KR102619855B1 - Construction method for continuous bridge using single supporter - Google Patents
Construction method for continuous bridge using single supporter Download PDFInfo
- Publication number
- KR102619855B1 KR102619855B1 KR1020220038058A KR20220038058A KR102619855B1 KR 102619855 B1 KR102619855 B1 KR 102619855B1 KR 1020220038058 A KR1020220038058 A KR 1020220038058A KR 20220038058 A KR20220038058 A KR 20220038058A KR 102619855 B1 KR102619855 B1 KR 102619855B1
- Authority
- KR
- South Korea
- Prior art keywords
- support
- concrete beam
- installing
- steel frame
- construction method
- Prior art date
Links
- 238000010276 construction Methods 0.000 title claims abstract description 30
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 45
- 239000010959 steel Substances 0.000 claims abstract description 45
- 239000000463 material Substances 0.000 claims abstract description 13
- 238000004519 manufacturing process Methods 0.000 claims abstract description 7
- 238000006243 chemical reaction Methods 0.000 claims description 14
- 238000009415 formwork Methods 0.000 claims description 3
- 230000003014 reinforcing effect Effects 0.000 claims description 3
- 238000010586 diagram Methods 0.000 description 9
- 230000000694 effects Effects 0.000 description 5
- 238000000034 method Methods 0.000 description 4
- 238000003466 welding Methods 0.000 description 4
- 238000004080 punching Methods 0.000 description 3
- 230000006378 damage Effects 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 239000000356 contaminant Substances 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 238000012217 deletion Methods 0.000 description 1
- 230000037430 deletion Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 229920001903 high density polyethylene Polymers 0.000 description 1
- 239000004700 high-density polyethylene Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 238000012552 review Methods 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2/00—Bridges characterised by the cross-section of their bearing spanning structure
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
- E01D2101/28—Concrete reinforced prestressed
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
본 발명은 교량 시공 방법에 관한 것으로, 보다 상세하게는 단일 받침을 이용한 PSC 연속교 시공 방법에 관한 것이다. 본 발명의 일 측면에 따른 단일 받침을 이용한 PSC 연속교 시공 방법은 콘크리트 빔을 제작하는 단계와, 교각에 1개의 영구 받침을 설치하는 단계와, 상기 교각에 임시 받침을 설치하는 단계와, 상기 임시 받침 위에 상기 콘크리트 빔을 거치하는 단계와, 상기 교각 위에 유압 잭을 설치하는 단계와, 상기 유압 잭을 이용해서 높이 방향을 따라 상기 콘크리트 빔을 인양하는 단계와, 상기 임시 받침을 해체하는 단계와, 상기 유압 잭을 이용해서 상기 콘크리트 빔을 상기 영구 받침 위에 안착시키는 단계와, 종 방향을 따라 순차적으로 배치된 상기 콘크리트 빔의 사이에 구비된 클로저 조인트 구간에 강재 프레임을 삽입하는 단계와, 종 방향을 따라 순차적으로 배치된 상기 콘크리트 빔을 연결재로 상호 연결하는 단계와, 상기 연결재로 상기 강재 프레임을 고정하는 단계와, 상기 강재 프레임과 상기 콘크리트 빔을 연결하는 단계와, 상기 콘크리트 빔을 상기 영구 받침에 연결하는 단계, 및 종 방향을 따라 순차적으로 배치된 상기 콘크리트 빔이 상호 일체화되도록 연결하는 단계를 포함한다.The present invention relates to a bridge construction method, and more specifically, to a PSC continuous bridge construction method using a single support. A PSC continuous bridge construction method using a single support according to an aspect of the present invention includes the steps of manufacturing a concrete beam, installing one permanent support on a pier, installing a temporary support on the pier, and the temporary support on the pier. Mounting the concrete beam on a support, installing a hydraulic jack on the pier, lifting the concrete beam along the height direction using the hydraulic jack, dismantling the temporary support, Seating the concrete beam on the permanent support using the hydraulic jack, inserting a steel frame into a closure joint section provided between the concrete beams sequentially arranged along the longitudinal direction, and interconnecting the concrete beams sequentially arranged according to the connecting material, fixing the steel frame with the connecting material, connecting the steel frame and the concrete beam, and attaching the concrete beam to the permanent support. It includes a step of connecting, and a step of connecting the concrete beams sequentially arranged along the longitudinal direction to be integrated with each other.
Description
본 발명은 교량 시공 방법에 관한 것으로, 보다 상세하게는 단일 받침을 이용한 PSC 연속교 시공 방법에 관한 것이다.The present invention relates to a bridge construction method, and more specifically, to a PSC continuous bridge construction method using a single support.
일반적으로 중, 소 지간 교량의 경우 RC나 PC BEAM을 이용한 가설이 대부분인 실정이다. 연속교를 시공할 경우 현재 국내의 대부분 콘크리트 BEAM교의 연속교의 내부 지점의 처리는 콘크리트 거더 양단에 영구 받침을 1개씩 각각 배치하는 방식, 즉, 내부 지점에서 볼 때 교축 방향(종 방향)으로 2개의 영구 받침이 소요되는 방식을 사용하고 있다.In general, in the case of medium and small span bridges, most constructions use RC or PC BEAM. When constructing a continuous bridge, most of the concrete BEAM bridges in Korea currently handle the internal points of the continuous bridge by placing one permanent support on both ends of the concrete girder, that is, two permanent supports in the direction of the bridge axis (longitudinal direction) when viewed from the internal point. A method that requires a permanent support is used.
이와 같이 내부 지점에서 2개의 영구 받침을 근접하여 배치한 후 양측 거더 사이에 콘크리트를 타설해서 연결시키는 현재의 콘크리트 BEAM 가설 방식은 공용 중 영구 받침에 발생하게 되는 부반력을 피할 수 없고, 이와 같은 부반력의 영향으로 인해 필요한 영구 받침의 지지 용량이 교축 방향으로 1개의 영구 받침을 배치하는 경우보다 더 큰 지지 용량을 필요로 하게 되는 불합리성을 가지고 있다.In this way, the current concrete BEAM construction method, which places two permanent supports in close proximity at an internal point and connects them by pouring concrete between both girders, cannot avoid the negative reaction force generated in the permanent supports during public use, and such parts cannot be avoided. Due to the influence of the reaction force, the required support capacity of the permanent support is unreasonable in that it requires a larger support capacity than when one permanent support is placed in the throttling direction.
아울러 이러한 비경제적인 영구 받침의 추가 배치로 인해 내부 지점 교각의 주두부는 교축 방향으로 영구 받침을 2개 설치할 수 있는 공간이 필요하게 되어 교각 단면의 비경제성 또한 초래하고 있는 실정이다.In addition, due to this uneconomical additional arrangement of permanent supports, the head of the inner branch pier requires space to install two permanent supports in the direction of the axis, which also results in uneconomical use of the pier cross section.
따라서 이에 대한 개선이 필요하다.Therefore, improvement is needed in this regard.
본 발명은 상기와 같은 문제점을 해결하기 위한 것으로, 본 발명의 목적은 콘크리트 BEAM교 연속교의 내부 지점에 종 방향으로 1개의 영구 받침만 배치하여 영구 받침의 수량이 1/2로 감소할 뿐만 아니라 영구 받침의 설계 용량에 적정성을 확보할 수 있고, 아울러 연속교 내부 교각 단면의 축소가 가능한 단일 받침을 이용한 PSC 연속교 시공 방법을 제공하는 것이다.The present invention is to solve the above problems, and the purpose of the present invention is to place only one permanent support in the longitudinal direction at the inner point of the concrete BEAM continuous bridge, so that not only the number of permanent supports is reduced by half, but also the permanent support is reduced by half. The purpose is to provide a PSC continuous bridge construction method using a single support that can secure the design capacity of the support and reduce the cross-section of the inner piers of the continuous bridge.
본 발명의 과제들은 이상에서 언급한 과제들로 제한되지 않으며, 언급되지 않은 또 다른 과제들은 아래의 기재로부터 본 발명이 속하는 기술분야의 통상의 기술자에게 명확하게 이해될 수 있을 것이다.The problems of the present invention are not limited to the problems mentioned above, and other problems not mentioned can be clearly understood by those skilled in the art from the description below.
본 발명의 일 측면에 따르면, 콘크리트 빔을 제작하는 단계와, 교각에 1개의 영구 받침을 설치하는 단계와, 상기 교각에 임시 받침을 설치하는 단계와, 상기 임시 받침 위에 상기 콘크리트 빔을 거치하는 단계와, 상기 교각 위에 유압 잭을 설치하는 단계와, 상기 유압 잭을 이용해서 높이 방향을 따라 상기 콘크리트 빔을 인양하는 단계와, 상기 임시 받침을 해체하는 단계와, 상기 유압 잭을 이용해서 상기 콘크리트 빔을 상기 영구 받침 위에 안착시키는 단계와, 종 방향을 따라 순차적으로 배치된 상기 콘크리트 빔의 사이에 구비된 클로저 조인트 구간에 강재 프레임을 삽입하는 단계와, 종 방향을 따라 순차적으로 배치된 상기 콘크리트 빔을 연결재로 상호 연결하는 단계와, 상기 연결재로 상기 강재 프레임을 고정하는 단계와, 상기 강재 프레임과 상기 콘크리트 빔을 연결하는 단계와, 상기 콘크리트 빔을 상기 영구 받침에 연결하는 단계, 및 종 방향을 따라 순차적으로 배치된 상기 콘크리트 빔이 상호 일체화되도록 연결하는 단계를 포함하는 단일 받침을 이용한 PSC 연속교 시공 방법이 제공된다.According to one aspect of the present invention, manufacturing a concrete beam, installing one permanent support on a pier, installing a temporary support on the pier, and mounting the concrete beam on the temporary support. and installing a hydraulic jack on the pier, lifting the concrete beam along the height direction using the hydraulic jack, dismantling the temporary support, and lifting the concrete beam using the hydraulic jack. Seating the steel frame on the permanent support, inserting a steel frame into a closure joint section provided between the concrete beams sequentially arranged along the longitudinal direction, and placing the concrete beams sequentially arranged along the longitudinal direction. interconnecting with connectors, fixing the steel frame with the connector, connecting the steel frame and the concrete beam, connecting the concrete beam to the permanent support, and along the longitudinal direction. A PSC continuous bridge construction method using a single support is provided, including the step of connecting the sequentially arranged concrete beams to be integrated with each other.
이때, 상기 콘크리트 빔을 제작하는 단계는, 상기 콘크리트 빔의 단부에 매립 앵커를 이용해서 매립 플레이트를 설치하는 단계를 포함할 수 있다.At this time, manufacturing the concrete beam may include installing an embedded plate at an end of the concrete beam using an embedded anchor.
이때, 상기 교각에 임시 받침을 설치하는 단계는, 종 방향을 따라 상기 영구 받침의 전방 및 후방에 상기 임시 받침을 각각 설치하는 단계일 수 있다.At this time, the step of installing a temporary support on the pier may be a step of installing the temporary support respectively in front and behind the permanent support along the longitudinal direction.
이때, 상기 교각에 임시 받침을 설치하는 단계는, 상기 임시 받침의 하면에 라이닝을 설치하고, 상기 임시 받침의 상면에 패드를 설치하는 단계를 더 포함할 수 있다.At this time, the step of installing a temporary support on the pier may further include installing a lining on the lower surface of the temporary support and installing a pad on the upper surface of the temporary support.
이때, 상기 클로저 조인트 구간에 강재 프레임을 삽입하는 단계는, 지점 반력으로 인해 생성되는 인장력을 지지하기 위한 제1 지지 프레임과, 지점 반력으로 인해 생성되는 압축력을 지지하기 위한 제2 지지 프레임이 구비된 상기 강재 프레임을 삽입하는 단계일 수 있다.At this time, the step of inserting a steel frame into the closure joint section includes a first support frame for supporting the tensile force generated due to the point reaction force, and a second support frame for supporting the compressive force generated due to the point reaction force. This may be a step of inserting the steel frame.
이때, 상기 제1 지지 프레임은, 제2 솔 플레이트의 상면에 배치되어 횡 방향으로 연장되는 하부 지지 부재와, 상기 하부 지지 부재의 양단에 각각 배치되어 높이 방향으로 연장되는 한 쌍의 측부 지지 부재와, 상기 측부 지지 부재의 상단에 배치되어 횡 방향으로 연장되는 상부 지지 부재를 포함할 수 있다.At this time, the first support frame includes a lower support member disposed on the upper surface of the second sole plate and extending in the transverse direction, and a pair of side support members disposed on both ends of the lower support member and extending in the height direction. , It may include an upper support member disposed at the top of the side support member and extending in the transverse direction.
이때, 상기 제2 지지 프레임은 상기 상부 지지 부재와 상기 하부 지지 부재를 연결하도록 횡 방향으로 대향 배치된 한 쌍의 내부 지지 부재를 포함하되, 상기 내부 지지 부재는 횡 방향을 따라 경사지게 배치될 수 있다.At this time, the second support frame includes a pair of internal support members disposed opposite each other in the transverse direction to connect the upper support member and the lower support member, and the internal support members may be disposed inclined along the transverse direction. .
이때, 상기 강재 프레임은 한 쌍의 상기 측부 지지 부재를 연결하도록 횡 방향으로 배치되는 온도 철근을 더 포함할 수 있다.At this time, the steel frame may further include temperature reinforcing bars disposed in the transverse direction to connect the pair of side support members.
이때, 상기 강재 프레임과 상기 콘크리트 빔을 연결하는 단계는, 상기 콘크리트 빔의 하면에 설치된 제1 솔 플레이트와 상기 강재 프레임의 하면에 설치된 제2 솔 플레이트를 상호 연결하는 단계일 수 있다.At this time, the step of connecting the steel frame and the concrete beam may be a step of interconnecting the first sole plate installed on the lower surface of the concrete beam and the second sole plate installed on the lower surface of the steel frame.
이때, 상기 종 방향을 따라 순차적으로 배치된 상기 콘크리트 빔이 상호 일체화되도록 연결하는 단계는, 상기 클로저 조인트 구간에 거푸집 설치 및 콘크리트를 타설해서 상기 콘크리트 빔이 상호 일체화되도록 연결하는 단계일 수 있다.At this time, the step of connecting the concrete beams sequentially arranged along the longitudinal direction to be integrated with each other may be a step of connecting the concrete beams to be integrated with each other by installing formwork and pouring concrete in the closure joint section.
상기의 구성에 따라, 본 발명의 실시예에 따른 단일 받침을 이용한 PSC 연속교 시공 방법은 영구 받침의 수량이 1/2로 감소함과 동시에 사용되는 영구 받침의 용량이 감소하더라도 안정적인 지지가 가능하게 되며, 아울러 내부 지점 교각의 단면적도 기존 교각에 비해 축소됨에 따라 경제성은 물론 영구 받침의 내구성도 향상된다.According to the above configuration, the PSC continuous bridge construction method using a single support according to the embodiment of the present invention enables stable support even if the number of permanent supports is reduced by 1/2 and the capacity of the permanent supports used is reduced. In addition, as the cross-sectional area of the internal branch piers is reduced compared to existing piers, not only the economic efficiency but also the durability of the permanent supports is improved.
본 발명의 효과는 상기한 효과로 한정되는 것은 아니며, 본 발명의 상세한 설명 또는 청구범위에 기재된 발명의 구성으로부터 추론 가능한 모든 효과를 포함하는 것으로 이해되어야 한다.The effects of the present invention are not limited to the effects described above, and should be understood to include all effects that can be inferred from the configuration of the invention described in the detailed description or claims of the present invention.
도 1은 본 발명의 일 실시예에 따른 단일 받침을 이용한 PSC 연속교 시공 방법을 도시한 순서도이다.
도 2는 본 발명의 일 실시예에 따른 콘크리트 빔의 단면도이다.
도 3은 본 발명의 일 실시예에 따른 콘크리트 빔의 정면도이다.
도 4는 본 발명의 일 실시예에 따른 교각 위에 임시 받침이 설치된 상태를 도시한 도면이다.
도 5는 본 발명의 일 실시예에 따른 콘크리트 빔을 유압 잭으로 인양한 상태를 도시한 도면이다.
도 6은 본 발명의 일 실시예에 따른 콘크리트 빔이 영구 받침 위에 안착된 상태를 도시한 도면이다.
도 7은 본 발명의 일 실시예에 따른 콘크리트 빔 사이에 구비된 클로저 조인트 구간에 강재 프레임을 삽입하고, 콘크리트 빔이 연결재로 연결된 상태를 도시한 도면이다.
도 8은 본 발명의 일 실시예에 따른 강재 프레임의 정면도이다.
도 9는 본 발명의 일 실시예에 따른 콘크리트 빔이 강재 프레임 및 영구 받침에 연결된 상태를 도시한 도면이다.
도 10은 본 발명의 일 실시예에 따른 콘크리트 빔이 상호 일체화되도록 연결된 상태를 도시한 도면이다.Figure 1 is a flowchart showing a PSC continuous bridge construction method using a single support according to an embodiment of the present invention.
Figure 2 is a cross-sectional view of a concrete beam according to an embodiment of the present invention.
Figure 3 is a front view of a concrete beam according to an embodiment of the present invention.
Figure 4 is a diagram showing a state in which a temporary support is installed on a pier according to an embodiment of the present invention.
Figure 5 is a diagram showing a state in which a concrete beam according to an embodiment of the present invention is lifted with a hydraulic jack.
Figure 6 is a diagram showing a state in which a concrete beam according to an embodiment of the present invention is seated on a permanent support.
Figure 7 is a diagram showing a state in which a steel frame is inserted into a closure joint section provided between concrete beams according to an embodiment of the present invention, and the concrete beams are connected with a connector.
Figure 8 is a front view of a steel frame according to an embodiment of the present invention.
Figure 9 is a diagram showing a state in which a concrete beam according to an embodiment of the present invention is connected to a steel frame and a permanent support.
Figure 10 is a diagram showing a state in which concrete beams according to an embodiment of the present invention are connected so as to be integrated with each other.
이하, 첨부한 도면을 참고로 하여 본 발명의 실시예에 대하여 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 상세히 설명한다. 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시예에 한정되지 않는다. 본 발명을 명확하게 설명하기 위해서 도면에서 설명과 관계없는 부분은 생략하였으며, 명세서 전체를 통하여 동일 또는 유사한 구성요소에 대해서는 동일한 참조부호를 붙였다.Hereinafter, with reference to the attached drawings, embodiments of the present invention will be described in detail so that those skilled in the art can easily implement the present invention. The present invention may be implemented in many different forms and is not limited to the embodiments described herein. In order to clearly explain the present invention, parts not related to the description have been omitted in the drawings, and identical or similar components are given the same reference numerals throughout the specification.
본 명세서 및 청구범위에 사용된 단어와 용어는 통상적이거나 사전적인 의미로 한정 해석되지 않고, 자신의 발명을 최선의 방법으로 설명하기 위해 발명자가 용어와 개념을 정의할 수 있는 원칙에 따라 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야 한다.The words and terms used in this specification and claims are not to be construed as limited in their usual or dictionary meanings, but according to the principle that the inventor can define terms and concepts in order to explain his or her invention in the best way. It must be interpreted with meaning and concepts consistent with technical ideas.
도 1은 본 발명의 일 실시예에 따른 단일 받침을 이용한 PSC 연속교 시공 방법을 도시한 순서도이고, 도 2는 본 발명의 일 실시예에 따른 콘크리트 빔의 단면도이고, 도 3은 본 발명의 일 실시예에 따른 콘크리트 빔의 정면도이고, 도 4는 본 발명의 일 실시예에 따른 교각 위에 임시 받침이 설치된 상태를 도시한 도면이고, 도 5는 본 발명의 일 실시예에 따른 콘크리트 빔을 유압 잭으로 인양한 상태를 도시한 도면이고, 도 6은 본 발명의 일 실시예에 따른 콘크리트 빔이 영구 받침 위에 안착된 상태를 도시한 도면이고, 도 7은 본 발명의 일 실시예에 따른 콘크리트 빔 사이에 구비된 클로저 조인트 구간에 강재 프레임을 삽입하고, 콘크리트 빔이 연결재로 연결된 상태를 도시한 도면이고, 도 8은 본 발명의 일 실시예에 따른 강재 프레임의 정면도이고, 도 9는 본 발명의 일 실시예에 따른 콘크리트 빔이 강재 프레임 및 영구 받침에 연결된 상태를 도시한 도면이며, 도 10은 본 발명의 일 실시예에 따른 콘크리트 빔이 상호 일체화되도록 연결된 상태를 도시한 도면이다. 여기서 X 방향은 콘크리트 빔이 배치되는 종 방향(교축 방향)을 의미하고, Y 방향은 횡 방향(교축 직각 방향)을 의미하며, Z 방향은 높이 방향을 의미한다. 본 발명을 명확하게 설명하기 위하여 설명과 관계없는 부분은 도면에서 생략한다.Figure 1 is a flowchart showing a PSC continuous bridge construction method using a single support according to an embodiment of the present invention, Figure 2 is a cross-sectional view of a concrete beam according to an embodiment of the present invention, and Figure 3 is an example of the present invention. It is a front view of a concrete beam according to an embodiment, Figure 4 is a diagram showing a state in which a temporary support is installed on a pier according to an embodiment of the present invention, and Figure 5 is a view showing a concrete beam according to an embodiment of the present invention using a hydraulic jack. It is a drawing showing a state in which it is lifted, and Figure 6 is a drawing showing a state in which a concrete beam according to an embodiment of the present invention is seated on a permanent support, and Figure 7 is a drawing showing a state in which a concrete beam according to an embodiment of the present invention is seated on a permanent support. It is a drawing showing a state in which a steel frame is inserted into the closure joint section provided in and the concrete beam is connected with a connecting material, Figure 8 is a front view of a steel frame according to an embodiment of the present invention, and Figure 9 is an embodiment of the present invention. It is a diagram showing a state in which a concrete beam according to an embodiment is connected to a steel frame and a permanent support, and Figure 10 is a diagram showing a state in which the concrete beams according to an embodiment of the present invention are connected so as to be integrated with each other. Here, the In order to clearly explain the present invention, parts not related to the description are omitted from the drawings.
도 1 내지 도 3에 도시된 바와 같이, 본 발명의 실시예에 따른 단일 받침을 이용한 PSC 연속교 시공 방법은 콘크리트 빔(100)을 제작하는 단계(S1)를 포함한다. 이때, 콘크리트 빔(100)의 하면 중 영구 받침(200)의 상부에 거치되는 부분에는 제1 솔 플레이트(sole plate, 110)를 설치할 수 있다.As shown in Figures 1 to 3, the PSC continuous bridge construction method using a single support according to an embodiment of the present invention includes a step (S1) of manufacturing a
도 4에 도시된 바와 같이, 교각(10)에 1개의 영구 받침(200)을 설치하는 단계(S2)와, 교각(10)에 임시 받침(300)을 설치하는 단계(S3)를 포함할 수 있다.As shown in FIG. 4, it may include a step (S2) of installing one
이러한 임시 받침(300)은 지지해야 할 콘크리트 빔(100)의 형상에 따라 횡 방향 길이가 결정되고, 임시 받침의 재질은 일 예로, 강(鋼) 재질의 임시 받침(300)을 사용할 수 있으나, 가설 중의 콘크리트 빔(100)의 자중 영향을 충분히 지지할 수 있다면 콘크리트나 기타 어느 재질로도 사용할 수 있다. 다른 예로, 임시 받침(300)은 스크류 잭(Screw jack) 등의 구성을 사용할 수도 있다.The lateral length of this
도 5에 도시된 바와 같이, 임시 받침(300) 위에 콘크리트 빔(100)을 거치하는 단계(S4)와, 콘크리트 빔(100)을 영구 받침(200)에 안착시키기 위해 임시 받침(300)을 해체할 목적으로 교각(10) 위에 유압 잭(400)을 설치하는 단계(S5)와, 유압 잭(400)을 이용해서 높이 방향(Z)을 따라 콘크리트 빔(100)을 인양하는 단계(S6)를 포함할 수 있다.As shown in FIG. 5, a step (S4) of mounting the
이러한 유압 잭(400)의 상면에는 지압 플레이트(410)를 설치할 수 있다. 유압 잭(400)의 잭 로드 단면적이 작게 형성될 경우 이러한 유압 잭(400)의 반력으로 인해 콘크리트 빔(100)의 하면이 펀칭 파괴될 우려가 있으며, 사전에 유압 잭(400)에 의한 펀칭 파괴의 안전성 검토를 수행하게 되며, 필요한 경우 잭 로드의 상단에 지압 플레이트(410)를 설치하는 것이다. 물론, 잭 로드 단면적이 충분히 크게 형성되어 펀칭 파괴 우려가 없는 경우에는 유압 잭(400)의 상면에 지압 플레이트(410)를 설치하지 않을 수도 있다. 이때, 유압 잭(400)을 이용해서 콘크리트 빔(100)을 인양하는 높이(△H2)는 대략 5 ~ 10 mm 정도일 수 있다.An acupressure plate 410 can be installed on the upper surface of the hydraulic jack 400. If the cross-sectional area of the jack rod of the hydraulic jack 400 is small, there is a risk that the lower surface of the
도 6에 도시된 바와 같이, 임시 받침(300)을 해체하는 단계(S7)와, 유압 잭(400)을 이용해서 콘크리트 빔(100)을 영구 받침(200) 위에 안착시키는 단계(S8)를 포함할 수 있다.As shown in FIG. 6, it includes a step (S7) of dismantling the
도 7 및 도 8에 도시된 바와 같이, 종 방향(X)을 따라 순차적으로 배치된 콘크리트 빔(100)의 사이에 구비된 클로저 조인트(closure joint) 구간(C)에 강재 프레임(500)을 삽입하는 단계(S9)와, 종 방향(X)을 따라 순차적으로 배치된 콘크리트 빔(100)을 연결재(600)로 상호 연결하는 단계(S10)와, 연결재(600)로 강재 프레임(500)을 고정하는 단계(S11)를 포함할 수 있다.As shown in FIGS. 7 and 8, the
이때, 종 방향(X)을 따라 순차적으로 배치된 콘크리트 빔(100)을 연결재(600)로 상호 연결하는 것은 콘크리트 빔(100)의 단부에 각각 구비된 매립 플레이트(130)를 종 방향(X)을 따라 배치되는 연결재(600)로 연결하는 것으로, 용접(W) 등의 방식을 사용할 수 있다.At this time, the
또한, 연결재(600)로 강재 프레임(500)을 고정하는 것은 삽입된 강재 프레임(500)이 정위치에 고정되어 클로저 조인트 구간(C)에 콘크리트를 타설하는 등의 영향에 의해 변위나 변형이 발생하지 않도록 종 방향(X) 연결재(600)와 강재 프레임(500)을 용접(W) 또는 결속 등의 방법으로 고정시켜서 강재 프레임(500)을 세팅하는 것을 의미한다.In addition, fixing the
도 9에 도시된 바와 같이, 강재 프레임(500)과 콘크리트 빔(100)을 연결하는 단계(S12)와, 콘크리트 빔(100)을 영구 받침(200)에 연결하는 단계(S13)를 포함할 수 있다.As shown in Figure 9, it may include a step (S12) of connecting the
이때, 콘크리트 빔(100)을 영구 받침(200)에 연결하는 것은 콘크리트 빔(100)의 하면에 설치된 제1 솔 플레이트(110)를 영구 받침(200)에 용접(W) 고정하는 것을 의미한다.At this time, connecting the
도 10에 도시된 바와 같이, 종 방향(X)을 따라 순차적으로 배치된 콘크리트 빔(100)이 상호 일체화되도록 연결하는 단계(S14)를 포함할 수 있다.As shown in Figure 10, it may include a step (S14) of connecting the
이와 같이 1개의 영구 받침(200)을 이용해서 상호 인접 배치된 콘크리트 빔(100)의 단부를 모두 지지하도록 구성하면 영구 받침(200)의 수량이 1/2로 감소함과 동시에 기존의 종 방향(X) 2열 영구 받침 배치 방식과 비교해 볼 때 공용 중 발생하는 부반력의 영향을 고려하지 않게 되어 사용되는 영구 받침(200)의 용량(Capacity)을 감소시키면서도 안정적인 지지가 가능하게 되며, 아울러 내부 지점 교각(10)의 단면적도 기존 교각에 비해 축소됨에 따라 경제성은 물론 영구 받침(200)의 내구성도 향상될 수 있다.In this way, if one
또한, 도 3에 도시된 바와 같이, 콘크리트 빔(100)을 제작하는 단계(S1)는 콘크리트 빔(100)의 단부에 매립 앵커(120)를 이용해서 매립 플레이트(130)를 설치하는 단계를 포함할 수 있다.In addition, as shown in FIG. 3, the step (S1) of manufacturing the
이때, 콘크리트 빔(100)의 단부에 매립 앵커(120)를 이용해서 매립 플레이트(130)를 설치하는 경우 매립 앵커(120) 및 매립 플레이트(130)가 프리 스트레스 인장 정착구 등과 간섭이 발생하지 않는 위치에 설치되도록 구성하는 것이 바람직하다.At this time, when installing the embedded
아울러 도 4에 도시된 바와 같이, 교각(10)에 임시 받침(300)을 설치하는 단계(S3)는 종 방향(X)을 따라 영구 받침(200)의 전방 및 후방에 임시 받침(300)을 각각 설치하는 단계일 수 있다.In addition, as shown in FIG. 4, the step (S3) of installing the
이때, 임시 받침(300)의 상단이 영구 받침(200)의 상단보다 높이 방향(Z)을 따라 대략 5 ~ 10 mm의 높이(△H1) 만큼 더 높게 배치되도록 임시 받침(300)을 설치하는 단계일 수 있다. 또한, 임시 받침(300)의 가설 중 안전성 확보를 위해 필요하다고 판단되는 경우에는 임시 받침(300)과 교각(10) 주두부 사이를 별도의 임시 앵커(330)로 고정하여 임시 받침(300)의 가설 중 안전성을 향상시킬 수 있다.At this time, installing the
이러한 교각(10)에 임시 받침(300)을 설치하는 단계(S3)는 임시 받침(300)의 하면에 라이닝(310)을 설치하고, 임시 받침(300)의 상면에 패드(320)를 설치하는 단계를 더 포함할 수 있다.The step (S3) of installing the
이때, 라이닝(310)은 임시 받침(300)의 평탄한 레벨 확보를 위해 교각(10) 두부의 평탄화를 위해 설치되는 것으로, 무수축 몰탈, 드라이 팩(dry pack) 처리 등 임시 받침(300)을 해체하기 전까지 작용하는 하중에 대한 저항성과 평탄성을 유지할 수 있는 재료를 이용해서 시공하는 것을 의미한다.At this time, the lining 310 is installed to flatten the head of the
또한, 패드(320)는 임시 받침(300)의 상단에 설치되는 것으로, 임시 받침(300)으로 인해 유발되는 오염 요인(일 예로, 녹물 등)이 직접 콘크리트 빔(100)에 영향을 주지 못하게 함과 동시에 시공 과정 중 발생할 수 있는 충격이나 진동 등의 영향으로 인해 임시 받침(300)이나 콘크리트 빔(100)이 손상되는 것을 방지하는 것으로, 압축성이 있는 고경도 고무판이나 고밀도 폴리에틸렌 재질의 패드를 사용할 수 있다.In addition, the
한편, 도 7 및 도 8에 도시된 바와 같이, 클로저 조인트 구간(C)에 강재 프레임(500)을 삽입하는 단계(S9)는 지점 반력으로 인해 생성되는 인장력을 지지하기 위한 제1 지지 프레임(510)과, 지점 반력으로 인해 생성되는 압축력을 지지하기 위한 제2 지지 프레임(520)이 구비된 강재 프레임(500)을 삽입하는 단계일 수 있다. 일 예로, 강재 프레임(500)은 클로저 조인트 구간(C) 내에 작용하는 지점 반력에 대해 스트럿-타이 모델을 통해 저항하도록 구성될 수 있다. 이러한 지점 반력은 강재 프레임(500)에 구비된 제2 솔 플레이트(530)를 통해 전달될 수 있다.Meanwhile, as shown in FIGS. 7 and 8, the step (S9) of inserting the
이때, 도 8에 도시된 바와 같이, 제1 지지 프레임(510)은 제2 솔 플레이트(530)의 상면에 배치되어 횡 방향(Y)으로 연장되는 하부 지지 부재(511)와, 하부 지지 부재(511)의 양단에 각각 배치되어 높이 방향(Z)으로 연장되는 한 쌍의 측부 지지 부재(512)와, 측부 지지 부재(512)의 상단에 배치되어 횡 방향(Y)으로 연장되는 상부 지지 부재(513)를 포함할 수 있으며, 이를 통해 지점 반력으로 인해 생성되는 인장력을 지지할 수 있게 된다.At this time, as shown in FIG. 8, the
또한, 제2 지지 프레임(520)은 상부 지지 부재(513)와 하부 지지 부재(511)를 연결하도록 횡 방향(Y)으로 대향 배치된 한 쌍의 내부 지지 부재(521)를 포함하되, 이러한 내부 지지 부재(521)는 횡 방향(Y)을 따라 경사지게 배치됨으로써 지점 반력으로 인해 생성되는 압축력을 지지할 수 있게 된다.In addition, the
일 예로, 하부 지지 부재(511), 측부 지지 부재(512), 상부 지지 부재(513) 및 내부 지지 부재(521) 중 적어도 어느 하나는 ’ㄱ’자 형강으로 사용할 수 있다. 이와 같이 구성하면 지점 반력에 의해 클로저 조인트 구간(C)의 콘크리트 부분에 발생하는 인장력과 압축력에 대해 효과적으로 지지할 수 있게 된다.For example, at least one of the
아울러 강재 프레임(500)은 한 쌍의 측부 지지 부재(512)를 연결하도록 횡 방향(Y)으로 배치되는 온도 철근(514)을 더 포함할 수 있다. 일 예로, 온도 철근(514)은 도로교 설계기준에 따라 배근되되, 강재 프레임(500)에 부착 설치될 수 있으며, 이를 통해 온도에 의한 균열을 방지할 수 있다.In addition, the
도 9에 도시된 바와 같이, 강재 프레임(500)과 콘크리트 빔(100)을 연결하는 단계(S12)는 콘크리트 빔(100)의 하면에 설치된 제1 솔 플레이트(110)와 강재 프레임(500)의 하면에 설치된 제2 솔 플레이트(530)를 상호 연결하는 단계일 수 있다. 이러한 제1 솔 플레이트(110)와 제2 솔 플레이트(530)는 용접(W) 방식으로 연결될 수 있다.As shown in Figure 9, the step (S12) of connecting the
또한, 도 10에 도시된 바와 같이, 종 방향(X)을 따라 순차적으로 배치된 콘크리트 빔(100)이 상호 일체화되도록 연결하는 단계(S14)는 클로저 조인트 구간(C)에 거푸집 설치 및 콘크리트를 타설해서 종 방향(X)을 따라 배치된 2개의 콘크리트 빔(100)이 상호 일체화되도록 연결하는 단계일 수 있다.In addition, as shown in FIG. 10, the step (S14) of connecting the
앞서 살펴본 바와 같이, 본 발명의 실시예에 따른 단일 받침을 이용한 PSC 연속교 시공 방법은 1개의 영구 받침(200)을 이용해서 상호 인접 배치된 콘크리트 빔(100)의 단부를 모두 지지하도록 구성하면 영구 받침(200)의 수량이 1/2로 감소함과 동시에 기존의 종 방향(X) 2열 영구 받침 배치 방식과 비교해 볼 때 공용 중 발생하는 부반력의 영향을 고려하지 않게 되어 사용되는 영구 받침(200)의 용량을 감소시키면서도 안정적인 지지가 가능하게 되며, 아울러 내부 지점 교각(10)의 단면적도 기존 교각에 비해 축소됨에 따라 경제성은 물론 영구 받침(200)의 내구성도 향상될 수 있다.As seen above, the PSC continuous bridge construction method using a single support according to an embodiment of the present invention is configured to support all the ends of the
이상에서 본 발명의 일 실시예에 대하여 설명하였으나, 본 발명의 사상은 본 명세서에 제시되는 실시예에 의해 제한되지 아니하며, 본 발명의 사상을 이해하는 당업자는 동일한 사상의 범위 내에서, 구성요소의 부가, 변경, 삭제, 추가 등에 의해서 다른 실시예를 용이하게 제안할 수 있을 것이나, 이 또한 본 발명의 사상범위 내에 든다고 할 것이다.Although an embodiment of the present invention has been described above, the spirit of the present invention is not limited to the embodiments presented in the present specification, and those skilled in the art who understand the spirit of the present invention will understand the spirit of the present invention within the scope of the same spirit. Other embodiments can be easily proposed by addition, change, deletion, addition, etc., but this will also be said to fall within the scope of the present invention.
10 : 교각 100 : 콘크리트 빔
110 : 제1 솔 플레이트 120 : 매립 앵커
130 : 매립 플레이트 200 : 영구 받침
300 : 임시 받침 310 : 라이닝
320 : 패드 330 : 임시 앵커
400 : 유압 잭 410 : 지압 플레이트
500 : 강재 프레임 510 : 제1 지지 프레임
511 : 하부 지지 부재 512 : 측부 지지 부재
513 : 상부 지지 부재 514 : 온도 철근
520 : 제2 지지 프레임 521 : 내부 지지 부재
530 : 제2 솔 플레이트 600 : 연결재
C : 클로저 조인트 구간 W : 용접
X : 종 방향 Y : 횡 방향
Z : 높이 방향10: pier 100: concrete beam
110: first sole plate 120: embedded anchor
130: embedded plate 200: permanent support
300: Temporary support 310: Lining
320: Pad 330: Temporary anchor
400: Hydraulic jack 410: Acupressure plate
500: steel frame 510: first support frame
511: lower support member 512: side support member
513: upper support member 514: temperature rebar
520: second support frame 521: internal support member
530: Second sole plate 600: Connecting material
C: Closure joint section W: Welding
X: Longitudinal Y: Transverse
Z: height direction
Claims (10)
교각에 1개의 영구 받침을 설치하는 단계;
상기 교각에 임시 받침을 설치하는 단계;
상기 임시 받침 위에 상기 콘크리트 빔을 거치하는 단계;
상기 교각 위에 유압 잭을 설치하는 단계;
상기 유압 잭을 이용해서 높이 방향을 따라 상기 콘크리트 빔을 인양하는 단계;
상기 임시 받침을 해체하는 단계;
상기 유압 잭을 이용해서 상기 콘크리트 빔을 상기 영구 받침 위에 안착시키는 단계;
종 방향을 따라 순차적으로 배치된 상기 콘크리트 빔의 사이에 구비된 클로저 조인트 구간에 강재 프레임을 삽입하는 단계;
종 방향을 따라 순차적으로 배치된 상기 콘크리트 빔을 연결재로 상호 연결하는 단계;
상기 연결재로 상기 강재 프레임을 고정하는 단계;
상기 강재 프레임과 상기 콘크리트 빔을 연결하는 단계;
상기 콘크리트 빔을 상기 영구 받침에 연결하는 단계; 및
종 방향을 따라 순차적으로 배치된 상기 콘크리트 빔이 상호 일체화되도록 연결하는 단계;
를 포함하고,
상기 클로저 조인트 구간에 강재 프레임을 삽입하는 단계는,
지점 반력으로 인해 생성되는 인장력을 지지하기 위한 제1 지지 프레임과, 지점 반력으로 인해 생성되는 압축력을 지지하기 위한 제2 지지 프레임이 구비된 상기 강재 프레임을 삽입하는 단계인 단일 받침을 이용한 PSC 연속교 시공 방법.Manufacturing a concrete beam;
Installing one permanent abutment on the pier;
Installing a temporary support on the pier;
Mounting the concrete beam on the temporary support;
installing a hydraulic jack on the pier;
Lifting the concrete beam along the height direction using the hydraulic jack;
dismantling the temporary support;
seating the concrete beam on the permanent support using the hydraulic jack;
Inserting a steel frame into a closure joint section provided between the concrete beams sequentially arranged along the longitudinal direction;
Interconnecting the concrete beams sequentially arranged along the longitudinal direction with a connecting material;
Fixing the steel frame with the connecting material;
Connecting the steel frame and the concrete beam;
connecting the concrete beam to the permanent support; and
Connecting the concrete beams sequentially arranged along the longitudinal direction to be integrated with each other;
Including,
The step of inserting a steel frame into the closure joint section,
PSC continuous bridge using a single support, which is a step of inserting the steel frame provided with a first support frame to support the tensile force generated due to the point reaction force and a second support frame to support the compressive force generated due to the point reaction force. Construction method.
상기 콘크리트 빔을 제작하는 단계는,
상기 콘크리트 빔의 단부에 매립 앵커를 이용해서 매립 플레이트를 설치하는 단계를 포함하는 단일 받침을 이용한 PSC 연속교 시공 방법.According to paragraph 1,
The step of manufacturing the concrete beam is,
A PSC continuous bridge construction method using a single support, including the step of installing an embedded plate at the end of the concrete beam using an embedded anchor.
상기 교각에 임시 받침을 설치하는 단계는,
종 방향을 따라 상기 영구 받침의 전방 및 후방에 상기 임시 받침을 각각 설치하는 단계인 단일 받침을 이용한 PSC 연속교 시공 방법.According to paragraph 1,
The step of installing a temporary support on the pier is,
A PSC continuous bridge construction method using a single support, which is the step of installing the temporary support respectively in front and rear of the permanent support along the longitudinal direction.
상기 교각에 임시 받침을 설치하는 단계는,
상기 임시 받침의 하면에 라이닝을 설치하고, 상기 임시 받침의 상면에 패드를 설치하는 단계를 더 포함하는 단일 받침을 이용한 PSC 연속교 시공 방법.According to paragraph 3,
The step of installing a temporary support on the pier is,
A PSC continuous bridge construction method using a single support further comprising installing a lining on the lower surface of the temporary support and installing a pad on the upper surface of the temporary support.
상기 제1 지지 프레임은, 제2 솔 플레이트의 상면에 배치되어 횡 방향으로 연장되는 하부 지지 부재와, 상기 하부 지지 부재의 양단에 각각 배치되어 높이 방향으로 연장되는 한 쌍의 측부 지지 부재와, 상기 측부 지지 부재의 상단에 배치되어 횡 방향으로 연장되는 상부 지지 부재를 포함하는 단일 받침을 이용한 PSC 연속교 시공 방법.According to paragraph 1,
The first support frame includes a lower support member disposed on the upper surface of the second sole plate and extending in the transverse direction, a pair of side support members disposed at both ends of the lower support member and extending in the height direction, and A PSC continuous bridge construction method using a single support including an upper support member disposed on top of the side support member and extending in the transverse direction.
상기 제2 지지 프레임은 상기 상부 지지 부재와 상기 하부 지지 부재를 연결하도록 횡 방향으로 대향 배치된 한 쌍의 내부 지지 부재를 포함하되,
상기 내부 지지 부재는 횡 방향을 따라 경사지게 배치되는 단일 받침을 이용한 PSC 연속교 시공 방법.According to clause 6,
The second support frame includes a pair of internal support members disposed opposite each other in the transverse direction to connect the upper support member and the lower support member,
A PSC continuous bridge construction method using a single support in which the internal support member is disposed inclined along the transverse direction.
상기 강재 프레임은 한 쌍의 상기 측부 지지 부재를 연결하도록 횡 방향으로 배치되는 온도 철근을 더 포함하는 단일 받침을 이용한 PSC 연속교 시공 방법.In clause 7,
The steel frame is a PSC continuous bridge construction method using a single support, wherein the steel frame further includes temperature reinforcing bars disposed in the transverse direction to connect the pair of side support members.
상기 강재 프레임과 상기 콘크리트 빔을 연결하는 단계는,
상기 콘크리트 빔의 하면에 설치된 제1 솔 플레이트와 상기 강재 프레임의 하면에 설치된 제2 솔 플레이트를 상호 연결하는 단계인 단일 받침을 이용한 PSC 연속교 시공 방법.According to paragraph 1,
The step of connecting the steel frame and the concrete beam is,
A PSC continuous bridge construction method using a single support, which is a step of interconnecting the first sole plate installed on the lower surface of the concrete beam and the second sole plate installed on the lower surface of the steel frame.
상기 종 방향을 따라 순차적으로 배치된 상기 콘크리트 빔이 상호 일체화되도록 연결하는 단계는,
상기 클로저 조인트 구간에 거푸집 설치 및 콘크리트를 타설해서 상기 콘크리트 빔이 상호 일체화되도록 연결하는 단계인 단일 받침을 이용한 PSC 연속교 시공 방법.According to paragraph 1,
The step of connecting the concrete beams sequentially arranged along the longitudinal direction to be integrated with each other,
A PSC continuous bridge construction method using a single support, which is the step of installing formwork and pouring concrete in the closure joint section to connect the concrete beams so that they are integrated with each other.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020220038058A KR102619855B1 (en) | 2022-03-28 | 2022-03-28 | Construction method for continuous bridge using single supporter |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020220038058A KR102619855B1 (en) | 2022-03-28 | 2022-03-28 | Construction method for continuous bridge using single supporter |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20230139568A KR20230139568A (en) | 2023-10-05 |
KR102619855B1 true KR102619855B1 (en) | 2023-12-29 |
Family
ID=88294531
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020220038058A KR102619855B1 (en) | 2022-03-28 | 2022-03-28 | Construction method for continuous bridge using single supporter |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR102619855B1 (en) |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101958862B1 (en) * | 2017-09-18 | 2019-03-15 | 쌍용건설 주식회사 | Continuous concrete girder and bridge structure using the same |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100621539B1 (en) * | 2003-12-23 | 2006-09-13 | 동양종합건업 주식회사 | Method for connecting continuously P.S.C-Ibeam by steel bracket and its structure |
KR20180063530A (en) * | 2016-12-02 | 2018-06-12 | 롯데건설 주식회사 | The launching method of bridge slab using temporary bearing |
-
2022
- 2022-03-28 KR KR1020220038058A patent/KR102619855B1/en active IP Right Grant
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101958862B1 (en) * | 2017-09-18 | 2019-03-15 | 쌍용건설 주식회사 | Continuous concrete girder and bridge structure using the same |
Also Published As
Publication number | Publication date |
---|---|
KR20230139568A (en) | 2023-10-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100837608B1 (en) | J.K Bracket Method | |
KR101237000B1 (en) | Precast concrete panel construction technique | |
KR20090001261A (en) | Prestressed concrete girder bridge having connecting structure using steel bar, and constructing method thereof | |
JP4002771B2 (en) | Continuous girder structure of existing simple girder bridges | |
JP3728391B2 (en) | Continuous girder bridge structure | |
KR101133420B1 (en) | Precast concrete connection block and the continuity method of composite bridges using it | |
KR20090027052A (en) | Precast concrete panel, construction method and structure of precast concrete panel using steel plate | |
KR102619855B1 (en) | Construction method for continuous bridge using single supporter | |
US5553439A (en) | Composite, prestressed structural members and methods of forming same | |
KR100592196B1 (en) | large number bracket in which supporter was installed is used and it is a bridge, multiplex point installed so that support might be carried out support bracket and its installation method | |
KR100565384B1 (en) | Structure of continuous PSC beam with connection member and steel cross beam and bridge construction method using the same | |
KR102490192B1 (en) | Bridge upper structure and the method constructing bridge upper structure using the same | |
KR102132338B1 (en) | Steel Composite PSC Girder Including Arched Reinforcement | |
KR100474640B1 (en) | Method for protecting the loss of prestress in prestressed beam by temporary load | |
JP3581691B2 (en) | Mounting method and mounting structure of horizontal force damper for structure | |
JP6586305B2 (en) | Replacement method for existing bridges | |
KR102575432B1 (en) | Construction Method of Ramen Bridge Using Partial Rigid Composite Box Girder | |
KR102679158B1 (en) | Improved slope bridge structure | |
KR100588350B1 (en) | Bridge slab construction method for the median strip side end of the slab and upper part bracket applied therein | |
KR102641740B1 (en) | Bridge using precast concrete and construction method thereof | |
KR100465350B1 (en) | Bridge construction method using prestressed concrete composite beam with extended distance of eccentricity | |
JPH08170429A (en) | Method for constructing arch concrete | |
KR101319473B1 (en) | bearing plate for resisting bearing stress and negative moment | |
JP6621161B1 (en) | Prestress introduction method for seismic isolation device replacement | |
CN212714460U (en) | Bridge assembly |