Underground drilling bits
KR100550359B1 (en) 2003-04-30 2006-02-08 주식회사 제일종합통상 Construction method for reinforcing the ground using steel pipes and prestressed concrete piles
KR20120103824A (en) * 2011-03-11 2012-09-20 김인호 Concrete-filled tube type rotary file
KR20130076070A (en) 2011-12-28 2013-07-08 주식회사 포스코 Steel socket and apparatus connecting steel pile steel column using the same
KR20210144389A (en) * 2020-05-22 2021-11-30 주식회사 대림 Construction site integrated safety management system and safety management method using the same
KR102231581B1 (en) * 2020-08-18 2021-03-24 유민상 Construction method for medium and large rotational penetration pile

Similar Documents

Publication Publication Date Title
US5934836A (en) Ground anchor device
US5919005A (en) Ground anchor device for penetrating an underground rock formation
KR101467142B1 (en) Pressure grouting enabled steel pipe pile and penetration device of the same and pile construction method using the same
US7748932B2 (en) Soil stabilization and anchorage system
KR20210024183A (en) Threaded truss foundation and related systems, methods and machines
CN101173517A (en) Pile-pulling construction method
CN106088064A (en) A kind of hard stratum precrushing three axle cement mixing pile drilling tool and construction method thereof
KR100686697B1 (en) Tension and compressure supporting pile
KR102649072B1 (en) Multi-rotation penetration pile according to depth and manufacturing method therefor
US20070286686A1 (en) Method For Installing A Solidifying Material Pier Anchorage System
KR20200013275A (en) A device that can be separated after entering a PHC pile using a steel pipe
KR101727574B1 (en) Rotary penetration device of hydraulic jack type for circular pipe
JP2007332559A (en) Removal method for existing underground pile
KR101912039B1 (en) Rotary penetration device of hydraulic jack type for circular pipe
KR101042272B1 (en) Boring casings pipe for micro-pile with connector
AU2015349623A1 (en) Construction screw pile
KR101224440B1 (en) Construction method of screw file
JP4943363B2 (en) Steel pipe pile and its construction method
CN117927170B (en) Geological exploration drilling equipment and method for constructional engineering
JP6035355B2 (en) Low strength pipe burial method and excavation head used for it
KR102666633B1 (en) A Rock Drilling Device
CN210152541U (en) Rotary excavating machine pile casing rotating device and rotary excavating machine with same
KR101304877B1 (en) Pile construction structure
KR102668052B1 (en) Medium-large rotary penetration joint connection device and manufacturing method thereof
CN107524412B (en) Rotary digging equipment for building

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant